HomeMy WebLinkAboutRES 25-34 ,L ..
A�
(� OFFICIAL RECORDS OF
�"`PINAL COUNTY RECORDER
\ .. Dana Lewis
DATE/TIME: 12/03/2025 1514
For tax Purposes: FEE: $15.00
EXEMPT PER PAGES: 14
FEE NUMBER: 2025-097422
A.R.S. § 11-1134.A.3
When recorded, mail to:
City of Apache Junction
Public Works Department
575 E. Baseline Ave.
Apache Junction, AZ 85119
INTENTION TO FORM
STREETLIGHT IMPROVEMENT DISTRICT
NO. 2025-SV-BR-3
RESOLUTION 25-34
RESOLUTION NO. 25-34
A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY
OF APACHE JUNCTION, ARIZONA, ACCEPTING A PETITION,
WAIVER AND CONSENT, AND THE INTENTION TO FORM A MUNICIPAL
STREET LIGHTING IMPROVEMENT DISTRICT IN THE CITY OF
APACHE JUNCTION TO BE DESIGNATED AS "CITY OF APACHE
JUNCTION STREET LIGHTING IMPROVEMENT DISTRICT NO. 2025-
SV-BR-3"; DECLARING FUNDING TO CONTRACT FOR THE PURCHASE
OF ENERGY FOR THE STREET LIGHTS BE BY ANNUAL LEVY OF
TAXES OR ASSESSMENTS EQUALLY APPORTIONED UPON ALL OF THE
PROPERTY OWNERS OF THE DISTRICT; AND PROVIDING THE
LIGHTING OF PUBLIC STREETS AND PARKS WITHIN AND ADJACENT
TO STREETS IN THE PROPOSED DISTRICT.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL
OF THE CITY OF APACHE JUNCTION ARIZONA, AS FOLLOWS:
1 . Acceptance and Findings . A petition (the "Petition") for
the formation of the City of Apache Junction Street Lighting
Improvement District No. 2025-SV-BR-3 (the `SLID" or the
"District") (see Map of District Boundaries, respectively Exhibit
A) to purchase, and not generate, energy for street or public park
lighting within the District and adjacent streets, has been filed
with the city clerk and presented to the mayor and city council at
the meeting at which this resolution was adopted. The Petition
purports to be signed by all of the real property owners in the
proposed District, exclusive of mortgagees and other lienholders .
After verification of such ownership, the mayor and city council
find pursuant to Arizona Revised Statutes ("A.R. S .") § 48-615 (A)
that the Petition was signed by all of the real property owners in
the proposed District, exclusive of mortgagees and other
lienholders .
2 . Declaration of Intention to Order Formation of the
District . The public interest and convenience require and it is
the intention of the mayor and city council to order the work
through formation of the District pursuant to A.R. S . Title 48,
Chapter 4, Article 2 . The District' s sole purpose shall be the
purchase, not generation, of energy to operate the street lighting
system as it now exists or is hereafter enlarged. The phrase
"street lighting system" shall mean all publicly owned street and
traffic lights and all wire, apparatus and other facilities now in
place or hereafter constructed or acquired for the lighting of
public streets and parks within the District and on adjacent
streets . For purposes of this resolution and of all resolutions,
RESOLUTION NO. 25-34
PAGE ONE OF THREE
ordinances and notices pertaining hereto, the SLID shall be known
as and is hereby designated "City of Apache Junction Street
Lighting Improvement District No. 2024-SV-BR-2" .
3 . Statutory Authority; Payment of Incidental Expenses . All
proceedings pertaining to the District is authorized by A.R. S .
Title 48, Chapter 4, Article 2, and all amendments thereto
including, without limitation, §§ 48-616 and 48-617 . All
incidental expenses shall become the obligation of the District,
unless paid for by the signers of the Petition. The phrase
"incidental expenses" shall mean the costs of posting,
publication, recording and legal fees associated with the
formation of the District and the annual levy of taxes .
4 . Protests, Objections, Waiver. In the Petition, the signers
have made written consents and waivers pertaining to the ordering
of the work and to the formation of the District and have
specifically waived all protests and objections against formation
of the District . City staff has verified such ownership and the
mayor and city council find as a fact that all property owners
within the District signed such Petition. Therefore, pursuant to
A.R. S . § 48-617 (A) , no publication or posting of any notice
pertaining to formation of the District will be made which is
normally required under A.R.S . §§ 48-575 (C) and 48-578 .
5 . Engineer' s Estimate. As financing for the acquisition and
construction of the initial street lighting system has been
provided, the District' s sole purpose will be to purchase, and not
generate, energy to operate the street lighting system. All owners
of land within the District who signed the Petition waived the
filing of an engineer' s estimate and no engineer' s estimate has
been filed with the city clerk.
6 . Determination of Type of Lighting and Consideration of the
Rate to be Paid. The type of lighting shall be the type now in
place within the District which now comprises the street lighting
system or such lighting facilities as may be required in the future
by city engineering staff or some other entity for use within the
District . The mayor and city council agree that the current rate
to be paid for purchasing energy for the proposed district per
street light per month and per kilowatt hour is set by the public
service entity which provides the energy to light the streets
(currently Salt River Project) and may be increased as they or
their successors so determine in the future . The estimate of the
District' s costs and expenses of purchasing energy for the
operation of the street lighting system is subject to change or
RESOLUTION NO. 25-34
PAGE TWO OF THREE
correction when the actual costs of operation are known and is
subject to change due to inflation, new construction or acquisition
of additional portions of the street lighting system.
7 . Compliance with City Outdoor Lighting Code . The District
shall comply with the provisions of the Apache Junction City Code,
Vol . II, Land Development Code, Chapter 1 : Zoning Ordinance,
Article 1-10 : Outdoor Lighting Regulations, as amended.
PASSED AND ADOPTED BY THE MAYOR 4ND CITY COUNCIL F THE CITY OF
APACHE JUNCTION, ARIZONA, THIS .2" DAY OF 20�5.
SIGNED AND ATTESTED TO THIS p_ DAY OF 200?6
WALTER "CHIP" WILSON
Mayor
ATTEST:
6 azx / 'I
EVIE MCKINNEY
DEqmatpy City Clerk
APPROVED AS TO FORM:
!Z•! '2S
RICHARD J. STERN
City Attorney
RESOLUTION NO. 25-34
PAGE THREE OF THREE
EXHIBIT A
JLIIIIIII�� �� ���low V
w
• • , •.
BLOSSOM ROCK .
WOOD
PAT E L STREET LIGHT IMPROVEMENT DISTRICT
DATE : 0 . .
•: NO 235498 rerWrITRIIIIIIIIIIIIIIIIIII
ppD i
SLID / C-AP321275
BOUNDARY 38 WATTS
C-AP321276 SLID
38 WATTS BOUNDARY N
C 21988
8 WATTS �.1 P'��ti ��YJti dG C-AP321277
1�00� >, 38 WATTS
O
0 125 250
C-AP321219 2 fG �° Horz. 1 in. = 250 ft.
38 WATTS ``� y C-AP3� \ _ C-AP321279
38 WATTS
38 WATTS
SLID � / `� �� \\ �� C-AP321281
BOUNDARY �g0P' \ �+ C-AP321280 \ 38 WATTS
38 WATTS
C-AP321282 Y
C-AP321964 P ` 38 WATTS C-AP321283
C-AP321214 38 WATTS .
C�PR� C-AP321967 , 38 WATTS
38 WATTS �i O¢ -'� 38 WATTS SLID
C-AP321966 BOUNDARY
* C-AP321965 38 WATTS
38 WATTS
'oP� �fG
¢OPT
BLOSSOM ROCK - PHASE 3
• • 1
P STREET LIGHT IMPROVEMENT DISTRICT
DATE 11/18/2025 SCALE 1"=250' SHEET 2 OF 4
JOB NO 235498 DESIGN DM CHECK DM
DRAWN DM
C Wsers\kpalmer\AppData\LocallTemp\AcPublish_17484\5498.01 BR PH3-SLID.dwg
N
Ro
T 0 125 250
P SLID Horz. 1 in. = 250 ft.
APR BOUNDARY
\ C-AP321284
38 WATTS
C-AP321285
38 WATTS
C-AP321968 ��p 38 WATTS 6
38 WATTS
C-AP321287
OP� ✓G 38 WATTS
C-AP321977 C-AP321288
38 WATTS 38 WATTS
C-AP321289
C-AP321969 SS 38 WATTS
4
pa 38 WATTS \ S �\ C-AP321978 C AP321290
38 WATTS 38 WATTS
C-AP321291
C-AP321979 38 WATTS
\ C-AP321976 d
/) 38 WATTS 38 WATT ' C-AP321292
np 38 WATTS
C-AP321988 ��
38 WATTS ^� ��R0 \ �7�
PR C AP321981
`Y� 38 WATTS
C-AP321980
38 WATTS
�) SLID
y BOUNDARY
C-AP321982 C-AP321293 C-AP321294
38 WATTS 38 WATTS 38 WATTS
SLID
BOUNDARY
BLOSSOM ROCK - PHASE 3
WOOD '
PATEL STREET LIGHT IMPROVEMENT DISTRICT
DATE 11/18/2025 SCALE V = 250' SHEET 3 OF 4
JOB NO 235498 DESIGN DM CHECK DM
DRAWN DM
C:1Users\kpalmer\AppDala\LocaPTemplAcPublish_1 74 84154 9 8.01 BR PH3-SLID.dwg
SLID {�lr
BOUNDARY
ACACIA TRAIL a'p \
� C-AP323 I p
Q C-AP323303 - _ 38 WATTS7T
2
Ix
38 WATTS /
C�
OPUNTIA DRIVE C-AP323301
W -- ,�.
-,- C-AP323304 38 WATTS 0'2
C-AP321974 38 WATTS
38 WATTS771111
w^� w HERITAGE PASS
✓ FBI r
Q I / C-AP321970
C-AP321973 C-AP321972 38 WATTS C�
38 WATTS 38 WATTS / C-AP321971
38 WATTS
C-AP321975
�RRO 38 WATTS
C-AP323306 OPT \ C AP321983
38 WATTS C-AP323305 38 WATTS
38 WATTS
SLID
BOUNDARY 'S PSS C-AP322344 /
38 WATTS
C-AP322346 —p I C-AP322345 )
38 WATTS
�s! i >" I 38 WATTS d / ✓
a C-AP322349
- C-AP321984
a O� �R � p 38 WATTS
- O /
O a 38 WATTS
w l � \
I 3 i V,� C-AP321986
W C AP322348 38 WATTS
pa C-AP322347 38 WATTS /
38 WATTS
SLID
BOUNDARY
C-AP321987
38 WATTS C-AP321985
38 WATTS 0 125 250
• SLID p
BOUNDARY Yd Horz. 1 in. = 250 ft.
BLOSSOM ROCK - PHASE 3
• • 1
P STREET LIGHT IMPROVEMENT DISTRICT
DATE 11/18/2025 SCALE 1" = 250' SHEET 4 OF 4
JOB NO 235498 DESIGN DM CHECK DM
DRAWN DM
C:1UserslkpalmeMppData\Local\TemplAcPublish_1748415498.01 BR PH3-SLID.dwg
Wood, Patel &Associates, Inc. November 12, 2025
602.335.8500 WP# 235498.01
www.woodpatel.com Page 1 of 5
See Exhibit "A"
LEGAL DESCRIPTION
Blossom Rock Phase 3
Street Light Improvement District
A parcel of land lying within Sections 17 and 20, Township 1 South, Range 8 East, of the Gila and
Salt River Meridian, Maricopa County, Arizona, more particularly described as follows:
COMMENCING at the west quarter corner of said Section 20, a Pinal County Highway
Department (PCHD) brass cap in handhole, from which the northwest corner of said Section 20,
a Pinal County Department of Public Works (PCDPW) brass cap in handhole, bears North
00'17'35" West, a distance of 2641.12 feet;
THENCE along the east-west mid-section line of said Section 20, North 89042'59" East, a distance
of 65.00 feet, to the easterly line of the west 65 feet of said Section 20 and the westerly line of
Blossom Rock Phase 1, recorded in Fee 2022-084918, Pinal County Records (PCR);
THENCE leaving said mid-section line, along said easterly and said westerly lines, North
00017'35" West, a distance of 52.97 feet, to the northwest corner of said Blossom Rock Phase 1
and the POINT OF BEGINNING;
THENCE leaving said westerly line, continuing North 00017'35"West, a distance of 1698.28 feet,
to the southwest corner of Parcel A, Phase 3 Commercial, recorded in Fee 2024-061061, PCR;
THENCE leaving said easterly line, along the south line of said Parcel A, North 90000'00" East, a
distance of 110 1.97 feet, to the southeast corner of said Parcel A;
THENCE leaving said south line, along the easterly line of said Parcel A, North 00°00'00" East, a
distance of 483.14 feet;
THENCE North 75051'51" East, a distance of 90.15 feet;
THENCE North 14°08'09" West, a distance of 380.56 feet, to the most easterly northeast corner
of said Parcel A and the southerly right-of-way line of Warner Avenue Phase 1, recorded in Fee
2024-061054, PCR;
THENCE leaving said easterly line, along the northerly line of said Parcel A and said southerly
right-of-way line, South 75051'51" West, a distance of 21.00 feet;
THENCE North 58°46'30" West, a distance of 22.06 feet, to a point of intersection with a non-
tangent curve;
THENCE leaving said northerly line and said southerly right-of-way line, easterly along said non-
tangent curve to the left, having a radius of 2065.00 feet, concave northerly, whose radius bears
North 13004'03" West, through a central angle of 02°01'31", a distance of 73.00 feet, to said
southerly right-of-way line;
THENCE along said southerly right-of-way line, continuing easterly along said curve to the left,
having a radius of 2065.00 feet, concave northerly, whose radius bears North 15005'35" West,
through a central angle of 09001'14", a distance of 325.11 feet, to the curves end;
Legal Description November 12, 2025
Blossom Rock Phase 3 WP# 235498.01
Street Light Improvement District Page 2 of 5
See Exhibit "A"
THENCE North 65053'12" East, a distance of 547.51 feet;
THENCE South 69°06'48" East, a distance of 35.36 feet;
THENCE North 65°53'12" East, a distance of 67.00 feet;
THENCE North 20°53'12" East, a distance of 24.04 feet;
THENCE leaving said southerly right-of-way line, South 24006'48" East, a distance of 114.76 feet,
to the beginning of a curve;
THENCE southeasterly along said curve to the left, having a radius of 7.00 feet, concave
northeasterly, through a central angle of 31'19'56", a distance of 3.83 feet, to the beginning of a
reverse curve;
THENCE southeasterly along said reverse curve to the right, having a radius of 41.00 feet,
concave southwesterly, through a central angle of 31019'56", a distance of 22.42 feet;
THENCE South 24006'48" East, a distance of 198.55 feet, to the beginning of a curve;
THENCE southerly along said curve to the right, having a radius of 41.00 feet, concave westerly,
through a central angle of 31'19'56", a distance of 22.42 feet, to the beginning of a reverse curve;
THENCE southerly along said reverse curve to the left, having a radius of 7.00 feet, concave
easterly, through a central angle of 31019'56", a distance of 3.83 feet, to the curves end;
THENCE South 24006'48" East, a distance of 473.52 feet, to a point of intersection with a non-
tangent curve;
THENCE southeasterly along said non-tangent curve to the left, having a radius of 83.00 feet,
concave northeasterly, whose radius bears North 44054'38" East, through a central angle of
25005'42", a distance of 36.35 feet, to the beginning of a reverse curve;
THENCE southeasterly along said reverse curve to the right, having a radius of 101.50 feet,
concave southwesterly, through a central angle of 07006'54", a distance of 12.60 feet, to the
beginning of a reverse curve;
THENCE easterly along said reverse curve to the left, having a radius of 83.00 feet, concave
northerly, through a central angle of 51°02'38", a distance of 73.94 feet, to the curves end;
THENCE North 65053'12" East, a distance of 46.05 feet;
THENCE South 24006'48" East, a distance of 66.00 feet;
THENCE South 65°53'12" West, a distance of 46.07 feet, to a point of intersection with a non-
tangent curve;
THENCE southwesterly along said non-tangent curve to the left, having a radius of 83.00 feet,
concave southeasterly, whose radius bears South 24007'09" East, through a central angle of
51002'10", a distance of 73.93 feet, to the beginning of a reverse curve;
THENCE southerly along said reverse curve to the right, having a radius of 101.50 feet, concave
westerly, through a central angle of 06049'16", a distance of 12.08 feet, to the beginning of a
reverse curve;
THENCE southerly along said reverse curve to the left, having a radius of 83.00 feet, concave
easterly, through a central angle of 26°08'49", a distance of 37.88 feet, to a point of intersection
with a non-tangent line;
THENCE South 24°06'48" East, a distance of 480.14 feet, to the beginning of a curve;
THENCE southeasterly along said curve to the left, having a radius of 7.00 feet, concave
northeasterly, through a central angle of 31°19'56", a distance of 3.83 feet, to the beginning of a
reverse curve;
Legal Description November 12, 2025
Blossom Rock Phase 3 WP# 235498.01
Street Light Improvement District Page 3 of 5
See Exhibit "A"
THENCE southeasterly along said reverse curve to the right, having a radius of 41.00 feet,
concave southwesterly, through a central angle of 31019'56", a distance of 22.42 feet, to the
curves end;
THENCE South 24006'48" East, a distance of 110.10 feet, to the beginning of a curve;
THENCE southerly along said curve to the right, having a radius of 41.00 feet, concave westerly,
through a central angle of 31°19'56", a distance of 22.42 feet, to the beginning of a reverse curve;
THENCE southerly along said reverse curve to the left, having a radius of 7.00 feet, concave
easterly, through a central angle of 31019'56", a distance of 3.83 feet, to the curves end;
THENCE South 24°06'48" East, a distance of 79.00 feet;
THENCE South 69006'48" East, a distance of 11.31 feet;
THENCE South 24006'48" East, a distance of 49.00 feet;
THENCE South 20053'12" West, a distance of 11.31 feet;
THENCE South 24006'48" East, a distance of 79.00 feet, to the beginning of a curve;
THENCE southeasterly along said curve to the left, having a radius of 7.00 feet, concave
northeasterly, through a central angle of 31°19'56", a distance of 3.83 feet, to the beginning of a
reverse curve;
THENCE southeasterly along said reverse curve to the right, having a radius of 41.00 feet,
concave southwesterly, through a central angle of 31019'56", a distance of 22.42 feet, to the
curves end;
THENCE South 24006'48" East, a distance of 291.58 feet, to the beginning of a curve;
THENCE southerly along said curve to the right, having a radius of 41.00 feet, concave westerly,
through a central angle of 31'19'56", a distance of 22.42 feet, to the beginning of a reverse curve;
THENCE southerly along said reverse curve to the left, having a radius of 7.00 feet, concave
easterly, through a central angle of 31°19'56", a distance of 3.83 feet, to the curves end;
THENCE South 24006'48" East, a distance of 114.50 feet;
THENCE South 65°53'12" West, a distance of 84.00 feet, to the easterly line of said Blossom
Rock Phase 1;
THENCE along said easterly line, North 24°06'48" West, a distance of 114.50 feet, to the
northwest corner of said Blossom Rock Phase 1;
THENCE leaving said easterly line, along the northerly line of said Blossom Rock Phase 1, South
65°53'12" West, a distance of 2220.90 feet;
THENCE South 56°39'14" West, a distance of 49.58 feet;
THENCE South 89042'59" West, a distance of 793.08 feet;
THENCE North 00'17'01" West, a distance of 6.19 feet, to said east-west mid-section line;
THENCE leaving said mid-section line, continuing North 00017'035 West, a distance of 52.97 feet;
Legal Description November 12, 2025
Blossom Rock Phase 3 WP# 235498.01
Street Light Improvement District Page 4 of 5
See Exhibit "A"
THENCE South 89042'25" West, a distance of 8.00 feet, to the POINT OF BEGINNING.
Containing 5,360,599 square feet or 123.0624 acres, more or less.
Subject to existing right-of-ways and easements.
This legal description is based on Final Plat of Phase 3 Commercial, recorded in Fee Number
2024-061061, PCR, Final Plat of Blossom Rock Phase 1, recorded in Fee 2022-084918, PCR,
Map of Dedication for Warner Road Phase 1, recorded in Fee 2024-061054, PCR and other client
provided information and is located within an area surveyed by Wood, Patel & Associates, Inc.
during the month of December, 2020.Any monumentation noted in this legal description is within
acceptable tolerance (as defined in Arizona Boundary Survey Minimum Standards dated
02/14/2002) of said positions based on said survey. �p LAND
Y:\WP\Parcel Descnptions\2023\235498.01 Blossom Rock Phase 3 Street Light Improvement District L09 11-12-25.docx �� �\\FICATE LP
61
co 23945 m
BRIAN J.
W DIEHL tip'
q�Ps�9ngd�� P
A, f
i
E P"S 9-30-26
NORTHWEST CORNER
SECTION 20, T1S, R8E LFD
ORTH 1/4 CORNER
3 PCDPW BCH / CTION 20, T1S, R8E
WARNER
A � 21/2 GLO BC
N89047'05"E 2530.81'
N
U
F
C� � Yti
Z U
v- rn
co
W N Of O
m O N
O cL i cU N
U) ti O w
(n a J w
Qo mw
m o
_ Z
� �QNPgE1
Q SgOM�gA9��eGR POB
Q 16\P�2�ZZA
F
C) L1 I J
LINE TABLE
POB
LINE BEARING DISTANCE L1
O LL-
WEST 1/4 CORNER WEST 1/4 CORNER
SECTION 20, T1 S, R8E L1 N89042'42"E 73.00'
3" PCHD BCH SECTION 20, T1 S, R8E
POC L2 S00°17'35"E 52.97' 3" PCHD BCH
POC
LAND
• • 1 ��(�FICAIF�Y SG EXHIBIT "A"
° �G
23945 BLOSSOM ROCK PHASE 3
- m
BRIAN J. STREET LIGHT IMPROVEMENT DISTRICT
d �d DIEHL 11/12/2025
feS% n ��' WP#235498.01
qA P A PAGE 5 OF 5
� .
NOT TO SCALE
ExP s -3a26 Z:1Blossom Rock120231235498.011SurveylLegal15498-L09.dwg