Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2024 05.06 City Council Work Session Agenda
re�cf�� City of Apache Junction, Arizona Meeting location: City Council Chambers at City Hall Agenda 300 E.Superstition Blvd. \ - g Apache Junction,AZ \YZONr 85119 - City Council Work Session apachejunctionaz.gov Ph:(480)982-8002 Monday, May 6,2024 7:00 PM City Council Chambers A. CALL TO ORDER B. ROLL CALL C. AGENDA ITEMS 1. 24-330 Presentation and discussion of cases P-23-63-PZ& P-23-64-GPA, by Jason Barney and John Hartman with Olsen Recker/Guadalupe Properties LLC, represented by Greg Davis with (plan Consulting. Case P-23-64-GPA is a proposed general plan land use map amendment to re-designate 18 acres at the southeast corner of US-60 and Goldfield Road from Commercial to High Density Residential. Case P-23-63-PZ is the companion rezoning case to the map amendment, proposing to rezone the 18 acre area from General Commercial by Planned Development("B-1/PD")and B-1/PD to High Density Multiple-Family Residential by Planned Development ("RM-2/PD"). Sponsors: Kelsey Schattnik Attachments: P-23-63-PZ&P-23-64-GPA-CC WS MEMO.pdf 1. Narrative.pdf 2. Site Plan.pdf 3. Elevations and Floor Plans.pdf 4. Landscape Plans.pdf 5. Wall Plans.pdf 6. Final Participation Report(Silveray).pdf 7. GPA External Agency Responses.pdf 8. Resident Letters(4.25.24).pdf 9. Updated Protest Petition 03.20.2024.pdf 10. Vicinity Map.pdf 11. Traffic Impact Analysis.pdf 12. Market Study(applicant).Pdf 13. P-24-63-PZ& P-24-64-GPA PZ Staff Report.pdf City of Apache Junction,Arizona Page 1 Printed on 5/2/2024 City Council Work Session Agenda May 6,2024 2. 24-345 Presentation and discussion on the second amendment to the professional services agreement between the City of Apache Junction and Central Arizona Council on Developmental Disabilities for senior transportation services. Sponsors: Jamie Sullivan Attachments: Memo to Council Senior Transportation Services Second Amendment DRAFT EXECUTED 2017 CACDD Contract EXECUTED First Amendment 2022 D. ADJOURNMENT Copies of this agenda and additional information on any of the items listed above may be obtained from the City Clerk's office located at 300 E Superstition Blvd,Apache Junction,AZ 85119, Monday through Thursday from 7:00a-6:00p, excluding holidays. The City of Apache Junction invites and welcomes people of all abilities to use our programs, sites and facilities. Specific requests may be made by contacting the Human Resources Office at(480)474-2617 or TDD(480) 983-0095. The Apache Junction City Council may vote to go into Executive Session for legal advice on any item listed on this agenda pursuant to A.R.S. §38-431.03(A)(3);this notice is given pursuant to A.R.S. § 38-431.02 to the members of the City Council and the public. City of Apache Junction,Arizona Page 2 Printed on 5/2/2024 City of Apache Junction, Arizona 300 E Superstition Boulevard U z Agenda Item Cover Sheet Apache Junction,AZ 85119 ` Agenda Item No. 1. '+PizoN* File ID: 24-330 Sponsor: Kelsey Schattnik Agenda Date: 5/6/2024 Index: In Control: City Council Work Session Presentation and discussion of cases P-23-63-PZ& P-23-64-GPA, by Jason Barney and John Hartman with Olsen Recker/Guadalupe Properties LLC, represented by Greg Davis with (plan Consulting. Case P-23-64-GPA is a proposed general plan land use map amendment to re-designate 18 acres at the southeast corner of US-60 and Goldfield Road from Commercial to High Density Residential. Case P-23-63-PZ is the companion rezoning case to the map amendment, proposing to rezone the 18 acre area from General Commercial by Planned Development("B-1/PD")and B-1/PD to High Density Multiple-Family Residential by Planned Development("RM-2/PD"). City of Apache Junction,Arizona Page 1 Printed on 5/2/2024 O� PQACHE✓G'L n� 4 1pjk�z City of Apache Junction "', Development Services Department gRIZONP CITY COUNCIL WORK SESSION STAFF MEMO Date: May 6, 2024 To: Honorable Mayor and City Council Members Through: Bryant Powell, City Manager Rudy Esquivias, Development Services Director Sidney Urias, Planning Manager From: Kelsey Schattnik, Senior Planner Case Numbers: P-23-63-PZ & P-23-64-GPA Subject: P-23-63-PZ: Proposed Rezoning of approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") P-23-64-GPA: Proposed Major General Plan Amendment to redesignate approximately 18 acres from Commercial to High Density Residential Summary P-23-63-PZ Is a Planned Development (PD) Rezoning request by Greg Davis with Iplan Consulting, representing the property owner, Jason Barney with Olsen Recker/Guadalupe Properties LLC, to rezone approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM- 2/PD") near the southeast corner of the US-60 and Goldfield Road. The subject site is proposed to be developed with approximately 271 rental units to be known as Silveray on Goldfield. P-23-64-GPA Is a proposed Major General Plan Amendment of APNs 103-01- 0110, 103-01-0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170 and 103-01-0180, located near the southeast corner of Goldfield Rd. and US-60, from Commercial to High Density Residential (40 du/ac) . "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 6, 2024 - City Council Work Session Memo Planning & Zoning Commission Hearing and Recommendation Due to the requirements for a Major General Plan Amendment, the Planning and Zoning Commission held two (2) public hearings for these cases . The General Plan requires that these meetings be held in two (2) different locations . The Planning and Zoning Commission held the first public hearing for P-23-63-PZ & P-23-64-GPA on March 26, 2024 in the Superstition Fire and Medical District' s Board Room located at 565 N. Idaho Road. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. At this meeting, Staff made a presentation and introduced the preliminary recommended conditions of approval for the Planned Development Rezoning and Major General Plan Amendment. The applicant also made a presentation and answered questions asked by the Commission. Eight (8) residents of Golden Vista Resort spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . Water pressure concerns 3 . Increased density 4 . Property value concerns 5 . Maintaining commercial land 6. Increased traffic The Planning and Zoning Commission held a second public hearing for P- 23-63-PZ & P-23-64-GPA on April 23, 2024 . Both Staff and the applicant gave a presentation. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. Five (5) residents spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . The desire for commercial development at this site. 3 . Increased density. Ultimately, the Planning and Zoning Commission voted 4-3 to recommend approval of P-23-63-PZ & P-23-64-GPA, subject to the conditions of approval that were recommended in the Staff Report, dated April 23, 2024, with the elimination of Project Specific Condition Numbers 1 & 2 . Project Specific Condition No. 1 would have required the developer to reserve 5 acres on the north side of Resort Boulevard to remain commercial. Project Specific Condition No. 2 provided a list of General Commercial Uses that would not be permitted. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 6, 2024 - City Council Work Session Memo The commissioners who voted in favor of the proposed development discussed the following: 1 . The benefit of developing a historically vacant property. 2 . The benefit of adding additional rooftops . 3 . Whether this site is viable for commercial use and noted that the approved development plan has been in existence for 20+ years and has yet to be developed. 4 . Recent trends of commercial development. 5 . Not wanting to keep commercial property that may never develop. The commission members who voted against the proposal discussed: 1 . The desire of an ownership product at this site as opposed to a rental product. 2 . The lack of desire to continue changing the voter approved General Plan. 3 . The concern of changing commercial to residential. 4 . Concerns regarding the lack of affordability with market rate housing. Attached: - Planning and Zoning Commission Staff Reports and attachments (March 23, 2024 & April 23, 2024) "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 6, 2024 - City Council Work Session Memo • �����R y �� .. . ���a ��.�, ��R�� i zo • � Y � , z 5` w rn4& • U f'yl y Kelsey Schattnik � Senior Planner/Development Services Dept. City of Apache Junction Dear Ms Schattnik: We the undersigned, are writing to voice our concerns about the 2-story, high density, 270-unit rental home development referred to as "Silveray" which is proposed for the land on the east side of Goldfield Rd south of Hwy 60. We are all residents of Golden Vista Resort, an over 55-age community directly across the street from the proposed development. Of course, this large 2-story development would greatly obstruct our views of the Superstition Mountains but we are opposed to this high density rental development for a number of reasons for"the common good." The development would be built on currently pristine undeveloped land which affords beautiful views of the Superstition Mtns. These views arc enjoyed not only by us and other surrounding age-55+ communities but by so many Apache Junction locals & visitors alike, as is evidenced by the many vehicles that sometimes pull over to the side of Goldfield Rd, flashers on, for a quick minute,to appreciate and snap a couple cellphone photos of the unobstructed view of these majestic mountains. This even includes busy tradespeople in their company trucks and vans. The greater the lightshow on the mountains or dramatic the cloud formations are,the greater the number of people that stop for a moment of awe. When there is the infrequent snow on the mountain it can become a parade of appreciators! Once this exquisite land parcel is given over for development it would be lost forever to the public domain. Our Q is this: Would it be possible for the City of Apache Junction to put forth an appeal for would-be benefactors to come forward with donated funds so the City could purchase this land, assuming the City has no funds to do so, for a public park?! This beautiful parcel of land could then be slowly groomed into a relatively low-maintenance park as more funds might come available. Development of the park could be done in phases. Initially a contest might be held for area landscape architects and students of that discipline to submit master plans for the park in exchange for name recognition only over the years. Once a Master Plan is approved, Phase#1 could be a recontouring of the shallow drainage ravine into a retention pond that would benefit wildlife and enhance the future park. Phase #2 might be grading and paving of both a one-way roadway with a wide designated bicycle lane winding around the inside park perimeter; separate pedestrian-only paved walkways would meander thru the grounds. This way all park users would enjoy their own spaces. The roadway and walking paths could be done for the most part using the existing natural contours of the land. To keep maintenance costs low only indigenous plants,trees and flora would be planted. There would be NO athletic or children's play facilities for the same reason. No lights would be needed for this dusk-to-dawn park where the single entry gate and separate exit gate would be locked& unlocked by police at the appropriate times on their regular rounds. Phase#3 might be restrooms and a few shaded picnic pavilions, all placed to minimize obstruction of mountain views from Goldfield Rd. Over a 20-year period, let's say,this pedestrian friendly park could become a jewel in the City of Apache Junction Parks system with many city residents coming out of their way to enjoy a peaceful walk here while communing with nature. Currently there is nothing like it within miles. However, if ask is completely out of the question for this exquisite land parcel, we would implore the City Planning&Zonin Departments,etc to limit the zonin to single story, owner occupied homes. Even if it is a high density community like the recently completed project at the Hwy 60 exit at Goldfield Rd they would no doubt sell out quickly for the developers given the fantastic views the homeowners would enjoy. The undeveloped strip of land running parallel to Hwy 60 and to the east of the Chevron gas station could remain zoned commercial for future restaurants, offices and the like. With the high visibility they would have from the highway these commercial enterprises should be quite successful. Finally, the key issue here is the need to limit any residential develop ent to sin stog in /1 keep with e oundin ove - comet 'es- a 2-story development would attract families with children and teens, not at all in keeping with the makeup of the immediate neighborhoods. A 2-story development,therefore, would also mean much greater water usage and higher traffic levels; already on Febru &March wkds of the Renaissance Festival we have chaotic traffic backed up on Goldfield Rd, Baseline and Hwy CO. And that is already destined to get worse with the 1,000(+?!) residences being built south of Baseline at Ironwood and beyond. +�-f- On behalf of all of us we thank you for your careful consideration to these matters. Sincerely, Thoma F. Lange, et all Y�- 3710 S Goldfi ld Rd, 4489 Print name G p 1�R/NT AA'!E� Ll g O I I Vo i I 5 wow,n&ram QPrint N Lot# Print Name: I A W E Lot# 7/ s+ 7'1►'S Print Name: ' ' U D Lot#A-2 7 Print Name: Lot# 3 S Print Name: �'<Cam-- �-s� Lot# Print Name: Lot Lot# � 1 QlOPrint Name: Lot# Print Name: --e Lot# l /2 Print Name: Lot# LP7 QPrint Name: A 'L� `c 1 F Lot# 1 Ht+Q-� `Print Name: r �,�1 rl Y1 E` 1 Lot# 1 �S Print Name: /� �/l��G� Lot# l � • l �6 Print Name: � �� �/ (' `-{ Lot# �T 67IEnLntName: Lot# 3 /� Print Name: Lot# OfPrint Name: ! ""` Lot# `T ` 0 r �� 0,0rint Name: � Lot# J rint Name: Q. O Lot# �2 �Z rint Name: / S Lot# �3 rint Name: Lot # 13 DqPrint Name:_ Jr*L Lot# 5gL-I-Y /,'PA 14�2Z SPrint Name: Lot# Print Name. /—/, Lot OSM (eD7 Print Name: �-��" Lot# ICI -2 oOe rint Name: Lot# 30 04?-17Print Name: bako , Lot# 3 j o Print Name: Lot# 3� Print Name: cs, °- a Lot# 2 Q rint Name: � C, � Lot# �tJ rint Name: Lot# ` Print Name:STA ti D37 M.CCPR v Lot# 3 Print Name: b)1,166;0Lot# 1 Print Name: Ren�OnLot# 37 Print Name: r Lot#C 4 O-VPrint Name: L ( �� �� P Lot# ` rint Name: Lot# yO Print Name: f � Lot# r Print Name: S Q- Lot# Z rint Name: �iS ` Lot# / L _lint Name: �d � Print Name: Cv �.� Lot# 1 rint Name: [. Lot# C� ` I 1 �6 Print Name: v (' O(jx Lot# (�()Vrint Name: A Lot# Print Name: 1 r`���� �`-� ��`� �� Lot# �- y Print Name. LC y� �- t� S n Lot# 3 3 Print Name. t� Lot#NOL v (r.r L Lot# rint Name: �3 Lot rint Name: # 'LL 3 1 rint Name: e,r 'C S S Lot# n m rint Name: J l� k�& Lot# 5� not Nam {� Lot# ?7 v - - ,/ i rint Name: SOB y" I `A Lot Print Name: �+ ' f`' W , 7-1-' I vN W Lot # `7 `J� �9 rint Name: i Print Name: Lot# rint Name: Lot # Z rint Name: 0mint Name: Gtz� l Lot# d 7 rint Name: r , 5 Lot# a 05LrintName- Lot# Z d / rint Nam . Lot p,411" rint Name: Lot# Print Name: \ Q S 4 Lot# b Print Name: \./ a Lot# �Pint Name:Sl°e e-S Lot# 7 rint Name: 'WI Ctr Lot# Print Name: Ci4(z Lot# �Q 1 3 rint Name: [�J' f✓'1 `' �/`'1/ ' ' ` ��C� Lot#La 5a rint Name: v j � Lot# (D7��-__jLnt Name: Lot# r� S(�-� Lot# Print Name: rint Name: � 9 Lot rint Name: WJ i �9rint Name: Lot# 9/ 9 Print Name: Lot# �v Print Name: Lot# 2 rint Name: P61 T Lot# -3 Print Name: r Print N� Lot# e /35 Print Name: G Lot# Print Name: e- 't��o j Lot#O(el 3 3 3 ` �c� � l �P Lot# Print Name:�a� ► C �- v &�nnt Name: ® e Y ola r�- Lot# 3 �� J , rint Name �� a U .S �' t- Lot# Print Name: " Lot# 1 (X / 7 Print Name-�((AE d i� � �� Lot#s 'Z (f?Z - rint Name: jO le� G 5.5e� Lot# �5 Print Name: Lot# f �y Pnrrt Name: n' Lot# ca X" � Print Name: v �Q.� �� Lot# 62 9 Print Name: Lot# L2 All 44< �' cS alt/ Lot# 9l' Print Name: r/ 1 rint Name: S -t^^- Lot# �g Print Name: G�, L&7t7T) Vl J-/✓L Lot# / l Print Name: L Zi'� Lot# p - . L 13 Cc_ /VM YJ fir Lot# 5 � Print Name- �ZP int Name: Lot# Print Name:- e: ��,h �-� Lot# h 1 Tint N , Lot# c2 0 (/t,og )r�intNa�mee: � / e�nl Lot# 0 fjC) rint Name: V ' Lot# �p rint Name: Lot# IInn rint Name: rp a r I a � © W11,e'r '— Lot# S /6l� rint Name: Lot# Print Name: Lot# Print Name. Lot# rir Name. Lot# Lot# rint Name: cc�' `e- v }-�� not N � �`/ Lot# ame: r Q /�� •nt Name: `fr -JO( 1�Ct Lot# �� �� rint Name: � -G-C ►1 Lot# � � /J' tint Name: Lot# tint Name: '! Lot# P . oj�' not Name. 36c� Cl I Lot# not Name: P�z✓ f! h ��"[ �✓' e-tF Lot# v tint Name: 0/00int Name: Lot# �3 t Name: Lot# 4 r `� �y Tint Name: �-- AV A CJT' o Lot# 8 P rint Name: �la- !� Lot# rint Name: Lot# �2 I Print Name: L (p � � Lot# (92-gPrint Name: Lot (� rint Name: Yyl �' N/J Lot# d S 136) Print Name: Lot# f J Print Name: Lot# Print Name: C r r ti cl/Q Lot# (/33 rintName: ��rr't ��anh�� Lot# _3�� C Print Name: 24,Ah v Lot# 02 Print Name:CJ b �, �CC�w h Lot# (S , / l J,6 Print Name: P et Lot# I' (✓ / Print Name: 1= �- Y` y p h Lot# �r 2 v Print Name: /'1 Lot# ds !)%intNarne: Print Name: Lot# 9 Print Name: opY"' ` � " t1 Lot �yz rint Name: (/D�-3Print Name: Y 1 1'` r Lot# / Lot# not Name: �y� 3 Lri nt Name: r� ` Lot# ✓� g Print Name L�� �-� L W\('V-, Lot# 31 1 Print Name: '�e G�t4zmoty\ Lot# �3 y c�MO n.Gu v ZY�GL Lot# � Print Name rint Name: F e � 6 Lot# Print Name: A c? -T O n Lot# -1 Print Name: Aa�JLot# l J Z Print Name: �) � Lot# �j not Name: ( � Lot# �� Print Name: Lot# Xrint Name: Lot# 0f j rint Name: Lot# lS CtA Lot# rint Name: Print Name: 1 f ' Lot# Print Name: Lot# Print Name: Lot# / Print Name: 1�' Lot# °2 l,6 Z P int Name: J� ! Lot# 3 L r�3 rint Name: rA,� Lot# L c Lot# ��/�S � r�.r►t Name: S , fS Tint Name: rint Name: Lot# �r Print Name: � � 6 O Lot# Do —rint Name: lL Lot# 1 4 CODEn nt Name: Yl � Lo not Name: jv Lot# J Print Name: Lot# �7 Print Name: Lot# 171 rint Name: Lot# US 60 RAMP Ji J ilk — —I i0 Wi ill l71———— Awom — :♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦..♦♦♦♦♦♦♦♦♦♦♦♦..♦♦♦♦♦♦♦♦',♦♦♦♦♦♦♦♦♦♦♦.;Wwwwwo WHO ♦♦♦♦♦♦♦♦♦♦♦♦/'♦♦♦♦♦♦♦♦♦♦. ►♦♦♦♦♦♦♦♦�♦♦♦♦♦♦♦1 ♦♦♦♦♦►♦♦♦♦♦1 ♦♦♦♦♦♦�♦♦♦♦♦♦ �♦��♦♦♦♦♦♦♦♦♦♦♦♦��` per.♦♦♦♦♦♦� - 1-I- -�- - -- ---- '♦����♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦�� E JASPER DR �.♦�♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� /♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ n O 9 ►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� U1 E_IRONSTONE.DR ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� � ►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� LN ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� VIOLA ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ E HAWKS_EYE_DR ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦i ♦♦♦♦♦♦♦♦♦♦M I I I I I I ♦♦♦♦♦♦♦♦♦♦ W, Own E'GYPSUM DR ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ = ° ♦♦♦♦♦♦♦♦� CANDELA LN 204 115011,'mill III III E TELDSPARE DR O ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� AMORE LN E EMERALD DR w w ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� O G ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦� Z ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦1 E DIAMOND DR c07 j♦j♦j♦j♦j♦j♦j♦j♦j♦j♦�♦j♦�♦j♦j♦j♦j♦j�� VERDE LN ►♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦. a E'CINNABAR DRif - VIA w 2 DE RE WAY z TERRA LN a � 4—E BERYL--DR -G SORRISO LN BE LLA LN Alhancc broadStonc , S j ve ra Traffic Impact Analysis South of US-60 East of Goldfield Road in Apache Junction, Arizona August 2022 Project No. 22-1180 Prepared For: Alliance Residential Company 7135 East Camelback Road, Suite 360 Scottsdale, AZ 85251 For Submittal to: Arizona Department of Transportation Town of Apache Junction Prepared By: CivTech 10605 North Hayden Road Suite 140 Scottsdale, Arizona 85260 480-659-4250 ALLIANCE BROADSTONE SILVERAY TRAFFIC IMPACT ANALYSIS South of US-60 and east of Goldfield Road in Apache Junction, Arizona Prepared for: Alliance Residential Company 7135 East Camelback Road, Suite 360 Scottsdale, AZ 85251 For Submittal to: Arizona Department of Transportation Town of Apache Junction Prepared By: oF�'SSIONA� F� CivTech Inc. 4: � ifICA?, cti� Cj 10605 North Hayden Road w 48377 SEAN D. Suite W MESSNER Scottsdale, Arizona 85260 Office: (480) 659-4250 Fax: (480) 659-0566 gR�2oNA 0 5 P August 2022 CivTech Project No.22-1180 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis TABLE OF CONTENTS EXECUTIVE SUMMARY .....................................................................................................1 INTRODUCTION ...............................................................................................................3 StudyRequirements...........................................................................................................3 StudyArea ........................................................................................................................3 HorizonYears....................................................................................................................3 EXISTING CONDITIONS...................................................................................................5 LandUse...........................................................................................................................5 SurroundingLand Use........................................................................................................5 RoadwayNetwork..............................................................................................................5 Intersection Configuration ..................................................................................................6 TrafficVolumes..................................................................................................................7 CapacityAnalysis.............................................................................................................10 Future Roadway Improvements ........................................................................................11 CrashHistory...................................................................................................................11 PROPOSED DEVELOPMENT.............................................................................................12 SiteLocation ...................................................................................................................12 Site Density/Intensity.......................................................................................................12 SiteAccess......................................................................................................................12 TripGeneration ...............................................................................................................13 Vehicle Trip Distribution And Assignment...........................................................................16 Future Background Traffic ................................................................................................16 TotalTraffic.....................................................................................................................16 TRAFFIC AND IMPROVEMENT ANALYSIS.......................................................................23 Turn Lane Warranting And Queue Length Analysis..............................................................24 SightDistance Analysis.....................................................................................................27 CONCLUSIONS ...............................................................................................................28 LIST OF REFERENCES.....................................................................................................29 TECHNICAL APPENDICES...............................................................................................30 C i v T e c h August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis LIST OF TABLES Table 1 — Level of Service Criteria for Controlled Intersections................................10 Table 2 — Existing Peak Hour Levels of Service.........................................................11 Table 3 — Intersection Crash Data Summary.............................................................12 Table4 —Trip Generation..........................................................................................14 Table5 — Site Trip Distribution .................................................................................16 Table6 — Peak Hour Levels of Service.......................................................................23 Table 7 — Driveway Right-Turn Lane Analysis...........................................................24 Table 8 —AASHTO Sight Distance Requirements ......................................................27 LIST OF FIGURES Figure1 —Vicinity Map................................................................................................4 Figure 2 — Existing Lane Configurations and Stop Controls ........................................8 Figure 3 — Existing Peak Hour Traffic Volumes ...........................................................9 Figure4— Site Plan and Access.................................................................................15 Figure5 —Trip Distribution.......................................................................................17 Figure6 — Site Generated Traffic Volumes................................................................18 Figure 7 — 2024 Background Traffic Volumes ...........................................................19 Figure 8 — 2027 Background Traffic Volumes ...........................................................20 Figure 9 — 2024 Total Traffic Volumes ......................................................................21 Figure 10 — 2027 Total Traffic Volumes ....................................................................22 Figure 11 — Proposed Lane Configurations and Traffic Control.................................26 CivTech August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis EXECUTIVE SUMMARY Alliance Residential Company proposes the development of a 275-unit multi-family residential complex located south of US-60 (Superstition Freeway) and east of Goldfield Road on property that is currently undeveloped desert landscape. Access to the site is provided by four (4) future access points along Resort Boulevard and one (1) future access point along Chevron Access. CivTech, Inc. has been retained by Alliance Residential Company to perform the traffic impact analysis for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. The following conclusions and recommendations have been documented in this study. GENERAL • The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/ 94 out) trips during the AM peak hour, and 139 (89 in/ 51 out) trips during the PM peak hour. • The existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564 (388 in/ 176 out) trips during the AM peak hour, and 747 (294 in/ 453 out) trips during the PM peak hour. o The proposed land uses generate approximately 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/ 399 out) fewer PM peak hour trips than the existing zoning allows. CRASH HISTORY • In total, there were 13 incidents within the study area from 2018-2020. There was a total of 15 injuries and 4 fatalities. EXISTING • The results of the existing conditions analysis indicate that all study intersections operate with acceptable levels of service (LOS B or better). OPENING YEAR • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. 2027 CAPACITY ANALYSIS • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. CivTech 1 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis QUEUE STORAGE • The recommended storage lengths are provided for study horizon year 2027 using the total traffic projections. SIGHT DISTANCE • Sight visibility should be provided at all driveways according to the distances and sight triangles at public intersections should be maintained according to Section 10-3-4 of the City Code. CivTech 2 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis INTRODUCTION Alliance Residential Company proposes the development of a 275-unit multi-family residential complex located south of US-60 (Superstition Freeway) and east of Goldfield Road on property that is currently undeveloped desert landscape. Access to the site is provided by four (4) future access points along Resort Boulevard and one (1) future access point along Chevron Access. The vicinity of the site is provided in Figure 1. CivTech, Inc. has been retained by Alliance Residential Company to perform the traffic impact analysis for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. STUDY REQUIREMENTS This study analyzes the traffic impact due to the proposed complex on the surrounding street network. The study has been prepared in conformance with the Arizona Department of Transportation (ADOT) Traffic Engineering Guidelines and Processes (TGP) Section 240 Traffic Impact Analysis and Statement, August 2021. The specific objectives of the study are: • To determine whether the planned street system in the vicinity of the site is adequate to accommodate the increased traffic that results from the proposed development. • To recommend additional street improvements or traffic control devices, where necessary, to mitigate the additional site-generated traffic; and, • Evaluate the internal site circulation and provide recommendations if necessary. STUDY AREA The study area has been defined as including the following intersections: • Goldfield Road & Old West Highway • Goldfield Road & US 60/Old West Highway Exit • Goldfield Road & US 60 WB Off-Ramp . Goldfield Road & US 60 EB Off-Ramp • Goldfield Road & Chevron Access • Goldfield Road & Resort Boulevard • Chevron Access & Resort Boulevard HORIZON YEARS This study has been conducted to conform to ADOT TGP 240 Traffic Impact Analysis and Statement, prepared by ADOT in August 2021. Based on trip generation rates in the 111" edition of the Institute of Transportation Engineers' (ITE) Trip Generation Manual, the proposed development is anticipated to generate more than 100 but less than 500 trips during the highest peak hour. Therefore, ADOT requires the TIA for this development to evaluate the opening year and three years after build-out. It is assumed that the complex will open during 2024. CivTech 3 August 2022 IL 6 0 NORTH PI COU Y 7 �PSe tiny Cr o/ WB Ramp 60 EB Ramp Chevron Access 60 Resort Blvd. SITE Figure 1: Vicinity Map Alliance BroadStone Silveray , „ AnalysisCivTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis EXISTING CONDITIONS LAND USE The existing site is an approximately 17-acre section consisting of 7 parcels of undeveloped desert landscape. SURROUNDING LAND USE Surrounding the site are primarily single-family residential developments and retail uses. Approximately a mile north of the site is Mountain View Lutheran Church, Crossroads Southern Baptist Church, and some single-family homes. The existing Chevron gas station is located in an outparcel on the western edge of the project area and southeast of the site is a mobile home resort. East of the site is predominantly undeveloped land with single-family residential homes east of Mountain View Road. West of the site is more single-family homes and Golden Vista 55+ Resort. Per TGP 240, the project corresponds to a 'Small Development' and would require a Category I analysis. Such a TIA requires analysis of site access driveways and "adjacent signalized intersections and/or major unsignalized street intersections within a minimum of 1/2 mile." ROADWAY NETWORK The existing roadway network within the study area includes Goldfield Road, Old West Highway, US- 60 Highway, Chevron Access, and Resort Boulevard. Goldfield Road is a north-south road classified by the City of Apache Junction as a principal arterial roadway. South of Old West Highway, Goldfield Road consists of two travel lanes in each direction with a center two-way-left-turn lane (TWLTL); north of Old West Highway, Goldfield Road consists of only one lane in each direction of travel. Goldfield Road begins at the intersection with Baseline Road, south of the US 60, and continues north until terminating at the intersection with Lost Dutchman Boulevard. The posted speed limit is 35 miles per hour (mph) within the vicinity of the site. Old West Highway is a southeast-northwest road classified by the City of Apache Junction as a principal arterial. Old West Highway consists of two lanes in each direction of travel and a bicycle lane, separated by a 65-foot median along the entire length of road. Old West Highway begins east of the intersection with State Route (SR) 88 after transitioning from Apache Trail and continues southeast until merging with Goldfield Road at the northeast corner of the proposed site. The posted speed limit is 45 mph within the vicinity of the site. US 60 (Superstition Freeway) is an east-west United States highway north of the proposed site. Just east of the Goldfield Road interchange, US 60 is a divided highway with two travel lanes in each direction separated by a 45-foot raised median. West of the Goldfield interchange, the US 60 becomes an access-controlled freeway. US 60 provides direct access to SR-202, SR-87, SR-101, SR- 79, SR-188, I-10, and Old West Highway via an off-shoot just before the Goldfield Road interchange. The posted speed limit is 65 mph within the vicinity of the site. Chevron Access is a curvilinear unmarked driveway with a width large enough for one (1) lane of travel in direction. Chevron Access is located east of Goldfield Road and north of Resort Boulevard. There is no posted speed limit. CivTech 5 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis Resort Boulevard is an east-west local road with one (1) lane in each direction of travel. Resort Boulevard begins east of Goldfield Road and terminates approximately 860-feet east of Chevron Access where it becomes Dolce Vista Way. There is no posted speed limit. INTERSECTION CONFIGURATION The intersection of Goldfield Road and Old West Highway (SE bound lanes) is a three-legged unsignalized "T" intersection with a stop sign on the southwest-bound approach. The southeast-bound approach consists of one dedicated left turn lane and two (2) through lanes. The southbound approach consists of a dedicated left turn lane only. Please note that the left turn lane intersects Goldfield Road "behind" a waiting westbound vehicle. Therefore, the movement is considered to be an approach to the next intersection. The intersection of Goldfield Road and Old West Highway (NW bound lanes) operates as a three- way/four-legged unsignalized intersection with a stop sign on the southwest-bound approach. The northwest-bound approach consists of two through lanes and a bicycle lane; there is a "no left turn"sign on this approach and right turns are channelized. The southeast-bound approach is a single left turn lane. The southwest-bound approach consists of one through lane and a dedicated right turn lane. The through lane goes across this intersection to allow for left turns onto southeast-bound Old West Highway. The intersection of Goldfield Road and US 60/01d West Highway Exit operates as an unsignalized "T" intersection with stop control on the westbound approach. The northbound and southbound approach consist of two (2) through lanes. The westbound approach consists of one (1) dedicated right- turn lane. The US-60 WB off ramp is a one-way road that allows access to the northbound Goldfield Road or northwest-bound Old West Highway. The intersections of Goldfield Road and US 60 Ramps operate as a diamond traffic interchange within the vicinity of the site with protected-permitted left turn phasing on the northbound and southbound approaches. The northbound approach consists of one dedicated left turn lane, two through lanes and one dedicated right turn lane. The westbound approach consists of one dedicated left turn lane, one shared left-turn/through/right-turn lane and one dedicated right turn lane. The southbound approach consists of one (1) dedicated left turn lane, two (2) through lanes and a dedicated right turn lane. The eastbound approach consists of an exclusive left turn lane, one (1) shared left- turn/through/right-turn lane, and one dedicated right turn lane. The intersection of Goldfield Road and Chevron Access operates as a four-legged unsignalized intersection with stop control in the eastbound and westbound approach. The northbound approach consists of two (2) through lanes and one (1) dedicated right-turn lane. The southbound approach consists of one (1) through lane and one (1) shared through/right-turn lane. The eastbound and westbound approach consist of one (1) shared left/through/right-turn lane. The intersection of Goldfield Road and Resort Boulevard operates as a "T" intersection with stop control in the westbound approach. The northbound approach consists of one (1) through lane and one (1) shared through/right-turn lane. The southbound approach consists of two (2) through lanes and a TWLTL that allows storage for left-turns. The westbound approach consists of one (1) shared left/right-turn lane. 1/ C i v T e c h 6 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis The intersection of Chevron Access and Resort Boulevard operates as a "T" intersection with stop control in the southbound approach. The southbound approach consists of one (1) shared left/right-turn lane. The eastbound approach consists of one (1) shared left-turn/through lane. The westbound approach consists of one (1) shared through/right-turn lane. The existing intersection lane configurations and traffic control is illustrated in Figure 2. TRAFFIC VOLUMES CivTech engaged Field Data Services of Arizona, Inc. to record traffic volumes at seven (7) study intersections within the project vicinity. Peak hour volume turning movement counts were performed from 7:00-9:00 AM and 4:00-6:00 PM on Thursday, July 13, 2022. Peak hour turning movement counts were conducted at the following study intersections: • Goldfield Road & Old West Highway • Goldfield Road & US 60 WB Off-Ramp (north) • Goldfield Road & US 60 WB Off-Ramp • Goldfield Road & US 60 EB Off-Ramp • Goldfield Road & Chevron Access • Goldfield Road & Resort Boulevard • Chevron Access & Resort Boulevard The existing traffic volumes observed for this study are presented in Figure 3 for the weekday AM and PM peak hours. Traffic volume data obtained for this study have been included in Appendix B. CivTech 7 August 2022 4 l ©il �Pstti IL LEGEND NORTH Q ©Thru or Turning Movement Traffic Signal ©Two-Way Left Turn-Lane Stop Sign e Raised Median 40 Speed Limit Bike Lane Q Yield Sign O/a ,I MEChannelized Turn Lane :2 iePstyly�p 0 y Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWBh WB Ramp _ © Ho EB Ramp Chevron Access O 60 Resort Blvd.0 0 �o SITE 35 Goldfield Rd&US-60/Old West Highway Exit O © O O 4 0 0 �. • Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Figure 2: Existing Lane Configurations and Traffic controls AllianceBroad, , - , „ , CivTech �Ps�ti N � � O r 9(5) 16(19) 54(46) O oc / v a v 0co " N Legend NORTH 6(yt XX(XX)-AM(PM)Peak Hour Traffic Volumes WB Ramp Goldfield Rd&O IF ld West Hwy SEB Goldfield Rd&Oki West Hwy NWB try b0 EB Ramp Chevron Access 0 60 N Resort Blvd.0 0 162(110 SITE �. 0 v c Goldfield Rd&US-60/Old West Highway Exit 0 00 rn � U') v i::- eo rn O N 1.- 5(2) 60(85) 3(5) 21(28) 1&14(27,) 2) 0(0) 0(0) 2(0) 1(0) 7(19) 30(43) 0(1) 2(4) clj o o oo m� co N co co O u7 00 Goldfield Road and US-60 WB Ramps Goldfield Road and U6-ti0 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Figure 3: Existing Traffic Volumes Alliance . , ,Stone Silveray-Traffic Impact , CivTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis CAPACITY ANALYSIS Peak hour capacity analyses have been conducted for the study intersections based on existing intersection configurations and traffic volumes. All intersections have been analyzed using the methodologies presented in the Highway Capacity Manua/(HCM), Updated 2016, Special Report 209, and using Synchro software, version 11.0 under the HCM 61" edition (2016) methodology. The concept of level of service (LOS) uses qualitative measures that characterize operational conditions within the traffic stream. The individual levels of service are described by factors that include speed, travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six levels of service are defined for each type of facility for which analysis procedures are available. They are given letter designations A through F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions. Levels of service for intersections are defined within ranges of average control delay per vehicle, the number of seconds a vehicle can expect to wait due to the presence of a traffic control device. Table 1 lists the level of service criteria for signalized and unsignalized intersections, respectively. Table 1 — Level of Service Criteria for Controlled Intersections ControlLevel-of-Service Signalized Unsignalized D- Control Delay A <— 10 <— 10 .......................................................................................................... --------.................................:......................................---------------------........ B > 10-20 > 10-15 ....................................................................................................................---................................................................................ .........--------------- C > 20-35 > 15-25 _.................................................................................................................. .................................... ................---------- D > 35-55 > 25-35 _............................................................................................................... ----............................................................................------------------------ E > 55-80 > 35-50 _....................................................................................................... ---------- ........................................................... ----------------------------- F > 80 (or v/c > 1) > 50 (or v/c > 1) Source:Exhibits 19-8,20-2,21-8,and 22-8, Highway Capacity Manual, 61h Edition(2016) Synchro 11.0 software calculates the LOS per the HCM 61" edition (2016) methodology. The 61" edition HCM documents the signalized LOS calculation methodology which takes into account lane geometry, traffic volumes and cycle length/phasing to compute LOS. Synchro analysis worksheets report individual movement delay/LOS and overall delay/LOS for signalized intersections; unsignalized intersection worksheets report the worst-case delay/LOS and the average overall intersection delay. Results of the existing level of service analyses are shown in Table 2 for both AM and PM peak hours. The existing conditions analysis worksheets have been included in Appendix C. C i v T e c h 10 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis Table 2— Existing Peak Hour Levels of Service ID Intersection Control Approach/ Existing LOS 1 Goldfield Road and Old West Highway SEB 1-way Stop (WB) WB Left A (A) EB Thru B (B) 2 Goldfield Road and Old West Highway NWB 2-way stop (EB/WB) WB Thru B (B) WB Right A (A) 3 Goldfield Road and US-60/Old West Highway Exit 1-way stop (WB) WB Right A (A) NB A (A) (A) 4 Goldfield Road and US-60 WB Ramp Signal SB WB A A (D) Overall A(A) NB A (A) ) (A 5 Goldfield Road and US-60 EB Ramp Signal SB EB A A (A) Overall B (B) NB Left A (A) 6 Goldfield Rd &Chevron Access 2-way stop (EB/WB) SB Left A (A) EB Shared A (A) WB Shared A (A) 7 Goldfield Road & Resort Boulevard 1-way stop (WB) SB Left A (A) WB Shared A (A) 8 Chevron Access & Resort Boulevard 1-way stop (SB) SB Shared A (A) EB Left A (A) The results of the existing conditions analysis summarized in Table 2 indicate that all study intersections operate with acceptable levels of service (LOS B or better). FUTURE ROADWAY IMPROVEMENTS Upon review of the City of Apache Junction ongoing construction projects and current ADOT projects, there are no additional improvements proposed by ADOT or the City or Apache Junction within the study area. CRASH HISTORY Crash data for the study area was obtained from the City of Apache Junction for the last three (3) calendar years for which data is available (2018-2020). Crash data for all study intersections were provided. In total, there have been 13 incidents within the study area since the beginning of 2018. All crashes occurred at intersections along the length of Goldfield Road within the vicinity of the site. The summary of intersection crash data is presented in Table 3. CiVTech 11 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis Table 3 — Intersection Crash Data Summary • IntersectionGoldfield Rd &Old West Hwy SEB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .............-------------------------------------------------- ............ ................................. . ................... .............................................................. ........................ . Goldfield Rd &Old West Hwy NWB 3 1 2 0 4 1 0 2 0 0 0 0 1 0 0 ------------- ---------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------- Goldfield Rd &Old West Hwy Exit 6 0 2 4 5 2 0 0 0 0 0 1 5 0 0 ----------- ----- ------------------------ ---------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------- Goldfield Rd &US-60 WB Ramp 4 2 0 1 6 1 0 0 1 0 0 3 0 0 0 ------------- ---- -- ----------------------------- ----------------------------------------...........................................----------------------------------------- ..........................................--------------------------- Goldfield Rd &US-60 EB Ramp 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ------------------------------------------------------------------------------------------------------------------------------ -------------------------- ------------ ------------------------------------------------------- ------------- --------------------------------------------------------------------- ------------ Goldfield Rd &Chevron Access 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 --------------------Goldfield Rd &Resort Blvd 0 .....0.... -0 0 0 .....0..........0..........0....... -0 0 0 .....0..........0..........0..... -0 0 ------------------------------------------------------------------------------------------------------------------------------ .............................................. ..........................................------------- ------------ Chevron Access&Resort Blvd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 The crash analysis worksheets are included in Appendix D. PROPOSED DEVELOPMENT SITE LOCATION The Alliance Residential Company proposed plan consists of a 17-acre multi-family residential complex located south of US-60 and east of Goldfield Road on currently undeveloped land. The complex is composed of approximately 275 proposed multi-family dwelling units (DU). SITE DENSITY/INTENSITY This development consists of approximately 275 units of proposed multi-family apartment complex. The complex is comprised of the following: • 3 Bedroom Townhomes — 82 DU's • 2 Bedroom Apartments — 104 DU's • 1 Bedroom Apartments — 89 DU's SITE ACCESS There is a total of five (5) proposed access points. • Access A — is a full movement access located approximately 100 feet east of Goldfield Road along Chevron Access. • Access B— is a full movement access located approximately 445 feet east of Goldfield Road along Resort Boulevard. • Access C— is a full movement access located approximately 735 feet east of Goldfield Road along Resort Boulevard. C i v T e c h 12 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis • Access D— is a full movement access located approximately 925 feet east of Goldfield Road along Resort Boulevard. • Access E— is a full movement access located approximately 1055 feet east of Goldfield Road along Resort Boulevard. The proposed development site plans are provided in Figure 4. TRIP GENERATION The potential trip generation for the proposed development was estimated utilizing the Institute of Transportation Engineers (ITE) Trip Generation Manual, llt" Edition and Trip Generation Handbook, -Td Edition. The ITE Trip Generation Manua/ contains data collected by various transportation professionals for a wide range of different land uses. The data are summarized in the report and average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized land use. The report provides information for daily and peak hour trips. The anticipated trip generation is summarized in Table 4. Detailed trip generation calculations are provided in Appendix E. [Remainder of Page Left Intentionally Blank] If C i v T e c h 13 August 2022 Alliance BroadstoneSilveray-Apache ]uncbon, AZ Traffic Impact Analysis Table /& — Trip Generation Land Use ITE ITE Land Use Nafflt— lQuantity Units+ AM Distribution PM Distribution I Code In Out In Out Proposed Alliance Residential Complex Existing Zoned Land Use Lot 1: Sit Down Restaurant 931 Sit Down Restaurant 10.803 KSF 55% 45% 61% 39% Lot 4: Medical Office 720 Medical-Dental Office 8.276 KSF 79% 21% 30% 70% Lot 5: Medical Office 720 Medical-Dental Office 8.102 KSF 88% 12% 17% 8 o Lot 6: Medical Office 720 Medical-Dental Office 7.928 KSF 79% 21% 30% 70% Lot 7: Sit Down Restaurant 931 Sit Down Restaurant 6.447 KSF 80% 20% 67% 33% ADT AM Peak Hour PM Peak Hour Rate. I Total Rate. In Out I Total Rate. In Out Total Proposed Alliance Residential Complex Existing Zoned Land Use Notes: *All average rates were calculated by dividing total trips generated using regression equation by the number of dwelling units. (See below.) CALCULA TION5(Equations shown only where applicable) IIA The proposed development is anticipated to generate 2,038 daily trips, 134 (30 in/ 94 out) trips during the AM peak hour, and 139 /89 in/ 51 out) trips during the PM peak hour. By comparison, the eX|St|Dg ZOD|Dg of the Site VVOUld be dDMdpdt8d to generate 7,596 weekday daily trips, 564 (388 in/ 176OUt) trips during the AM D8dk hour, and 747 (294 in/ 453 out) trips during the PM D8dk hour. The proposed |dDd uses generate 5,558 fewer daily trips, 439 (359 in/ 80 Out) fewer AM peak hour volumes, and 602 (203 in/ 399 out) fewer PM peak hour trips than the existing zoning O||OvvS. �/�� C'vlFec h 14 Augu5tZOZZ /� NORTH N89'59'58°E 1130.01' _ I I ' 4 1 1 7 P I I ! P 1 1 P ! 1 1 2 ! 1 1 Y w P 2 1 S S 70 X I - �I [ (. I04 X I. ^I 36 6 X 76 3G - / 76 9ll e 3G 36 36 36 36 3 36 36 1 I a�° 589'S9'Stl'-- --- °6. -� 0 * « qgg B 03 W 5 I I I �.r�a,o �F I ' - - e95627 E 100.00 m Y \ _-- - 1 p ! if - 1 p 3G ~ mu t I 1 1 1 1 ! Y 1 Y 1 4 36 / P 4 Y P 1 I P 4 I 9G I II p 1 1 p 7 1 1 ! \, II P S P 36 I .spa°roa aw �• I � X I I � I I I 36 I I 3G 36 9G 9G 36 36 36 I( I I I 3G X = / P P P 4 1 1 P P Y Y % 3G X I 1 1 C I I 7G 1 I I 1 I 36 3G P P P 4 1 1 9 ! Y Y 36 to 3G % 36 7 7 P P 1 1 9 ! Y Y I 76 3G I I I 1 f C I I I 1 36 31 I l P P P 4 1 1 92 P S 36 sell 3G 36 i li I 3G 36 3G obi a�--ra 36 36 36 W I osa 76 o� o a 3G — 36 3G 36 II 76 P Y Y I 1 I P P 1 1 I 2dj ]G 36 I I p p 1 1 ! /r mrc roe-ar-coca _—_ __ I I I�III ranr�,�arnrAx wi�— - N90Il0'�W 469.SE___ ''"'� tcr.ursuxac[co Figure 4: Site Plan and Access Alliance BroadStone Silveray - Traffic Impact Analysis CivTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis VEHICLE TRIP DISTRIBUTION AND ASSIGNMENT A single trip distribution pattern was assumed for the proposed development. It is expected that the proposed development will generate trips based on future employment within a 7-mile radius of the site. Future total employment within a 7-mile radius of the site, as projected by the 2030 socio- economic data compiled by the Maricopa Association of Governments (MAG), was used as a basis to estimate trip distribution. The resulting trip distribution percentages for the study area are shown in Table S. The trip distribution calculations are included in Appendix F. Table 5 — Site Trip Distribution PercentageDirection (To/From) North on Goldfield Road (north of Old West Highway) 5% .....................------------------........--------------------------------.....----------.....----------------------.............................................................................. Northwest on Old West Highway (west of Goldfield Road) 25% ......................................-----------------------------------------------------------------------................................................................................................. East on US-60 (east of Goldfield Road) 65% ......................................... -------------- -------------------------------------------.................................................................... .................... West on US-60 (west of Goldfield Road) 5% Total 1000/0 Figure 5 illustrates the trip distribution percentages noted in Table 5 on the roadway network within the study area. The percentages presented in Figure 5 were applied to the site trips generated to determine the AM and PM peak hour site traffic at the intersections within the study area. Figure 6 presents the resulting site generated traffic for the proposed development. FUTURE BACKGROUND TRAFFIC CivTech took historical daily traffic volumes from the ADOT's Transportation Management System website to estimate an average annual growth rate. Average daily traffic volumes at US-60 Exit 198 just west of Goldfield Road (Location ID: 6980) were considered. The location experienced an average annual increase of 1.9% per year from 2018 to 2019. To be conservative, this growth rate was rounded up so that a 2% annual growth rate (1.040 annual expansion factor for 2024, 1.104 for 2027) was applied to the volumes at the study intersections to obtain the future background traffic volumes. The background volumes for the opening year of 2024 are presented in Figure 7. The background volumes for the horizon year of 2027 are presented in Figure 8. Background traffic calculations are located within Appendix G. TOTAL TRAFFIC Total traffic was determined by adding the site generated traffic to the estimated projected background traffic. Total peak hour traffic volumes for the opening year of 2024 are shown in Figure 9. Total peak hour traffic volumes for the horizon year of 2027 are shown in Figure 10. 1/ CivTech 16 August 2022 /� NORTH LEGEND TI, Trip Distribution y � O y WB Ramp ' 60 EB Ramp Chevron Access 60 Resort Blvd. SITE Figure 5: Trip Distribution „ , CivTech N O 1� O 0(0) JA 0(0) 1(5) 1(5) V M N O� v any a �tihy Legend NORTH 0 6(yt XX(XX)-AM(PM)Peak Hour Traffic Volumes Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB w6 Ramp �n EB Ramp N Chevron Access 60 0(0) Resort Blvd. 0 72 SITE 69 Goldfield Rd&US-60/Old West Highway Exit N V V M OD W rc, N O N0(0) 0(0) 0(0)� (4) 89(51) 0(0) 0(0) 0(0) 0(0) 0(0) 0 0(0) 27(84) 89(51) 1(5) M 19(59) 0(0) 0(0) 0(0) c0 1� N M O H O O N W O CO N T W =9 601 Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard O N O O .N^.. O O 0 0 LO O M O M O 2(7) 0(0) 3(11) 0(0) 1(5) 0(0) 1(3) 0(0) 1(3) 0(0) 0(0) 0(0) 3(11) 12(7) 2(6) 7(4) 1(3) 3(2) 0(0) 0(0) 20(62) 0(0) �o 0 o 0 Access Aand Chevron Access Access Band Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure 6: Site Generated Traffic Volumes AllianceBroad, , , „ , CivTech O/a �Pst 1: rn �N 9(5) 17(20) 59(59) 59(59) 0 00 '6 �a(y ao esty co co Legend NORTH 0F�;t XX(XX)-AM(PM)Peak Hour Traffic Volumes WB Ramp Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB 60 EB Ramp Chevron Access 00 60 co co Resort Blvd.O 0 168(114) SITE M N O Goldfield Rd&US-60/Old West Highway Exit ' �I ' aO N N Cp OD M CO O .75 M F// M CI) N M 17(42) 77(138) 3(5) 22(29) 28(18) 6(2) 1(0) 0(0) 0(0) 2(0) 1(0) Z15(28) 29(10) 7(20) qU L 31(45) 0(1) 2(4) Am 2(2) aO N (D N O ;R G3 N� c0 V 7 O 00 M u7 � M a0 V V O Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Figure 7: 2024 Background Traffic Volumes Alliance BroadStone Silveray-Traffic Impact Analysis CIVTech 0 © ``PSFti� J� v 0 N � N N W( 10(6) 18(21) 63(62) o ^ �PS�ti N Legend NORTH 0 r XX(XX)-AM(PM)Peak Hour Traffic Volumes WB Ramp Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB O po EB Ramp Chevron Access 60 O Resort Blvd. -- 179(121) SITE 0 Z2 h"M O Goldfield Rd&US-60/Old West Highway Exit <7I M c0 lC) N W coO c0 _O �M.. _ M I� co O or � 18(42) 81(144) 3(6) 23(31 30(19) 7(2) 1(0) 0(0) 0(0) 2(0) 1(0) 15(30) 31(11) 8(21) ' ' 33(47) 0(1)M N 2(4) 2(2) -A O 61 W V Q> N (O O �. O t�W M 00 Z— I— M co I-- Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Figure 8: 2027 Background Traffic Volumes Alliance BroadStone Silveray-Traffic Impact Analysis — CIVTech fore M N Y N � 9(5) 17(20) 60(64) 60(64) m N �PS Legend NORTH 0 Ft�� Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB XX(XX)-AM(PM)Peak Hour Traffic Volumes W6 Ramp 60 EB Ramp r- Cq Cq Chevron Access 00 O O 60 168(114) Resort Blvd.O O 0 SITE �. co 00 Goldfield Rd&US-60/Old West Highway Exit 00 F� N 6) � � M �W c0 N 1� co M u7 N M u7// V � M CO N N V � M 17(42) 77(138), 29(33) 117(69) 6(2) 1(0) 0(0) 0(0) 1(0) 42(112) 118(61) 8(25) 50(104) 0(1) 2(4) 2(2) v rn oo ui � eo ao eo ui ! O _ a0 M Cl) lf) Goldtield Road and US-60 WB Ramps Goldtield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard �I V O N O O V O V O v O 2(7) 0(0) 3(11) 0(0) 1(5) 0(0) 1(3) 0(0) 1(3) 0(0) Uh3 0(3 7) 7(2) 18(39) 41(17) 17(34) 36(14) 16(31) 32(12) 15(28) 29(10) 20(62) 0(0) o 0 Access A and Chevron Access Access B and Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure 9: 2024 Total Traffic Volumes Alliance BroadStone Silveray- Traffic Impact Analysis CIVTech oia �oreCIJ h' 2 �k M OD P 10(6) 18(21) 64(67) 64(67 G:;�:, N �Er cli Legend NORTH 0 FIEF Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB XX(XX)-AM(PM)Peak Hour Traffic Volumes W6 Ramp 6 0 EB Ramp M d) Chevron Access OD O • i 60 179(121) Resort Blvd. SITE Goldfield Rd&US-60/Uld West Highway E)l R ! 0 coo _ !a N M r 7 coW coT �O O M r• L l[') M .�M coc0 Q4 � N 7 � M - 18(42) 81(144) 3(6) 30(35) 119(70) 1 7(2) 1(0) 0(0) 0(0) 2(0) 1(0) 42(114) 120(62) ^ 9(26) 52(106) 0(1) 2(4) 2(2) CD [D N (D (D O 7 LO O O c0 N LO Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard 1 I CCd 2(7) 0( )) 3(11) 0(0) 1(5) 0(0) 1(3) 0(0) 1(3) 0(0) 32(40) (2)= jr 18(41) 43(18) 17(36) 38(15) 16(33) 34(13) 15(30) 31(11) 20(62) 0(0) M 2 Ir M �o 0 M O O CD Access Aand Chevron Access Access B and Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure 10: 2027 Total Traffic Volumes Alliance BroadStone Silveray- Traffic Impact Analysis (' CIVTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis TRAFFIC AND IMPROVEMENT ANALYSIS The overall intersection and approach levels of service are summarized in Table 6 for the 2024 and 2027 background and total traffic conditions. Detailed analysis worksheets for the 2024 background analysis can be found in Appendix H, worksheets for the 2027 background analysis can be found in Appendix I, worksheets for the 2024 total traffic analysis can be found in Appendix 7, and worksheets for the 2027 total traffic analysis can be found in Appendix K. Table 6 — Peak Hour Levels of Service Movement2024 2027 ID Intersection Control •Build Build No Build • AM (PM) AM(PM) AM (PM) AM(PM) 1 Goldfield Road and Old 1-way Stop WB Left A(A) A(A) A(A) A(A) West Highway SEB (WB) EB Thru B(B) B(B) B(B) B(B) 2 Goldfield Road and Old 2-Way Stop WB Thru B(B) B(B) B(B) B(B) West Highway NWB (EB/WB) WB Right A(A) A(A) A(A) A(A) Goldfield Road and US- 1-way stop 3 60/Old West Highway (WB) WB Right A(A) A(A) A(A) A(A) Exit NB A(A) A(A) A(A) A(A) Goldfield Road and US- Signal SB A(A) A(A) A(A) A(A) 4 60 WB Ramp WB D(D) D (D) D(D) D(D) Overall A(A) A(A) A(A) A(A) NB A(A) A(A) A(A) A(A) Goldfield Road and US- Signal SB A(A) A(A) A(A) A(A) 5 60 EB Ramp EB D(D) D (D) D(D) D(D) Overall B(B) B(B) B(B) B(B) NB Left A(A) A(A) A(A) A(A) 6 Goldfield Rd & 2-way stop SB Left A(A) A(A) A(A) A(A) Chevron Access (EB/WB) EB Shared B(A) B(B) A(A) B(B) WB Shared A(A) A(A) A(A) A(A) 7 Goldfield Road & 1-way stop SB Left A(A) A(A) A(A) A(A) Resort Boulevard (WB) WB Shared A(A) A(A) A(A) A(A) 8 Chevron Access& 1-way stop EB Left A(A) A(A) A(A) A(A) Resort Boulevard (SB) SB Shared A(A) A(A) A(A) A(A) 9/A Access A&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) EB Left A(A) A(A) 10/B Access B&Resort 2-way stop WB Left A(A) A(A) Boulevard (NB/SB) NB Shared A(A) A(A) SB Shared A(A) A(A) 11/C Access C&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) 12/D Access D&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) 13/E Access E&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) CivTech 23 August 2022 Alliance Broadstone Silveray-Apache Junction, AZ Traffic Impact Analysis The results of the Synchro analysis summarized in Table 6 indicate that all study intersections operate with overall acceptable levels of service (LOS B or better). TURN LANE WARRANTING AND QUEUE LENGTH ANALYSIS RIGHT-TURN LANE WARRANT ANALYSIS The City of Apache Junction Land Development Code, Chapter 10: Engineering Design Guidelines and Policies do not specify criteria warranting a right turn lane. Therefore, MCDOT guidelines are considered for this analysis. Per section 7.15 of the MCDOT Roadway Design Manual, a driveway right-turn deceleration lane is required when either of the following is met: A. The outside lane has an expected volume of 250 vph or greater and the right turn volume is greater than 55 vph. B. Any three of the below criteria are met: 1. At least 5,000 vehicles per day are using or are expected to be using the adjacent street. 2. The roadway's posted speed limit is greater than 35 mph. 3. At least 1,000 vehicles per day are using or are expected to use the driveway. 4. At least 30 vehicles are expected to make right-turns into the driveway within a one-hour period. All access points were evaluated under these criteria. The results are shown in Table 7. Table 7 is a summary of the 2027 peak hour right-turn volumes from the adjacent street onto the proposed driveways: Table 7 - Driveway Right-Turn Lane Analysis Access A &Chevron Access No No No No No ------------------------------- --------------------------------- --------------------- ------------------------ -----------------------------------------------------------------------------............------------- Access B & Resort Boulevard No No No No Yes ............................................................................................................................................................................................................................................................................................................................................ Access C & Resort Boulevard No No No No No ....................................................................................... ................................................. ..........................................................-....................................................................................................... Access D & Resort Boulevard No No No No No Access E & Resort Boulevard I No No I No I No I No Due to the low expected future traffic volumes and low speed limit on Resort Boulevard & Chevron Access, neither criterion is met for the intersection. Therefore, a right-turn deceleration lane is not warranted for the site accesses. QUEUE STORAGE Adequate turn storage should be supplied on any approach where turn lanes are permitted and/or warranted. Per ADOT TGP 430 on Turn Lane Design, the configuration of a turn lane consists of a taper, an opening or "gap", and the storage length. A formula for calculating the length of the taper (which may not be required for right turn lanes) is provided in the TGP and the gap is specified in Table 430-1; both are based on posted or design speed, while the taper calculation also considers CivTech 24 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis the width of the lane and whether widening for it will be to one side or symmetrical. The storage is comprised of two components: braking distance (also specified in TGP 430) and the queue, which can vary depending on the projected number of turns. There are several methods of determining the appropriate queue for a turning movement. One common method is outlined in A Policy on Geometric Design of Highways and Streets (the AASHTO "Green Book', a conservative methodology in which it is assumed that the turn lane should store the average number of turning vehicles arriving in a two-minute period, where unsignalized, or, in two signal cycles, where signalized. TGP 430 describes this method (without attributing it to the Green Book) as one way of estimating the queue, indicating that the minimum queue should be 50 feet (i.e., two passenger vehicles) where trucks are less than 10% of the total traffic volume of 85 feet (one 25-foot passenger vehicle + one 60-ft long truck) where trucks are greater than 10% of the total traffic volume. TGP 240 allows/suggests the use of another method, one outlined in the Highway Capacity Manual. This method is used by the Synchro software to report the 95th percentile number of vehicles to the back of the queues. CivTech rounds this number up to the nearest whole number of vehicles and multiplies by 25 feet to convert the number of vehicles to a required queue. The equations used for the calculations are shown below, and the resulting turn lane storage requirements for the study intersections are summarized in Table S. Detailed queue storage calculation worksheets using the AASHTO method are included in Appendix L. Proposed lane configurations are shown in Figure 11. Table 8— Queue Storage Lengths ID Intersection Control Movement Existing(') ADOT AASHTO HCM(2) Recommended Goldfield Road and 1-way SB Left 195' 405' 90' 85' 100, 25' (5)195' 1 Old West Highway Stop WB Left 25' 245' 60' 45' 150' 25' (5)25' SEB (WB) ...................................................................................................................................................................................................................................................................................................................................... Goldfield Road and 2-Way 2 Old West Highway Stop WB Right 55' 245' 60' 40' 100, <25' (5)55' NWB (EB/WB) ............ ........... ......................................................................... ..................................... .............................. Goldfield Road and 1-way 3 US-60/Old West Stop WB Right M_ 405' 90' 85' 225' 25' (5)_ HighwayExit (WB) .......................................... .......................................................................................................................................................................................................................................................................... NB Left 445' 245' 60' 40' 200' 25' (5)445' Goldfield Road and WB Left 190, 405' 90' 85' 125' 40' M190' 4 US-60 WB Ramp Signal SB Right 140' 245' 60' 40' 250' <25' (5)140' WB Right 185' 405' 90' 85' 150' <25' N185 ................................. ............................. .................................... ..................................... .............................. SB Left 440' 245' 60' 40' 325' <25' (5)440' Goldfield Road and EB Left 125' 405' 90' 85' 275' 100, (5)125' 5 US-60 EB Ramp Signal NB Right 120' 245' 60' 40' 150' <25' (5)120' EB Right 125' 405' 90' 85' 225' 35' (5)125' ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Goldfield Rd& 2-way NB Left (3)TWLTL 245' 60' 40' 100, <25' (3)TWLTL 6 Stop SB Left (3)TWLTL 245' 60' 40' 125' 25' (3)TWLTL Chevron Access (EB/WB) NB Right 75' 245' 60' 40' 100, <25' (5)75' -------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Goldfield Road& 1-way 7 Resort Boulevard Stop SB Left 3�TWLTL 245' 60' 40' 175' 25' 3�TWLTL (WB) (1) Measured from beginning of stop bar (2) HCM 951h percentile queue reported in vehicles/lane,assuming 1 vehicle—25 feet. (3) Two-way-left-turn-lane(TWLTL) provides excess storage for the left-turn lane. (4) Queue for right turns is an exit road from the US-60. (5) Existing conditions meet queue storage requirements. CivTech 25 August 2022 0 © ��sFti �y IL LEGEND NORTH Q ©Thru or Turning Movement Traffic Signal ©Two-Way Left Turn-Lane Stop Sign e Raised Median 40 Speed Limit Bike Lane Q Yield Sign 'a O /a,I MEd Channelize Turn Laneillie /. �_ YPSFti ■Development Improvements O (� Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB 'h WB Ramp © 60 EB Ramp Chevron Access OD � 60 o , J 4- Resort Blvd. SITE L IT 35 Goldfield Rd&US-60/Old West Highway Exit O © O O 4 10 iE Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard O O O O Access Aand Chevron Access Access B and Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure 11: Proposed Lane Configurations and Traffic controls Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis SIGHT DISTANCE ANALYSIS Adequate sight distance must be provided at intersections and site access driveways to allow safe turning movements. There must be sufficient unobstructed sight distance along both approaches of a street/driveway intersection and across their included corners to allow operators of vehicles to see each other in time to prevent a collision. The City of Apache Junction maintains sight distance requirements within their Engineering and Design Guidelines and Policies Manual. The City of Apache Junction measures sight distance using AASHTO methodology. Sight distance calculations according to AASHTO guidelines are summarized in Table 9. Table 8 —AASHTO Sight Distance Requirements 12EE,1397Left MMC Chevron Access 15/25 265, 310' 225' .................................................................................................................................................... .................................................................................................................................................................................. Resort Boulevard 20/30 225' 260' 185' Sight visibility should be provided at all driveways according to the distances shown in Table 9 and that sight triangles at public intersections are maintained according to Section 10-3-4 of the City Code. Sight distance worksheets and Section 10-3-4 of the City Code have been included within Appendix M. C i v T e c h 27 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis CONCLUSIONS The following conclusions and recommendations have been documented in this study. GENERAL • The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/ 94 out) trips during the AM peak hour, and 139 (89 in/ 51 out) trips during the PM peak hour. • The existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564 (388 in/ 176 out) trips during the AM peak hour, and 747 (294 in/ 453 out) trips during the PM peak hour. o The proposed land uses generate approximately 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/ 399 out) fewer PM peak hour trips than the existing zoning allows. CRASH HISTORY • In total, there were 13 incidents within the study area from 2018-2020. There was a total of 15 injuries and 4 fatalities. EXISTING • The results of the existing conditions analysis indicate that all study intersections operate with acceptable levels of service (LOS B or better) with the existing traffic control devices. OPENING YEAR • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. 2027 CAPACITY ANALYSIS • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. QUEUE STORAGE • The recommended storage lengths are provided for study horizon year 2027 using the total traffic projections. SIGHT DISTANCE • Sight visibility should be provided at all driveways according to the distances and sight triangles at public intersections should be maintained according to Section 10-3-4 of the City Code. CivTech 28 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis LIST OF REFERENCES Highway Capacity Manual, Sixth Edition: A Guide for Multimodal Mobility Analysis Transportation Research Board, Washington, D.C., 2018. Manual on Uniform Traffic Control Devices U.S. Department of Transportation, Federal Highways Administration, Washington, D.C., 2009. Roadway Design Manual, Mancopa County Department of Transportation, Phoenix, Arizona, Revised April 2004. Trip Generation Manual, 11t17 Edition, Institute of Transportation Engineers, Washington, D.C., 2017. Trip Generation Handbook, 3rd Edition, Institute of Transportation Engineers, Washington, D.C., 2014. A Policy on Geometric Design of Highways and Streets ("AASHTO Green Book") 61h Edition, The American Association of Highway Transportation Officials, page 9-127, Washington, D.C., 2011. CivTech 29 August 2022 7 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis TECHNICAL APPENDICES APPENDIX A: REVIEW COMMENTS AND RESPONSES (RESERVED) APPENDIX B: EXISTING TRAFFIC COUNTS APPENDIX C: EXISTING PEAK HOUR ANALYSIS APPENDIX D: CRASH ANALYSIS WORKSHEETS APPENDIX E: TRIP GENERATION CALCULATIONS APPENDIX F: TRIP DISTRIBUTION CALCULATIONS APPENDIX G: BACKGROUND GROWTH CALCULATIONS APPENDIX H: 2024 NO BUILD PEAK HOUR ANALYSIS APPENDIX I: 2027 NO BUILD PEAK HOUR ANALYSIS APPENDIX 3: 2024 BUILD PEAK HOUR ANALYSIS APPENDIX K: 2027 BUILD PEAK HOUR ANALYSIS APPENDIX L: QUEUE STORAGE ANALYSIS APPENDIX M: SIGHT DISTANCE ANALYSIS 1/ CivTech 30 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX A REVIEW COMMENTS AND RESPONSES (Reserved) CivTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX B EXISTING TRAFFIC COUNTS CivTech Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-001 TMC SUMMARY OF Goldfield Rd& Old West Highway APPROACH LANES ,352 N w � [REF-1 ,3 a L, o 0 Old West Highway a rn "' o Old West Highway AM MD PM TOTAL w TOTAL AM MD PM z 35 16 19 CONTROL 0 0 0 ? �0 0 0 i-Way Stop 0 0 0 0 a p 297 112 185 se 0 0 0 a n z LOCATION#: 22-1400-001 0 TURNING MOVEMENT COUNT 00 00 o Goldfield Rd&Old West Highway (Intersection Name) O M ^ O F .a WEDNESDAY 06/29/22 aI Day Date w 'a APPROACH LANES p COUNT PERIODS W AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 400 PM Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-002 TMC SUMMARY OF Goldfield Rd& US-60 WB Off-Rama (north) APPROACH LANES ,352 N N O ❑❑ M ❑ F O O w a O M O US-60 WB Off-Ramp(north) a o o US-60 WB Off-Ramp(north) AM MD PM TOTAL w TOTAL AM MD PM z g 00 0 0 CONTROL 162 110 272 U �0 0 0 i-Way Stop O O 0 O a 0 FL 0 0 WB 1 1 2 a D n I I U0 o 0 0 - LOCATION#: 22-1400-002 0 TURNING MOVEMENT COUNT a o o ildfield Rd&US-60 WB Off-Ramp(norl (Intersection Name) 0 BE o .a WEDNESDAY 06/29/22 aI Day Date w 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 400 PM Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-003 TMC SUMMAR Y OF Goldfield Rd& US-60 WB Off- APPROACH LANES ,352 N N O M O O❑ M F w 13 1 a LLr) 000 O N O US-60 WB Off-Ramp a °' �" US-60 WB Off-Ramp AM MD PM TOTAL w TOTAL AM MD PM z g 0 0 0 CONTROL 5 2 7 U �00 O 0 0 Signal 0 0 0 FL 0 0 7 19 26 a D n I I U0 a N O O LOCATION#: 22-1400-003 0 TURNING MOVEMENT COUNT M 00 O Goldfield Rd&US-60 WB Off-Ramp (Intersection Name) oo .a WEDNESDAY 06/29/22 aI Day Date w 'a APPROACH LANES p COUNT PERIODS W AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 715 AM NOON PEAK HOUR PM PEAK HOUR 500 PM Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-004 TMC SUMMAR Y OF Goldfield Rd& US-60 ES Ramps APPROACH LANES ,352 N w o ❑❑ ,3 a L 0 US-60 EB Ramps a `' °i US-60 EB Ramps AM MD PM TOTAL w TOTAL AM MD PM z 145 60 85 CONTROL 0 0 0 ? �0 0 0 0 0 Signal 0 0 a p 73 30 43 0 0 0 a n z a v C) LOCATION#: 22-1400-004 0 TURNING MOVEMENT COUNT a o � � I ILL] Goldfield Rd&US-60 EB Ramps (Intersection Name) 0 BE .a WEDNESDAY 06/29/22 aI Day Date w 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 715 AM NOON PEAK HOUR PM PEAK HOUR 415 PM Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-005 TMC SUMMARY OF Goldfield Rd& Chevron Access APPROACH LANES ,352 N 0 [EF-IF-1 w ,3 a CF, Co rlJ 0 CM Chevron Access a M `�' Chevron Access AM MD PM TOTAL w TOTAL AM MD PM z g 88 3 5 CONTROL 21 28 49 v2 0 2-way stop 1 0 1 0 o 1 0 1 Es&Ws 2 4 6 a D n z 00 LOCATION#: 22-1400-005 0 TURNING MOVEMENT COUNT a o ^ co Goldfield Rd&Chevron Access (Intersection Name) o .a WEDNESDAY 06/29/22 aI Day Date w 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 445 PM Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-006 TMC SUMMARY OF Goldfield Rd& Resort Blvd APPROACH LANES ,352 2 N w 1111EH ,3 Resort Blvd a o N Resort Blvd AM MD PM TOTAL w TOTAL AM MD PM z ❑ 0 0 CONTROL 27 17 44 ? �0 0 0 i-Way Stop 0 0 0 O a O FL 0 0 ws 2 2 4 a D n 11 U0 a o ° Ln LOCATION#: 22-1400-006 0 TURNING MOVEMENT COUNT Q C) M Goldfield Rd&Resort Blvd (Intersection Name) 0 BE co 13 .a WEDNESDAY 06/29/22 aI Day Date w 'a APPROACH LANES p COUNT PERIODS W AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 445 PM Intersection Turning Movement Prepared by: .s. FIELD DATA SERVICES OF ARIZONA, INC. 520.316.6745 Project #: 22-1400-007 TMC SUMMARY OF Chevron Access& Resort Blvd APPROACH LANES to N U L t a M O -i U 0 � O Resort Blvd a LJI M Resort Blvd AM MD PM TOTAL w TOTAL AM MD PM z g 6 2 CONTROL 1 0 1 U v 41 14 27 E=* 1-way stop 28 10 38 0 O 0 0 0 se D 0 0 0 a n z o 0 0 LOCATION#: 22-1400-007 0 TURNING MOVEMENT COUNT a o 0 0 Chevron Access&Resort Blvd (Intersection Name) �n o Ell 0 N ~ V Q WEDNESDAY 06/29/22 p Day Date L y APPROACH LANES t COUNT PERIODS U AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 415 PM Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX C EXISTING PEAK HOUR ANALYSIS �- CivTech Existing AM 1:Goldfield Rd/EB Old West Hwy Existing PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection In erse ion Int Delay,s/veh 3.8 Int Delay,s/veh 2.9 Movement WBL Movement WBL WBR NBT NBR SBL Lane Configurations Lane Configurations ►f ) Qf Traffic Vol,veh/h 54 0 0 0 0 112 Traffic Vol,veh/h 46 0 0 0 0 185 Future Vol,veh/h 54 0 0 0 0 112 Future Vol,veh/h 46 0 0 0 0 185 Conflicting Pads,Whir 0 0 0 0 0 0 Conflicting Pads,Whir 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None RT Channelized - None None - None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 - 0 - - 0 Grade,% 0 - 0 - - 0 Peak Hour Factor 63 63 25 25 91 91 Peak Hour Factor 46 46 25 25 79 79 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 86 0 0 0 0 123 Mvmt Flow 100 0 0 0 0 234 Major/Minor -1 Major2 Major/Minor Minorl Major2 - Conflicting Flow All 62 - 0 0 Conflicting Flow All 117 - 0 0 Stage 1 Elill 0 Stage 1 0 - Stage 2 62 - - - Stage 2 117 - - - Critical Hdwy 6.84 4.14 Critical Hdwy 6.84 4.14 - Critical Hdwy Stg 1 - - Critical Hdwy Stg 1 - - Critical Hdwy Stg 2 5.84 - Critical Hdwy Stg 2 5.84 - r Follow-up Hdwy 3.52 - 2.22 - Follow-up Hdwy 3.52 - 2.22 - Pot Cap-1 Maneuver 937 0 - f Pot Cap-1 Maneuver 867 0 - 7 Stage 1 - 0 Stage 1 - 0 Stage 2 953 0 Stage 2 895 0 Platoon blocked,% - Platoon blocked,% - Mov Cap-1 Maneuver 937 - Mov Cap-1 Maneuver 867 - - Mov Cap-2 Maneuver 937 Mov Cap-2 Maneuver 867 Stage 1 - Stage 1 - Stage 2 953 Stage 2 895 Approach WB SIB Approach WB SIB HCM Control Delay,s 9.2 0 HCM Control Delay,s 9.7 0 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt WBLni SBL SBT Minor Lane/Major Mvmt WBLni SBL SBT Capacity(veh/h) 937 - - Capacity(veh/h) 867 - - HCM Lane V/C Ratio 0.091 HCM Lane V/C Ratio 0.115 HCM Control Delay(s) 9.2 0 HCM Control Delay(s) 9.7 0 HCM Lane LOS A A - HCM Lane LOS A A - HCM 95th%tile Q(veh) 0.3 HCM 95th%tile Q(veh) 0.4 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 Existing AM 2:Goldfield Rd&WB Old West Hwy Existing PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection In erseFlon Int Delay,s/veh 3.5 Int Delay,s/veh 3.8 Movement Movement NBR WBL WBT WBR NBL NBT NBR SBL SB Lane Configurations Lane Configurations } F Tt r Traffic Vol,veh/h 0 16 0 0 54 9 0 178 28 _ 0 0 7 Traffic Vol,veh/h 0 19 0 0 46 5 0 171 49 N 0 0 0 - Future Vol,veh/h 0 16 0 0 54 9 0 178 28 0 0 0 Future Vol,veh/h 0 19 0 0 46 5 0 171 49 0 0 0 Conflicting Pads,Whir 0 0 0 0 0 0 0 0 0 i0 Conflicting Pads,Whir 0 0 0 0 0 0 ^ i^ ^Molill - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None Stop Yield �e RT Channelized None Stop Yield - None j Storage Length 0 0 Storage Length 0 0 - - - Veh in Median Storage,# - 0 0 - 0 - - Veh in Median Storage,# - 0 0 - 0 - 0 Grade,% - 0 - - 0 - - 0 - - 0 - Grade,% - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 91 91 91 63 63 63 84 84 84 25 25 25 Peak Hour Factor 79 79 79 46 46 46 89 89 89 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 18 0 0 86 14 0 212 33 0 0 0 Mvmt Flow 0 24 0 0 100 11 0 192 55 0 0 0 Major/Minor Min2r2 Minorl Majors Major/Minor Minors Minorl Majorl Conflicting Flow All 212 - 212 106 0 0 Conflicting Flow All - 192 - 192 96 0 0 Stage 1 0 212 - - - Stage 1 0 192 - - - Stage 2 212 0 - Stage 2 192 0 - Critical Hdwy 6.54 6.54 6.94 Critical Hdwy 6.54 6.54 6.94 Critical Hdwy Stg 1 - 5.54 - Critical Hdwy Stg 1 - 5.54 - Critical Hdwy Stg 2 5.54 Critical Hdwy Stg 2 5.54 Follow-up Hdwy - 4.02 - - 4.02 3.32 - - - Follow-up Hdwy - 4.02 - - 4.02 3.32 - - - Pot Cap-1 Maneuver 0 684 0 0 684 928 0 Pot Cap-1 Maneuver 0 702 0 0 702 942 0 Stage 1 0 - 0 0 726 - 0 Stage 1 0 - 0 0 740 - 0 Stage 2 0 726 0 0 - - 0 Stage 2 0 740 0 0 - - 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 684 - - 684 928 - Mov Cap-1 Maneuver - 702 - - 702 942 - _ Mov Cap-2 Maneuver 684 684 - Mov Cap-2 Maneuver 702 702 - Stage 1 - - - - 726 - - - - _ Stage 1 - - - - 740 - - - - Stage 2 726 - Stage 2 740 - Approach EB WB NB Approach EB WB INS - HCM Control Delay,s 10.4 10.7 0 HCM Control Delay,s 10.3 10.8 0 - HCM LOS B B HCM LOS B B Minor Lane/Major Mvmt NBT NBR E Minor Lane/Major Mvmt NBT NBR EBLn1WBLn1WBLn2 Capacity(veh/h) - - 6t1! 928 Capacity(veh/h) - - 702 702 942 - HCM Lane V/C Ratio 0.026 0.125 0.015 HCM Lane V/C Ratio 0.034 0.142 0.012 HCM Control Delay(s) 10.4 11 8.9 HCM Control Delay(s) 10.3 11 8.9 - HCM Lane LOS - - B B A HCM Lane LOS - - B B A HCM 95th%tile C(veh) 0.1 0.4 0 HCM 95th%tile C(veh) 0.1 0.5 0 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 Existing AM 3:Goldfield Rd&US-60/01d West Hwy Exit Existing PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 4 Int Delay,s/veh 2 Movement Movement WBL WBR Lane Configurations Lane Configurations r T+ +f Traffic Vol,veh/h 0 162 44 0 0 166 Traffic Vol,veh/h 0 110 110 0 0 231 Future Vol,veh/h 0 162 44 0 0 166 Future Vol,veh/h 0 110 110 0 0 231 Conflicting Pads,Whir 0 0 0 0 0 0 Conflicting Pads,#/hr 0 0 0 0 0 0 Sign Control Stop Slop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized None None None RT Channelized None None None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 - 0 0 Veh in Median Storage,# 0 - 0 0 Grade,% 0 - 0 - - 0 Grade,% 0 - 0 - - 0 Peak Hour Factor 82 82 58 58 87 87 Peak Hour Factor 84 84 86 86 68 68 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 198 76 0 0 191 Mvmt Flow 0 131 128 0 0 340 Major/Minor �rl Majorl Major2 Major/Minor Minorl Majorl Majo2 - Conflicting Flow All 38 0 - Conflicting Flow All 64 0 Stage 1 MEA - - Stage 1 - - - Stage 2 Stage 2 - Critical Hdwy 6.94 Critical Hdwy 6.94 - Critical Hdwy Stg 1 - Critical Hdwy Stg 1 - Critical Hdwy Stg 2 - Critical Hdwy Stg 2 - Follow-up Hdwy - 3.32 - - - - Follow-up Hdwy - 3.32 - - - - Pot Cap-1 Maneuver 0 1026 0 0 J Pot Cap-1 Maneuver 0 987 0 0 Stage 1 0 - 0 0 Stage 1 0 - 0 0 Stage 2 0 - 0 0 Stage 2 0 - 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 1026 - - Mov Cap-1 Maneuver - 987 - - Mov Cap-2 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 1 Stage 2 Stage 2 Approach WB NB SIB Approach WB NB SIB HCM Control Delay,s 9.3 0 0 HCM Control Delay,s 9.2 0 0 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt Ni SBT Minor Lane/Major Mvmt NBTWBLM SBT Capacity(veh/h) 1026 Capacity(veh/h) 987 - HCM Lane V/C Ratio 0.193 HCM Lane V/C Ratio 0.133 HCM Control Delay(s) 9.3 HCM Control Delay(s) 9.2 - HCM Lane LOS - A - HCM Lane LOS - A HCM 95th%tile C(veh) 0.7 HCM 95th%tile C(veh) 0.5 i 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 Existing AM 4:Goldfield Rd&US-60 WB Ramps Existing PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings 'r ~ t \ t l -' 'r ~ t \ t l WBR NBL NBT SBT SBR T SBT SBR Lane Configurations 1 4 ) ?T ?T? if Lane Configurations ►) r ►) T? }TT r Traffic Volume(vph) 7 0 5 34 87 121 80 Traffic Volume(vph) 19 0 2 27 108 180 59 Future Volume(vph) 7 0 5 34 87 121 80 Future Volume(vph) 19 0 2 27 108 180 59 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase I Switch Phase Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 31.6 31.6 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 31.6 31.6 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% 37.8% 37.8% Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% 37.8% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 J9.9 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 5.6 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Y- Lead-Lag Optimiz8JJJJJJJJJkL .JW Yes Yes gas Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max n elTrse(ion Summary n erse ion Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps #14*#5 #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 �'1 01 02 03 i1 01 02 t 03 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 Existing AM 4:Goldfield Rd&US-60 WB Ramps Existing PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis MENErIIIIINFIr'S131- SBT SBR T WBR NBL NBT NBR SBL SBT SBR Lane Configurations ►) r ) tt ttt r Lane Configurations ►) 4. if ) t} tt} r Traffic Volume(vph) 0 0 0 7 0 5 34 87 0 0 121 80 Traffic Volume(vph) 0 0 0 19 0 2 27 108 0 0 180 59 Future Volume(vph) 0 0 0 7 0 5 34 87 0 0 121 80 Future Volume(vph) 0 0 0 19 0 2 27 108 0 0 180 59 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Fr: 1.00 0.94 0.85 1.00 1.00 1.00 0.85 Fr: 1.00 1.00 0.85 1.00 1.00 1.00 0.85 Fit Protected 0.95 0.97 1.00 0.95 1.00 1.00 1.00 Fit Protected 0.95 0.95 1.00 0.95 1.00 1.00 1.00 Satd.Flow(prot) 1681 1547 1504 1770 3539 5085 1583 Satd.Flow(prot) 1681 1610 1504 1770 3539 5085 1583 Fit Permitted 0.95 0.97 1.00 0.66 1.00 1.00 1.00 FIl Permitted 0.95 0.95 1.00 0.61 1.00 1.00 1.00 Satd.Flow(perm) 1681 1547 1504 1235 3539 5085 1583 Satd.Flow(perm) 1681 1610 1504 1140 3539 5085 1583 Peak-hour factor,PHF 0.25 0.25 0.25 0.75 0.75 0.75 0.89 0.89 0.89 0.90 0.90 0.90 Peak-hour factor,PHF 0.25 0.25 0.25 0.58 0.58 0.58 0.79 0.79 0.79 0.84 0.84 0.84 Adj.Flow(vph) 0 0 0 9 0 7 38 98 0 0 134 89 Adj.Flow(vph) 0 0 0 33 0 3 34 137 0 0 214 70 RTOR Reduction(vph) 0 0 0 0 5 5 0 0 0 0 0 29 RTOR Reduction(vph) 0 0 0 0 0 3 0 0 0 0 0 23 Lane Group Flow(vph) 0 0 0 6 0 0 38 98 0 0 134 60 Lane Group Flow(vph) 0 0 0 16 17 0 34 137 0 0 214 47 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 1 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 66.1 60.7 60.7 60.7 Actuated Green,G(s) 6.7 6.7 6.7 66.2 60.8 60.8 60.8 Effective Green,g(s) 6.8 6.8 66.1 60.7 60.7 60.7 Effective Green,g(s) 6.7 6.7 6.7 66.2 60.8 60.8 60.8 Actuated g/C Ratio 0.08 0.08 0.08 0.73 0.67 0.67 0.67 Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 127 116 113 939 2386 3429 1067 Lane Grp Cap(vph) 125 119 111 876 2390 3435 1069 v/s Ratio Prot 00.00 0.03 0.03 v/s Ratio Prot c0.00 0.04 c0.04 v/s Ratio Perm c0.00 0.00 0.00 0.03 -0.04 v/s Ratio Perm 0.01 0.01 0.00 0.03 0.03 v/c Ratio 0.05 0.00 0.00 0.04 0.04 0.04 0.06 v/c Ratio 0.13 0.14 0.00 0.04 0.06 0.06 0.04 Uniform Delay,dl 38.6 38.5 38.5 3.3 4.9 4.9 5.0 Uniform Delay,dl 38.9 39.0 38.6 3.2 4.9 4.9 4.9 Progression Factor 1.00 1.00 1.00 0.46 0.61 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.56 0.65 1.00 1.00 Incremental Delay,d2 0.1 0.0 0.0 0.1 0.0 0.0 0.1 Incremental Delay,d2 0.2 0.2 0.0 0.1 0.0 0.0 0.1 Delay(s) 38.7 38.5 38.5 1.6 3.0 4.9 5.1 Delay(s) 39.1 39.2 38.6 1.9 3.3 5.0 5.0 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 0.0 38.5 2.6 5.0 Approach Delay(s) 0.0 39.1 3.0 5.0 Approach LOS A D A A Approach LOS A D A A Intersection Summary Intersection Summary HCM 2000 Control Delay �.6 HCM 2000 Level of Service A HCM 2000 Control Delay = 6.8 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.05 HCM 2000 Volume to Capacity ratio 0.07 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 42.6% ICU Level of Service A Intersection Capacity Utilization 45.7% ICU Level of Service A Analysis Period(min) 151 1 Analysis Period(min) 151 1 c Critical Lane Group c Critical Lane Group 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 Existing AM 4:Goldfield Rd&US-60 WB Ramps Existing PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues t --\ 1 1 -' 'r ~ t -4\ 1 1 -' WBT WBR NBL NBT SBT SBR WBL WBT WBR NBL NBT SBT SBR Lane Group Flow(vph) 6 5 5 38 98 134 89 Lane Group Flow(vph) 16 17 3 34 137 214 70 v/c Ratio 0.04 0.02 0.02 0.04 0.04 0.04 0.08 v/c Ratio 0.10 0.11 0.01 0.04 0.06 0.06 0.06 Control Delay 37.2 0.2 0.2 1.3 3.4 5.4 1.2 Control Delay 38.8 39.0 0.0 1.5 3.6 5.3 0.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.2 0.2 0.2 1.3 3.4 5.4 1.2 Total Delay 38.8 39.0 0.0 1.5 3.6 5.3 0.7 Queue Length 50th(ft) 3 0 0 1 4 8 0 Queue Length 50th(ft) 9 9 0 1 6 13 0 Queue Length 951h(ft) 12 0 0 3 8 16 12 Queue Length 951h(ft) 18 19 0 3 10 21 5 Internal Link Dist(ft) 639 484 300 Internal Link Dist(ft) 639 484 300 Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 728 7091 955 2432 3495 1120 Base Capacity(vph) 730 699 709 890 2436 3500 1122 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 ON 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.01 0.01 0.01 0.04 0.04 0.04 0.08 Reduced v/c Ratio 0.02 0.02 0.00 0.04 0.06 0.06 0.06 Intersection Summary Intersection Summary 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 Existing AM 5:Goldfield Rd&US-60 EB Ramps Existing PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings --* -. 1 1 /. �► l --I -. 1 1 �' �► l EBL EB�BT NBR SBL SBT EBL EBT EBR NBT NBR SBL SBT Lane Configurations ) 4+ r ttf if ) T? Lane Configurations ) 4+ r f T? r ) T? Traffic Volume(vph) 60 0 30 61 17 91 37 Traffic Volume(vph) 85 0 43 44 40 147 55 Future Volume(vph) 60 0 30 61 17 91 37 Future Volume(vph) 85 0 43 44 40 147 55 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase I Switch Phase Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10.6 31.6 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5:i5.9 5.6 5.6 5.6 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? as Yes Yes Yes Lead-Lag Optimiz8111111111hk Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max n elTrse[ion Summary n erse ion Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 #9 #5 i1 01 �02 ~403 it 01 02 03 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 Existing AM 5:Goldfield Rd&US-60 EB Ramps Existing PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis t t 1 t t 1 EBL EB- BL NBT NBR SBL SBT EBL EB NBL NBT NBR SBL SBT Lane Configurations Ttt i tT Lane Configurations tt} r }T Traffic Volume(vph) 60 0 30 0 0 0 0 61 17 91 37 0 Traffic Volume(vph) 85 0 43 0 0 0 0 44 40 147 55 0 Future Volume(vph) 60 0 30 0 0 0 0 61 17 91 37 0 Future Volume(vph) 85 0 43 0 0 0 0 44 40 147 55 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Fr: 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fr: 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Satd.Flow(prot) 1681 1600 1504 5085 1583 1770 3539 Satd.Flow(prot) 1681 1598 1504 5085 1583 1770 3539 Fit Permitted 0.95 0.96 1.00 1.00 1.00 0.70 1.00 FIl Permitted 0.95 0.96 1.00 1.00 1.00 0.72 1.00 Satd.Flow(perm) 1681 1600 1504 5085 1583 1306 3539 Satd.Flow(perm) 1681 1598 1504 5085 1583 1341 3539 Peak-hour factor,PHF 0.68 0.68 0.68 0.25 0.25 0.25 0.78 0.78 0.78 0.84 0.84 0.92 Peak-hour factor,PHF 0.87 0.87 0.87 0.25 0.25 0.25 0.84 0.84 0.84 0.80 0.80 0.80 Adj.Flow(vph) 88 0 44 0 0 0 0 78 22 108 44 0 Adj.Flow(vph) 98 0 49 0 0 0 0 52 48 184 69 0 RTOR Reduction(vph) 0 42 37 0 0 0 0 0 7 0 0 0 RTOR Reduction(vph) 0 47 41 0 0 0 0 0 16 0 0 0 Lane Group Flow(vph) 47 3 3 0 0 0 0 78 15 108 44 0 Lane Group Flow(vph) 52 4 3 0 0 0 0 52 32 184 69 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 60.7 60.7 66.1 60.7 Actuated Green,G(s) 6.7 6.7 6.7 60.8 60.8 66.2 60.8 Effective Green,g(s) 6.8 6.8 6.8 60.7 60.7 66.1 60.7 Effective Green,g(s) 6.7 6.7 6.7 60.8 60.8 66.2 60.8 Actuated g/C Ratio 0.08 0.08 0.08 0.67 0.67 0.73 0.67 Actuated g/C Ratio 0.07 0.07 0.07 0.68 0.68 0.74 0.68 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 127 120 113 3429 1067 987 2386 Lane Grp Cap(vph) 125 118 111 3435 1069 1012 2390 v/s Ratio Prot 0.02 c0.01 0.01 v/s Ratio Prot 0.01 c0.01 0.02 v/s Ratio Perm c0.03 0.00 0.00 0.01 c0.07 v/s Ratio Perm c0.03 0.00 0.00 0.02 c0.12 v/c Ratio 0.37 0.03 0.03 0.02 0.01 0.11 0.02 v/c Ratio 0.42 0.03 0.03 0.02 0.03 0.18 0.03 Uniform Delay,dl 39.6 38.5 38.5 4.8 4.8 3.5 4.8 Uniform Delay,dl 39.8 38.6 38.6 4.8 4.8 3.6 4.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.42 0.67 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.53 0.55 Incremental Delay,d2 0.7 0.0 0.0 0.0 0.0 0.2 0.0 Incremental Delay,d2 0.8 0.0 0.0 0.0 0.1 0.4 0.0 Delay(s) 40.2 38.6 38.6 4.9 4.8 1.7 3.2 Delay(s) 40.6 38.7 38.7 4.8 4.9 2.3 2.7 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 39.2 0.0 4.9 2.1 Approach Delay(s) 39.4 0.0 4.8 2.4 Approach LOS D A A A Approach LOS D A A A Intersection Summary Intersection Summary HCM 2000 Control Delay i 15.6 HCM 2000 Level of Service B HCM 2000 Control Delay � 13.8 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.13 HCM 2000 Volume to Capacity ratio 0.20 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 42.6% ICU Level of Service A Intersection Capacity Utilization 45.7% ICU Level of Service A Analysis Period(min) 151 1 Analysis Period(min) 151 c Critical Lane Group c Critical Lane Group 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 Existing AM 5:Goldfield Rd&US-60 EB Ramps Existing PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues EBL EBT EBR NBT NBR SBL SBT EBL EBT EBR NBT NBR SBL SBT Lane Group Flow(vph) 47 45 40 78 22 108 44 Lane Group Flow(vph) 52 51 44 52 48 184 69 v/c Ratio 0.30 0.19 0.17 0.02 0.02 0.11 0.02 v/c Ratio 0.34 0.22 0.19 0.01 0.04 0.18 0.03 Control Delay 43.1 1.7 1.6 5.5 0.1 1.3 3.8 Control Delay 44.3 3.5 1.9 5.5 0.1 1.8 3.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 43.1 1.7 1.6 5.5 0.1 1.3 3.8 Total Delay 44.3 3.5 1.9 5.5 0.1 1.8 3.0 Queue Length 50th(ft) 27 0 0 4 0 2 2 Queue Length 50th(ft) 29 0 0 3 0 0 2 Queue Length 951h(ft) 45 0 0 9 0 4 4 Queue Length 951h(ft) 64 5 0 7 0 21 6 Internal Link Dist(ft) 535 222 484 Internal Link Dist(ft) 535 222 484 Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base Capacity(vph) 730 750 709 3495 1120 1003 2432 Base Capacity(vph) 730 750 709 3500 1122 1029 2436 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.06 0.06 0.06 0.02 0.02 0.11 0.02 Reduced v/c Ratio 0.07 0.07 0.06 0.01 0.04 0.18 0.03 Intersection Summary Intersection Summary - 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 Existing AM 6:Goldfield Rd&Chevron Access Existing PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection In erseFlon Int Delay,s/veh 2.7 Int Delay,s/veh 2.5 Movement E WBR NBL NBT NBR SBL SB Movement WBT WBR NBL NBT NBR SBL SIB Lane Configurations ) tt r ►f 0 Lane Configurations F+ Vi tt r ) 0 Traffic Vol,veh/h 3 2 0 2 1 21 0 71 MJMJ&=37 3 Traffic Vol,veh/h 5 0 1 4 0 28 1 d&=Eb=&jE57 9 - Future Vol,veh/h 3 2 0 2 1 21 0 71 8 19 37 3 Future Vol,veh/h 5 0 1 4 0 28 1 64 8 28 57 9 Conflicting Pads,Whir 0 0 0 0 0 0 0 0 �0 Conflicting Pads,Whir 0 0 0 0 0 0 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None �e RT Channelized None None - None - None _ Storage Length 50 50 50 - Storage Length 50 50 50 - Veh in Median Storage,# - 0 0 0 - Veh in Median Storage,# - 0 0 0 - - 0 Grade,% 0 0 0 - - 0 Grade,% 0 0 0 - - 0 Peak Hour Factor 63 63 63 75 75 75 90 90 90 74 74 92 Peak Hour Factor 50 50 50 80 80 80 55 55 55 87 87 87 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 3 0 3 1 28 0 79 9 26 50 3 Mvmt Flow 10 0 2 5 0 35 2 116 15 32 66 10 Major/Minor Minot Minorl Majors Majo2 Major/Minor Minor2 Minorl Majors Majo2 Conflicting Flow All 144 192 27 158 184 40 53 0 0 88 0 0 Conflicting Flow All 197 270 38 217 260 58 76 0 0 131 0 0 Stage 1 N 104 104 - 79 79 - - - - Stage 1 135 135 - 120 120 - - - - - Stage 2 40 88 - 79 105 - - - Stage 2 62 135 - 97 140 - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver 811 702 1042 793 709 1022 1551 1506 Pot Cap-1 Maneuver 770 650 1058 745 659 996 1542 1452 Stage 1 890 808 - 921 829 - - - Stage 1 877 798 - 872 796 - - - Stage 2 970 821 - 921 807 - - - Stage 2 942 784 - 923 794 - - - Platoon blocked,% - - - - Platoon blocked,% 1 1 1 1 1 1 - - - - Mov Cap-1 Maneuver 777 690 1042 780 697 1022 1551 1506 Mov Cap-1 Maneuver 730 635 1058 730 644 996 1542 1452 Mov Cap-2 Maneuver 777 690 - 780 697 - - - Mov Cap-2 Maneuver 730 635 - 730 644 - - - Stage 1 890 794 921 829 _ Stage 1 876 780 871 795 Stage 2 942 821 901 793 Stage 2 908 783 901 776 1 Appro�6 WB-� INS SIB Appro�B WB INS SIB HCM Control Delay,s 9.9 8.8 0 2.4 HCM Control Delay,s 9.7 8.9 0.1 2.2 HCM LOS A A HCM LOS A A 1 Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLnl SBL SBT SBR Capacity(veh/h) 1551 - - 740 978 1506 - - Capacity(veh/h) 1542 - - 770 953 1452 - - HCM Lane V/C Ratio - 0.011 0.033 0,017 HCM Lane V/C Ratio 0.001 0.016 0.042 0.022 HCM Control Delay(s) 0 9.9 8.8 7.4 HCM Control Delay(s) 7.3 9.7 8.9 7.5 HCM Lane LOS A - - A A A - - HCM Lane LOS A - - A A A - - HCM 95th%tileC(veh) 0 0 0.1 0.1 HCM 95th%tile C(veh) 0 0 0.1 0.1 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 Existing AM 7:Goldfield Rd&Resort Blvd Existing PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection In erse iocl�n Int Delay,s/veh 3.6 Int Delay,s/veh 2 Movement Movement WBL W Lane Configurations Y 0 Lane Configurations Y 0 ++ Traffic Vol,veh/h 2 27 52 3 17 22 Traffic Vol,veh/h 2 17 56 5 13 49 Future Vol,veh/h 2 27 52 3 17 22 Future Vol,veh/h 2 17 56 5 13 49 Conflicting Peds,Whir 0 0 0 0 0 0 Conflicting Peds,Whir 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None None - None RT Channelized - None None - None Storage Length 0 50 - Storage Length 0 50 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 - 0 - - 0 Grade,% 0 - 0 - - 0 Peak Hour Factor 60 60 86 86 70 70 Peak Hour Factor 53 53 61 61 74 74 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 45 60 3 24 31 Mvmt Flow 4 32 92 8 18 66 Major/Minor Minorl Majorl Major2 Major/Minor Minorl Majorl Major2 - Conflicting Flow All 126 32 0 0 63 0 Conflicting Flow All 165 50 0 0 100 0 Stage 1111111111 62 - - - - - Stage 1 111111111 96 - - - - - - Stage 2 64 - Stage 2 69 - Critical Hdwy M 6.84 6.94 4.14 Critical Hdwy M 6.84 6.94 4.14 - Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 2 5.84 - - Critical Hdwy Stg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 - - 2.22 - Follow-up Hdwy 3.52 3.32 - - 2.22 - Pot Cap-1 Maneuver 856 1035 1538 Pot Cap-1 Maneuver 833 1008 1490 Stage 1 953 - - Stage 1 917 - - Stage 2 951 - - J Stage 2 967 - - Platoon blocked,% - - - Platoon blocked,% 1 - - - Mov Cap-1 Maneuver 842 1035 1538 Mov Cap-1 Maneuver 823 1008 1490 Mov Cap-2 Maneuver 815 - - Mov Cap-2 Maneuver 801 - - Stage 1 953 Stage 1 917 Stage 2 936 Stage 2 955 Appro NB SIB App NB SIB HCM Control Delay,s 8.7 0 3.2 HCM Control Delay,s 8.8 0 1.6 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT Capacity(veh/h) - - 1016 1538 - Capacity(veh/h) - - 981 1490 - HCM Lane V/C Ratio 0,048 0,016 HCM Lane V/C Ratio 0.037 0.012 HCM Control Delay(s) 8.7 7.4 HCM Control Delay(s) 8.8 7.4 - HCM Lane LOS - - A A - HCM Lane LOS - - A A - HCM 95th%tile Q(veh) 0.1 0 HCM 95th%tile Q(veh) 0.1 0 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 Existing AM 8:Resort Blvd&Chevron Access Existing PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection In erse ion Int Delay,s/veh 1.7 Int Delay,s/veh 0.8 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations +T T+ Lane Configurations rj .l ►� Traffic Vol,veh/h 6 14 28 1 3 1 Traffic Vol,veh/h 2 27 10 0 1 3 Future Vol,veh/h 6 14 28 1 3 1 Future Vol,veh/h 2 27 10 0 1 3 Conflicting Pads,#/hr 0 0 0 0 0 0 Conflicting Pads,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized None None - None RT Channelized None None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% - 0 0 - 0 - Grade,% - 0 0 - 0 - Peak Hour Factor 83 83 60 60 33 92 Peak Hour Factor 81 81 42 42 100 100 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 7 17 47 2 9 1 ; Mvmt Flow 2 33 24 0 1 3 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 49 0 0 79 48 Conflicting Flow All 24 0 0 61 24 Stage 1 48 - Stage 1 - - - 24 - _ Stage 2 31 - Stage 2 - 37 - Critical Hdwy 4.1 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Stg 1 5.42 - Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1558 924 1021 Pot Cap-1 Maneuver 1591 945 1052 Stage 1 - 974 - Stage 1 - 999 - Stage 2 - 992 - Stage 2 - 985 - Platoon blocked,% - - - Platoon blocked,% - - Mov Cap-1 Maneuver 1558 919 1021 Mov Cap-1 Maneuver 1591 944 1052 Mov Cap-2 Maneuver - 919 - Mov Cap-2 Maneuver - 944 - Stage 1 969 _ Stage 1 998 Stage 2 992 Stage 2 985 Approach EB WB F SIB I Approach EB WB SIB HCM Control Delay,s 2.2 0 8.9 HCM Control Delay,s 0.5 0 8.5 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity(veh/h) 1558 929 Capacity(veh/h) 1591 1023 - HCM Lane V/C Ratio 0.005 0,011 HCM Lane V/C Ratio 0.002 0,004 HCM Control Delay(s) 7.3 0 8.9 HCM Control Delay(s) 7.3 0 8.5 - HCM Lane LOS A A - - A HCM Lane LOS A A - - A HCM 95th%tile Q(veh) 0 0 HCM 95th%tile Q(veh) 0 0 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX D CRASH ANALYSIS WORKSHEETS CivTech CRASH STATISTICS involvement Goldfield Rd & Old West Hwy NWB c 2019-2020 o " c m 0 0 0 F0, �0 Code No. Code No. Additional Useful Information Incidents 3 5 Veh 7 0 First Harmful Event Month Fatal 0 0 PP1 0 0 Circumstances OVERTURN_ROLLOVER 1 0 January 1 0 Vehicle Action Codes Injury 1 1 PP1 0 0 Hit & Run? 0 FIRE_EXPLOSION 2 0 February 2 1 1 GOING_STRAIGHT_AHEAD PDO 2 4 Veh Intersection Related? 0 IMMERSION 3 0 March 3 0 2 SLOWING_IN_TRAFFICWAY Peds/Bikes Summary m Injuries JACKKNIFE 4 0 April 4 0 3 STOPPED_IN_TRAFFICWAY p y CARGO_EQUIPMENT_LOSS_SHIFT 5 0 May 5 0 4 MAKING_LEFT_TURN p Code No. FELL_JUMPED_FROM_VEHICLE 6 0 June 6 0 5 MAKING_RIGHT_TURN a a w 0 r0 JunctionRelation THROWN_OR FALLING_OBJECT 7 0 July 7 0 6 MAKING U TURN Pedestrian: 0 0 0 0 NOT_JUNCTION_RELATED 0 0 OTHER_NON_COLLISION 8 0 August 8 0 7 OVERTAKING_PASSING Bicycle: 0 0 0 0 INTERSECTION_NON INTERCHANGE 1 0 EQUIPMENT_FAILURE_. -.k,"5 9 0 September 9 1 8 CHANGING LANES INTERSECTION_RELATED_NON_INTERCHANGE 2 0 SEPARATION_OF_UNITS 10 0 October 10 1 9 NEGOTIATING_A_CURVE Code No. ENTRANCE EXIT RAMP NON INTERCHANGE 3 2 RAN_OFF_ROAD_RIGHT 11 0 November 11 0 10 BACKING LiahtCondition RAILWAY_GRADE_CROSSING 4 0 RAN_OFF_ROAD_LEFT 12 0 December 12 0 11 Avoiding_Vehicle_Object_Pedestdan DAYLIGHT 1 2 CROSSOVER_RELATED 5 0 CROSS MEDIAN 13 0 Total 3 12 ENTERING_PARKING POSITION DAWN 2 1 FRONTAGE_ROAD_NON_INTERCHANGE 6 1 CROSS_CENTERLINE 14 0 13 LEAVING_PARKING POSITION DUSK 3 0 DRIVEWAY 7 0 DOWNHILL_RUNAWAY 15 0 (Unit) SurfaceCondition 14 PROPERLY_PARKED DARK LIGHTED 4 0 ALLEY_ACCESS_RELATED 8 0 MOTOR_VEHICLE_IN_TRANSPORT 16 2 DRY 1 4 15 IMPROPERLY PARKED DARK_NOT_LIGHTED 5 0 UNKNOWN_NON INTERCHANGE 9 0 PEDESTRIAN 17 0 WET 2 1 16 DRIVERLESS_MOVING_VEHICLE DARK_UNKNOWN_LIGHTING 6 0 THRU_ROADWAY 10 0 PEDALCYCLE 18 0 SNOW 3 0 17 CROSSING ROAD UNKNOWN 99 0 INTERSECTION_INTERCHANGE 11 0 RAILWAY VEHICLE TRAIN ENGINE 19 0 SLUSH 4 0 18 WALKING_WITH TRAFFIC Check Total 3 INTERSECTION_RELATED_INTERCHANGE 12 0 LIGHT RAILWAY RAILCAR VEHICLE 20 0 ICE FROST 5 0 19 WALKING_AGAINST_TRAFFIC ENTRANCE_EXIT_RAMP_INTERCHANGE 13 0 ANIMAL_WILD NON GAME 21 0 WATER_STANDING_MOVING 6 0 20 STANDING Weather FRONTAGE_ROAD_INTERCHANGE 14 0 ANIMAL WILD GAME 22 0 SAND 7 0 21 LYING CLEAR 1 1 OTHER_PART_OF_INTERCHANGE 15 0 ANIMAL PET 23 0 MUD DIRT GRAVEL 8 0 22 GETTING_ON_OR OFF VEHICLE CLOUDY 2 2 <not defined> 16 0 ANIMAL LIVESTOCK 24 0 OIL 9 0 23 WORKING_ON OR PUSHING_VEHICLE SLEET Hnn FREEZING RAIN OR DRIZZLE 3 0 UNKNOWN_INTERCHANGE 17 0 PARKED_MOTOR_VEHICLE 25 0 OTHER 97 0 24 WORKING_ON ROAD RAIN 4 0 UNKNOWN_JUNCTION 18 0 WORK_ZONE_MAINTENANCE_EQUIPMENT 26 0 UNKNOWN 99 0 97 OTHER SNOW 5 0 UNKNOWN 99 0 STRUCK_By FALLING SETETENG CARGO OR OBJECT 27 0 Total 5 99 UNKNOWN SEVERE_CROSSWINDS 6 0 OTHER_NON_INTERCHANGE 109 0 OTHER_NON_FIXED_OBJECT 28 0 BLOWING_SAND_SOIL_DIRT 7 0 Check Total 3 IMPACT ATTENUATOR CRASH CUSHION 29 0 Body Styles FOG_SMOG_SMOKE 8 0 BRIDGE OVERHEAD STRUCTURE 30 0 -1 NOT_REPORTED BLOWING SNOW 9 0 CollisionManner BRIDGE RAIL 31 0 1 \Passenger Vehicles,including RVs OTHER 97 0 SINGLE VEHICLE 1 1 CULVERT 32 0 53 / UNKNOWN 99 0 ANGLE (front to side)(other than left turn) 2 2 CURB 33 1 54 \TRUCKS Check Total 3 LEFT_TURN 3 0 DITCH 34 0 88 / REAR END 4 0 EMBANKMENT 35 0 89 \MOBILEHOME (NOT EVE) TrafficWavTyoe HEAD ON 5 0 GUARDRAIL_FACE 36 0 92 / ONE WAY_TRAFFICWAY 1 2 SIDESWIPE_SAME_DIRECTION 6 0 GUARDRAIL_END 37 0 93 \TRAILERS TWO WAY_NOT_DIVIDED 2 0 SIDESWIPE_OPPOSITE_DIRECTION 7 0 CONCRETE_TRAFFIC_BARRIER 38 0 120 / IDII iToDCONTENoOoo®TTdToRNm4N[ 3 0 REAR_TO_SIDE 8 0 CABLE_TRAFFIC_BARRIER 39 0 121 \MOTORCYCLES ENoR0ToCToDIEAiNToDCtmooTEMoDE0 4 1 REAR_TO_REAR 9 0 OTHER_TRAFFIC_BARRIER 40 0 128 / )DDDD0Dl7®ODv10DANEBARR®R 5 0 OTHER 97 0 TREE_BUSH_STUMP_STANDING 41 0 254 UNKNOWN UNKNOWN 99 0 UNKNOWN 99 0 TRAFFIC_SIGN_SUPPORT 42 0 255 NOT REPORTED Check Total 3 Check Total 3 TRAFFIC_SIGNAL_SUPPORT 43 0 UTILITY POLE LIGHT SUPPORT 44 0 Weekday TravelDirection 1 NORTH N OTHER_POST_POLE_OR_SUPPORT 45 0 Sunday 1 0 2 SOUTH S FENCE 46 0 Monday 2 0 3 EAST E MAILBOX 47 0 Tuesday 3 1 4 WEST W BUILDING 48 0 Wednesday 4 0 5 NORTHWEST NW OTHER_FIXED_OBJECT 49 0 Thursday 5 0 6 NORTHEAST NE UNKNOWN 99 0 Friday 6 0 7 SOUTHWEST SW Not Reported 255 0 Saturday 7 2 8 SOUTHEAST SE Check Total 3 Check Total 3 99 UNKNOWN 99 CRASH LISTING Goldfield Rd & Old West Hwy NWB <---------------------- LOCATION -----------------------> <-DATE & 7IME->1------------------- UNITS --------------------> <---------- PERSON -----------><------- SEVERITY -------><----- GENERAL ----> OFF- D DIS- INTERSECT OFCR D TO- SRFCND ALGMT GRADE DFCTS BSTYLE TRDR UACT TTLTTL TYP INJR VLTN PHSCND NON INCIDENTS INJURIESFATALITIES H LT WE JCT THE HE M INCIDNT ON STREET MP SET R TANCE STREET NCIC NCIC YYMMDD HH:MM W TAL U1 U2 1 2 1 2 Ul U2 Ul U2 1 2 Ul U2 MOT NON 1 2 1 2 D1 D2 D1 D2 LOG PDOINJFATTTLMOTNONTTLMOTNON R CN CN REL CWY CD C 3489075 11 OLD WEST P 0 Goldfield (0) Rd 1113 1113 190223 08:09 7 1 2 2 1 99 44 W 1 1 0 1 3 5 0 1 1 0 0 0 0 0 N 2 1 203 1 33 1 3566569 11 OLD WEST P 0 Goldfield (0) Rd 1113 1113 190924 15:06 3 2 1 1 1 2 1 0 0 0 44 32 S NW 97 1 2 0 1 1 1 1 20 1 0 0 255 1 0 0 N 1 2 206 4 16 2 3705064 11 OLD WEST P 0 Goldfield (0) Rd 1113 1113 201024 14:39 7 2 1 1 1 2 1 0 0 0 30 47 S W 1 1 4 0 1 4 1 1 20 0 0 0 255 1 0 0 N 1 2 203 1 16 2 4 1 1 1 0 1 0 0 255 Appendix D Printed: 7/18/2022 Goldfield Rd & Old West Hwy NWB Page 1 Goldfield Rd & Old West Hwy NWB SUMMARY BY YEAR SEVERITY/INCIDENTS 2019 2020 Totals Checks N❑❑®®®=-❑®EId❑❑® 1 1 TOTA❑❑ ❑ 1 I J ❑❑d❑®®❑101111❑❑® ❑❑d❑®®❑❑IIIImlmd B®®l]d❑❑® B E111m11111d SEVERITY/INVOLVMENT N❑❑�❑���1®❑ 1 1 ❑DO ❑❑❑®❑ ❑ ❑ 4 ❑❑d❑®®❑❑❑❑®®®=-❑d ❑❑d❑®[[]❑❑N❑❑E[]❑ITT[[L❑1❑d B®❑❑®®EE=rDd B N❑❑E[]❑[[[IrflT[[[][[flr❑d COLLISION MANNER ❑IJ❑❑❑❑❑❑❑[C❑❑ 1 1 1 AN❑on ❑ 1 1 ❑ ❑❑❑TdT❑RN 3 R❑AR❑❑ND 4 ❑❑AD❑ON I ❑iD❑❑❑ iiii❑❑❑AM❑i [DiRo T[ON ❑ ED❑❑❑ ®❑❑O❑❑O❑d❑mlR❑CT[ON ❑ R❑AR❑TO❑❑iD❑ 8 R❑ARdTOEROAR ❑ OT❑❑R ❑❑ ❑N❑NO❑ N ❑❑ TOTA❑❑ ❑ 1 I Appendix D Printed: 7/18/2022 Summary by Year Page 2 CRASH STATISTICS involvement Goldfield Rd & OldWest Hwy Exit 2018-2019 1 0 " 1 0 0 0 H ✓ E z✓ F0, �0 Code No. Code No. Additional Useful Information Incidents 6 7 Veh 8 0 First Harmful Event Month Fatal 0 0 Ppl 0 0 Circumstances OVERTURN_ROLLOVER 1 0 January 1 1 Vehicle Action Codes Injury 2 2 Ppl 0 0 Hit & Run? 2 FIRE_EXPLOSION 2 0 February 2 0 1 GOING_STRAIGHT_AHEAD PDo 4 5 Veh Intersection Related? 1 IMMERSION 3 0 March 3 0 2 SLOWING_IN_TRAFFICWAY Peds/Bikes Summary m Injuries JACKKNIFE 4 0 April 4 0 3 STOPPED_IN_TRAFFICWAY p y CARGO_EQUIPMENT_LOSS_SHIFT 5 0 May 5 1 4 MAKING_LEFT_TURN p Code No. FELL_ FROM 6 0 June 6 0 5 MAKING RIGHT TURN a a w 0 r0 JunctionRelation THROWN_OR FALLING_OBJECT 7 0 July 7 0 6 MAKING U TURN Pedestrian: 0 0 0 0 NOT_JUNCTION_RELATED 0 3 OTHER_NON_COLLISION 8 0 August 8 1 7 OVERTAKING_PASSING Bicycle: 0 0 0 0 INTERSECTION_NON INTERCHANGE 1 1 EQUIPMENT_FAILURE_. -.k,"5 9 0 September 9 1 8 CHANGING LANES INTERSECTION_RELATED_NON_INTERCHANGE 2 0 SEPARATION_OF_UNITS 10 0 October 10 0 9 NEGOTIATING_A_CURVE Code No. ENTRANCE EXIT RAMP NON INTERCHANGE 3 1 RAN_OFF_ROAD_RIGHT 11 0 November 11 0 10 BACKING LiahtCondition RAILWAY_GRADE_CROSSING 4 0 RAN_OFF_ROAD_LEFT 12 0 December 12 2 11 Avoiding_Vehicle_Object_Pedestdan DAYLIGHT 1 3 CROSSOVER_RELATED 5 1 CROSS MEDIAN 13 0 Total 6 12 ENTERING_PARKING POSITION DAWN 2 2 FRONTAGE_ROAD_NON_INTERCHANGE 6 0 CROSS_CENTERLINE 14 0 13 LEAVING_PARKING POSITION DUSK 3 0 DRIVEWAY 7 0 DOWNHILL_RUNAWAY 15 0 (Unit) SurfaceCondition 14 PROPERLY_PARKED DARK LIGHTED 4 1 ALLEY_ACCESS_RELATED 8 0 MOTOR_VEHICLE_IN_TRANSPORT 16 1 DRY 1 7 15 IMPROPERLY PARKED DARK_NOT_LIGHTED 5 0 UNKNOWN_NON INTERCHANGE 9 0 PEDESTRIAN 17 0 WET 2 0 16 DRIVERLESS_MOVING_VEHICLE DARK_UNKNOWN_LIGHTING 6 0 THRU_ROADWAY 10 0 PEDALCYCLE 18 0 SNOW 3 0 17 CROSSING ROAD UNKNOWN 99 0 INTERSECTION_INTERCHANGE 11 0 RAILWAY VEHICLE TRAIN ENGINE 19 0 SLUSH 4 0 18 WALKING_WITH TRAFFIC Check Total 6 INTERSECTION_RELATED_INTERCHANGE 12 0 LIGHT RAILWAY RAILCAR VEHICLE 20 0 ICE FROST 5 0 19 WALKING_AGAINST_TRAFFIC ENTRANCE_EXIT_RAMP_INTERCHANGE 13 0 ANIMAL_WILD NON GAME 21 0 WATER_STANDING_MOVING 6 0 20 STANDING Weather FRONTAGE_ROAD_INTERCHANGE 14 0 ANIMAL WILD GAME 22 0 SAND 7 0 21 LYING CLEAR 1 5 OTHER_PART_OF_INTERCHANGE 15 0 ANIMAL PET 23 0 MUD DIRT GRAVEL 8 0 22 GETTING_ON_OR OFF VEHICLE CLOUDY 2 1 <not defined> 16 0 ANIMAL LIVESTOCK 24 0 OIL 9 0 23 WORKING_ON OR PUSHING_VEHICLE SLEET Hnn FREEZING RAIN OR DRIZZLE 3 0 UNKNOWN_INTERCHANGE 17 0 PARKED_MOTOR_VEHICLE 25 0 OTHER 97 0 24 WORKING_ON ROAD RAIN 4 0 UNKNOWN_JUNCTION 18 0 WORK-ZONE-MAINTENANCE-EQUIPMENT 26 0 UNKNOWN 99 0 97 OTHER SNOW 5 0 UNKNOWN 99 0 STRUCK_By FALLING SETETENG CARGO OR OBJECT 27 0 Total 7 99 UNKNOWN SEVERE_CROSSWINDS 6 0 OTHER_NON_INTERCHANGE 109 0 OTHER_NON_FIXED_OBJECT 28 0 BLOWING_SAND_SOIL_DIRT 7 0 Check Total 6 IMPACT ATTENUATOR CRASH CUSHION 29 0 Body Styles FOG_SMOG_SMOKE 8 0 BRIDGE OVERHEAD STRUCTURE 30 0 -1 NOT_REPORTED BLOWING SNOW 9 0 CollisionManner BRIDGE RAIL 31 0 1 \Passenger Vehicles,including RVs OTHER 97 0 SINGLE VEHICLE 1 5 CULVERT 32 0 53 / UNKNOWN 99 0 ANGLE (front to 5ide)(other than left turn) 2 0 CURB 33 4 54 \TRUCKS Check Total 6 LEFT_TURN 3 0 DITCH 34 0 88 / REAR END 4 0 EMBANKMENT 35 0 89 \MOBILEHOME (NOT EVE) TrafficWavTyoe HEAD ON 5 0 GUARDRAIL_FACE 36 0 92 / ONE WAY_TRAFFICWAY 1 3 SIDESWIPE_SAME_DIRECTION 6 1 GUARDRAIL_END 37 0 93 \TRAILERS TWO WAY_NOT_DIVIDED 2 0 SIDESWIPE_OPPOSITE_DIRECTION 7 0 CONCRETE_TRAFFIC_BARRIER 38 0 120 / IDII iToDCONTENoOoo®TTdToRNm4N[ 3 0 REAR_TO_SIDE 8 0 CABLE_TRAFFIC_BARRIER 39 0 121 \MOTORCYCLES ENoR0ToCToDIEAiNToDCtmooTEMoDE0 4 1 REAR_TO_REAR 9 0 OTHER_TRAFFIC_BARRIER 40 0 128 / )DDDD0Dl7®ODv10DANEBARR®R 5 1 OTHER 97 0 TREE_BUSH_STUMP_STANDING 41 0 254 UNKNOWN UNKNOWN 99 1 UNKNOWN 99 0 TRAFFIC_SIGN_SUPPORT 42 1 255 NOT REPORTED Check Total 6 Check Total 6 TRAFFIC_SIGNAL_SUPPORT 43 0 UTILITY POLE LIGHT SUPPORT 44 0 Weekday TravelDirection 1 NORTH N OTHER_POST_POLE_OR_SUPPORT 45 0 Sunday 1 2 2 SOUTH S FENCE 46 0 Monday 2 1 3 EAST E MAILBOX 47 0 Tuesday 3 0 4 WEST W BUILDING 48 0 Wednesday 4 0 5 NORTHWEST NW OTHER_FIXED_OBJECT 49 0 Thursday 5 1 6 NORTHEAST NE UNKNOWN 99 0 Friday 6 0 7 SOUTHWEST SW Not Reported 255 0 Saturday 7 2 8 SOUTHEAST SE Check Total 6 Check Total 6 99 UNKNOWN 99 CRASH LISTING Goldfield Rd & 01dWest Hwy Exit <---------------------- LOCATION -----------------------> <-DATE & TIME-X------------------- UNITS --------------------> <---------- PERSON -----------><------- SEVERITY -------><----- GENERAL ----> OFF- D DIS- INTERSECT OFCR D TO- SRFCND ALGMT GRADE DFCTS BSTYLE TRDR UACT TTLTTL TYP INJR VLTN PHSCND NON INCIDENTS INJURIESFATALITIES H LT WE JCT THE HE M INCIDNT ON STREET MP SET R TANCE STREET NCIC NCIC YYMMDD HH:MM W TAL U1 U2 1 2 1 2 Ul U2 Ul U2 1 2 Ul U2 MOT NON 1 2 1 2 D1 D2 D1 D2 LOG PDOINJFATTTLMOTNONTTLMOTNON R CN CN REL CWY CD C 3335071 11 GOLDFIELD P 0 Old West Hwy Non-Carc1113 1113 180128 01:49 1 1 1 3 1 99 50 N 1 1 0 1 2 3 0 1 1 0 0 0 0 0 N 4 1 0 1 33 1 3407618 11 OLD WEST P 0 Goldfield Rd 1113 1113 180819 05:54 1 1 1 1 1 99 44 W 1 1 0 1 3 3 0 1 1 0 0 0 0 0 Y 2 1 5 1 33 1 3462439 11 OLD WEST P 0 Goldfield Rd 1113 1113 181222 08:12 7 1 1 3 1 0 50 S 1 1 0 1 1 2 0 1 0 0 N 2 1 1 5 42 1 3474659 11 OLD WEST P 0 Goldfield Rd 1113 1113 181229 16:33 7 1 1 1 1 0 44 BE 1 1 0 1 1 2 0 1 0 0 N 1 1 0 1 33 1 3528119 11 GOLDFIELD P 0 Old West Hwy 1113 1113 190520 06:37 2 1 1 3 1 0 44 S 1 2 0 1 4 1 1 ## 0 0 0 255 1 0 0 N 1 2 3 99 33 1 3558273 11 GOLDFIELD M 200 Old West Hwy 1113 1113 190905 15:01 5 2 1 1 2 2 3 0 0 0 31 50 NW NW 1 1 2 0 1 1 99 99 12 1 0 0 255 1 0 0 Y 1 1 0 4 16 6 Appendix D Printed: 7/18/2022 Goldfield Rd & OldWest Hwy Exit Page 1 Goldfield Rd & OldWest Hwy Exit SUMMARY BY YEAR SEVERITY/INCIDENTS 2018 2019 Totals Checks N 00®®==rE1®EId❑❑® ❑ ❑D01IDA❑❑[ID ❑ ❑ 4 TOTA❑❑ 4 ❑ ❑❑d❑®®❑101111❑❑® ❑❑d❑®®❑❑IIIIm1md B®®l]d❑❑® B E111m[1111d SEVERITY/INVOLVMENT N❑❑[11❑[ID=[[l-®❑ ❑ ❑ ❑DO ❑❑❑®❑ ❑ 3 ❑ ❑❑d❑®®❑❑❑❑®®EE=rDd ❑❑d❑®[[]❑❑N❑❑E[]❑[[[I1❑[ID❑1❑d B®❑❑®®EE=rDd B N❑❑E[]❑[[[I1I❑[[[][[flr❑d COLLISION MANNER ❑INEl00❑❑❑❑IC❑❑ 1 4 1 ❑ AN❑on ❑ ❑❑❑TdT❑RN 3 R❑AR❑❑ND 4 ❑❑AD❑ON I ❑1ID❑❑❑ iiii❑❑❑AM❑i [DiRo ICON ❑ 1 1 1ID❑❑❑ ®❑❑O❑❑O❑1T❑m1RE1CT1ON ❑ R❑AR❑TO❑❑1ID❑ 8 R❑ARdTOEROAR ❑ OT❑❑R ❑❑ ❑N❑NO❑ N ❑❑ TOTA❑❑ 4 ❑ Appendix D Printed: 7/18/2022 Summary by Year Page 2 CRASH STATISTICS Involvement Goldfield Rd & US60 WB Off-ramp 1� /� C 2018-2020 N N 1 .11 O O m 0 4 U 0 0 C H c H ✓ E z✓ 0 �0 Code No. Code No. Additional Useful Information Incidents 4 8 veh 11 0 First Harmful Event Month Fatal 0 0 Ppl 0 0 Circumstances OVERTURN_ROLLOVER 1 0 January 1 8 Vehicle Action Codes Injury 1 1 Ppl 0 0 Hit & Run? 0 FIRE EXPLOSION 2 0 February 2 1 1 GOING_STRAIGHT_AHEAD PDO 3 6 veh Intersection Related? 1 IMMERSION 3 0 March 3 0 2 SLOWING_IN_TRAFFICWAY Peds/Bikes Summary Inluries JACKKNIFE 4 0 April 4 0 3 STOPPED_IN_TRAFFICWAY G o 1CARGO_EQUIPMENT_LOSS_SHIFT 5 0 May 5 0 4 MAKING_LEFT_TURN yitl, a y'tl, Code No. FELL_JUMPED_FROM_VEHICLE 6 0 June 6 0 5 MAKING RIGHT TURN a W y W JunctionRelation THROWN_OR FALLING_OBJECT 7 0 July 7 0 6 MAKING U TURN Pedestrian: 0 0 0 0 NOT_JUNCTION_RELATED 0 1 OTHER_NON COLLISION 8 0 August 8 0 7 OVERTAKING_PASSING Bicycle: 0 0 0 0 INTERSECTION_NON_INTERCHANGE 1 0 EQUIPMENT_FAILURE_-T4".,—. -4E-S 9 0 September 9 0 8 CHANGING_LANES INTERSECTION_RELATED_NON_INTERCHANGE 2 1 SEPARATION_OF UNITS 10 0 October 10 0 9 NEGOTIATING_A_CURVE Code No. ENTRANCE EXIT RAMP NON INTERCHANGE 3 1 RAN_OFF_ROAD_RIGHT 11 0 November 11 0 10 BACKING LiahtCondition RAILWAY GRADE CROSSING 4 0 RAN_OFF_ROAD_LEFT 12 0 December 12 0 11 Avoiding_Vehide_Object_Pedestrian DAYLIGHT 1 4 CROSSOVER_RELATED 5 0 CROSS MEDIAN 13 0 Total 4 12 ENTERING_PARKING_POSITION DAWN 2 0 FRONTAGE_ROAD_NON_INTERCHANGE 6 1 CROSS_CENTERLINE 14 0 13 LEAVING_PARKING_POSITION DUSK 3 0 DRIVEWAY 7 0 DOWNHILL_RUNAWAY 15 0 (Unit) SurfaceCondition 14 PROPERLY_PARKED DARK LIGHTED 4 0 ALLEY_ACCESS_RELATED 8 0 MOTOR_VEHICLE_IN_TRANSPORT 16 4 DRY 1 8 15 IMPROPERLY_PARKED DARK_NOT_LIGHTED 5 0 UNKNOWN_NON_INTERCHANGE 9 0 PEDESTRIAN 17 0 WET 2 0 16 DRIVERLESS_MOVING_VEHICLE DARK_UNKNOWN_LIGHTING 6 0 THRU_ROADWAY 10 0 PEDALCYCLE 18 0 SNOW 3 0 17 CROSSING ROAD UNKNOWN 99 0 INTERSECTION INTERCHANGE 11 0 RAILWAY VEHICLE TRAIN ENGINE 19 0 SLUSH 4 0 18 WALKING WITH TRAFFIC Check Total 4 INTERSECTION_RELATED_INTERCHANGE 12 0 LIGHT_RAILWAY_RAILCAR VBHICLE 20 0 ICE_FROST 5 0 19 WALKING_AGAINST_TRAFFIC ENTRANCE_EXIT_RAMP_INTERCHANGE 13 0 ANIMAL_WILD_NON_GAME 21 0 WATER_STANDING_MOVING 6 0 20 STANDING Weather FRONTAGE_ROAD_INTERCHANGE 14 0 ANIMAL_WILD_GAME 22 0 SAND 7 0 21 LYING CLEAR 1 4 OTHER_PART_OF_INTERCHANGE 15 0 ANIMAL PET 23 0 MUD_DIRT_GRAVEL 8 0 22 GETTING_ON OR OFF_VEHICLE CLOUDY 2 0 <not defined> 16 0 ANIMAL_LIVESTOCK 24 0 OIL 9 0 23 WORKING_ON OR PUSHING_VEHICLE SLEET_HAIL_FREEZING_RAIN_OR DRIZZLE 3 0 UNKNOWN_INTERCHANGE 17 0 PARKED MOTOR VEHICLE 25 0 OTHER 97 0 24 WORKING_ON ROAD RAIN 4 0 UNKNOWN_JUNCTION 18 0 WORK_ZONE_MAINTENANCEEQUIFMEMf 26 0 UNKNOWN 99 0 97 OTHER SNOW 5 0 UNKNOWN 99 0 SMOCK_BY FALLING SHffTING_CARGO_OR_OBJECT 27 0 Total 8 99 UNKNOWN SEVERE_CROSSWINDS 6 0 OTHER_NON_INTERCHANGE 109 0 OTHER_NON_FIXED_OBJECT 28 0 BLOWING_SAND_SOIL_DIRT 7 0 Check Total 4 IMPACT_ATTENUATOR_CRASH CUSHION 29 0 Body Styles FOG_SMOG_SMOKE 8 0 BRIDGE OVERHEAD STRUCTURE 30 0 -1 NOT_REPORTED BLOWING SNOW 9 0 CollisionManner BRIDGE_RAIL 31 0 1 \Passenger Vehicles,including RVs OTHER 97 0 SINGLE VEHICLE 1 0 CULVERT 32 0 53 / UNKNOWN 99 0 ANGLE (front to side)(other than left turn) 2 0 CURB 33 0 54 \TRUCKS Check Total 4 LEFT_TURN 3 1 DITCH 34 0 88 / REAR END 4 0 EMBANKMENT 35 0 89 \MOBILEHOME (NOT RVS) TrafficWa VTVDe HEAD ON 5 0 GUARDRAIL FACE 36 0 92 / ONE WAY TRAFFICWAY 1 0 SIDESWIPE_SAME_DIRECTION 6 3 GUARDRAIL END 37 0 93 \TRAILERS TWO WAY NOT DIVIDED 2 2 SIDESWIPE_OPPOSITE_DIRECTION 7 0 CONCRETE_TRAFFIC_BARRIER 38 0 120 / ]oDm To CCONTNoO000moTdlo RNm4N[ 3 2 REAR TO SIDE 8 0 CABLE_TRAFFIC_BARRIER 39 0 121 \MOTORCYCLES IMNOROTDCTDDmAINTODO4mO0TEMOD@J 4 0 REAR_TO_REAR 9 0 OTHER_TRAFFIC_BARRIER 40 0 128 / DODDDOOQ®DEMODLANEBARR®R 5 0 OTHER 97 0 TREE_BUSH_STUMP_STANDING 41 0 254 UNKNOWN UNKNOWN 99 0 UNKNOWN 99 0 TRAFFIC_SIGN_SUPPORT 42 0 255 NOT REPORTED Check Total 4 Check Total 4 TRAFFIC_SIGNAL_SUPPORT 43 0 UTILITY_POLE_LIGHT_SUPPORT 44 0 Weekday TravelDirection 1 NORTH N OTHER_POST_POLE_OR_SUPPORT 45 0 Sunday 1 2 2 SOUTH S FENCE 46 0 Monday 2 0 3 EAST E MAILBOX 47 0 Tuesday 3 0 4 WEST W BUILDING 48 0 Wednesday 4 0 5 NORTHWEST NW OTHER_FIXED_OBJECT 49 0 Thursday 5 2 6 NORTHEAST NE UNKNOWN 99 0 Friday 6 0 7 SOUTHWEST SW Not Reported 255 0 Saturday 7 0 8 SOUTHEAST SE Check Total 4 Check Total 4 99 UNKNOWN 99 CRASH LISTING Goldfield Rd & US60 WB Off-raM <---------------------- LOCATION -----------------------> <-DATE 6 TIME-X------------------- UNITS --------------------> <---------- PERSON -----------><------- SEVERITY -------><----- GENERAL ----> OFF- D DIS- INTERSECT OFCR D TO- SRFCND ALGMT GRADE DFCTS BSTYLE TRDR UACT TTL TTL TYP INJR VLTN PHSCND NON INCIDENTS INJURIESFATALITIES H LT WE JCT TRF HE M INCIDNT ON STREET MP SET R TANCE STREET NCIC NCIC YYMMDD HH;MM W TAL Ul U2 1 2 1 2 Ul U2 Ul U2 1 2 Ul U2 MOT NON 1 2 1 2 D1 D2 D1 D2 LOC PDO INC FAT TTLMOTNON TTLMOTNON R CN CN REL CWY CD C 3327884 11 GOLDFIELD P 500 US-60 Exit 198 J-RamF 1113 1113 180128 13:03 1 2 1 1 1 1 1 0 0 0 44 30 S S 8 1 3 0 1 1 1 1 12 1 0 0 255 1 0 0 N 1 1 0 2 16 6 4 1 0 0 3580689 11 GOLDFIELD P 500 US-60 Exit 198 J-RamF 1113 1113 180128 13:03 1 2 1 1 1 1 1 0 99 99 44 15 E N 4 1 3 0 1 1 1 1 99 99 0 0 255 1 0 0 N 1 1 6 2 16 6 3631089 11 GOLDFIELD P 100 US-60 Exit 198 C-RamF 1113 1113 200123 12:52 5 2 1 1 1 1 2 0 0 0 50 44 S S 8 2 3 0 1 4 1 1 12 0 0 0 255 1 0 0 N 1 1 206 3 16 6 1 1 1 0 2 3637779 11 GOLDFIELD P 0 US-60 Exit 198 J-RamF 1113 1113 200227 14:41 5 2 1 1 1 1 1 0 0 0 44 15 NW S 4 1 2 0 1 1 3 1 20 1 0 0 255 1 1 0 0 0 0 0 N 1 1 3 3 16 3 Appendix D Printed: 7/18/2022 Goldfield Rd & US60 WB Off-ramp Page 1 Goldfield Rd & US60 WB Off-ramp SUMMARY BY YEAR SEVERITY/INCIDENTS 2018 2019 2020 Totals Checks N❑❑®®®❑Y❑®EId❑❑® 1 1 ❑DO imA❑❑iiii ❑ 1 3 TOTA❑❑ ❑ ❑❑d❑®®❑101111❑❑® ❑❑d❑®®❑❑IIIImlmd B®®l]d❑❑® B E111m11111d SEVERITY/INVOLVMENT N❑❑�❑���1®❑ 1 1 ❑DO ❑❑❑®❑ 4 ❑ ❑❑d❑®®❑❑❑❑®®®=-❑d ❑❑d❑®[[]❑❑N❑❑E[]❑[[[Imm[[L❑1❑d B®❑❑®®EE=rDd B N❑❑E[]❑[[[]Fu[[[][[flr❑d COLLISION MANNER ❑IJ❑❑❑❑❑❑❑[C❑❑ 1 AN❑on ❑ ❑❑❑TdT❑RN 3 1 1 R❑AR❑❑ND 4 ❑❑AD❑ON I ❑iD❑❑❑ iiii❑❑❑AM❑i [DiRo T[ON ❑ ❑ 1 3 ED❑❑❑ ®❑❑O❑❑O❑d❑mlR❑CT[ON ❑ R❑AR❑TO❑❑iD❑ 8 R❑ARdTOEROAR ❑ OT❑❑R ❑❑ ❑N❑NO❑ N ❑❑ TOTA❑❑ ❑ ❑ Appendix D Printed: 7/18/2022 Summary by Year Page 2 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX E TRIP GENERATION CALCULATIONS �- CivTech 22-1180 Alliance Broadstone Trip Generation Proposed June 2022 Methodology Overview This form facilitates trip generation estimation using data within the Institute of Transportation Engineer's(ITE)Trip Generation Manual,11th Edition and methodology described within ITE's Trip Generation Handbook,3rd Edition.These references will be referred to as Manual and Handbook,respectively.The Manual contains data collected by various transportation professionals for a wide range of different land uses,with each land use category represented by a land use code(LUC).Average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized LUC in various settings and time periods.The Handbook indicates an established methodology for how to use data contained within the Manual when to use the fitted curve instead of the average rate and when to adjustments to the volume of trips are appropriate and how to do so.The methodology steps are represented visually in boxes in Figure 3.1.This worksheet applies calculations for each box if applicable. Box 1-Define Study Site Land Use Tvoe&Site Characteristics, i Box 2-Define Site Context I Box 3-Define Analysis Objectives Trip Tvoes&Time Period The analyst is to pick an appropriate LUC(s)based on the subject's zoning/land use(s)/future land use(s).The size of the land use(s)is described in reference to an independent variable(s)specific to(each)the land use(example:1,000 square feet of building area is relatively common).Context assessment is to"simply determine whether the study sites is in a multimodal setting"and"could have persons accessing the site by walking,bicycling,or riding transit."This assessment is used in Box 4.The Manual separates data into 4 setting categories-Rural,General Urban/Suburban, Dense Multi-Urban Use and Center City Core.This worksheet uses the following abbreviations,respectively:R,G,D,and C.The Manual does not have data for all settings of all land use codes. The"General Urban/Suburban"setting is used by default. This tool will focus on vehicular trips for a 24-hour period on a typical weekday as well as its AM peak hour and PM peak hour.Other time period(s)may be of interest. Land Use Types and Size Proposed Use Amount Units ITE LUC ITE Land Use Name LR-Apartments No Rail 275 Dwelling Units 220 Multifamily Housing(Low-Rise Not Close to Rail) Box 4-Is Study Site Multimodal? Per the Handbook,"if the objective is to establish a local trip generation rate for a particular land use or study site,the simplified approach(Box 9)may be acceptable but the Box 5 through 8 approach is required if the study site is located in an infill setting,contains a mix of uses on-site,or is near significant transit service." Box 5/Box 9-Estimate Baseline Trips/Estimate Vehicular Trips(Determine Equation) Vehicle trips are estimated using rates/equations applicable to each LUC.When the appropriate graph has a fitted curve,the Handbook has a process(Figure 4.2)to determine when to use it versus using the weighted average rate or collecting local data.The methodology requires for engineering judgement in some circumstances and permits engineering judgement to override or make adjustments when appropriate to best project(example 1:study site is expected to operate differently than data in the applicable land use code-such as restaurant that is closed in the morning or in the evening;example 2:LUC data in a localized area fails to be represented by the typically selected fitted curve/weighted average rate-a small shop/LUC 820,AM peak hour is skewed by the high y-intercept). Equation Type:Equation Used[Equated Rate](Type Abbreviations:Weighted Average Rate "WA",Fitted Curve Type:Equation Used[Equated Rate] Proposed Use ADT AM Peak Hour PM Peak Hour LR-Apartments No Rail C:T=X'7.41[7.41] C:T=X'0.45[0.45] FC:T=0.43'X+20.55 Box 5/Box 9-Estimate Baseline Trips/Estimate Vehicular Trips(Apply Equations and in/out Distributions) Baseline Vehicular Trigs ADT AM Peak Hour PM Peak Hour Proposed Use %in I In Out I Total %in I In I Out I Total %in I In I Out Total LR-Apartments No Rail 50% 1,019 1,019 2,038 24% 30 94 124 63% 88 51 139 CivTech Appendix E Page 1 of 1 August 2022 22-1180 Alliance Broadstone Trip Generation August 2022 Methodology Overview This form facilitates trip generation estimation using data within the Institute of Transportation Engineer's(ITE)Trip Generation Manual,11th Edition and methodology described within ITE's Trip Generation Handbook,3rd Edition.These references will be referred to as Manual and Handbook,respectively.The Manual contains data collected by various transportation professionals for a wide range of different land uses,with each land use category represented by a land use code(LUC).Average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized LUC in various settings and time periods.The Handbook indicates an established methodology for how to use data contained within the Manual when to use the fitted curve instead of the average rate and when to adjustments to the volume of trips are appropriate and how to do so.The methodology steps are represented visually in boxes in Figure 3.1.This worksheet applies calculations for each box if applicable. Box 1-Define Study Site Land Use Type&Site Characteristics The analyst is to pick an appropriate LUC(s)based on the subject's zoning/land use(s)/future land use(s).The size of the land use(s)is described in reference to an independent variable(s)specific to (each)the land use(example:1,000 square feet of building area is relatively common). Land Use T es and Size 0.2 FAR 2.4 RAR 43560 SF Proposed Use Amount Units ITE LUC ITE Land Use Name Lot 1•High Turnover 10.803 1,000 square feet 931 High Turnover(Sit Down)Restaurant Sit Down Restaurant Lot 3:Hotel or Motel 178 Rooms 310 Hotel Lot 4:Medical,Dental or Health Office 8.276 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Lot 5:Medical,Dental or Health Office 8.102 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Lot 6:Medical,Dental or Health Office 7.928 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Lot 7:High Turnover 6.447 1,000 square feet 931 High Turnover(Sit Down)Restaurant Sit Down Restaurant Lot 8:Medical,Dental or Health Office 100.014 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Box 2-Define Site Context Context assessment is to"simply determine whether the study sites is in a multimodal setting"and"could have persons accessing the site by walking,bicycling,or riding transit."This assessment is used in Box 4.The Manual separates data into 4 setting categories-Rural,General Urban/Suburban,Dense Multi-Urban Use and Center City Core.This worksheet uses the following abbreviations,respectively: R,G,D,and C.The Manual does not have data for all settings of all land use codes.See the table on the next page titled"Site Context and Time Periods"-if this table is not provided,the"General Urban/Suburban"setting is used by default. Box 3-Define Analysis Objectives Types of Trips&Time Period This tool will focus on vehicular trips for a 24-hour period on a typical weekday as well as its AM peak hour and PM peak hour.Other time periods)may be of interest. Site Context and Time Periods-Actual Setting,Setting Data Available for LUC,Setting Used in Analyses Proposed Use Setting Availa o Available Used Lot 1: •High Turnover General Urban/Suburban G G G G G* G G Sit Down Restaurant Lot 3:Hotel or Motel General Urban/Suburban G G C G G D C G G C G Lot 4:Medical,Dental or Health Office General Urban/Suburban G G G G G G G Buildings and Clinics Lot 5:Medical,Dental or Health Office General Urban/Suburban G G G G G G G Buildings and Clinics Lot 6:Medical,Dental or Health Office General Urban/Suburban G G G G G G G Buildings and Clinics Lot 7:High Turnover General Urban/Suburban G G G G G G G Sit Down Restaurant Lot 8:Medical,Dental or Health Office I General Urban/Suburban G G G G G I G G Buildings and Clinics If the desired setting is not available within the Manual,adjustments may be made in Boxes 6 through 8. Per the Handbook,"if the objective is to establish a local trip generation rate for a particular land use or study site,the simplified approach(Box 9)may be acceptable but the Box 5 through 8 approach is Box 5lBox 9-Estimate Baseline Trips/Estimate Vehicular Trips(Determine Equation) Vehicle trips are estimated using rates/equations applicable to each LUC.When the appropriate graph has a fitted curve,the Handbook has a process(Figure 4.2)to determine when to use it versus using the weighted average rate or collecting local data.The methodology requires for engineering judgement in some circumstances and permits engineering judgement to override or make adjustments when appropriate to best project(example 1:study site is expected to operate differently than data in the applicable land use code-such as restaurant that is closed in the morning or in the evening;example 2: LUC data in a localized area fails to be represented by the typically selected fitted curve/weighted average rate-a small shop/LUC 820,AM peak hour is skewed by the high y-intercept). Equation Type:Equation Used[Equated Rate](Type Abbreviations:Weighted Average Rate("WA"),Fitted Curve("FC"),or Custom("C")) Proposed Use ADT AM Peak ur Lot 1• * High Turnover WA:T=X*107.2[107.20] WA:T=X*9.57[9.57] WA:T=X*9.05ur PM Peak *[9.05] Sit Down Restaurant Lot 3:Hotel or Motel WA:T=X*7.99[7.99] FC:T=0.5*X-7.45[0.46] FC:T=0.74*X-27.89[0.58] Lot 4:Medical,Dental or Health Office FC:T=42.97*X-108.01[29.92] FC:LN(T)=0.9*LN(X)+1.34[3.09] FC:T=4.07*X-3.17[3.69] Buildings and Clinics Lot 5:Medical,Dental or Health Office FC:T=42.97*X-108.01[29.64] WA:T=X*3.1[3.10] WA:T=X*3.93[3.93] Buildings and Clinics Lot 6:Medical,Dental or Health Office FC:T=42.97*X-108.01[29.35] FC:LN(T)=0.9*LN(X)+1.34[3.10] WA:T=X*3.93[3.93] Buildings and Clinics Lot 7:High Turnover WA:T=X*107.2[107.20] WA:T=X*9.57[9.57] WA:T=X*9.05[9.05] Sit Down Restaurant Lot 8:Medical,Dental or Health Office WA:T=X*36[36.00] FC:LN(T)=0.9*LN(X)+1.34[2.41] WA:T=X*3.93[3.93] Buildin s and Clinics Box 5/Box 9-Estimate Baseline Trips/Estimate Vehicular Trips(Apply Equations and in/out Distributions) Baseline Vehicular Trips I ADT AM Peak Hour PM Peak Hour Proposed Use %in In Out Total %In In Out Total %in In Out Total Lot 1:High Turnover 50% 579 579 1,158 55% 57 46 103 61% 60 38 98 (Sit Down)Restaurant Lot 3:Hotel or Motel 50% 713 713 1,426 56% 46 36 82 51% 53 51 104 Lot 4:Medical,Dental or Health Office 50% 124 124 248 79% 21 5 26 30% 9 22 31 Buildings and Clinics Lot 5:Medical,Dental or Health Office 50% 120 120 240 79% 20 5 25 30% 10 22 32 Buildings and Clinics Lot 6:Medical,Dental or Health Office 50% 116 116 232 79% 20 5 25 30% 9 22 31 Buildings and Clinics Lot 7:High Turnover 50% 346 346 692 55% 34 28 62 61% 35 23 58 Sit Down Restaurant Lot 8:Medical,Dental or Health Office 50% 1,800 1,800 3,600 79% 190 51 241 30% 118 275 393 L Buildings and Clinics Totals 3,798 3,798 7,596 388 176 564 294 453 747 CiVTech `/ Page 1 of 1 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX F TRIP DISTRIBUTION CALCULATIONS �- CivTech C� � 2020 2030 ° v � Quadrant Population Percent Employment Percent Population Percent Employment Percent n North Northwest 4,283 5.3% 737 6.7% 5,550 5.4% 967 6.2% Q- c North Northeast 3,691 4.6% 491 4.4% 5,420 5.3% 601 3.9% 20 p North 7,975 9.9% 1,228 11.1% 10,970 10.7% 1,567 10.1% 0 East Northeast 9,170 11.4% 970 8.8% 13,369 13.1% 1,233 7.9% S fR East Southeast 9,170 11.4% 970 8.8% 13,369 13.1% 1,233 7.9% m a East 18,340 22.8% 1,940 17.6% 26,738 26.2% 2,466 15.8% 3 South Southeast 11,069 13.8% 878 7.9% 13,883 13.6% 1,378 8.9% D South Southwest 9,520 11.9% 1,222 11.1% 11,095 10.9% 2,018 13.0% D CD South 20,590 25.7% 2,099 19.0% 24,978 24.5% 3,396 21.9% M West Southwest 16,675 20.8% 3,117 28.2% 20,847 20.4% 4,520 29.1% m West Northwest 16,636 20.7% 2,672 24.2% 18,523 18.1% 3,563 23.0% C- CWest 33,311 41.5% 51789 52.4% 39,370 38.5% 8,082 52.1% Totals 80,216 99.9% 11,056 100.1% 102,056 99.9% �rt 15,512 99.9/a C Radii northern limits Population radius: 10 miles - Employment radius: 10 miles NNW NNE cc m 2020 2030 2020 2030 Select Analysis Year(2020, 2030, 2040,2050) 5.3% 5.4% 4.6% 5.3% 2020 WNW 6.7% 6.2% 4.4% 3.9% ENE a� 2020 2030 2020 2030 n 20.7% 18.1% 11.4% 13.1% w ff 24.2% 23.0% 8.8% 7.9% C 0 =3 �. " 2020 2030 2020 2030 " y 20.8% 20.4% 11.4% 13.1% y CL 28.2% 29.1% 8.8% 7.9 0 cc WSW 2020 2030 2020 2030 ESE c 11.9% 10.9% 13.8% 13.6% 11.1% 13.0% 7.9% 8.9% m 07 Pop% SSW SSE N a Em % N o x southern limits c c.0 m .< Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX G BACKGROUND GROWTH CALCULATIONS CivTech 22-1180 Alliance Broadstone Silveray Background Traffic Calculations Location of counts; US-60 Exit 198 A-Ramp just West of Goldfield Rd (Location ID: 6980) ADOT Traffic Counts available at https://adot.public. ms2soft.com/tcds/ts earch.asp?loc=Adot Source(s): &mod=TCDS Year Volume Start 2018 1,141 End 2019 1,163 AAGR 1.90% Exp Factor 1.019 Growth Rate Used 2.0% Per-Year Multiplier 1.020 2024 2027 Expansion Year Factor(s) 2022 1.000 Existing 2023 1.020 2024 1.040 Opening 2025 1.061 2026 1.082 2027 1.104 Horizon 2028 1.126 2029 1.149 2030 1.172 2031 1.195 2032 1.219 2033 1.243 2034 1.268 2035 1.294 2036 1.319 2037 1.346 2038 1.373 2039 1.400 2040 1.428 2041 1.457 2042 1.486 2043 1.516 2044 1.546 2045 1.577 2046 1.608 2047 1.641 2048 1.673 2049 1.707 2050 1.741 2051 1.776 2052 1.811 2053 1.848 2054 1.885 cwrech Appendix G Page 1 July 2021 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX H 2024 NO BUILD PEAK HOUR ANALYSIS CivTech 2024 Background AM 1:Goldfield Rd/EB Old West Hwy 2024 Background PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection - Int Delay,s/veh 3.2 Int Delay,s/veh 2.3 Movement Movement - Lane Configurations Lane Configurations �f Traffic Vol,veh/h 59 0 0 0 0 116 Traffic Vol,veh/h 59 0 0 0 0 192 - Future Vol,veh/h 59 0 0 0 0 116 Future Vol,veh/h 59 0 0 0 0 192 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 - Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None - Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 - Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 74 0 0 0 0 136 Mvmt Flow 74 0 0 0 0 226 - Major/Minor Minor'I�jor2 Major/Minor Mail Conflicting Flow All 68 - 0 0 Conflicting Flow All 113 - 0 0 Stage 1^ 0 - - Stage 1_ 0 - - - Stage 2 68 - Stage 2 113 - Critical Hdwy 6.84 4.14 Critical Hdwy 6.84 4.14 - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - Critical Hdwy Stg 2 5.84 - _ Follow-up Hdwy 3.52 2.22 Follow-up Hdwy 3.52 2.22 Pot Cap-1 Maneuver 929 0 - - 7 Pot Cap-1 Maneuver 872 0 - - Stage 1 - 0 Stage 1 - 0 Stage 2 947 0 Stage 2 899 0 - Platoon blocked,% - Platoon blocked,% - Mov Cap-1 Maneuver 929 - - - Mov Cap-1 Maneuver 872 - - - - Mov Cap-2 Maneuver 929 Mov Cap-2 Maneuver 872 Stage 1 - Stage 1 - - Stage 2 947 Stage 2 899 Approach WB SB Approach WB SB MEL HCM Control Delay,s 9.2 0 HCM Control Delay,s 9.5 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt WBLnl SBL SBT Minor Lane/Major Mvmt WBLnl SBL SBT Capacity(veh/h) 929 - - Capacity(veh/h) 872 - - HCM Lane V/C Ratio 0.079 - - HCM Lane V/C Ratio 0.085 - - HCM Control Delay(s) 9.2 0 HCM Control Delay(s) 9.5 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) 0.3 - - HCM 95th%tile C(veh) 0.3 - - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2024 Background AM 2:Goldfield Rd&WB Old West Hwy 2024 Background PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection - Int Delay,s/veh 3 Int Delay,s/veh 2.9 Movement Movement ST NBR SBL Lane Configurations f +f if Lane Configurations + if +T r Traffic Vol,veh/h 0 17 0 0 59 9 0 188 39 �0 Traffic Vol,veh/h 0 20 0 0 59 5 0 180 58 0 0 - Future Vol,veh/h 0 17 0 0 59 9 0 188 39 0 0 0 Future Vol,veh/h 0 20 0 0 59 5 0 180 58 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 1 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0MA 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Slop Free Free Free Free Free Free RT Channelized - - None - - Stop - - Yield - - ^^ RT Channelized - - None - - Stop - - Yield - - None Storage Length 0 0 Storage Length 0 0 Veh in Median Storage,# - 0 0 - 0 n Veh in Median Storage,# - 0 0 - 0 - 0 Grade,% 0 - 0 0 - - 0 - Grade,% 0 - 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 21 0 0 74 11 0 221 49 0 0 0 Mvmt Flow 0 25 0 0 74 6 0 212 73 0 0 0 Major/Minor Minorl Minorl Majorl ■ Major/Minor �lll Minorl Conflicting Flow All - 221 - - 221 111 - 0 0 Conflicting Flow All - 212 - - 212 106 - 0 0 Stage 1 0 221 - - - Stage 1+ 0 212 - Stage 2 221 0 - Stage 2 212 0 - Critical Hdwy 6.54 6.54 6.94 - Critical Hdwy 6.54 6.54 6.94 Critical Hdwy Stg 1 - - - - 5.54 - - - - Critical Hdwy Stg 1 - - - - 5.54 - - - - Critical Hdwy Stg 2 5.54 Critical Hdwy Stg 2 5.54 Follow-up Hdwy 4.02 - - 4.02 3.32 Follow-up Hdwy 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver 0 676 0 0 676 921 0 Pot Cap-1 Maneuver 0 684 0 0 684 928 0 Stage 1 0 - 0 0 719 - 0 - - Stage 1 0 - 0 0 726 - 0 - - Stage 2 0 719 0 0 - 0 Stage 2 0 726 0 0 - 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 676 - - 676 921 - Mov Cap-1 Maneuver - 684 - - 684 928 - Mov Cap-2 Maneuver 676 676 - Mov Cap-2 Maneuver 684 684 - Stage 1 - 719 Stage 1 - 726 _ Stage 2 719 - Stage 2 726 - Approach EB WB NB Approach EB WB NB HCM Control Delay,s 10.5 10.7 0 HCM Control Delay,s 10.5 10.7 0 HCM LOS B B HCM LOS B B _ Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Capacity(veh/h) 676 676 921 Capacity(veh/h) 684 684 928 HCM Lane V/C Ratio - - 0.031 0.109 0.012 HCM Lane V/C Ratio - - 0.037 0.108 0.007 HCM Control Delay(s) 10.5 11 9 HCM Control Delay(s) 10.5 10.9 8.9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th%tile C(veh) - - 0.1 0.4 0 HCM 95th%tile C(veh) - - 0.1 0.4 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2024 Background AM 3:Goldfield Rd&US-60/01d West Hwy Exit 2024 Background PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.8 Int Delay,s/veh 2.2 Movement Movement Lane Configurations Lane Configurations Traffic Vol,veh/h 0 168 59 0 0 176 Traffic Vol,veh/h 0 114 123 0 0 251 Future Vol,veh/h 0 168 59 0 0 176 Future Vol,veh/h 0 114 123 0 0 251 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 - 0 0 Veh in Median Storage,# 0 - 0 0 Grade,% 0 - 0 0 Grade,% 0 - 0 0 Peak Hour Factor 80 85 80 80 80 85 Peak Hour Factor 80 85 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 198 74 0 0 207 Mvmt Flow 0 134 145 0 0 295 - Major/Minor Minors Majorl Major2 Major/Minor Minorl Majorl Major2 - Conflicting Flow All - 37 0 - - - Conflicting Flow Al - 73 0 - - - Stage 1 - - Stage 1 - - - Stage 2 - Stage 2 - Critical Hdwy 6.94 Critical Hdwy 6.94 - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 2 Critical Hdwy Slg 2 - Follow-up Hdwy - 3.32 Follow-up Hdwy - 3.32 Pot Cap-1 Maneuver 0 1027 - 0 0 - Pot Cap-1 Maneuver 0 974 - 0 0 - Stage 1 0 - - 0 0 - Stage 1 0 - - 0 0 - Stage 2 0 - 0 0 Stage 2 0 - 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 1027 - - - - Mov Cap-1 Maneuver - 974 - - - - - Mov Cap-2 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 1 - Stage 2 Stage 2 Approach WB NB SB Approach WB NB SB HCM Control Delay,s 9.3 0 0 HCM Control Delay,s 9.3 0 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBTWBLnl SBT Minor Lane/Major Mvmt NBTWBLnl SBT Capacity(veh/h) - 1027 - Capacity(veh/h) - 974 - HCM Lane V/C Ratio - 0.192 - HCM Lane V/C Ratio - 0.138 - HCM Control Delay(s) 9.3 HCM Control Delay(s) 9.3 HCM Lane LOS A HCM Lane LOS A HCM 95th%tile C(veh) - 0.7 - HCM 95th%tile C(veh) - 0.5 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2024 Background AM 4:Goldfield Rd&US-60 WB Ramps 2024 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Grou WBR NBL NBT SBT SBR Lane Grou WBR NBL NBT SBT Lane Configurations 4+ jr ) TT TTT r Lane Configurations r ) Tt ttt r Traffic Volume(vph) 7 0 17 35 105 162 128 Traffic Volume(vph) 20 0 42 28 162 211 91 - Future Volume(vph) 7 0 17 35 105 162 128 Future Volume(vph) 20 0 42 28 162 211 91 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 - Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase A Switch Phase A ' Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 W.6 31.6 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 I&6 31.6 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% IMF-37.8% Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% JW 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 lift_ 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Infection Su'r all Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps #4 #5 N4 *5 #4 #5 #4 #5 tM #5 #4 #5 1t #01 W.2 ~_403 1t #01 b02 4--403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2024 Background AM 4:Goldfield Rd&US-60 WB Ramps 2024 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis t 1 t 1 Movemen WBR NBL NBR SBL SBT SBR Movemen WBR NBL Lane Configurations 4+ r ) TT} r Lane Configurations a{r r ) ff W IN Traffic Volume(vph) 0 0 0 7 0 17 35 105 0 0 162 128 Traffic Volume(vph) 0 0 0 20 0 42 28 162 0 0 211 91 Future Volume(vph) 0 0 0 7 0 17 35 105 0 0 162 128 Future Volume(vph) 0 0 0 20 0 42 28 162 0 0 211 91 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Frt 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Frt 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 1.00 Fit Protected 0.95 0.99 1.00 0.95 1.00 1.00 1.00 Satd.Flow(prof) 1681 1457 1504 1770 3539 5085 1583 Satd.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0.95 1.00 1.00 0.63 1.00 1.00 1.00 Fit Permitted 0.95 0.99 1.00 0.59 1.00 1.00 1.00 Said.Flow(perm) 1681 1457 1504 1167 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1102 3539 5085 1583 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.80 0.85 0.80 0.80 0.85 0.85 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.80 0.85 0.80 0.80 0.85 0.80 Adj.Flow(vph) 0 0 0 9 0 21 44 124 0 0 191 151 Adj.Flow(vph) 0 0 0 25 0 52 35 191 0 0 248 114 RTOR Reduction(vph) 0 0 0 0 10 10 0 0 0 0 0 49 RTOR Reduction(vph) 0 0 0 0 26 26 0 0 0 0 0 38 Lane Group Flow(vph) 0 0 0 8 1 1 44 124 0 0 191 102 Lane Group Flow(vph) 0 0 0 22 2 2 35 191 0 0 248 76 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 1 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.6 6.6 6.6 66.3 60.9 60.9 60.9 Actuated Green,G(s) 7.6 7.6 7.6 65.3 59.9 59.9 59.9 Effective Green,g(s) 6.6 6.6 6.6 66.3 60.9 60.9 60.9 Effective Green,g(s) 7.6 7.6 7.6 65.3 59.9 59.9 59.9 Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Actuated g/C Ratio 0.08 0.08 0.08 0.73 0.67 0.67 0.67 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 123 106 110 895 2394 3440 1071 Lane Grp Cap(vph) 141 123 127 839 2355 3384 1053 v/s Ratio Prot c0.00 0.04 0.04 v/s Ratio Prot c0.00 c0.05 0.05 v/s Ratio Perm c0.00 0.00 0.00 0.03 c0.06 v/s Ratio Perm c0.01 0.00 0.00 0.03 0.05 v/c Ratio 0.07 0.01 0.01 0.05 0.05 0.06 0.10 v/c Ratio 0.16 0.02 0.02 0.04 0.08 0.07 0.07 Uniform Delay,dl 38.8 38.7 38.7 3.2 4.9 4.9 5.0 Uniform Delay,dl 38.2 37.8 37.8 3.5 5.3 5.3 5.3 Progression Factor 1.00 1.00 1.00 0.46 0.62 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.70 0.65 1.00 1.00 Incremental Delay,d2 0.1 0.0 0.0 0.1 0.0 0.0 0.2 Incremental Delay,d2 0.2 0.0 0.0 0.1 0.1 0.0 0.1 Delay(s) 38.9 38.7 38.7 1.6 3.0 4.9 5.2 Delay(s) 38.4 37.8 37.8 2.5 3.5 5.3 5.4 Level of Service _ D D D A A A A Level of Service D D D A A A A Approach Delay(s) 0.0 38.7 2.7 5.0 Approach Delay(s) 0.0 38.0 3.4 5.4 Approach LOS Jll� D A A Approach LOS D A A Intersection Summary Intersection Summary HCM 2000 Control Delay � 6.2 HCM 2000 Level of Service A HCM 2000 Control Delay 8.5 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.09 HCM 2000 Volume to Capacity ratio 0.09 Actuated Cycle Length(s) Sum of lost time(s) 17.1 Actuated Cycle Length(s)� 90.0 Sum of lost time(s) 17.1 - Intersection Capacity Utilization 44.8%_ ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) - 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2024 Background AM 4:Goldfield Rd&US-60 WB Ramps 2024 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues ,< ~ 4- -,\ f 1 < ~ 4- -N t 1 Lane Group WBL WBT WBR NBL NBT SBT Lane Group WBL WBT WBR NBL NBT SBT S Lane Group Flow(vph) 8 11 11 44 124 191 151 Lane Group Flow(vph) 22 28 28 35 191 248 114 v/c Ratio 0.05 0.05 0.05 0.05 0.05 0.05 0.13 v/c Ratio 0.13 0.12 0.12 0.04 0.08 0.07 0.10 - Control Delay 37.8 0.4 0.4 1.3 3.3 5.3 1.3 Control Delay 37.4 1.0 1.0 2.2 3.9 5.8 1.6 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 ' Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 Total Delay 37.8 0.4 0.4 1.3 3.3 5.3 1.3 Total Delay 37.4 1.0 1.0 2.2 3.9 5.8 1.6 Queue Length 50th(ft) 4 0 ANNEk 1 5 12 0 Queue Length 50th(ft) 12 0 MER 1 8 16 0 Queue Length 95th(ft) 16 0 0 3 9 19 16 Queue Length 95th(ft) 30 0 0 3 16 27 14 Internal Link Dist(ft) 639 _ 484 300 Internal Link Dist(ft) 639 _ 484 300 _ Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688 7091IN 911 2439 3505 1137 Base Capacity(vph) 730 690 7091 854 2400 3448 1110 _ Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 L 0 0 0 0 Spillback Cap Reductn 0 0 ON 0 0 0 0 _ Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.01 0.02 0.02 0.05 0.05 0.05 0.13 Reduced v/c Ratio 0.03 0.04 0.04 0.04 0.08 0.07 0.10 _ Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2024 Background AM 5:Goldfield Rd&US-60 EB Ramps 2024 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Grou EBR NBT NBR SBL SBT Lane Grou EBR NBT NBR Lane Configurations *4 r ttt r ) ?? Lane Configurations *4 r fff r ►� ff Traffic Volume(vph) 77 0 31 63 18 131 38 Traffic Volume(vph) 138 0 45 46 42 177 57 Future Volume(vph) 77 0 31 63 18 131 38 Future Volume(vph) 138 0 45 46 42 177 57 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 = Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase ` A Switch Phase ` A Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Split(s) 44.9 44.9 44.9T 31.6 31.6 10.6 31.6 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? �:'es Yes Yes Yes Lead-Lag Optimize? des Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 1t #01 02 ~_'403 1t #01 02 -403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2024 Background AM 5:Goldfield Rd&US-60 EB Ramps 2024 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis Movemen W� NBR SBL SBT SBR Movemen WBFir NBR SBL SBT SBR Lane Configurations 41� r Vi tT Lane Configurations 41� r ) tT Traffic Volume(vph) 77 0 31 0 0 0 0 63 18 131 38 0 Traffic Volume(vph) 138 0 45 0 0 0 0 46 42 177 57 0 Future Volume(vph) 77 0 31 0 0 0 0 63 18 131 38 0 Future Volume(vph) 138 0 45 0 0 0 0 46 42 177 57 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Satd.Flow(prof) 1681 1601 1504 5085 1583 1770 3539 Satd.Flow(prof) 1681 1603 1504 5085 1583 1770 3539 Fit Permitted 0.95 0.96 1.00 1.00 1.00 0.70 1.00 Fit Permitted 0.95 0.96 1.00 1.00 1.00 0.72 1.00 Said.Flow(perm) 1681 1601 1504 5085 1583 1305 3539 Said.Flow(perm) 1681 1603 1504 5085 1583 1333 3539 Peak-hour factor,PHF 0.85 0.80 0.80 0.25 0.25 0.25 0.80 0.80 0.80 0.85 0.80 0.80 Peak-hour factor,PHF 0.85 0.80 0.80 0.25 0.25 0.25 0.80 0.80 0.80 0.85 0.80 0.80 Adj.Flow(vph) 91 0 39 0 0 0 0 79 22 154 48 0 Adj.Flow(vph) 162 0 56 0 0 0 0 58 52 208 71 0 RTOR Reduction(vph) 0 44 32 0 0 0 0 0 7 0 0 0 RTOR Reduction(vph) 0 77 46 0 0 0 0 0 18 0 0 0 Lane Group Flow(vph) 47 4 3 0 0 0 0 79 16 154 48 0 Lane Group Flow(vph) 84 7 4 0 0 0 0 58 35 208 71 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.6 6.6 6.6 60.9 60.9 66.3 60.9 Actuated Green,G(s) 7.6 7.6 7.6 59.9 59.9 65.3 59.9 Effective Green,g(s) 6.6 6.6 60.9 60.9 66.3 60.9 Effective Green,g(s) 7.6 7.6 7.6 59.9 59.9 65.3 59.9 Actuated g/C Ratio 0.07 0.07 0.07 0.68 0.68 0.74 0.68 Actuated g/C Ratio 0.08 0.08 0.08 0.67 0.67 0.73 0.67 Clearance Time(s) 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 123 117 110 ` 3440 1071 989 2394 Lane Grp Cap(vph) 141 135 127 3384 1053 993 2355 v/s Ratio Prot 0.02 c0.01 0.01 v/s Ratio Prot 0.01 c0.01 0.02 v/s Ratio Perm c0.03 0.00 0.00 -1 0.01 c0.11 v/s Ratio Perm c0.05 0.00 0.00 0.02 c0.14 v/c Ratio 0.38 0.03 0.02 0.02 0.01 0.16 0.02 v/c Ratio 0.60 0.05 0.03 0.02 0.03 0.21 0.03 Uniform Delay,dl 39.8 38.7 38.7 4.8 4.8 3.5 4.8 Uniform Delay,dl 39.7 37.9 37.8 5.1 5.1 4.0 5.1 Progression Factor 1.00 1.00 1.00 1.00 _1.00 0.36 0.51 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.47 0.52 Incremental Delay,d2 0.7 0.0 0.0 0.0 0.0 0.3 0.0 Incremental Delay,d2 4.4 0.1 0.0 0.0 0.1 0.5 0.0 Delay(s) 40.5 38.8 38.7 4.8 4.8 1.6 2.4 Delay(s) 44.2 37.9 37.9 5.1 5.2 2.4 2.7 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 39.4 0.0 4.8 1.8 Approach Delay(s) 40.3 0.0 5.2 2.4 Approach LOS D A A A Approach LOS D A A A Intersection Summary Intersection Summary HCM 2000 Control Delay � 13.8 HCM 2000 Level of Service B HCM 2000 Control Delay i 16.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.18 HCM 2000 Volume to Capacity ratio 0.25 Actuated Cycle Length(s)-90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s)� 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 44.8%_ ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) - 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2024 Background AM 5:Goldfield Rd&US-60 EB Ramps 2024 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group EBL EBB NBT NBR Lane Group EBL EBT EBR NBT NBR SBL SBT Lane Group Flow(vph) 47 48 35 79 23 154 48 Lane Group Flow(vph) 84 84 50 58 53 208 71 v/c Ratio 0.31 0.20 _ 0.02 0.02 0.15 0.02 v/c Ratio 0.49 0.33 0.21 0.02 0.05 0.21 0.03 Control Delay 43.7 2.7 1.4 5.4 0.1 1.3 2.8 Control Delay 47.6 9.7 3.0 6.1 0.3 1.9 3.2 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 - Total Delay 43.7 2.7 1.4 5.4 0.1 1.3 2.8 Total Delay 47.6 9.7 3.0 6.1 0.3 1.9 3.2 Queue Length 50th(ft) 27 0 5 0 0 1 7 Queue Length 50th(ft) 49 01111& 3 0 1 2 Queue Length 95th(ft) 57 0 0 9 0 4 3 Queue Length 95th(ft) 87 25 0 8 0 15 6 Internal Link Dist(ft) 535 = 222 1 484 Internal Link Dist(ft) 535 _ 222 1 484 _ Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base Capacity(vph) 730 750 7091IN 3505 1123 1006 2439 Base Capacity(vph) 730 752 704 3448 1106 1009 2400 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 ON 0 0 0 0 Spillback Cap Reductn 0 0 -A 0 0 0 0 _ Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.06 0.06 0.05 0.02 0.02 0.15 0.02 Reduced v/c Ratio 0.12 0.11 0.07 0.02 0.05 0.21 0.03 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2024 Background AM 6:Goldfield Rd&Chevron Access 2024 Background PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 2.4 Int Delay,s/veh 2.7 Movement NBR SBL SBT Movement NBR SBL SBT Lane Configurations tt r ) T'N Lane Configurations r ) tfr Traffic Vol,veh/h 3 2 0 2 1 22 0 74 8 20 38 Traffic Vol,veh/h 5 0 1 4 0 29 1 67 8 29 59 Future Vol,veh/h 3 2 0 2 1 22 0 74 8 20 38 3 Future Vol,veh/h 5 0 1 4 0 29 1 67 8 29 59 9 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0016mm 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0016mm 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - N_ - - Will RT Channelized - - None - - None - - None - - None _ Storage Length 50 50 50 Storage Length 50 50 50 Veh in Median Storage,# - 0 0 0 - n Veh in Median Storage,# - 0 0 0 - - 0 Grade,% 0 - 0 0 - - 0 - Grade,% 0 - 0 0 - - 0 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 3 0 3 1 28 0 93 10 25 48 4 Mvmt Flow 6 0 1 5 0 36 1 84 10 36 74 11 Major/Minor Minor2 Minorl Mail Major2 Major/Minor Minor2 Minorl Majors Major2 Conflicting Flow All 147 203 26 169 195 47 52 0 0 103 0 0 Conflicting Flow All 196 248 43 195 243 42 85 0 0 94 0 0 Stage 1 0 100 100 - 93 93 - - - - - - - Stage 1 0 152 152 - 86 86 - - - - - - - Stage 2 47 103 - 76 102 - - - Stage 2 44 96 - 109 157 - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver 807 692 1044 779 699 1012 1552 1487 Pot Cap-1 Maneuver 771 669 1050 772 674 1019 1531 1498 Stage 1 895 811 - 904 817 - - - - - - - Stage 1 857 784 - 912 823 - - - - - - - Stage 2 961 809 - 924 810 - - - Stage 2 965 815 - 909 780 - - - Platoon blocked,% - - - - Platoon blocked,% 1 1 1 1 1 1 - - - - Mov Cap-1 Maneuver 774 680 1044 767 687 1012 1552 - - 1487 - - Mov Cap-1 Maneuver 729 652 1050 756 657 1019 1531 - - 1498 - - Mov Cap-2 Maneuver 774 680 - 767 687 - - - Mov Cap-2 Maneuver 729 652 - 756 657 - - - Stage 1 895 797 904 817 Stage 1 856 765 911 822 _ Stage 2 933 809 906 796 Stage 2 930 814 886 761 Approach Eff- WB NB SB Approach EB WB NB SB HCM Control Delay,s 10 8.8 0 2.4 HCM Control Delay,s 9.7 8.8 0.1 2.2 HCM LOS B A HCM LOS A A Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR - Capacity(veh/h) 1552 733 969 1487 Capacity(veh/h) 1531 768 978 1498 - HCM Lane V/C Ratio - - - 0.009 0.032 0.017 - - HCM Lane V/C Ratio 0.001 - - 0.01 0.042 0.024 - - HCM Control Delay(s) 0 10 8.8 7.5 HCM Control Delay(s) 7.4 9.7 8.8 7.5 HCM Lane LOS A B A A HCM Lane LOS A A A A HCM 95th%tile C(veh) 0 0 0.1 0.1 HCM 95th%tile C(veh) 0 0 0.1 0.1 i 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2024 Background AM 7:Goldfield Rd&Resort Blvd 2024 Background PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.1 Int Delay,s/veh 1.9 Movement Movement WBL Lane Configurations Y +t- Lane Configurations M +T. Vi ++ Traffic Vol,veh/h 2 28 54 3 18 23 Traffic Vol,veh/h 2 18 58 5 14 51 Future Vol,veh/h 2 28 54 3 18 23 Future Vol,veh/h 2 18 58 5 14 51 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 50 - Storage Length 0 50 Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 35 68 4 23 29 Mvmt Flow 3 23 73 6 18 64 - Major/Minor�orl Malorl Major2 Major/Minor�orl Majorl Major2 Conflicting Flow All 131 36 0 0 72 0 Conflicting Flow All 144 40 0 0 79 0 Stage 1_ 70 - - - - - Stage 1_ 76 - - - - - - Stage 2 61 - Stage 2 68 - Critical Hdwy _6.84 6.94 4.14 Critical Hdwy _6.84 6.94 4.14 - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 2 5.84 - - Critical Hdwy Slg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 2.22 Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 850 1029 - - 1526 - Pot Cap-1 Maneuver 858 1022 - - 1517 - Stage 1 945 - - Stage 1 938 - - Stage 2 954 - - Stage 2 968 - - _ Platoon blocked,% - - - Platoon blocked,% 1 - - - Mov Cap-1 Maneuver 837 1029 - - 1526 - Mov Cap-1 Maneuver 848 1022 - - 1517 Mov Cap-2 Maneuver 812 - - Mov Cap-2 Maneuver 819 - - Stage 1 945 Stage 1 938 _ Stage 2 940 Stage 2 956 Approach WB NB SB Approach WB NB SB - HCM Control Delay,s 8.7 0 3.2 HCM Control Delay,s 8.7 0 1.6 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT - Capacity(veh/h) - - 1011 1526 - Capacity(veh/h) - - 997 1517 - - HCM Lane V/C Ratio - - 0.037 0,015 - HCM Lane V/C Ratio - - 0.025 0.012 - HCM Control Delay(s) 8.7 7.4 HCM Control Delay(s) 8.7 7.4 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) - - 0.1 0 - HCM 95th%tile C(veh) - - 0.1 0 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2024 Background AM 8:Resort Blvd&Chevron Access 2024 Background PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 1.4 Int Delay,s/veh 1.1 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T# Y Lane Configurations rT T# Y Traffic Vol,veh/h 6 15 29 1 3 1 Traffic Vol,veh/h 2 28 10 0 1 3 Future Vol,veh/h 6 15 29 1 3 1 Future Vol,veh/h 2 28 10 0 1 3 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 8 19 36 1 4 1 Mvmt Flow 3 35 13 0 1 4 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 37 0 - 0 72 37 Conflicting Flow All 13 0 - 0 54 13 Stage 1^ - - - 37 - Stage 1^ - - - 13 - _ Stage 2 - 35 - Stage 2 - 41 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 - 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2.218 3,518 3.318 Follow-up Hdwy 2.218 3,518 3.318 Pot Cap-1 Maneuver 1574 932 1035 Pot Cap-1 Maneuver 1606 954 1067 Stage 1 - - - - 985 - Stage 1 - - - - 1010 - Stage 2 - 987 - Stage 2 - 981 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1574 - - - 927 1035 Mov Cap-1 Maneuver 1606 - - - 952 1067 Mov Cap-2 Maneuver - 927 - Mov Cap-2 Maneuver - 952 - Stage 1 980 Stage 1 1008 _ Stage 2 987 Stage 2 981 Approach EB WB SB Approach EB WB SB L1 HCM Control Delay,s 2.1 0 8.8 HCM Control Delay,s 0.5 0 8.5 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1574 - - - 952 Capacity(veh/h) 1606 - - - 1036 HCM Lane V/C Ratio 0.005 - - - 0.005 HCM Lane V/C Ratio 0.002 - - - 0,005 HCM Control Delay(s) 7.3 0 8.8 HCM Control Delay(s) 7.2 0 8.5 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX I 2027 NO BUILD PEAK HOUR ANALYSIS CivTech 2027 Background AM 1:Goldfield Rd/EB Old West Hwy 2027 Background PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection - Int Delay,s/veh 3.3 Int Delay,s/veh 2.3 Movement Movement BT - Lane Configurations tf Lane Configurations tt Traffic Vol,veh/h 63 0 0 0 0 124 Traffic Vol,veh/h 62 0 0 0 0 204 - Future Vol,veh/h 63 0 0 0 0 124 Future Vol,veh/h 62 0 0 0 0 204 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 - Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None - Storage Length 0 195 - Storage Length 0 195 Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 - Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 79 0 0 0 0 146 Mvmt Flow 78 0 0 0 0 240 - Major/Minor Minors �ajor2 Major/Minor- - Conflicting Flow All 73 - 0 0 Conflicting Flow All 120 - 0 0 Stage 1^ 0 Stage 1_ 0 - Stage 2 73 Stage 2 120 Critical Hdwy 6.84 4.14 Critical Hdwy 6.84 4.14 - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - Critical Hdwy Stg 2 5.84 - _ Follow-up Hdwy 3.52 2.22 Follow-up Hdwy 3.52 2.22 Pot Cap-1 Maneuver 922 0 - - 7 Pot Cap-1 Maneuver 863 0 - - Stage 1 - 0 Stage 1 - 0 Stage 2 941 0 Stage 2 892 0 - Platoon blocked,% - Platoon blocked,% - Mov Cap-1 Maneuver 922 - - - Mov Cap-1 Maneuver 863 - - - - Mov Cap-2 Maneuver 922 Mov Cap-2 Maneuver 863 Stage 1 - Stage 1 - - Stage 2 941 Stage 2 892 Approach WB SB Approach WB SB HCM Control Delay,s 9.3 0 HCM Control Delay,s 9.6 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt WBLnl SBL SBT Minor Lane/Major Mvmt WBLnl SBL SBT Capacity(veh/h) 922 - - Capacity(veh/h) 863 - - HCM Lane V/C Ratio 0.085 - - HCM Lane V/C Ratio 0.09 - - HCM Control Delay(s) 9.3 0 HCM Control Delay(s) 9.6 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) 0.3 - - HCM 95th%tile C(veh) 0.3 - - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2027 Background AM 2:Goldfield Rd&WB Old West Hwy 2027 Background PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio I m - Int Delay,s/veh 3.1 Int Delay,s/veh 2.9 Movement Movement NBR SEL Lane Configurations f if +f if Lane Configurations + ++ r Traffic Vol,veh/h 0 18 0 0 63 10 0 200 41 �0 Traffic Vol,veh/h 0 21 0 0 62 6 0 191 61 0 0 - Future Vol,veh/h 0 18 0 0 63 10 0 200 41 0 0 0 Future Vol,veh/h 0 21 0 0 62 6 0 191 61 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 1 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0MA 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Slop Free Free Free Free Free Free RT Channelized - - None - - Stop - - Yield - - RT Channelized - - None - - Stop - - Yield - - None Storage Length 0 0 Storage Length 0 0 Veh in Median Storage,# - 0 0 - 0 n Veh in Median Storage,# - 0 0 - 0 - 0 Grade,% 0 - 0 0 - - 0 - Grade,% 0 - 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 23 0 0 79 13 0 235 51 0 0 0 Mvmt Flow 0 26 0 0 78 8 0 225 76 0 0 0 Major/Minor Min2r2 Minorl Majorl Major/Minor Minor2 Minorl Majorl Conflicting Flow All - 235 - - 235 118 - 0 0 Conflicting Flow All - 225 - - 225 113 - 0 0 Stage 1 0 235 - - - Stage 1 0 225 - - - Stage 2 235 0 - Stage 2 225 0 - Critical Hdwy 6.54 6.54 6.94 Critical Hdwy 6.54 6.54 6.94 - Critical Hdwy Stg 1 - - - - 5.54 - - - - Critical Hdwy Stg 1 - - - - 5.54 - - - - Critical Hdwy Stg 2 5.54 Critical Hdwy Stg 2 5.54 s Follow-up Hdwy 4.02 - - 4.02 3.32 Follow-up Hdwy 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver 0 664 0 0 664 912 0 Pot Cap-1 Maneuver 0 673 0 0 673 918 0 - Stage 1 0 - 0 0 709 - 0 - - Stage 1 0 - 0 0 716 - 0 - - Stage 2 0 709 0 0 - 0 Stage 2 0 716 0 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 664 - - 664 912 - - - Mov Cap-1 Maneuver - 673 - - 673 918 Mov Cap-2 Maneuver 664 664 - Mov Cap-2 Maneuver 673 673 - Stage 1 - 709 Stage 1 - 716 Stage 2 709 - Stage 2 716 - Approach EB WB NB Approach EB WB NB - HCM Control Delay,s 10.6 10.9 0 HCM Control Delay,s 10.6 10.8 0 - HCM LOS B B HCM LOS B B Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Capacity(veh/h) 664 664 912 Capacity(veh/h) 673 673 918 HCM Lane V/C Ratio - - 0.034 0.119 0.014 HCM Lane V/C Ratio - - 0.039 0.115 0.008 HCM Control Delay(s) 10.6 11.2 9 HCM Control Delay(s) 10.6 11 9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th%tile C(veh) - - 0.1 0.4 0 HCM 95th%tile C(veh) - - 0.1 0.4 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2027 Background AM 3:Goldfield Rd&US-60/01d West Hwy Exit 2027 Background PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.9 Int Delay,s/veh 2.2 Movement Movement Lane Configurations Lane Configurations ++ Traffic Vol,veh/h 0 179 62 0 0 186 Traffic Vol,veh/h 0 121 130 0 0 266 Future Vol,veh/h 0 179 62 0 0 186 Future Vol,veh/h 0 121 130 0 0 266 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 - 0 0 Veh in Median Storage,# 0 - 0 0 Grade,% 0 - 0 0 Grade,% 0 - 0 0 Peak Hour Factor 80 85 80 80 80 85 Peak Hour Factor 80 85 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 211 78 0 0 219 Mvmt Flow 0 142 153 0 0 313 - Major/Minor Minors Majorl Major2 Major/Minor Minorl Majorl Major2 - Conflicting Flow All - 39 0 - - - Conflicting Flow Al - 77 0 - - - Stage 1 - - Stage 1 - - - Stage 2 - Stage 2 - Critical Hdwy 6.94 Critical Hdwy 6.94 - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 2 Critical Hdwy Slg 2 - Follow-up Hdwy - 3.32 Follow-up Hdwy - 3.32 Pot Cap-1 Maneuver 0 1024 0 0 Pot Cap-1 Maneuver 0 968 0 0 Stage 1 0 - - 0 0 - Stage 1 0 - - 0 0 - Stage 2 0 - 0 0 Stage 2 0 - 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 1024 - - - - Mov Cap-1 Maneuver - 968 - - - - - Mov Cap-2 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 1 - Stage 2 Stage 2 Approach WB NB SB Approach WB NB SB HCM Control Delay,s 9.4 0 0 HCM Control Delay,s 9.4 0 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBTWBLnl SBT Minor Lane/Major Mvmt NBTWBLnl SBT Capacity(veh/h) - 1024 - Capacity(veh/h) - 968 - HCM Lane V/C Ratio - 0.206 - HCM Lane V/C Ratio - 0.147 - HCM Control Delay(s) 9.4 HCM Control Delay(s) 9.4 HCM Lane LOS A HCM Lane LOS A HCM 95th%tile C(veh) - 0.8 - HCM 95th%tile C(veh) - 0.5 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2027 Background AM 4:Goldfield Rd&US-60 WB Ramps 2027 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Grou WBR NBL NBT SBT SBR Lane Grou WBR NBL NBT SBT SBR Lane Configurations 4+ r ) TT TTT r Lane Configurations r ) TT TTT jr Traffic Volume(vph) 8 0 18 38 111 170 133 Traffic Volume(vph) 21 0 42 30 169 223 95 Future Volume(vph) 8 0 18 38 111 170 133 Future Volume(vph) 21 0 42 30 169 223 95 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm - Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 - Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase A Switch Phase A ' Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 W.6 31.6 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 _D1.6 31.6 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% IMF-37.8% Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% JW 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 Jift_ 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps #4 #5 N4 *5 #4 #5 #4 #5 tM #5 #4 #5 1t #01 W.2 ~_403 1t #01 b02 4--403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2027 Background AM 4:Goldfield Rd&US-60 WB Ramps 2027 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis r ~ t 1 t 1 Movemen WBR NBL SBT SBR Movemen WBR NBL Lane Configurations 4+ r ) ff ttt r Lane Configurations 4:� r ) ff W IN Traffic Volume(vph) 0 0 0 8 0 18 38 111 0 0 170 133 Traffic Volume(vph) 0 0 0 21 0 42 30 169 0 0 223 95 Future Volume(vph) 0 0 0 8 0 18 38 111 0 0 170 133 Future Volume(vph) 0 0 0 21 0 42 30 169 0 0 223 95 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Frt 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Frt 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 1.00 Fit Protected 0.95 0.99 1.00 0.95 1.00 1.00 1.00 Satd.Flow(prof) 1681 1456 1504 1770 3539 5085 1583 Satd.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0.95 1.00 1.00 0.62 1.00 1.00 1.00 Fit Permitted 0.95 0.99 1.00 0.58 1.00 1.00 1.00 Said.Flow(perm) 1681 1456 1504 1157 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1087 3539 5085 1583 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.80 0.85 0.80 0.80 0.85 0.85 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.80 0.85 0.80 0.80 0.85 0.85 Adj.Flow(vph) 0 0 0 10 0 22 48 131 0 0 200 156 Adj.Flow(vph) 0 0 0 26 0 52 38 199 0 0 262 112 RTOR Reduction(vph) 0 0 0 0 11 11 0 0 0 0 0 51 RTOR Reduction(vph) 0 0 0 0 26 26 0 0 0 0 0 38 Lane Group Flow(vph) 0 0 0 9 1 1 48 131 0 0 200 105 Lane Group Flow(vph) 0 0 0 23 2 2 38 199 0 0 262 74 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 1 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.7 6.7 6.7 66.2 60.8 60.8 60.8 Actuated Green,G(s) 7.8 7.8 7.8 65.1 59.7 59.7 59.7 Effective Green,g(s) 6.7 6.7 6.7 66.2 60.8 60.8 60.8 Effective Green,g(s) 7.8 7.8 7.8 65.1 59.7 59.7 59.7 Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Actuated g/C Ratio 0.09 0.09 0.09 0.72 0.66 0.66 0.66 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 125 108 111 887 2390 3435 1069 Lane Grp Cap(vph) 145 126 130 827 2347 3373 1050 v/s Ratio Prot c0.00 0.04 0.04 v/s Ratio Prot c0.00 c0.06 0.05 v/s Ratio Perm c0.01 0.00 0.00 0.04 c0.07 v/s Ratio Perm c0.01 0.00 0.00 0.03 0.05 v/c Ratio 0.07 0.01 0.01 0.05 0.05 0.06 0.10 v/c Ratio 0.16 0.02 0.02 0.05 0.08 0.08 0.07 Uniform Delay,dl 38.8 38.6 38.6 3.3 4.9 4.9 5.1 Uniform Delay,dl 38.1 37.6 37.6 3.6 5.4 5.4 5.4 Progression Factor 1.00 1.00 1.00 0.46 0.61 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.72 0.65 1.00 1.00 Incremental Delay,d2 0.1 0.0 0.0 0.1 0.0 0.0 0.2 Incremental Delay,d2 0.2 0.0 0.0 0.1 0.1 0.0 0.1 Delay(s) 38.8 38.6 38.6 1.6 3.0 5.0 5.3 Delay(s) 38.2 37.6 37.6 2.7 3.6 5.4 5.5 Level of Service _ D D D A A A A Level of Service D D D A A A A Approach Delay(s) 0.0 38.7 2.7 5.1 Approach Delay(s) 0.0 37.8 3.4 5.4 Approach LOS Jll� D A A Approach LOS A D A A Intersection Summary Intersection Summary HCM 2000 Control Delay i 6.3 HCM 2000 Level of Service A HCM 2000 Control Delay i 8.5 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.09 HCM 2000 Volume to Capacity ratio 0.09 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s)! 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 45.1% ICU Level of Service A Intersection Capacity Utilization 47.9% ICU Level of Service A Analysis Period(min) 15 Analysis Period(min) 15 _ c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2027 Background AM 4:Goldfield Rd&US-60 WB Ramps 2027 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues ,< ~ 4- 4\ f l ✓ < ~ 4- 4\ t 1 Lane Group WBL WBT WBR NBL NBT SBT S Lane Group WBL WBT WBR NBL NBT SBT S Lane Group Flow(vph) 9 12 12 48 131 200 156 Lane Group Flow(vph) 23 28 28 38 199 262 112 v/c Ratio 0.06 0.05 0.05 0.05 0.05 0.06 0.14 v/c Ratio 0.13 0.12 0.11 0.05 0.08 0.08 0.10 - Control Delay 38.0 0.5 0.4 1.3 3.3 5.3 1.3 Control Delay 37.3 1.0 1.0 2.3 4.0 5.9 1.7 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 Total Delay 38.0 0.5 0.4 1.3 3.3 5.3 1.3 Total Delay 37.3 1.0 1.0 2.3 4.0 5.9 1.7 Queue Length 50th(ft) 5 0 dm§EL 1 5 12 0 Queue Length 50th(ft) 12 0 ` 2 9 17 0 Queue Length 95th(ft) 17 0 0 3 9 20 17 Queue Length 95th(ft) 31 0 0 3 22 29 16 Internal Link Dist(ft) 639 _ 484 300 Internal Link Dist(ft) 639 _ 484 300 - Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688 7091IN 903 2438 3504 1139 Base Capacity(vph) 730 690 7091 840 2393 3439 1107 - Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0&- 0 0 0 0 Spillback Cap Reductn 0 0 ON 0 0 0 0 _ Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.01 0.02 0.02 0.05 0.05 0.06 0.14 Reduced v/c Ratio 0.03 0.04 0.04 0.05 0.08 0.08 0.10 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2027 Background AM 5:Goldfield Rd&US-60 EB Ramps 2027 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Grou EBR NBT NBR SBL SBT Lane Grou EBR NBT NBR SBL SBT Lane Configurations *4 r f?? r ) ?? Lane Configurations *4 r f?? r ) f f Traffic Volume(vph) 81 0 33 67 19 136 41 Traffic Volume(vph) 144 0 47 49 44 186 61 Future Volume(vph) 81 0 33 67 19 136 41 Future Volume(vph) 144 0 47 49 44 186 61 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 = Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase ` A Switch Phase ` A M Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Split(s) 44.9 44.9 44.9T 31.6 31.6 10.6 31.6 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? �:'es Yes Yes Yes Lead-Lag Optimize? des Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 1t #01 02 ~_'403 1t #01 02 -403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2027 Background AM 5:Goldfield Rd&US-60 EB Ramps 2027 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis Movemen W� NBR SBL SBT SBR Movemen WBR--MRPP=Rgf-- NBR SBL SBT-WMR- Lane Configurations 41� r Vi tT Lane Configurations 41� r }+t r ) tt Traffic Volume(vph) 81 0 33 0 0 0 0 67 19 136 41 0 Traffic Volume(vph) 144 0 47 0 0 0 0 49 44 186 61 0 Future Volume(vph) 81 0 33 0 0 0 0 67 19 136 41 0 Future Volume(vph) 144 0 47 0 0 0 0 49 44 186 61 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Satd.Flow(prof) 1681 1601 1504 5085 1583 1770 3539 Satd.Flow(prof) 1681 1603 1504 5085 1583 1770 3539 Fit Permitted 0.95 0.96 1.00 1.00 1.00 0.70 1.00 Fit Permitted 0.95 0.96 1.00 1.00 1.00 0.71 1.00 Said.Flow(perm) 1681 1601 1504 5085 1583 1299 3539 Said.Flow(perm) 1681 1603 1504 5085 1583 1329 3539 Peak-hour factor,PHF 0.85 0.80 0.80 0.25 0.25 0.25 0.80 0.80 0.80 0.85 0.80 0.80 Peak-hour factor,PHF 0.85 0.80 0.80 0.25 0.25 0.25 0.80 0.80 0.80 0.85 0.80 0.80 Adj.Flow(vph) 95 0 41 0 0 0 0 84 24 160 51 0 Adj.Flow(vph) 169 0 59 0 0 0 0 61 55 219 76 0 RTOR Reduction(vph) 0 46 34 0 0 0 0 0 8 0 0 0 RTOR Reduction(vph) 0 79 48 0 0 0 0 0 19 0 0 0 Lane Group Flow(vph) 49 4 3 0 0 0 0 84 16 160 51 0 Lane Group Flow(vph) 88 8 5 0 0 0 0 61 36 219 76 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 1 31 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.7 6.7 6.7 60.8 60.8 66.2 60.8 Actuated Green,G(s) 7.8 7.8 7.8 59.7 59.7 65.1 59.7 Effective Green,g(s) 6.7 6.7 6.7 60.8 60.8 66.2 60.8 Effective Green,g(s) 7.8 7.8 7.8 59.7 59.7 65.1 59.7 Actuated g/C Ratio 0.07 0.07 0.07 0.68 0.68 0.74 0.68 Actuated g/C Ratio 0.09 0.09 0.09 0.66 0.66 0.72 0.66 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 125 119 111 3435 1069 983 2390 Lane Grp Cap(vph) 145 138 130 3373 1050 987 2347 v/s Ratio Prot 0.02 c0.01 0.01 v/s Ratio Prot 0.01 c0.01 0.02 v/s Ratio Perm c0.03 0.00 0.00 10.01 c0.11 v/s Ratio Perm c0.05 0.00 0.00 0.02 c0.15 v/c Ratio 0.39 0.03 0.02 0.02 0.02 0.16 0.02 v/c Ratio 0.61 0.05 0.04 0.02 0.03 0.22 0.03 Uniform Delay,dl 39.7 38.6 38.6 4.8 4.8 3.6 4.8 Uniform Delay,dl 39.6 37.7 37.7 5.2 5.2 4.1 5.2 Progression Factor 1.00 1.00 1.00 1.00 _1.00 0.37 0.50 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.47 0.51 Incremental Delay,d2 0.7 0.0 0.0 0.0 0.0 0.4 0.0 Incremental Delay,d2 4.8 0.1 0.0 0.0 0.1 0.5 0.0 Delay(s) 40.4 38.7 38.7 4.8 4.8 1.7 2.4 Delay(s) 44.5 37.8 37.7 5.2 5.3 2.5 2.7 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 39.3 0.0 4.8 1.9 Approach Delay(s) 40.3 0.0 5.2 2.5 Approach LOS D A A A Approach LOS D A A A Intersection Summary Intersection Summary HCM 2000 Control Delay � 13.8 HCM 2000 Level of Service B HCM 2000 Control Delay i 16.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.18 HCM 2000 Volume to Capacity ratio 0.26 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s)� 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 45.1% ICU Level of Service A Intersection Capacity Utilization 47.9% ICU Level of Service A Analysis Period(min) 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2027 Background AM 5:Goldfield Rd&US-60 EB Ramps 2027 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues - --* t , ,► 1 _A . --* t A� `► 1 Lane Group EBL EB1jjr� NBT NBR SBL S Lane Group EBL EBT EBR NBT NBR SBL S Lane Group Flow(vph) 49 50 37 84 24 160 51 Lane Group Flow(vph) 88 87 53 61 55 219 76 v/c Ratio 0.32 0.21 L.16 0.02 0.02 0.16 0.02 v/c Ratio 0.50 0.34 0.22 0.02 0.05 0.22 0.03 Control Delay 44.0 3.2 1.5 5.4 0.1 1.3 2.7 Control Delay 47.8 10.3 3.6 6.2 0.4 2.0 3.2 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 Total Delay 44.0 3.2 1.5 5.4 0.1 1.3 2.7 Total Delay 47.8 10.3 3.6 6.2 0.4 2.0 3.2 Queue Length 50th(ft) 28 01111L 5 0 0 1 7 Queue Length 50th(ft) 51 01111L 4 0 1 2 Queue Length 95th(ft) 61 0 0 9 0 4 3 Queue Length 95th(ft) 91 27 2 8 1 16 7 Internal Link Dist(ft) 535 _ 222 1 484 Internal Link Dist(ft) 535 NNNNN' 222 T 484 - Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base Capacity(vph) 730 751 7097 3504 1123 1000 2438 Base Capacity(vph) 730 752 704 3439 1104 1004 2393 � Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 ON 0 0 0 0 Spillback Cap Reductn 0 0 -A 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.07 0.07 0.05 0.02 0.02 0.16 0.02 Reduced v/c Ratio 0.12 0.12 0.07 0.02 0.05 0.22 0.03 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2027 Background AM 6:Goldfield Rd&Chevron Access 2027 Background PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 2.4 Int Delay,s/veh 2.7 Movement NBR SBL SBT Movement NBR SBL Lane Configurations r ) tT* Lane Configurations ff r ) +T. Traffic Vol,veh/h 3 2 0 2 1 23 0 78 9 E21 41 3 Traffic Vol,veh/h 6 0 1 4 0 31 1 71 EjEll 63 10 - Future Vol,veh/h 3 2 0 2 1 23 0 78 9 21 41 3 Future Vol,veh/h 6 0 1 4 0 31 1 71 9 31 63 10 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 Mimi 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 _0 0 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - N_ - - Will RT Channelized - - None - - None - - None - - None Storage Length 50 50 50 Storage Length 50 50 50 Veh in Median Storage,# - 0 0 0 - n Veh in Median Storage,# - 0 0 0 - - 0 Grade,% 0 - 0 0 - - 0 - Grade,% 0 - 0 0 - - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 3 0 3 1 29 0 92 11 26 51 4 Mvmt Flow 8 0 1 5 0 39 1 89 11 39 79 13 Major/Minor Minor2 Minorl Majorl Major2 Major/Minor Minor2 Minorl M Conflicting Flow Al 152 208 28 171 199 46 55 0 0 103 0 0 Conflicting Flow Al 211 266 46 209 261 45 92 0 0 100 0 0 Stage 1 0 105 105 - 92 92 - - Stage 1 0 164 164 - 91 91 - Stage 2 47 103 - 79 107 - - Stage 2 47 102 - 118 170 Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 i - Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver 828 704 1074 802 712 1014 1570 - - 1487 - - Pot Cap-1 Maneuver 752 654 1045 754 658 1015 1521 - - 1490 - Stage 1 913 821 - 905 818 - - - - - - - Stage 1 843 775 - 906 819 - - - - - - - Stage 2 961 809 - 946 820 - - - Stage 2 961 810 - 898 770 - - - Platoon blocked,% 1 1 1 1 1 1 - - - - Platoon blocked,% 1 1 1 1 1 1 - - - - Mov Cap-1 Maneuver 793 692 1074 790 700 1014 1570 - - 1487 - - Mov Cap-1 Maneuver 708 636 1045 737 640 1015 1521 - - 1490 - - Mov Cap-2 Maneuver 793 692 - 790 700 - - - Mov Cap-2 Maneuver 708 636 - 737 640 - - - Stage 1 913 807 905 818 Stage 1 842 755 905 818 _ Stage 2 932 809 927 806 Stage 2 924 809 873 750 Approach EB WB NB SB Approach EB WB NB SB HCM Control Delay,s 9.8 8.8 0 2.4 HCM Control Delay,s 9.9 8.9 0.1 2.2 HCM LOS A A HCM LOS A A Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR - Capacity(veh/h) 1570 - - 749 976 1487 - - Capacity(veh/h) 1521 - - 742 973 1490 - - - HCM Lane V/C Ratio - - - 0.008 0.033 0.018 - - HCM Lane V/C Ratio 0.001 - - 0.012 0.045 0.026 - - HCM Control Delay(s) 0 9.8 8.8 7.5 HCM Control Delay(s) 7.4 9.9 8.9 7.5 HCM Lane LOS A A A A HCM Lane LOS A A A A HCM 95th%tile C(veh) 0 0 0.1 0.1 HCM 95th%tile C(veh) 0 0 0.1 0.1 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2027 Background AM 7:Goldfield Rd&Resort Blvd 2027 Background PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.1 Int Delay,s/veh 1.8 Movement Movement BT Lane Configurations f y +f Lane Configurations ++ Traffic Vol,veh/h 2 30 57 3 19 24 Traffic Vol,veh/h 2 19 62 6 14 54 Future Vol,veh/h 2 30 57 3 19 24 Future Vol,veh/h 2 19 62 6 14 54 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 50 - Storage Length 0 50 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 38 71 4 24 30 Mvmt Flow 3 24 78 8 18 68 - Major/Minor�orl Malorl Major2 Major/Minor�orl Majorl Major2 - Conflicting Flow All 136 38 0 0 75 0 Conflicting Flow All 152 43 0 0 86 0 Stage 1_ 73 - - - - - Stage 1_ 82 - - - - - - Stage 2 63 - Stage 2 70 - Critical Hdwy _6.84 6.94 4.14 Critical Hdwy _6.84 6.94 4.14 - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 2 5.84 - - Critical Hdwy Slg 2 5.84 - - - Follow-up Hdwy 3.52 3.32 2.22 Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 844 1026 - - 1522 - Pot Cap-1 Maneuver 848 1018 - - 1508 - Stage 1 941 - - Stage 1 932 - - Stage 2 952 - - Stage 2 965 - - _ Platoon blocked,% - - - Platoon blocked,% 1 - - - Mov Cap-1 Maneuver 830 1026 - - 1522 - Mov Cap-1 Maneuver 838 1018 - - 1508 Mov Cap-2 Maneuver 807 - - Mov Cap-2 Maneuver 812 - - Stage 1 941 Stage 1 932 _ Stage 2 937 Stage 2 953 Approach WB NB SB Approach WB NB SB - HCM Control Delay,s 8.7 0 3.3 HCM Control Delay,s 8.7 0 1.5 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT ohms Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT - Capacity(veh/h) - - 1009 1522 - Capacity(veh/h) - - 994 1508 - - HCM Lane V/C Ratio - - 0.04 0,016 - HCM Lane V/C Ratio - - 0.026 0.012 - HCM Control Delay(s) 8.7 7.4 HCM Control Delay(s) 8.7 7.4 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) - - 0.1 0 - HCM 95th%tile C(veh) - - 0.1 0 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2027 Background AM 8:Resort Blvd&Chevron Access 2027 Background PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 1.5 Int Delay,s/veh 1.1 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations t1 T+ Y Lane Configurations Q T* Y Traffic Vol,veh/h 7 15 31 1 3 1 Traffic Vol,veh/h 2 30 11 0 1 3 Future Vol,veh/h 7 15 31 1 3 1 Future Vol,veh/h 2 30 11 0 1 3 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 9 19 39 1 4 1 Mvmt Flow 3 38 14 0 1 4 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 40 0 - 0 77 40 Conflicting Flow All 14 0 - 0 58 14 Stage 1^ - - - 40 - Stage 1^ - - - 14 - _ Stage 2 37 - Stage 2 - 44 - Critical Hdwy 4.14llllllllllllllllll 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2.218 3,518 3.318 Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 157(L_- 926 1031 Pot Cap-1 Maneuver 1604 949 1066 Stage 1 982 Stage 1 - 1009 - Stage 2 985 - Stage 2 - 978 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1570 920 1031 Mov Cap-1 Maneuver 1604 947 1066 Mov Cap-2 Maneuver - 920 - Mov Cap-2 Maneuver - 947 - Stage 1 976 Stage 1 1007 _ Stage 2 985 Stage 2 978 Approach EB WB SB Approach EB WB SB L1 HCM Control Delay,s 2.3 0 8.8 HCM Control Delay,s 0.5 0 8.5 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1570 - - - 945 Capacity(veh/h) 1604 - - - 1034 HCM Lane V/C Ratio 0.006 - - - 0.005 HCM Lane V/C Ratio 0.002 - - - 0,005 HCM Control Delay(s) 7.3 0 8.8 HCM Control Delay(s) 7.2 0 8.5 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX 3 2024 BUILD PEAK HOUR ANALYSIS �- CivTech 2024 Total AM 1:Goldfield Rd/EB Old West Hwy 2024 Total PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.2 Int Delay,s/veh 2.3 Movement Movement BT Lane Configurations Lane Configurations �T Traffic Vol,veh/h 60 0 0 0 0 123 Traffic Vol,veh/h 64 0 0 0 0 215 Future Vol,veh/h 60 0 0 0 0 123 Future Vol,veh/h 64 0 0 0 0 215 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 75 0 0 0 0 145 Mvmt Flow 80 0 0 0 0 253 - Major/Minor Minorl Major2 Major/Minor jor2 - Conflicting Flow All 73 - 0 0 Conflicting Flow All 127 - 0 0 Stage 1^ 0 - - Stage 1_ 0 - - - Stage 2 73 - Stage 2 127 - Critical Hdwy 6.84 4.14 Critical Hdwy 6.84 4.14 - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - Critical Hdwy Stg 2 5.84 - _ Follow-up Hdwy 3.52 2.22 Follow-up Hdwy 3.52 2.22 Pot Cap-1 Maneuver 922 0 - - 7 Pot Cap-1 Maneuver 854 0 - - Stage 1 - 0 Stage 1 - 0 Stage 2 941 0 Stage 2 885 0 - Platoon blocked,% - Platoon blocked,% - Mov Cap-1 Maneuver 922 - - - Mov Cap-1 Maneuver 854 - - - - Mov Cap-2 Maneuver 922 Mov Cap-2 Maneuver 854 Stage 1 - Stage 1 - - Stage 2 941 Stage 2 885 Approach WB SB Approach WB SB HCM Control Delay,s 9.3 0 HCM Control Delay,s 9.7 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt WBLnl SBL SBT Minor Lane/Major Mvmt WBLnl SBL SBT Capacity(veh/h) 922 - - Capacity(veh/h) 854 - - HCM Lane V/C Ratio 0.081 - - HCM Lane V/C Ratio 0.094 - - HCM Control Delay(s) 9.3 0 HCM Control Delay(s) 9.7 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) 0.3 - - HCM 95th%tile C(veh) 0.3 - - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2024 Total AM 2:Goldfield Rd&WB Old West Hwy 2024 Total PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC Intersectio Intersection Int Delay,s/veh 2.8 Int Delay,s/veh 2.9 Movement Movement NBR SEL Lane Configurations f +f if Lane Configurations + ++ r Traffic Vol,veh/h 0 17 0 0 60 9 0 212 44 �0 Traffic Vol,veh/h 0 20 0 0 64 5 0 194 61 0 0 - Future Vol,veh/h 0 17 0 0 60 9 0 212 44 0 0 0 Future Vol,veh/h 0 20 0 0 64 5 0 194 61 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 1 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0MA 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Slop Free Free Free Free Free Free RT Channelized - - None - - Stop - - Yield - - ^^ RT Channelized - - None - - Stop - - Yield - - None Storage Length 0 0 Storage Length 0 0 Veh in Median Storage,# - 0 0 - 0 n Veh in Median Storage,# - 0 0 - 0 - 0 Grade,% 0 - 0 0 - - 0 - Grade,% 0 - 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 21 0 0 75 11 0 249 55 0 0 0 Mvmt Flow 0 25 0 0 80 6 0 228 76 0 0 0 Major/Minor Min2r2 Minorl Majorl Major/Minor Minor2 Minorl Majorl Conflicting Flow All - 249 - - 249 125 - 0 0 Conflicting Flow All - 228 - - 228 114 - 0 0 Stage 1 0 249 - - - Stage 1 0 228 - - - Stage 2 249 0 - Stage 2 228 0 - Critical Hdwy 6.54 6.54 6.94 Critical Hdwy 6.54 6.54 6.94 - Critical Hdwy Slg 1 - - - - 5.54 - - - - Critical Hdwy Slg 1 - - - - 5.54 - - - - Critical Hdwy Slg 2 5.54 Critical Hdwy Slg 2 5.54 i Follow-up Hdwy 4.02 - - 4.02 3.32 Follow-up Hdwy 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver 0 653 0 0 653 902 0 Pot Cap-1 Maneuver 0 670 0 0 670 917 0 - Stage 1 0 - 0 0 699 - 0 - - Stage 1 0 - 0 0 714 - 0 - - Stage 2 0 699 0 n n a Stage 2 0 714 0 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 653 - 653 902 Mov Cap-1 Maneuver - 670 - - 670 917 - Mov Cap-2 Maneuver 653 653 - Mov Cap-2 Maneuver 670 670 - Stage 1 - 699 Stage 1 - 714 Stage 2 699 - Stage 2 714 - Approach EB WB NB Approach EB WB NB HCM Control Delay,s 10.7 10.9 0 HCM Control Delay,s 10.6 10.9 0 - HCM LOS B B HCM LOS B B Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 - Capacity(veh/h) 653 653 902 Capacity(veh/h) 670 670 917 HCM Lane V/C Ratio - - 0.033 0.115 0.012 HCM Lane V/C Ratio - - 0.037 0.119 0.007 HCM Control Delay(s) 10.7 11.2 9 HCM Control Delay(s) 10.6 11.1 9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th%tile C(veh) - - 0.1 0.4 0 HCM 95th%tile C(veh) - - 0.1 0.4 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2024 Total AM 3:Goldfield Rd&US-60/01d West Hwy Exit 2024 Total PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.6 Int Delay,s/veh 2 Movement Movement Lane Configurations Lane Configurations +f Traffic Vol,veh/h 0 168 88 0 0 185 Traffic Vol,veh/h 0 114 140 0 0 278 Future Vol,veh/h 0 168 88 0 0 185 Future Vol,veh/h 0 114 140 0 0 278 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 - 0 0 Veh in Median Storage,# 0 - 0 0 Grade,% 0 - 0 0 Grade,% 0 - 0 0 Peak Hour Factor 80 85 85 80 80 85 Peak Hour Factor 80 85 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 198 104 0 0 218 Mvmt Flow 0 134 165 0 0 327 - Major/Minor Minors Majorl Major2 Major/Minor Minorl Majorl Major2 - Conflicting Flow All - 52 0 - - - Conflicting Flow Al - 83 0 - - - Stage 1 - - Stage 1 - - - Stage 2 - Stage 2 - Critical Hdwy 6.94 Critical Hdwy 6.94 - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 2 Critical Hdwy Slg 2 - Follow-up Hdwy - 3.32 Follow-up Hdwy - 3.32 Pot Cap-1 Maneuver 0 1005 0 0 Pot Cap-1 Maneuver 0 960 0 0 Stage 1 0 - - 0 0 - Stage 1 0 - - 0 0 - Stage 2 0 - 0 0 Stage 2 0 - 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 1005 - - - - Mov Cap-1 Maneuver - 960 - - - - - Mov Cap-2 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 1 - Stage 2 Stage 2 Approach WB NB SB Approach WB NB SB HCM Control Delay,s 9.5 0 0 HCM Control Delay,s 9.4 0 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBTWBLnl SBT Minor Lane/Major Mvmt NBTWBLnl SBT Capacity(veh/h) 1005 Capacity(veh/h) 960 HCM Lane V/C Ratio - 0.197 - HCM Lane V/C Ratio - 0.14 - HCM Control Delay(s) 9.5 HCM Control Delay(s) 9.4 HCM Lane LOS A HCM Lane LOS A HCM 95th%tile C(veh) - 0.7 - HCM 95th%tile C(veh) - 0.5 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2024 Total AM 4:Goldfield Rd&US-60 WB Ramps 2024 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings 4 f 1 4 f 1 Lane Group WBR NBL NBT SBT SBR L NEW WBR NBL NBT SBT Lane Configurations 4+ jr ) TT TTT r Lane Configurations *T+ r ) TT TTT if Traffic Volume(vph) 8 0 17 97 134 171 128 Traffic Volume(vph) 25 0 42 64 179 238 91 Future Volume(vph) 8 0 17 97 134 171 128 Future Volume(vph) 25 0 42 64 179 238 91 Turn Type Perm NA Perm pni NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase A Switch Phase A Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 W.6 31.6 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 I&J.6 31.6 _ Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% IMF-37.8% Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% EJR-37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 Jift_ 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps #4 #5 N4 *5 #4 #5 #4 #5 tM #5 #4 #5 1t #01 W.2 ~_403 1t #01 b02 4--403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2024 Total AM 4:Goldfield Rd&US-60 WB Ramps 2024 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis r ~ 4- 4% t /'- \- 4 W -* - -,* r ~ 4- 4% t /'- \- 4 Movement WBR NBL Movement WBR NBL Lane Configurations 4+ r ) ff W IN Lane Configurations a{r r ) ?f W IN Traffic Volume(vph) 0 0 0 8 0 17 97 134 0 0 171 128 Traffic Volume(vph) 0 0 0 25 0 42 64 179 0 0 238 91 Future Volume(vph) 0 0 0 8 0 17 97 134 0 0 171 128 Future Volume(vph) 0 0 0 25 0 42 64 179 0 0 238 91 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Frt 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Frt 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 1.00 Fit Protected 0.95 0.99 1.00 0.95 1.00 1.00 1.00 Satd.Flow(prof) 1681 1457 1504 1770 3539 5085 1583 Satd.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0.95 1.00 1.00 0.62 1.00 1.00 1.00 Fit Permitted 0.95 0.99 1.00 0.57 1.00 1.00 1.00 Said.Flow(perm) 1681 1457 1504 1155 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1067 3539 5085 1583 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.85 0.85 0.80 0.80 0.85 0.85 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.80 0.85 0.80 0.80 0.85 0.85 Adj.Flow(vph) 0 0 0 10 0 21 114 158 0 0 201 151 Adj.Flow(vph) 0 0 0 31 0 52 80 211 0 0 280 107 RTOR Reduction(vph) 0 0 0 0 10 10 0 0 0 0 0 49 RTOR Reduction(vph) 0 0 0 0 25 25 0 0 0 0 0 39 Lane Group Flow(vph) 0 0 0 9 1 1 114 158 0 0 201 102 Lane Group Flow(vph) 0 0 0 28 3 3 80 211 0 0 280 68 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 1 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 66.1 60.7 60.7 60.7 Actuated Green,G(s) 10.0 10.0 10.0 62.9 57.5 57.5 57.5 Effective Green,g(s) 6.8 6.8 6.8 66.1 60.7 60.7 60.7 Effective Green,g(s) 10.0 10.0 10.0 62.9 57.5 57.5 57.5 Actuated g/C Ratio 0.08 0.08 0.08 0.73 0.67 0.67 0.67 Actuated g/C Ratio 0.11 0.11 0.11 0.70 0.64 0.64 0.64 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 127 110 113 885 2386 3429 1067 Lane Grp Cap(vph) 186 162 167 787 2261 3248 1011 v/s Ratio Prot c0.01 0.04 0.04 v/s Ratio Prot c0.01 0.06 0.06 v/s Ratio Perm c0.01 0.00 0.00 c0.09 0.06 v/s Ratio Perm c0.02 0.00 0.00 c0.06 0.04 v/c Ratio 0.07 0.01 0.01 0.13 0.07 0.06 0.10 v/c Ratio 0.15 0.02 0.02 0.10 0.09 0.09 0.07 Uniform Delay,dl 38.7 38.5 38.5 3.5 5.0 5.0 5.1 Uniform Delay,dl 36.2 35.6 35.6 4.4 6.2 6.2 6.1 Progression Factor 1.00 1.00 1.00 0.44 0.60 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.71 0.63 1.00 1.00 Incremental Delay,d2 0.1 0.0 0.0 0.3 0.1 0.0 0.2 Incremental Delay,d2 0.1 0.0 0.0 0.3 0.1 0.1 0.1 Delay(s) 38.8 38.5 38.5 1.8 3.0 5.0 5.3 Delay(s) 36.3 35.6 35.6 3.4 4.0 6.3 6.3 Level of Service _ D D D A A A A Level of Service D D D A A A A Approach Delay(s) 0.0 38.6 2.5 5.1 Approach Delay(s) 0.0 35.9 3.8 6.3 Approach LOS Jll� D A A Approach LOS A D A A Intersection Summary Intersection Summary HCM 2000 Control Delay � 5.6 HCM 2000 Level of Service A HCM 2000 Control Delay � 8.6 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.12 HCM 2000 Volume to Capacity ratio 0.11 Actuated Cycle Length(s) Sum of lost time(s) 17.1 Actuated Cycle Length(s)� 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 44.8%_ ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) - 15 Analysis Period(min) 15 _ c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2024 Total AM 4:Goldfield Rd&US-60 WB Ramps 2024 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues 1< ~ 4- 4\ t 1 < ~ 4- .., f l Lane Group WBL WBT WBR NBL NBT SB Lane Group WBL WBT WBR NBL NBT SBT SB Lane Group Flow(vph) 9 11 11 114 158 201 151 Lane Group Flow(vph) 28 28 28 80 211 280 107 v/c Ratio 0.06 0.05 0.05 0.13 0.06 0.06 0.13 v/c Ratio 0.15 0.11 0.11 0.10 0.09 0.09 0.10 Control Delay 37.6 0.4 0.4 1.5 3.3 5.4 1.4 Control Delay 36.6 0.9 0.9 2.7 4.3 6.6 1.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.6 0.4 0.4 1.5 3.3 5.4 1.4 Total Delay 36.6 0.9 0.9 2.7 4.3 6.6 1.9 Queue Length 50th(ft) 5 0 Illff 2 6 13 0 Queue Length 50th(ft) 15 0 3 9 19 0 Queue Length 95th(ft) 17 0 0 4 11 21 17 Queue Length 95th(ft) 34 0 0 20 36 32 17 Internal Link Dist(ft) 639 484 300 Internal Link Dist(ft) 639 484 300 - Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688 7099j 900 2433 3496 1135 Base Capacity(vph) 730 690 704,787 2260 3247 1049 - Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0&- 0 0 0 0 Spillback Cap Reductn 0 0 0_ 0 0 0 ' Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.01 0.02 0.02 0.13 0.06 0.06 0.13 Reduced v/c Ratio 0.04 0.04 0.04 0.10 0.09 0.09 0.10 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2024 Total AM 5:Goldfield Rd&US-60 EB Ramps 2024 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Group ESIR NBT NBR SBL SBT L ;ro 111FIi EBR NBT NBR Lane Configurations Vi *4 r ff? r ) f? Lane Configurations .4 r ff? r }� Traffic Volume(vph) 77 0 50 154 23 131 48 Traffic Volume(vph) 138 0 104 98 45 177 89 Future Volume(vph) 77 0 50 154 23 131 48 Future Volume(vph) 138 0 104 98 45 177 89 Turn Type Perm NA Perm NA Perm pni NA Turn Type Perm NA Perm NA Perm pri NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase ` A Switch Phase ` A Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Split(s) 44.9 44.9 44.9T 31.6 31.6 10.6 31.6 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 _j,, 5.6 5.6 5.6 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? �:'es Yes Yes Yes Lead-Lag Optimize? iiiiiiiillldes Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 1t #01 02 .4--403 1t #01 02 4--403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2024 Total AM 5:Goldfield Rd&US-60 EB Ramps 2024 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis r t 1 r t 1 Movement WB NBR SBL SBT SBR Movement NBR SBL SBT SBR Lane Configurations 411 W i" ) TT Lane Configurations 41 r W i" ) TT Traffic Volume(vph) 77 0 50 0 0 0 0 154 23 131 48 0 Traffic Volume(vph) 138 0 104 0 0 0 0 98 45 177 89 0 Future Volume(vph) 77 0 50 0 0 0 0 154 23 131 48 0 Future Volume(vph) 138 0 104 0 0 0 0 98 45 177 89 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Frt 1.00 0.96 0.85 1.00 0.85 1.00 1.00 Frt 1.00 0.95 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0.96 1.00 1.00 1.00 0.95 1.00 Fit Protected 0.95 0.97 1.00 1.00 1.00 0.95 1.00 Satd.Flow(prof) 1681 1571 1504 5085 1583 1770 3539 Satd.Flow(prof) 1681 1557 1504 5085 1583 1770 3539 Fit Permitted 0.95 0.96 1.00 1.00 1.00 0.63 1.00 Fit Permitted 0.95 0.97 1.00 1.00 1.00 0.68 1.00 Said.Flow(perm) 1681 1571 1504 5085 1583 1179 3539 Said.Flow(perm) 1681 1557 1504 5085 1583 1259 3539 Peak-hour factor,PHF 0.80 0.80 0.80 0.25 0.25 0.25 0.80 0.85 0.80 0.85 0.80 0.80 Peak-hour factor,PHF 0.85 0.80 0.85 0.25 0.25 0.25 0.80 0.85 0.80 0.85 0.85 0.80 Adj.Flow(vph) 96 0 62 0 0 0 0 181 29 154 60 0 Adj.Flow(vph) 162 0 122 0 0 0 0 115 56 208 105 0 RTOR Reduction(vph) 0 50 45 0 0 0 0 0 9 0 0 0 RTOR Reduction(vph) 0 85 79 0 0 0 0 0 20 0 0 0 Lane Group Flow(vph) 56 4 4 0 0 0 0 181 20 154 60 0 Lane Group Flow(vph) 99 11 10 0 0 0 0 115 36 208 105 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 60.7 60.7 66.1 60.7 Actuated Green,G(s) 10.0 10.0 10.0 57.5 57.5 62.9 57.5 Effective Green,g(s) 6.8 6.8 60.7 60.7 66.1 60.7 Effective Green,g(s) 10.0 10.0 10.0 57.5 57.5 62.9 57.5 Actuated g/C Ratio 0.08 0.08 0.08 0.67 0.67 0.73 0.67 Actuated g/C Ratio 0.11 0.11 0.11 0.64 0.64 0.70 0.64 Clearance Time(s) 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 127 118 113 3429 1067 901 2386 Lane Grp Cap(vph) 186 173 167 3248 1011 910 2261 v/s Ratio Prot 0.04 c0.01 0.02 v/s Ratio Prot 0.02 c0.01 0.03 v/s Ratio Perm c0.03 0.00 0.00 10.01 c0.12 v/s Ratio Perm c0.06 0.01 0.01 0.02 c0.15 v/c Ratio 0.44 0.03 0.03 0.05 0.02 0.17 0.03 v/c Ratio 0.53 0.06 0.06 0.04 0.04 0.23 0.05 Uniform Delay,dl 39.8 38.6 38.6 4.9 4.8 3.7 4.9 Uniform Delay,dl 37.8 35.8 35.8 6.0 6.0 4.9 6.0 Progression Factor 1.00 1.00 1.00 1.00 _1.00 0.39 0.50 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.46 0.50 Incremental Delay,d2 0.9 0.0 0.0 0.0 0.0 0.4 0.0 Incremental Delay,d2 1.5 0.1 0.1 0.0 0.1 0.6 0.0 Delay(s) 40.7 38.6 38.6 5.0 4.9 1.8 2.4 Delay(s) 39.3 35.9 35.8 6.0 6.1 2.8 3.1 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 39.3 0.0 5.0 2.0 Approach Delay(s) 37.0 0.0 6.0 2.9 Approach LOS D A A A Approach LOS D A A A Intersection Summary Intersection Summary or- HCM 2000 Control Delay � 13.2 HCM 2000 Level of Service B HCM 2000 Control Delay � 16.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.20 HCM 2000 Volume to Capacity ratio 0.27 Actuated Cycle Length(s) Sum of lost time(s) 17.1 Actuated Cycle Length(s)� 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 44.8%_ ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) - 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2024 Total AM 5:Goldfield Rd&US-60 EB Ramps 2024 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues - --* t /". �► 1 -A - --* t r 1 Lane Group EBL EBT EBR NBT NBR SBL Lane Group EBL EBT EBR NBT NBR OEM- Lane Group Flow(vph) 56 54 49 181 29 154 60 Lane Group Flow(vph) 99 96 89 115 56 208 105 v/c Ratio 0.36 0.23 0.21 0.05 0.03 0.17 0.02 v/c Ratio 0.53 0.37 0.35 0.04 0.05 0.23 0.05 Control Delay 44.8 4.2 3.1 5.4 0.0 1.5 2.8 Control Delay 47.7 11.5 10.4 6.5 0.5 2.3 3.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 44.8 4.2 3.1 5.4 0.0 1.5 2.8 Total Delay 47.7 11.5 10.4 6.5 0.5 2.3 3.3 Queue Length 50th(ft) 32 0� 11 0 0 2 Queue Length 50th(ft) 57 0 7 0 9 4 Queue Length 95th(ft) 62 3 0 19 0 7 4 Queue Length 95th(ft) 97 32 31 15 1 17 10 Internal Link Dist(ft) 222 484 Internal Link Dist(ft) 535 222 484 Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base Capacity(vph) 730 M8 7097 3496 1120 916 2433 Base Capacity(vph) 730 731 7091 3247 1048 910 2260 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0&- 0 0 0 0 Spillback Cap Reductn 0 0 A 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.08 0.07 0.07 i 0.03 0.17 0.02 Reduced v/c Ratio 0.14 0.13 0.13 0.04 0.05 0.23 0.05 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2024 Total AM 6:Goldfield Rd&Chevron Access 2024 Total PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 1.8 Int Delay,s/veh 2 Movement NBR SBL SBT SB Movement NBR SBL SBT Lane Configurations r ) }'. Lane Configurations Tt ir ) 4 Traffic Vol,veh/h 3 2 0 2 1 29 0 163 8 E22 65 3 Traffic Vol,veh/h 5 0 1 4 0 33 1 118 8 36 143 9 - Future Vol,veh/h 3 2 0 2 1 29 0 163 8 22 65 3 Future Vol,veh/h 5 0 1 4 0 33 1 118 8 36 143 9 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 M&M1 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 00 0 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - N_ - - dpp� RT Channelized - - None - - None - - None - - None _ Storage Length 50 50 50 Storage Length 50 50 50 Veh in Median Storage,# - 0 0 0 - n Veh in Median Storage,# - 0 0 0 - - 0 Grade,% 0 - 0 0 - - 0 Grade,% 0 - 0 0 - - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 85 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 3 0 3 1 36 0 192 10 28 81 4 Mvmt Flow 6 0 1 5 0 41 1 139 10 45 168 11 Major/Minor Minor2 Minorl Majorl Major2 Major/Minor Minor2 Minor1 Conflicting Flow All 236 341 43 290 333 96 85 0 0 202 0 0 Conflicting Flow All 336 415 90 315 410 70 179 0 0 149 0 0 Stage 1 0 139 139 - 192 192 - - Stage 1 0 264 264 - 141 141 �- Stage 2 97 202 - 98 141 - - Stage 2 72 151 - 174 269 Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 i - Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver 722 592 1050 661 599 942 1531 1367 Pot Cap-1 Maneuver 686 583*1038 711 587 978 1481 1430 Stage 1 873 795 - 791 740 - - - - - - - Stage 1 807 743 - 847 779 - - - - - - Stage 2 899 733 - 922 793 - - - Stage 2 929 771 - 915 739 - - - Platoon blocked,% 1 1 1 1 1 1 - - - - Platoon blocked,% 1 1 1 1 1 1 - - - - Mov Cap-1 Maneuver 683 581 1050 648 587 942 1531 1367 Mov Cap-1 Maneuver 641 564 *1038 693 568 978 1481 1430 Mov Cap-2 Maneuver 683 581 - 648 587 - - - Mov Cap-2 Maneuver 641 564 - 693 568 - - - Stage 1 873 779 791 740 Stage 1 806 720 846 778 Stage 2 863 733 901 777 Stage 2 889 770 885 716 Approach EB WB NB SB Approach EB WB NB SB HCM Control Delay,s 10.7 9.2 0 1.9 HCM Control Delay,s 10.3 9 0.1 1.5 HCM LOS B A HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Capacity(veh/h) 1531 638 899 1367 Capacity(veh/h) 1481 685 936 1430 HCM Lane V/C Ratio - - - 0.01 0.044 0.02 - - HCM Lane V/C Ratio 0.001 - - 0.011 0.049 0.031 - - HCM Control Delay(s) 0 10.7 9.2 7.7 HCM Control Delay(s) 7.4 10.3 9 7.6 HCM Lane LOS A B A A HCM Lane LOS A B A A HCM 95th%tile C(veh) 0 - - 0 0.1 0.1 - - HCM 95th%tile C(veh) 0 - - 0 0.2 0.1 - - Notes -:Volume exceeds capacity $:Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon _ 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 8 CivTech Inc.-CM Page 8 2024 Total AM 7:Goldfield Rd&Resort Blvd 2024 Total PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 5.7 Int Delay,s/veh 4.8 Movement Movement Lane Configurations Y +t. Lane Configurations Y +T. ++ Traffic Vol,veh/h 2 117 54 3 45 23 Traffic Vol,veh/h 2 69 58 5 98 51 - Future Vol,veh/h 2 117 54 3 45 23 Future Vol,veh/h 2 69 58 5 98 51 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 - Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None - Storage Length 0 50 - Storage Length 0 50 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 - Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 138 68 4 56 29 Mvmt Flow 3 86 73 6 115 64 - Major/Minor�orl Malorl Major2 Major/Minor Minorl Majorl Major2 Conflicting Flow All 197 36 0 0 72 0 Conflicting Flow All 338 40 0 0 79 0 Stage 1_ 70 - - - - - Stage 1 N 76 - - - - - - Stage 2 127 - Stage 2 262 - Critical Hdwy _6.84 6.94 4.14 Critical Hdwy `6.84 6.94 4.14 - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 2 5.84 - - Critical Hdwy Slg 2 1 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 773 1029 - - 1526 - Pot Cap-1 Maneuver 649 1022 - - 1517 - J Stage 1 945 - - - - - Stage 1 938 - - - - - Stage 2 885 - - Stage 2 774 - - Platoon blocked,% - - - Platoon blocked,% 1 - - - Mov Cap-1 Maneuver 744 1029 - - 1526 - Mov Cap-1 Maneuver 600 1022 - - 1517 - - Mov Cap-2 Maneuver 743 - - Mov Cap-2 Maneuver 626 - - Stage 1 945 Stage 1 938 - Stage 2 852 Stage 2 715 Approach WB NB SB Approach WB NB SB - HCM Control Delay,s 9.1 0 4.9 HCM Control Delay,s 8.9 0 4.9 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT - Capacity(veh/h) - - 1022 1526 - Capacity(veh/h) - - 1004 1517 - - HCM Lane V/C Ratio - - 0.137 0.037 - HCM Lane V/C Ratio - - 0.088 0.076 - HCM Control Delay(s) 9.1 7.4 HCM Control Delay(s) 8.9 7.6 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) 0.5 0.1 HCM 95th%tile C(veh) 0.3 0.2 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 9 CivTech Inc.-CM Page 9 2024 Total AM 8:Resort Blvd&Chevron Access 2024 Total PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.5 Int Delay,s/veh 0.3 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T# Y Lane Configurations r1 * Y Traffic Vol,veh/h 6 42 118 1 3 1 Traffic Vol,veh/h 2 112 61 0 1 3 Future Vol,veh/h 6 42 118 1 3 1 Future Vol,veh/h 2 112 61 0 1 3 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 - Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 85 80 80 80 Peak Hour Factor 80 85 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 8 53 139 1 4 1 Mvmt Flow 3 132 76 0 1 4 Major/Minor-orl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 140 0 - 0 209 140 Conflicting Flow All 76 0 - 0 214 76 Stage 1_ 140 - Stage 1^ - - - 76 - _ Stage 2 69 - Stage 2 - 138 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 - 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2,218 3.518 3.318 Follow-up Hdwy 2.218 3,518 3.318 Pot Cap-1 Maneuver 1443 - - - 779 908 Pot Cap-1 Maneuver 1523 - - - 774 985 Stage 1 - 887 Stage 1 - 947 Stage 2 - 954 - Stage 2 - 889 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1443 - - - 774 908 Mov Cap-1 Maneuver 1523 - - - 772 985 _ Mov Cap-2 Maneuver - 774 - Mov Cap-2 Maneuver - 772 - Stage 1 882 Stage 1 945 Stage 2 954 Stage 2 889 Approach EB WB SB Approach EB WB SB HCM Control Delay,s 0.9 0 9.5 HCM Control Delay,s 0.1 0 8.9 - HCM LOS A HCM LOS A _ Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1443 - - - 804 Capacity(veh/h) 1523 - - - 921 HCM Lane V/C Ratio 0.005 - - - 0.006 HCM Lane V/C Ratio 0.002 - - - 0.005 HCM Control Delay(s) 7.5 0 9.5 HCM Control Delay(s) 7.4 0 8.9 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 10 CivTech Inc.-CM Page 10 2024 Total AM 9:Chevron Access&Access A 2024 Total PM 9:Chevron Access&Access A 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 1.6 Int Delay,s/veh 1.7 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations r1 * Lane Configurations Q T* ►� Traffic Vol,veh/h 2 30 7 0 0 7 Traffic Vol,veh/h 7 37 2 0 0 4 Future Vol,veh/h 2 30 7 0 0 7 Future Vol,veh/h 7 37 2 0 0 4 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Slop Sign Control Free Free Free Free Stop Slop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 38 9 0 0 9 Mvmt Flow 9 46 3 0 0 5 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 9 0 - 0 53 9 Conflicting Flow All 3 0 - 0 67 3 Stage 1^ - - - 9 - Stage 1^ - - - 3 - _ Stage 2 - 44 - Stage 2 - 64 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 ' 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3,518 3.318 Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 1611 955 1073 Pot Cap-1 Maneuver 1619 938 1081 Stage 1 - 1014 - Stage 1 - 1020 - Stage 2 - 978 - Stage 2 - 959 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1611 - - - 953 1073 Mov Cap-1 Maneuver 1619 - - - 932 1081 Mov Cap-2 Maneuver - 953 - Mov Cap-2 Maneuver - 932 - Stage 1 1012 Stage 1 1014 _ Stage 2 978 Stage 2 959 Approach EB WB SB Approach EB WB SB HCM Control Delay,s 0.5 0 8.4 HCM Control Delay,s 1.2 0 8.3 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity(veh/h) 1611 - - - 1073 Capacity(veh/h) 1619 - - - 1081 HCM Lane V/C Ratio 0.002 - - - 0.008 HCM Lane V/C Ratio 0.005 - - - 0.005 HCM Control Delay(s) 7.2 0 8.4 HCM Control Delay(s) 7.2 0 8.3 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 11 CivTech Inc.-CM Page 11 2024 Total AM 10:Access B&Resort Blvd 2024 Total PM 10:Access B&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 4.7 Int Delay,s/veh 2.9 Movement Movement Lane Configurations Lane Configurations r�i a�f tfi Traffic Vol,veh/h 3 18 20 0 41 0 12 Traffic Vol,veh/h 11 39 62 0 17 0 37 0 0 0 0 Future Vol,veh/h 3 18 20 0 41 0 65 0 0 0 0 12 Future Vol,veh/h 11 39 62 0 17 0 37 0 0 0 0 7 Conflicting Peds,#/hr 0 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop Sign Control Free Free Free Free Free Free Stop Stop Slop Stop Stop Stop RT Channelized - - None - - None RT Channelized - - None - - None - - None - None - Storage Length Storage Length Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 0 Grade,% 0 0 0 - - 0 - Grade,% 0 0 0 0 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvml Flow 4 23 25 0 51 0 81 0 0 0 0 15 Mvmt Flow 14 49 78 0 21 0 46 0 0 0 0 9 Major/Minor Majorl Major2 Minorl Major/Minor Majors Major2 Minorl Minor2 Conflicting Flow All 51 0 0 48 0 0 103 95 36 95 107 51 Conflicting Flow All 21 0 0 127 0 0 142 137 88 137 176 21 Stage 1 - - - - - 44 44 - 51 51 - Stage 1 - - - - - 116 116 - 21 21 - Stage 2 - - 59 51 - 44 56 - Stage 2 - - 26 21 - 116 155 - Critical Hdwy 4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy 4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 2.218 3.518 4.018 3.318 3.518 4.018 3.318 Follow-up Hdwy 2.218 2.218 3.518 4,018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1555 1559 877 795 1037 888 783 1017 Pot Cap-1 Maneuver 1595 1459 828 754 970 834 717 1056 Stage 1 - - 970 858 - 962 852 - Stage 1 - - 889 800 - 998 878 - Stage 2 - - 953 852 - 970 848 - Stage 2 - - 992 878 - 889 769 - Platoon blocked,% - - - - Platoon blocked,% - - - - Mov Cap-1 Maneuver 1555 1559 862 793 1037 886 781 1017 Mov Cap-1 Maneuver 1595 1459 815 746 970 827 710 1056 Mov Cap-2 Maneuver - - 862 793 - 886 781 - Mov Cap-2 Maneuver - - 815 746 - 827 710 - Stage 1 967 855 959 852 Stage 880 792 988 878 Stage 2 939 852 967 845 Stage 2 984 878 880 761 Approach EB WB Approach EB WB HCM Control Delay,s 0.5 0 9.6 8.6 HCM Control Delay,s 0.7 0 9.7 8.4 HCM LOS A A HCM LOS A A Minor Lane/MajorMvmt NBLnl EBL EBT EBR WBL WBT WBRSBLnl Minor Lane/MajorMvmt NBLnl EBL EBT EBR WBL WBT WBRSBLnl Capacity(veh/h) 862 1555 1559 1017 Capacity(veh/h) 815 1595 1459 1056 - HCM Lane V/C Ratio 0.094 0.002 - - - - - 0.015 HCM Lane V/C Ratio 0.057 0.009 - - - - - 0.008 HCM Control Delay(s) 9.6 7.3 0 0 8.6 HCM Control Delay(s) 9.7 7.3 0 0 8.4 - HCM Lane LOS A A A A A HCM Lane LOS A A A A A HCM 95th%tile C(veh) 0.3 0 - - 0 - - 0 HCM 95th%tile C(veh) 0.2 0 - - 0 - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 12 CivTech Inc.-CM Page 12 2024 Total AM 11:Resort Blvd&Access C 2024 Total PM 11:Resort Blvd&Access C 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.8 Int Delay,s/veh 1.1 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T# Y Lane Configurations rT T M Traffic Vol,veh/h 1 17 36 0 0 5 Traffic Vol,veh/h 5 34 14 0 0 3 Future Vol,veh/h 1 17 36 0 0 5 Future Vol,veh/h 5 34 14 0 0 3 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 21 45 0 0 6 Mvmt Flow 6 43 18 0 0 4 - Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 45 0 - 0 68 45 Conflicting Flow All 18 0 - 0 73 18 Stage 1^ - - - 45 - Stage 1^ - - - 18 - _ Stage 2 - 23 - Stage 2 - 55 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 - 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2.218 3,518 3.318 Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 1563 937 1025 Pot Cap-1 Maneuver 1599 931 1061 Stage 1 - - - - 977 - Stage 1 - - - - 1005 - Stage 2 - 1000 - Stage 2 - 968 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1563 936 1025 Mov Cap-1 Maneuver 1599 927 1061 _ Mov Cap-2 Maneuver - 936 - Mov Cap-2 Maneuver - 927 - Stage 1 976 Stage 1 1001 Stage 2 1000 Stage 2 968 Approach EB WB SB Approach EB WB SB L1 HCM Control Delay,s 0.4 0 8.5 HCM Control Delay,s 0.9 0 8.4 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1563 1025 Capacity(veh/h) 1599 1061 HCM Lane V/C Ratio 0.001 - - - 0.006 HCM Lane V/C Ratio 0.004 - - - 0.004 HCM Control Delay(s) 7.3 0 8.5 HCM Control Delay(s) 7.3 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 13 CivTech Inc.-CM Page 13 2024 Total AM 12:Resort Blvd&Access D 2024 Total PM 12:Resort Blvd&Access D 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.6 Int Delay,s/veh 0.8 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T+ Lane Configurations Q T+ M Traffic Vol,veh/h 1 16 32 0 0 3 Traffic Vol,veh/h 3 31 12 0 0 2 Future Vol,veh/h 1 16 32 0 0 3 Future Vol,veh/h 3 31 12 0 0 2 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 20 40 0 0 4 Mvmt Flow 4 39 15 0 0 3 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 40 0 - 0 62 40 Conflicting Flow All 15 0 - 0 62 15 Stage 1^ - - - 40 - Stage 1^ - - - 15 - Stage 2 22 - Stage 2 - 47 - Critical Hdwy 4.12m 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2.218 3.518 3.318 Follow-up Hdwy 2.218 3,518 3.318 Pot Cap-1 Maneuver 157� - - 944 1031 Pot Cap-1 Maneuver 1603 - - - 944 1065 Stage 1 - - - - 982 - Stage 1 - - - - 1008 - Stage 2 - 1001 - Stage 2 - 975 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1570 943 1031 Mov Cap-1 Maneuver 1603 941 1065 Mov Cap-2 Maneuver - 943 - Mov Cap-2 Maneuver - 941 - Stage 1 981 Stage 1 1005 _ Stage 2 1001 Stage 2 975 Approach EB WB SB Approach EB WB SB L1 HCM Control Delay,s 0.4 0 8.5 HCM Control Delay,s 0.6 0 8.4 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1570 1031 Capacity(veh/h) 1603 1065 HCM Lane V/C Ratio 0.001 - - - 0.004 HCM Lane V/C Ratio 0.002 - - - 0.002 HCM Control Delay(s) 7.3 0 8.5 HCM Control Delay(s) 7.3 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 14 CivTech Inc.-CM Page 14 2024 Total AM 13:Resort Blvd&Access E 2024 Total PM 13:Resort Blvd&Access E 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.7 Int Delay,s/veh 0.9 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T+ Lane Configurations Q T+ M Traffic Vol,veh/h 1 15 29 0 0 3 Traffic Vol,veh/h 3 28 10 0 0 2 Future Vol,veh/h 1 15 29 0 0 3 Future Vol,veh/h 3 28 10 0 0 2 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Slop Sign Control Free Free Free Free Stop Slop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 19 36 0 0 4 Mvmt Flow 4 35 13 0 0 3 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 36 0 - 0 57 36 Conflicting Flow All 13 0 - 0 56 13 Stage 1^ - - - 36 - Stage 1^ - - - 13 - _ Stage 2 21 - Stage 2 - 43 - Critical Hdwy 4.14llllllllllllllllll 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3,518 3.318 Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 157j 950 1037 Pot Cap-1 Maneuver 1606 952 1067 Stage 1 - - - - 986 - Stage 1 - - - - 1010 - Stage 2 1002 - Stage 2 - 979 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1575 949 1037 Mov Cap-1 Maneuver 1606 949 1067 Mov Cap-2 Maneuver - 949 - Mov Cap-2 Maneuver - 949 - Stage 1 985 Stage 1 1007 _ Stage 2 1002 Stage 2 979 Approach EB WB SB Approach EB WB SB L1 HCM Control Delay,s 0.5 0 8.5 HCM Control Delay,s 0.7 0 8.4 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1575 - - - 1037 Capacity(veh/h) 1606 - - - 1067 HCM Lane V/C Ratio 0.001 - - - 0,004 HCM Lane V/C Ratio 0.002 - - - 0.002 HCM Control Delay(s) 7.3 0 8.5 HCM Control Delay(s) 7.2 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 15 CivTech Inc.-CM Page 15 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX K 2027 BUILD PEAK HOUR ANALYSIS CivTech 2027 Total AM 1:Goldfield Rd/EB Old West Hwy 2027 Total PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.2 Int Delay,s/veh 2.3 Movement Movement Lane Configurations Lane Configurations �f Traffic Vol,veh/h 64 0 0 0 0 131 Traffic Vol,veh/h 67 0 0 0 0 227 Future Vol,veh/h 64 0 0 0 0 131 Future Vol,veh/h 67 0 0 0 0 227 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 80 0 0 0 0 154 Mvmt Flow 84 0 0 0 0 267 - Major/Minor Minor Major/Minor Mail - Conflicting Flow All 77 - 0 0 Conflicting Flow All 134 - 0 0 Stage 1^ 0 Stage 1_ 0 - - - Stage 2 77 Stage 2 134 - Critical Hdwy 6.84 4.14 Critical Hdwy 6.84 4.14 - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 5.84 - Critical Hdwy Stg 2 5.84 - _ Follow-up Hdwy 3.52 2.22 Follow-up Hdwy 3.52 2.22 Pot Cap-1 Maneuver 917 0 - - 7 Pot Cap-1 Maneuver 846 0 - - Stage 1 - 0 Stage 1 - 0 Stage 2 937 0 Stage 2 878 0 - Platoon blocked,% - Platoon blocked,% - Mov Cap-1 Maneuver 917 - - - Mov Cap-1 Maneuver 846 - - - - Mov Cap-2 Maneuver 917 Mov Cap-2 Maneuver 846 Stage 1 - Stage 1 - - Stage 2 937 Stage 2 878 Approach WB SB Approach WB SB MEL HCM Control Delay,s 9.3 0 HCM Control Delay,s 9.7 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt WBLnl SBL SBT Minor Lane/Major Mvmt WBLnl SBL SBT Capacity(veh/h) 917 - - Capacity(veh/h) 846 - - HCM Lane V/C Ratio 0.087 - - HCM Lane V/C Ratio 0.099 - - HCM Control Delay(s) 9.3 0 HCM Control Delay(s) 9.7 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) 0.3 - - HCM 95th%tile C(veh) 0.3 - - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2027 Total AM 2:Goldfield Rd&WB Old West Hwy 2027 Total PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC Intersectio Intersection Int Delay,s/veh 2.9 Int Delay,s/veh 2.9 Movement Movement NBR SEL Lane Configurations f if +f if Lane Configurations + ++ r Traffic Vol,veh/h 0 18 0 0 64 10 0 224 46 �0 Traffic Vol,veh/h 0 21 0 0 67 6 0 205 64 0 0 - Future Vol,veh/h 0 18 0 0 64 10 0 224 46 0 0 0 Future Vol,veh/h 0 21 0 0 67 6 0 205 64 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 1 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0MA 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Slop Free Free Free Free Free Free RT Channelized - - None - - Stop - - Yield - - ^^ RT Channelized - - None - - Stop - - Yield - - None Storage Length 0 0 Storage Length 0 0 Veh in Median Storage,# - 0 0 - 0 n Veh in Median Storage,# - 0 0 - 0 - 0 Grade,% 0 - 0 0 - - 0 - Grade,% 0 - 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 23 0 0 80 13 0 264 58 0 0 0 Mvmt Flow 0 26 0 0 84 8 0 241 80 0 0 0 Major/Minor Min2r2 Minorl Majorl Major/Minor Minor2 Minorl Majorl Conflicting Flow All - 264 - - 264 132 - 0 0 Conflicting Flow Al - 241 - - 241 121 - 0 0 Stage 1 0 264 - - - Stage 1 0 241 - - - Stage 2 264 0 - Stage 2 241 0 - Critical Hdwy 6.54 6.54 6.94 - Critical Hdwy 6.54 6.54 6.94 - Critical Hdwy Slg 1 - - - - 5.54 - - - - Critical Hdwy Slg 1 - - - - 5.54 - - - - Critical Hdwy Slg 2 5.54 s Critical Hdwy Slg 2 5.54 i Follow-up Hdwy 4.02 - - 4.02 3.32 Follow-up Hdwy 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver 0 640 0 0 640 893 0 Pot Cap-1 Maneuver 0 659 0 0 659 908 0 - Stage 1 0 - 0 0 689 - 0 - - Stage 1 0 - 0 0 705 - 0 - - Stage 2 0 689 0 0 n Stage 2 0 705 0 0 - 0 _ Platoon blocked,% - - Platoon blocked,% - Mov Cap-1 Maneuver - 640 - - 640 893 Mov Cap-1 Maneuver - 659 - - 659 908 - Mov Cap-2 Maneuver 640 640 - Mov Cap-2 Maneuver 659 659 - Stage 1 - 689 ' Stage 1 - 705 _ Stage 2 689 - Stage 2 705 - Approach EB WB NB Approach EB WB NB HCM Control Delay,s 10.8 11.1 0 HCM Control Delay,s 10.7 11.1 0 HCM LOS B B HCM LOS B B Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Minor Lane/Major Mvmt NBT NBR EBLnlWBLnlWBLn2 Capacity(veh/h) 640 640 893 Capacity(veh/h) 659 659 908 HCM Lane V/C Ratio - - 0.035 0.125 0.014 HCM Lane V/C Ratio - - 0.04 0.127 0.008 HCM Control Delay(s) 10.8 11.4 9.1 HCM Control Delay(s) 10.7 11.3 9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th%tile C(veh) - - 0.1 0.4 0 HCM 95th%tile C(veh) - - 0.1 0.4 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2027 Total AM 3:Goldfield Rd&US-60/01d West Hwy Exit 2027 Total PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 3.7 Int Delay,s/veh 2 Movement WBL WBR NBT NBR SIB L Movement Lane Configurations a tt }T Lane Configurations Traffic Vol,veh/h 0 179 91 0 0 195 Traffic Vol,veh/h 0 121 147 0 0 293 Future Vol,veh/h 0 179 91 0 0 195 Future Vol,veh/h 0 121 147 0 0 293 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 - 0 0 Veh in Median Storage,# 0 - 0 0 Grade,% 0 - 0 0 Grade,% 0 - 0 0 Peak Hour Factor 80 85 85 80 80 85 Peak Hour Factor 80 85 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 211 107 0 0 229 Mvmt Flow 0 142 173 0 0 345 - Major/Minor Minors Majorl Major2 Major/Minor Minorl Majorl Major2 - Conflicting Flow All - 54 0 - - - Conflicting Flow Al - 87 0 - - - Stage 1 - - Stage 1 - - - Stage 2 - Stage 2 - Critical Hdwy 6.94 Critical Hdwy 6.94 - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 1 - - - - - - Critical Hdwy Slg 2 Critical Hdwy Slg 2 - Follow-up Hdwy - 3.32 Follow-up Hdwy - 3.32 Pot Cap-1 Maneuver 0 1002 0 0 Pot Cap-1 Maneuver 0 954 0 0 Stage 1 0 - - 0 0 - Stage 1 0 - - 0 0 - Stage 2 0 - 0 0 Stage 2 0 - 0 0 Platoon blocked,% - - Platoon blocked,% - - Mov Cap-1 Maneuver - 1002 - - - - Mov Cap-1 Maneuver - 954 - - - - - Mov Cap-2 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 1 - Stage 2 Stage 2 Approach WB NB SB Approach WB NB SB HCM Control Delay,s 9.5 0 0 HCM Control Delay,s 9.4 0 0 HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBTWBLnl SBT Minor Lane/Major Mvmt NBTWBLnl SBT Capacity(veh/h) - 1002 - Capacity(veh/h) - 954 - HCM Lane V/C Ratio - 0.21 - HCM Lane V/C Ratio - 0.149 - HCM Control Delay(s) 9.5 HCM Control Delay(s) 9.4 HCM Lane LOS A HCM Lane LOS A HCM 95th%tile C(veh) - 0.8 - HCM 95th%tile C(veh) - 0.5 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2027 Total AM 4:Goldfield Rd&US-60 WB Ramps 2027 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings 4 f 1 4 f 1 Lane Group WBR NBL NBT SBT SBR Lane Grou WBR NBL NBT SBT SBR Lane Configurations 4+ r TT TTT r Lane Configurations r ) TT TTT jr Traffic Volume(vph) 9 0 18 100 140 179 133 Traffic Volume(vph) 26 0 42 66 186 250 95 - Future Volume(vph) 9 0 18 100 140 179 133 Future Volume(vph) 26 0 42 66 186 250 95 Turn Type Perm NA Perm pni NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm - Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 - Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase A Switch Phase A Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 W.6 31.6 Minimum Split(s) 44.9 44.9 44.9 10.6 31.6 _JL1.6 31.6 _ Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% IMF-37.8% Total Split(%) 50.0% 50.0% 50.0% 12.2% 37.8% EJR-37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 Jift_ 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 i5.9 5.6 5.6 5.6 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps Splits and Phases: 4:Goldfield Rd&US-60 WB Ramps #4 #5 N4 *5 #4 #5 #4 #5 tM #5 #4 #5 1t #01 W.2 ~_403 1t #01 02 ~403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2027 Total AM 4:Goldfield Rd&US-60 WB Ramps 2027 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis r ~ 4- 4% t /'- \- 4 W -* - -,* r ~ 4- 4% t /'- \- 4 Movement WBR NBL Movement WBR NBL Lane Configurations 4+ r ) ff W IN Lane Configurations a{r r ) ?f W IN Traffic Volume(vph) 0 0 0 9 0 18 100 140 0 0 179 133 Traffic Volume(vph) 0 0 0 26 0 42 66 186 0 0 250 95 Future Volume(vph) 0 0 0 9 0 18 100 140 0 0 179 133 Future Volume(vph) 0 0 0 26 0 42 66 186 0 0 250 95 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Lane Util.Factor 0.95 0.91 0.95 1.00 0.95 0.91 1.00 Frt 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Frt 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 1.00 0.95 1.00 1.00 1.00 Fit Protected 0.95 0.99 1.00 0.95 1.00 1.00 1.00 Satd.Flow(prof) 1681 1456 1504 1770 3539 5085 1583 Satd.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0.95 1.00 1.00 0.61 1.00 1.00 1.00 Fit Permitted 0.95 0.99 1.00 0.56 1.00 1.00 1.00 Said.Flow(perm) 1681 1456 1504 1144 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1052 3539 5085 1583 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.85 0.85 0.80 0.80 0.85 0.85 Peak-hour factor,PHF 0.25 0.25 0.25 0.80 0.80 0.80 0.80 0.85 0.80 0.80 0.85 0.85 Adj.Flow(vph) 0 0 0 11 0 22 118 165 0 0 211 156 Adj.Flow(vph) 0 0 0 32 0 52 82 219 0 0 294 112 RTOR Reduction(vph) 0 0 0 0 11 11 0 0 0 0 0 50 RTOR Reduction(vph) 0 0 0 0 25 25 0 0 0 0 0 41 Lane Group Flow(vph) 0 0 0 10 1 1 118 165 0 0 211 106 Lane Group Flow(vph) 0 0 0 30 3 3 83 219 0 0 294 71 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 1 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.6 6.6 6.6 66.3 60.9 60.9 60.9 Actuated Green,G(s) 10.1 10.1 10.1 62.8 57.4 57.4 57.4 Effective Green,g(s) 6.6 6.6 6.6 66.3 60.9 60.9 60.9 Effective Green,g(s) 10.1 10.1 10.1 62.8 57.4 57.4 57.4 Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Actuated g/C Ratio 0.11 0.11 0.11 0.70 0.64 0.64 0.64 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 123 106 110 880 2394 3440 1071 Lane Grp Cap(vph) 188 163 168 777 2257 3243 1009 v/s Ratio Prot c0.01 0.05 0.04 v/s Ratio Prot c0.01 0.06 0.06 v/s Ratio Perm c0.01 0.00 0.00 c0.09 0.07 v/s Ratio Perm c0.02 0.00 0.00 c0.07 0.05 v/c Ratio 0.08 0.01 0.01 0.13 0.07 0.06 0.10 v/c Ratio 0.16 0.02 0.02 0.11 0.10 0.09 0.07 Uniform Delay,dl 38.9 38.7 38.7 3.5 4.9 4.9 5.0 Uniform Delay,dl 36.1 35.5 35.5 4.5 6.3 6.3 6.2 Progression Factor 1.00 1.00 1.00 0.45 0.63 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.72 0.63 1.00 1.00 Incremental Delay,d2 0.1 0.0 0.0 0.3 0.1 0.0 0.2 Incremental Delay,d2 0.1 0.0 0.0 0.3 0.1 0.1 0.1 Delay(s) 39.0 38.7 38.7 1.9 3.1 4.9 5.2 Delay(s) 36.3 35.6 35.6 3.5 4.1 6.3 6.3 Level of Service _ D D D A A A A Level of Service D D D A A A A Approach Delay(s) 0.0 38.8 2.6 5.1 Approach Delay(s) 0.0 35.8 3.9 6.3 Approach LOS JM111111111111111D A A Approach LOS A D A A Intersection Summary Intersection Summary HCM 2000 Control Delay � 5.7 HCM 2000 Level of Service A HCM 2000 Control Delay � 8.6 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.13 HCM 2000 Volume to Capacity ratio 0.11 Actuated Cycle Length(s)- 90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s)! 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 45.1% ICU Level of Service A Intersection Capacity Utilization 47.9% ICU Level of Service A Analysis Period(min) 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2027 Total AM 4:Goldfield Rd&US-60 WB Ramps 2027 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues 1< ~ 4- 4\ t l < ~ 4- 4\ 1 1 Lane Group WBL WBT WBR NBL NBT SBT Lane Group WBL WBT WBR NBL NBT SBT S Lane Group Flow(vph) 10 12 12 118 165 211 156 Lane Group Flow(vph) 30 28 28 83 219 294 112 v/c Ratio 0.07 0.05 0.05 0.13 0.07 0.06 0.14 v/c Ratio 0.16 0.11 0.11 0.11 0.10 0.09 0.11 Control Delay 38.1 0.5 0.4 1.5 3.4 5.3 1.3 Control Delay 36.8 0.9 0.9 2.8 4.4 6.7 1.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.1 0.5 0.4 1.5 3.4 5.3 1.3 Total Delay 36.8 0.9 0.9 2.8 4.4 6.7 1.8 Queue Length 50th(ft) 5 0 3 7 13 0 Queue Length 50th(ft) 16 0 ` 3 10 20 0 Queue Length 95th(ft) 18 0 0 5 12 21 16 Queue Length 95th(ft) 36 0 0 21 38 34 17 Internal Link Dist(ft) 639 484 300 Internal Link Dist(ft) 639 484 300 - Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688 7099j 894 2439 3505 1139 ' Base Capacity(vph) 730 690 704,776 2257 3242 1050 - Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0&- 0 0 0 0 Spillback Cap Reductn 0 0 0_ 0 0 0 ' Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.01 0.02 0.02 0.13 0.07 0.06 0.14 Reduced v/c Ratio 0.04 0.04 0.04 0.11 0.10 0.09 0.11 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2027 Total AM 5:Goldfield Rd&US-60 EB Ramps 2027 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Group ESIR NBT NBR SBL SBT L ;ro 111FIi EBR NBT NBR SBL SBT Lane Configurations r4 r f?? r ) ?? Lane Configurations .4 r ff? r ) ff Traffic Volume(vph) 81 0 52 158 24 136 51 Traffic Volume(vph) 144 0 106 101 47 186 93 Future Volume(vph) 81 0 52 158 24 136 51 Future Volume(vph) 144 0 106 101 47 186 93 Turn Type Perm NA Perm NA Perm pni NA Turn Type Perm NA Perm NA Perm pni NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase ` A Switch Phase Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Split(s) 44.9 44.9 44.9T 31.6 31.6 10.6 31.6 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Total Split(%) 50.0% 50.0% 50.0% 37.8% 37.8% 12.2% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 All-Red Time(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Total Lost Time(s) 5.9 5.9 Ursa 5.6 5.6 5.6 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? �:'es Yes Yes Yes Lead-Lag Optimize? iiiiiiiillldes Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max Infection Sum Intersection Summ Cycle Length:90 Cycle Length:90 Actuated Cycle Length: Actuated Cycle Length: Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 #4 #5 1t #01 02 .4--403 1t #01 02 4--403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2027 Total AM 5:Goldfield Rd&US-60 EB Ramps 2027 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis r t /'- \- 4 W -'* - -,* r '- 4- 4� t /'- \- 4 Movement W� NBR SBL SBT SBR Movement WB NBR SBL SBT SBR Lane Configurations 41� i" ) TT Lane Configurations 41� i" ) TT Traffic Volume(vph) 81 0 52 0 0 0 0 158 24 136 51 0 Traffic Volume(vph) 144 0 106 0 0 0 0 101 47 186 93 0 Future Volume(vph) 81 0 52 0 0 0 0 158 24 136 51 0 Future Volume(vph) 144 0 106 0 0 0 0 101 47 186 93 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Lane Util.Factor 0.95 0.91 0.95 0.91 1.00 1.00 0.95 Frt 1.00 0.94 0.85 1.00 0.85 1.00 1.00 Frt 1.00 0.95 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0.97 1.00 1.00 1.00 0.95 1.00 Fit Protected 0.95 0.97 1.00 1.00 1.00 0.95 1.00 Satd.Flow(prof) 1681 1551 1504 5085 1583 1770 3539 Satd.Flow(prof) 1681 1560 1504 5085 1583 1770 3539 Fit Permitted 0.95 0.97 1.00 1.00 1.00 0.63 1.00 Fit Permitted 0.95 0.97 1.00 1.00 1.00 0.67 1.00 Said.Flow(perm) 1681 1551 1504 5085 1583 1173 3539 Said.Flow(perm) 1681 1560 1504 5085 1583 1254 3539 Peak-hour factor,PHF 0.85 0.80 0.87 0.25 0.25 0.25 0.80 0.85 0.80 0.85 0.80 0.80 Peak-hour factor,PHF 0.85 0.80 0.85 0.25 0.25 0.25 0.80 0.85 0.80 0.85 0.85 0.80 Growth Factor(vph) 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Adj.Flow(vph) 169 0 125 0 0 0 0 119 59 219 109 0 Adj.Flow(vph) 76 0 601 0 0 0 0 186 30 160 64 0 RTOR Reduction(vph) 0 88 82 0 0 0 0 0 21 0 0 0 RTOR Reduction(vph) 0 42 40 0 0 0 0 0 10 0 0 0 Lane Group Flow(vph) 101 13 10 0 0 0 0 119 38 219 109 0 Lane Group Flow(vph) 48 3 3- 0 0 186 20 160 64 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 10.1 10.1 10.1 57.4 57.4 62.8 57.4 Actuated Green,G(s) 6.6 6.6 6.6- 60.9 60.9 66.3 60.9 Effective Green,g(s) 10.1 10.1 10.1 57.4 57.4 62.8 57.4 Effective Green,g(s) 6.6 6.6 6.6 60.9 60.9 66.3 60.9 Actuated g/C Ratio 0.11 0.11 0.11 0.64 0.64 0.70 0.64 Actuated g/C Ratio 0.07 0.07 0.68 0.68 0.74 0.68 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Clearance Time(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 188 175 168 3243 1009 905 2257 Lane Grp Cap(vph) 123 113 110 3440 1071 899 2394 v/s Ratio Prot 0.02 c0.01 0.03 v/s Ratio Prot 0.04 c0.01 0.02 v/s Ratio Perm c0.06 0.01 0.01 0.02 c0.15 v/s Ratio Perm c0.03 0.00 0.00 0.01 c0.12 v/c Ratio 0.54 0.07 0.06 0.04 0.04 0.24 0.05 v/c Ratio 0.39 0.03 0.03 0.05 10.02 0.18 0.03 Uniform Delay,dl 37.7 35.8 35.7 6.0 6.0 5.0 6.1 Uniform Delay,d1 39.8 38.7 38.7 4.9 4.8 3.6 4.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.47 0.50 Progression Facto3� 1.00 1.00 1.00 1.00 0.40 0.50 Incremental Delay,d2 1.5 0.1 0.1 0.0 0.1 0.6 0.0 Incremental Delay,d2 0.7 0.0 0.0 0.0 0.0 0.4 0.0 Delay(s) 39.2 35.8 35.8 6.1 6.1 3.0 3.1 Delay(s) �40.5 38.8 38.8 4.9 JIMEb._1.9 2.4 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 37.0 0.0 6.1 3.0 Approach Delay(s)= 39.4 0.0 4.9 � 2.0 Approach LOS D A A A Approach LOS D A A A Intersection Summary Intersection Summary HCM 2000 Control Delay � 16.2 HCM 2000 Level of Service B HCM 2000 Control Delay 11.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.28 HCM 2000 Volume to Capacity ratio 0.20 Actuated Cycle Length(s)! 90.0 Sum of lost time(s) 17.1 Actuated Cycle Length(s) 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 47.9% ICU Level of Service A Intersection Capacity Utilization 45.1% ICU Level of Service Analysis Period(min) 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2027 Total AM 5:Goldfield Rd&US-60 EB Ramps 2027 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group EBL EBT EBR SBL Lane Group EBL EBT EBR NBT NBR SBL S Lane Group Flow(vph) 48 45 43 186 30 160 64 Lane Group Flow(vph) 101 101 92 119 59 219 109 v/c Ratio 0.31 0.19 0.19 0.05 0.03 0.17 0.03 v/c Ratio 0.54 0.39 0.36 0.04 0.06 0.24 0.05 Control Delay 43.9 1.9 1.8 5.3 0.0 1.5 2.8 Control Delay 47.8 12.4 10.9 6.6 0.6 2.4 3.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 43.9 1.9 1.8 5.3 0.0 1.5 2.8 Total Delay 47.8 12.4 10.9 6.6 0.6 2.4 3.4 Queue Length 50th(ft) 27 0 12 0 0 2 Queue Length 50th(ft) 58 1 8 0 12 5 Queue Length 95th(ft) 58 0 0 19 0 4 4 Queue Length 95th(ft) 98 36 33 16 2 18 10 Internal Link Dist(ft) 535� 222 1 484 Internal Link Dist(ft) 535 222 484 Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base Capacity(vph) 730 729 7097 3505 1123 915 2439 Base Capacity(vph) 730 733 a 3242 1046 905 2257 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0&- 0 0 0 0 Spillback Cap Reductn 0 0- 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.07 0.06 0.06 0.05 0.03 0.17 0.03 Reduced v/c Ratio 0.14 0.14 0.13 0.04 0.06 0.24 0.05 Intersection Summary Intersection Summary 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2027 Total AM 6:Goldfield Rd&Chevron Access 2027 Total PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 1.8 Int Delay,s/veh 2.1 Movement NBR SBL SBT Movement NBR SBL SBT Lane Configurations f f r ) 0 Lane Configurations r ) 0 Traffic Vol,veh/h 3 2 0 2 1 30 0 167 E&=23 68 Traffic Vol,veh/h 6 0 1 4 0 35 1 122 9 38 147 10 - Future Vol,veh/h 3 2 0 2 1 30 0 167 9 23 68 3 Future Vol,veh/h 6 0 1 4 0 35 1 122 9 38 147 10 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 _0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0mamm 0 0 0 - Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - N_ - - dpp� RT Channelized - - None - - None - - None - - None Storage Length 50 50 50 Storage Length 50 50 50 Veh in Median Storage,# - 0 0 0 - n Veh in Median Storage,# - 0 0 0 - - 0 Grade,% 0 - 0 0 - - 0 Grade,% 0 - 0 0 - - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 85 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 3 0 3 1 38 0 196 11 29 85 4 Mvmt Flow 8 0 1 5 0 44 1 144 11 48 173 13 Major/Minor Minor2 Minorl M Major2 Major/Minor Minor2 Minorl Mail Major2 Conflicting Flow All 244 352 45 298 343 98 89 0 0 207 0 0 Conflicting Flow All 350 433 93 329 428 72 186 0 0 155 0 0 Stage 1 0 145 145 - 196 196 Stage 1 0 276 276 - 146 146 - - - - - - - Stage 2 99 207 - 102 147 Stage 2 74 157 - 183 282 - - - Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 4.14 Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 1 6.54 5.54 - 6.54 5.54 - - - - - - - Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 Critical Hdwy Slg 2 6.54 5.54 - 6.54 5.54 - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 Pot Cap-1 Maneuver 712 585 1047 652 591 939 1525 1361 Pot Cap-1 Maneuver 670 569*1038 694 573 975 1473 '- 1423 Stage 1 866 790 - 787 737 - - - - - - - Stage 1 794 734 - 842 775 - - - - - - Stage 2 896 729 - 917 788 - - - Stage 2 927 767 - 903 730 - - - Platoon blocked,% 1 1 1 1 1 1 Platoon blocked,% 1 1 1 1 1 1 Mov Cap-1 Maneuver 672 572 1047 639 579 939 1525 1361 Mov Cap-1 Maneuver 623 550 *1038 675 553 975 1473 1423 Mov Cap-2 Maneuver 672 572 - 639 579 - - - Mov Cap-2 Maneuver 623 550 - 675 553 - - - Stage 1 866 773 787 737 Stage 1 793 709 841 774 Stage 2 859 729 895 771 Stage 2 885 766 872 705 Approach Eg-- WB - NB SB Approach EB WB NB SB HCM Control Delay,s 10.8 9.2 0 1.9 HCM Control Delay,s 10.5 9.1 0.1 1.6 HCM LOS B A HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR Capacity(veh/h) 1525 - - 628 897 1361 - - Capacity(veh/h) 1473 - - 661 932 1423 - - HCM Lane V/C Ratio - - - 0.01 0.046 0.021 - - HCM Lane V/C Ratio 0.001 - - 0.013 0.052 0.033 - - HCM Control Delay(s) 0 10.8 9.2 7.7 HCM Control Delay(s) 7.4 10.5 9.1 7.6 HCM Lane LOS A B A A HCM Lane LOS A B A A HCM 95th%tile C(veh) 0 - - 0 0.1 0.1 - - HCM 95th%tile C(veh) 0 - - 0 0.2 0.1 - - Notes -:Volume exceeds capacity $:Delay exceeds 300s +:Computation Not Defined *:All major volume in platoon _ 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 8 CivTech Inc.-CM Page 8 2027 Total AM 7:Goldfield Rd&Resort Blvd 2027 Total PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersection Intersection Int Delay,s/veh 5.7 Int Delay,s/veh 4.7 Movement Movement SBT - Lane Configurations f y +f Lane Configurations ++ Traffic Vol,veh/h 2 119 57 3 46 24 Traffic Vol,veh/h 2 70 62 6 98 54 - Future Vol,veh/h 2 119 57 3 46 24 Future Vol,veh/h 2 70 62 6 98 54 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 - Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None RT Channelized - None - None - None - Storage Length 0 50 - Storage Length 0 50 - Veh in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 - Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 140 71 4 58 30 Mvmt Flow 3 88 78 8 115 68 - Major/Minor�orl Malorl Major2 Major/Minor Minorl Majorl Major2 - Conflicting Flow All 204 38 0 0 75 0 Conflicting Flow All 346 43 0 0 86 0 Stage 1_ 73 - - - - - Stage 1 N 82 - - - - - - Stage 2 131 - Stage 2 264 - Critical Hdwy _6.84 6.94 4.14 Critical Hdwy `6.84 6.94 4.14 - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 1 5.84 - - - - - Critical Hdwy Slg 2 5.84 - - Critical Hdwy Slg 2 1 5.84 - - Follow-up Hdwy 3.52 3.32 2.22 Follow-up Hdwy 3.52 3.32 2.22 Pot Cap-1 Maneuver 766 1026 - - 1522 - Pot Cap-1 Maneuver 641 1018 - - 1508 - Stage 1 941 - - - - - Stage 1 932 - - - - - Stage 2 881 - - Stage 2 772 - - Platoon blocked,% - - - Platoon blocked,% 1 - - - Mov Cap-1 Maneuver 737 1026 - - 1522 - Mov Cap-1 Maneuver 592 1018 - - 1508 - - Mov Cap-2 Maneuver 738 - - Mov Cap-2 Maneuver 622 - - Stage 1 941 Stage 1 932 - Stage 2 848 Stage 2 713 Approach WB NB SB Approach WB NB SB - HCM Control Delay,s 9.1 0 4.9 HCM Control Delay,s 9 0 4.8 - HCM LOS A HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT ohms Minor Lane/Major Mvmt NBT NBRWBLnl SBL SBT Capacity(veh/h) - - 1019 1522 - Capacity(veh/h) - - 1000 1508 - HCM Lane V/C Ratio - - 0.14 0.038 - HCM Lane V/C Ratio - - 0.09 0.076 - HCM Control Delay(s) 9.1 7.5 HCM Control Delay(s) 9 7.6 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile C(veh) - - 0.5 0.1 - HCM 95th%tile C(veh) - - 0.3 0.2 - 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 9 CivTech Inc.-CM Page 9 2027 Total AM 8:Resort Blvd&Chevron Access 2027 Total PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.6 Int Delay,s/veh 0.3 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T# Y Lane Configurations rT T# Y Traffic Vol,veh/h 7 42 120 1 3 1 Traffic Vol,veh/h 2 114 62 0 1 3 Future Vol,veh/h 7 42 120 1 3 1 Future Vol,veh/h 2 114 62 0 1 3 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 — Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 85 80 80 80 Peak Hour Factor 80 85 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 9 53 141 1 4 1 Mvmt Flow 3 134 78 0 1 4 Major/Minor—orl Malor2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 142 0 - 0 213 142 Conflicting Flow All 78 0 - 0 218 78 Stage 1_ 142 - Stage 1^ - - - 78 - _ Stage 2 71 - Stage 2 - 140 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 - 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2,218 3,518 3.318 Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 1441 775 906 Pot Cap-1 Maneuver 1520 770 983 Stage 1 - 885 Stage 1 - 945 Stage 2 - 952 - Stage 2 - 887 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1441 - - - 770 906 Mov Cap-1 Maneuver 1520 - - - 768 983 Mov Cap-2 Maneuver - 770 - Mov Cap-2 Maneuver - 768 - Stage 1 880 Stage 1 943 _ Stage 2 952 Stage 2 887 Approach EB WB SB Approach EB WB SB714W— HCM Control Delay,s 1.1 0 9.5 HCM Control Delay,s 0.1 0 8.9 HCM LOS A HCM LOS A _ Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1441 - - - 800 Capacity(veh/h) 1520 - - - 919 HCM Lane V/C Ratio 0.006 - - - 0.006 HCM Lane V/C Ratio 0.002 - - - 0.005 HCM Control Delay(s) 7.5 0 9.5 HCM Control Delay(s) 7.4 0 8.9 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 10 CivTech Inc.-CM Page 10 2027 Total AM 9:Chevron Access&Access A 2027 Total PM 9:Chevron Access&Access A 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 1.5 Int Delay,s/veh 1.6 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations r1 * Lane Configurations Q T* ►� Traffic Vol,veh/h 2 32 8 0 0 7 Traffic Vol,veh/h 7 40 2 0 0 4 Future Vol,veh/h 2 32 8 0 0 7 Future Vol,veh/h 7 40 2 0 0 4 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Slop Sign Control Free Free Free Free Stop Slop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 40 10 0 0 9 Mvmt Flow 9 50 3 0 0 5 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 10 0 - 0 56 10 Conflicting Flow All 3 0 - 0 71 3 Stage 1^ - - - 10 - Stage 1^ - - - 3 - _ Stage 2 - 46 - Stage 2 - 68 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2,218 3,518 3.318 Follow-up Hdwy 2.218 3.518 3.318 Pot Cap-1 Maneuver 1610 952 1071 Pot Cap-1 Maneuver 1619 933 1081 Stage 1 - 1013 - Stage 1 - 1020 - Stage 2 - 976 - Stage 2 - 955 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1610 950 1071 Mov Cap-1 Maneuver 1619 927 1081 Mov Cap-2 Maneuver - 950 - Mov Cap-2 Maneuver - 927 - Stage 1 1011 Stage 1 1014 _ Stage 2 976 Stage 2 955 Approach EB WB SB Approach EB WB SB HCM Control Delay,s 0.4 0 8.4 HCM Control Delay,s 1.1 0 8.3 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity(veh/h) 1610 - - - 1071 Capacity(veh/h) 1619 - - - 1081 HCM Lane V/C Ratio 0.002 - - - 0.008 HCM Lane V/C Ratio 0.005 - - - 0.005 HCM Control Delay(s) 7.2 0 8.4 HCM Control Delay(s) 7.2 0 8.3 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 11 CivTech Inc.-CM Page 11 2027 Total AM 10:Access B&Resort Blvd 2027 Total PM 10:Access B&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 4.6 Int Delay,s/veh 2.8 Movement Movement Lane Configurations Lane Configurations r�i tfi Traffic Vol,veh/h 3 18 20 0 43 0 12 Traffic Vol,veh/h 11 41 62 0 18 0 37 0 0 0 0 Future Vol,veh/h 3 18 20 0 43 0 65 0 0 0 0 12 Future Vol,veh/h 11 41 62 0 18 0 37 0 0 0 0 7 Conflicting Peds,#/hr 0 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop Sign Control Free Free Free Free Free Free Stop Stop Slop Stop Stop Stop RT Channelized - - None - - None RT Channelized - - None - - None - - None - None - Storage Length Storage Length Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 0 Grade,% 0 0 0 - - 0 - Grade,% 0 0 0 0 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 23 25 0 54 0 81 0 0 0 0 15 Mvmt Flow 14 51 78 0 23 0 46 0 0 0 0 9 Major/Minor Majorl Major2 Minorl Minor2 Major/Minor Majorl Mail Minor2 Conflicting Flow All 54 0 0 48 0 0 106 98 36 98 110 54 Conflicting Flow All 23 0 0 129 0 0 146 141 90 141 180 23 Stage 1 - - - - - 44 44 - 54 54 - Stage 1 - - - - - 118 118 - 23 23 - Stage 2 - - 62 54 - 44 56 - Stage 2 - - 28 23 - 118 157 - Critical Hdwy 4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy 4.12 4.12 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2,218 2.218 3.518 4.018 3.318 3.518 4.018 3.318 Follow-up Hdwy 2.218 2.218 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1551 1559 873 792 1037 884 780 1013 Pot Cap-1 Maneuver 1592 1457 823 750 968 829 714 1054 Stage 1 - - 970 858 - 958 850 - Stage 1 - - 887 798 - 995 876 - Stage 2 - - 949 850 - 970 848 - Stage 2 - - 989 876 - 887 768 - Platoon blocked,% - - - - Platoon blocked,% - - - - Mov Cap-1 Maneuver 1551 - - 1559 - - 858 790 1037 882 778 1013 Mov Cap-1 Maneuver 1592 - - 1457 - - 810 743 968 822 707 1054 Mov Cap-2 Maneuver - - 858 790 - 882 778 - Mov Cap-2 Maneuver - - 810 743 - 822 707 - Stage 1 967 855 955 850 Stage 878 790 985 876 Stage 2 935 850 967 845 Stage 2 981 876 878 760 Approach EB WB NB-W Approach EB WB HCM Control Delay,s 0.5 0 9.6 8.6 HCM Control Delay,s 0.7 0 9.7 8.4 HCM LOS A A HCM LOS A A Minor Lane/Major Mvmt NBLnl EBL EBT EBR WBL WBT WBR SBLnl Minor Lane/Major Mvmt NBLnl EBL EBT EBR WBL WBT WBR SBLnl Capacity(veh/h) 858 1551 1559 1013 Capacity(veh/h) 810 1592 1457 1054 HCM Lane V/C Ratio 0.095 0.002 - - - - - 0.015 HCM Lane V/C Ratio 0.057 0.009 - - - - - 0.008 HCM Control Delay(s) 9.6 7.3 0 0 8.6 HCM Control Delay(s) 9.7 7.3 0 0 8.4 HCM Lane LOS A A A A A HCM Lane LOS A A A A A HCM 95th%tile C(veh) 0.3 0 - - 0 - - 0 HCM 95th%tile C(veh) 0.2 0 - - 0 - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 12 CivTech Inc.-CM Page 12 2027 Total AM 11:Resort Blvd&Access C 2027 Total PM 11:Resort Blvd&Access C 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.8 Int Delay,s/veh 1.1 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T+ Lane Configurations Q T+ M Traffic Vol,veh/h 1 17 38 0 0 5 Traffic Vol,veh/h 5 36 15 0 0 3 Future Vol,veh/h 1 17 38 0 0 5 Future Vol,veh/h 5 36 15 0 0 3 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 21 48 0 0 6 Mvmt Flow 6 45 19 0 0 4 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 48 0 - 0 71 48 Conflicting Flow All 19 0 - 0 76 19 Stage 1^ - - - 48 - Stage 1^ - - - 19 - _ Stage 2 - 23 - Stage 2 - 57 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 - 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2,218 3,518 3.318 Follow-up Hdwy 2.218 3,518 3.318 Pot Cap-1 Maneuver 1559 933 1021 Pot Cap-1 Maneuver 1597 927 1059 Stage 1 - - - - 974 - Stage 1 - - - - 1004 - Stage 2 - 1000 - Stage 2 - 966 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1559 932 1021 Mov Cap-1 Maneuver 1597 923 1059 Mov Cap-2 Maneuver - 932 - Mov Cap-2 Maneuver - 923 - Stage 1 973 Stage 1 1000 _ Stage 2 1000 Stage 2 966 Approach EB WB SB Approach EB WB SB L1 HCM Control Delay,s 0.4 0 8.5 HCM Control Delay,s 0.9 0 8.4 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1559 - - - 1021 Capacity(veh/h) 1597 - - - 1059 HCM Lane V/C Ratio 0.001 - - - 0.006 HCM Lane V/C Ratio 0.004 - - - 0.004 HCM Control Delay(s) 7.3 0 8.5 HCM Control Delay(s) 7.3 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 13 CivTech Inc.-CM Page 13 2027 Total AM 12:Resort Blvd&Access D 2027 Total PM 12:Resort Blvd&Access D 22-1180 Alliance Broadstone Silveray HCM 6lh TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.6 Int Delay,s/veh 0.8 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations t1 T+ Lane Configurations Q T M Traffic Vol,veh/h 1 16 34 0 0 3 Traffic Vol,veh/h 3 33 13 0 0 2 Future Vol,veh/h 1 16 34 0 0 3 Future Vol,veh/h 3 33 13 0 0 2 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 20 43 0 0 4 Mvmt Flow 4 41 16 0 0 3 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 43 0 - 0 65 43 Conflicting Flow All 16 0 - 0 65 16 Stage 1^ - - - 43 - Stage 1^ - - - 16 - Stage 2 - 22 - Stage 2 - 49 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 1 - - - - 5.42 - Critical Hdwy Slg 2 - 5.42 - Critical Hdwy Slg 2 - 5.42 - Follow-up Hdwy 2,218 3,518 3.318 Follow-up Hdwy 2.218 3,518 3.318 Pot Cap-1 Maneuver 1566 - - - 941 1027 Pot Cap-1 Maneuver 1602 - - - 941 1063 Stage 1 - - - - 979 - Stage 1 - - - - 1007 - Stage 2 - 1001 - Stage 2 - 973 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1566 - - - 940 1027 Mov Cap-1 Maneuver 1602 - - - 938 1063 _ Mov Cap-2 Maneuver - 940 - Mov Cap-2 Maneuver - 938 - Stage 1 978 Stage 1 1004 Stage 2 - - - - 1001 - Stage 2 - - - - 973 - Approach EB WB SB Approach EB WB SB - HCM Control Delay,s 0.4 0 8.5 HCM Control Delay,s 0.6 0 8.4 - HCM LOS A HCM LOS A _ Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1566 - - - 1027 Capacity(veh/h) 1602 - - - 1063 HCM Lane V/C Ratio 0.001 - - - 0.004 HCM Lane V/C Ratio 0.002 - - - 0.002 HCM Control Delay(s) 7.3 0 8.5 HCM Control Delay(s) 7.3 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 14 CivTech Inc.-CM Page 14 2027 Total AM 13:Resort Blvd&Access E 2027 Total PM 13:Resort Blvd&Access E 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Intersectio Intersection Int Delay,s/veh 0.7 Int Delay,s/veh 0.9 Movement EBL EBT WBT Movement EBL EBT WBT Lane Configurations rT T# Lane Configurations rT * M Traffic Vol,veh/h 1 15 31 0 0 3 Traffic Vol,veh/h 3 30 11 0 0 2 Future Vol,veh/h 1 15 31 0 0 3 Future Vol,veh/h 3 30 11 0 0 2 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Slop Sign Control Free Free Free Free Stop Slop RT Channelized - None - None - None RT Channelized - None - None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# - 0 0 0 Veh in Median Storage,# - 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 19 39 0 0 4 Mvmt Flow 4 38 14 0 0 3 Major/Minor Majorl Major2 Minor2 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 39 0 - 0 60 39 Conflicting Flow All 14 0 - 0 60 14 Stage 1^ - - - 39 - Stage 1^ - - - 14 - _ Stage 2 - 21 - Stage 2 - 46 - Critical Hdwy 4.12 6.42 6.22 Critical Hdwy 4.12 6.42 6.22 _ Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - 5.42 - Critical Hdwy Stg 2 - 5.42 - Follow-up Hdwy 2.218 3,518 3.318 Follow-up Hdwy 2.218 3,518 3.318 Pot Cap-1 Maneuver 1571 - - - 947 1033 Pot Cap-1 Maneuver 1604 - - - 947 1066 Stage 1 - - - - 983 - Stage 1 - - - - 1009 - Stage 2 - 1002 - Stage 2 - 976 - Platoon blocked,% - - - Platoon blocked,% - - - Mov Cap-1 Maneuver 1571 - - - 946 1033 Mov Cap-1 Maneuver 1604 - - - 944 1066 Mov Cap-2 Maneuver - 946 - Mov Cap-2 Maneuver - 944 - Stage 1 982 Stage 1 1006 _ Stage 2 1002 Stage 2 976 J Approach EB WB SB Approach EB WB SB L HCM Control Delay,s 0.5 0 8.5 HCM Control Delay,s 0.7 0 8.4 1 HCM LOS A HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Minor Lane/Major Mvmt EBL EBT WBT WBR SBLnl Capacity(veh/h) 1571 - - - 1033 Capacity(veh/h) 1604 - - - 1066 HCM Lane V/C Ratio 0.001 - - - 0,004 HCM Lane V/C Ratio 0.002 - - - 0.002 HCM Control Delay(s) 7.3 0 8.5 HCM Control Delay(s) 7.2 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile C(veh) 0 - - - 0 HCM 95th%tile C(veh) 0 - - - 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 15 CivTech Inc.-CM Page 15 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX L QUEUE STORAGE ANALYSIS CivTech 22-1180 Alliance Broadstone Silveray 2027 Queue Storage Queue Length Analysis Average Vehicle Length(ft): 26 Trucks>10%? N Veh.Tvoe %Vehicles 25 Passenger 98% DesignAM Cycle PM Cycle Cycle D ID Intersection Control Length Length Length Approach Eree-Flow HCM AASHTO F Right Speed Volume Car Trucks Car Trucks Minimum Q (sec) (sec) AM(PM) (mph) AM (PM) AM (PM) AM (PM) AM (PM) AM (PM) AM (PM) Max AM(PM) AM (PM) AM(PM) MEL AM PM Max AM(PM) 1 Goldfield Rd&Old 1-Way WB - _ SB Left 45 18 21 1 1 1 1 - - - - 25' 25' 25' 25'(25') 100' 100' 100'(100') 405' 90' 175' 175' 175' 175(175) West Hwy SEB y Stop( ) () WB Left 35 64 67 3 3 1 1 - - - - 25' 25' 25' 25'(25') 150' 150' 150'(150') 245' 60' 180' 180' 180' 180(180) 2 Goldfield Rd&Old 2-Way Stop _ - WB Right No 35 10 6 1 1 1 1 - - - - <25'(<25') 100' 100' 100'(100') 245' 60' 110' 110' 110(110) West Hwy NWB Control(EB/WB) <25' <25' <25' 110' Goldfield Rd&US- 3 60/Old West Highway 1-Way Stop(WB) - - -(-) WB Right No 45 179 121 6 4 1 1 - - - - 25'(25') 225' 175' 225'(175') 405' 90' 330' 400' 400(310) Exit 25' 25' 25' 400' NB Left 35 100 66 4 3 1 1 5 4 1 1 5' 25' 25' 5'(25') 200' 175' 200'(175') 245' 60' 215' 180' 215' 215(180) 4 Goldfield Road and US- Signalized 90 90 90(90) WB Left 45 9 26 1 1 1 1 1 2 1 1 20' 40' 40' 20'(40') 100' 125' 100'(125') 405' 90' 175' 175' 175' 175(175) 60 WB Ramps SB Right No 35 133 95 5 4 1 1 7 5 1 1 <25' 20' 20' <25'(20') 250' 200' 250'(200') 245' 60' 250' 215' 250' 250(215) WB Right No 45 18 42 1 2 1 1 1 3 1 1 <25' <25' <25' <25'(<25') 100' 150' 100'(150') 405' 90' 175' 220' 220' 175(220) SB Left 35 136 186 5 7 1 1 7 10 1 1 5' 20' 20' 5'(20') 250' 325' 250'(325') 245' 60' 250' 320' 320' 250(320) 5 Goldfield Road and US- Signalized 90 90 90(90) EB Left 45 81 144 3 5 1 1 4 8 1 1 <25' 100' 100' <25'(100') 175' 275' 175'(275') 405' 90' 265' 355' 355' 265(355) 60 EB Ramps NB Right No 35 24 47 1 2 1 1 2 3 1 1 <25' 5' 5' <25'(5') 125' 150' 125'(150') 245' 60' 110' 145' 145' 110(145) EB Right No 45 52 106 2 4 1 1 3 6 1 1 <25' 35' 35' <25'(35') 150' 225' 150'(225') 405' 90' 220' 310' 310' 220(310) Goldfield Road and 2-Way Stop NB Left 35 0 1 0 1 0 1 - - - - 125' <25' <25' <25'(<25') 0' 100' 0'(100') 245' 60' 90' 130' 110' 90(110) 6 Chevron Access Control(E top -(-) SB Left 35 23 38 1 2 1 1 - - - - 25' 25' 25' 25'(25') 100' 125' 100'(125') 245' 60' 110' 145' 145' I10(145) NB Right No 35 9 9 1 1 1 1 - - - - <25' <25' <25' <25'(<25') 100' 100' 100'(100') 245' 60' 110' 110' 110' 110(110) 7 Goldfield Road and 1-Way Stop(WB) - - -(-) SB Left 35 46 98 2 4 1 1 - - - - 25'(25') 125' 175' 125'(175') 245' 60' 215' 215' 145(215) Resort Boulevard 25' 25' 25' 145' �CivTech 111111111 A0000d®❑ m®11111111 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX M SIGHT DISTANCE ANALYSIS �- CivTech 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access A&Chevron Access Location:Access A&Chevron Access Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 942 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7.60 ft §3.2.6.1,p 3-15 Case B1—Left Turn from the Minor Road §9.5.3.2.1,p 943 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(tg) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbi 9-6,p 9-44 Vehicle Height 4.25 ft §3.2.6.1,p 3-15 Single-Unit Tuck 9.5 sec Tbi 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1,p 943 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/secz §3.2.2.2,p 34 Add'I lanes to cross(1"is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbi 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(Vm*r) 30 MPH Site data Grades-Approaching Minor Street from:(—=approachin downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GL) / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(Ga) Approach Grade Adjustment Factor Left 1.0 Tbi 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROI/LI]only) Design Vehicle Gap+Adj for Approach Grade>3%+Adjs forAdd'l Lanes&Median Median Width(in"Lane Equivalents") (Use 0 for RI/ROI/LI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) Combination Truck 10.8 sec LI LO/Th RO ISD to left&right along Major Road ISD=1.47Vm.A (ft) Eq 9-1,p 945 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Z Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ Vz Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 CIVTech Appendix M CivTech Appendix M Page 1 of 4 July 2022 C Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access A&Chevron Access Location:Access A&Chevron Access Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 132-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 Case B3-Crossinq Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(ts) Passenger Car 5.5 sec Tbl 9-16,p 9-57 Design Vehicle Time Gap(t�) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 949 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only' Trucks 0.7 sec Tbl 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(adj'd for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,p 947 Case B-3 Only 0.2 sec Tbl 9-10,p 949 Time Gap based on site data Design Vehicle Gap+Adj forAdd'1 Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 947 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 947 Combination Truck 6.8 sec ISD to front along Major Road ISD=1.47Vmwte (ft) Eq 9-1,p 945 Time Gap based on site data(sec) B2&B3 B3 Only Passenger Car calculated ISD= 220.5 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adjs forAdd'I Lanes&Median for B3) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8 ft Combination Truck 9.8 9.1 design ISD= 260 ft ISD to left(132/133)&right(63)along Major Rd ISD=1.47V_j,« (ft) Eq 9-1,p 945 Combination Truck calculated ISD= 299.9 ft design ISD= 300 ft ISD to Left ISD to right (132&63) (63 Only) The differences between Case F and Cases B1,B2&B3 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 design ISD= 345 315 Sight Distance Type I Case Car ISU Truck I TrMuck Combination Truck calculated ISD= 432.2 401.3 topping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A `Number of major road lanes is irrelevant in Case B2. With effect of grade on right 200 N/A N/A Intersection The differences between Case B1 and Cases B2&B3 are reduced To Right B1 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 132/133 265 345 435 On Major Road F 225 260 300 CivT@Ch Appendix M CivTech Appendix M �/ Page 3 of 4 July 2022 C Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access B&Resort Blvd Location:Access B&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7.60 ft §3.2.6.1,p 3-15 Case 61—Left Turn from the Minor Road §9.5.3.2.1,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(te) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 9-44 Vehicle Height 4.25 ft §3.2.6.1,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2,p 3-4 Addl lanes to cross(1"is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V_j,) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GL) / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROI/LI]only) Design Vehicle Gap+Ad%for Approach Grade>3%+Ad%s forAdd'I Lanes&Median Median Width(in"Lane Equivalents") [�j(Use 0 for RI/RO(/LI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) L Combination Truck 10.8 sec LI LO/Th RO ISD to left&right along Major Road ISD=1.47V-.jA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ Vz Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 CivTech Appendix M CivTeCh Appendix M Page 1 of 4 July 2022 C Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access B&Resort Blvd Location:Access B&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 & Case 133-Crossina Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(te) Passenger Car 5.5 sec Tbl 9-16,p 9-57 Design Vehicle Time Gap(ta) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only' Trucks 0.7 sec Tbl 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(adj'd for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,p 9-47 Case B-3 Only 0.2 sec Tbl 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'I Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1.47Vmaiort (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) 62&133 63 Only Passenger Car calculated ISD= 220.5 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdd'I Lanes&Median for63) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8ft Combination Truck 9.8 9.1 design ISD= 260 ft ISD to left(62/63)&right(133)along Major Rd ISD=1.47V_j,r (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 ft ISD to Left ISO to right (62&133) (133 Only) The differences between Case F and Cases 61,132&63 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 Governinj Combo design ISD= 345 315 Sight Distance Type I Case Car ISU Truck I Truck Combination Truck calculated ISD= 432.2 401.3 topping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A 'Number of major road lanes is irrelevant in Case 132. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&133 are reduced To Right 131 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 132/133 265 345 435 On Major Road F 225 260 300 CIVTech Appendix M CivTeCh Appendix M �/ Page 3 of 4 July 2022 C Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access C&Resort Blvd Location:Access C&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7.60 ft §3.2.6.1,p 3-15 Case 61—Left Turn from the Minor Road §9.5.3.2.1,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(te) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 9-44 Vehicle Height 4.25 ft §3.2.6.1,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2,p 3-4 Addl lanes to cross(1"is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V_j,) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GL) / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROI/LI]only) Design Vehicle Gap+Ad%for Approach Grade>3%+Ad%s forAdd'I Lanes&Median Median Width(in"Lane Equivalents") [�j(Use 0 for RI/RO(/LI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) L Combination Truck 10.8 sec LI LO/Th RO ISD to left&right along Major Road ISD=1.47V-.jA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ Vz Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 CivTech Appendix M CivTeCh Appendix M Page 1 of 4 July 2022 C Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access C&Resort Blvd Location:Access C&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 & Case 133-Crossina Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(te) Passenger Car 5.5 sec Tbl 9-16,p 9-57 Design Vehicle Time Gap(ta) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only' Trucks 0.7 sec Tbl 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(adj'd for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,p 9-47 Case B-3 Only 0.2 sec Tbl 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'I Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1.47Vmaiort (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) 62&133 63 Only Passenger Car calculated ISD= 220.5 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdd'I Lanes&Median for63) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8ft Combination Truck 9.8 9.1 design ISD= 260 ft ISD to left(62/63)&right(133)along Major Rd ISD=1.47V_j,r (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 ft ISD to Left ISO to right (62&133) (133 Only) The differences between Case F and Cases 61,132&63 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 Governinj Combo design ISD= 345 315 Sight Distance Type I Case Car ISU Truck I Truck Combination Truck calculated ISD= 432.2 401.3 topping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A 'Number of major road lanes is irrelevant in Case 132. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&133 are reduced To Right 131 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 132/133 265 345 435 On Major Road F 225 260 300 CIVTech Appendix M CivTeCh Appendix M �/ Page 3 of 4 July 2022 C Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access D&Resort Blvd Location:Access D&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7.60 ft §3.2.6.1,p 3-15 Case 61—Left Turn from the Minor Road §9.5.3.2.1,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(te) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 9-44 Vehicle Height 4.25 ft §3.2.6.1,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2,p 3-4 Addl lanes to cross(1"is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V_j,) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GL) / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROI/LI]only) Design Vehicle Gap+Ad%for Approach Grade>3%+Ad%s forAdd'I Lanes&Median Median Width(in"Lane Equivalents") [�j(Use 0 for RI/RO(/LI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) L Combination Truck 10.8 sec LI LO/Th RO ISD to left&right along Major Road ISD=1.47V-.jA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ Vz Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 CivTech Appendix M CivTeCh Appendix M Page 1 of 4 July 2022 C Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access D&Resort Blvd Location:Access D&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 & Case 133-Crossina Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(te) Passenger Car 5.5 sec Tbl 9-16,p 9-57 Design Vehicle Time Gap(ta) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only' Trucks 0.7 sec Tbl 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(adj'd for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,p 9-47 Case B-3 Only 0.2 sec Tbl 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'I Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1.47Vmaiort (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) 62&133 63 Only Passenger Car calculated ISD= 220.5 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdd'I Lanes&Median for63) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8ft Combination Truck 9.8 9.1 design ISD= 260 ft ISD to left(62/63)&right(133)along Major Rd ISD=1.47V_j,r (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 ft ISD to Left ISO to right (62&133) (133 Only) The differences between Case F and Cases 61,132&63 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 Governinj Combo design ISD= 345 315 Sight Distance Type I Case Car ISU Truck I Truck Combination Truck calculated ISD= 432.2 401.3 topping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A 'Number of major road lanes is irrelevant in Case 132. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&133 are reduced To Right 131 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 132/133 265 345 435 On Major Road F 225 260 300 CIVTech Appendix M CivTeCh Appendix M �/ Page 3 of 4 July 2022 C Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access E&Resort Blvd Location:Access E&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7.60 ft §3.2.6.1,p 3-15 Case 61—Left Turn from the Minor Road §9.5.3.2.1,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(te) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 9-44 Vehicle Height 4.25 ft §3.2.6.1,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2,p 3-4 Addl lanes to cross(1"is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V_j,) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GL) / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROI/LI]only) Design Vehicle Gap+Ad%for Approach Grade>3%+Ad%s forAdd'I Lanes&Median Median Width(in"Lane Equivalents") [�j(Use 0 for RI/RO(/LI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) L Combination Truck 10.8 sec LI LO/Th RO ISD to left&right along Major Road ISD=1.47V-.jA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neolectinc Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ Vz Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 CivTech Appendix M CivTeCh Appendix M Page 1 of 4 July 2022 C Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access E&Resort Blvd Location:Access E&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 & Case 133-Crossina Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(te) Passenger Car 5.5 sec Tbl 9-16,p 9-57 Design Vehicle Time Gap(ta) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only' Trucks 0.7 sec Tbl 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(adj'd for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,p 9-47 Case B-3 Only 0.2 sec Tbl 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'I Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1.47Vmaiort (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) 62&133 63 Only Passenger Car calculated ISD= 220.5 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdd'I Lanes&Median for63) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8ft Combination Truck 9.8 9.1 design ISD= 260 ft ISD to left(62/63)&right(133)along Major Rd ISD=1.47V_j,r (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 ft ISD to Left ISO to right (62&133) (133 Only) The differences between Case F and Cases 61,132&63 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 Governinj Combo design ISD= 345 315 Sight Distance Type I Case Car ISU Truck I Truck Combination Truck calculated ISD= 432.2 401.3 topping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A 'Number of major road lanes is irrelevant in Case 132. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&133 are reduced To Right 131 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 132/133 265 345 435 On Major Road F 225 260 300 CIVTech Appendix M CivTeCh Appendix M �/ Page 3 of 4 July 2022 C Page 4 of 4 July 2022 feet)between delineators is the same as the speed limit(in miles per hour)for the roadway. (D) Conduits, sleeves or carrier pipes. Projects that have parkway landscaping with irrigation lines under public streets shall install conduit sleeves for the irrigation line(s)prior to the paving improvements. All parkway landscaping shall be as directed and approved by the Apache Junction Parks and Recreation Department. (E) Signage and striping. All signage and striping shall be per the latest MUTCD and approved by the Development Services Engineer. (Ord. 1282, § 3.3,passed 11-7-2006) § 10-3-4 DESIGN GUIDELINES. Street design will be in accordance with the following criteria,subject to the approval of the City Engineer. Geometric design standards not specifically included in this Standard will conform to the latest A Policy on Geometric Design of Highways and Streets, published by the American Association of State Highway and Transportation Officials(AASHTO). (A) Street right-of-way requirements. (1) The right-of-way requirements shall be as shown in Apache Junction Standard Details AJ-20.1 through AJ-20.8. (2) Right-of-way widths in excess of the standard widths may be required in special circumstances such as when: (a) Cut or fill slopes cannot be confined within the standard width; (b) Minimum sight distance lines on horizontal curves are not within standards; (c) Minimum sight distances at intersections are not within the standards;and (d) Auxiliary lanes are to be provided. (B) Intersections. Although all intersections share certain common elements,they are not subject to generalized treatment. (1) Minimize conflict. To minimize conflicts and provide for anticipated traffic movements,each intersection must be evaluated with regard to its individual characteristics,and designed based on the following factors: (a) Traffic factors such as capacities,turning movements,vehicle size and operating characteristics,vehicle speed, pedestrian movements,transit operations and accident history; (b) Physical factors such as topography,existing conditions,channelization requirements; and (c) Human factors such as driving habits,reaction to surprises,decision and reaction time,and natural paths of movement. (2) Angle of intersection. A right-angle intersection provides the shortest crossing distance for intersecting traffic streams. It also provides the most favorable condition for drivers to judge the relative position and speed of intersecting vehicles. Where special conditions exist,intersection angles may diverge from a right angle with approval of the City Engineer. (3) Alignment and profile. Intersections occurring on horizontal or crest vertical curves are undesirable. When there is latitude in the selection of intersection locations,vertical or horizontal curvature should be avoided. A line or grade change is frequently warranted when major intersections are involved. If a curve is unavoidable,it should be as flat as site conditions permit. Where the grade of the through roadway is steep,flattening through the intersections is desirable as a safety measure. (4) Intersection sight visibility. (a) Sight visibility triangles. Clear lines of sight will be maintained along all streets,alleys and driveways to assure the safety of motorists and pedestrians. (b) Lines of sight. Lines of sight will not be obscured between 24 inches and 6 feet through a triangular area adjacent to a driveway,an alley or a street,where such access ways intersect with another street in a T-configuration. The sight visibility triangle,or sight triangle,consists of 3 sides that are formed by 2 intersecting access ways and a line connecting the 2(see Apache Junction Standard Detail AJ-27.1). (C) Sight distance. (1) Adequate sight distance shall be provided at all intersections,alleys and driveways(see Apache Junction Standard Detail AJ-26.1). (2) The determination of whether an object constitutes a sight obstruction shall consider both the horizontal and vertical alignment of both intersecting roadways,as well as the height and position of the object. (3) The sight distance required varies according to traffic speeds on the through road. A designer shall provide the sight distance based on the latest AASHTO Policy on Geometric Design of Highways and Streets and submit it with the plans. (D) Street slopes. (1) Typical street cross-slope. Undivided streets should have a normal crown that is a 2-way cross-slope with the cross- section high point on the street centerline. Divided streets should have cross-slope on each pavement section. The high point of each slope on each pavement section shall occur on the edge of the pavement nearest to the median. Unusual conditions may cause cross-slope requirements to vary,but normally,the desirable cross-slope is 2%,with a maximum cross-slope of 3% and a minimum cross-slope of 1%. Any deviation from the desirable cross-slope shall be approved by the City Engineer. (2) Cross-slopes in street dip sections. While dip sections are discouraged,where storm drainage runoff flows must cross the street,dip sections are needed and must be approved by the City Engineer. The pavements through the dip section should have a 1-way slope(no crown),curbing and medians must not be raised,and cut-off walls shall be installed in accordance with MAG Standard Detail 552. Transitions back to normal street cross-slopes will be needed at both ends of the dip section. (3) Existing cross-slope. See Vol.II, § 10-3-6(D)for street widening guidelines. (4) Longitudinal slope. (a) The minimum street and gutter slope for public streets is 0.0032 feet/feet(0.32%). Special approval by the City Engineer is required for slopes less than the minimum. (b) Projects that have any area with less than the approved minimum gutter slope shall provide construction staking on the actual gutter alignment(not offset)at a spacing not to exceed 25 feet and have the grades checked by a city Engineering Inspector immediately preceding the concrete pour. (c) Grade breaks and grade changes shall be clearly noted and stationed on the grading and drainage plan and the profile views. (d) Projects with longitudinal slopes less than 0.32%shall have the gutter lines water-tested in the presence of and to the satisfaction of the city's Inspector. (5) Vertical curves. Roadways with a longitudinal grade break or grade change of greater than 1.5%shall be required to design and construct a vertical curve along that section of roadway. Vertical curves shall be designed,at a minimum,per the most current AASHTO guidelines. (6) Superelevation. Although the superelevation of roadways is discouraged,unusual circumstances may require the use of superelevation. The City Engineer must approve the use and design of superelevated roadways. Roadway drainage must be considered in superelevated conditions. (7) Undulating roadways. Roadways shall be designed to eliminate undulations. In the case where an existing paved roadway undulates,it shall be removed full width and reconstructed to a new grade acceptable to the City Engineer and the entire cost paid for by the developer. (8) Side slopes. Side slopes should be designed for functional effectiveness,ease of maintenance and pleasing appearance. (a) For areas more than 10 feet from back of curb,slopes of 4:1 or flatter shall be provided. (b) Steeper slopes may be approved in areas more than 30 feet from back of curb when soils are not highly susceptible to erosion,or when a cut is not more than 4 feet vertical. Cuts or fills greater than 4 feet vertically shall be approved by the City Engineer. (E) Pavement tapers. (1) Projects are required to provide sufficient pavement tapers at all necessary locations(such as the beginning or end of a project)to properly guide traffic. (2) The pavement section for tapers shall be per these Guidelines. See Table 10-3.1 under Vol.II, § 10-3-5 below. (3) Pavement tapers shall be constructed with a thickened edge per MAG Standard Detail 201,Type"B." (4) Taper length formulas: Taper length for merging traffic situations are calculated by the following formulas: (a) When the design speed is 40 mph or less: TL= WXS2 60 (b) When the design speed is 45 mph or greater: TL=WxS where: TL= Taper length in feet S = Design speed in miles per hour. The design speed is 5 mph over the posted speed limit. W = Width of the offset between the edge of the travel lane and the edge of the lane after the taper (5) Taper length for non-merging traffic situation(such as where pavement widens with traffic)is normally 50 feet minimum.However,there may be some instances when more than 50 feet of taper may be required. The requirement for a longer taper will be determined on a case-by-case basis by the city. (6) The Engineer shall investigate the existing conditions and if determined to be substandard,the project shall sawcut and remove any existing pavement tapers when extending or installing new pavement improvements. (Ord. 1282, § 3.4,passed 11-7-2006) § 10-3-5 STREET STRUCTURAL SECTION(AGGREGATE BASE,ASPHALT BASE COURSE AND ASPHALT SURFACE COURSE). (A) Flexible pavement. The flexible pavement street structural section for public streets shall be the minimum depths shown below. SURFACE TREATMENT SEE NOTE 4 PLANT MIX SURFACE COURSE I I PLANT MIX COMPACT SUBGRADE BASE COURSE A.B.C. AS SPECIFIED (A) (B) (C) Table 10-3.1 - Street Structural Section (Minimum Depths) Street Classifications Asphalt Surface Asphalt Base ABC Fill Course(A) Course(B) (C) Parkway 2.5 in. -A-19** 3 in. -A-19 12 in.* Arterial 2.5 in. -A-19** 3 in. -A-19 12 in.* Collector 1.5 in. -A-12.5** 2.5 in. -A-19 8 in. Local Street-Residential 2.5 in. -A-12.5** 0 in. 6 in. Local Street-Commercial and Industrial 1.5 in. -A-12.5** 2.5 in. -A-19 8 in. ti,1 � --s ._,aE� ��� �-` '.' r a3`•" �� � �-` v, cacy �-•tea`— ..-_ Yas�. -: r ilk - r Silveray at Goldfield Market ViabilityStudy October 2023 Prepared for: Olsen Recker/Guadalupe Properties, LLC 4915 E. Baseline Rd. #105 Gilbert, AZ 85234 By: Rounds Consulting Group 4450 S. Rural Rd., Suite C-220,Tempe, AZ 85282 1 Phone: 480-508-4911 1 www.roundsconsulting.com Table of Contents Introduction............................................................................................................................1 ExecutiveSummary.................................................................................................................2 KeyFindings..............................................................................................................................................3 MarketAnalysis Summary......................................................................................................4 General Demographic Profile and Housing Supply ..................................................................................4 Household Retail Spending Potential.......................................................................................................8 Land Use Characteristics and Access to Site.............................................................................................8 Housing Market Characteristics and Trends...........................................................................................10 Benefitsof Rezoning.............................................................................................................13 Proposed Silveray at Goldfield Project...................................................................................................14 Conclusions& Recommendations..........................................................................................15 Appendix A:Study Area Statistics..........................................................................................17 Introduction Rounds Consulting Group, Inc. ("RCG") was contracted by Olsen Recker/Guadalupe Properties LLC to perform an independent study of the viability of the property for its underlying commercial zoning and identify the best use of the site. The subject site is an 18-acre parcel located on the east side of Goldfield Road, south of the US 60 in Apache Junction (Figure 1).The property is divided by Resort Boulevard into two parts, both of which have frontage on Goldfield Road.The site is currently zoned for general commercial use(B-1),with a PD overlay specifically designated for a hospital, office, hotel, and restaurant uses. RCG analyzed the general economic conditions throughout the Phoenix-Mesa-Scottsdale Metropolitan Statistical Area ("Phoenix MSA") and the City of Apache Junction. Due to varying factors discussed in the following sections, the subject site is unlikely to develop as a "retail destination site" such as a shopping center offering a range of retail and entertainment options. Therefore, a 5-minute and a 10-minute drive time radius from the site was identified as the areas where retail demand would originate from since the commercial site would be a place where consumers stop by at rather than drive to. Figure 2 displays the boundaries for the 5-minute(red area) and 10-minute (green area) drive time market areas. Figure 1:Subject Site . .0I) . . • •t. _ � r i *6 r.--• `« • -- - - - • Nov a ri �.'�' �.,r..��� ,�•. 3 7, ' ''� � ..`� tit �'�� -- D Y 'SITE Cal ry ►1� - C a r' a - �J ' Source:Ran Consulting;Google Maps 1 ■� Figure 2: 5-and 10-Minute Drive Study Area Boundaries 1- b EYT7ziRaFAX E�'C�.IlDY•nG�' C�JCC� III1 604;co CL7U zoo .{ AI u Source:Google Maps;Esri Executive Summary The purpose of this analysis is to determine the viability of commercial development at the subject site in the City of Apache Junction,Arizona ("Apache Junction" or "City'). The general and local demographic profile, economic trends, consumer spending, and housing/retail demand of the region and study areas indicate that a destination retail development (such as a mix of well-known retailers that includes dining and entertainment options) is not viable at the site. Viable alternative retail options include low-rise standalone retail stores such as vape/smoke shops, pawn shops, check cashing stores, etc. A multi-family development at the site will make for better use of the property, better serve the community by providing additional housing options for residents, drive retail development in existing retail corridors, and it will preserve view corridors, among others. RCG recommends that the current site be rezoned to address the fact that destination commercial development would not be viable because of the commercial demand in the area is low relative to averages, limited access to the site, low traffic counts, as well as the limited development of new housing in the area and connectivity growth for the coming decades.Alternatively,a multi-family residential rental property would help to address the community's needs by offering diversity in the type of housing available while supporting existing and future commercial activity, thus generating additional tax revenues in the City. 2 The following summarizes the key findings of the viability and market demand study. Key Findings C The site is not conducive to commercial or retail development due to a limited number of households surrounding the site, access is limited to Goldfield Road which ends just south of the property,the site is surrounded by undeveloped state-owned land which also restricts any future transportation routes to the site, and there are more viable alternatives to retail nearby (and others as discussed). C Additionally, because of the seasonal nature of the immediate customer base(i.e.,a large portion of the surrounding residents do not live in the area year-round), the seasonal downtime further adds to the lack of viability for commercial or retail development at this location. C The study area's spending potential was reviewed to determine the potential need for additional commercial development. The study areas' demand for various categories of retail was significantly lower than the average. Without additional housing development, the area is estimated to have limited growth in consumer retail demand. C The geometry of existing Resort Boulevard significantly limits retail viability by splitting up the site and preventing any retail from proper visibility and critical orientation to Goldfield Road. Because the freeway is elevated at this location and the site is separated from the freeway by the Goldfield on-ramp, there is no additional freeway visibility to compensate for this handicap to retail viability. C More viable commercial development is planned west of the site,further decreasing the viability of commercial activity at the site. C Arizona's housing cost has increased rapidly due to various factors, including population growth, housing shortages, rising interest rates, supply chain issues, and rising construction costs. For context,the median sales price of a home in Apache Junction was$403,456 in 2023. C As Arizona's population keeps increasing, places on the outskirts of the larger metropolitan area, like Apache Junction,should expect higher rates of growth than the metro area.This has not been the case for Apache Junction in recent years due to limited housing options. C There is a lack of multi-family housing options in the study areas and Apache Junction. Multi- family availability is important for housing diversity, housing affordability, and providing workforce housing to support economic development initiatives.Approximately 46.0%of housing units in Apache Junction are single-family, 43.9% are mobile homes, and 10.1% are multi-family homes. In comparison, 65.9%of housing units in Phoenix MSA are single-family homes, 28.4%are multi-family homes, and 5.5%are mobile homes. C Overall, the data presents that commercial zoning for the land is not feasible due to the area's low traffic counts, inaccessibility, and low spending potential or commercial zoning will lead to less desirable retail shops that would likely be in conflict with the adjacent residential uses. 3 Market Analysis Summary A review of the general demographic profile, real estate market trends, and land use characteristics of the region and study areas indicate that a destination commercial development (such as a shopping center) is not viable and that the current commercial designation will lead to low-rise standalone retail shops.The analysis also indicated that a multi-family development at the site will make the best use of the vacant land, providing workforce housing to support business development nearby and generate additional tax revenues for the City. General Demographic Profile and Housing Supply Phoenix MSA and the City of Apache Junction have experienced steady population growth over the last 10 years. The population of Phoenix MSA grew at an average annual rate of 1.6% from 2012 to 2022, adding approximately 774,000 new residents. Over the same period, Apache Junction's population grew at an average annual rate of 0.8%, adding approximately 3,040 new residents. As Arizona's population keeps increasing, places on the outskirts of the larger metropolitan area, like Apache Junction, should expect higher rates of growth than the metro area. This has not been the case for Apache Junction in recent years due to limited housing options. Figure 3 depicts the slowdown in population growth in Apache Junction compared to the Phoenix MSA. While new housing development at the Superstition Vistas is quickly ramping up in Apache Junction,the area surrounding the subject site is disconnected from the Superstition Vistas and is lacking diverse housing options. According to estimates from MAG, Apache Junction's population is expected to increase by 25.0% from 2022 to 2030. However, the current imbalance in Apache Junction's housing options could limit this growth, especially in the east US 60 area of Apache Junction that is very different and disconnected from the Superstition Vistas area of Apache Junction currently under development. 4 ■� Figure 3:Annual Population Percent Change(2012—2022) 2.00% 1.50% 1.00% 0.50% 0.00% -0.50% 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Phoenix MSA City of Apache Junction Note:Percent change represents year-over-year growth. Source:Arizona Office of Economic Opportunity MAG estimates employment growth from 2020-2040 in the Phoenix MSA, Apache Junction, and the 5- minute study area. MAG estimated that employment growth will remain strong with the addition of 967,300 jobs in the Phoenix MSA, over 11,100 jobs in Apache Junction, and 2,471 in the 5-minute study area by 2040. EmploymentTable 1: Phoenix MSA City of Apache Junction 5-Minute Study Area Employment Growth Employment Growth Employment Growth Year Level Rate Level Rate Level Rate 2020 2,205,800 - 7,860 - 6,068 - 2040 3,173,100 43.85% 18,995 141.7% 8,539 40.7% Net Gain 967,300 11,135 - 2,471 Note:Employed in the selected area. Source:Maricopa Association of Governments;Rounds Consulting Group,Inc. Housing diversity is limited in Apache Junction and the surrounding areas.According to data from the U.S. Census Bureau, approximately 46.0% of housing units in Apache Junction are single-family units, 43.9% are mobile homes(or other similar types),and 10.1%are multi-family units,and the study areas displayed similar proportions to the City. For context, approximately 65.9% of the homes in the Phoenix MSA are single-family, 28.4%are multi-family, and 5.5%are mobile homes. 5 Figure 4: Percent Share of Housing Units by Structure 70 0 65.9% 60% 54.6% 50.9% 500 0 46.0% 43.9% 40% 36.4% 34.5% 30% 28.4% 20% 12.6% 10.1% 9.9% 10% 0% 5■ Single-Family Multi-Family Mobile Homes and Other ■Apache Junchion ■5-Minute Study Area 10-Minute Study Area ■Phoenix MSA Source:U.S.Census Bureau;Esri Updated Demographics,2021;Rounds Consulting Group,Inc. According to the U.S. Census Bureau, as of 2021, 17.5% of those over the age of 25 living in Apache Junction obtained a bachelor's degree or higher, and 26.7% and 26.2% of those living in the 5- and 10- minute study area, respectively, have obtained a bachelor's degree or higher. This can be compared to 34.6%in the Phoenix MSA.This difference in educational attainment is a primary contributor to the large gap between the median household incomes. Apache Junction and the 5-minute study area report household incomes that are 29.3%and 12.0%less than the Phoenix MSA median income as of 2021, respectively. The data identified demand for rental housing options.The share of renter-occupied single-family homes was 26.9%within the 5-minute study area compared to 27.5% in Apache Junction.While renter-occupied apartments comprised 46.5% of the 5-minute study area's housing and 38.1% of Apache Junction's housing. The following table displays select key economic and demographic statistics of the Phoenix MSA, Apache Junction, and the 10-minute study area. The key statistics for the 5-minute study areas are displayed in the Appendix. 6 .� DemographicsTable 2:General Phoenix MSA Apache Junction 10-Minute Study Area Est. Percent Est. Percent Est. Percent Total Population 4,946,145 - 38,311 - 90,362 - Age Median Age 39 - 53.5 - 49.5 - Under 5 years 282,742 5.7% 1,602 4.2% 4,337 4.8% 5 to 24 years 1,302,328 26.3% 8,262 21.6% 17,801 19.7% 25 to 64 years 2,530,101 51.2% 16,650 43.5% 40,753 45.1% 65 to 85+years 803,974 16.3% 12,769 33.3% 27,560 30.5% Educational Attainment Population 25 years and over 3,361,075 - 30,049 - 68,208 - Less than 9th Grade 160,529 4.8% 1,591 5.3% 5,661 8.3% High School Graduate(includes equivalency) 751,707 22.4% 10,342 34.4% 20,735 30.4% Some College,No Degree 774,095 23.0% 7,662 25.5% 16,097 23.6% Bachelor's Degree 722,528 21.5% 3,499 11.6% 12,141 17.8% Graduate or Professional Degree 439,910 13.1% 1,767 5.9% 5,729 8.4% Household Income Total Households 1,777,705 - 17,334 - 38,586 - Family Households 1,176,350 66.2% 9,947 57.4% 25,143 65.2% Median Household Income(dollars) $69,216 - $48,917 - $64,870 - Less than$10,000 to$49,999 593,271 31.8% 8,840 51.0% 14,200 36.8% $50,000 to$200,000+ 1,271,943 68.3% 8,489 49.0% 24,386 63.2% Employment Occupation(of those living in the selected area) Civilian employed population 16 years and over 2,365,928 - 13,955 - 36,161 - Management,business,professional occupations 996,907 42.1% 3,960 28.4% 14,319 39.6% Service occupations 366,757 15.5% 2,548 18.3% 5,749 15.9% Sales and office occupations 542,631 22.9% 3,625 26.0% 8,353 23.1% Construction and maintenance occupations 198,421 8.4% 2,038 14.6% 3,616 10.0% Production,transportation,moving occupations 261,212 11.0% 1,784 12.8% 3,977 11.0% Housing and Occupancy Total Housing Units 1,863,195 - 17,334 - 49,504 - Owner Occupied Housing Units 1,250,606 67.1% 13,468 77.7% 31,583 63.8% Renter Occupied Housing Units 612,589 32.9% 3,866 22.3% 6,980 14.1% Units in Structure Single-family 1,336,503 65.9% 7,974 46.0% 24,897 50.9% Multi-family 576,679 28.4% 1,751 10.1% 6,194 12.6% Mobile Home and Other 110,658 5.5% 7,610 43.9% 17,803 36.4% Source:U.S.Census Bureau;Esri Updated Demographics,2021;Rounds Consulting Group,Inc. 7 Household Retail Spending Potential A spending potential index represents the amount spent by households in a given area for a product or service relative to the national average.The national average is represented as 100. The spending potential index for the multiple categories within the immediate study area (i.e., 5 minute drive) have a spending potential index that is significantly lower than the national average. This means that the spending potential within a 5-minute drive from the site is relatively low, thus commercial demand is lower than average.This is also generally true for the 10-minute study area. The future projections of consumer spending in the areas are estimated to have moderate growth over the next 5 years and beyond without increasing rooftops.This indicates that if the site remains zoned for commercial development,it will remain vacant or be developed as less desirable low-rise standalone retail due to low demand.The spending potential index for each given study area is shown in Appendix A. Land Use Characteristics and Access to Site Currently, Goldfield Road ends roughly half a mile south of the US 60, and the area consists of a majority of lower-density residential land uses.The nearby area has limited rooftops due to the state-owned land that will limit new rooftop growth and access to the site for decades. Additionally,the site does not have any plans for a transportation route to act as a connectivity path with other nearby areas, and plans for a future north-south freeway interchange will draw commercial activity away from the Goldfield area. These factors significantly lower traffic counts in the area, reducing the viability of commercial development for this site. Multi-family properties, however, can be developed without depending on nearby rooftops or sufficient traffic, and are more attractive when the site has highway access to nearby employment centers. Therefore, a multi-family residential project is clearly more viable due to its proximity to US 60 and compatibility with surrounding communities. Overall,the data presents that commercial zoning for the subject site is not feasible due to the area's low traffic counts, inaccessibility, high percentage of seasonal residents, and comparatively low spending potential. The following images illustrate that the location of the subject site and the varying factors hindering commercial development. 8 Retail Needs Rooftops (�?Goldfield Goldfield Has Very Limited Subject Site Demographic Trade Area: rs wy c I`- LOY. Low Density,Mountains, �`""" M,,_,.• -�,w State Trust Land -' IdLal - Retail Hab om.rtv .,t r 1,Gald G•nwn 1 • No Connectivity to Path of Growth - - - For Decades N` - J 1 - Limited New Rooftop Growth _ For Decades In Goldfield - Trade Area . State Land Slow To Market 2,800 Acres Brookfi CAP Canal Barrier 1-_-- 8,000-10,000 Homes to Growth to East _ Muhl-Decade Build Out Until Center of Path of Grown - i For several Decades 1 � Source:Man Consulting i� Goldfield Subject Site Future North South Freeway if r Interchange Will Draw L Comm ercial Activity Away iieell�� Y 3 From Goldfield 14 I • I ' r Goldfield is Dominated by Seasonal Residents Decreasing Retail Viability (Dolce Vita,Golden Vista,Rancho Mirage,Desert Sun) J Source:Man Consulting 9 Housing Market Characteristics and Trends The demand for residential housing in Arizona has outpaced supply, resulting in a rapid increase in home prices due to the recent influx of residents. The current surge in home prices can be traced back to the Great Recession of 2008 and was amplified by the COVID-19 pandemic. Following the housing crisis of 2008, developers significantly reduced the construction of new homes for an extended period. The Phoenix MSA economy thrived in 2019 and recovered from the pandemic induced recession more rapidly than other metros in 2020,attracting many people seeking job opportunities and affordable living. Due to the large migration of new residents, housing inventory shortages started driving home prices up quickly. Lower-income households were disproportionately affected by the rapid increase in housing costs. The majority of the job losses included occupations that earned a wage less than $60,000 a year. However, high-income workers did well through the pandemic. Additionally,the federal government overreacted by providing excessive stimulus programs and kept the interest rates historically low for a prolonged period.The combination of low interest rates and excessive stimulus spending put further pressure on housing prices as high-income individuals and potential homebuyers (who were waiting for the right market conditions) seized on the opportunity to buy starter homes,trade-up homes, investment properties, and/or second homes. According to Cromford Associates and Redfin data, the median sales price of a home in the Phoenix MSA was $556,1668, $403,456 in Apache Junction, and $470,250 in the 5-minute study area in 2023. The median sales price for all residential real estate grew at an annual rate of 1.4% in Phoenix MSA, 1.6% in Apache Junction, and 11.6% in the study area (Figure 5). Affordability in the Phoenix VISA worsened over the previous year due to rising home prices, increased investment capital in residential housing, and steady demand (Figure 6).The circumstance has raised the cost of housing to levels that many cannot afford. New housing products (i.e., starter homes, trade-up homes, multi-family, etc.) are necessary to mitigate housing shortages and affordability issues. 10 ■� Figure 5:Annual Percent Change in Median Sales Prices for Phoenix MSA, Apache Junction,and the 5-Minute Study Area 35% 30% 25% 20% 15% 10% 5% 0% 2017 2018 2019 2020 2021 2022 2023 -5% Phoenix MSA City of Apache Junction 5-Minute Study Area Source:Cromford Associates LLC(data derived from residential deeds recorded by Maricopa County);Redfin Note:The available data for the study area include the years 2018 and onward.Pervious years data is unavailable. Figure 6: Housing Opportunity Index in the Phoenix MSA 90% 80% 70% 60% 50% 40% 30% 20% 10% o-ti o-ti o-ti ati o-ti ati o-ti o-ti o-ti o-ti o-ti o-ti o-ti do titi titi ti3 ti� ti`' ti° ti� tiw ti° yo titi titi ,yo do ,yo ,yo ,yo ,yo ,yo ,yo ,yo ,yo ,yo ,yo ,yo Phoenix MSA Note:Share of homes sold affordable to families earning the median income. Source:NAHB/Wells Fargo Housing Opportunity Index The median household income in the Phoenix MSA increased at an average annual rate of 2.7%, 2.1% in Apache Junction, and 2.6%in the 5-minute study area from 2011 to 2021 (latest available data). Over the same period, home values in the Phoenix MSA increased at an average annual rate of 3.4%,4.7%in Apache Junction, and 4.6% in the 5-minute study area. 11 The data shows that household incomes are experiencing growth that is slower than the rate of growth that home values are having each year. Therefore, households are forced to spend a greater percentage of their incomes on housing. Overall, this will cause the households over time to become cost-burdened. Because only a small percentage of homes in the Phoenix MSA are affordable for individuals earning the median wage, many people have no choice but to seek out rental housing or other solutions. This has led to a surge in demand for rental properties, which has outpaced the supply growth. Consequently, rental rates have increased, mirroring the trend in home prices and further exacerbated the need for rental housing. It was estimated that single-family homes made up 65.9% of the Phoenix MSA housing stock, 45.4% of Apache Junction's, and 54.6% of the 5-minute study area in 2021, according to the U.S. Census Bureau. For context,the share of single family homes in East Valley cities,Apache Junction, and Maricopa County are displayed in Figure 7. Multi-family homes comprised 28.4%of all housing units in Phoenix MSA,while multi-family homes made up 10.7% Apache Junction's housing stock and 10.8% of the 5-minute study area's housing stock. For context, the share of multi-family homes in East Valley cities, Apache Junction, and Maricopa County are displayed in Figure 8. For additional context, in the Phoenix MSA, mobile homes and other housing options made up 5.5% of the housing stock, while mobile homes and others accounted for 43.9%Apache Junction's housing stock, and 34.5%of the housing stock within the 5-minute study area. Figure 7:Single Family Units as a Percentage of Total Housing Inventory 100% 94.2% 90% 84.9% 80% 70% 68.9% 64.4% 600 0 54.8% 50% 45.4% 40% 30% 20% 10% 0% Maricopa County Apache Junction Chandler Gilbert Mesa Queen Creek Source:United States Census Bureau(latest available data). 12 Figure 12: Multi-Family Units as a Percentage of Total Housing Inventory 25% 21.4% 20% 19.5% 19.5% 15% 10.7% 9.9% 10% 5% 3.2% 0 o�o Maricopa County Apache Junction Chandler Gilbert Mesa Queen Creek Source:United States Census Bureau(latest available data). Benefits of Rezoning The following is a list of the key benefits of rezoning the site from commercial to multi-family residential. C The property is located adjacent to US 60, providing future households easy access to key employment areas as well as existing and future commercial areas within the City. C Although, the property is adjacent to the US 60, it is not viable to develop as commercial due to its limited existing rooftops, the seasonal nature of the area residents, limited drive-by traffic, Goldfield road ending just south of the property, and future, better located commercial opportunities. C The property is surrounded by residential housing on three sides, while the U.S. 60 covers the remaining side. Therefore, a residential property is more compatible the area. With the region already having an ample supply of single-family homes and mobile homes,a multi-family complex would be a benefit to this area. C Past plans to develop a hospital center with office buildings, hotels, and restaurants has failed because of nearby hospital development(i.e.,the Banner Health Center that is less than five miles away) and because it would not be viable as the surrounding area lacks the necessary demographics, traffic counts, and access. 13 C The property has a natural desert wash with views of Superstition mountains.The wash would be better preserved if the land is developed with a multi-family project with limited heights and appropriate setbacks from the wash. C Multi-family projects can be developed without depending solely on the surrounding demographics, nearby housing, or traffic counts. Therefore, a multi-family residential project is more viable and compatible with surrounding communities. C The proposed multi-family project introduces a new product type to the community that expands the diversity of the City's housing stock, making it more appealing to employers as well as new families. C The activation of this property as a multi-family neighborhood will help build demand for commercial services in the area which will benefit the entire community. Proposed Silveray at Goldfield Project The Silveray at Goldfield project is planned as an approximately 18-acre rental home residential neighborhood consisting of about 270 units. The northern border of the property lines up the US 60's on-ramp. The portion of the property that is north of Resort Boulevard comprises seven different lots and has a Chevron convenience store on the west side. South of Resort Boulevard,the property is made up of one large lot. Neighboring the property is the Dolce Vita community,an adult multi-family development on the east and south sides. Goldfield Road borders the west side of the property,with the Golden Vista RV Resort on the other side. The proposed housing project will be a unique multi-family product that lives more similar to a single- family home.The project will feature clusters of one,two, and three homes with a maximum height of 30 feet. The units will offer an elevated level of luxury via high-end finishes, numerous floor plan options, and attractive architecture. Each unit will include a private rear yard space, which allows for secure and personal use for its residents,guests,and pets.About half of the units will also include an attached garage for the resident's use. The proposed housing units will have more similarities to a single-family home than traditional apartments. This will allow the Silveray project to benefit the community by being compatible with the surrounding residential areas and providing a different housing option for residents. The multi-family project aims to activate an undeveloped lot and introduce an innovative housing option to the area of Apache Junction. The City's current housing supply is comprised of primarily single-family homes or mobile homes. The shortage of housing options in the city creates a lack of diversity in income levels and lifestyles which results in a less vibrant and sustainable community. The Silveray at Goldfield project will help address that issue and fill a community need by introducing a new product. 14 Conclusions & Recommendations This subject site is distinctive because it is located near a major transportation corridor but has limited traffic since the connecting road ends just south of the highway. Furthermore, the area is surrounded by state-owned land that restricts access to the site and housing development. While state land is developing at a rapid pace along Ironwood in southern Apache Junction, development of state land in this area will not occur for many decades to come. Due to these factors, commercial development has not been feasible and the site has remained vacant. Furthermore, the approved commercial development is composed of high intensity uses that would not be compatible with the existing surrounding residential developments. The proposed project would offer a moderately dense multi-family product type that is compatible with the neighboring communities and includes a significant reduction in building height better preserving the views of the mountains. The property would bring working professionals who will be a short drive to the regional employment areas but desire a more single-family-like lifestyle combined with the luxuries of resort-like amenities and no maintenance responsibilities. The City as a whole would also benefit from the proposed property as increasing the number of households will support nearby commercial activity and generate new tax revenues. The Phoenix MSA's housing affordability has worsened over the years due to rising home prices, large migrations of new residents, and a housing shortage. The pandemic also had an effect on the housing market through the combination of historically low-interest rates for a prolonged period and excessive stimulus spending. Lower-income households have been disproportionately affected by the added pressure on housing prices. New housing products are imperative to mitigate the affordability issues and relieve the housing shortages. The proposed property would offer a unique housing type that would be a feasible option for households. Additionally the property site does not have a connectivity path to the nearby area as Goldfield Road ends just over a half of a mile to the south, limiting the number of cars going south of the US 60. Also, ADOT has plans for a north-south freeway interchange to the east of the property which will draw commercial interest away from the Goldfield interchange. The geometry of existing Resort Blvd significantly limits retail viability on the north of that road because it prevents retail from being oriented toward the arterial (Goldfield in this case) that is critical to retail viability. Because the freeway is elevated at Goldfield and the site is distanced from the freeway by the onramp,this lack of visibility is not sufficiently offset by proximity to the freeway. Any retail north of Resort Blvd will be hidden both from Goldfield and the freeway.The site south of Resort Blvd does have better visibility onto Goldfield. But, as explained, the lack of traffic counts and lack of residential rooftops in the area means destination retail is not a viable option, let alone on the larger parcel south of Resort Blvd. Furthermore, Resort Blvd splits the site up in a way that hinders commercial or retail development, adding to the general lack of retail viability in this location. 15 Retail that is too heavily disadvantaged by location,traffic, market depth,or demographic issues can easily degrade from desirable shops and restaurants to less desirable uses such as vape shops, cannabis, or check cashing.Retail development is market driven and cannot be forced to work where market conditions are not there to support it. Although nice retail shops and/or restaurants at this location would be desirable, because of the many market-driven disadvantages, those types of uses would not be viable at the site. Eventually any retail at this site would likely default to less desirable uses that are presumably not the desired outcome for either the City or the neighboring residents. RCG recommends that the current site be rezoned to address the fact that commercial development would not be viable because of the surrounding demographics, limited access to the site, the extremely low traffic counts, as well as the limited development of new rooftops and connectivity restrictions. The proposed multi family project, however, is viable, is compatible with the adjacent existing residential uses, and would help to address the community's needs by offering diversity in the type of housing available in the city. 16 ■� Appendix A: Study Area Statistics DemographicsTable 3:General Phoenix MSA Apache Junction 5-Minute Study Area Est. Percent Est. Percent Est. Percent Total Population 4,946,145 - 38,311 - 13,979 - Age Median Age 39 - 53.5 - 52.5 - Under 5 years 282,742 5.7% 1,602 4.2% 657 4.7% 5 to 24 years 1,302,328 26.3% 8,262 21.6% 1,957 14.0% 25 to 64 years 2,530,101 51.2% 16,650 43.5% 5,885 42.1% 65 to 85+years 803,974 16.3% 12,769 33.3% 4,808 34.4% Educational Attainment Population 25 years and over 3,361,075 - 30,049 - 10,683 - Less than 9th Grade 160,529 4.8% 1,591 5.3% 374 3.5% High School Graduate(includes equivalency) 751,707 22.4% 10,342 34.4% 2,820 26.4% Some College,No Degree 774,095 23.0% 7,662 25.5% 2,628 24.6% Bachelor's Degree 722,528 21.5% 3,499 11.6% 1,944 18.2% Graduate or Professional Degree 439,910 13.1% 1,767 5.9% 908 8.5% Household Income Total Households 1,777,705 - 17,334 - 6,360 - Family Households 1,176,350 66.2% 9,947 57.4% 3,988 62.7% Median Household Income(dollars) $69,216 - $48,917 - $60,876 - Less than$10,000 to$49,999 593,271 31.8% 8,840 51.0% 2,128 33.5% $50,000 to$200,000+ 1,271,943 68.3% 8,489 49.0% 4,223 66.5% Employment Occupation(of those living in the selected area) Civilian employed population 16 years and over 2,365,928 - 13,955 - 4,985 - Management,business,professional occupations 996,907 42.1% 3,960 28.4% 1,308 26.2% Service occupations 366,757 15.5% 2,548 18.3% 696 14.0% Sales and office occupations 542,631 22.9% 3,625 26.0% 1,642 32.9% Construction and maintenance occupations 198,421 8.4% 2,038 14.6% 764 15.3% Production,transportation,moving occupations 261,212 11.0% 1,784 12.8% 1,339 26.9% Housing and Occupancy Total Housing Units 1,863,195 - 17,334 - 10,377 - Owner Occupied Housing Units 1,250,606 67.1% 13,468 77.7% 8,123 78.3% Renter Occupied Housing Units 612,589 32.9% 3,866 22.3% 2,254 21.7% Units in Structure Single-family 1,336,503 65.9% 7,974 46.0% 5,671 54.6% Multi-family 576,679 28.4% 1,751 10.1% 1,031 9.9% Mobile Home and Other 110,658 5.5% 7,610 43.9% 3,585 34.5% Source:U.S.Census Bureau;Esri Updated Demographics,2021;Rounds Consulting Group,Inc. 17 ■� Table 4: Demographic Summary for the 5-minute, 10-minute,and 15-minute Study Area's 5-Minute 10-Minute 2023 2028 2023 2028 Population 13,979 13,953 90,362 92,790 Households 6,360 6,351 38,586 39,628 Families 3,988 3,993 25,143 25,955 Median Age 52.5 52.7 49.5 48.8 Median Household Income $60,876 $74,361 $64,870 $77,498 Source:Esri Table •.• • Service Expenditures • Boundary Spending Potential Index Average Amount Spent Total (SPI) Apparel and Services 72 $1,573.48 $10,007,328 Men's 77 $315.16 $2,004,412 Women's 74 $555.71 $3,534,304 Children's 67 $223.87 $1,423,798 Footwear 68 $340.46 $2,165,332 Watches&Jewelry 62 $105.43 $670,513 Apparel Products and Services 74 $32.86 $208,969 Computer Computers and Hardware for Home Use 73 $186.23 $1,184,446 Portable Memory 72 $3.29 $20,929 Computer Software 73 $10.52 $66,896 Computer Accessories 81 $20.20 $128,474 Entertainment&Recreation 79 $2,978.30 $18,941,972 Fees and Admissions 71 $502.24 $3,194,239 Membership Fees for Clubs 70 $195.01 $1,240,232 Fees for Participant Sports,excel.Trips 86 $102.64 $652,775 Tickets to Theatre/Operas/Concerts 74 $40.23 $255,869 Tickets to Movies 74 $20.51 $130,426 Tickets to Parks or Museums 72 $20.11 $127,884 Admission to Sporting Events,excel.Trips 60 $35.28 $6,998,230 Fees for Recreational Lessons 61 $87.86 $4,659,093 Dating Services 56 $0.60 $3,844 TV/Video/Audio 81 $1,100.35 $6,998,230 Cable and Satellite Television Services 85 $732.56 $4,659,093 Televisions 78 $113.79 $723,707 Satellite Dishes 68 $1.17 $7,454 VCRs,Video Cameras,and DVD Players 77 $3.69 $23,473 Miscellaneous Video Equipment 71 $8.97 $57,036 Video Cassettes and DVDs 84 $5.47 $34,767 Video Game Hardware/Accessories 68 $27.43 $174,423 Video Game Software 70 $13.60 $86,487 Rental/Streaming/Downloaded Video 74 $90.82 $577,596 Installation of Televisions 72 $1.16 $7,352 Audio 74 $99.46 $632,570 Rental and Repair of TV/Radio/Sound Equipment 81 $2.24 $14,272 Pets 84 $770.70 $4,901,649 Toys/Games/Crafts/Hobbies 75 $119.12 $757,616 Recreational Vehicles and Fees 75 $113.39 $721,180 Sports/Recreation/Exercise Equipment 78 $220.32 $1,401,244 Photo Equipment and Supplies 70 $32.88 $209,122 Reading 81 $102.72 $653,318 Catered Affairs 55 $16.57 $105,374 Food 77 $8,098.41 $51,505,918 Food at Home 78 $5,321.18 $33,842,709 Bakery and Cereal Products 77 $681.30 $4,333,061 Meats,Poultry,Fish,and Eggs 78 $1,146.75 $7,293,349 Source:Esri 18 Table 5(continued): Retail Goods and Service Expenditures—5 Minute Study Area Boundary Spending Potential Index Average Amount Spent Total (SPI) Dairy Products 79 $523.10 $3,326,915 Fruits and Vegetables 78 $1,041.34 $1,041.34 Snacks and Other Food at Home 79 $1,928.68 $1,928.68 Food Away from Home 75 $2,777.23 $2,777.23 Alcoholic Beverages 77 $516.09 $516.09 Financial Value of Stocks/Bonds/Mutual Funds 71 $27,983.29 $27,983.29 Value of Retirement Plans 75 $105,847.08 $105,847.08 Value of Other Financial Assets 79 $6,790.30 $6,790.30 Vehicle Loan Amount Excluding Interest 79 $2,872.67 $2,872.67 Value of Credit Card Debt 75 $2,357.86 $2,357.86 Health Nonprescription Drugs 87 $148.55 $944,792 Prescription Drugs 89 $326.38 $2,075,751 Eyeglasses and Contact Lenses 78 $86.59 $550,722 Home Mortgage Payment and Basics 76 $9,823.72 $62,478,887 Maintenance and Remodeling Services 84 $3,194.65 $20,317,996 Maintenance and Remodeling Materials 88 $693.17 $4,408,571 Utilities,Fuel,and Public Services 80 $4,665.07 $29,669,835 Household Furnishings and Equipment Household Textiles 76 $93.61 $595,380 Furniture 78 $641.99 $4,083,085 Rugs 76 $31.83 $202,465 Major Appliances 83 $439.00 $2,792,024 Housewares 89 $85.20 $541,844 Small Appliances 76 $55.39 $352,278 Luggage 76 $10.95 $69,659 Telephones and Accessories 75 $80.71 $513,341 Household Operations Child Care 58 $298.37 $1,897,640 Lawn and Garden 84 $560.65 $3,565,756 Moving/Storage/Freight Express 85 $76.42 $486,031 Housekeeping Supplies 82 $768.53 $4,887,869 Insurance Owners and Renters Insurance 84 $657.90 $4,184,267 Vehicle Insurance 81 $1,755.74 $11,166,492 Life/Other Insurance 77 $531.39 $3,379,641 Health Insurance 84 $4,150.44 $26,396,829 Personal Care Products 77 $426.60 $2,713,183 School Books and Supplies 75 $100.97 $642,151 Smoking Products 82 $356.21 $2,265,511 Transportation Payments on Vehicles excluding Leases 78 $2,366.82 $15,052,983 Gasoline and Motor Oil 80 $2,033.38 $12,932,313 Vehicle Maintenance and Repairs 82 $1,070.37 $6,807,577 Travel Airline Fares 74 $342.99 $2,181,430 Lodging on Trips 74 $533.82 $3,395,121 Auto/Truck Rental on Trips 74 $58.30 $370,761 Food and Drink on Trips 75 $418.95 $2,664,544 Source:Esri 19 Table 6: Retail Goods and Service Expenditures-10 Minute Study Area Boundary Spending Potential Index Average Amount Spent Total (SPI) Apparel and Services 80 $1,759.18 $67,879,565 Men's 85 $349.59 $13,489,343 Women's 82 $614.86 $23,725,017 Children's 78 $258.50 $9,974,583 Footwear 76 $380.63 $14,686,825 Watches&Jewelry 71 $119.98 $4,629,371 Apparel Products and Services 80 $35.62 $1,374,427 Computer Computers and Hardware for Home Use 82 $210.85 $8,135,880 Portable Memory 82 $3.73 $143,807 Computer Software 82 $11.66 $449,887 Computer Accessories 89 $22.27 $859,143 Entertainment&Recreation 87 $3,277.78 $126,476,348 Fees and Admissions 82 $585.61 $22,596,166 Membership Fees for Clubs(2) 81 $224.72 $8,760,980 Fees for Participant Sports,excel.Trips 97 $115.64 $4,4462,162 Tickets to Theatre/Operas/Concerts 83 $45.44 $1,753,386 Tickets to Movies 87 $24.02 $926,975 Tickets to Parks or Museums 86 $24.04 $927,446 Admission to Sporting Events,excel.Trips 70 $40.74 $1,571,812 Fees for Recreational Lessons 76 $110.32 $4,256,978 Dating Services 64 $0.69 $26,444 TV/Video/Audio 88 $1,185.98 $45,762,292 Cable and Satellite Television Services 90 $772.50 $29,807,610 Televisions 86 $125.36 $4,837,095 Satellite Dishes 78 $1.34 $51,822 VCRs,Video Cameras,and DVD Players 85 $4.10 $158,389 Miscellaneous Video Equipment 80 $10.09 $389,200 Video Cassettes and DVDs 94 $6.16 $237,619 Video Game Hardware/Accessories 77 $30.90 $1,192,278 Video Game Software 79 $15.23 $587,499 Rental/Streaming/Downloaded Video 84 $104.00 $4,013,123 Installation of Televisions 81 $1.30 $50,234 Audio(3) 83 $112.78 $4,351,846 Rental and Repair of TV/Radio/Sound Equipment 80 $2.22 $85,575 Pets 89 $816.22 $31,494,675 Toys/Games/Crafts/Hobbies(4) 84 $133.82 $5,163,603 Recreational Vehicles and Fees(5) 81 $124.89 $4,818,980 Sports/Recreation/Exercise Equipment(6) 83 $261.03 $10,071,944 Photo Equipment and Supplies 80 $37.86 $1,460,818 Reading(8) 89 $111.83 $4,314,885 Catered Affairs(9) 84 $20.55 $792,986 Food 83 $8,907.01 $343,685,723 Food at Home 93 $5,794.82 $223,598,965 Bakery and Cereal Products 81 $740.98 $28,591,332 Meats,Poultry,Fish,and Eggs 88 $1,245.03 $48,040,814 Dairy Products 86 $568.56 $21,938,302 Fruits and Vegetables 85 $1,136.18 $43,840,482 Snacks and Other Food at Home(10) 86 $2,104.08 $81,188,034 Food Away from Home 84 $3,112.18 $120,086,758 Alcoholic Beverages 84 $567.27 $21,888,721 Financial Value of Stocks/Bonds/Mutual Funds 79 $31,115.37 $1,200,617,687 Value of Retirement Plans 84 $118,519.28 $4,573,184,828 Value of Other Financial Assets 85 $7,285.25 $281,108,490 Vehicle Loan Amount Excluding Interest 89 $3,252.57 $125,503,496 Value of Credit Card Debt 82 $2,601.32 $100,374,620 Source:Esri 20 ■� Table 6(continued): Retail Goods and Service Expenditures—10 Minute Study Area Boundary(Continued) Spending Potential Index Average Amount Spent Total (SPI) Health Nonprescription Drugs 93 $159.12 $6,139,632 Prescription Drugs 93 $341.70 $13,184,658 Eyeglasses and Contact Lenses 84 $93.96 $3,625,596 Home Mortgage Payment and Basics 87 $11,198.19 $432,093,181 Maintenance and Remodeling Services 94 $3,589.68 $138,511,373 Maintenance and Remodeling Materials 97 $761.73 $29,392,244 Utilities,Fuel,and Public Services 87 $5.052.50 $194,955,651 Household Furnishings and Equipment Household Textiles 85 $104.05 $4,014,873 Furniture 87 $715.70 $27,615,923 Rugs 85 $35.19 $1,357,885 Major Appliances 92 $483.69 $18,663,501 Housewares 88 $94.82 $3,658,861 Small Appliances 84 $61.20 $2,361,401 Luggage 87 $12.42 $479,125 Telephones and Accessories 83 $89.27 $3,444,670 Household Operations Child Care 71 $386.17 $14,206,214 Lawn and Garden 90 $605.85 $23,377,216 Moving/Storage/Freight Express 93 $83.77 $3,232,475 Housekeeping Supplies 89 $832.51 $32,123,397 Insurance Owners and Renters Insurance 92 $715.04 $27,590,635 Vehicle Insurance 89 $1,924.44 $74,256,363 Life/Other Insurance 85 $588.80 $22,719,445 Health Insurance 90 $4,465.62 $172,310,366 Personal Care Products 85 $470.40 $18,150,923 School Books and Supplies 85 $114.08 $4,402,033 Smoking Products 84 $364.15 $14,051,263 Transportation Payments on Vehicles excluding Leases 88 $2,645.68 $102,086,220 Gasoline and Motor Oil 87 $2,214.46 $85,447,005 Vehicle Maintenance and Repairs 89 $1,170.23 $45,154,587 Travel Airline Fares 85 $394.08 $15,205,781 Lodging on Trips 84 $605.30 $23,356,274 Auto/Truck Rental on Trips 84 $66.57 $2,568,839 Food and Drink on Trips 84 $472.18 $18,219,562 Source:Esri 21 O� PeACHf✓GAO .._ z City o A ache Junction Development Services Department, qR/ZONP PLANNING AND ZONING COMMISSION PUBLIC HEARING STAFF REPORT DATE: April 23, 2024 CASE NUMBERS: P-23-63-PZ & P-23-64-GPA OWNERS: Jason Barney and John Hartman, Recker/Guadalupe Properties LLC. REPRESENTATIVE: Greg Davis, Iplan Consulting Corporation REQUEST: P-23-63-PZ: Proposed Rezoning of approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") P-23-64-GPA: Proposed Major General Plan Amendment to redesignate approximately 18 acres from Commercial to High Density Residential LOCATION: The property is generally located near the Southeast corner of US-60 and Goldfield Road GENERAL PLAN/ ZONING DESIGNATION: Commercial; currently zoned B-1/PD SURROUNDING USES: North: US-60; South: Manufactured Home Park ("MHP") (Dolce Vita) ; East: MHP (Dolce Vita) ; West: Recreational Vehicle Park by Planned Development ("RVP/PD") (Golden Vista RV Resort) . "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 1 BACKGROUND There are currently two (2) planned development Ordinances which govern the subject property. Ordinance No. 1144 (PZ-09-00) applies to the six (6) parcels north of Resort Blvd. (APNs : 103-01-0110, 103-01- 0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170) . This ordinance was approved in 2000 and permitted the development of a commercial project consisting of a gas station/convenience mart, hotel, restaurants, medical or office buildings and retail shops . Ordinance No. 1146 (Case PZ-13-00) governs the one (1) parcel south of Resort Blvd. (APN 103-01-0180) . This Ordinance was also approved in 2000 and permitted the development of the Apache Junction Medical Center, a 60-bed hospital campus including a single-level emergency unit and central lobby, a 3-story main hospital unit and medical office building on either side of the lobby, and a helipad on the northwest corner of the property. The only development that came to fruition was a gas station/convenience mart, located on APN 103-01-0120, which is not part of this rezoning/major general plan amendment request. All seven (7) parcels that are part of this request are currently undeveloped. PROPOSALS P-23-63-PZ Is a Planned Development (PD) Rezoning request by Greg Davis with Iplan Consulting, representing the property owner, Jason Barney with Olsen Recker/Guadalupe Properties LLC, to rezone approximately 17 . 96 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") near the SEC of the US-60 and Goldfield Road. The subject site is proposed to be developed with approximately 270 rental units to be known as Silveray on Goldfield. P-23-64-GPA Is a proposed Major General Plan Amendment of APNs 103-01- 0110, 103-01-0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170 and 103-01-0180, located near the Southeast corner of Goldfield Rd. and US-60, from Commercial to High Density Residential (40 du/ac) . PLANNING STAFF ANALYSIS Relationship to General Plan: The subject site is designated by the city' s General Plan as "Commercial". The proposed use constitutes a Major General Plan Amendment from the land use type "Commercial" to "High Density Residential". The change of use is considered a Major Amendment due to the subject size being over 10-acres in size. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 2 Zoning/Site Context: The approximate 18-acre property is surrounded by residential properties on the west (Golden Vista RV Subdivision) , east and south (Dolce Vita Manufactured Home Park) and US-60 on the north. Planned Development Zoning: The developer is requesting one (1) deviation from the Zoning Ordinance. They are requesting a 12-foot reduction in the rear setback from 20' to 8' to better organize the units on the northeastern corner of the project due to the existing wash corridor. Infrastructure Improvements: The surrounding infrastructure for the project is substantially developed, however, there are certain offsite improvements that are being requested by the City Engineer. The four curb returns along the intersection of Goldfield Road and Resort Boulevard and Chevron Gas Station shall be updated to current ADA standards . Also, concrete sidewalk shall be added from the north existing access drive heading north to tie into the existing sidewalk located within the Arizona Department of Transportation ("ADOT") right-of-way. Resort Boulevard is an existing roadway that was developed at the time of development of the Dolce Vita community. This roadway is substandard in size and, as such, will remain a private road and will not be dedicated as public right-of-way. Furthermore, all other necessary on-site and off-site improvements, such as community amenities, retention basins, accessible routes, and landscape buffers, will be built at the time of development. Please see project narrative to see a detailed list of all proposed infrastructure improvements . Availability of Water: The subject site is not being developed as a subdivision and, as such, is not required to obtain a 100-year certificate of assured water supply through the Arizona Department of Water Resources ("ADWR") , however, this project is under the jurisdiction of the Apache Junction Water District and has been reviewed by their Staff to ensure that there is enough water available to serve the project. For context, the District has what is known as a "Designation of Assured Water Supply" issued by ADWR. This means that the District has proved it has enough capacity/supplies to serve water up to a certain point. As development occurs, they track the water usage and report annually to ADWR. This is different from the Arizona Water Company "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 3 who does not have this designation. As such, The Arizona Water Company places the burden of proving there are enough water supplies on the developer to obtain a certificate of assured water supply from ADWR. Public Input: Neighborhood meeting notification letters were sent from the applicant to all property owners within a 300-foot radius. The applicant hosted multiple neighborhood meetings regarding this project. The first formal Public Neighborhood Meeting was held on 10/24/23 at the Golden Vista RV Park. Approximately 90+ individuals were in attendance. Most of these individuals were residents of Golden Vista. Another meeting was held on 11/06/24 at Dolce Vita Community Meeting. This meeting was well attended by Dolce Vita Residents, as this meeting was held during their weekly meeting. Staff received multiple emails, as well as a protest petition from primarily residents located within Golden Vista, regarding the rezoning request. All emails and the petition have been attached to this report. Primary concerns that were discussed during the meetings and within the emails to Staff include the availability of water, traffic, road improvements, and concerns regarding the height of the development and its impact on view sheds. FINDINGS OF FACT As required by the Apache Junction Zoning Ordinance, a Planned Development request may be approved by the City Council after consideration has been given to three different criteria. The criteria is outlined in the text below: 1 . That a better design cannot be achieved by applying the strict provisions of the underlying zoning district. Applicant Response: The current zoning is specific to the development plans for a regional hospital and commercial uses which are no longer market viable at this location. Furthermore, maintaining the B-1 underlying zoning would allow the introduction of land uses that are incompatible with a residential neighborhood in terms of height, noise, light, odors, etc. 2 . That strict adherence to the provisions of the zoning ordinance is not required in order to ensure the health, safety and welfare of the inhabitants of the proposed development. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 4 Applicant Response: The proposed development plan is in strict adherence to the zoning ordinance (RM-2) with one exception which is a setback deviation for a small portion of the property that is adjacent to a 50-foot wide wash, thus the distance provided still meets the intent of the setback requirement and thus the zoning ordinance. 3 . That strict adherence to the ordinance is not required to ensure that property values of adjacent properties will not be reduced. Applicant Response: As aforementioned, the proposed development plan is in strict adherence to the zoning ordinance (RM-2) with one exception which is a setback for a small portion of the property that is adjacent to a 50-foot wide wash, thus the distance provided still meets the intent of the setback requirement and thus the zoning ordinance. Furthermore, the continuation of the PD overlay use will provide the area residents reliance that the approved plans cannot be amended without a public hearing process. This is especially important in terms of the proposed project density and the proposed building height, both of which are significantly reduced from the maximum allowed in the RM-2 zoning district. FINDINGS OF FACT FOR MAJOR GENERAL PLAN AMENDEMENT As required by the Apache Junction General Plan, a Major General Plan request may be approved by the City Council after consideration has been given to specific criteria. The criteria is outlined in the text below: 1 . Whether the amendment proposes a land use designation that the Land Use Plan Map does not adequately provide optional sites to accommodate. Applicant Response: Although the General Plan does provide alternative HDR sites, many are developed and /or in areas of the City already being served by higher density residential uses. 2 . Whether the amendment constitutes an overall improvement to the General Plan, will not solely benefit a particular landowner or owners at a particular point in time, and is consistent with the overall intent of the 2020-2050 General Plan. Applicant Response: The Commercial land use classification of the subject property was specific to a previous plan which proved to be non-viable and other than one parcel developing as a fuel station, the rest of the site has remained vacant. The proposed amendment to a residential use will activate this property, bringing in a housing product that will benefit the community and residents that will spur additional economic growth in the area. The proposed amendment is more consistent with the quieter character of the neighboring communities, thus more compatible from a general Plan perspective. Since Commercial "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 5 land is significantly more valuable, the amendment does not solely benefit the land owner and instead benefits the community which is consistent with the intent of the General Plan. 3 . Whether the proposed amendment is justified by an error in the 2020-2050 General Plan as originally adopted. Applicant Response: The proposed amendment is justified by a change in how commercial development occurs and is not tied to an error of the General Plan. The commercial market has adapted to the post-COVID world of fewer commercial centers and the clustering of uses in regional nodes versus on "every street corner". That change in market has made sites like this better suited for other land uses such as the HDR proposed. 4 . Whether the proposed change is generally consistent with goals, objectives, and other elements of the 2020-2050 General Plan. Applicant Response: As demonstrated later in this narrative, we strongly believe the proposed change is consistent with the goals and objectives of the General Plan. The proposal is also consistent with the adjacent properties which share the same HDR classification. 5 . Whether the proposed change is justified by a change in community conditions or neighborhood characteristics since adoption of the Plan. Applicant Response: Yes, as aforementioned, this property has proven to be non-viable for the current Commercial classification and in analyzing other land uses available, the HDR designation is the most appropriate given the surrounding land uses. 6. Whether the amendment will adversely impact a portion of, or the entire community by: a. Significantly altering acceptable existing land use patterns, especially in established neighborhoods . Applicant Response: The proposed HDR classification is more compatible with the established neighborhoods, many which also utilize the HDR land use designation. Furthermore, the Commercial designation and specifically the approved hospital use would certainly adversely impact this quiet residential area via the regular high levels of noise and light caused by ambulances & helicopters coming and going. b. Significantly reducing the housing to jobs balance in the Planning Area. Applicant Response: Although a Commercial classification is more associated with jobs, that only matters if the property can be developed under that land use designation. The commercial "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 6 classification (and commercial zoning) has been in place for almost 25 years and only produced one small fuel station. It is clear the property would continue to sit vacant producing no jobs for the foreseeable future. The HDR classification will allow the property to be developed immediately, create a handful of jobs, but more importantly, will provide a housing product for employees that not only will help the City attract employers, but also will spur economic growth in this otherwise under-developed part of town. c. Substantially decreasing existing and future water supplies. Applicant Response: The proposed HDR classification and resulting residential community will use significantly less water than the current Commercial classification and approved uses would. d. Replacing employment with residential uses. Applicant Response: As previously mentioned, this site, although currently designated for commercial use, is not viable and will remain vacant. Developing an HDR land use will help bring people here and will likely spur economic and job growth in the area by activating an otherwise vacant property. e. Requiring additional and more expensive improvements to infrastructure systems and/or proximity to municipal facilities and/or services than are needed to support the prevailing land uses and which, therefore, may impact the level of service for existing and proposed developments in other areas . Applicant Response: As an infill parcel, this site is already served by adequate infrastructure which means the City will bring in more revenue on systems already in place, increasing their efficiency. Furthermore, the proposed HDR land use will actually use LESS utilities than the Commercial approved land uses would producing lower stress levels on the City's infrastructure systems. f. Increasing traffic (without mitigation measures) on existing roadways beyond the planned level of service, and that negatively impact existing and planned land uses . Applicant Response: Although Goldfield Road sees very little traffic today, it is an arterial street that is designed to accommodate significantly more traffic. The traffic study prepared for the proposed HDR land projects an acceptable LOS (Level of Service) , meeting the City's guidelines. Furthermore, the proposed amendment actually reduces the traffic load on the area streets by over 70% from the projected traffic of the currently approved Commercial land uses. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 7 g. Affecting the existing character (i.e. , visual, physical and functional) of the immediate area. Applicant Response: The surrounding area is largely residential with a hybrid rental/ownership home community to our east and south (Dolce Vita) and an RV community to our west (Golden Vistas) , both of which have the same HDR land use classification that is proposed for the subject property. As such, our low intensity rental home community is consistent with the character of the area and may even enhance the built aesthetics. The current Commercial designation would significantly change the character of the area as hospitals, office buildings, and hotels are large blocky structures that would look foreign to the area and block view corridors. h. Increasing the exposure of residents to aviation generated noise, safety and/or flight operations. Applicant Response: This proposal does not have an aviation component, but also does not generate the noise, light, and potential safety issues that a commercial development might. The current Commercial classification included a hospital complex that likely would have a helicopter service which would expose residents to aviation noise, safety, and/or flight operations. i. Materially diminishing the environmental quality of the air, water, land, or cultural resources . Applicant Response: The proposed HDR classification will result in a development that is much more sensitive to the environmental quality of the area than the current Commercial classification would allow for as we are building a neighborhood for families to live in which requires a longer-term vision in terms of the environment for our residents. j . Significantly altering recreational amenities such as open space, parks, and trails. Applicant Response: The current Commercial classification and approved plans make no mention of recreational amenities whereas the proposed HDR land use heavily focuses on recreational amenities for the residents which is detailed in the concurrent PD Rezoning application package. PUBLIC HEARING ON MARCH 26,2024 On the meeting of the 26t'', Staff made a presentation and introduced the preliminary recommended conditions of approval for the Planned Development Rezoning and Major General Plan Amendment. The applicant also made a presentation and answered questions asked by the Commission. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 8 Eight (8) residents of Golden Vista Resort spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . Water pressure concerns 3 . Increased density 4 . Property value concerns 5 . Maintaining commercial land 6. Increased traffic PLANNING DIVISION PRELIMINARY RECOMMENDATION Staff is supportive of the proposed project due to the enhanced features such as the building elevations, community amenities and overall site design, however, it is Staff' s recommendation that a portion of the property remain commercial for a future use. Per the City Council and resident adopted General Plan, the subject site is currently designated commercial. As Staff reviews each proposed development within the City, we use the General Plan as a guide for our recommendations . Throughout the review of this project, and with the guidance of the General Plan, Staff noted a few primary factors that make this property a candidate for commercial use. 1 . US-60 Freeway Frontage: Commercial businesses look for highly visible and easily reachable locations to attract and serve potential customers. The northern six (6) parcels (+/- 6 acres) are located directly south of the US-60 . Not only are these properties visible from the freeway, but they have full access to the freeway allowing easy access to the site. 2 . Recent Rezoning Trends and Concerns : Staff is cognizant of both the Planning and Zoning Commission' s and City Council' s hesitation to rezone commercial property to residential. While providing a diverse housing stock is important to diversify the City' s population, the City relies heavily on sales tax since the City does not have a property tax. This is especially important to point out now that the City will no longer be able to collect rental tax as of 2025. This means that the City will only be able to collect a one-time development fee during construction from a residential rental product. While the City will benefit from the additional residents living within the City, there is no guarantee that these residents will spend money within Apache Junction. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 9 3 . North-South Corridor: The proposed North-South Corridor is expected to connect to the US-60 just east of the proposed Silveray development. This connection will travel south and connect to the SR-24 and continuing to Arizona Farms South. This new roadway will connect this area of Apache Junction with communities further south and provide additional traffic to the area, which is needed for successful commercial development. 4 . Location of Future Commercial: During an internal study of commercially zoned properties back in 2021, Staff discovered that, while we have a similar amount of commercial land in comparison to nearby municipalities, much of our commercial land is not located within an ideal location for development. There are three commonly referred to types of commercial developments: 1 . Neighborhood, which is typically spread throughout the community and provides services to the local population in the form of retail, office and other similar services. 2 . Community, which is typically located near major intersections and typically accommodates a larger size development. An example of this type of development would be the Fry' s Marketplace at the northeast corner of Idaho Road and Old West Highway. 3 . Regional commercial developments tend to be located near freeways or major arterials to have access to high traffic counts and visibility and are the largest commercial developments . An example of this type of development would be the Tempe Marketplace located near the southwest corner of the Loop 202 and Loop 101 in Tempe, AZ . Many of our existing commercial properties are considered neighborhood commercial and our availability of land to accommodate community commercial developments is becoming increasingly limited. Many of our existing, undeveloped commercial properties are not located at highly trafficked intersections and are not an adequate size to accommodate a community, or regional, development. Throughout the review process, Staff expressed the need to keep at least a portion of this area as commercial based on the location of the property along the US-60. Staff is recommending that at least 5 acres of land be reserved for a commercial use, "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 10 but we have not designated a specific area to allow flexibility in the site design. A 5-acre property could reasonably accommodate a community commercial development. Respectfully, Staff recommends to the Commission that they include the following conditions of approval as part of a favorable recommendation to the City Council. As always, Commissioners may recommend changes or additional conditions which they feel will improve the development plan. RECOMMENDED MOTION FOR P-23-64-GPA (Major General Plam Amendment) I move that the Planning and Zoning Commission recommend to the Apache Junction City Council the (APPROVAL/DENIAL) of General Plan Amendment Case P-23-64-GPA, a request by Jason Barney and John Hartman with Recker/Guadalupe Properties LLC (developer) , represented by Greg Davis of Iplan Consulting Corporation (applicant) , to redesignate 18 acres, located near the Southwest corner of US-60 and Goldfield Road, from "commercial" to "high density residential . " RECOMMENDED MOTION FOR P-23-63-PZ (Planned Development Rezoning) I move that the Planning and Zoning Commission recommend to the Apache Junction City Council the (APPROVAL/DENIAL) of Planned Development Rezoning case P-23-63-PZ, a request by Jason Barney and John Hartman with Recker/Guadalupe Properties LLC (developer) , represented by Greg Davis of Iplan Consulting Corporation (applicant) , for an approximate 270 for-rent single- family residential community to be named Silveray, generally located near the Southwest corner of US-60 and Goldfield Road, from General Commercial by Planned Development ("B-1/PD") and B- 1/PD to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") , subject to the following conditions of approval : STANDARD CONDITIONS 1) All the provisions of the Zoning Ordinance are applicable to this case. 2) The development shall reflect substantial compliance and consistency with the Planned Development presented with case P-23-63-PZ, P-23-64-GPA and P-23-65-DR incorporated by reference herein, and as otherwise specified through these "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 11 conditions of approval, to include site layout, elevations, setbacks, public and private rights-of-ways, easements and tracts, amenities (including proposed pool and clubhouse) , perimeter and interior lot separation walls, model types, landscaping and other improvements. 3) Landscape, screening and irrigation improvements, planted within a minimum 10-foot-deep strip inside the net property line (but outside of required walls) along the perimeters of the property, shall be provided in compliance with the city' s landscape and screening requirements contained in Apache Junction City Code, Volume II, Land Development Code, Chapter 1, Zoning Ordinance, Article 1-8, Landscape Regulations. All required trees shall be 24" box and all required shrubs shall be 5-gallon in size and a decorative 6-foot-tall wall shall be constructed on all roadway frontages. 4) Street improvements include but not necessarily limited to, extension of pavement and the provision of sidewalk, curb, gutter, streetlights, underground utilities, fire hydrants, landscaping shall be required as part of this planned development project, and subject to review and approval by the City Engineer. 5) All applicable permits shall be applied for and plans shall be designed to current city codes prior to any lot grading or construction on the lots. Inclusively, all applicable development fees, including public art fees, shall be paid at the time of permit issuance. Development fees shall be paid on a per unit basis. 6) All common areas, amenity areas, and tracts within and immediately adjacent to the proposed development, including perimeter walls and fences, and interior and exterior common area landscaping, shall be owned and maintained in good condition at all times by the owners or homeowners association of the proposed subdivision. 7) The developer' s engineer shall meet the civil engineering improvement plans and document requirements, as outlined in the previously provided pre-application and review comments and in accordance of the City' s approved engineering standards that are in effect at the time of plan submittal. 8) Minor PD modifications or alterations of the approved architecture designs, floor plans, open space, unit mix, unit count, clubhouse location or development plan, shall be administratively reviewed and approved by the Development Services Director or designee. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 12 9) Major deviations or proposed changes from the original plans associated with this case will require a Major PD Amendment. The Director or designee shall interpret the proposed modification to be significant/major if, in the Development Services Director or designee' s opinion, the modified project density (i.e. , units per acre) is proposed to be increased by more than 100, the quality of project design is diminished, the types of proposed land uses are significantly altered and/or the overall character of the project is contrary to the intent and spirit of the original City Council PD ordinance approval. PROJECT SPECIFIC CONDITIONS 1) The applicant shall reserve, at minimum, 5 acres of contiguous land for General Commercial ("B-1") development. 2) The permitted uses in the B-1 zoning district shall be those which are permitted by Zoning Ordinance, Article 1-5, Section 1-5-3 : Non-Residential Use Regulations, except that the following uses shall not be permitted herein: Motor vehicle dealer (new or used vehicles; and similar uses) ; Thrift store/used merchandise sales; Medical marijuana facilities and dual licensees; Swap meets; Tattoo and/or piercing services; Death care services/funeral homes; Commercial parking lots and garages; Check cashing stores; Psychiatric and substance abuse facilities; Nursing and residential care facilities; Homeless shelter; Community food and relief services; Commercial equestrian boarding, rentals, arenas and academies; Cemeteries/mausoleum; Scenic and sightseeing terminal/parking; Assisted living facility; Group care home; Multi-family residential (including apartments, condominiums or townhouses) ; Similar uses designated by the Development Services Director not conducive to the City' s and community' s goals and objectives for successful community commercial development. 3) The proposed project must submit a Site Plan and Design Review Application for the revised residential and proposed commercial site for review and approval by Planning Department Staff. 4) The maximum height for the site shall be limited to 30-feet. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 13 5) A reduced rear setback of 8' shall be permitted on the parcels north of Resort Boulevard. 6) The proposed development will not be age-restricted. 7) Resort Boulevard will remain a private road and will not be dedicated as public right-of-way. 8) The City will transfer ownership, maintenance, and payment of all existing streetlights along Resort Boulevard to the adjacent property owners/commercial homeowner' s association. 9) The four curb returns along the intersection of Goldfield Road and Resort Boulevard and Chevron Gas Station shall be updated to current ADA standards. 10) Concrete sidewalk shall be added from the north existing access drive heading north to tie into the existing sidewalk located within the Arizona Department of Transportation ("ADOT") right-of-way as outlined by the City Engineer. 11) Any other future improvements to existing public facilities in Goldfield Road will be per city standards and as requested by the City Engineer. K aUey Scha Wnd<l Prepared by Kelsey Schattnik Senior Planner Attachments: Exhibit 1 - Project Narrative Exhibit 2 - Site Plan Exhibit 3 - Elevations and Floor Plans Exhibit 4 - Landscape Plan Exhibit 5 - Wall Plans Exhibit 6 - Final Participation Report Exhibit 7 - GPA External Agency Responses Exhibit 8 - Resident Emails to Staff Exhibit 9 - Updated Protest Petition (3.20.24) Exhibit 10 - Vicinity Map Exhibit 11 - Traffic Impact Analysis Exhibit 12 - Markey Study (applicant) "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 14 5i* Ivcr Y at G Major General Plan Amendment Rezoning Project Narrative Submitted to: O� PQACHE✓GAO O /IONr City of Apache Junction, Arizona Submitted on behalf of: Olsen Recker/Guadalupe Properties LLC 4915 E. Baseline Rd. #105 Gilbert, AZ 85234 Prepared by: Iplan Consulting 3317 S. Higley Road, Suite 114-622 Gilbert, AZ 85297 October 2023 1 Page Iplan Consulting Purpose of Request This narrative accompanies a request for formal application review of a Major General Plan Amendment (GPA) and a Planned Development (PD) rezoning for approximately 18 acres of vacant land located on the east side of Goldfield Road, immediately south of US60 within the City of Apache Junction. The property has an existing General Plan land use classification of Commercial and a zoning designation of B-1/PD which is proposed to be changed respectively to a classification of High Density Residential (HDR) and zoning designation of RM-2/PD (multi- unit residential) for the purpose of replacing the current PD development plan of a hospital complex along with offices, hotels, and restaurants, with a proposal for an approximately 15 DU/acre rental home residential neighborhood of 271 units (Site Plan currently shows 269 units but site can accommodate up to 271 units subject to an easement abandonment which is currently underway). Site Aerial 1 • L - 60 — 60 61_601E�:_—�ruvrs 0 • 1:ii SITE a Z �-�,--. _. _.. ___ ! I Bow \ ' .C•f r".-- �,� 71 1 Location The subject property is bifurcated by Resort Boulevard into two parts which both front on to Goldfield Road. The northern part is located immediately south of the on ramp for US60 and contains seven separate parcels. The southern part is located south of Resort Boulevard and is comprised of one large lot. The entire northern boundary is comprised of ADOT right-of-way for US60. To the east and south is the Dolce Vita community which is an active adult multi-family 2 1 P a g e Iplan Consulting development. Goldfield Road is our western boundary with the Golden Vista RV Resort beyond. Also to our west is the existing Chevron gas station and convenience store. Surrounding Property Information Direction General Plan Desi nation Zoning Existing Use On-Site High Density Residential RM-2/PD Vacant North - - US 60 R/W South High Density Residential MHP Dolce Vita Community East High Density Residential MHP Dolce Vita Communi West High Density Residential RVP Golden Vista RV Resort We believe this property is ideally located for a multi-unit residential land use as it is in close proximity to US60 and the multiple services and employment nodes along it. In addition, this product type provides a great land use transition for the Dolce Vita and Golden Vista communities as it is a significantly less intense use that what the current zoning allows for, resulting in significantly less traffic and better preservation of view corridors. Description of Proposal The intent of this proposal is to both activate this otherwise overlooked and underdeveloped parcel and to bring a unique housing product to the City of Apache Junction that is needed. Currently, the City's housing stock is comprised of either single family homes or traditional apartments. The dearth of other housing types creates a lack of diversity in both lifestyle and income levels. The proposed Silveray product helps address that issue by introducing a new product type into the community that will fill an existing need for residents that want the lifestyle akin to that of a single- family home or townhome but not the long-term time/cost commitment or maintenance that comes with it. Residents also benefit from the resort level amenities and lock/leave ability that this product and project provides. This will be a market-rate, non-age-restricted project that can serve all members of the community. Access: Not only is the product unique,but so is the site as it is bifurcated into two parcels that span Resort Blvd. which will provide the main points of access to this project. Both sides of the project are 3 1 P a g e Iplan Consulting proposed to be gated and will have multiple points of ingress/egress along Resort Blvd. The north parcels currently each show two points of ingress/egress and two second points of egress only, however all four access points permit emergency ingress. The southern parcel features the primary access from Resort Blvd. to the community clubhouse and leasing office which is outside of the gated area. The entry drive then continues on through a gated access that allows for both ingress and egress into the site. A secondary point of connection provides egress to Goldfield Road and also serves as an emergency vehicle access point. Circulation &Parking: Once through the gates, the 26-foot, or wider, driveways circulate through the property providing access to all of the residential units and parking areas. The current unit count and mix result in a parking requirement (established by the City of Apache Junction Zoning Code) of 496 spaces which we intend to exceed via a mix of private garages, shaded car ports,and open parking spaces. The parking ratios are based upon anticipated product mix for the site, which currently includes 95 one-bedroom units, 102 two-bedroom units, and 77 three-bedroom units. The parking ratios are 1.5 spaces/unit for the one-bedroom units, and 2 spaces/unit for the two and three-bedroom units for a blended ratio of 2.2 spaces/unit and a total space count, including garages, of 496 parking spaces. It is intended that 25%of the garages will provide enhanced electrical connection for residents with electric vehicles. Bicycle and pedestrian access is provided at all of the vehicular points of access but also in multiple other locations connecting residents directly to Resort Blvd. and Goldfield Road. The north parcels are compact and do not need additional points of access, however five additional access points are spread throughout the south parcel making it convenient for residents to exist the community safely. A total of fifty bicycle parking spaces are provided in the project via garage and designated bike racks around the site. Open Space &Amenities: As a high-quality residential community, the site will offer an elevated level of site amenities for the residents including the primary amenity area which features a clubhouse community building with fitness center, swimming pool with a large sun deck, spa, ramada, grilling areas, and more. Additional amenity areas feature a game lawn, two dog parks, and several walking paths with shade trees and multiple benches. The location of the primary amenity will be at the north end of the south parcel which affords centralized access from all residential units. The amenity area 4 1 P a g e Iplan Consulting location also enhances the streetscape along Resort Blvd. Additional passive parks will be provided and linked by walking paths the circulate throughout the project. In all, there is almost three acres of open space which equates to over 15% of the net site area. Product: The residential homes themselves offer an elevated level of luxury via high end interior finishes, numerous floor plan options, and attractive architecture. Although there is quite an eclectic mix of architecture in the area, the intent of this project is to blend into the more single family feel of the community which is why our homes use materials and roof structures similar to that seen in traditional single-family neighborhoods. We are using materials that stand up to the harsh environmental conditions in the desert including stucco, stone,metal, and concrete tile, and utilize colors that are complimentary to beautiful desert environs. Sloped rooflines and articulated massing complete the robust and complimentary architectural design for the project. Departing from traditional large monolithic multi-family buildings containing multiple units, this project features smaller cluster of one, two, and three units which have a maximum height of two- stories all under 30-feet tall. These smaller units look and live more like a traditional single- family home than traditional apartments thus are much more compatible to the adjacent HDR communities. Similar to a single-family home, every unit at Silveray includes a private rear yard space that allows for private and secure use by the residents, guests, and their pets. In addition, almost half of the units offer attached garages which is also something more akin to single family homes versus traditional multi-family apartments. Compatibility with adjacent uses This property is unique in several ways. First, although it is adjacent to US60, it is a difficult property to develop due to limited access and extremely low traffic volumes due to Goldfield being a dead-end street. The previous concept of a hospital complex, office buildings, hotels, and restaurants were a grand vision that is simply not viable at this location due to lack of surrounding demographics and traffic counts. A multi-family residential project is much more viable here as it can utilize the proximity to the highway but still be compatible with the existing residential communities surrounding it. Multi-family uses also do not rely on area demographics or traffic counts. Furthermore, being immediately adjacent to an important highway corridor leading to critical employment areas provides an important housing opportunity for the city. The site being 5 1 P a g e Iplan Consulting bifurcated by a private street serving another community affords some design challenges which we believe have been successfully mitigated by the more single-family nature of the product type. Additionally, this property is blessed with a beautiful natural desert wash and some of the most spectacular views of the Superstition mountains in the valley, both of which are better protected by developing a lower intensity multi-family project with limited heights and appropriate setbacks from the wash than the current zoning would allow for. The hospital, hotel, and restaurant uses that would come with the existing zoning would bring much higher vertical structures disrupting those views for some of the neighbors, especially to the west. In addition, those uses would bring much more intense traffic and congestion to Goldfield but most of all to Resort Boulevard, the primary access for the Dolce Vita residents. The proposed land use change would limit traffic to this area to people who live there as opposed to the existing land use which would draw a constant flow of people from elsewhere. This makes the proposed use much more compatible with the quiet residential character currently being enjoyed by neighboring communities. The site is bordered on three sides by existing residential uses, making this proposal compatible from a land use perspective. In addition, the building configuration (1-3 units per structure), building height (less than 30-feet), and design result in a single-family look and feel which is complimentary to the adjacent projects. Traffic: The site fronts onto Goldfield Road which is a fully improved arterial level road within the city and can easily accommodate the existing traffic volumes in addition to the traffic generated by this proposal. The proposed change in land use will actually reduce the potential traffic generated from the existing proposed uses as identified in the Traffic Impact Analysis for the site: • The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/94 out) trips during the AM peak hour, and 139 (89 in/51 out)trips during the PM peak hour. • The existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564(388 in/ 176 out)trips during the AM peak hour,and 747 (294 in/453 out)trips during the PM peak hour. • The proposed land uses generate approximately 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/399 out) fewer PM peak hour trips than the existing zoning allows. 6 1 P a g e Iplan Consulting The reduced intensity of the proposal from the approved commercial land uses will also benefit the City in terms of a lessened demand on public infrastructure,facilities,and services,all of which are in place and have capacity to serve this project. Lastly, the Development Plan for the proposal currently exceeds the City parking requirements which ensures there is adequate off-street parking. Views: This property and area is blessed with wonderful views of the majestic Superstition Mountains and one of the many benefits of this project is the lowering of the allowable height for the property. The current zoning allows building heights to be up to 45-feet and while the proposed RM-2 zoning district reduces that maximum height to 40-feet, the proposed product is less than 30-feet which we will be voluntarily committing to via the PD overlay. The project will take advantage of the existing 8-foot wall of Dolce Vita by adding landscaping to effectively screen our project from the adjacent Dolce Vita project to the east. A new wall will be built along the perimeter where needed which will further screen the project. Goldfield Road acts as a buffer to the west and a 50'+wide wash provides a buffer to the east. Additional landscaping is proposed along the south boundary to act as a buffer beyond the existing 8-foot wall. Noise and Light: The proposed residential use does not contain any sources that will create atypical levels of odors, dust, gas, noise, lighting, vibration, smoke, heat, or glare. Lighting and noise obviously will emit from this project, but the levels of emission will be significantly less than would occur under the currently approved land uses, especially the noise and light attributed to a hospital use. Even so, we have prepared a photometric plan to demonstrate light level compliance with City regulations and all community amenities will close at lOpm minimizing impacts to adjacent properties. General Plan Amendment The current General Plan designation of Commercial has proven to be non-viable at this location for multiple reasons. The most damaging reason is the lack of ambient traffic in the area but specifically along Goldfield Road. Currently Goldfield Road dead ends one-half mile to the south, limiting the necessity of traffic to turn south of US 60. US 60 itself is a major transportation corridor but this specific interchange has nothing immediately nearby to attract motorists to exit which is of critical importance for the viability of the commercial uses the current zoning allows for. Large commercial centers exist to the east(Gold Canyon)and the west(at Signal Butte)which serve the regional needs for commercial services along US60, limiting the viability of any 7 1 P a g e Iplan Consulting commercial services at this interchange. It is possible some commercial/employment uses that do not require high traffic volumes(e.g.mini-storage,warehousing,contractor yards,etc.)could work here, but those uses would still prefer to be in more active areas and we believe types of uses are not as compatible with the adjacent land uses as the residential use proposed. Another justification for the amendment is that the Commercial classification is not as compatible with surrounding land uses which use the same High Density Residential (HDR) land use classification of our proposal. This area has proven to be viable for residential uses such as the rental community of Dolce Vita to our east and south, and the Golden Vista RV park to our west. As such,we believe changing the land use classification to HDR is more appropriate and will allow the property to finally develop as a viable and long-term sustainable use. Findings of Fact: As required by the City of Apache Junction 2020 General Plan,below are the applicant's responses to the Findings of Fact which are the criteria the City evaluates the justification of the proposed Major General Plan Amendment from a land use classification of Commercial(C)to High Density Residential (HDR). 1. Whether the amendment proposes a land use designation that the land use plan map does not adequately provide optional sites to accommodate. Response: Although the General Plan does provide alternative HDR sites, many are developed and/or in areas of the City already being served by higher density residential uses. 2. Whether the amendment constitutes an overall improvement to the general plan,will not solely benefit a particular landowner or owners at a particular point in time, and is consistent with the overall intent of the 2020-2050 general plan. Response: The Commercial land use classification of the subject property was specific to a previous plan which proved to be non-viable and other than one parcel developing as a fuel station, the rest of the site has remained vacant. The proposed amendment to a residential use will activate this property, bringing in a housing product that will benefit the community and residents that will spur additional economic growth in the area. The proposed amendment is more consistent with the quieter character of the neighboring communities, thus more compatible from a general Plan perspective. Since Commercial land is significantly more valuable, the amendment does not solely benefit the land owner and instead benefits the community which is consistent with the intent of the General Plan. 3. Whether the proposed amendment is justified by an error in the 2020-2050 general plan as originally adopted. 8 Page Iplan Consulting Response: The proposed amendment is justified by a change in how commercial development occurs and is not tied to an error of the General Plan. The commercial market has adapted to the post-COVID world of fewer commercial centers and the clustering of uses in regional nodes versus on "every street corner". That change in market has made sites like this better suited for other land uses such as the HDR proposed. 4. Whether the proposed change is generally consistent with goals, objectives, and other elements of the 2020-2050 general plan. Response: As demonstrated later in this narrative, we strongly believe the proposed change is consistent with the goals and objectives of the General Plan. The proposal is also consistent with the adjacent properties which share the same HDR classification. 5. Whether the proposed change is justified by a change in community conditions or neighborhood characteristics since adoption of the plan. Response: Yes, as aforementioned, this property has proven to be non-viable for the current Commercial classification and in analyzing other land uses available, the HDR designation is the most appropriate given the surrounding land uses. 6. Whether the amendment will adversely impact a portion of the community by: a. Significantly altering acceptable existing land use patterns, especially in established neighborhoods. Response: The proposed HDR classification is more compatible with the established neighborhoods, many which also utilize the HDR land use designation. Furthermore, the Commercial designation and specifically the approved hospital use would certainly adversely impact this quiet residential area via the regular high levels of noise and light caused by ambulances & helicopters coming and going. b. Significantly reducing the housing to jobs balance in the planning area. Response: Although a Commercial classification is more associated with jobs, that only matters if the property can be developed under that land use designation. The commercial classification (and commercial zoning) has been in place for almost 25 years and only produced one small fuel station. It is clear the property would continue to sit vacant producing no jobs for the foreseeable future. The HDR classification will allow the property to be developed immediately, create a handful of jobs, but more importantly, will provide a housing product for employees that not only will help the City attract employers, but also will spur economic growth in this otherwise under- developed part of town. c. Substantially decreasing existing and future water supplies. Response: The proposed HDR classification and resulting residential community will use significantly less water than the current Commercial classification and approved uses would. d. Replacing employment with residential uses. 9 Page Iplan Consulting Response: As previously mentioned, this site, although currently designated for commercial use, is not viable and will remain vacant. Developing an HDR land use will help bring people here and will likely spur economic and job growth in the area by activating an otherwise vacant property. e. Requiring additional and more expensive improvements to infrastructure systems and/or proximity to municipal facilities and/or services than are needed to support the prevailing land uses and which, therefore, may impact the level of service for existing and proposed developments in other areas. Response: As an infill parcel, this site is already served by adequate infrastructure which means the City will bring in more revenue on systems already in place, increasing their efficiency. Furthermore, the proposed HDR land use will actually use LESS utilities than the Commercial approved land uses would producing lower stress levels on the City's infrastructure systems. f. Increasing traffic(without mitigation measures)on existing roadways beyond the planned level of service that negatively impact existing and planned land uses. Response: Although Goldfield Road sees very little traffic today, it is an arterial street that is designed to accommodate significantly more traffic. The traffic study prepared for the proposed HDR land projects an acceptable LOS (Level of Service), meeting the City s guidelines. Furthermore, the proposed amendment actually reduces the traffic load on the area streets by over 70%from the projected traffic of the currently approved Commercial land uses. g. Affecting the existing character (i.e., visual, physical and functional) of the immediate area. Response: The surrounding area is largely residential with a hybrid rental/ownership home community to our east and south (Dolce Vita) and an RV community to our west (Golden Vistas), both of which have the same HDR land use classification that is proposed for the subject property. As such, our low intensity rental home community is consistent with the character of the area and may even enhance the built aesthetics. The current Commercial designation would significantly change the character of the area as hospitals, office buildings, and hotels are large blocky structures that would look foreign to the area and block view corridors. h. Increasing the exposure of residents to aviation generated noise, safety and/or flight operations. Response: This proposal does not have an aviation component, but also does not generate the noise, light, and potential safety issues that a commercial development might. The current Commercial classification included a hospital complex that likely would have a helicopter service which would expose residents to aviation noise, safety, and/or f ight operations. 10 Page Iplan Consulting i. Materially diminishing the environmental quality of the air, water, land, or cultural resources. Response: The proposed HDR classification will result in a development that is much more sensitive to the environmental quality of the area than the current Commercial classification would allow for as we are building a neighborhood for families to live in which requires a longer-term vision in terms of the environment for our residents. j. Significantly altering recreational amenities such as open space,parks,and trails. Response: The current Commercial classification and approved plans make no mention of recreational amenities whereas the proposed HDR land use heavily focuses on recreational amenities for the residents which is detailed in the concurrent PD Rezoning application package. As evidenced above, we believe the proposed HDR land use classification not only meets the Findings of Fact but also will be more compatible with the existing neighborhoods, will spur economic growth in this area, and is a more appropriate land use for the property. Zoning Complimentary to the General Plan Amendment, we are proposing to rezone the property from PD B-I to PD RM-2, replacing the previous plans for a hospital complex, hotels, restaurants, and offices with a residential project. We believe the RM-2 base zoning district is most applicable as it aligns with the density intent of the project at approximately 15 DU/acre. The PD overlay is proposed to highlight overall compliance with the development regulations of the RM-2 zoning district and request one deviation which is discussed in detail in the next paragraph. Below is the PD development standards proposed for Silveray on Goldfield. Development Standards Standard RM-2 Code PD RM-2 proposed Minimum Development Area 7,000 square feet 700,000 square feet Minimum Lot/Parcel Width 60-feet 60-feet Maximum Residential Density 22 DU/acre 15.1 DU/acre Minimum Area Per Unit 1,980 square feet 2,800 square feet Maximum Lot Coverage 50% 27% Minimum Front Setback(West) 20-feet 20-feet Minimum Side Setback(North) 10-feet 10-feet Minimum Side Setback(South) 10-feet 10-feet Minimum Street Side Setback(Resort Blvd.) 10-feet 20-feet 11 Page Iplan Consulting Minimum Rear Setback(East) 20-feet 8-feet' Maximum Height(feet) 40-feet 30-feet Minimum Building Separation 10-feet 10-feet2 1—Not including adjacent wash corridor. 2—0-feet when attached. We are currently identifying one deviation to the City's Zoning Code. The deviation is a 12-foot reduction in the rear setback that only affects the northeastern corner of the project. The northeastern parcel is severely constrained by wash corridors on both the east and west sides which significantly restricts the buildable area of that parcel. However, since there is over 90 feet of wash corridor buffering our property from the closet homes in the adjacent Dolce Vita community, we believe the intent of the setback is met and exceeded in this instance. Additional justification for the minor deviation includes our commitment to exceed compliance with many of the other development standards, including a lowered density and lowered building height which are more important standards to the adjacent residents. The project also exceeds the open space and amenity requirements which enhance the livability of the project and sufficiently compensates for any negative impact to the greater community this one deviation would have. General Plan Compliance As the guiding policy document for development with the City of Apache Junction, we have reviewed the 2020 General Plan and affirm the proposed amendment is consistent with the overall Goals identified therein. Following is an analysis of the project's compliance with the Goals of the General Plan. Goal 3.2 - Diversify housing stock and neighborhoods by incorporating a variety of housing types and associated values to allow for a diverse demographic of residents. Being one of the more outlying communities of the Phoenix Metropolitan area, Apache Junction has historically attracted only single-family home development and as noted within the General Plan, the existing housing stock percentages are heavily skewed that way. The proposed development of this site as a for-rent housing community will add to the City's multi-family inventory and help the overall diversity of both the City's housing stock and residents. Goal 3.3 -Maintain and attract a quality housing stock in condition, design and construction standards. 121Page Iplan Consulting The ownership history has a history of developing and maintaining quality commercial, industrial and residential communities within the Phoenix metro area. The design, open space amenities, housing diversity and quality of life built into this community achieves the stated goal. Goal 5.1 -Attract all quality private investment that will add value and bring diversification to current and future residents of Apache Junction as a great place to live,work and play. Within the Economic Development Element of the General Plan, this goal is appropriately broad to recognize that economic development contains many different components. In this case, the private investment is expanding the housing diversity, thus employee pool, which is critical for not only existing employers to be able to maintain their workforce, but also important for prospective employers considering Apache Junction as their new home. This project meets this goal on a number of different levels. Goal 9.1 -Increase the city's financial sustainability. Financial sustainability is helped tremendously by increased residential density and diversity. Assuring sufficient disposable income through attainable housing choices, as well as increasing the number of people in the immediate trade area, the City is well served financially by the development of this project. Goal 9.3 -Encourage infill development. As a strategic piece of land located between an existing community and the US60,this property is an infill property. It can be difficult to identify the proper balance of uses in an infill location,but this site creates a density transition between existing commercial and residential, and takes advantage of the proximity to a major transportation corridor which might negatively impact other land uses. Goal 9.4 - Support and foster sustainable growth. Sustainable growth is a term that relates to housing diversity, financial sustainability, economic development contribution, and the overall goals of creating a city favorable to a live, work and play environment. This goal is met on all accounts. Goal 11.2 - Provide a balance of uses throughout the community. From the General Plan: 131Page Iplan Consulting "Currently, the city has less multi family and single-family residential homes per capita than Queen Creek, Chandler, Gilbert or Mesa.A highly disproportionate percentage of current housing stock resides in manufactured/recreational vehicle homes which currently totals approximately 63 percent (63%) of the city's residences. As a result, only 27 percent (27%) of the city's housing stock is considered single family development. As young people grow out of their parent's home it is important to have a diversity of housing types in order to keep new generations within the city. Moreover, the lack of diversity in housing stock also has a direct effect on people being able to move into the city. The general plan addresses this concern through appropriate land use designations and housing policies." As noted above, this product is critical to help achieve the overall balance of uses the community needs. Goal 11.4 -Encourage and promote sustainable land use development. As identified under the Sustainable Growth Goal, there are many components to sustainable land use development. Providing an appropriately dense housing project along a major transportation corridor reduces traffic in the community and creates a density transition away from the traffic and other commercial uses. This project, and multi-family projects in general, also result in higher efficiencies of utility infrastructure due to the focused intensity/density and bring a higher ratio of customers per capita resulting in a higher level of sustainability for the public utility providers. Conclusion: This property is unique as it is close to a major transportation corridor, but is somewhat isolated by the lack of transportation network to the south or east. For those reasons,the current entitlement failed to become viable. The property ownership has analyzed this site and larger context and believe this infill property's highest and best use is as a multi-family development. Even so, it is important to take the adjacent mobile home park and RV park communities into account and develop a project that is compatible both in land use and design. We are proposing a lower intensity product type that we believe it is compatible to the adjacent communities due to its lower height buildings and single family livability. Furthermore, this product is designed to attract working professionals that need to be a short drive into the regional employment areas,but desire a more single family like lifestyle combined with no maintenance responsibilities and resort like amenities which make this a complimentary development for both the adjacent neighbors and the City as a whole. 141Page Iplan Consulting Within the Phoenix metropolitan area, the shortage of housing quantity and variety is having a significant detrimental impact on communities' ability to grow in an economically viable fashion due to a variety of reasons, not the least of which is the inability of employers to find quality housing for new employees relocating to the Valley. If a community wants to develop in a smart and sustainable way, they need to have a range of housing to address affordability and lifestyle choices. This project will help achieve that goal for Apache Junction. 151Page Iplan Consulting DEVELOPMENT DATA GOLDFIELD ZONING: DENSITY: PARKING: N CURRENT: B-1 PD 1 BEDROOM 85 REQUIRED: PROVIDED: o PROPOSED: RM-2 PD 2 BEDROOM 107 Northeast (PARCEL 3) ` BTR — CASE: P-23-63-PZ 3 BEDROOM 77 PARCEL 1 PARCEL 2 PARCEL 3 TOTAL ( ) ( ) ( )_ Garage 15 SEC OF S. GOLDFIELD RD AND CO Y SECTION: 23 TOTAL 269 1 BEDROOM: 1.5 63 =95 1.5 22 =33 1.5 0 - 0 CD - C Q TOWNSHIP: 01 N 2 BEDROOM: 2(72)= 144 2(35)= 70 2(0)= 0 Resident-ADA Covered 1 N o m 13'-9" 12'6" 19'-9" 11'8" 12'6" 19'-9" 11'8" 12'6" 19'-9" 11'8" 12'6" 19'-9" 12'8" 13'9" °O 20'-6" w o ,; RANGE: 08E DENSITY: 14.9 DU/AC 3 BEDROOM: 2(52)= 104 2(10)= 20 2(15)= 30 Resident-Covered 3 RESORT BLVD _L ----- - - - - - -- - --- - ____ - - - - __ -___ _ - - - - - - - - -__ - ___ - - - - - - -_ 103-01-0110, 103-01-0130, 103-01-0140, "' - — _ - --— —- - __ ______ - - APN. 103 01 0150, 103 01 0160, 103 01 0170, TOTAL: 343 123 30 496 V s Resident-Tandem 21 APACH E JUNCTION, ARIZONA 85219 m TYPE 4 103-01-0180 I Lill Visitor-ADA 1 00 0 0 00 > (2-STORY) o o _ _ _ _ o o _ _ _ _ o o _ _ _ _ o o _ _ t + dC ® TYPE 8 TYPE 7 TYPE 8 TYPE 8 TYPE 7 TYPE 8 TYPE 8 TYPE 7 TYPE 8 TYPE 8 TYPE 7 TYPE 8 TYPE 8 TYPE 7 ® ® m TYPE 3 1 TYPE 317.96 ACRES 54 1018 (2-STORY) (2-STORY) (2-STORY) (2-STORY) 2 STORY ° ® � I I m ® � / (2-STORY) ( ) (2-STORY) (2-STORY) ( ) (2-STORY) (2-STORY) (2-STORY) (2-STORY) (2-STORY) (2-STORY) ( ) o ® (2-STORY) (2-STORY) " OPEN SPACE: 2.8 ACRES 15.6% Northwest(PARCEL 2) O ° ° — — — a o a — — — ° ° o SETBACK LOT COVERAGE: 4.8 ACRES(26.8/0) Garage 28 1 Li < Resident-ADA Covered 1 m46 24'_0� < a Ty- PERIMETER BUILDING SETBACKS: Resident-Covered 43 m ® TYPE 1,,, TYPE 1. TYPE 11 ® - PE 1 ® TYPE 1 < (z-STORY) Resident-Tandem 8 m m m m ® (2-STORY) V 2-STORY) m m m m m m m m (2-STORY) o (2-STORY) m m m m m m m 2-STORY) < ® 1106 1001 1017 ° m m m FRONT: io=o° BICYCLE PARKIN visitor 62 1016 1017 c G Visitor-ADA 1 1302 1120 N loll REAR: 10 0 143 m 1001 LU 1302 TYPE4 < ® REQUIRED: 1 PER EVERY 10 VEHICLES South (PARCEL 1) t 1 ® (2-STORY) TYPE3 ® PROVIDED: 10 SITE SPACES 50 Garage 79 ® (2-STORY) _ 40 GARAGE Resident 8 lox EXIT x sF0 Resident-ADA 2 I I m ONLY i �Q� vl '9 � tAA I IIo A11'-5" i �' /TYPE 4 TYPE 4 TYPE 4 1114 C� Resident-ADA Covered 1 11 (2-STORY) (2-STORY) (2-STORY 26'-0" 3,-O„ loll n 1114 1122 °° o 0 0 0 1208 Resident-Covered 102 ��� ^r]� ` ® 1126 Resident-Tandem 50 EXIT ONLY Visitor 73 \ ° �1 veE� ONLY Visitor-ADA 4 \ 12s�°��� re�1 '-1'- : o`Y' 319 WorldHQ@0RBArch . com m Nj \\� o \ , ® Zs�ORI . �. LL LL LL RESORT BOULEVARD `� , 8 TOTAL PROVIDED 516 S-0: 1g9 :.LL.4.= (PRIVATE PAVED ROAD) N o N l2 11® s I 1106 \ / o ¢ S�ERED ARCyi QQE 1125 w 1106 1124 UGE UGE _ UGE UGE UGE U N I T M I X. J �l I '� ,�QE2 � � �� �. / PARCEL 1 PARCEL 2 PARCEL 3 TOTAL EXCEPTION r, s\°�`�) ® 1 BEDROOM: 63 22 0 1 13 ® / 2 BEDROOM: 72 35 0 Ric Barbe 3 BEDROOM: 52 10 15 g12 22 s ned. •' 1208 269 ARl 20 S'P _, • _ _ _ � ��� / TOTAL 187 67 15 ss G� 17 n m Expires 3/31/2026 �N c GE LEASING I REC / SF���ck IT] o , : o LEGEND KEYNOTES m VGE y _ / 1001 TYPICAL PARKING STALL, 9'x 18' STALL ❑ 1002 // 1201 — — DENOTES PROPERTY LINE 1002 ACCESSIBLE PARKING STALL, MIN. 1 V x 18' STALL ss w w GE v 1011 / 1011 BICYCLE PARKING m 19 S�?y/ O 1016 24'WIDE INTERIOR DRIVEWAY o DENOTES ACCESSIBLE PARKING 1017 5'-0"WIDE SIDEWALK ADJACENT TO PARKING 133`� < ° / 1018 4'-0"WIDE DETACHED MEANDERING SIDEWALK qLu 1017 - ° ° / 1019 TYPICAL TANDEM PARKING STALL, 9'x 18' STALL. STRIPING PROVIDED TO PREVENT o aw ° QE2�1 1001 / ENCROACHMENT INTO WALK AISLE. 1123 FIRE HYDRANT 1114 1106 PEDESTRIAN CROSSWALK 3E)n Son C1Q�1 ( SRQ�2 / 1122 s= , , , ,�2g` 125�R� �2s�o��l / 1114 VEHICLE ACCESS GATE Q s o TYPE ' DENOTES ACCESSIBLE ROUTE 1120 DENOTES CARPORT STRUCTURE LOCATION O m 1121 PEDESTRIAN GATE AND ACCESS TO PUBLIC WAY 1122 MAIL KIOSK W 1106 / W Q 11'-T TYPE7 11'9" - - - SPORVI ° 1�0R11 �2" 1 BEDROOM UNIT 1124 GAME AWN (2-STORY) 0 U I m I I M - l2 ®J � 1 BEDROOM UNIT OVER GARAGES 1125 RAMADA WITH BBQ J J TYPE TYPE TYPE T1pET o ��Qo�vi / �Q 1126 DOG PARK O m (2-STORY) TYPE 7 (2-STORY) (2-STORY) 12S10Ryl / (' o - - - (2-STORY) - - - o o ( - - � lZs� ® ® TYPE5 ® / 2 BEDROOM UNIT 1201 POOL ®® 1208 DECORATIVE PAVERS OR EQUIVALENT ® (2-STORY) 1301 DOUBLE REFUSE ENCLOSURE WITH DOUBLE FULL HEIGHT SET OF GATES � 1302 s / 3 BEDROOM UNIT 1302 SINGLE REFUSE ENCLOSURE WITH FULL HEIGHT SET OF GATES TVPE� / 20, 1405 EXISTING STREET LIGHT, TYPICAL _ lip TYPE 1 Q (2-STORY)® ® ® ® ® L. ® 1120 / o o 1302 V v Fgs�6:0„ 1302 / F�F TYPE 5- 1017 ® ' TYPE 5 �T 2-STORY) A A (2-STORY / �N ® ® ® ® m 9 a / - = 4"X8"X16"SOLID CAP o / LOOP STEEL PIPE, PAINT II - 777 / 11 TYPE 35-8 TYPES ® Oo 8"DECORATIVE CMU, TO MATCH DE6378"JET" -__ _(2-STORY (z-STORY) r6' SEE DETAIL 2 THIS SHEET STEEL EMBED PLATE, ti ® o0 0 o o WELD LOOP TO PLATE CONCRETE SLAB OR ' ®® ®® J. SIDEWALK PER PLAN TYPE 4 1016 c Ell > I I (2-STORY) TYPE 2 1 TYPE 2 1 1 TYPE 5 m (z-STORY) 01 DECOMPOSED GRANITE 1121 (2-STORY) (2-STORY) 0 1'-6" ® 19'9" 9'9" 9'9" 19'-9" 18'0" 20'-0" o "' 1016 a ° a a ° SETBACK o TYPE11 TYPE7 TYPE? o �TYPE7 TYPE? rTYPE1 - a 'a 9 STEEL DECKING,PAINT ® e (2-STORY) ° (2-STORY) (2-STORY) ° ° (2-STORY) (2-STORY) 6"DIA.STEEL PIPE TO MATCH DE6212 o 1124 "CRISP MUSLIN" _ 24'-0" BOLLARD FILLED W/ TYPE 5 ® 6) 1405 (2-STOR)) ;�, ;�, CONCRETE.PAINTED m a p '• ® ' COLUMN,PAINT TO MATCH TO MATCH WALL STEEL BEAM AND 50'0"R — o LOOP STEEL PIPE,PAINT TYPE 2 PE 2 (2-STORY) 2-STORY TYPE 5 DET600"DOLPHIN TALES" < (2-STORY) CONCRETE SLAB TO MATCH DE6378"JET" CC, Im C — o �o 6 THICK,4000 PSI, ®® �� ©A a = 3/4"AGGREGATE W/ STEEL EMBED PLATE, w q G o o 6x6-10/10 WWM OR WELD LOOP TO PLATE LANDSCAPE AREA Z o 1120 m EQUAL.SLOPE TO SIDEWALK PER PLAN PER PLANS ¢ a TYPE 2 1 bo I TYPE 2 1 Q o (2-STORY) o 1 (2-STORY)1 1 DRAIN 1l8"PER FOOT DECOMPOSED GRANITE 5o v o < e 1019 CURB& m PE 19'9" 9'9"—a' a' 9'-9" 19'-9" O 0 0 0 0 0 0 \ II 2-STORY) a 112 0 00 00 ® SIDEWALK 0 0 0 0 1018 ;,; TYPE 7 TYPE 7 TYPE 1 2O' O' ° _ a® TYPE 1� TYPE 7 TYPE 7 o r a — (2-STORY) ° (2-STORY) (2-STORY ° (2-STORY) (2-STORY) (z-STORY) TYPES a<° ° - " a — ❑ b SETBA ° ® ® ® (2-STORY o C a - — i "� - — - � - - - 18 -0 �6"[, 5'-0" 1121 m APPROXIMATE LOCATION co - — °zo ® - ° - CONCRETE FOOTING PER CONCRETE HEADER I _ CO C 00 G o> C OF ADJACENT BUILDING MANUFACTURER SPECIFICATIONS N o TYPE 2 1 PE 2 0o a a a 1 (2-STORY (2-STORY) o� as ° ® I ® I II 16'-0"P.U. TYPE 5 0 0 ® ' EASEMENT (2-STORY) ° " ® . .® o I I I o o� � � o o 1120 26'-0�� 1,_0„ ® 1017 12"DIA.x 24"DEEP ® ® ® rTYPE3 ® ® TYPE3 a ® ® ® TYPE5 4'-0" EASEMENT CONRETE FOOTING 2-STORY) 2-STORY ° ® ( ) < ® 2-STORY I c 1 < ® I II L-1 .ter +_Jv v v v v v v ---- II EXIT 1017 0 1018 1001 loll o 11 / QNLY 4 0,106 1302 1016 N 1301 TRASH ENCLOSURE WALL GROUND MOUNTED BIKE RACKS CARPORT CANOPY ommoc 1-1 El U5 F-1 n c ® ® ® ® ® TYPE 1 ® ® ® ® ® ® ® ® ® TYPE 1 A ® ® ❑� S 1121 N L, L-STORY)l (2 STORY) 1126 ::::... 20'.0, o SETBA 0 � NOT TO SCALE 20'-0" � M - PRE-CAST C SETBACK _ _ _ _ _ _ °° _ _ _ CONCRETE CAP o < 01 .10 - o 0 ® o 0 0 o 9 ® ° TYPE 7 TYPE 7 Y m o ® (2-STORY) - - - - (2-STORY) - - 26:�n Q PE 3 M TYPE 2 TYPE 2 =,,' TYPE 2 / EASEMENT o w — 2-STORY ACCESSIBLE ROUTE - 2 STORY (2-STORY) - 2 STORY TYPES � - - o (- - ) ( - -) o (- - ) ...... � ® ° ° ° 2-STORY ® o 0 0 �N m m TYPE 7 TYPE 7 � o METAL GATE - - - - - - ® ' (2-STORY) (2-STORY) I < - - - - - - - - BEYOND c� �A o cn w m — — — — — — — — — — — - - Q i " " i " e SUPERSTITION FREEWAY L 3 0 4 0 3 0 ------ o. '- A., o / = U 0 o w 7 8"x8"x16"DECORATIVE CMU Lu Cn SIDE ELEVATION WALL,SEE NOTES 1 AND 2 - APPROXIMATE LOCATION FOR SPECIFICATIONS O O O SITE OF ADJACENT BUILDING 0 _ I i i II 6"CONCRETE CURB MOTHER LODE DR PRE-CAST M LANDSCAPE ISLAND CONCRETE CAP 3"x23"VIEW SLOT IN GATE 10'0"AT SINGLE ENCLOSURE N 19'-4"AT DOUBLE ENCLOSURE q BASELINE AVE PRELIMINARY SITE PLAN 0.1 1 30' 60' 120' CD C SOLID METAL STEEL ENLCOSURE GATE n v SCALE: 1"=60'-0" DECKING,COLOR TO o N BE DUNN EDWARDS VICINITY MAP DE6378"JET" El 4"WIDE PAINTED °� PARKING STRIPES R3'0" PROVIDE SLOTS AT OPEN RE-ZONING SUBMITTAL c0 &CLOSED GATE POSITION cli 0 TO RECIEVE CANE BOLT o DATE: DE(EMBER 22, 2023 ORB #: 23-206 N 9 0„ FRONT ELEVATION FLOOR PLAN TYPICAL 0 1. SMOOTH FACE CMU BASIS OF DESIGN TO BE ECHELON STANDARD MASONRY SMOOTH FACE IN COLOR Al"ASPEN" 2. SPLIT FACE CMU TO BE ECHELON STANDARD MASONRY SPLIT FACE BLOCK IN COLOR"BLACK MOUNTAINco PRELIMINARY SITE PLAN PARKING STALL WITH ISLAND REFUSE ENCLOSURE Q � 2 I Q NGOLDFIELD O Lo o EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co 2 "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND 3.04 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 95'3° DE6212 "CRISP MUSLIN" 401 le 39'-11" oe 554" Dl STUCCO FINISH DUNN EDWARDS f DE6376 "LOOKING GLASS" Oy Pi C,h D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY �/y 0 E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a - H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS ,� DE6378 JET to COMMUNITY FLEX SPACE K OFFICE FR ' I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" 6•�n J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com LEASING G 1 C I \S�ERED ARCy1T BREAK ROOM CLUBHOUSE T.O. 200E � ��GG���\FI CAr /Fc ��- �I 1 13 4 0 0 >1 N Ric Barbe A3.04 Cl") MECHANICAL STORAGE OFFICE g�09/ 28 2 ned. 4 K - /3 Expires 3 31 2026 CLUBHOUSE T.O. PLATE 11'Ll -6" MAINTENANCE -� -- CLUB ROOM LEVEL L1 00 FITNESS BUSINESS CENTER CLUB HOUSE - FRONT ELEVATIONO'� 4' 8' 16' ul SCALE: 1/8"=1'4' r; C G C I CLUBHOUSE T.O. ROOF � 22'-10" A3.04C ..�._ i CLUBHOUSE T.O. PLATE** CLUB HOUSE FLOOR PLAN 0' � 4' 8' 16' 5 L r SCALE: 1/8"= l'-0" ....... ................ -' ................... .. .................. LEVEL L1"n............................ 0'-0" V OPEN - -1 F- , - CLUB HOUSE - BACK ELEVATION 4' $' 16' 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- I I SCALE: 1/8"=l'-0" I I - I I _ , : r - I - Lr — — — — — — — — — — — — — — — — — — — — — — — — C CLUBHOUSE T.O. ROOF �I 4"/ 12" _ I 22'-10° - - S N - _ _ — J _ _ - = CLUBHOUSE T.O. PLATE I - I - J = � - ` I - j T ii it ii ii iii nli nli — _ _ -- "/12" - II - � LEVEL L1 - - I 00 I - I CLUB HOUSE - RIGHT ELEVATION 0.� 4' 8' 16' - c - SCALE: 1/8"=l'-0" -_ - - 7 _ - u_ - J J � _ T _ _ _ _ _ _ _ _ _ -_ _ _ _ _ -, CLUBHOUSE T.O. ROOF � - - - - - - - - - - - - - T - � 22-10" Hill 11 Hill 11 Hill III, I�lim ~ I u l I II u II u l I I I II u II u l I I I II u .._ m I. I1 , ICI f,I I..II I III I I I, 1 ICI„III III II I I I I I III III I II h ill I I - 4"/ 12" 4_ 4'/ 12",_ — - - - - - - - - - - - - - - - - - - Il - I - - � O — L —c- - - - — � 1 O _ C� - _-- - - - - - - - - - - - - - j _ �--� - CLUBHOUSE T.O. PLATE o =rK J 11 -6 - - - - - - - - - - - - - - - - - - - - - J m r RE-ZONING SUBMITTAL 0 LEVEL L1 �� DATE: SEPTEMBER 28, 2023 ORB #: 23-206 CD CLUB HOUSE ROOF PLAN 0'I 4' 8' 16' I OPEN SCALE: 1/8"= l'-0" bi CLUB HOUSE - LEFT ELEVATION 0' 4' 8' 16' A • C 4 -6 SCALE: 1/8"=l'-0" CLUBHOUSE Q Q GOLDFIELD EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND , 2 COOL DECEMBER RESORT BLVD 3.14 Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 DE6212 "CRISP MUSLIN" 34'-T D1 STUCCO FINISH DUNN EDWARDS 28'-0" 6'-3" D ,� DE6376 "LOOKING GLASS" 0 b f- �i D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y - E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ® ' G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" r H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" � ,�STORAGE: i i II II --- I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" p1 . J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 4 ; 3 "JET" A iA A3.14 M 1011 1011" 10' 11" 3.14a WorldHQ@ORBArchcom co N - \ER y GARAGE N GARAGE � GARAGE s E° ARC r N N \FI CAr F 1 13 Ric Barbe g09 28 2 P ned. qR 20 A,U.S•P. Expires 3/31/2026 34'-T 1 3.14a FLOOR PLAN - LEVEL L1 0,� 4' 81 16' 5 SCALE: 1/8"= l'-0" MEMO 36-7" 34'-3° 1 --- __ I BEDROOM - — _ --- = ROOF T.O. PLATE ROOF T.O. PLATE 20'-4" 20, <j C? > - N �' N N ° ° ! UNIT C < LEVEL L2 LEVEL L2 00 10'-4" 10'-4" L — — — — — 6'SCREEN WALL LEVEL L1 L — — — LEVEL L . .�• 0,-01, 0,-0„ FLOOR PLAN - LEVEL L2 0,� I 4' 8' 16' REAR COLOR ELEVATION 0'l 4' 8' 16' FRONT COLOR ELEVATION 0,� 4' 8' 16' SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" - - - - - I I I I � 7 I I C F J 1 C J L F I , I 5"/ 12"I r I I I - L L- r , - 5"/ 12" — — — ROOF T.O. PLATE — — — _ ROOF T.O. PLATE I1 5"/12"_ �1 �I - 20'-4" — 20'-4" r r I - 04 - - = I in04 04 LEVEL L2 LEVEL L2 10 4 10 4 6'SCREEN WALL - - - - - - - - - - - - 5"/ 12"_ 5'/ 12"- — — — — — — — — — — — L - � - j m LEVEL L1 n LEVEL L1 n 0'-0" V 0'-01, �I 0 0 cfl 0 N ROOF PLAN LEFT COLOR ELEVATION RIGHT COLOR ELEVATION 0' � 4' 8 16 � 0'� � 4' 8' 16' � 0' � 4' 8' 16' EEG 11 ~ SCALE: 1/8"=l'-0" SCALE: 1/8"= l'-0" SCALE: 1l8"=1'-0" m 0 RE-ZONING SUBMITTAL 0 momml— o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N N O A . 1 4a co N 0 BUILDING TYPE 1 COLOR SCHEME 1 Q Q 0 t_ n GOLDFIELD n EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR Co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS y �C DE6376 "LOOKING GLASS" O b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" p1 . J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 �P ned. 4191 20 A,U.S•P. Expires 3/31/2026 J C F C F I H J - _ k ROOF T.O. PLATE n. ROOF T.O. PLATE n 20'-4" V LEVEL L2..n LEVEqrr TO L L2 n ........................ 6'SCREEN WALL kj - - - - - -- --- ................... ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ .................... .......... ................................. . . . . . . . . . . - - - -- - LEVELL L1 n LEVEL L REAR COLOR ELEVATION 0'l 4' 8' 16' FRONT COLOR ELEVATION 0'� 4' 8' 16' SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" C F G J C J F C ROOF T.O. PLATE'., , — ROOF T.O. PLATE n - — 20'_4�� ��r 20 LEVEL L2 .� . .•..•... •......... — _ — LEVEL L2 n 10-4" \� . .. 1010'-4" m 6'SCREEN WALL IF LE� . . .................... ` i ....... ................................. o LEVEL L1 � =_- LEVEL L1 n N �I �I 0'-0" 0'-0" N m N RE-ZONING SUBMITTAL CD LEFT COLOR ELEVATION 0'l 4' 8' 16' RIGHT COLOR ELEVATION 0,� 4' 8' 16' DATE: SEPTEMBER 28, 2023 ORB #: 23-206 SCALE: 1/8"=1'0" SCALE: 1/8"=1' 0" \ bi 0o A301 4b _y Co 0 BUILDING TYPE 1 COLOR SCHEME 2 Q Q Q0 0 N GOLDFIELD EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR Co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 2 DE6212 "CRISP MUSLIN" 3.24 D1 STUCCO FINISH DUNN EDWARDS � DE6376 "LOOKING GLASS" of RiCb 88'-8" D2 STUCCO FINISH DUNN EDWARDS �QJ DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ❑ ❑ ❑ G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" ❑ H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 n�� "JET" ❑ o°o WorldHQ@ORBArch . com I I 4 >II i< �ERED ARCy i F p o 0 0 0 0 o P71 �G� �\FI CAj T�+ — 3.24 M o 0 0 3 3.24a 1 13 C I F C G I J C C F C C Ric Barbe -- -- -- --- -- 7Q g09 28 2 I77 P -- UNIT TH2 UNIT TH2 -- -- UNIT TH2 UNIT TH2 =__ UNIT TH1 == 7 s ned. -- -- -- -- -- AR 20 A,U.S.P. 11 Hill Hill iiiii III Expires 3/31/2026 < ill Hill Hill - - ROOF T.O. � PLATE 20'_4" 18'-2" 18'-0" 18'-0" 18'-0" 16'4" 88'-8" C N LEVEL L2 10'-4" 1 3.24a ® 1 Ll 1 FLOOR PLAN - LEVEL L1 - 0'1 I 1 4' 8' 16' LEVEL L1 501-01, SCALE: 1/8"= 1'4' FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 SCALE: 1/8"=1'4' 91'4' 1'-4" 88'-8" > 7 BEDROOM BEDROOM BEDROOM BEDROOM �❑ C C J G F 1 C G F J 1 C I I FE -- - - - - - - -- I -- - - - - - - -- -- -- -- -- — — - ROOF T.O. PLATE 20'-4-4" CV Al O —— —— —— —— —— MCo —— —— —— —— —— I I LEI LUNIT TH2 UNIT TH2 -- -- UNIT TH2 UNIT TH2 -- UNIT TH1 N BEDROOM BEDROOM I BEDROOM BEDROOM BEDROOM 10'-4" 6'SCREEN WALL - -_ LEVELL_L09, FLOOR PLAN - LEVEL L2 0'1 1 4' 8' 16' REAR COLOR ELEVATION 0'� 1 4' 8' 16' 6 SCALE: 1/8"=1'4' 2 SCALE: 1/8"=1'4' F - - - - - - - - -- - _ - - - - - - - F - - - - - - - - - - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5"/ 12" -5"/12" � ^C 5"- - - - - - - - - - - - - - - N � I in _ io N_ CV - in J 5"/12" ��I ROOF T.O. PLATE ROOF T.O. PLATE �❑ 20'-4" 20' .4 1 N N — - l�� J_ - �� LEVEL L2 LEVEL L2 _ �� 10'-4" 100'_4" 1 0 5' / 12 5 /12" 5"/ 12" 5"/ 12" N I � ����� �� � ❑ 6 SCREEN WALL _ — — — — — — — — — — — — — — — — _ _ _ _ - - J L - - - - - - - - - - - - J - 6'SCREEN WALL m -6 - LEVEL L1 - - -- - LEVEL L1 — — — — E 0,_0,, RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I ROOF PLAN 0' 4' $' LEFT COLOR ELEVATION 0' 4' $' RIGHT COLOR ELEVATION 0'I 4' $' 16' o SCALE: 1/8"= 1'4' SCALE: 1/8"= 1'4' SCALE: 1/8"= 1'4' . 24a 0 T 0 BUILDING TYPE 2 COLOR SCHEME 1 Q Q GOLDFIELD N EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR Co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS y �C DE6376 "LOOKING GLASS" O b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" p1 . J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 T C T T F Ric Barbe g09 28 2 7 7 �P ned. 4191 20 A,U.S•P. Expires 3/31/2026 ROOF T.O. PLATE 20'-4-4" N LEVEL L2 10'-4° ® IJ IJLl Ll — LEVEL L1 n 0'-0° FRONT COLOR ELEVATION 0.� 4' 8' 16' 1 SCALE: 1/8"=l'-0" J G� :C C F J 7 I I mil I I I ROOF T.O. PLATE 20'-4" r` N —LEVEL L2 10'-4-4" 6'SCREEN WALL LEVEL L1 0'-0" 1 REAR COLOR ELEVATION 0,� 4' 8' 16' 2 SCALE: 1/8"=l'-0" 7 7 C C F G J T C F C -T+, 4 ' ROOF T.O. PLATE ROOF T.O. PLATE 20'-4" m N N 0 LEVEL L2 LEVEL L2 c? 10'-4" 10'-4" 1 0 6'SCREEN WALL N I N 6'SCREEN WALL z. - m - - -6 _ — LEVEL L1 RE-ZONING SUBMITTAL CD o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I LEFT COLOR ELEVATION 4' $' RIGHT COLOR ELEVATION �1 4' $' 16' o SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" A3024b 0 T 0 BUILDING TYPE 2 COLOR SCHEME 2 Q Q 00 c;j GOLDFIELD EXTERIOR FINISH SCHEDULE 6' 2 C n 0 3.34 N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND s7 4 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" y E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �/y� E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 1 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' = H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS -- -- -- 3 DE6378 "JET" 4 , o o o o o 0 3.34a I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c A3.34 M a°o 0 0 0 o J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 GARAGE 1 GARAGE GARAGE "JET" WorldHQ@0RBArch . com 10'-T 10'-7" 10'-T UNIT TH3 __ I -- UNIT TH3 -- UNIT TH3 --_ -- -- F C I 7 J C F H C F 1 G H CT' 7 1 C I 1 —— —— —— \S�ERED ARCy T -- -- -- ��� � FI CAT Co G 1 13 Ric Barbe ROOF T.O. P2 TE I1 g�09/ 28 2 — T ned. i n i n � n 29-2 29-0 29-2 Expires 3/31/2026 87'-4" - L? _ N LEVEL L2 1 .. �I 3.34a FLOOR PLAN - LEVEL L1 0.1 1 4' 8' 16' 5 C LEVEL L1 SCALE: 1/8"=l'-0" 0'-0" FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 SCALE: 1/8"=1'4' 90'-0" 1 114" 87'-4" q o C 1 F C C J F J 1 F F C BEDROOM 0 0 BEDROOM 0 BEDROOM 7 d' �� -- -- ROOF T.O. PLATE r, -- BEDROOM BEDROOM -- BEDROOM -- �t — --- 27m 20'-4" co �D M -- -- -- UNIT TH3 -- -- UNIT TH3 -- UNIT TH3 ' _ N LEVEL L2 0L BEDROOM BEDROOM BEDROOM 10'-4" -`_ -- 6-SCREEN WALL LEVEL L1 0'-0-01, FLOOR PLAN - LEVEL L2 0'1 1 1 4' 8' 16' REAR COLOR ELEVATION 0'I 4' 8' 16' 6 SCALE: 1/8"=l'-0" 2 SCALE: 1/8"=1'-0" r- — — — — — — — — — — — — - - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —N — — — — 5"/ 12" 5'/ 12' `r' I 1 1 F J C J F C I I = I I I I � ir) L0 _ _ _ ROOF T.O. PLATE ROOF T.O. PLATE L r'_ r 20'-4" — — — 20'-4" CV N I Lo in Cn N N rl = — — __ _ J - - - - - - - - - - - - - - - - - - - - r - - - - - - - - - - - - _- LEVELL2 � LEVELL2 � —10, 44„ — — —10, 4„ 1 r - - 5"/ 12" _ _ - 5"/ 12" ► 1 = 5"/ 12" 5"/ 12" 1 r = _ 1 I 6'SCREEN WALL — — I i m �= f O I—- € L — — — — — — — — — — — — - _- — — — — — — — — �J L — — — — — — — — — — — — — — — — - I _6 - - o LEVEL L1 i i ! LEVEL L1 c� V V 0' 0 0' 0 cfl 0 N I N m ROOF PLAN 0' 4' 8' LEFT COLOR ELEVATION 0' 4' 8' RIGHT COLOR ELEVATION 10' 4' 8' 16' 7 RE-ZONING SUBMITTAL 0 SCALE: 1/8"=1'4' SCALE: 1/8"=1'4' SCALE: 1/8"= 1'-0' 0 o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I N \ ON 1% \ O A 4 a k 6- co f_ 1 7m7 0 BUILDING TYPE 3 COLOR SCHEME 1 Q Q N GOLDFIELD EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 0 "DOLPHIN TALES" BTR co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS RESORT BLVD DE6212 "CRISP MUSLIN" APACHE JUNCTION, ARIZONA 85219 D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" of PiC D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �ry E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .� I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 n�� "JET" WorldHQ@0RBArch . com C G J H G J I F C `r G\S,�ERED ARCy,T \F I CA r FC 1 13 Ric Barbe ROOF T.O. PLATE I1 g09 28 2 20'-4" P S ned. r — 4R1 20 A,U.S•P. Expires 3/31/2026 ire N LEVEL L2 10'-4" I _LEVEL L1 n 0'-0-0" 1 MEMO FRONT COLOR ELEVATION 0.� 4' 8' 16' 1 SCALE: 1/8"=l'-0" C C J J T T ROOF T.O. PLATE 20'-4" 04 LEVEL 42 4" 6'SCREEN WALL . . . . . . . . . .. 1 LEVEL L1 jU 0'-0° REAR COLOR ELEVATION 0.� 4' 8' 16' 2 SCALE: 1/8"=l'-0" 7 C J J C G ROOF T.O. PLATE _ _ ROOF T.O. PLATE � 20'-4" 20'-4" 1 Ln ro N CV LEVEL L2 _ _ _ LEVEL L2 10'-4" 10'-4" 1 6'SCREEN WALL m o sue. LEVEL L1 LEVEL L1 0'-0" V 0'-0" V cfl 0 N I N m LEFT COLOR ELEVATION �� 4' 8' El RIGHT COLOR ELEVATION lo' 4' 8' 16' o SCALE: 1/8"=l'-0" SCALE: 1/8"= l'-0' RE-ZONING SUBMITTAL CD o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I N \ \ 0O _y co A 4 0 BUILDING TYPE 3 COLOR SCHEME 2 Q Q 0 Ln N GOLDFIELD EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry 2 E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y 3.44 E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK 58'-0" G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �zn J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" Li Li Ll WorldHQ@0RBArch . com G\S�ERED ARC&I \F I CA r F� 1 13 Ric Barbe g09 28 2 �P ned. 4 0 3 C F J 1 G F H TT T// Ri Zo n, s q P 7T �''� o 0 0 0 3.44a Expires 3/31/2026 A3.44 GARAGE N GARAGE N 00, 10'-T 1 OW" - UNIT TH3 -- -- UNIT TH3 -- -- _ — �.,,, ROOF T.O. PLATE n -- -- 20'-4" Lo CV LEVEL L2 n 29'-2" 29'-2" 1010'-4" 58'-4" 1 3.44a LEVEL L1 0'-0" FLOOR PLAN — LEVEL L1 lo,l 1 1141 $' 16' 5NEMEC SCALE: 1l8"=1'-0" 1 FRONT COLOR ELEVATION 0'l 4' 8' 16' SCALE: 1/8"= l'-0" oe 61'-0" 1 r�rr 1�rr 58'-4" C 1 > K EEI > < T BEDROOM 0 0 BEDROOM ROOF T.O. PLATE n 20'-4" L d r- _ -- BEDROOM BEDROOM -- _ M -- -- in M p > —— co -- -- < N LEVEL L2 n UNIT TH3 -- -- UNIT TH3 BEDROOM BEDROOM 6'SCREEN WALL r — LEVEL L1 n 0'-0 i FLOOR PLAN — LEVEL L2 0'I 1 4' 8' 16' REAR COLOR ELEVATION 0'l 4' 8' 16' 6 2 SCALE: 1/8"= l'-0" SCALE: 1/8"=1'-0" C J F - - - - - - - - - - - - - - - - - - - - - - - - - - - N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N - - - - G J C 7 F 7 I I - in icy I I 1 = N _ "' ROOF T.O. PLATE — _ —ROOF T.O. PLATE n y 20' 4" = 20' 44" L = r J N_ _ n in I = - - - \ - 04 N - `o - LEVEL L2 — _ — — LEVEL L. n - _ — — - — — 10'-4-4" 10'-4" - 6'SCREEN WALL r m - 5"/ 12" _5"/ 12" 5"/ 12" 5"/ 12" = = 6'SCREEN WALL 04 1 O LEVEL L1 LEVEL0 _L01 n (_o 0l_O 0 OL — — — - — — — — — — — — — — — J L — — — = l N m ROOF PLAN 0'1 4' 8' 16' LEFT COLOR ELEVATION 0'1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 4' 8' 16' RE-ZONING SUBMITTAL 0 SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N N \ \ O A . 44a co N 0 BUILDING TYPE 4 COLOR SCHEME 1 Q Q 0 N GOLDFIELD EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR N "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 P ned. C J G G H T qR 20 A,U.S•P. Expires 3/31/2026 ROOF T.O. PLATE n 20'-4LID ET N LEVEL L2 n 10'-4" LEVEL L1 n 0'-0" 1 FRONT COLOR ELEVATION 0'l 4' 8' 16' 1 SCALE: 1/8"= l'-0" C C G J F C ROOF T.O. PLATE n 20'-4" ED N LEVEL L2 n qw 10'-4" 6'SCREEN WALL LEVEL L1 n 0'-0" REAR COLOR ELEVATION 0'l 4' 8' 16' 2 SCALE: 1/8"=l'-0" J G J G C ROOF T.O. PLATE,01L ROOF T.O. PLATE n 20'-4" — — — 20'-4-4" L E CV N _ _ LEVEL L2 10'-4" 10'-4-4" 6'SCREEN WALL m — 6'SCREEN WALL 0 LEVEL L1 LEVEL L1 D 0' -- 0'-01, 0 N I N m LEFT COLOR ELEVATION 0'1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 4' 8' 16' RE-ZONING SUBMITTAL CD SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I N \ \ 0O _y Co A3044b 0 BUILDING TYPE 4 COLOR SCHEME 2 Q Q co 2GOLDFIELD 3.54 EXTERIOR FINISH SCHEDULE C rl-) 87'-4" N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR C 0 "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of Pi DE6376 "LOOKING GLASS" Cb D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" r 1 r F VINYL WINDOW FRAME COLOR BLACK = G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 4 M N 3 G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' 1 _ _ 3.54a H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS A3.54 N N N DE6378 "JET" GARAGE30 GARAGES GARAGE I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET •�n�'�a 10'-7" 10'-7" oe J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 -- -- -- < < "JET" UNIT TH3 -- < UNIT TH3 UNIT TH3 -- W o r l d H Q@ O R B A r c h . c o m M \S\ERED ARC&I \FI CAr F� C 777 C H C F I J C 1 13 29'-2" 29'-0" 29'-2" Ric Barbe g09 28 2 87'4' qR 20 A,U.S•P. Expires 3/31/2026 ROOF T.O. PLATE �i 20'-4"1 FLOOR PLAN - LEVEL L1 0'I 4' 8' 16' SCALE: 1/8"=1'-0" __ --- LEVEL L2 10'-4" Flf ® ❑ ® ❑ ' ❑ —LEVEL L1 1'4" 901-o„ 1��„ FRONT COLOR ELEVATION 1 0' 4' 8' 16' 87-4 oo SCALE: 1/8"=l'-0" FEI Ell �❑> K ❑ ❑ ❑ BEDROOM BEDROOM BEDROOM 0 1 0 0 Q /� G (F� C 1 C J F C 1 1 F C b N C? -- BEDROOM BEDROOM -- -- BEDROOM C'7 p -- -- -- O _ _— Co -- -- -- c7 -- -- -- — i,... - ROOF T.O. PLATE UNIT TH3 -- -- UNIT TH3 UNIT TH3 -- — — 20'-4" BEDROOM BEDROOM I BEDROOM > > o� 71� > < > LEVEL L2 C 6'SCREEN WALL LEVEL L1 FLOOR PLAN - LEVEL L2 0'I 1 I 4' 8' 16' 6 SCALE: 1/8"=l'-0" REAR COLOR ELEVATION 0'I 1 4' 8' 16' 2 SCALE: 1/8"=l'-0" F- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N 5"/ 12" 5"/ 12" LO I 5"/ 12" * F J C I � I Y/ 12" 5"/112� � •� _ - ROOF T.O. PLATE ROOF T.O. PLATE J 20'-4" V 20'-4„ - -4 _ 5"/ 12" 5"/ 12" L L� -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL LF. 2 � LEVELL2 V . 5"/ 12" CV ,,:; ,.., ,. _ - 5"/12"_ 5"/ 12' iv r - �, 6'SCREEN WALL o - Lo CD - 1 6'SCREEN WALL NL — — — — — — — — — — -_ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — LEVEL L1 n LEVEL L1 N — — 0,_0„ 0�_0�� m N RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 ROOF PLAN 0'I 1 I 4' 8' 16' LEFT COLOR ELEVATION 0'I 1 14' $' RIGHT COLOR ELEVATION 0'I 4' 8' 16' N SCALE: 1/8"=l'-0" .......... SCALE: 1/8"= l'-0" .......... SCALE: 1/8"= l'-0" o • 54 a ...................... ...................... Cf) .. .................. _0 .. .................. BUILDING TYPE 5 COLOR SCHEME 1 Q Q Ln ri� GOLDFIELD Lo EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� In TT TT C I J 1 13 Ric Barbe g09 28 2 �P ned. - AR 20 A,U.S•P. Expires 3/31/2026 EtaROOF T.O. PLATE 20'-4"1 r LEVEL L� 10'-4" ET dl ® ❑ L=A — LEVEL L1 � FRONT COLOR ELEVATION 0'� 4' 8' 16' 1NEMEC SCALE: 1/8"=l'-0" C F C J G C G C J C ROOF T.O. PLATE 20'-4" LEVEL L2 6'SCREEN WALL - LEVEL L1 0'-0" 2 I REAR COLOR ELEVATION 0.� 4' 8' 16' SCALE: 1/8"=l'-0" J F J C Mid C G J ROOF T.O. PLATE ROOF T.O. PLATE 20'-4" V 20'-4" i LEVEL L2 LEVEL L2 m 10'-4" 6'SCREEN WALL 6'SCREEN WALL 0 c� CD LEVEL L1 n - - LEVEL L1 N — 0�-On-On I O�-On m N 0 RE-ZONING SUBMITTAL CD o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 d LEFT COLOR ELEVATION o'1 1 1 4' $' RIGHT OLOR ELEVATION �� 4' 8' 16' T ......... .......... SCALE: 1/8"= l'-0° \ . SCALE: 1/8"= 1'-0" U 0 • ...................... ...................... 54 Co .. .................. ... .................. BUILDING TYPE 5 COLOR SCHEME 2 Q Q N GOLDFIELD 0 EXTERIOR FINISH SCHEDULE o o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" 2 Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 3.64 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PiC 1164" DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 0 F VINYL WINDOW FRAME COLOR BLACK 0 0 0 0 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com 4 M o o -- -- LP -- -- � P 0 I o �ERED ARC& 30 0 1 F J I 1 J C G H I J G F T H C 1 C c Fi car �rF � 3.64 �, � � �, 3.64a GARAGE -- GARAGE GA 22 RAGE GARAGE 1 13 10'-T 10'-7" 10'-T 10'-T Ric Barbe g09 28 2 UNIT TH3 -- -- UNIT TH3 UNIT TH3 -- Fj UNIT TH3-- -- 20 A,U.-- -- — _ — _ — — ROOF T.O. PLATE Expires 3/31/2026 20'-4" ` r` - -- 29'-0" 29'-0" 29'-0" 29'-0" LEVEL L2 10'116'-0" �I 1 A3.64a . - T - LEVEL L1 0'-0" FLOOR PLAN - LEVEL L1 0'I 4' 8' 16' 5 SCALE: 1/8"= l'-0" FRONT COLOR ELEVATION 0,� 4' 8' 16' 1mmoc SCALE: 1/8"=l'-0" oe 118'-8" oe 1'4" 1'-4" 116'-0" El C G F 1 C J G C F C F 1 C F 1 C C BEDROOM 0 0 BEDROOM BEDROOM 0 0 BEDROOM - �_ Co __ BEDROOM BEDROOM -- -- BEDROOM BEDROOM -- — ROOF T.O. P20ATE � O -- -- -- -- - V M -- I -- -- I -- 1111 it UNIT TH3 -- L UNIT TH3 UNIT TH3 -- -- UNIT TH3 N wr BEDROOM BEDROOM BEDROOM BEDROOM LEVEL L2 10'-4" V 6'SCREEN WALL — - r r-- r- ;r ,r - — LEVEL L1 ,� 0'_0" CFLOOR PLAN - LEVEL L2 0,� 4' 8' REAR COLOR ELEVATION 0.� 4' 8' 16' SCALE: 1/8"=l'-0" 2 SCALE: 1/8"=l'-0" r - - - - - - - - - - - - - - - - - - - - - - - - N- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N - - - - - C J F 1 5"/ 12" 5"/ 12"Lo F C 1 f 5"/ 12" <4 5"/ 12" N = - �I I_I I II II ILIA _I All I I_ LO r I _ I r l r l rrr r—r r—n urn l r l r l rrr r—r r—n urn l r l r l rrr r—r r—n urn l r l r l I - ROOF T.O. PLATE d ROOF T.O. PLATE d — 20'-4" 20'-4" ., !+ II 5"/ 12" _ _ - _ I _ iv =5"/ 12" - in �- Lo = 1 - _ - Lo Lo 5"/ 12— - 5„/ 12„ - _ _ L - = c _ — r u II a N N - - - - - - - - - - - - - - - - - - - - - — LEVELL2 — — — LEVELL2 n 10'-4" 10'-44" m 11" r, r,. r . u 1 - 5' / 12' = I I ..I it 1: = I _ N 5"/ 12" _ CV - - — - J I� 4 = 6'SCREEN WALL (V N Ln r c? - -_ 6'SCREEN WALL CD \ — — — — — — — —J' — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — L — — — — — — — — — — — — — — — _J V LEVEL L1 LEVEL L1 n 0'-0" 0'-0" �I N m N RE-ZONING SUBMITTAL `0 ROOF PLAN LEFT COLOR ELEVATION RIGHT COLOR ELEVATION DATE: SEPTEMBER 28, 2023 ORB #: 23-206 o 0' 4' 8' 16' 0' 4' 8' 16' 0' 4' 8' 16' N C I SCALE: 1/8"=1,4, SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" N \ \ O A . 64a 7 77—T L4 Cf) 00 0 BUILDING TYPE 6 COLOR SCHEME 1 Q Q 0GOLDFIELD r7 0 EXTERIOR FINISH SCHEDULE 0 o 0 Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD .COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS 0y �C DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com �ERED ARCy J I G J F TU I J C C 7 G�.��FI CAr iFc 1 13 Ric Barbe g09 28 2 P led. gRI20 A,' ' .-( P ROOF T.O. PLATE L 7 --- --- ------- Expires 3 31 2026 - - N — LEVEL L2 — — — — - 10'-4" Fl I 0 LEVEL L1 0'-0" FRONT COLOR ELEVATION 0.� 4' 8' 16' 1mmoc SCALE: 1/8"=1'-0" C J F C G 20'-4" V r` CV LEVEL L2 10'_4" V NEW- 6'SCREEN WALL LEVEL L1 , 0' 0" REAR COLOR ELEVATION 0'� 4' 8' 16' SCALE: 1/8"=1'-0" C F (J) C J F G _ ROOF T.O. PLATE d — ROOF T.O. PLATE d 20'-4" 20'-4" - P' > N N LEVEL L2 LEVEL L2 n — - — — — 10'-4" - — — — 10'-4" m � 6'SCREEN WALL 6'SCREEN WALL e 0 cfl 0 LEVELL1r_-,:=_. __.-- ==r-=7-_=:. LEVEL L1 n 0'-0" 0'_0" �I N m N RE-ZONING SUBMITTAL N L LEFT COLOR ELEVATION RIGHT COLOR ELEVATION DATE: SEPTEMBER28, 2023 ORB #: 23-206 0'� � 4' 8' 16' � 0' � 4' 8' 16' El SCALE: 1/8"= 1'-0" SCALE: 1/8"=1'-0" N \ \ 0O _y Co A 064 0 BUILDING TYPE 6 COLOR SCHEME 2 Q Q GOLDFIELD EXTERIOR FINISH SCHEDULE o o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS Oy �C DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 2 F VINYL WINDOW FRAME COLOR BLACK 3.74 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' 334" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS ,� DE6378 "JET" _1 I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" ZD WorldHQ@0RBArch . com D D G\S.�ERED ARCyT \FI CAr F 0 0 o ° Ric Barbe g09 28 2 P S ned. qRI ZO A,T(S' Expires 3/31/2026 i 4 "? 3 3.74 N 4 < 4 '1< 74a UNIT TH1 UNIT TH1 F 1 ROOF T.O. PLATE n 20'-4" 16-51/2" 16-51/2" oe 32'-11" co C,,.... . 1 LEVEL L2 n 10'-4"1 A3.74a FLOOR PLAN - LEVEL L1 0'� 4' $' 16' 5 _ LEVELLl SCALE: 1/8"=l'-0" FRONT COLOR ELEVATION 0'1 1 1 4' 8' 16' SCALE: 1/8"=1'-0" 32'11" ....... ................................. C1 J C T 1 C �� �� ROOF T.O. PLATE -- -- 20'-4" -- -- L> zy, -- -- m Co > -- -- M N —— —— UNIT TH1 UNIT TH1 N _ '• .. _ _ LEVEL L2 10'-4" BEDROOM BEDROOM .................. — — — — — — ........... ............ ...................• 6'SCREEN WALL LEVEL L1 0'-0" FLOOR PLAN - LEVEL L2 0'1 4' 8' REAR COLOR ELEVATION 0.� I 4' 8' 16' 6 SCALE: 1/8"=l'-0" C SCALE: 1/8"=1'4' T - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 5"/ 12" 5"/ 12" G � C F 1 J C 1 5"/ 12" iv � iv 5"/ 12" I I 1 Lo icy c� i I 5"/ 12" 5' / 12" - ROOF T.O. PLATE ROOF T.O. PLATE I1 -- �1 �I r �J- _ -1 20'-4" 20'-4,� N c i LEVEL L2 LEVEL L2 CD _4 5"/ 12" 5"/ 12" , � �. _ ► N USCREEN WALL mL — — — — — — — — — — — — — — — — — — — — J l LEVEL L1 LEVEL L1 I IFo'-o" �� — — - — 0'-0" RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 0 A 74a N ROOF PLAN 10.1 1 4' 8' 16' LEFT COLOR ELEVATION 0.1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 1 4' 8' 16' • 7 SCALE: 1/8"= 1'0" SCALE: 1/8"=1' 0" SCALE: 1/8"=1'0'' BUILDING TYPE 7 COLOR SCHEME 1 0 Q Q 0 GOLDFIELD EXTERIOR FINISH SCHEDULE o o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" N SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 P ned. 4191 20 A,U.S•P. Expires 3/31/2026 C J G F C I ROOF T.O. PLATE n 20'-4" MEMO 04 LEVEL -2 n 10'-4" 1 LEVEL L1 0'-0" FRONT COLOR ELEVATION 0'1 1 4' 8' 16' SCALE: 1/8"=l'-0" •.......... ................................. G C J C F C _ ROOF_T.O. PLATE 20'-4" CV LEVEL L. 10'-4" .................... ® 6'SCREEN WALL LEVEL L1 0,-0,, REAR COLOR ELEVATION od I 4' 8' 16' 2 SCALE: 1/8"=l'-0" C F J G C C J F C 7 mid.> ROOF T.O. PLATE - � ` ° - ROOF T.O. PLATE 20'-4" 20'-4" m ti o N N LEVEL L2 LEVEL L2 0 10'-4" 10'-4" N I 6'SCREEN WALL 7T m o LEVE0L�L0j _ _ __ _LEVEOL,o,, RE-ZONING SUBMITTAL c� o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 0 A374b I N LEFT COLOR ELEVATION 0.1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 1 4' 8' 16' • -6 SCALE: 1/8"=l'-0" SCALE: 1/8"=l'-0" BUILDING TYPE 7 COLOR SCHEME 2 0 Q Q GOLDFIELD Ln EXTERIOR FINISH SCHEDULE o N 0 Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N N BTR "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMEL D1 STUCCO FINISH DUNN EDWARDS of PiC DE6376 LOOKING GLASS D2 STUCCO FINISH DUNN EDWARDS CJ� DE6215 "WOODEN PEG" �y E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" O E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 2 3.84 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 5414" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" 0 WorldHQ@0RBArch . com G\S.,ERED ARC&I \F I CA r FC 13 1 Bar e g09 28 2 �P -- -- --� ned. 4191 20 A,U.S•P. 4 3 Expires 3/31/2026 A3.84 0 1 oo o 00 "' o 0 0 0 0 I C I 777 T F C -- UNIT TH2 -- UNIT TH2 UNIT TH2 -- < 7 7 I I A AAAAA ROOF T.O. PLATE 200'-4" 18'-1 1/2" 18'-0" 18'-1 1/2" MENG 54'-3" N 1 — — — LEV 10L L2 A3.84a FLOOR PLAN - LEVEL L1 = - _ 0'I 4' 8' 16' LEVEL' 1 5 SCALE: 1/8"=l'-0" FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 I SCALE: 1/8"=l'-0" 56-11" 1-4 54'3" 1,4„ G J C F C BEDROOM BEDROOM BEDROOM I I > < — — — — — — ROOF T.O. PLATE I� _ 20'-4-4' -- -- M - ■ ■ N -- -- -- -- -- 2L -- -- -- N UNIT TH2 -- UNIT TH2 UNIT TH2 -- LEVEL L2 1 4 BEDROOM BEDROOM BEDROOM ® Q > 1 I < K > < < >< -4- 6'SCREEN WALL t — LEVEL L1 FLOOR PLAN - LEVEL L2 REAR COLOR ELEVATION ff 0'I 4' 8' 16' 0'I 4' 8' .. 116' D6 SCALE: 1/8"=l'-0" SCALE: 118"=1'.,0" - - - - - - - - - - - - - - - - - - - � r — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 7 L 5"/ 12" F 5"/ 12" F 5"/ 12" 5"/ 12" I� io I I _ = - ROOF T.O. PLATE n ROOF T.O. PLATE n 5"/r12 5"/ 12" 20'-4" V — 20'-4" V m - _ - r _ ti � - ` N N - c o r- LEVEL L2 n LEVEL 4 � c� V V o I J J1 1 - - 5"/ 12" 6'SCREEN WALL N wuuwuuuu�uu�uu u u uwuu �uu ' - 5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �6'SCREENWALL L - - - - - - - - - - - - - - - - - - - - � m LEVEL�L09� —LEVEL Ll L' 0" RE-ZONING SUBMITTAL (_0 DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N C\' BLDG TYPE 8 ROOF PLAN LEFT COLOR ELEVATION RIGHT COLOR ELEVATION \ � 0' 4' 8' 16' C4� 0' 4' 8 16' 0' 1 4' 8' 16'u SCALE: 1/8"=l'-0" l SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" o La ql 11 T 0 BUILDING TYPE 8 COLOR SCHEME 1 Q Q Q0 N N GOLDFIELD EXTERIOR FINISH SCHEDULE o N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMEL D1 STUCCO FINISH DUNN EDWARDS of PiC DE6376 LOOKING GLASS D2 STUCCO FINISH DUNN EDWARDS CJ� DE6215 "WOODEN PEG" �y E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" O E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 P ned. 4191 20 A,U.S•P. Expires 3/31/2026 I C C J F C ROOF T.O. PLATE 20'_4" r` N LEVEL L2 10'-4" 171 LEVEL L1 0'-0" 1 FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 I SCALE: 1/8"=l'-0" F C G J C C ROOF T.O. PLATE I1 20'-4-4" N LEVEL L2 10_4 ® ® 6'SCREEN WALL r H _ LEVEL L1 � : .. . REAR COLOR ELEVATION 0'I 4' 8' r16 SCALE: 10=1'-07 . . ...... C F C J G C G J F C ROOF T.O. PLATE n ROOF T.O. PLATE n 20'-4" 20'-4" m , . N N o — LEVEL L2 n LEVEL L2 � 10'-4" V 10'-4"CD �I cfl N 6'SCREEN WALL� ,. �6'SCREEN WALL N m LEVEOL��" _LEVEO'-0" RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N LEFT COLOR ELEVATION RIGHT COLOR ELEVATION 0' 4 8 16' � 0' � 4' 8' 16' I \ u C4� SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" o 0 _y A3084b 0 BUILDING TYPE 8 COLOR SCHEME 2 Q Q NGOLDFIELD O Lo o EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co 2 "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND 3.04 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 95'3° DE6212 "CRISP MUSLIN" 401 le 39'-11" oe 554" Dl STUCCO FINISH DUNN EDWARDS f DE6376 "LOOKING GLASS" Oy Pi C,h D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY �/y 0 E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a - H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS ,� DE6378 JET to COMMUNITY FLEX SPACE K OFFICE FR ' I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" 6•�n J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com LEASING G 1 C I \S�ERED ARCy1T BREAK ROOM CLUBHOUSE T.O. 200E � ��GG���\FI CAr /Fc ��- �I 1 13 4 0 0 >1 N Ric Barbe A3.04 Cl") MECHANICAL STORAGE OFFICE g�09/ 28 2 ned. 4 K - /3 Expires 3 31 2026 CLUBHOUSE T.O. PLATE 11'Ll -6" MAINTENANCE -� -- CLUB ROOM LEVEL L1 00 FITNESS BUSINESS CENTER CLUB HOUSE - FRONT ELEVATIONO'� 4' 8' 16' ul SCALE: 1/8"=1'4' r; C G C I CLUBHOUSE T.O. ROOF � 22'-10" A3.04C ..�._ i CLUBHOUSE T.O. PLATE** CLUB HOUSE FLOOR PLAN 0' � 4' 8' 16' 5 L r SCALE: 1/8"= l'-0" ....... ................ -' ................... .. .................. LEVEL L1"n............................ 0'-0" V OPEN - -1 F- , - CLUB HOUSE - BACK ELEVATION 4' $' 16' 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- I I SCALE: 1/8"=l'-0" I I - I I _ , : r - I - Lr — — — — — — — — — — — — — — — — — — — — — — — — C CLUBHOUSE T.O. ROOF �I 4"/ 12" _ I 22'-10° - - S N - _ _ — J _ _ - = CLUBHOUSE T.O. PLATE I - I - J = � - ` I - j T ii it ii ii iii nli nli — _ _ -- "/12" - II - � LEVEL L1 - - I 00 I - I CLUB HOUSE - RIGHT ELEVATION 0.� 4' 8' 16' - c - SCALE: 1/8"=l'-0" -_ - - 7 _ - u_ - J J � _ T _ _ _ _ _ _ _ _ _ -_ _ _ _ _ -, CLUBHOUSE T.O. ROOF � - - - - - - - - - - - - - T - � 22-10" Hill 11 Hill 11 Hill III, I�lim ~ I u l I II u II u l I I I II u II u l I I I II u .._ m I. I1 , ICI f,I I..II I III I I I, 1 ICI„III III II I I I I I III III I II h ill I I - 4"/ 12" 4_ 4'/ 12",_ — - - - - - - - - - - - - - - - - - - Il - I - - � O — L —c- - - - — � 1 O _ C� - _-- - - - - - - - - - - - - - j _ �--� - CLUBHOUSE T.O. PLATE o =rK J 11 -6 - - - - - - - - - - - - - - - - - - - - - J m r RE-ZONING SUBMITTAL 0 LEVEL L1 �� DATE: SEPTEMBER 28, 2023 ORB #: 23-206 CD CLUB HOUSE ROOF PLAN 0'I 4' 8' 16' I OPEN SCALE: 1/8"= l'-0" bi CLUB HOUSE - LEFT ELEVATION 0' 4' 8' 16' A • C 4 -6 SCALE: 1/8"=l'-0" CLUBHOUSE Q Q GOLDFIELD EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND , 2 COOL DECEMBER RESORT BLVD 3.14 Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 DE6212 "CRISP MUSLIN" 34'-T D1 STUCCO FINISH DUNN EDWARDS 28'-0" 6'-3" D ,� DE6376 "LOOKING GLASS" 0 b f- �i D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y - E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ® ' G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" r H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" � ,�STORAGE: i i II II --- I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" p1 . J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 4 ; 3 "JET" A iA A3.14 M 1011 1011" 10' 11" 3.14a WorldHQ@ORBArchcom co N - \ER y GARAGE N GARAGE � GARAGE s E° ARC r N N \FI CAr F 1 13 Ric Barbe g09 28 2 P ned. qR 20 A,U.S•P. Expires 3/31/2026 34'-T 1 3.14a FLOOR PLAN - LEVEL L1 0,� 4' 81 16' 5 SCALE: 1/8"= l'-0" MEMO 36-7" 34'-3° 1 --- __ I BEDROOM - — _ --- = ROOF T.O. PLATE ROOF T.O. PLATE 20'-4" 20, <j C? > - N �' N N ° ° ! UNIT C < LEVEL L2 LEVEL L2 00 10'-4" 10'-4" L — — — — — 6'SCREEN WALL LEVEL L1 L — — — LEVEL L . .�• 0,-01, 0,-0„ FLOOR PLAN - LEVEL L2 0,� I 4' 8' 16' REAR COLOR ELEVATION 0'l 4' 8' 16' FRONT COLOR ELEVATION 0,� 4' 8' 16' SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" - - - - - I I I I � 7 I I C F J 1 C J L F I , I 5"/ 12"I r I I I - L L- r , - 5"/ 12" — — — ROOF T.O. PLATE — — — _ ROOF T.O. PLATE I1 5"/12"_ �1 �I - 20'-4" — 20'-4" r r I - 04 - - = I in04 04 LEVEL L2 LEVEL L2 10 4 10 4 6'SCREEN WALL - - - - - - - - - - - - 5"/ 12"_ 5'/ 12"- — — — — — — — — — — — L - � - j m LEVEL L1 n LEVEL L1 n 0'-0" V 0'-01, �I 0 0 cfl 0 N ROOF PLAN LEFT COLOR ELEVATION RIGHT COLOR ELEVATION 0' � 4' 8 16 � 0'� � 4' 8' 16' � 0' � 4' 8' 16' EEG 11 ~ SCALE: 1/8"=l'-0" SCALE: 1/8"= l'-0" SCALE: 1l8"=1'-0" m 0 RE-ZONING SUBMITTAL 0 momml— o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N N O A . 1 4a co N 0 BUILDING TYPE 1 COLOR SCHEME 1 Q Q 0 t_ n GOLDFIELD n EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR Co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS y �C DE6376 "LOOKING GLASS" O b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" p1 . J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 �P ned. 4191 20 A,U.S•P. Expires 3/31/2026 J C F C F I H J - _ k ROOF T.O. PLATE n. ROOF T.O. PLATE n 20'-4" V LEVEL L2..n LEVEqrr TO L L2 n ........................ 6'SCREEN WALL kj - - - - - -- --- ................... ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ .................... .......... ................................. . . . . . . . . . . - - - -- - LEVELL L1 n LEVEL L REAR COLOR ELEVATION 0'l 4' 8' 16' FRONT COLOR ELEVATION 0'� 4' 8' 16' SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" C F G J C J F C ROOF T.O. PLATE'., , — ROOF T.O. PLATE n - — 20'_4�� ��r 20 LEVEL L2 .� . .•..•... •......... — _ — LEVEL L2 n 10-4" \� . .. 1010'-4" m 6'SCREEN WALL IF LE� . . .................... ` i ....... ................................. o LEVEL L1 � =_- LEVEL L1 n N �I �I 0'-0" 0'-0" N m N RE-ZONING SUBMITTAL CD LEFT COLOR ELEVATION 0'l 4' 8' 16' RIGHT COLOR ELEVATION 0,� 4' 8' 16' DATE: SEPTEMBER 28, 2023 ORB #: 23-206 SCALE: 1/8"=1'0" SCALE: 1/8"=1' 0" \ bi 0o A301 4b _y Co 0 BUILDING TYPE 1 COLOR SCHEME 2 Q Q Q0 0 N GOLDFIELD EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR Co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 2 DE6212 "CRISP MUSLIN" 3.24 D1 STUCCO FINISH DUNN EDWARDS � DE6376 "LOOKING GLASS" of RiCb 88'-8" D2 STUCCO FINISH DUNN EDWARDS �QJ DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ❑ ❑ ❑ G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" ❑ H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 n�� "JET" ❑ o°o WorldHQ@ORBArch . com I I 4 >II i< �ERED ARCy i F p o 0 0 0 0 o P71 �G� �\FI CAj T�+ — 3.24 M o 0 0 3 3.24a 1 13 C I F C G I J C C F C C Ric Barbe -- -- -- --- -- 7Q g09 28 2 I77 P -- UNIT TH2 UNIT TH2 -- -- UNIT TH2 UNIT TH2 =__ UNIT TH1 == 7 s ned. -- -- -- -- -- AR 20 A,U.S.P. 11 Hill Hill iiiii III Expires 3/31/2026 < ill Hill Hill - - ROOF T.O. � PLATE 20'_4" 18'-2" 18'-0" 18'-0" 18'-0" 16'4" 88'-8" C N LEVEL L2 10'-4" 1 3.24a ® 1 Ll 1 FLOOR PLAN - LEVEL L1 - 0'1 I 1 4' 8' 16' LEVEL L1 501-01, SCALE: 1/8"= 1'4' FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 SCALE: 1/8"=1'4' 91'4' 1'-4" 88'-8" > 7 BEDROOM BEDROOM BEDROOM BEDROOM �❑ C C J G F 1 C G F J 1 C I I FE -- - - - - - - -- I -- - - - - - - -- -- -- -- -- — — - ROOF T.O. PLATE 20'-4-4" CV Al O —— —— —— —— —— MCo —— —— —— —— —— I I LEI LUNIT TH2 UNIT TH2 -- -- UNIT TH2 UNIT TH2 -- UNIT TH1 N BEDROOM BEDROOM I BEDROOM BEDROOM BEDROOM 10'-4" 6'SCREEN WALL - -_ LEVELL_L09, FLOOR PLAN - LEVEL L2 0'1 1 4' 8' 16' REAR COLOR ELEVATION 0'� 1 4' 8' 16' 6 SCALE: 1/8"=1'4' 2 SCALE: 1/8"=1'4' F - - - - - - - - -- - _ - - - - - - - F - - - - - - - - - - - - - - - - - - � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5"/ 12" -5"/12" � ^C 5"- - - - - - - - - - - - - - - N � I in _ io N_ CV - in J 5"/12" ��I ROOF T.O. PLATE ROOF T.O. PLATE �❑ 20'-4" 20' .4 1 N N — - l�� J_ - �� LEVEL L2 LEVEL L2 _ �� 10'-4" 100'_4" 1 0 5' / 12 5 /12" 5"/ 12" 5"/ 12" N I � ����� �� � ❑ 6 SCREEN WALL _ — — — — — — — — — — — — — — — — _ _ _ _ - - J L - - - - - - - - - - - - J - 6'SCREEN WALL m -6 - LEVEL L1 - - -- - LEVEL L1 — — — — E 0,_0,, RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I ROOF PLAN 0' 4' $' LEFT COLOR ELEVATION 0' 4' $' RIGHT COLOR ELEVATION 0'I 4' $' 16' o SCALE: 1/8"= 1'4' SCALE: 1/8"= 1'4' SCALE: 1/8"= 1'4' . 24a 0 T 0 BUILDING TYPE 2 COLOR SCHEME 1 Q Q GOLDFIELD N EXTERIOR FINISH SCHEDULE o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N "DOLPHIN TALES" BTR Co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS y �C DE6376 "LOOKING GLASS" O b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" p1 . J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 T C T T F Ric Barbe g09 28 2 7 7 �P ned. 4191 20 A,U.S•P. Expires 3/31/2026 ROOF T.O. PLATE 20'-4-4" N LEVEL L2 10'-4° ® IJ IJLl Ll — LEVEL L1 n 0'-0° FRONT COLOR ELEVATION 0.� 4' 8' 16' 1 SCALE: 1/8"=l'-0" J G� :C C F J 7 I I mil I I I ROOF T.O. PLATE 20'-4" r` N —LEVEL L2 10'-4-4" 6'SCREEN WALL LEVEL L1 0'-0" 1 REAR COLOR ELEVATION 0,� 4' 8' 16' 2 SCALE: 1/8"=l'-0" 7 7 C C F G J T C F C -T+, 4 ' ROOF T.O. PLATE ROOF T.O. PLATE 20'-4" m N N 0 LEVEL L2 LEVEL L2 c? 10'-4" 10'-4" 1 0 6'SCREEN WALL N I N 6'SCREEN WALL z. - m - - -6 _ — LEVEL L1 RE-ZONING SUBMITTAL CD o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I LEFT COLOR ELEVATION 4' $' RIGHT COLOR ELEVATION �1 4' $' 16' o SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" A3024b 0 T 0 BUILDING TYPE 2 COLOR SCHEME 2 Q Q 00 c;j GOLDFIELD EXTERIOR FINISH SCHEDULE 6' 2 C n 0 3.34 N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND s7 4 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" y E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �/y� E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 1 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' = H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS -- -- -- 3 DE6378 "JET" 4 , o o o o o 0 3.34a I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c A3.34 M a°o 0 0 0 o J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 GARAGE 1 GARAGE GARAGE "JET" WorldHQ@0RBArch . com 10'-T 10'-7" 10'-T UNIT TH3 __ I -- UNIT TH3 -- UNIT TH3 --_ -- -- F C I 7 J C F H C F 1 G H CT' 7 1 C I 1 —— —— —— \S�ERED ARCy T -- -- -- ��� � FI CAT Co G 1 13 Ric Barbe ROOF T.O. P2 TE I1 g�09/ 28 2 — T ned. i n i n � n 29-2 29-0 29-2 Expires 3/31/2026 87'-4" - L? _ N LEVEL L2 1 .. �I 3.34a FLOOR PLAN - LEVEL L1 0.1 1 4' 8' 16' 5 C LEVEL L1 SCALE: 1/8"=l'-0" 0'-0" FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 SCALE: 1/8"=1'4' 90'-0" 1 114" 87'-4" q o C 1 F C C J F J 1 F F C BEDROOM 0 0 BEDROOM 0 BEDROOM 7 d' �� -- -- ROOF T.O. PLATE r, -- BEDROOM BEDROOM -- BEDROOM -- �t — --- 27m 20'-4" co �D M -- -- -- UNIT TH3 -- -- UNIT TH3 -- UNIT TH3 ' _ N LEVEL L2 0L BEDROOM BEDROOM BEDROOM 10'-4" -`_ -- 6-SCREEN WALL LEVEL L1 0'-0-01, FLOOR PLAN - LEVEL L2 0'1 1 1 4' 8' 16' REAR COLOR ELEVATION 0'I 4' 8' 16' 6 SCALE: 1/8"=l'-0" 2 SCALE: 1/8"=1'-0" r- — — — — — — — — — — — — - - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —N — — — — 5"/ 12" 5'/ 12' `r' I 1 1 F J C J F C I I = I I I I � ir) L0 _ _ _ ROOF T.O. PLATE ROOF T.O. PLATE L r'_ r 20'-4" — — — 20'-4" CV N I Lo in Cn N N rl = — — __ _ J - - - - - - - - - - - - - - - - - - - - r - - - - - - - - - - - - _- LEVELL2 � LEVELL2 � —10, 44„ — — —10, 4„ 1 r - - 5"/ 12" _ _ - 5"/ 12" ► 1 = 5"/ 12" 5"/ 12" 1 r = _ 1 I 6'SCREEN WALL — — I i m �= f O I—- € L — — — — — — — — — — — — - _- — — — — — — — — �J L — — — — — — — — — — — — — — — — - I _6 - - o LEVEL L1 i i ! LEVEL L1 c� V V 0' 0 0' 0 cfl 0 N I N m ROOF PLAN 0' 4' 8' LEFT COLOR ELEVATION 0' 4' 8' RIGHT COLOR ELEVATION 10' 4' 8' 16' 7 RE-ZONING SUBMITTAL 0 SCALE: 1/8"=1'4' SCALE: 1/8"=1'4' SCALE: 1/8"= 1'-0' 0 o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I N \ ON 1% \ O A 4 a k 6- co f_ 1 7m7 0 BUILDING TYPE 3 COLOR SCHEME 1 Q Q N GOLDFIELD EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 0 "DOLPHIN TALES" BTR co A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS RESORT BLVD DE6212 "CRISP MUSLIN" APACHE JUNCTION, ARIZONA 85219 D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" of PiC D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" �ry E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .� I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 n�� "JET" WorldHQ@0RBArch . com C G J H G J I F C `r G\S,�ERED ARCy,T \F I CA r FC 1 13 Ric Barbe ROOF T.O. PLATE I1 g09 28 2 20'-4" P S ned. r — 4R1 20 A,U.S•P. Expires 3/31/2026 ire N LEVEL L2 10'-4" I _LEVEL L1 n 0'-0-0" 1 MEMO FRONT COLOR ELEVATION 0.� 4' 8' 16' 1 SCALE: 1/8"=l'-0" C C J J T T ROOF T.O. PLATE 20'-4" 04 LEVEL 42 4" 6'SCREEN WALL . . . . . . . . . .. 1 LEVEL L1 jU 0'-0° REAR COLOR ELEVATION 0.� 4' 8' 16' 2 SCALE: 1/8"=l'-0" 7 C J J C G ROOF T.O. PLATE _ _ ROOF T.O. PLATE � 20'-4" 20'-4" 1 Ln ro N CV LEVEL L2 _ _ _ LEVEL L2 10'-4" 10'-4" 1 6'SCREEN WALL m o sue. LEVEL L1 LEVEL L1 0'-0" V 0'-0" V cfl 0 N I N m LEFT COLOR ELEVATION �� 4' 8' El RIGHT COLOR ELEVATION lo' 4' 8' 16' o SCALE: 1/8"=l'-0" SCALE: 1/8"= l'-0' RE-ZONING SUBMITTAL CD o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I N \ \ 0O _y co A 4 0 BUILDING TYPE 3 COLOR SCHEME 2 Q Q 0 Ln N GOLDFIELD EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry 2 E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y 3.44 E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK 58'-0" G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �zn J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" Li Li Ll WorldHQ@0RBArch . com G\S�ERED ARC&I \F I CA r F� 1 13 Ric Barbe g09 28 2 �P ned. 4 0 3 C F J 1 G F H TT T// Ri Zo n, s q P 7T �''� o 0 0 0 3.44a Expires 3/31/2026 A3.44 GARAGE N GARAGE N 00, 10'-T 1 OW" - UNIT TH3 -- -- UNIT TH3 -- -- _ — �.,,, ROOF T.O. PLATE n -- -- 20'-4" Lo CV LEVEL L2 n 29'-2" 29'-2" 1010'-4" 58'-4" 1 3.44a LEVEL L1 0'-0" FLOOR PLAN — LEVEL L1 lo,l 1 1141 $' 16' 5NEMEC SCALE: 1l8"=1'-0" 1 FRONT COLOR ELEVATION 0'l 4' 8' 16' SCALE: 1/8"= l'-0" oe 61'-0" 1 r�rr 1�rr 58'-4" C 1 > K EEI > < T BEDROOM 0 0 BEDROOM ROOF T.O. PLATE n 20'-4" L d r- _ -- BEDROOM BEDROOM -- _ M -- -- in M p > —— co -- -- < N LEVEL L2 n UNIT TH3 -- -- UNIT TH3 BEDROOM BEDROOM 6'SCREEN WALL r — LEVEL L1 n 0'-0 i FLOOR PLAN — LEVEL L2 0'I 1 4' 8' 16' REAR COLOR ELEVATION 0'l 4' 8' 16' 6 2 SCALE: 1/8"= l'-0" SCALE: 1/8"=1'-0" C J F - - - - - - - - - - - - - - - - - - - - - - - - - - - N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N - - - - G J C 7 F 7 I I - in icy I I 1 = N _ "' ROOF T.O. PLATE — _ —ROOF T.O. PLATE n y 20' 4" = 20' 44" L = r J N_ _ n in I = - - - \ - 04 N - `o - LEVEL L2 — _ — — LEVEL L. n - _ — — - — — 10'-4-4" 10'-4" - 6'SCREEN WALL r m - 5"/ 12" _5"/ 12" 5"/ 12" 5"/ 12" = = 6'SCREEN WALL 04 1 O LEVEL L1 LEVEL0 _L01 n (_o 0l_O 0 OL — — — - — — — — — — — — — — — J L — — — = l N m ROOF PLAN 0'1 4' 8' 16' LEFT COLOR ELEVATION 0'1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 4' 8' 16' RE-ZONING SUBMITTAL 0 SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N N \ \ O A . 44a co N 0 BUILDING TYPE 4 COLOR SCHEME 1 Q Q 0 N GOLDFIELD EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR N "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 P ned. C J G G H T qR 20 A,U.S•P. Expires 3/31/2026 ROOF T.O. PLATE n 20'-4LID ET N LEVEL L2 n 10'-4" LEVEL L1 n 0'-0" 1 FRONT COLOR ELEVATION 0'l 4' 8' 16' 1 SCALE: 1/8"= l'-0" C C G J F C ROOF T.O. PLATE n 20'-4" ED N LEVEL L2 n qw 10'-4" 6'SCREEN WALL LEVEL L1 n 0'-0" REAR COLOR ELEVATION 0'l 4' 8' 16' 2 SCALE: 1/8"=l'-0" J G J G C ROOF T.O. PLATE,01L ROOF T.O. PLATE n 20'-4" — — — 20'-4-4" L E CV N _ _ LEVEL L2 10'-4" 10'-4-4" 6'SCREEN WALL m — 6'SCREEN WALL 0 LEVEL L1 LEVEL L1 D 0' -- 0'-01, 0 N I N m LEFT COLOR ELEVATION 0'1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 4' 8' 16' RE-ZONING SUBMITTAL CD SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N I N \ \ 0O _y Co A3044b 0 BUILDING TYPE 4 COLOR SCHEME 2 Q Q co 2GOLDFIELD 3.54 EXTERIOR FINISH SCHEDULE C rl-) 87'-4" N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR C 0 "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of Pi DE6376 "LOOKING GLASS" Cb D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" r 1 r F VINYL WINDOW FRAME COLOR BLACK = G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 4 M N 3 G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' 1 _ _ 3.54a H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS A3.54 N N N DE6378 "JET" GARAGE30 GARAGES GARAGE I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET •�n�'�a 10'-7" 10'-7" oe J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 -- -- -- < < "JET" UNIT TH3 -- < UNIT TH3 UNIT TH3 -- W o r l d H Q@ O R B A r c h . c o m M \S\ERED ARC&I \FI CAr F� C 777 C H C F I J C 1 13 29'-2" 29'-0" 29'-2" Ric Barbe g09 28 2 87'4' qR 20 A,U.S•P. Expires 3/31/2026 ROOF T.O. PLATE �i 20'-4"1 FLOOR PLAN - LEVEL L1 0'I 4' 8' 16' SCALE: 1/8"=1'-0" __ --- LEVEL L2 10'-4" Flf ® ❑ ® ❑ ' ❑ —LEVEL L1 1'4" 901-o„ 1��„ FRONT COLOR ELEVATION 1 0' 4' 8' 16' 87-4 oo SCALE: 1/8"=l'-0" FEI Ell �❑> K ❑ ❑ ❑ BEDROOM BEDROOM BEDROOM 0 1 0 0 Q /� G (F� C 1 C J F C 1 1 F C b N C? -- BEDROOM BEDROOM -- -- BEDROOM C'7 p -- -- -- O _ _— Co -- -- -- c7 -- -- -- — i,... - ROOF T.O. PLATE UNIT TH3 -- -- UNIT TH3 UNIT TH3 -- — — 20'-4" BEDROOM BEDROOM I BEDROOM > > o� 71� > < > LEVEL L2 C 6'SCREEN WALL LEVEL L1 FLOOR PLAN - LEVEL L2 0'I 1 I 4' 8' 16' 6 SCALE: 1/8"=l'-0" REAR COLOR ELEVATION 0'I 1 4' 8' 16' 2 SCALE: 1/8"=l'-0" F- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N 5"/ 12" 5"/ 12" LO I 5"/ 12" * F J C I � I Y/ 12" 5"/112� � •� _ - ROOF T.O. PLATE ROOF T.O. PLATE J 20'-4" V 20'-4„ - -4 _ 5"/ 12" 5"/ 12" L L� -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL LF. 2 � LEVELL2 V . 5"/ 12" CV ,,:; ,.., ,. _ - 5"/12"_ 5"/ 12' iv r - �, 6'SCREEN WALL o - Lo CD - 1 6'SCREEN WALL NL — — — — — — — — — — -_ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — LEVEL L1 n LEVEL L1 N — — 0,_0„ 0�_0�� m N RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 ROOF PLAN 0'I 1 I 4' 8' 16' LEFT COLOR ELEVATION 0'I 1 14' $' RIGHT COLOR ELEVATION 0'I 4' 8' 16' N SCALE: 1/8"=l'-0" .......... SCALE: 1/8"= l'-0" .......... SCALE: 1/8"= l'-0" o • 54 a ...................... ...................... Cf) .. .................. _0 .. .................. BUILDING TYPE 5 COLOR SCHEME 1 Q Q Ln ri� GOLDFIELD Lo EXTERIOR FINISH SCHEDULE N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� In TT TT C I J 1 13 Ric Barbe g09 28 2 �P ned. - AR 20 A,U.S•P. Expires 3/31/2026 EtaROOF T.O. PLATE 20'-4"1 r LEVEL L� 10'-4" ET dl ® ❑ L=A — LEVEL L1 � FRONT COLOR ELEVATION 0'� 4' 8' 16' 1NEMEC SCALE: 1/8"=l'-0" C F C J G C G C J C ROOF T.O. PLATE 20'-4" LEVEL L2 6'SCREEN WALL - LEVEL L1 0'-0" 2 I REAR COLOR ELEVATION 0.� 4' 8' 16' SCALE: 1/8"=l'-0" J F J C Mid C G J ROOF T.O. PLATE ROOF T.O. PLATE 20'-4" V 20'-4" i LEVEL L2 LEVEL L2 m 10'-4" 6'SCREEN WALL 6'SCREEN WALL 0 c� CD LEVEL L1 n - - LEVEL L1 N — 0�-On-On I O�-On m N 0 RE-ZONING SUBMITTAL CD o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 d LEFT COLOR ELEVATION o'1 1 1 4' $' RIGHT OLOR ELEVATION �� 4' 8' 16' T ......... .......... SCALE: 1/8"= l'-0° \ . SCALE: 1/8"= 1'-0" U 0 • ...................... ...................... 54 Co .. .................. ... .................. BUILDING TYPE 5 COLOR SCHEME 2 Q Q N GOLDFIELD 0 EXTERIOR FINISH SCHEDULE o o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" 2 Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 3.64 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PiC 1164" DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 0 F VINYL WINDOW FRAME COLOR BLACK 0 0 0 0 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com 4 M o o -- -- LP -- -- � P 0 I o �ERED ARC& 30 0 1 F J I 1 J C G H I J G F T H C 1 C c Fi car �rF � 3.64 �, � � �, 3.64a GARAGE -- GARAGE GA 22 RAGE GARAGE 1 13 10'-T 10'-7" 10'-T 10'-T Ric Barbe g09 28 2 UNIT TH3 -- -- UNIT TH3 UNIT TH3 -- Fj UNIT TH3-- -- 20 A,U.-- -- — _ — _ — — ROOF T.O. PLATE Expires 3/31/2026 20'-4" ` r` - -- 29'-0" 29'-0" 29'-0" 29'-0" LEVEL L2 10'116'-0" �I 1 A3.64a . - T - LEVEL L1 0'-0" FLOOR PLAN - LEVEL L1 0'I 4' 8' 16' 5 SCALE: 1/8"= l'-0" FRONT COLOR ELEVATION 0,� 4' 8' 16' 1mmoc SCALE: 1/8"=l'-0" oe 118'-8" oe 1'4" 1'-4" 116'-0" El C G F 1 C J G C F C F 1 C F 1 C C BEDROOM 0 0 BEDROOM BEDROOM 0 0 BEDROOM - �_ Co __ BEDROOM BEDROOM -- -- BEDROOM BEDROOM -- — ROOF T.O. P20ATE � O -- -- -- -- - V M -- I -- -- I -- 1111 it UNIT TH3 -- L UNIT TH3 UNIT TH3 -- -- UNIT TH3 N wr BEDROOM BEDROOM BEDROOM BEDROOM LEVEL L2 10'-4" V 6'SCREEN WALL — - r r-- r- ;r ,r - — LEVEL L1 ,� 0'_0" CFLOOR PLAN - LEVEL L2 0,� 4' 8' REAR COLOR ELEVATION 0.� 4' 8' 16' SCALE: 1/8"=l'-0" 2 SCALE: 1/8"=l'-0" r - - - - - - - - - - - - - - - - - - - - - - - - N- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N - - - - - C J F 1 5"/ 12" 5"/ 12"Lo F C 1 f 5"/ 12" <4 5"/ 12" N = - �I I_I I II II ILIA _I All I I_ LO r I _ I r l r l rrr r—r r—n urn l r l r l rrr r—r r—n urn l r l r l rrr r—r r—n urn l r l r l I - ROOF T.O. PLATE d ROOF T.O. PLATE d — 20'-4" 20'-4" ., !+ II 5"/ 12" _ _ - _ I _ iv =5"/ 12" - in �- Lo = 1 - _ - Lo Lo 5"/ 12— - 5„/ 12„ - _ _ L - = c _ — r u II a N N - - - - - - - - - - - - - - - - - - - - - — LEVELL2 — — — LEVELL2 n 10'-4" 10'-44" m 11" r, r,. r . u 1 - 5' / 12' = I I ..I it 1: = I _ N 5"/ 12" _ CV - - — - J I� 4 = 6'SCREEN WALL (V N Ln r c? - -_ 6'SCREEN WALL CD \ — — — — — — — —J' — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — L — — — — — — — — — — — — — — — _J V LEVEL L1 LEVEL L1 n 0'-0" 0'-0" �I N m N RE-ZONING SUBMITTAL `0 ROOF PLAN LEFT COLOR ELEVATION RIGHT COLOR ELEVATION DATE: SEPTEMBER 28, 2023 ORB #: 23-206 o 0' 4' 8' 16' 0' 4' 8' 16' 0' 4' 8' 16' N C I SCALE: 1/8"=1,4, SCALE: 1/8"= l'-0" SCALE: 1/8"=l'-0" N \ \ O A . 64a 7 77—T L4 Cf) 00 0 BUILDING TYPE 6 COLOR SCHEME 1 Q Q 0GOLDFIELD r7 0 EXTERIOR FINISH SCHEDULE 0 o 0 Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD .COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS 0y �C DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" O F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com �ERED ARCy J I G J F TU I J C C 7 G�.��FI CAr iFc 1 13 Ric Barbe g09 28 2 P led. gRI20 A,' ' .-( P ROOF T.O. PLATE L 7 --- --- ------- Expires 3 31 2026 - - N — LEVEL L2 — — — — - 10'-4" Fl I 0 LEVEL L1 0'-0" FRONT COLOR ELEVATION 0.� 4' 8' 16' 1mmoc SCALE: 1/8"=1'-0" C J F C G 20'-4" V r` CV LEVEL L2 10'_4" V NEW- 6'SCREEN WALL LEVEL L1 , 0' 0" REAR COLOR ELEVATION 0'� 4' 8' 16' SCALE: 1/8"=1'-0" C F (J) C J F G _ ROOF T.O. PLATE d — ROOF T.O. PLATE d 20'-4" 20'-4" - P' > N N LEVEL L2 LEVEL L2 n — - — — — 10'-4" - — — — 10'-4" m � 6'SCREEN WALL 6'SCREEN WALL e 0 cfl 0 LEVELL1r_-,:=_. __.-- ==r-=7-_=:. LEVEL L1 n 0'-0" 0'_0" �I N m N RE-ZONING SUBMITTAL N L LEFT COLOR ELEVATION RIGHT COLOR ELEVATION DATE: SEPTEMBER28, 2023 ORB #: 23-206 0'� � 4' 8' 16' � 0' � 4' 8' 16' El SCALE: 1/8"= 1'-0" SCALE: 1/8"=1'-0" N \ \ 0O _y Co A 064 0 BUILDING TYPE 6 COLOR SCHEME 2 Q Q GOLDFIELD EXTERIOR FINISH SCHEDULE o o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS Oy �C DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 2 F VINYL WINDOW FRAME COLOR BLACK 3.74 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' 334" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS ,� DE6378 "JET" _1 I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" ZD WorldHQ@0RBArch . com D D G\S.�ERED ARCyT \FI CAr F 0 0 o ° Ric Barbe g09 28 2 P S ned. qRI ZO A,T(S' Expires 3/31/2026 i 4 "? 3 3.74 N 4 < 4 '1< 74a UNIT TH1 UNIT TH1 F 1 ROOF T.O. PLATE n 20'-4" 16-51/2" 16-51/2" oe 32'-11" co C,,.... . 1 LEVEL L2 n 10'-4"1 A3.74a FLOOR PLAN - LEVEL L1 0'� 4' $' 16' 5 _ LEVELLl SCALE: 1/8"=l'-0" FRONT COLOR ELEVATION 0'1 1 1 4' 8' 16' SCALE: 1/8"=1'-0" 32'11" ....... ................................. C1 J C T 1 C �� �� ROOF T.O. PLATE -- -- 20'-4" -- -- L> zy, -- -- m Co > -- -- M N —— —— UNIT TH1 UNIT TH1 N _ '• .. _ _ LEVEL L2 10'-4" BEDROOM BEDROOM .................. — — — — — — ........... ............ ...................• 6'SCREEN WALL LEVEL L1 0'-0" FLOOR PLAN - LEVEL L2 0'1 4' 8' REAR COLOR ELEVATION 0.� I 4' 8' 16' 6 SCALE: 1/8"=l'-0" C SCALE: 1/8"=1'4' T - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 5"/ 12" 5"/ 12" G � C F 1 J C 1 5"/ 12" iv � iv 5"/ 12" I I 1 Lo icy c� i I 5"/ 12" 5' / 12" - ROOF T.O. PLATE ROOF T.O. PLATE I1 -- �1 �I r �J- _ -1 20'-4" 20'-4,� N c i LEVEL L2 LEVEL L2 CD _4 5"/ 12" 5"/ 12" , � �. _ ► N USCREEN WALL mL — — — — — — — — — — — — — — — — — — — — J l LEVEL L1 LEVEL L1 I IFo'-o" �� — — - — 0'-0" RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 0 A 74a N ROOF PLAN 10.1 1 4' 8' 16' LEFT COLOR ELEVATION 0.1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 1 4' 8' 16' • 7 SCALE: 1/8"= 1'0" SCALE: 1/8"=1' 0" SCALE: 1/8"=1'0'' BUILDING TYPE 7 COLOR SCHEME 1 0 Q Q 0 GOLDFIELD EXTERIOR FINISH SCHEDULE o o Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" N SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" D1 STUCCO FINISH DUNN EDWARDS of PC DE6376 "LOOKING GLASS" b D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" Cry E1 CORONADO STONE BRICK VENEER COLOR WOLF GREY 'Y E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" a �' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" �•�n�'�a7c J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 P ned. 4191 20 A,U.S•P. Expires 3/31/2026 C J G F C I ROOF T.O. PLATE n 20'-4" MEMO 04 LEVEL -2 n 10'-4" 1 LEVEL L1 0'-0" FRONT COLOR ELEVATION 0'1 1 4' 8' 16' SCALE: 1/8"=l'-0" •.......... ................................. G C J C F C _ ROOF_T.O. PLATE 20'-4" CV LEVEL L. 10'-4" .................... ® 6'SCREEN WALL LEVEL L1 0,-0,, REAR COLOR ELEVATION od I 4' 8' 16' 2 SCALE: 1/8"=l'-0" C F J G C C J F C 7 mid.> ROOF T.O. PLATE - � ` ° - ROOF T.O. PLATE 20'-4" 20'-4" m ti o N N LEVEL L2 LEVEL L2 0 10'-4" 10'-4" N I 6'SCREEN WALL 7T m o LEVE0L�L0j _ _ __ _LEVEOL,o,, RE-ZONING SUBMITTAL c� o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 0 A374b I N LEFT COLOR ELEVATION 0.1 4' 8' 16' RIGHT COLOR ELEVATION 0'1 1 4' 8' 16' • -6 SCALE: 1/8"=l'-0" SCALE: 1/8"=l'-0" BUILDING TYPE 7 COLOR SCHEME 2 0 Q Q GOLDFIELD Ln EXTERIOR FINISH SCHEDULE o N 0 Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 N N BTR "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMEL D1 STUCCO FINISH DUNN EDWARDS of PiC DE6376 LOOKING GLASS D2 STUCCO FINISH DUNN EDWARDS CJ� DE6215 "WOODEN PEG" �y E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" O E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 2 3.84 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 5414" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" 0 WorldHQ@0RBArch . com G\S.,ERED ARC&I \F I CA r FC 13 1 Bar e g09 28 2 �P -- -- --� ned. 4191 20 A,U.S•P. 4 3 Expires 3/31/2026 A3.84 0 1 oo o 00 "' o 0 0 0 0 I C I 777 T F C -- UNIT TH2 -- UNIT TH2 UNIT TH2 -- < 7 7 I I A AAAAA ROOF T.O. PLATE 200'-4" 18'-1 1/2" 18'-0" 18'-1 1/2" MENG 54'-3" N 1 — — — LEV 10L L2 A3.84a FLOOR PLAN - LEVEL L1 = - _ 0'I 4' 8' 16' LEVEL' 1 5 SCALE: 1/8"=l'-0" FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 I SCALE: 1/8"=l'-0" 56-11" 1-4 54'3" 1,4„ G J C F C BEDROOM BEDROOM BEDROOM I I > < — — — — — — ROOF T.O. PLATE I� _ 20'-4-4' -- -- M - ■ ■ N -- -- -- -- -- 2L -- -- -- N UNIT TH2 -- UNIT TH2 UNIT TH2 -- LEVEL L2 1 4 BEDROOM BEDROOM BEDROOM ® Q > 1 I < K > < < >< -4- 6'SCREEN WALL t — LEVEL L1 FLOOR PLAN - LEVEL L2 REAR COLOR ELEVATION ff 0'I 4' 8' 16' 0'I 4' 8' .. 116' D6 SCALE: 1/8"=l'-0" SCALE: 118"=1'.,0" - - - - - - - - - - - - - - - - - - - � r — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 7 L 5"/ 12" F 5"/ 12" F 5"/ 12" 5"/ 12" I� io I I _ = - ROOF T.O. PLATE n ROOF T.O. PLATE n 5"/r12 5"/ 12" 20'-4" V — 20'-4" V m - _ - r _ ti � - ` N N - c o r- LEVEL L2 n LEVEL 4 � c� V V o I J J1 1 - - 5"/ 12" 6'SCREEN WALL N wuuwuuuu�uu�uu u u uwuu �uu ' - 5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �6'SCREENWALL L - - - - - - - - - - - - - - - - - - - - � m LEVEL�L09� —LEVEL Ll L' 0" RE-ZONING SUBMITTAL (_0 DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N C\' BLDG TYPE 8 ROOF PLAN LEFT COLOR ELEVATION RIGHT COLOR ELEVATION \ � 0' 4' 8' 16' C4� 0' 4' 8 16' 0' 1 4' 8' 16'u SCALE: 1/8"=l'-0" l SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" o La ql 11 T 0 BUILDING TYPE 8 COLOR SCHEME 1 Q Q Q0 N N GOLDFIELD EXTERIOR FINISH SCHEDULE o N Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR Co "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMEL D1 STUCCO FINISH DUNN EDWARDS of PiC DE6376 LOOKING GLASS D2 STUCCO FINISH DUNN EDWARDS CJ� DE6215 "WOODEN PEG" �y E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" O E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" WorldHQ@0RBArch . com G\S�ERED ARC&, \F I CA r F� 1 13 Ric Barbe g09 28 2 P ned. 4191 20 A,U.S•P. Expires 3/31/2026 I C C J F C ROOF T.O. PLATE 20'_4" r` N LEVEL L2 10'-4" 171 LEVEL L1 0'-0" 1 FRONT COLOR ELEVATION 0'I 4' 8' 16' 1 I SCALE: 1/8"=l'-0" F C G J C C ROOF T.O. PLATE I1 20'-4-4" N LEVEL L2 10_4 ® ® 6'SCREEN WALL r H _ LEVEL L1 � : .. . REAR COLOR ELEVATION 0'I 4' 8' r16 SCALE: 10=1'-07 . . ...... C F C J G C G J F C ROOF T.O. PLATE n ROOF T.O. PLATE n 20'-4" 20'-4" m , . N N o — LEVEL L2 n LEVEL L2 � 10'-4" V 10'-4"CD �I cfl N 6'SCREEN WALL� ,. �6'SCREEN WALL N m LEVEOL��" _LEVEO'-0" RE-ZONING SUBMITTAL o DATE: SEPTEMBER 28, 2023 ORB #: 23-206 N LEFT COLOR ELEVATION RIGHT COLOR ELEVATION 0' 4 8 16' � 0' � 4' 8' 16' I \ u C4� SCALE: 1/8"= l'-0" SCALE: 1/8"= l'-0" o 0 _y A3084b 0 BUILDING TYPE 8 COLOR SCHEME 2 Q t+ UJALL LEGJ:ENE�) 3 / I &' VIEW FENGE (REF. DETAIL 2, Sa-IEET CL6-5) 04 'qIIIIIIIIIIIIIII PARTIAL VIEW PENCE (REP. DETAIL G, SHEET CL6-5) 8ECFSGaEF1� �19 DECORATIVE THEME WALL (REI=. DETAIL 3, Sl-4EET GLS-5) 00 0 00 ■■■■■■■■■■■■■■■■■■■ VEHICULAR GATE CREE. DETAIL 8, SHEET CLS-5) � R I C` Li LiL-II ° — — — — — — 0 0 — — — I — — — ° ° — — — — — — 0 ° — — — — — — ° 0 — — — ® ® O - ®_ I 1 1 I I 1 - - - AR STEEL POOL BARRIER CREE. DETAIL 5, SHEET - - - 0 0 - - - ° ° o ° - - - - - - - - - ° - - - I � CLS-5) °�� � 00 ° ° 00 ° ° 00 ° ° 00 ° ° 00 ® � I I ® > p 0 ° ° 0 I ® I11 L\EEAY EID — — — — — — ------ - - - 4' WELDED WIRE DOG PARK FENCE (REF. DETAIL 8, SKEET -- --- -- -------- -- -- -------- -- -- -------- -- -- -------- -- ------ �; I v IF, v v v v v v ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® � F� E1-vI I ••••••••••••••••■•• (o' REAR PATIO WALL (REE. DETAIL 1, 5kEFT CL5-5) v v v v v L:j v v v v v v I p1 _ - - 0 0 < I EXISTING PERIMETER WALL I I n n n n n n n n n n n n TA n n n n n n n n �AA n n n n n 1NEW MONUMENT SIGNAGE UNDER SEPARATE PERMIT CREE. _ e _ _ _ _ DETAIL I, SHEET CLS-5) \ I -- --- - --------------------L ------ ---- -------- ---- -------- ---- I I ° ° ® ' ® I ®® J q 111 I I I 1 I , PEDESTRIAN GATE CREE. D' E. I I I I I� - 00 0 ® 1 �° 1 I I ■.■■ TRASH ENCLOSURE (REF. DETAIL 9, CL5-5 AND 0 0 0 0 0 0 . I� ARCHITECTURAL PLANS) V\bf I dr Ch. COrTI 0 i I — MA 11 EA 11 OR 113 ° o G O o i` NA33 — + ALLLANCE � I ' / - - - \ C COLLABORATIVE V DESIGN STUDIO INC. 711 5 EAST 1 ST AVENUE, — — — — � / � j � // ® //// Su ATE 103 — — — — — —— SEE LEFT SEE LEFT SCOTTSDALE, ARIZONA Q CPRf 147E PAYED RD.) ■ ■ ■ ■ ■ ■ ■ ■ oFFicE: 4so_347_os90 DESIGN . . V FAX: 480 b 5 6 b01 2 Ilk L-� u CPRIV,4TE P.41lED RD_) o / n i On ® ® / I o 0 ° II ° - - - - - - 0 ° l 0 0 0 ® ® e I 1 0 0 I 0 — — — — — — 0 ` I I EXISTING &' BLOCK 1 > / //� WALL, TYP. :1 — — 1 0 ® ® ® j ® ® ® ® ® ® I ® - - I I III o 1 1 1 1 ® n w III I I II 0 — ® jl ® 00 00 00 00 ® 1 ® ® o 0 � III ® II ® ® 1 I I I I I I I I \®/ I N \®/ a ` ® K ® > 1 KDEl oIT E] III � � I � Q Q III < psi ell ® ° W 1 Cn u I � I 1 /®\ I I I I I y.y I I I I /®\ I < ® n12�112 Ora ® 1 < ® 1 ® , II 1 - 00 0o GL— 00 00 -o N I 1 ® J I ® I — II ® /®\ I I I /®\ I — < II I II _ _ I �y CD °� I � ® 0 0 ® II _ 0 � I I o — — — — — — o 0 — — — o ® I L ® e a� — o it i - - 1 ® ® I F ] El o T �I II < 00 00 00 00 I � I I ® ® ® II u II o 11 1 00 ji. 0 00 o El I ® 1 1 1 ®® ® I < \ /\ ® < ® 1 I I a ® ® ® ® ® ® ® ® ® ® 0 ® ® v a v v v v v v v cn J o - Ll -o < 1 I ® Q I LL EXISTING �' SLOGK < ® / �JJy4 M 2i ttcl > 1 0 0 / WALL, TYP. cn 1 ® 1 / / 1 < ® I � I �t�xrlo�2�2�3 3"d�.�rritt�l II 11 ® O0 - - - 0 0 - - - 00 - - - 0 X 1 0 0 0 � ° ® II ® ® I — — — 0 / CIL — 1 a _ _ _ _ - - �� SEE RIGHT SEE RIGHT I 0 I Ll p ® 00 00 Z"I I - - - - - - - - - e 7 E E T E N LA F;�G; E �-1 E N T EAE gFu,m CFB# 2205 EXISTING 6' BLOCK WALL, TYP. / SCALE: 1"=50'-0" SCALE: 1"=20'-0" CFTIA 0 25 50 100 0 10' 20' 40' NORT❑ NORT❑ STEEL BEAM CANOPY, PAINTED DE6315 "JET" STUCCO FINISH COLOR DE6212 "CRISP MUSLIN" 9HDCFSG0ffFff_DMMD TBAD PEDESTRIAN ENTRY ��19 GATE MASONRY WALL W/ STUCCO FINISH PRE-CAST PRE-CAST COLOR D 6 "CRISP CONCRETE CAP PRE-CAST CONCRETE CAP �� R ❑h CONCRETE GAP CORONADO STONE y. 7• . 'Ay z BRICK VENEER COLOR CORONADO SCONE �� ,:' .,,� . �• LPILASTER OCATED IS LNHI "WOLF GREY" ON BRICK VENEER COLOR , Y EVERY 150'E� ❑ ' ; WOLF GREY ON - »_>. * . ALONG MR VEHICULAR 24II X24II CMU O PILASTER 24"X24" CMU �`; . � �"• _ .. �• ►" �+ FRON AGEJ EMERGENCY-ONLY - MD PILASTER ;' ROADS. ❑ TE PRE-CAST CONCRETE CAP ` TUBULAR STEEL PENCE PRE-CAST a= v v ❑ CONCRETE POT METAL TO 5E PAINTED STUCCO FINISH a DE63-t8 "JET" r COLOR DE6211 CORONADO STONE 6 �� r\�/❑/��/r\/�,� .� , . . � r �"ANCIENT EARTH" /\ \\/i\/\ \ \ \r\ �/\ BRICK VENEER COLOR "WOLF GREY" ON ❑ a PEDESTRIAN ENTRY 24"X24" CMU r=NTfR"T- r-IONUr- IENT ulEUJ FENCE GATE COLUMN, TYP. PILASTER V\brI d�a ORB,Arch. co SCALE: NTS SCALE: NTS VEHICULAR EMERGENCY-ONLY VCAT� 9, GATE a tioo O MA ❑ ❑A ❑ O ❑R � O [Q qR� NA��� O ❑x❑It❑❑ 0dkE3U1 ❑ ❑ ❑ ❑ DECORATIVE THEME • WALL ANCE ' ❑ ❑ ALLL 00 0 0 0 C 0 00 RESIDENTIAL COMPANY 000 0 0 000 00 o00000 0000c - Q 000 £ a VEHICULAR PAVERS AT COLLABORATIVE V 3o ENTRY DESIGN STUDIO INC. PRE-CAST 711 6 EAST 1 ST AVENUE, 1w AM CONCRETE CAP SUITE 103 V•— SCOTTSDALE, AR8 1 CORONADO STONE 5' SIDEWALK, TYP. • ' �;''c' 5RICK VENEER COLOR 0 OFFICE: 480-347-0590 "WOLF GREY" ON FAX: 480-65 6-601 2 ' • 24"X24" CMU CURB, TYP. PILASTER EDECOfi;;;�ATIuE T�4E1- IE WALL WIT�4 C0L-Jt-1N SCALE: 1/0" = 1'-0" TUBULAR STEEL FENCE, PRE-CAST CONCRETE METAL TO BE CAP PAINTED TUBULAR DE63l8 "JET" CORONADO STONE STEEL FENCE BRICK VENEER COLOR "WOLF GREY" ON LOCKING PRE-CAST 2411X24" CMU MECHANISM CONCRETE CAP Ll PILASTER GORONADO SCONE TUBULAR � BRICK VENEER COLOR "WOLF GREY" ON METAL TO BEFENCE, 24"X24" CMU PAINT PILASTER DE63 ES "JET" i PRE-CAST fi E1DESTfi;;,:)1,4N ENTF, _zAT CONCRETE MASONRY R RE E CAP SCALE: NTS WALL W/ EXPOSED STUCCO FINISH CORONADO STONE MASONRY COLOR BRICK VENEER COLOR WALL W/ COLOR "WOLF GREY" ON SMOOTH ANCIENT 24"X24" CMU PAINTED TI EARTH" PILASTER STUCCO FINISH COLOR DE9>212 CONCRETE \ \ \%❑\%\\i\\r�\r�\ �'�\�\\/i��/,\�ji❑/❑i\\i\\r�\r�\ "CRISP PRE CAST ♦. MUSLIN" ACCESSIBLE 0 GAP KEY FOB 21_011 PERFORATED SMOOTH SHEET METAL - FACE CMU 10" KICKPLATE -III=III III—II I Q i i= i � C , U � T ILVIEWNC METAL GATE — — SCALE: NTS SCALE: BEYOND T p p p p p p p o 0 0 4'-0" NTS - SPLIT FACE CMU II I II I II SCALE: NTS 3 -0 4 -0 3 -0 � d_• • d• _d _ d d• d• d• d_ d w 'b 'b 'b 'b_ 'b_ '�• S"X6"X16" DECORATIVE CMU WALL, SEE NOTES 1 AND 2 SIPE ELEVATION BELOW FOR SPECIFICATIONS 7D 0 c� PRE-CAST CONCRETE CAP Q 51—0 II 0 ❑ 3"X23" VIEW SLOT IN GATE 10'-0" AT 3" SQUARE PRE-CAST SINGLE ENCLOSURE METAL FRAME - / PICKET4" O.C., tYP., CONCRETE le'-4'' DOUBLE CAP 211 ENCLOSURE 77 CORONADO STONE BRICK VENEER COLOR SOLID METAL PECKING, WOLF GREY ON COLOR TO BE DUNN STEEL ENCLOSURE GATE 24"X24" CMU 77 EDWARDS DE63-t8 1 PILASTER �❑ n, �J A 11 LF ` 28�2�3 3 d rritt�l 0 PROVIDE SLOTS AT Matta X OPEN 4 CLOSED GATE �❑ POSITION TO RECEIVE o CANE BOLT 0 A FRONT ELEVATION FLOOS FLAN 14" METAL PLATE, PAINT TO MATCH 0 NOTES N1. METAL GATE COLOR - DUNN EDWARDS DE6315 "JET" ENE M27,M CFB# 2205 1, SMOOTH 1=❑�E 0,1U 5A5I5 OF DESIGN TO 5E EC,�4ELCN STANEDAfRD i IASON�1' SMOOTI4 2. PRE-CAST CONCRETE CAP BAND COLOR - DAMS, PEWTER 860 0 Q 1=❑C� �O O P 3. STUCCO FINISH COLOR -DUNN EDWARDS DE6213 "FINE GRAIN" �}j\\ T L\ERNY oAGam ffD 2, SPLIT FAGS GMU TO 5E ECHELON STANIDA p 1 ISON �' SFI-IT F,4CE 5LOC< IN COLOR \�y IIE3LAC MOUNTAIN` C [T� FF c3 TfRAS VET—IICUL AF,:' EN7f;,:1",r- GzATE SCALE: NTS SCALE: NTS GPA & PAD Rezoning Citizen Participation Report P-23-63-PZ lyc �ayon 0k2 Submitted to: O� PQACHE✓G�� O U z /ZONE' City of Apache Junction, Arizona Submitted on behalf of: Olsen Recker/Guadalupe Properties LLC 4915 E. Baseline Rd. #105 Gilbert, AZ 85234 Prepared by: (plan Consulting 3317 S. Higley Road, Suite 114-622 Gilbert, AZ 85297 November 2023 PURPOSE The purpose of this Citizen Participation Plan is to document and inform citizens,property owners,neighborhood associations, agencies, schools, and businesses in the vicinity of the site of the application and for the ongoing process and actions related to this request. Iplan Consulting, on behalf of the property ownership, has initiated a Major General Plan Amendment (GPA) and Planned Development (PD) rezoning request to amend the existing land use classification and zoning designation for an 18-acre property located on the east side of Goldfield Road just south of the US60 Highway in southeast Apache Junction. The intent of the proposed entitlements is to build a multi-family community on the subject property. Site Aerial : i 60 60 _. J + > .•0 1 S-_ SIT A CONTACT All questions and/or comments related to this proposal should be directed to: Iplan Consulting—Greg Davis 3317 S. Higley Rd. #114-622 Phone: (480) 227-9850 Email: Greg@iplanconsulting.com NOTIFICATION In order to provide effective citizen participation in regard to this application, the following actions will be taken to provide adequate opportunity to adjacent landowners or any other potentially affected individuals, agencies, or organizations to learn of and address any and all real or perceived impacts this proposed overlay may have on individuals,properties, or the community: A. A contact list was created and submitted to the City for all property owners within 300 feet of the site for the purpose of mailing Public Hearing notifications. B. A neighborhood meeting was held on 10/24/2023. The meeting was held at the Desert Vista RV Resort Community Room and was open to the public. A meeting notification letter was sent out to all property owners within 300 feet of the site notifying residents of the meeting time/date, a general description of the requests being made,as well as contact information should they not be able to attend. A summary of the meeting is included in this report. C. A second meeting was held with the residents of the Dolce Vita community on 11/06/2023. The Dolce Vita residents were notified of the meeting by the Community Management since this is a rental neighborhood. About 100 residents attended and a summary of the meeting is included in this report. D. A Notice of Public Hearing sign(s)will be posted per City regulations on the property at least 15-days prior to the Planning and Zoning Commission hearing(s) and remain posted through the City Council hearing(s). E. A Notice of Public Hearing letter will be sent out by the Cites to all property owners within 300 feet of the site notifying residents of the meeting per City regulations which is at least 15-days prior to the Planning and Zoning Commission hearing(s). SCHEDULE Formal Filing—07/21/2023 Citizen Participation Plan Initial Submittal—07/21/2023 Neighborhood Meeting Notification— 10/09/2023 Public Neighborhood Meeting— 10/24/2023 Dolce Vita Community Meeting— 11/06/2023 Citizen Participation Final Report— 1 l/10/2023 Notice of Public Hearing Sign Posting &Mailing—TBD Planning and Zoning Commission Meeting—TBD City Council Hearing—TBD ATTACHMENTS Notification Map - 300-foot radius Notification List- 300-foot radius Neighborhood Meeting Invitation Letter Neighborhood Meeting Summary Dolce Vita Meeting Summary 5,1vera on jolJf"elJ --- 3003 buffer Map .�,�ty6•yy&GFF 5A_. 31 El N:.P lf1 M HP c�PEQS +ON FAt1'S 'iTiON-FAWS HP rY,t, NF t _ t7PER 'I71E?ihf ALti S'}AMP t �_ cAI�SMtI? itl,P.'ckitflV�!'!• ti 1 tUODt i -miisegip5 _ SUP,ERSTFTIaN•FAL•L•S,MNP T M`� Q a N 1 SUTHERLAND BEVERLY & LEDI... WARD RONALD J & JACQUELIN... 14571 CROSS LAKE RD 921 S ALEXANDER ST PINE CITY, MN 55063 GREENVILLE, MI 48838 ELMSTRAND KATHLEEN M LIV ... MILLBRAND DEE & EUGENE JR MCCUBBIN RICHARD D TR 445 LAKE AVE 3710 S GOLDFIELD RD LOT 258 3323 COUNTY ROAD 338 WHITE BEAR LAKE, MN 55110 APACHE JUNCTION, AZ 85119 NEW BLOOMFIELD, MO 65063 PETERSON DAVID A GIAUQUE PAULA J FAM LIV TRU... SHERETTE MICHAEL & JANET 3710 S GOLDFIELD RD LOT 467 4453 S MCKECHNIE LOOP 3710 S GOLDFIELD RD LOT 276 APACHE JUNCTION, AZ 85119 PALMER, AK 99645 APACHE JUNCTION, AZ 85119 HAGEN DAVID A & LINDA K TRS... HUPPERT PAUL A & BERNICE E... RABBITT SUSAN PO BOX 460 4255 S MCKECHNIE LOOP 3710 S GOLDFIELD RD LOT 277 CASCADE, ID 83611 PALMER, AK 99645 APACHE JUNCTION, AZ 85119 OSTBERG CHARLES J & JANIC... ARNT DAVID & CAROL KUNERT DAVE & LINDA 3710 S GOLDFIELD RD #468 5483 WOODBURY DR 30 N 1400TH AVE APACHE JUNCTION, AZ 85119 WOODBURY, MN 55129 ORION, IL 61273 HALVERSON STEVEN D & LAUR... DUEY WILLIAM P & JERRE ANN ... BORNE PAUL T & MARGARET F W5904 FRONTAGE RD 12910 E 54TH ST 3133 CHARTER OAK RD MENASHA, WI 54952 KANSAS CITY, MO 64133 EDGEWOOD, KY 41017 GARDNER BARRY & RONDA BURKE VICKI & VAN TASSEL AN... 3445 E CLEVE BUTCHER RD 12653 HARRIET LAKE RD BLOOMINGTON, IN 47401 HIBBING, MN 55746 GUTZMAN RAMONA HUPPERT PAUL A & BERNICE E... OSWALD TIMOTHY J & DIANNA ... 1023 S EGAN AVE APT 2 4255 S MCKECHNIE LOOP 7201 MILKY WAY RD MADISON, SD 57042 PALMER, AK 99645 BISMARCK, ND 58503 FOLKERS MARK E 18612 SPRINGCREST DR MINNETONKA, MN 55345 ARNT CAROL J REV TRUST STOCKWELL JOHN VICTOR & ... 5483 WOODBURY DR 114 N WESTCHESTER DR SAINT PAUL, MN 55129 COLUMBIA CITY, IN 46725 BORNE PAUL T & MARGARET F LOVE MICHAEL W & CHERYL A 3133 CHARTER OAK RD 32581 HOMESTEAD DR EDGEWOOD, KY 41017 GRANGER, IA 50109 EMOND DENNIS D & MARIA SANGER MARK & CYNTHIA LANDON SAMUEL G & TAMMAR... 3710 S GOLDFIELD RD LOT 477 111 W PINE RIDGE DR 17084 PHEASANT MEADOW LN ... APACHE JUNCTION, AZ 85119 POLK CITY, IA 50226 PRIOR LAKE, MN 55372 PETCOVIC DEBORAH OLSON KRISTI EGOLF NED & CATHY D 3710 S GOLDFIELD RD LOT 478 11081 108TH AVE N 5215 S 100 E-57 APACHE JUNCTION, AZ 85119 MAPLE GROVE, MN 55369 CHURUBUSCO, IN 46723 NELSON GLENN & JOSEPHINE DECORTE CAROL J CRITES BRIAN & SUSAN 111 4TH AVE SW 21601 MAYFIELD ST 33317 WATERBERRY CIR PIPESTONE, MN 56164 FARMINGTON HILLS, MI 48336 WAUKEE, IA 50263 BACHTOLD BERNARD W & SHA... DEBROUX DAVID & CANDACE SNYDER JERRY N & YVETTE V 3710 S GOLDFIELD RD 302 3517 ROAD 84 TRLR 109E 9414 N NORMANDIE LN APACHE JUNCTION, AZ 85119 PASCO, WA 99301 SPOKANE, WA 99218 MERRIGAN STEVEN D KING JAMES & CAROLYN JENSEN RANDOLPH R & ROSA... 3710 S GOLDFIELD RD UNIT 18... 100 PINNACLE LN APT A 12512 LEYTE ST NE APACHE JUNCTION, AZ 85119 EASLEY, SC 29642 MINNEAPOLIS, MN 55449 BLANKERS JERRY A LIVING TR... POOLEY RANDALL J & JOLENE ... FIREBAUGH R SCOTT & DONN... 727 141ST ST 10012 W TWIN LAKES RD 11449 S NORTHWOOD CIR LAKE WILSON, MN 56151 RATHDRUM, ID 83858 OLATHE, KS 66061 OLSON DARLENE M BEDWELL DARYL WADE OLSON GERALD L & MARJORIE... 682 WESTERGARD RD 349 S FORK DR 602 MARYSLAND AVE BOTTINEAU, ND 58318 GURNEE, IL 60031 DANVERS, MN 56231 ZIMMERMANN DONALD W & JA... OEPPING VERNON R TRS SCHMEIL PAUL F & MARYLIN L ... 9733 E LOMPOC AVE 4028 LITTLE VALLEY RD 17303 SPANAWAY LOOP RD S U... MESA, AZ 85209 ESTES PARK, CO 80517 SPANAWAY, WA 98387 LITZINGER JOSEPH M & SUSA... STITH KENNETH & ELAINE TRU...25 GOOD ANN G TRS 108 SLEEPY HOLLOW ST GANDESA WAY PO BOX 654 GRAND FORKS, ND 58201 HOT SPRINGS VILLAGE, AR 71 SHERIDAN, MT 59749 WEGNER MARION J REV TRUS... KASTE LON & SHELLEY WONG DEAN D & REBECCA A 11330 LAKEVIEW HEIGHTS RD 5838 COUNTY ROAD 12A 20525 UNIVERSITY AVENUE EX... PINE CITY, MN 55063 PISEK, ND 58273 CEDAR, MN 55011 SCHMEIL PAUL F ETAL TRUSTE... LOPEZ DONALD & THERESA WYMA RICHARD LEE & GWEND... 17303 SPANAWAY LOOP RD S U... 1723 COUNTY ROAD 29 3710 S GOLDFIELD RD 417 SPANAWAY, WA 98387 FORT LUPTON, CO 80621 APACHE JUNCTION, AZ 85119 STEWART ALAN W BASS MARCIA ANN & PATRICK ... BARBER MICHAEL & COLLEEN 521 KAISER RD NW 251 RAINBOW DR # 15148 706 WESTLAND LN OLYMPIA, WA 98502 LIVINGSTON, TX 77399 NEW LONDON, MN 56273 TAYLOR CHARLES H & AGNES ... DEROWITSCH JIM & ELLEN DAHLKE RICHARD P & SHERYL ... PO BOX 9615 PO BOX 345 19572 CLAREMONT CIR ALBUQUERQUE, NM 87119 GOLD BAR, WA 98251 FARMINGTON, MN 55024 WIGLEY CONNIE LARSEN BRETT D ODEGAARD DONNA 3710 S GOLDFIELD RD LOT 364 3710 S GOLDFIELD RD LOT 393 16110 55TH ST SE APACHE JUNCTION, AZ 85119 APACHE JUNCTION, AZ 85119 KINDRED, ND 58051 ZAUN MICHAEL & VICKI TRUST VANLEEUWE ROBERT C REV LI... DALEY CYNTHIA A 8829 E LOST GOLD CIR 705 NUESE LN 1398 SHERWOOD CT GOLD CANYON, AZ 85118 MARSHALL, MN 56258 GURNEE, IL 60031 BREITBACH STEPHEN T & DIAN... ROHDE BARBARA J MARTUCCI CAROLE T 811 FREEDOM CIR 23756 ARENA DR HART RANCH... 32 MEETINGHOUSE CT HAZEL GREEN, WI 53811 RAPID CITY, SD 57702 SHAMONG, NJ 08088 LANGE THOMAS F MCGOWAN TERRY DOUGHERTY INEZ E 3710 S GOLDFIELD RD LOT 489 31329 TOBIAH PL 162 LAKEVIEW DR APACHE JUNCTION, AZ 85119 CASTAIC, CA 91384 SEQUIM, WA 98382 BRAUN GARY & ANNETTE T HERTIG JAMES M & LORRAINE ... 100 ELLSWORTH ST SE 9485 SEBRING DR SLEEPY EYE, MN 56085 PORTAGE, MI 49002 CRAIGER MICHAEL C & SALLY ... STOUTENBURG FAMILY TRUST HERZOG GERALD A & FRANTZ ... 3710 S GOLDFIELD RD LOT 386 5211 WILLIAMSBURG LN LOT 1... 3710 S GOLDFIELD RD LOT 420 APACHE JUNCTION, AZ 85119 LEXINGTON, MI 48450 APACHE JUNCTION, AZ 85119 DEROWITSCH JIM & ELAINE RIZNER GARY LEE & JULIE KAY... CALLIES CAROL LEE TR PO BOX 345 1002 7TH ST 5656 BARONSWOOD CIR GOLD BAR, WA 98251 GRUNDY CENTER, IA 50638 TOLEDO, OH 43615 NOLTON DANIEL ARTHUR SCHMITT BETTY A SCHROEDER JODI &ANDERSO... 23412 BRIER RD 1101 S SCHEUBER RD UNIT 31 1811 8TH ST SE BRIER, WA 98036 CENTRALIA, WA 98531 EAST GRAND FORKS, MN 56721 ADAMS WILLIAM E & GEORGIA ... HOGG BRYAN A& DEBORAH J 228 LAKE FRONT CT 1016 LESLIE DR HAMILTON, OH 45013 INNI FIL , ON -❑❑ EB❑ CANADA BURKE LAURA M REV TRUST DUNSTAN-ADAMS TAMI & PETE... AKTRON LLC 3050 HIDDEN RD 2635 DARTMOUTH DR 3265 S GOLDFIELD RD APT A BAY CITY, MI 48706 PENTICTON, BC ❑❑A 1]❑3 APACHE JUNCTION, AZ 85119 CANADA RODERICK LEWIS & SHEILA FAHRNOW JUDITH M TRUST 3270 S GOLDFIELD RD APT 814 3270 S GOLDFIELD RD APT 207 APACHE JUNCTION, AZ 85119 APACHE JUNCTION, AZ 85119 TKACHANKO WAYNE R & CARO... MADGE JAMES A SCHMIDT ROBERT E 205 52312 RANGE ROAD 223 5656 BARONSWOOD CIR 153 THAMESVIEW CRIES SHERWOOD PARK, AB T8C 1 B3 TOLEDO, OH 43615 ST MARYS, ON N4X 1 C4 CANADA CANADA NOLTON DANIEL ARTHUR CURTIS KAY D & GAYLA A REV ... HELSETH AARON 23412 BRIER RD 13796 E LANGTRY LN PO BOX 2208 BRIER, WA 98036 TUCSON, AZ 85747 ELIZABETH, CO 80107 HOAR IRREVOCABLE GRANTO... HELLER BERNICE ANN 3734 CHERRY FLATS RD 3270 S GOLDFIELD RD APT 201 COVINGTON, PA 16917 APACHE JUNCTION, AZ 85119 KINNAN FAMILY LTD PSHIP BAM 109 LLC 112 PERRINE RD 3034 ARTHUR ST NE OWEGO, NY 13827 MINNEAPOLIS, MN 55418 STURDEFANT JOHN L FELTON ROSEMARY & BRUCE 3710 S GOLDFIELD RD LOT 451 3270 S GOLDFIELD RD APT 107 APACHE JUNCTION, AZ 85119 APACHE JUNCTION, AZ 85119 ANDERSEN IVAN C & FLORA LA... KRAMER RAYMOND J & SHARO... WRIGHT JAMES LEE & CHARLO... 671 YUCCA RD 5126 KING AVE W 101 FLINTSTONE DR UNIT A ELK HORN, IA 51531 BILLINGS, MT 59106 WAVERLY, IA 50677 SORENSEN VERDON N & B LEE... WACKER ROBERT F & KATHLE... DAVIDSON GARY L & DIANE M 1 SIMPSON PL 17362 SUNRAY CIR SW 4880 WOODLAND DR NW SHENANDOAH, IA 51601 PRIOR LAKE, MN 55372 HACKENSACK, MN 56452 HISEK RONALD & BETTY 4121 JARMANN LN SHAKOPEE, MN 55379 FELTON BRUCE D KARTES CORINE 3270 S GOLDFIELD RD 107 6068 88TH AVE SE APACHE JUNCTION, AZ 85119 DICKEY, ND 58431 MCMAHON PAMELA K BARKLEY ANDREA & BLAKESL... 9902 E KIOWA AVE 1506 OAK DR SPC 108 MESA, AZ 85209 VISTA, CA 92084 GOETHALS ROBERT M WINNIKE ROBERT H 18784 E 40TH ST 605 5TH ST COAL VALLEY, IL 61240 WEST POINT, IA 52656 FASSLER JOHN A TRUST KELSEY STEPHEN L 86 PALMYRA RD UNIT 6863 HANNEGAN RD APT A STERLING, IL 61081 EVERSON, WA 98247 OLSEN RECKER/GUADALUPE P... KLOCKE DOUGLAS & PAULA SMITH HAROLD L & PEGGY J 5235 E SOUTHERN AVE APT D1... 2965 HARRIS AVE 3710 S GOLDFIELD RD LOT 500 MESA, AZ 85206 ROCKWELL CITY, IA 50579 APACHE JUNCTION, AZ 85119 MHC DOLCE VITA LLC LENARDSON DAVID H & JUDIT... THEISEN WILLIAM 917 W WASHINGTON MS 316 3710 S GOLDFIELD RD LOT 501 647 N WISCONSIN ST CHICAGO, IL 60607 APACHE JUNCTION, AZ 85119 PORT WASHINGTON, WI 53074 SCHOTT GERALD J & CYNTHIA ... SCHMITT RICKY A & BETH A RE... NOTT BRENDA ELIZABETH & M... 513 N MUNDT AVE 1640 FAIRSIDE DR 411 100 SAGHALIE RD HARTFORD, SD 57033 SANDWICH, IL 60548 VICTORIA, VI ❑❑A ❑A1 CANADA Iplan Consulting 16 Silveray on Goldfield Neighborhood Meeting Summary: Golden Vista RV Resort—October 24, 2023 Attendees: Applicant: Greg Davis—Iplan Consulting Jason Barney—Property Owner John Hartman—Property Owner City: Kelsey Schattnik—City Planner Neighbors: See sign-in sheets Meeting started at approximately 10:05 AM. Mr. Davis welcomed everyone, explained that the purpose of this meeting was to present the proposal of the landowners to modify the General Plan classification and the rezoning designation to allow for the development of a multi-family residential project. Mr. Davis explained what the current GP/zoning permitted in terms of uses (i.e. regional hospital, restaurants, hotels, offices, etc.) and then described the proposed multi-family project including access, circulation, open space/amenities, architecture, and then walked through several of the typical concerns brought up in similar projects. Mr. Davis then explained the approval processes and the expected timeframes associated with each phase of the process before asking if any of the attendees had any questions or comments. Below is a summary of questions and answers portion of the meeting. Please note that this list is meant to capture the most pertinent questions of the neighborhood, but similar questions, comments, and/or discussions have been combined or omitted and the responses have been summarized for brevity. Q: Question R: Response Q: What is the water source for the project? R: Mr. Davis replied that although water is a hot issue right now in the state, this site is already accounted for by the City which is the water provider. Furthermore, the proposed residential use will need much less water than the current approved uses. Q: What does the Traffic Analysis take into account? Does it include all the homes planned to the south? R: Mr. Davis replied that the traffic study looks at both existing and planned traffic generation and compares how the current use will compare to the proposed use and then makes recommendations based on the ability for the local roads to accommodate the projected traffic. Q: What road improvements will be made? R: Mr. Davis replied that the City will dictate what improvements need to be made and we expect some level of improvements for Goldfield Road. Q: Please clarify where the entries and exits are? We prefer them north of our entry. R: Mr. Davis went back to the appropriate slide and pointed them out. All of our access points are north of the existing access point for Golden Vista. Q: Will this property have an HOA? How will it be kept nice? R: Mr. Davis replied that the project will have a POA and the owners have the incentive and responsibility to maintain the property to a high degree. Q: Can you make the units along Goldfield single story? R: Mr. Davis replied that the product proposed is only two story. He also reiterated that the current zoning allows 45-feet (3 or 4 stories) and by proposing 2-stories was a fair compromise. Q: We would like to see this site be a City Park. Can the City buy it? R: Mr. Barney replied that a lot of work goes into locating City parks and this is not the right place for one. He also stated that the current plans were not for a park and thus the proposal never contemplated that use. Mr. Davis stated that City parks need to be more centralized to serve the most residents. Q: Can the project be built as a golf course? R: Mr. Barney stated that was not a viable use here on only 18 acres. Q: Can you have the project open space along Goldfield? R: Mr. Barney replied that the open space needs to serve the project residents, thus needs to be centralized. Q: How will this affect property values? R: Mr. Barney replied that although any/every project can have some impact on property values, this proposal would likely protect them more than the current commercial zoning. Mr. Davis stated that since our project was a rental product, no appraiser would use our project to establish land values for their homes. Q: Can you change the gray color with an earth tone or paint a mural of the mountain on the buildings along Goldfield? R: Mr. Davis replied that we can look at changing the building colors to be more earthen tones. Q: What is the distance between buildings? R: Mr. Davis replied that the front setback was 20-feet and distance between buildings was 10-feet. Q: Can these be re-rented as AirB&Bs? R: Mr. Davis replied that no, these are end user rentals only and no tenant can sublet for that purpose. Q: What is the minimum rental length? R: Mr. Davis replied that these are intended to be long-term rentals which are typically one-year in length. Q: Are these rentals subsidized? R: Mr. Davis replied that no, these are market-rate rental homes. Q: Will the project contribute to the City for parks and road/sidewalk maintenance? R: Mr. Davis replied that yes, the project will pay impact fees to the City as well as pay taxes for on- going road maintenance. Q: Are pets allowed? R: Mr. Davis replied that yes,pets are allowed and the project includes amenities for them. Q: Can you bring in a nice restaurant? R: Mr. Barney replied that they don't believe a high end restaurant would choose this location over the US60/Signal Butte commercial center or the future one to the east at US60/North-South freeway. Q: Can you use your influence to get ADOT to widen US 60 to account for the future N/S freeway? R: Mr. Barney mentioned his involvement with the Pinal Partnership group and their efforts to work with ADOT to make that happen. He said getting that done will happen, but it is likely decades away. Q: Will there be a sound wall along US 60? R: Mr. Davis replied that as of now,no sound wall is planned,but that would look into that further. Q: The project is too dense. Can you build something else. R: Mr. Davis shared that the project, at—15 DU/acre was lower than many multi-family projects and the site is retaining 15% open space in addition to the parking and drive aisles, and with only 2- story buildings, we disagree. Furthermore, the Golden Vista RV resort is actually denser at almost 25 DU/acre. Q: Can you use bushes or cacti instead of trees along Goldfield(to preserve the view)? R: Mr. Davis replied that the ownership would be fine with that but it was the City's call. Q: Can you use build something temporary along Goldfield to demonstrate the proposed height? R: Mr. Davis replied that we probably can't build anything, but we could use color balloons to illustrate the heights discussed today. Q: If you sell to someone else, what happens to the proposal? R: Mr. Davis replied that, if approved, the zoning would remain in place for whomever bought the land and if they wanted to change it, they would have to go back through the entire rezoning process. Seeing no other questions or comments, Mr. Davis thanked everyone for attending the meeting, reminded them that his and the City Planner's contact information was available and then adjourned the meeting. Meeting adjourned at approximately 11:22 AM. Project: Silveray on Goldfield Meeting Date: 10/24/2023 Location: Golden Vista RV Park Time Started: 10:OOam Time Ended: ATTENDANCE SIGN-IN NAME — (please print) ADDRESS EMAIL (Optional) G r 0 7/ arre h6 q i E.-o'�� 'C 4, ri� ,So �D Al A4�l en In L 71-o i ' G Ord 3 -s- /nGeon s� s co l��. 0� NAME — (please print) ADDRESS ZIP ict -Tel 14 b 4� G �nl 5co4-f 1�`y(o / to1- H+arkeQ NAME — (please print) ADDRESS ZIP 13 Ft f-t �v �/ �S�l 41OW/.s� Ya-s /,v-r-- cq ki GcO e a 1- fs 1 2Qnylo,j eel', Lb J-1 leg 77k 9 NAME — (please print) ADDRESS EMAIL 2 -306 e:f Cq4 e)6. C e,', cho�c✓� vr,cwQ . ce-k- . fit , �e- A4! f 596 • ,Pdefr e-J 6 rn of 1 b'y) v\ 't1Qre o �Fox /-4 Li Q- n Cso 27/D S. t L 2 7 1-77- ea�/L� 3 7 / /0 S. Go 140 lr e, �1��. 9.3 .S . S A S U , C,0/;'I f( Dz Irl 3- �J �� S ' �cL-!> � J �� q . f LA/IV 12 AMP F_/3 04z�L, Cow o P h n t 5 /V v ��o )} #L� ! 7 l I �Pr-�n�S Y1 C� �T` r) Cj �i�} / L •C�'h1 Jet yd Yale �sn f �`el^ 3 3 ve e clnd 1'ext (9CAcast. ae. S N n per �o rl j7, e: r 15 �o� � 7 e dd.� " �/. e o Iplan Consulting 16 Silveray on Goldfield Neighborhood Meeting Summary: Dolce Vita—November 06, 2023 Attendees: Applicant: Greg Davis—Iplan Consulting John Hartman—Property Owner City: Kelsey Schattnik—City Planner Neighbors: —100 (undocumented) Presentation Started at approximately 10:05AM Mr. Davis welcomed everyone, explained that the purpose of this meeting was to present the proposal of the landowners to modify the General Plan classification and the rezoning designation to allow for the development of a multi-family residential project. Mr. Davis explained what the current GP/zoning permitted in terms of uses (i.e. regional hospital, restaurants, hotels, offices, etc.) and then described the proposed multi-family project including access, circulation, open space/amenities, architecture, and then walked through several of the typical concerns brought up in similar projects. Mr. Davis then explained the approval processes and the expected timeframes associated with each phase of the process before asking if any of the attendees had any questions or comments. Below is a summary of questions and answers portion of the meeting. Please note that this list is meant to capture the most pertinent questions of the neighborhood and that similar questions, comments, and/or discussions have been combined or omitted and the responses have been summarized for brevity. Q: Question R: Response Q: Is this a rental project? R: Mr. Davis replied that yes, this is a for-rent residential project. Q: What will the rents be? R: Mr. Davis replied that the actual rents won't be known until the project is closer to opening and guessed that they would start at $1,000 or so. Mr. Hartman corrected Mr. Davis stating they would be quite a bit higher than that, likely above $1,800 a month. Q: Who owns Resort Blvd.? R: Mr. Hartman replied that our group owns Resort Blvd. and Dolce Vita gains access via easement. Q: What road improvements will be made? R: Mr. Davis replied that the City will dictate what improvements need to be made based on our Traffic Report and we expect some level of improvements for Goldfield Road and potentially Resort Blvd. Q: Can you move the access points to the west? R: Mr. Davis went back to the appropriate slide and pointed the access points out noting that most were already pretty far west which the exception of the northeast parcel which is cut-off from the rest of the project thus needs its own access points. Q: How can you ensure people will not park along Resort Blvd.? R: Mr. Davis replied that the project will have a POA that will prohibit parking along Resort Blvd. and the owners have the incentive to keep the entry road open and attractive. Q: Can you make the units along the perimeter single story? R: Mr. Davis replied that the product proposed is only two story noting that most have the garage on the lower level requiring a two-level design. He also reiterated that the current zoning allows 45- feet(3 or 4 stories) and by proposing 2-stories was a fair compromise. Q: Can you prohibit children from living here? R: Mr. Davis replied that he didn't believe it was legal to do that here and that the project was not designed to be attractive to families as there is very limited family services in the area. Q: Can you move the playground? R: Mr. Davis said they would look at that and could potentially move it to the west open space area. Q: Can you move the primary amenity area? That will be a party area. R: Mr. Davis replied that the primary amenity area needs to serve the project residents, thus needs to be centralized and that the pool facility will close at 1 Opm to minimize its use as a party location. Q: Will the construction traffic use Resort Blvd.? R: Mr. Davis replied that the construction traffic would mostly come from Goldfield Road as we are on the hook for maintenance of Resort Blvd. so will work to minimize use of that road for construction traffic. Seeing no other questions or comments, Mr. Davis thanked everyone for attending and then adjourned the meeting. Meeting adjourned at approximately 10:58 AM. Leo Lew County Manager PINAL COUNTY wIni o►ix OPPORTVMITY October 17t" 2023 City of Apache Junction Development Services Department 300 E Superstition Blvd Apache Junction, AZ 85119 Re: Proposed Silveray at Goldfield Major General Plan Amendment Dear Kelsey: The Pinal County Development Services Department is aware of the proposed multi-family development proposed within the area of the Pinal County Comprehensive Plan. County staff has prepared comments regarding this proposal and would not offer our support of this recommendation. Staff finds the request to convert the 18-acre subject site may detract from prime commercial parcels South of US-60. The location of these parcels having access to an arterial roadway and a major highway offer potential for higher levels of traffic consistent with retail requirements and exceeding the trip generation typical of a multi-family development. The presence of such roadways may encourage the market area of potential commercial opportunities to support communities that are more distant and may attract revenue to Apache Junction. Proximity of existing residential uses to the site promotes a pedestrian scaled commercial development that may support existing residential development on both the West and East sides of the proposed development. Such commercial parcels would also support expansion of additional multi-family projects to the South, which are supported at present by the Pinal County Comprehensive Plan. Development of this multi-family project to the south of the General Commercial land-use designated parcels would be consistent with the High Density Residential land-use designation present within the Pinal County Comprehensive Plan. Staff would be amicable toward multi-family development south of the proposal area provided commercial designations remain that would support residential growth. Please feel free to contact me regarding staff comments and our position on this matter. Staff appreciates the opportunity to provide input regarding this case. Sincerely, Patrick Roberts Senior Planner Pinal County Development Services COMMUNITY DEVELOPMENT PLANNING DIVISION 85 N Florence St,Florence,AZ 85132 T 520-866-6442 FREE 888-431-1311 F 520-866-6435 www.pinalcountyaz.gov 12/14/23, 10:09 AM [External]SPRSAZEA-Under Review:City of Apache Junction General Plan Amendment-Silveray at Goldfield-Kelsey Schatt_ [External] SPRSAZEA - Under Review: City of Apache Junction General Plan Amendment - Silveray at Goldfield Boyden, Holden <Holden.Boyden@lumen.com> Mon 9/11/2023 8:49 AM To:Kelsey Schattnik <kschattnik@apachejunctionaz.gov> Cc:AZMetroRelo <AZMetroRelo@lumen.com> 0 1 attachments(2 MB) Utility Map 1.pdf; Date: 08/25/2023 Attn: Kelsey Schattnik Thank you for your project notification. LUMEN has reviewed your utility notice regarding P-479235 AZ I Silveray at Goldfield -S Goldfield Rd & Dolce Vita at Superstition Falls, Apache Junction, AZ ("Project"). In response to your inquiry please find the enclosed drawings indicating the approximate location of the project limits. X LUMEN has facilities within your proposed construction area. The plans submitted are under review by our LUMEN Field Engineer(s). Currently,the estimated completion date of review is 09/25/2023. • LUMEN has facilities within your proposed construction area. Please find the enclosed drawings indicating the location of the LUMEN facilities. Once you have completed your review, please respond back if LUMEN facilities appear to be in conflict.A LUMEN engineer will be assigned when engineering plans are ready for review. • LUMEN does not have facilities within your proposed construction area. • LUMEN has facilities within your proposed construction zone, but it has been determined that no relocation will be necessary. However, due to the proximity of your project to our facilities, a LU MEN representative will be required on-site when construction begins. • The information provided in your initial request is insufficient to determine if the location of your proposed construction will conflict with LUMEN facilities. Please provide additional detailed location maps, drawings (PDF preferred), and description for further conflict review. Please contact your State One Call prior to construction. Any changes or additions to the project plans or parameters should be submitted to relocations@,lumen.com. Note: the location(s) of facilities shown on drawings you receive from us, are only approximate. LUMEN hereby disclaims any responsibility for the accuracy of this information. Please contact relocations@lumen.com regarding the above-mentioned project if you should have any questions. Please reference the file number P-479235 AZ with any future communications. Important Notice- For the States listed below, please add relocations@brightspeed.com to your distribution list for inquiries and updates regarding local facilities. (AL, AR, GA, IL, IN, KS, LA, MI, MO, MS, NC, NJ, OH, OK, PA, SC,TN,TX, VA, WI) Thank you for your cooperation! Holden Boyden (He/Him) Business Analyst Relocations Department aboutblank 1;3 12114/23, 10:09 AM [External]SPRSAZEA-Under Review:City of Apache Junction General Plan Amendment-Silveray at Goldfield-Kelsey Schaff... Holden.Boyden lumen.com **We have combinedH To better serve everyone, there is now a single email inbox for LUMEN. One team is monitoring both national and local network relocations & road moves. Please add relocations@lumen.com to your contacts list for inquiries, updates, and use it for all future notifications.* From:Wagner, Kevin <kwagner@congruex.com> Sent: Friday,August 25, 2023 1:15 PM To: relocations<relocations@centurylink.com> Subject: Fw: City of Apache Junction General Plan Amendment-Silveray at Goldfield CAUTION:This email originated outside of Lumen Technologies. Do not click links or open attachments unless you recognize the sender and know the content is safe. From: owner-azreview@Ixdnp32k.corp.intranet<owner-azreview@lxdn p32k.corp.intranet>on behalf of Kelsey Schattnik<kschattnik(@apachejunctionaz.gov> Sent:Thursday,August 24, 2023 3:08 PM Subject: City of Apache Junction General Plan Amendment-Silveray at Goldfield CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless ou recognize the sender and know the content is safe. CAUTION:This email originated outside of Lumen Technologies. Do not click links or open attachments unless you recognize the sender and know the content is safe. Dear Neighbors and Interested Parties: Submitted for your review and comment is a general plan amendment request within the City Of Apache Junction (Case No. P-23-64-GPA). In accordance with state and city requirements, we are submitting this proposal to you as part of the 60-day review process. Please review the materials provided and convey your comments to Kelsey Schattnik, Senior Planner, via the contact information below,on or prior to October 23, 2023.The City of Apache Junction values your comments and thanks you for your input.Thanks! All documents can be accessed through the below link: b.ttps://drive.ggogle.com/drive/folders/13d5lDb-h-Fwc3 18t7UJQdJ8aYdcEHAa?usp=shari g Best, Kelsey Kelsey Schattnik,LEED Green Associate Senior Planner I Development Services Department City of Apache Junction,AZ (480)474-5085 about:blank 213 12114/23, 10:09 AM [External]SPRSAZEA-Under Review:City of Apache Junction General Plan Amendment-Silveray at Goldfield-Kelsey Schatt... ks chattn i k@ apacheju ncti o naz.gov Hours: Monday-Thursday 7am-6pm;closed on Fridays. This communication is the property of Lumen Technologies and may contain confidential or privileged information. Unauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. about:blank 31i3 LUMEN Relocate Utility Map e L —E Z Ave E-30t'h P� Cn ` 19 Superstition Fwy Superstition Fwy 66 60 Supersfition Superstition FwY 6o F 60 ----- ---------- 6o Superstition Fwy uperstitioh F Wy , , 6 0 0 p , , , lg p i Dol_ -e Vita at S==rstiti - on F 0 �aQ dop Ein gU 0 n � ---------------------------E-has'peC-Dr--------------------------� '• D U o 1 ---rr• LF O ` ❑ � ❑ 0 0 � g E IronstoneD� n n n n n r � i --- 1P �3 /� '�,• �ea1��l/ITaaY3l, Arsftfrm,rtalts- r t� e a 0 � 0o `o nDDD ° ono0 EHwks Eye ur I o aQ ❑D a� ce t erton ailspst ITT - 0 U DODD 001JUPH Ern"n n n n n 0 n no Do N a o 4oDDDDDDDDD uuuuuuuuuuDnnnnDDl= � �a��' -,_ ��-_z_ -�� o ' 0 0 0 0 Q c IN Dolce Vita at Sop,, � —= DOME1 ° DDDDDnnnl nnnnD° nDnDnn� �_---� oC] �y , a 0 0 == E Emerald Or o ❑❑ LJU L n O O ti 1Q r 1-4x" --^----- 7 Qofl , _ � � � �w,► y 0 QQ E Diamond Dr 0 ED o i= 1 1 � 4NDU U U U U U U U U El U u U U U j I" 000000DDnnDDnDD PDU000000 [PI2' � % + > 1 ----i------_,_� 0 Q E Cmnebar Dr oQ ° o ---___ o I� Q QQ�D� Ono No),No) ° o D wZI t o O , 13. o E Beryl Dr Z o E Beryl Dr I O n j �i i fell I� qE Aquamarine Dr v C) I Dolce Vita at Superstition Falls �ss ❑ , ------------------------------ - m .- 0o ao Q Q o o D D l__—__4� ° LF " uL, u ���� �LJ E Mother Lode Dr 1n If �•r E Nightdigger Dr Q o F �fEF7 ET1 1 9/11/2023, 10:33:05 AM 1:4,514 Local Copper UG Route Underground,ln Construction - --- Underground,ln Construction o 0.05 0.1 0.19 mi Underground,ln Service - --- Underground,ln Service - --- Underground,ln Service o 0.07 0.15 0.3 km Fiber Cables Fiber Routes Esri Community Maps Contributors, © OpenStreetMap, Microsoft, Aerial,ln Service Aerial,ln Service Esri, HERE,Garmin,SafeGraph,GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA ©map data Lumen©1992—2023 TomTom INTERNAL USE ONLY:This map data is for internal LUMEN use only and is NOT to be disseminated outside of LUMEN without authorization from RISK MANAGEMENT. Dissemination of this data outside of LUMEN without authorization will be considered a violation of company policy. Kelsey Schattnik From: Annette Braun <abraun2999@gmail.com> Sent: Tuesday, March 21, 2023 9:32 AM To: Kelsey Schattnik Subject: External} Broadstone Silveray development Good morning Kelsey, Gary and I live at 3710 S Goldfield Rd, and are very opposed to 2 story homes in the proposed development across from Goldfield Rd. We have had this property since 2018 and enjoy the views of Superstition Mountains.There are approximately 1000 residents whom enjoy these views from across from this proposed development. Please note our objections to 2 story homes in this development. Thank you. Gary and Annette Braun Sent from my iPad i Kelsey Schattnik From: bdecorte@mi.rr.com Sent: Wednesday, April 12, 2023 12:23 PM To: Kelsey Schattnik Subject: [External] Broadstone Silveray Development Kelsey, I am again writing to oppose the Broadstone Silveray proposed development near the southwest corner of the US 60 and S. Goldfield Road. I have recently become aware that there is an underground drainage system running through the property. There is a large circular iron plate at the south end of the property near the La Dolce Vita development and just off the existing sidewalk (which is, by the way, used by many walkers). If the development is approved, I was in hopes that the land would be reduced to level with the sidewalk and street before building SINGLE STORY HOMES on the existing elevated berm. I am concerned with the loss of the mountainous view from Golden Vista, located directly across the street. I purchased my property on the East wall of the resort because of this view and am concerned with the loss of property value if the scenic view is lost. I have also learned that there is a "wash" located toward the back of the proposed building site. Please add this letter to my original communication dated March 27, 2023. Thank you for your time and consideration regarding this proposed housing development. Sincerely, Carol DeCorte Golden Vista Resort Lot 481 Apache Junction, AZ SS119 1 Kelsey Schattnik From: bdecorte@mi.rr.com Sent: Monday, March 27, 2023 12:09 PM To: Kelsey Schattnik Subject: [Externall BROADSTONE SILVERAY DEVELOPMENT Kelsey, I am writing to oppose the Broadstone Silvery proposed development near the southwest corner of the US 60 and Goldfield Road. I am a resident and property owner in Golden Vista Resort, directly opposite the proposed planned development. This will directly affect my property value. I purchased this particular property in the resort because of the views of the typical desert area across the street and the spectacular views of Superstition Mountain, Silly Mountain, and the further mountains. I am from Michigan. THIS VIEW IS ARIZONAI I The proposed development will most certainly block most of my view and therefore, decrease the value of my property located on the east wall of the resort. I urge the Apache Junction Planning and Zoning Commission and the City Council to carefully consider the impact this proposed development will have on the neighboring community of Golden Vista and it's resident's property values and views. I am also concerned about the impact on our water system with the addition of this many new homes needing water. We, in Arizona, are continually reminded of the need to conserve our water usage because of drought conditions in recent years. The increased traffic and noise on Goldfield is also a concern, not to mention the extended period of building disruption on Goldfield and increased difficulty of golden Vista residents exiting our resort through our East Gate and making a left turn. We will also be experiencing increased traffic on Goldfield from new residents in the development south of Baseline Rd as they turn north on Goldfield to access Highway 60. 1 understand the proposed development is a mix of 1 story and 2 story homes. If the city should chose to approve development of this land, I would suggest the developer revise their plan and to build the 2 story homes only north of the gas station, and therefore not blocking the Golden Vista entire view, as would happen on the existing proposed map of the community. Thank you for your time and consideration regarding this proposed building. Sincerely, Carol DeCorte Golden Vista Resort Lot 481 3710 S.Goldfield Rd. Apache Junction, AZ 85119 1 Kelsey Schattnik From: connie wigley <cywig66@gmail.com> Sent: Thursday, March 23, 2023 4:22 PM To: Kelsey Schattnik Subject: [External] Broadstone Silveray Deveopment I am Connie Wigley and I live at 3710 S Goldfield rd. Apache Junction, AZ. I oppose any 2 story buildings being built across from Golden Vista Resort. We bought in this area because of the view of the Superstition Mountains and the rural surroundings. This development will cause much more traffic and will put an even greater strain on our water usage. Sincerely,Connie Y Wigley 1 Kelsey Schattnik From: Diane Breitbach <diane.breitbach@gmail.com Sent: Friday, March 24, 2023 6:57 AM To: Kelsey Schattnik Subject: [External] Broadstone Silveray Development Hello Kelsey, I am a resident of Golden Vista Resort at 3710 S Goldfield Rd, Apache Junction, AZ 85119 and I understand that the property across the street from Golden Vista Resort has been sold and the developers are considering constructing one and two story homes. This is very concerning as it will increase traffic immensely in our area. With one and two story homes, that can imply a two or three car household, which causes a huge influx in the already busy streets. During the winter months, we have the added traffic of the Renaissance Festival and this year the LPGA in Gold Canyon. Please consider this valid concern when reviewing planning for this development. Your consideration is greatly appreciated ! Sincerely, Diane Breitbach Kelsey Schattnik From: Glenn Nelson <norskinelson@hotmail.com> Sent: Thursday, March 23, 2023 10:26 AM To: Kelsey Schattnik Subject: [External] Broadstone Silveray Deveopment We are on the wall of Golden Vista Resort with the mountains toward the east. We are very concerned of the information of the development that is planned to be developed on the east side of Goldfield Road. Our park is a property owned park. We may be temporary, but we have a stake in AZ and what happens locally or even state wide. We understand that two story houses are planned to be put up. We, my wife and I would prefer to see single level housing. We enjoy the view, have concerns of a two story site that would allow persons of the second story to look down at our park residents/homes, and are concerned of the desired land/home owner that would be coming into the development. If, and all possible, we would suggest that the homes be a single level. Another concern for us is internet availability. Our park has struggled to have a reliable internet distribution within the park. We are finding that internet providers are struggling to catch up to the growth. And this can also relate to the cell phone. As a member of the utilities committee, I would like to be informed of plans of these two products and if possible, be provided with conversations or discussions of plans for the area. We are very concerned of a internet provider within the park and if plans for a more reliable provider were combined into the development, this would provide the means to gain a more reliable internet program. Thank you for your consideration and review of the information above. Glenn and Josephine Nelson Lot 479 1 Kelsey Schattnik From: Lanny Aderman <Iraderman@yahoo.com> Sent: Thursday, March 30, 2023 8:10 PM To: Kelsey Schattnik Subject: [External] Silvery Development Hi Kelsey, I am writing you with hopes that the development planned for the southeast corner of US 60 and Goldfield Rd will be re- considered to limit homes to one story. I understand that 2 story homes are being planned for this development which will really restrict our view of Superstition Mountains. We live in the Golden Vista Resort across the street from the proposed development. Thank you for considering our request. Sincerely, Lanny Aderman Golden Vista resident. 3/30/23 Sent from Yahoo Mail for iPad Kelsey Schattnik From: Pam Oswald <pamoswald@hotmail.com> Sent: Sunday, March 26, 2023 9:33 AM To: Kelsey Schattnik Subject: [External] Proposed Silvery Development along S. Goldfield Rd. I am contacting you regarding the proposed housing development near the corner of US-60 and Goldfield Rd. We own property in Golden Vista Resort along Goldfield Rd., and enjoy our view of Silly Mountain and the Superstition Mountains. it would be very sad if 2-story homes are built as that would destroy views of the nature and the mountains. Please consider limiting the new homes to 1-story so they don't obstruct views and try to keep all of Apache Junction more rural with scenic views for everyone. Thank you! Jim and Pam Oswald Sent from Mail for Windows i Kelsey Schattnik From: Ron ward <camper474@hotmail.com> Sent: Wednesday, March 1 S, 2023 2:41 PM To: Kelsey Schattnik Subject: [External] Broadstone Silveray Kelsey,We live at 3710 S Goldfield Rd lot 474 and are very apposed to the two story homes planed for the Broadstone development.All the surrounding homes are one story.Two story house's will block the view of the mountain from Goldenvista the view is why we bought in Goldenvista. Thank you. Ronald Ward Sent from my iPhone 1 4/3/24,9:21 AM Mail-Kelsey Schattnik-Outlook [External] Silvery Development Candy DeBroux <cdebroux7@gmail.com> Sun 4/16/2023 1:57 PM To:Kelsey Schattnik <kschattnik@apachejunctionaz.gov> Dear Ms. Schattnik, I am reaching out as I have heard of a proposed residential development being considered at the southeast corner of South Goldfield Road and Hwy 60. 1 would like to express my opposition to the development as planned. My husband and I specifically purchased our home in the Golden Vista Resort with our backyard on Goldfield Road so we can enjoy unencumbered views of the Superstition Mountains. To learn a development is being planned across the road from us with TWO STORY homes which will block our views is very disheartening. I strongly believe that any development being considered in this area should be limited to one story construction in line with the other homes in the area. The recently built Goldview subdivision (northwest corner of Hwy 60 and Goldfield Rd is all one story_. Golden Vista is all one story. Dolce Vita is all one story_. There is no reason two story buildings should be considered in this neighborhood, especially to the EAST of existing one story homes. With the construction currently underway of thousands of new homes in Apache Junction to the south of Baseline Rd, there is ample opportunity for two story homes in those newly developed areas which would not impact existing homeowners. I realize the planning board and developer do not care about my ability to enjoy my backyard views, but please understand this also would inevitably reduce the value of our home (and our neighbors) once our views are gone. I would also be interested to know what plans are being made to accommodate the additional traffic on Baseline and Goldfield roads created by all these new homes along with water needs for thousands of new residents. We are constantly being reminded of the limited water supply in this area and the need to conserve water which makes me wonder where the water for all these new residents is going to come from. If this plan is allowed to proceed, I ask that only one story buildings be allowed in the development to preserve the views of the thousands who already live here. Thank you for your time and consideration of my concern. Sincerely, Candace DeBroux 3710 S Goldfield Rd, Lot 482 Apache Junction, AZ https:Houtlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNSl hOWViLT11 ZGM3YjVhNzcOZQAQAH%2BXYdsR6HBDpnUsLWTQ7... 1/1 Kelsey Schattnik From: Sally Craiger <mscraiger@msn.com> Sent: Monday, March 27, 2023 2:52 PM To: Kelsey Schattnik Subject: [External] Broadstone Silveray, US 60 @ Goldfield Rd, AJ, AZ Good Monday, Kelsey! We have been year round residents of Golden Vista Resort, 3710 S Goldfield Rd, Lot 386, AJ, AZ for 10 years. Our primary concerns of the new development are water &traffic. All of AZ is still in major drought yet all we see is building & more building for more residents. Yes, the tax dollars are important but we all need water to survive. Can Goldfield Rd support the traffic of this large new development? What are AJ's plans for water resources &traffic issues with any new development? We see the signs have gone up, "New Homes Coming Soon;" is Broadstone Silveray a done deal? Superstition Vistas, almost building homes, will add hundreds of vehicles to US 60 @ Goldfield Rd. What's the plan for all of this new growth in AP Please add our concerns to the project case file. Thank you. Sally & Mike Craiger 480-869-4153 i Kelsey Schattnik From: Sharon Kinnan <golions78@gmail.com> Sent: Monday, October 23, 2023 4:S7 AM To: Greg Davis Cc: Kelsey Schattnik Subject: Re: [External) Silveray development plan on Goldfield Good morning Greg, Thanks for your response. Sharon On Sun, Oct 22, 2023, 11:54 PM Greg Davis <greg@iplanconsulting.com>wrote: Hello Sharon and thanks for reaching out to us about this proposal. No worries about missing the meeting—most of what we will present was in the letter and email is a great way to continue the conversation for any questions you have. Regarding water, the City of Apache Junction is the water provider and they have accounted for the water to be used for this property in their 100 year Certificate of Assured Water Supply (CAWS). In fact, our proposal will actually reduce the anticipated water (along with sewer and electrical) demand for this property as the site is currently approved for much more intensive uses. The project will be served by a combination of existing and new lines in Goldfield Road and Resort Boulevard. The City requires extensive modelling and testing to ensure existing residents do not see a drop in water pressure and if upgraded lines/equipment are needed to avoid that scenario, they will require us to install them prior to any residents moving into our project. Water is an important issue in much of Arizona and fortunately the City of Apache Junction has planned ahead for properties such as ours to ensure an adequate supply exists for everyone in the City. Regarding the potential height of the project, we were anticipating the concern over the loss of the views which is why we are limiting our development to 2-stories (30-feet)which is what is permitted on the parcels around our property and we are doing more than just voluntarily limiting the height...we are actually making it a written part of the zoning approval (via the PD overlay) which means that any development, whether it be us or a future project, will have to comply with the 30-foot proposed height limit UNLESS they decide to go through the rezoning process again which will require another complete public process including a new neighborhood meeting and new public hearings. It is certainly possible for some future developer to propose that, but I can tell you from experience it is always much harder politically to increase height allowances in a situation like this where you have existing neighbors who care about their view. We recognize that we will be impacting the view of the Superstitions from some parts of the community since nothing is there today to obscure it (besides the Chevron canopy), but we hope the 30-feet proposed is a fair compromise given it is approved for 45-feet today. Hopefully I have answered your initial inquiry adequately. If not, or if you have additional questions, please let me know. Than k5, Greg Davis 3/20/24,2:35 PM Mail-Kelsey Schattnik-Outlook RE: [External] Silveray development plan on Goldfield Greg Davis <greg@iplanconsulting.com> Sun 10/22/2023 8:54 PM To:Sharon Kinnan <go1ions78@gmai1.com> Cc:Kelsey Schattnik <kschattnik@apachejunctionaz.gov> Hello Sharon and thanks for reaching out to us about this proposal. No worries about missing the meeting...most of what we will present was in the letter and email is a great way to continue the conversation for any questions you have. Regarding water,the City of Apache Junction is the water provider and they have accounted for the water to be used for this property in their 100 year Certificate of Assured Water Supply(CAWS). In fact, our proposal will actually reduce the anticipated water(along with sewer and electrical) demand for this property as the site is currently approved for much more intensive uses. The project will be served by a combination of existing and new lines in Goldfield Road and Resort Boulevard. The City requires extensive modelling and testing to ensure existing residents do not see a drop in water pressure and if upgraded lines/equipment are needed to avoid that scenario,they will require us to install them prior to any residents moving into our project. Water is an important issue in much of Arizona and fortunately the City of Apache Junction has planned ahead for properties such as ours to ensure an adequate supply exists for everyone in the City. Regarding the potential height of the project, we were anticipating the concern over the loss of the views which is why we are limiting our development to 2-stories (30-feet) which is what is permitted on the parcels around our property and we are doing more than just voluntarily limiting the height...we are actually making it a written part of the zoning approval (via the PD overlay) which means that any development, whether it be us or a future project, will have to comply with the 30-foot proposed height limit UNLESS they decide to go through the rezoning process again which will require another complete public process including a new neighborhood meeting and new public hearings. It is certainly possible for some future developer to propose that, but I can tell you from experience it is always much harder politically to increase height allowances in a situation like this where you have existing neighbors who care about their view. We recognize that we will be impacting the view of the Superstitions from some parts of the community since nothing is there today to obscure it (besides the Chevron canopy), but we hope the 30-feet proposed is a fair compromise given it is approved for 45-feet today. Hopefully I have answered your initial inquiry adequately. If not, or if you have additional questions, please let me know. Thanks, Greg Davis 480.227.9850 Gre90ip1anc0n5u1ting.c0m From: Sharon Kinnan <golions78@gmail.com> Sent:Sunday, October 22, 2023 3:39 PM To: Greg Davis<greg@iplanconsulting.com> Cc: kschattnik@apachejunctionaz.gov Subject: Silveray development plan on Goldfield Dear Greg, Thank you for inviting residents the informational meeting at Golden Vista Oct. 24th. Unfortunately, I am unable to attend. However, I would like to ask a few questions and provide comments on some concerns that were not mentioned in your letter. https:Houtlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNSlhOWViLT11ZGM3YjVhNzcOZQAQAHf3Jxly6xBPiRnNuf\/ODXQ%3D 1/2 3/20/24,2:35 PM Mail-Kelsey Schattnik-Outlook The 1st and most important in this day is water. Where will it be coming from and how will this additional need affect existing residents' use? Second is the elevation. Your letter states that the plan is to VOLUNTARILY limit the height to 30 feet, but voluntarily does not limit what actually can happen and who knows how long it will be before a developer changes plans and chooses to go to 40 foot height. Part of the beauty of this area is the Superstition Mountains and it would be very disappointing to loose that view. I have copied Kelsey Schattnik in this email to be sure AJ Planning and Zoning is aware of my concerns. Sincerely, Sharon Kinnan Owner at Golden Vista RV Resort https:Houtlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNSlhOWViLT11ZGM3YjVhNzcOZQAQAHf3Jxly6xBPiRnNuf\/ODXQ%3D 2/2 3/20/24,2:35 PM Mail-Kelsey Schattnik-Outlook [External] Silvery Development Lanny Aderman <lraderman@yahoo.com> Thu 3/30/2023 8:10 PM To:Kelsey Schattnik <kschattnik@apachejunctionaz.gov> Hi Kelsey, I am writing you with hopes that the development planned for the southeast corner of US 60 and Goldfield Rd will be re-considered to limit homes to one story. I understand that 2 story homes are being planned for this development which will really restrict our view of Superstition Mountains. We live in the Golden Vista Resort across the street from the proposed development. Thank you for considering our request. Sincerely, Lanny Aderman Golden Vista resident. 3/30/23 Sent from Yahoo Mail for Pad https:Houtlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNSl hOWViLT11 ZGM3YjVhNzcOZQAQALg3ZzAoENFNjm3TeeD2mwM°/o... 1/1 Kelsey Schattnik From: Shelley Kaste <Ionscaligirl@yahoo.com> Sent: Saturday, March 25, 2023 3:19 PM To: Kelsey Schattnik Subject: [External] Broadstone Silveray Development Dear Kelsey Schattnik, My husband and I live in Golden Vista Resort. The reason we chose GV Resort is because it is on the outskirts of town and close to superstition mountains. We enjoy the closeness to trails, the quietness, less traffic and, of course, the Superstition mountains. We purchased our tiny home here knowing that we own the lot and trailer and only pay county taxes and an HOA fee. If a new development goes in across the street, with two story family homes,what does that mean for us here at Golden Vista Resort? It means more noise, less view, more traffic, more property tax and special assessments. I think that would also discourage others from purchasing here, so thus, bringing our resale values down as well. Please let me know if there will be a town hall meeting on the subject, we would like to attend, if we are here. Thank You, Shelley Kaste Golden Vista Resident 1 12/14/23,8:19 AM Re:(External]Proposed silveray project-Kelsey Schattnik-Outlook Re: [External] Proposed silveray project Kelsey Schattnik <kschattnik@apachejunctionaz.gov> Wed 11/8/2023 5:53 PM To:Sammy <sammygreen46@yahoo.com> Hi Sammy, Thank you for reaching out to the City of Apache Junction with your thoughts and concerns regarding the proposed Silvery Development near the southwest corner of the US-60 and Goldfield Road. I will add this email to the project case file and staff report, which will be passed along to the Planning and Zoning Commission and City Council. I will also ensure that you are on the list to be notified of the public hearings once those are scheduled. Please feel free to reach out with any additional questions or concerns! Best, Kelsey Kelsey Schattnik,LEER Green Associate Senior Planner I Development Services Department City of Apache]unction,AZ (480)474-5085 kschattnik@apachejunctionaz,gov Hours:Monday-Thursday 7am-6pm;closed on Fridays. From:Sammy<sammygreen46@yahoo.com> Sent:Wednesday, November 8, 2023 3:38 AM To: Kelsey Schattnik<kschattnik@apachejunctionaz.gov> Subject: [External] Proposed silveray project Kelsey,This area is made up of 55 and over parks and just west is single family https://urldefense.proofr)oint.com/v2/url?u=http: 3A residents.my&d=DwIFaO&c=euGZstcaTDllvimEN8b7jXrwgOf- v5A CdpgnVfiiMM&r=NspkbZGgee1jvU6eiddn-NET70 ) CwYvnS35KO5WN c&m=pQK.Na7JAu2 i 2qL- 9ig4UGsti- g4AE2710pr bjnfAOtimOycv9AFPMEsLOPNDb&s=BmL2NTVT66pdaAegVnoGh xKVuDozOSuNN5mgkwuD YM&e= thoughts are to much traffic and vandalism and theft if the proposed project of apartments move forth.) would like to see a nice 55 and over community or single family homes go in .Rental property I believe would devalue my property in Golden Vista Resort.lf it goes commercial with an hospital or restaurants the twenty four hour lights would be uncomfortable .It is inevitable to not have development but something with less hustle and bustle,perhaps a single level strip mall.l'm familiar with owning rental property and managing property and I don't like what it would become.) don't think Apache Jct has a police dept to to handle a big rental property like this and then there is fire protection and water.You have old people out here that like their life style and it would be a big disruption and life style change.) would like to be on the mailing list for further public meetings on this.Sammy Green,3710 about:blank 1/2 4/24/24,9:26 AM Mail-Kelsey Schattnik-Outlook [External] Correspondence to Commission et al Michael David Myers <stainedglasspoetry@live.com> Tue 4/16/2024 5:23 PM ToXelsey Schattnik <kschattnik@apachejunctionaz.gov> April 16, 2024 Dear Mr. Jesse Gage, Ms. Robin Barker, Mr. AN Kalan, Ms. Sheryl Bigelow, Mr. Richard Cantwell, Mr. Dirk Begeman, Mr. Nick Leftwich, and Ms. Kelsey Schattnik, In Mr. Tom Lange's April 15, letter he notes the 2023 - 2024 donations that full time and part time Golden Vista residents donated to Apache Junction agencies and groups. In 2022, while I was President of the Stained Glass Club in Golden Vista, I donated handmade stained glass earrings and suncatchers to Arizona Coalition to End Sexual and Domestic Violence. The sale of these items raised $700 which provided direct service to victims and survivors of sexual and domestic violence. Each year I make stained glass service stars and donate these to Veterans, spouses of Veterans, First Responders, and personnel serving Police and Fire Departments. In addition, one resident in Golden Vista, Mr. Dennis Douglas, spends most of his time in Golden Vista's Workshop making small cars, trailers, and firetrucks from scraps of wood. For the past ten years, Mr. Douglas has sold these at the Annual March Artisan show in Golden Vista. He donates all the money generated to the Paws and Claws Care Center on Baseline. The other groups that Mr. Lange referred to in his letter have made donations every year. Since 2014, these donations total over $100,000. Mr. Leftwich's April 9th letter to the Commission states: "As new developments or rezonings are proposed, Planning Staff, the Planning and Zoning Commission, and the City Council must evaluate the highest and best use of commercial properties..." After the April 9 meeting, Mr. Lange gave Mr. Leftwich his drawing of the proposed commercial development on 8 acres. Mr. Lange's letter provides detailed information regarding his vision of the "Goldfield Gulch" development. Please consider that Mr. Lange's vision within those 8 acres IS the highest and best use of that property zoned commercial. When a developer is found, Mr. Lange's commercial vision will be a destination for some and a welcome addition for residents nearby, and all future residents. Tax dollars will be generated for Apache Junction. Please follow the recommendation of Mr. Patrick Roberts, Senior Planner, Pinal County Development Services who stated in his October 17, 2023, letter to Ms. Schattnik, in NOT supporting Silveray: "Pinal County staff would not offer our support (of the proposed Silveray development). Staff finds the request to convert the 18-acre subject site may detract from prime commercial parcels South of US-60. The location of these parcels having access to an arterial roadway and a major highway offer potential for higher levels of traffic consistent with retail requirements and exceeding the trip generation typical of a https://outlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNSl hOWViLTIlZGM3YjVhNzcOZQAQAD%2B%2Fnn%2BPTIZHunhXyj... 1/2 4/24/24,9:26 AM Mail-Kelsey Schattnik-Outlook multi-family development. The presence of such roadways may encourage the market area of potential commercial opportunities to support communities that are more distant and may attract revenue to Apache Junction. Proximity of existing residential uses to the site promotes a pedestrian scaled commercial development that may support existing residential development on both the West and East sides of the proposed development. Such commercial parcels would also support expansion of additional multi-family projects to the South, which are supported at present by the Pinal County Comprehensive Plan. Development of this multi-family project to the south of the General Commercial land-use designated parcels would be consistent with the High Density Residential land-use designation present within the Pinal County Comprehensive Plan. Staff would be amicable toward multi-family development south of the proposal area provided commercial designations remain that would support residential growth:' If you choose to change zoning to all or part of the 18 acres to high density resident, kindly consider keeping 8 acres zoned commercial and only support a one story owner based residential development for the remaining 10 acres. I hope each Commissioner will be influenced by the comments and concerns voiced by residents of Golden Vista. Golden Vista contains over 1000 tax paying homeowners in Apache Junction who will be negatively impacted by the proposed Silveray development. Although we have a vested interests in recommending that you do not support the Silveray development, we also believe such action will be the highest and best use of the property, and therefore better for all who live, visit, and will live in Apache Junction in the future. Before your next meeting, please walk along the sidewalk along Goldfield Road outside Golden Vista, then along the Dolce Vita entrance between the two parcels. With that in mind, please recommend to the City Council not to approve the Silveray development. Sincerely, Michael D Myers 3710 S. Goldfield Road #852 Apache Junction AZ 85119 https://outlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNS1 hOWViLTl1 ZGM3YjVhNzcOZQAQAD%2B%2Fnn%2BPTIZHunhXyj... 2/2 April 15, 2024 Kelsey Schattnik Senior Planner, Development Services City of Apache Junction 300 E Superstition Blvd Apache Junction, AZ 85119 RE: SILVERAY PROJECT Dear Ms Schattnik: This letter to you and the Zoning & Planning Commission will serve to update you with a couple followup points re the proposed SILVERAY development project on Goldfield Rd since my earlier letters of February 4 and March 19, 2024 which contained - 170 signatures of Golden Vista Resort residents opposed to the development as proposed. While we are now resigned to the fact that the beautiful pristine parcel of undeveloped land across Goldfield Rd from our resort will not be preserved for a City of Apache Junction Park, we are still hopeful that your imminent zoning change of this parcel can be limited to 1-Story residential as opposed to the 2-Story residential proposed by the SILVERAY developers. We implore both you and the Zoning & Planning Commissioners to please keep in mind that this - 18 arce parcel is surrounded on 3 sides by 1- Story owner-occupied (for the most part) over-55 residences. Our Golden Vista Resort (GVR) has a 20' height restriction placed on homes by the City of Apache Junction. So it begs the question, why should the City now approve a zoning of 30' high 2- Story rental ( ! ) homes directly across Goldfield Rd from us which would significantly block our views of the Superstition Mountains? ! Also, the 270 ( ! ) count high density of these proposed rental homes, along with more than a planned combined total of 500+ parking spaces alloted between garages, carports and open-air spaces, significantly would add to the local traffic on Goldfield Rd which already experiences bumper-to-bumper backed up traffice on Renaissance Festival weekends in February & March by those attempting to bypass the backed up traffice on Hwy 60. A single- story residential development would, of course, necessitate a larger footprint for each building thereby reducing the number of residences and hence, the traffic. Single-story residences, whether owner-occupied or rental like the "Havenly Upscale Rental" single story residences currently being built near City Hall, would attract more over-55 residents which would be more in keeping with the current makeup of the surrounding neighborhoods. 1 Owner-occupied vs rental residences should also be considered for this vacant parcel already surrounded by owner-occupied homes. It is no secret that owners generally take more pride in the appearances of their residences over the long term than do renters. Also, homeowners take more civic pride in their communities as a whole. Just look at the attached list of donations our GVR CHRISTIAN WOMEN'S ASSOCIATION has made to Apache Junction and other nearby areas in 2024 alone ! Nearly $9, 000 of the total money raised ($11, 342) from three resort patio sales and weekly can collections was donated to outside causes ! Only $2, 500 of the money raised was kept for causes within our own resort. Furthermore, all donated items not sold during the 3 four-hour patio sales were donated to Sunshine Acres Thrift Shop for their help in housing & supporting children and teens from problem homes. Additionally the GVR VETERAN'S CLUB donated $6, 000 out of $10, 000 raised thru their weekly resort breakfasts to area veteran groups ! Both the Arizona Honor Flight Veteran's group as well as the Pinal County Veteran's Center in Casa Grande received $3, 000 each from the GVR Veteran's Club. The GVR Chapel Services donates $2, 000 annually to a needy area student as scholarship $ to attend a local technical college; GVR Angel Tree Group collects up to $5, 000 annually for kids at Christmastime, these funds are sent to City of Apache Junction who then disperses the funds in part to the Fire & Police depts, ' PAWS' & for school kid' s snacks . The GVR Rattler's Musical Group donates $1, 000 annually to Apache Junction high schools for their music programs. Also over 650# ' s of food was donated by GVR residents to the Apache Junction Food Bank. Now, ask yourselves: Would the proposed rental community be as civic-minded and generous? ! Finally, the issue of possibly zoning some of this 18-acre parcel for commercial/retail is a reoccuring topic with Zoning & Planning for both continued tax base income to the City as well as area employment opportunities. The current developers cite 'lack of rooftops' , ie, lack of enough nearby bodies/customers for commercial & retail enterprises having little or no interest in this land. Perhaps the developers are only considering 'Big Box Stores ' and like commercial enterprises? Please consider the following vision for what could be an exciting retail corridor development for either the current or other developers: Zone the entire approximately 8-acre parcel of land running parallel to and south of Hwy 60 as "A Planned Condominium RETAIL Hub" with a Western-like 1880' s Old Town Theme ! With the - 1 , 100 GVR homes already in place plus the Dolce Vitae Resort and the new residential on the other 10 acres of the parcel in question fronting Goldfield Rd and Resort Blvd plus the new developments going up south of Baseline, even only 2 the year-round local residents of the immediate area and the additional potential customers from surrounding communities generated by the high visibility of this parcel from Hwy 60 should assure year-round customers enough to keep this kind of retail development lucrative'. So many of us year-round residents would like a nearby "destination cluster" of retail establishments that we could walk to, bicycle to, scooter to, etc; places like the following could be successful in a themed Western Old Town such as this . . . maybe 3 'blocks ' long with wide covered & railinged walkways along the store fronts; the buildings would have manufactured 'weathered wood' storefronts including the false old western upper building facades of varied designs. These would be outlined in various colors of neon to attract motorists along Hwy 60. The walkways and building fronts would be lighted by old- style western & pedestrian friendly lantern lights. There would be parking both along the fronts of these 'Old Town' blocks as well as ample parking behind, accessible by two drive-thru 'streets ' dividing the 3-blocks of establishments. An 'architectural' & business 'approval' board/committee would initially approve businesses for this retail/restaurant/commercial corridor in keeping with the 1880' s western theme, ie, no cellphone, fast food chain stores, etc, would be allowed to buy into the condo-commercial developement unless they could prove they would embrace the Old West theme for their building & enterprise. After sufficient businesses have opened here the developers would relinquist their architectural/approval functions to a self-governing board of existing business condo owners. Just consider the possibilities ! ! This "GOLDFIELD GULCH" could have a central Saloon similar to the old western TV show "Gunsmoke", The Longbranch possibly with a Beer Garden on one side and a restaurant on the other; a coffee shop & bakery would open at 6 or lam to attract people out for a morning walk or a stop before work; a barber shop with lighted red & while pole of course, a hair & nail Salon, an Old Time Ice Cream shop; both a General (Grocery) Store and a Mercantile (Hardware) Store . . . both of these stores would offer more selection than a typical convenience store, but less than the 'Big Box' concerns miles away, tho they could be satellites of those parent stores; a Boot Hill Western Wear; souveniers & jewelry; a Liquor/Beer & Wine shop with drive-thru; even a bank or S&L with drive thru; (each of the two preceding stores would be located on the ends of the two streets that would pass between the 3 blocks of shops for drive-thru convenience. Perhaps the local Police dept might even fund a satellite "Sheriff' s Office" & locate it on the corner opposite the drive-thru liquor store and close to the Saloon, visibility of which alone might help to ' keep the peace' . The police would not need regular hours, they would use the office on a come & go irregular day & night basis as a place to use a 3 personal staff restroom, write up reports, eat their lunches, even have a short nap in the single jail cell equiped with a single cot as long as a partner is also there for immediate response calls. A "Doc' s Urgent Care" would fit right in; as would a Stage Coach Depot Cafe/Deli.; an antique or consignment shop would be ideal; a florist; a dry cleaner/tailor/laundry; an "Immigrant's Pizza Parlor. " All fun and convenient shops & stores for us local residents and for tourists in the winter season. The development might be anchored on either side by a smaller but old-style elegant 'Orpheum'Theatre showing low-royalty-cost older movies, even time honored B&W's, both of which would keep ticket costs lower for all those over-55' s who miss going to a good movie close by, mattinees included on hot afternoons and evenings without the hassels of modern day purchasing of tickets online, & also catering to those who resist trying to watch DVD' s at home due to the hassels of trying to get their TV' s back to TV mode. The opposite side of GOLDFIELD GULCH might sport a bowling alley or a roller rink/arcade (also to give area teens a place to go) ; even an Ice Rink! (The #1, #2, #3 population groups of GVR alone are Minnesotans, Wisconsinites & Canadians respectively! ) Each of the 3-block stretches of the establishments could have a central public "Outhouse Alley", known as 'Central, East & West Allies' as well as some restrooms within various establishments. Though different shops would have different opening and closing times as chosen by individual owners, the entire GOLDFIELD GULCH would close down at llpm leaving only a few parking lot/street/walkway lights for security. GOLDFIELD GULCH. "Build it and they will come ! " Both retailers and customers ! Very ncerely, Thomas F Lange 3710 S Goldfield Rd, #489 Apache Junction, AZ 85119 72 19 I n G W W w W W W W W W W W W N H N \ \ 1 W O N tV N N N N N N IQ N N H -- H F-a Ul U7 to to Ln to cn Ln N Ui Ln w A u, 00 N A N N N N N N N N N N N N N N N G O O O O O O O O O O O O O O O N N N N N N N N N N N N N N r1i D 3 A A A A A A A A A A A p A A A z 7 O H I-A H H W W W W W W W W W f.J N N N H N m w V m (n A W Ni w O lD w W N CO N Z N O o :D (D o n o a a Q1 M M o 0 � M -n M m a (D p 0 L_^ C1' 0 0 D vi rN-r 7 3 0 N C c « m O O O c z G G Z ? o o c� q o 3 `° o `° D _ n T 0) v v N n o ^ = 3 O c ro °' � m o O Z o s o o n = U, < N � (D rt rDD � fD � N w .� rm o 3 d ID 0- �•• LL 7 m �• �1 N O a N W W 7 to r to to to to to to to to !� vs. to W In to O Ln Ul O O Ln d W In O O N In A O O O O O O O O O O O O O "1 01 N O O O O O O O O O O O O O V U1 O O O O O O O O O O O O O O d d O O O O O O O O O O O O O O O O Ln A A Pb A A L7 A A A UI A NJ 00 OD 00 00 00 O 00 00 00 N 00 O O O O O O N O O O O O N N (D lO N N V l0 A l0 N A O N w m 00 00 w C) W 00 O W DO U1 N N 00 00 In T 00 W 00 00 W V A Oo N N O A N N W N W V A tJ to lO LO O w lO w 00 N U'I A al U1 Ln lO N In LD N In W V O O U1 Ul to A N In W NJ w -D Ul w w w w 00 � U1 w -V O UI O U7 UI A 00 O Ul d O m OW �' m m O m CD m U3 -n x Z N ton m C 0 -n0 D O zr Q N O N n 0) �' fD < W D Z3 Z3 _ _0 - < Q v � m O O < ro w Ow O- v o0i c t�i Cl- N D D D (D �• 4 N N n D D 0 M m ai v co G O D c w a n w N = N wn � n n o M �, o _� n mr = x D Q D o 1 m m D N oo O a o0 tD N = O N Oo 7 c° 7 C C 00 Ln n D N N N D rt _� O oW j D O O rn D 00 :3 : N City of Apache Junction, Arizona 300 E Superstition Boulevard U z Agenda Item Cover Sheet Apache Junction,AZ 85119 ` Agenda Item No.2. '+PizoN►' File ID: 24-345 Sponsor: Jamie Sullivan Agenda Date: 5/6/2024 Index: In Control: City Council Work Session Presentation and discussion on the second amendment to the professional services agreement between the City of Apache Junction and Central Arizona Council on Developmental Disabilities for senior transportation services. City of Apache Junction,Arizona Page 1 Printed on 5/2/2024 O�PP ACHE✓G�� ityoZ ache unction C � .wJ. gPIZW4 Home of the Superstition Mountains Memorandum To: Honorable Mayor and Members of City Council Memorandum Through: Liz Langenbach,Parks and Recreation Director Bryant Powell,City Manager Memorandum From: Jamie Sullivan,Recreation Superintendent Date: April 22"d 2024 Subject: Professional Service Agreement for Senior Transportation On August l't 2017, The City of Apache Junction entered into an agreement with Central Arizona Council On Developmental Disabilities("CACDD")to provide transportation services to our senior and disabled populations. Transportation services included:transportation to and from the MGC for weekday lunch,medical and shopping trips. The first amendment was created in 2022, extending the contract and adjusting pricing. This is the second amendment to the agreement. This program is funded through Pinal Gila Council for Seniors Citizens ("PGCSC"),the general fund, grants and participant donations. The notable changes in the amendment to the agreement are: • moving to a flat daily rate for group MGC transportation instead of a per person fee • moving to a flat daily rate for additional group trips instead of per person and mileage. • increasing individual medical/shopping trips from$6 per mile to $8 mile. These changes are within our total budgeted costs for senior services. Staff feel this is a fair adjustment resulting from market conditions. This is a great program providing various transportation options to the senior community. The partnership with CACDD has been very successful and staff recommend this contract for council's approval. 300 E.Superstition Blvd.•APACHE JUNCTION,AZ 85219•www.ajcitv.net •PHONE(480)983-2181•FAX(480)982-2438•TDD(480)983-0095 SECOND AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT BETWEEN CITY OF APACHE JUNCTION AND CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES THIS SECOND AMENDMENT is made and entered into this day of , 2024, ("the Execution Date") by and between CITY OF APACHE JUNCTION, ARIZONA, an Arizona municipal corporation ("City"), and CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES, a 501(c)(3) not-for- profit corporation ("Contractor"), sometimes each collectively referred to as the "Parties" or individually as the "Party". RECITALS A. The Parties entered into an agreement for senior transportation services (the "Agreement") on August 28, 2017 for one year, and then with automatic four (4) one-year renewals, had a final contract end date of June 30, 2022. B. The Parties entered into a First Amendment beginning on July 1, 2022, ending on June 30, 2028 with one-year automatic renewal options being exercised. C. Since 2023, fuel and other inflationary operational expenses increased significantly which the Parties agree need adjustment. D. Formal procurement for the services provided under this Agreement are categorically exempted under A.J.C.C., Vol. I, Art. 3-7. E. This Second Amendment sets forth the above-noted terms. AGREEMENT NOW, THEREFORE, in consideration of mutual promises contained herein and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the Parties agree to amend the Agreement as follows: Section 2. PRICES. Prices shall be governed under attached Exhibit A "Transportation Costs", for general cost of services, senior transportation costs (home to multi-generational center) and additional medical/shopping trips. Section 3. CONTRACT TERMS. This agreement shall be effective beginning on July 1, 2024 and shall remain in full force and effect through June 30, 2025, with five (5) additional one-year renewal periods with the final end date of June 30, 2028, subject to the early termination option in Section 16, Termination of Contract (90 day written notice of intent to terminate). Except as expressly amended herein, all other terms and provisions of the Agreement shall remain in full force and effect until the Agreement is terminated. IN WITNESS WHEREOF, the Parties have caused this Amendment to be signed by their duly authorized representatives as of the day and year first above written. CONTRACTOR: CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES, a 501(c)(3) not-for-profit corporation By: Its: CITY: CITY OF APACHE JUNCTION, ARIZONA, an Arizona municipal corporation By: Walter "Chip" Wilson Its: Mayor ATTEST: Jennifer Pena City Clerk APPROVED AS TO FORM: R. Joel Stern City Attorney 2 EXHIBIT A TRANSPORTATION COSTS 1. TOTAL COST OF SERVICES: In accordance with the terms and conditions of this Agreement, City shall compensate Contractor for the senior transportation services in an amount not to exceed $ 70,000 per year. This total is reliant on receiving all anticipated gift and grant funds and program revenue to supplement the City's expenses. 2. SENIOR TRANSPORTATION COST (HOME TO MGC): Senior transportation from client's home to and from the Multi-Generational Center ("MGC") shall be charged at a flat rate of$240 per day, for up to 18 clients. The route shall be coordinated by the Parties and shall run Monday through Friday for all days the senior's congregate meal program operates. Special routes requested to run Saturday or Sunday will be charged at a flat rate of$320 per day, for up to 18 clients. 3. SENIOR TRANSPORTATION COST (Group shopping, food boxes, or other extended days): Will be charged at an additional $80 per day (Monday through Friday), for up to 18 clients. 4. SENIOR TRANSPORTATION COST (Additional): Senior transportation for clients (1 to 2 clients) from their home and from medical or individual shopping trips shall be charged at a rate of $8.00 per mile and $25.00 per hour rounded to the next'/4 hour) for each trip. Trips shall be scheduled on a case-by-case basis with the contractor only as funds are available. AGREEMENT FOR SENIOR TRANSPORTATION SERVICES BETWEEN CITY OF APACHE JUNCTION AND CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES PROJECT NO. PR-17-03 THIS AGREEMENT made and entered into by and between the CITY OF APACHE JUNCTION ("City"), an Arizona municipal corporation, and Central Arizona Council on Developmental Disabilities ("Contractor"), both whom shall collectively be referred to as the "Parties", or individually as a "Party". RECITALS A. Contractor has responded to City's request for proposal via RFP No. PR-17-03, in which Contractor asserts its willingness, ability and qualifications to provide this work and service (the "Work"). B. City and Contractor desire to set forth herein their respective responsibilities and the manner and terms upon which Contractor shall render the services. C. City has complied with the public bidding requirements under Arizona Revised Statute Title 34 and Apache Junction City Code, Volume 1, Chapter 3: Administration, Article 3-7, Procurement Procedure. AGREEMENT NOW, THEREFORE, City retains Contractor to perform, and Contractor agrees to render the services in accordance with the terms and conditions set forth as follows: 1. PROJECT DESCRIPTION: Contractor shall do and perform or cause to be done and performed in a good workmanlike manner, the Work in accordance with the contract documents as fully described in the Notice Inviting Bid Proposals for Project No. PR-17-03, as well as Contractor's response, both of which include all required specifications, a copy of which are on file with the City's Parks and Recreation Department. 2. PRICES: Prices shall be governed under attached Exhibit A "Transportation Costs", the Contractor's response to Project No. PR-17-03 for performance of the Work. 3. CONTRACT TERM: The Initial Term of this agreement shall be fromA,2017 to June 30, 2018. Thereafter, this agreement shall automatically be renewed for fdVr adiditional one-year(1) periods with the final end date of June 30, 2022. The City reserves the right to unilaterally extend any of the one-year(1) periods by thirty-one (31) days. 4. LABOR AND MATERIALS: Unless otherwise provided in the contract documents, Contractor shall provide, pay and insure under the requisite laws and regulations for all labor, transportation, and other related services necessary for the proper execution and completion of the Work whether temporary or permanent, and whether or not incorporated or to be incorporated in the Work. 5. TAXES: Contractor shall pay all license, sales, consumer, use and other similar taxes 1 for the Work or portions thereof provided by contractor which are legally enacted at the time bids are received whether or not yet effective or subsequently applicable due to acts of jurisdictions or bodies other than City. Further, Contractor agrees to pay all applicable privilege and use taxes that are applicable to the Work under the Agreement. 6. PERMITS & FEES: Unless otherwise provided in the contract documents, Contractor shall secure and pay for all permits, governmental fees, licenses and inspections necessary for the proper execution and completion of Work which are customarily secured after execution of the contract and which are legally required. Contractor shall give all notices and comply with all laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the Work. Contractor represents and warrants that any license necessary to perform the Work under this Agreement is current and valid. Contractor understands that the activity described herein constitutes "doing business in the City of Apache Junction" and Contractor agrees to obtain a business license pursuant to Article 8-2 of the Apache Junction City Code, Vol. I, and keep such license current during the term of this Agreement. Contractor also acknowledges that the tax provision of the Apache Junction Tax Code, Chapter 8A, may also apply and if so, shall obtain a privilege license. Any activity by subcontractors within the corporate city limits will invoke the same business and privilege license regulations on any subcontractors, and Contractor ensures its subcontractors will obtain any required licenses. If there are taxable activities, a business license shall be converted to a privilege license by the Contractor and any subcontractors through the City Clerk's Office. 7. INDEPENDENT CONTRACTOR: Contractor shall at all times during Contractor's performance of the services retain Contractor's status as an independent Contractor. Contractor's employees shall under no circumstances be considered or held to be employees or agents of City, and City shall have no obligation to pay or withhold state or federal taxes, or provide workers compensation or unemployment insurance for or on behalf of them or Contractor. Contractor shall supervise and direct the delivery of the materials using its best skill and attention. Except as provided in this Agreement, Contractor shall be solely responsible for all means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work required by the contract documents. Contractor shall be responsibie to City for the acts and omissions of its employees. 8. INDEMNIFICATION: To the fullest extent permitted by law, Contractor shall defend, indemnify and hold harmless City, its elected officials, agents, and employees from and against any and all liability including but not limited to demands, claims, actions, fees, costs and expenses, including attorney and expert witness fees, arising from or connected with or alleged to have arisen from or connected with, relating to, arising out of, or alleged to have resulted from the acts, errors, mistakes, omissions, Work of Contractor, its agents, employees, or any tier of Contractor's subcontractors in the performance of this Agreement. Contractor's duty to defend, hold harmless and indemnify City, elected officials, appointees, agents, and employees shall arise in connection with any tortious claim, damage, loss or expense that is attributable to bodily injury, sickness, disease, death, or injury to, impairment, or destruction of property including loss of use resulting therefrom, caused by an Contractor's acts, errors, mistakes, omissions, or Work in the performance of this Agreement including any employee of Contractor, any tier of Contractor's subcontractor or any other person for whose acts, errors, mistakes, omissions, Contractor may be legally liable. 9. ENFORCED DELAYS (FORCE MAJEURE): Neither City nor Contractor, as the case may be, shall be considered not to have performed its obligations under this Agreement in the 2 event of enforced delay(an "Enforced Delay") due to causes beyond its control and without its fault or negligence or failure to comply with Applicable Laws, including, but not restricted to, acts of God, fires, floods, epidemics, pandemics, quarantine, restrictions, embargoes, labor disputes, and unusually severe weather or the delays of subcontractors or materialmen due to such causes, acts of a public enemy, war, terrorism or act of tenor(including but not limited to bio- terrorism or eco-terrorism), nuclear radiation, blockade, insurrection, riot, labor strike or interruption, extortion, sabotage, or similar occurrence or any exercise of the power of eminent domain of any governmental body on behalf of any public entity, or a declaration of moratorium or similar hiatus (whether permanent or temporary) by any public entity directly affecting the Work. In no event will Enforced Delay include any delay resulting from unavailability for any reason of labor shortages, or the unavailability for any reason of particular consultants, subcontractors, vendors or investors desired by Contractor in connection with the Work. Contractor agrees that Contractor alone will bear all risks of delay which are not Enforced Delay. In the event of the occurrence of any such Enforced Delay, the time or times for performance of the obligations of the Party claiming delay shall be extended for a period of the Enforced Delay; provided, however, that the Party seeking the benefit of the provisions of this Section shall, within thirty(30) calendar days after such Party knows or should know of any such Enforced Delay, first notify the other Party of the specific delay in writing and claim the right to an extension for the period of the Enforced Delay; and provided further that in no event shall a period of Enforced Delay exceed ninety (90) calendar days. 10. GOVERNING LAW AND VENUE: The terms and conditions of this Agreement shall be governed by and interpreted in accordance with the laws of the State of Arizona. Any action at law or in equity brought by either Party for the purpose of enforcing a right or rights provided for in this Agreement, shall be tried in a court of competent jurisdiction in Pinal County, State of Arizona. The Parties hereby waive all provisions of law providing for a change of venue in such proceeding to any other county. In the event either Party shall bring suit to enforce any term of this Agreement or to recover any damages for and on account of the breach of any term or condition in this Agreement, it is mutually agreed that the prevailing party in such action shall recover all costs including: all litigation and appeal expenses, collection expenses, reasonable attorneys' fees, necessary witness fees and court costs to be determined by the court in such action. 11. INSURANCE: Contractor, at its own expense, shall purchase and maintain the minimum insurance and other additional requirements set forth herein. All insurance required herein shall be maintained in full force and effect until all Work or service required to be performed under the terms of the Agreement is satisfactorily completed and formally accepted; failure to do so may, at the sole discretion of the City constitute a material breach of this Agreement. Contractor's insurance shall be primary insurance as respect to City, and any insurance or self- insurance maintained by City shall not contribute to it. Any failure to comply with the claim reporting provisions of the insurance policies or any breach of an insurance policy warranty shall not affect coverage afforded under the insurance policies to protect City. The insurance policies, except Workers Compensation, shall contain waiver of transfer rights of recovery (subrogation) against City, its agents, officers, officials and employees for any claims arising out of Contractor's acts, errors, mistakes, omissions, Work or services. 3 The insurance policies may provide coverage which contains deductibles or self-insured retentions. Such deductible and/or self-insured retentions shall not be applicable with respect to the coverage provided to City under such policies. Contractor shall be solely responsible for the deductible and/or self-insured retention and City, at its option, may require Contractor to secure payment of such deductibles or self-insured retentions by a Surety Bond or an irrevocable and unconditional letter of credit. City reserves the right to request and to receive within ten (10) working days, certified copies of any or all of the herein required insurance policies and/or endorsements. City shall not be obligated, however, to review same or to advise Contractor of any deficiencies in such policies and endorsements, and such receipt shall not relieve Contractor from, or be deemed a waiver of City's right to insist on strict fulfillment of Contractor's obligations under this Agreement. The insurance policies, except Workers Compensation, required by this Agreement, shall name City, its agent, officers, officials and employees as additional insured parties. REQUIRED COVERAGE Commercial General Liability Contractor shall maintain Commercial General Liability insurance with a limit of not less than $1,000,000 for each occurrence with a $2,000,000 Products/Completed Operations Aggregate and a $2,000,000 General Aggregate Limit. The policy shall include coverage for bodily injury, broad form property damage, personal injury, products and completed operations and blanket contractual coverage including, but not limited to, the liability assumed under the indemnification provisions of this Agreement which coverage will be at least as broad as Insurance Service Office, Inc. Policy Form CG 00011-93 or any replacement thereof. In addition, automobile liability coverage of at least $1 million per occurrence or a combined single limit of at least $1,000,000 is required. The auto liability policy should contain endorsements for hired autos, non-owned autos and scheduled vehicles, as applicable to the Contractor's business. Such policy shall contain a severability of interest provision, and shall not contain a sunset provision or commutation clause, nor any provision which would serve to limit third party action over claims. The Commercial General Liability additional insured endorsement shall be at least as broad as the Insurance Service Office Inc.'s Additional Insured, Form CG 20101185, and shall include coverage for Contractor's operations and products and completed operations. If required by this Agreement, if Contractor sublets any part of the Work, services or operations, Contractor shall purchase and maintain, at all times during prosecution of the Work, services or operations under this Agreement, City and Contractor's Protective Liability insurance policy for bodily injury and property damage, including death, which may arise in the prosecution of the Contractor's Work or operations under this Contract. Coverage shall be on an occurrence basis with a limit not less than $1,000,000 per occurrence, and the policy shall be issued by the same insurance company that issues Contractor's General Liability insurance. Workers Compensation Contractor shall carry Workers Compensation insurance to cover obligations imposed by federal 4 and state statutes having jurisdiction of Contractor's employees engaged in the performance of the Work; and Employer's Liability insurance of not less than $100,000 for each accident, $100,000 disease for each employee, and $500,000 disease policy limit. In case any Work is subcontracted, Contractor will require subcontractor to provide Workers Compensation and Employer's Liability to at least the same extent as required of Contractor. Umbrella Policy Contractor shall carry an umbrella policy with a limit not less than $5,000,000. The umbrella policy shall cover claims that are uncovered by the primary policy and claims in excess of the primary policy. The umbrella insurance policy shall cover those claims as primary insurance and fill in the gaps in the underlying policies. CERTIFICATE OF INSURANCE Prior to commencing Work under this Agreement, Contractor shall furnish the City with Certificates of Insurance, or formal endorsements as required by Agreement, issued by Contractor's insurer(s), as evidence that policies providing the required coverages, conditions and limits required by this Agreement are in full force and effect. In the event any insurance policies required by this Agreement are written on a "claims made" basis, coverage shall extend for two (2) years past completion and acceptance of the Contractor's Work or services and as evidenced by annual Certificates of Insurance, to be filed with the City Attorney of City. If a policy does expire during the life of the Agreement, a renewal certificate must be sent to City thirty(30) days prior to the expiration date. All Certificates of Insurance shall be identified with Bid serial number and title. Insurance required herein shall not expire, be canceled, or materially changed without thirty(30) days' prior written notice to City. 12. SUCCESSORS &ASSIGNS: Neither party to this agreement shall assign the obligations hereunder, nor shall the Contractor assign any monies due or to become due. 13. WRITTEN NOTICE: Written notice shall be deemed to have been duly served if delivered in person to the individual or member of the firm or entity, or to an office of the corporation for whom it was intended or if delivered at or sent registered or certified mail, return receipt requested, and first class postage prepaid to the last business address known to them who gives the notice. 14. SAFETY: Contractor and/or its subcontractors shall be solely responsible for job safety at all times. 15. RIGHTS & REMEDIES: The duties and obligations imposed by the contract documents and the rights and remedies available hereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. No action or failure to act by City or Contractor shall constitute a waiver of any right or duty afforded any of them under the contract, nor shall any action or failure to act constitute an approval of or an 5 acquiescence to any breaches hereunder except as may be specifically agreed to in writing. 16. TERMINATION OF CONTRACT: If, for any reason, the Contractor shall fail to fulfill in a timely and proper manner it's obligations under the contract, or if the Contractor shall violate any of the covenants, agreements, or stipulations of the contract, the City shall thereupon have the right to terminate the contract by giving written notice to the Contractor of such termination and specifying the effective date thereof. Notwithstanding the above, the Contractor shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of the contract by the Contractor. The Parties may terminate the contract at any time by giving at least ninety(90) calendar days Notice of Intent to Terminate. If the contract is terminated by the City as provided herein, the Contractor will be paid for the time expended and expenses incurred up to the termination date. 17. APPEALS: All contractual grievances shall be submitted in writing to the City Manager within five (5) calendar days after the difference of opinion or grievance occurs relating to any of the provisions of the terms of this Agreement. Within five (5) calendar days of receiving a written grievance, the City Manager shall respond in writing. The City Manager's decision shall be final and binding, subject only to a further appeal in the Pinal County Superior Court pursuant to A.R.S. § 12-901, of seq. 18. RECORDS: Records of Contractor's labor, payroll and other costs pertaining to this Agreement shall be kept on a generally recognized accounting basis and made available to City for inspection on request. Contractor shall maintain records for a period of at least three (3) years after termination of this Agreement, and shall make such records available during that retention period for examination or audit by City personnel during regular business hours. 19. AMENDMENT: It is mutually understood and agreed that no alteration or variation of the terms and conditions of this Agreement shall be valid unless made in writing and signed by the parties hereto, and that oral understandings or agreements not incorporated herein shall not be binding on the parties. 20. SEVERABILITY: City and Contractor each believe that the execution, delivery and performance of this Agreement are in compliance with all applicable laws. However, in the unlikely event that any provision of this Agreement is declared void or unenforceable (or is construed as requiring City to do any act in violation of any applicable laws, including any constitutional provision, law, regulation, or city code), such provision shall be deemed severed from this Agreement and this Agreement shall otherwise remain in full force and effect; provided that this Agreement shall retroactively be deemed reformed to the extent reasonably possible in such a manner so that the reformed agreement(and any .related agreements effective as of the same date) provide essentially the same rights and benefits (economic and otherwise) to the Parties as if such severance and reformation were not required. Unless prohibited by applicable laws, the Parties further shall perform all acts and execute, acknowledge and/or deliver all amendments, instruments and consents necessary to accomplish and to give effect to the purposes of this Agreement, as reformed. 21. CONFLICT OF INTEREST: This Agreement is subject to, and may be terminated by City in accordance with, the provisions of A.R.S. § 38-511. 22. TIME IS OF THE ESSENCE: Time is of the essence with respect to all provisions in this 6 Agreement. Any delay in performance by either Party shall constitute a material breach of this Agreement. 23. PROHIBITION TO CONTRACT WITH CONTRACTORS WHO ENGAGE IN BOYCOTT OF THE STATE OF ISRAEL: The Parties acknowledge A.R.S.§ 35-393 through 35-393.03, as amended, which forbids public entities from contracting with Contractors who engage in boycotts of the State of Israel. Should Contractor, or its subcontractors, under this Agreement engage in any such boycott against the State of Israel, this Agreement is automatically terminated. Any such boycott is a material breach of contract and will subject Contractor to monetary damages. 24. COMPLIANCE WITH FEDERAL AND STATE LAWS: Contractor understands and acknowledges the applicability of the American with Disabilities Act, the Immigration Reform and Control Act of 1986 and the Drug Free Workplace Act of 1989 to the services performed under this Agreement. As required by A.R.S. §41-4401, Contractor hereby warrants its compliance with all federal immigration laws and regulations that relate to its employees and A.R.S. § 23-214(A). Contractor further warrants that after hiring an employee, Contractor will verify the employment eligibility of the employee through the E-Verify program. If Contractor uses any subcontractors in performance of services, subcontractors shall warrant their compliance with all federal immigration laws and regulations that relate to its employees and A.R.S. §23-214(A), and subcontractors shall further warrant that after hiring an employee, such subcontractor verifies the employment eligibility of the employee through the E-Verify program. A breach of this warranty shall be deemed a material breach of the Agreement that is subject to penalties up to and including termination of this Agreement. Contractor is subject to a penalty of$100 per day for the first violation, $500 per day for the second violation, and $1,000 per day for the third violation. City at its option may terminate this Agreement after the third violation. Contractor shall not be deemed in material breach of this Agreement if the Contractor and/or subcontractors establish compliance with the employment verification provisions of'Sections 274A and 2748 of the federal Immigration and Nationality Act and the E-Verify requirements contained in A.R.S. § 23-214(A). City retains the legal right to inspect the papers of any Contractor or subcontractor employee who works under this Agreement to ensure that the Contractor or subcontractor is complying with the warranty. Any inspection will be conducted after reasonable notice and at reasonable times. If state law is amended, the Parties may modify this paragraph consistent with state law. 7 IN WITNESS WHEREOF the parties hereto have caused this Agreement to be signed by their duly authorized representative as of this %1-- day of ttisr , 204. CONTRACTOR: CENTRAL ARIZONA COUNCIL ON DEV LOPMENTAL SABILITIES By: Doug Bacon Title: Executive Director CITY: CITY OF APACHE JUNCTION an Arizona municipal corporation By: Jeff Serdy Title: City Mayor ATTEST: Kathleen Connelly City Clerk APPROVED A FORM: Richard J. Stem City Attorney 8 STATE OF 2cl ss.rr- ) COUNTY of 1��`� ) The foregoing was subscribed and sworn to before me this �� day of s--f 20 [-7, by Doug Bacon, as Executive Director of Central Arizona CoAcil on Developmental Disabilities. Notary b ' My Commission Expires: 6 000 - - - - - uyil M*cLoro (seal) tldar�Public•Arizona s .i\ Maefeoprt Couch+ my Comm.' copra Mar 6,2020 STATE OF ARIZO A ) ) ss. COUNTY OF th, ) The foregoing was subscribed and sworn to before me this 3,Aay of &94S-r 20 I7, by Jeff Serdy, as Mayor of the City of Apache Junction, Arizona, an Arizona municipal corporation. 4iRoPublic My Commission Expires: 0 / (seal) NOTARY PUBLIC V ATE OF ARIZONA Mseicopa County NET R MASON xpires August 31,2020 9 EXIBIT A Transportation Costs 1. TOTAL COST OF SERVICES: In accordance with the terms and conditions of this Agreement, City shall compensate Contractor for senior transportation services in an amount not to exceed $70,000 per year. This total is reliant on receiving all anticipated gift and grant funds and program revenue to supplement the City's expenses. 2. SENIOR TRANSPORTATION COSTS (HOME TO MGC): Senior transportation from clients' homes to and from the Multi-Generational Center("MGC") shall be charged at a rate of$15.00 per client per round-trip. The route shall be coordinated by the Parties and shall run Monday through Friday all days that the senior congregate meal program operates. A minimum of five (5) clients shall be charged each day that transportation to the MGC occurs. 3. SENIOR TRANSPORTATION COSTS (ADDITIONAL): Senior transportation to and from medical and shopping trips shall be charged at a rate of$4.00 per mile and $24.00 per hour for each trip. Trips shall be scheduled on a case-by-case basis with the Contractor only as funds are available. 10 FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT BETWEEN CITY OF APACHE JUNCTION AND CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES THIS AMENDMENT is made and entered into this �day of , 20 av ("the Execution Date") by and between the CITY OF APACHE UN ION, an Arizona municipal corporation ("City"), and CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES, a 501(c)(3) not for profit corporation ("Contractor"), collectively referred to as the "Parties" or individually as a "Party". RECITALS A. The Parties entered into an agreement for senior transportation services (the "Agreement") on August 28, 2017 for a year, and then with the automatic four (4) one-year renewal periods, have a final end date of June 30, 2022. B. Beyond that date City will still need senior transportation services for meals, medical and shopping outings. C. The Parties desire to extend the term of the Agreement for another six (6) years through the end of fiscal year 2027-2028. D. Due to the increased cost of fuel and other inflationary operational expenses the transportation costs in Exhibit A need to be adjusted. E. Formal procurement for the services provided under this Agreement are categorically exempted. F. This First Amendment sets forth the renewal terms. AGREEMENT NOW, THEREFORE, in consideration of mutual promises contained herein and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the Parties agree to amend the Agreement as follows: Section 2. PRICES: Prices shall be governed under attached Exhibit A "Transportation Costs". Section 3. CONTRACT TERM: This Agreement shall be effective beginning on July 1, 2022 and shall remain in full force and effect through June 30, 2023, with five (5) additional one year renewal periods with the final end date of June 30, 2028, subject to the early termination option in § 16 Termination of Contract (90 day written notice of intent to terminate). However, no later than 90 calendar days before the end of the second and fourth year this First Amendment is in effect (i.e., April 2, 2024 and April 2, 2026), Contractor has the right to notify City of a proposed price increase. If the Parties agree to a price increase, the terms shall be reduced to writing in the form of a subsequent amendment to the Agreement. Should the negotiations fail, this First Amendment will be deemed terminated immediately after June 30, 2024 or June 30, 2026, as applicable, without the necessity of a notice of intent to terminate by either Party. Section 12. SUCCESSORS & ASSIGNS: City and Contractor each bind themselves, their partners, successors, assigns and legal representatives to the other Party hereto and to the partners, successors, assigns and legal representatives of such other Party in respect to all covenants, agreements and obligations contained in this Agreement. Neither Party to the contract shall assign the contract as a whole or delegate the duties hereunder, without the written consent of the other, nor shall Contractor assign any monies due or to become due to it without the previous written consent of City. Except as expressly amended herein, all other terms and provisions of the Agreement executed by the Parties shall remain in full force and effect. IN WITNESS WHEREOF, the Parties have caused this Amendment to be signed by their duly authorized representatives as of the day and year first above written. CONTRACTOR: CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES, a 501(c)(3) not for profit corporation oae"V� -g�� - By: o clod-45 Z Aco Its: Executive Director CITY: CITY OF APACHE JUNCTION, an Arizona municipal corporation By: Walter"Chip"Wilson- Its: Mayor ATTEST: Jennifer Pena City Clerk 2 APPROVED AS TO FORM: 24�2_z R. Joel Stern City Attorney 3 EXHIBIT A Transportation Costs 1. TOTAL COST OF SERVICES: In accordance with the terms and condition of this Agreement, City shall compensate Contractor for senior transportation services in amount not to exceed $70,000 per year. This total is reliant on receiving all anticipated gift and grant funds and program revenue to supplement the City's expenses. 2. SENIOR TRANSPORTATION COST (HOME TO MGC): Senior transportation from clients' home to and from the Multi-Generational Center ("MGC") shall be charged at a rate of$17.50 per client per round trip. The route shall be coordinated by the Parties and shall run Monday through Friday all the days that the senior congregate meal program operates. A minimum of six (6) clients shall be charged each day that transportation to the MGC occurs. 3. SENIOR TRANSPORTATION COSTS (ADDITIONAL): Senior transportation to and from medical and shopping trips shall be charged at a rate of$6 per mile and $25 per hour for each trip. Trips shall be scheduled on a case-by case basis with the Contractor only as funds are available. CITY COUNCIL MEETING ROLL CALL Date: - -6- N S— "07 LI WorkStudyS Regulars a Special 5-6-4 S:9',I( E: S: •'OZ E S:�:v7/E:��l CITY COUNCIL: Present Ab/excu Present Ab/excu Present Ab/excu MAYOR WILSON V, 1z ✓ VICE MAYOR SCHROEDER COUNCILMEMBER CROSS V LZ COUNCILMEMBER HECK ✓ ✓ COUNCILMEMBER JOHNSON ✓ t/ COUNCILMEMBER NESSER V COUNCILMEMBER SOLLER LZ V TOTAL CITY STAFF: Present Ab/excu Present Ab/excu Present Ab/excu City Manager Bryant Powell xzV, Assistant City Manager Matt Busby ✓ ✓ City Clerk Jennifer Pena V ✓ City Attorney Joel Stern Information Technology Director Doug Wirthgen Public Information Officer Public Safety Director Michael Pooley Dev Services Director Rudy Esquivias V, (/ PW Director Ted Wolff Parks& Rec Director Liz Langenbach ED Director Patrick Ainsworth Library Director Pam Harrison Finance Director Angelie Hawley4 owce- HR Director Anna McCray Water District Director Mike Loggins Municipal Judge A. Doug LaSota OTHERS: Deputy City Clerk Evie McKinney Int.Planning Manager Sidney Urias Building&Safety Mngr Adrian Alegria Senior Planner Planner Kelsey Schattnik Associate Planner Nick Leftwich PW Project Engineer Raquel Schatz City Engineer Emile Schmid S:\Templates & Forms\Roll Call - City Council -Attendance.docx Nuw'r-,T V City Council VOTE - ROLL CALL ITEM # MEETING OF 5 7'207- 9' MOTION BY: r K SECONDED BY: SCAyUa4_e..' NOTES:___CtM.&A �Qa& YES NO ABSTAINED CITY COUNCIL: COUNCILMEMBER HECK V_ COUNCILMEMBER CROSS ✓ VICE MAYOR SCHROEDER COUNCILMEMBER NESSER V COUNCILMEMBER JOHNSON ✓ COUNCILMEMBER SOLLER v MAYOR WILSON TOTAL UNANIMOUS IN FAVOR OPPOSED ABSTAINED TOTAL Vote sheet 4 S:/5—Templates&Forms/Vote Call—City Council Date5' 2'a9 CITY OF APACHE JUNCTION -- REQUEST TO SPEAK FORM Please fill out completely and return to the City Clerk PRIOR to the conclusion of the City Manager's Report portion of the agenda. I would like to speak on Agenda Item #: would like to speak on a Non-Agenda matter regarding: Do you wish to speak before Council on this item? Yes \ No Only If Necessary I am in favor of toe proposed Item. I am opposed to the proposed Item. Firs Name Last Name (PRINT)'3P 7 5 AE/- I �ZD � l Address City Zip gooe � ,^-)( I4r-2 11 rvt �-e CoC� Telephone Email address This information will be used by staff for follow-up, if necessary. Speakers shall make comments directly to the Mayor and City Council when called up to speak at the podium. Note: Call to the Public comments have a three minute limit and Public Hearing comments have a five minute limit. Consent for Minor to be Audio and/or Video Recorded: I, , as the parent/guardian of (minor(s)), a minor(s), agree to allow said minor(s) to appear and/or participate in the City of Apache Junction City Council Meeting. I further understand that,this activity may be audio and/or video recorded and I hereby consent to the minor being audio and/or video recorded during his/her participation with the likelihood that their image will appear on cable TV and the internet video stream showing their participation. A.R.S. 1-602 (A)(9). Signature of Parent/Guardian Date 08/26/2019 Date: 1 d? `.�Iy CITY OF APACHE JUNCTION REQUEST TO SPEAK FORM Please fill out completely and return to the City Clerk PRIOR to the conclusion of the City Manager's Report port-ion of-the agenda.. I would like to speak on Agenda Item #: I would like to speak on a Non-Agenda matter regarding: L� Do you wish to speak before Council on this item? Yes--LZ No Only If lNecessary I am in favor of the proposed Item. I am opposed.to the proposed Item. Off. First Name Last Name (PRINT) Address City Zip Code ffs z Telephone Email address This information will be used by staff for follow-up, if necessary. Speakers shall make comments directly to the Mayor and City Council when called up to speak at the podium. Note: Call to the Public comments have a three minute limit and Public Hearing comments have-a five-minute,limit. Consent for Minor to be Audio and/or Video Recorded: I, 1 as the parent/guardian of (minor(s)), a minor(s), agree to allow said minor(s) to appear and/or participate in the City of Apache Junction City Council Meeting. I further understand that this activity may be audio and/or video recorded and I hereby consent to the minor being audio and/or video recorded during his/her participation with the likelihood that their image will appear on cable TV and the internet video stream showing their participation. A.R.S. 1-602 (A)(9)_ Z ignature of Parent/Guardian Date 08/26/2019 Date: S CITY OF AP ACHE JUNCTION REQUEST TO SPEAK FORM Please fill out completely and return to the City Clerk PRIOR to the conclusion of the City Manager's Report portion of the agenda. I would like to speak on Agenda Item #: pp I would like to speak on a Non-Agenda matter regarding: LO Do you wish to speak before Council on this item? Yes No Only If Necessary I am in favor of the proposed Item. Lam opposed to the proposed Item. ls+_eQ_ K 0 �j , Nk-.2, First Name Last Name (PRINT) 3 ` - C Address City Zip Code Telephone Email address This information will be used by staff for follow-up, if necessary. Speakers shall make comments directly to the Mayor and City Council when called up to speak at the podium. Note.: Call to the Public comments have a three minute limit and Public Hearing comments have:a five minute limit. Consent for.Minor to be Audio and/or Video Recorded: I, , as the parent/guardian of (minor(s)), a minor(s), agree to allow said minor(s) to appear and/or participate in the City of Apache Junction City Council Meeting. I further understand that this activity may be audio and/or video recorded and I hereby consent to the minor being audio and/or video recorded-during his/her participation-with the likelihood that their image will appear on cable TV and the internet video stream showing their participation. A.R.S.. 1-602 (A)(9). Signature of Par&eduardian Date 08/26/2019 Date: �v 7V� CITY OF APACHE JUNCTION REQUEST TO SPEAK FORM Please fill out completely and return to the City Clerk PRIOR to the conclusion of the City Manager's Report portion of the agenda. I would like to speak on Agenda Item #: I would like to speak on a Non-Agenda matter regarding: M Do you wish to speak before Council on this item? Yes P/ No Only If Necessary I am in favor of the proposed Item. I am opposed to the proposed Item. CGo y� v► 1 e., W _egong First Name Last Name (PRINT) / 1431 A Co rf e z Road Address City Zip Code 9'0 ozoa. 776 5- C,j w e_,y e-yg /aItag -com Telephone Email address This information will be used by staff for follow-up, if necessary. Speakers shall make comments directly to the Mayor and City Council when called up to speak at the podium. Note: Call to the Public comments have a three minute limit and Public Hearing comments have a five minute limit. Consent for Minor to be Audio and/or Video Recorded: I, , as the parent/guardian of (minor(s)), a minor(s), agree to allow said minor(s) to appear and/or participate in the City of Apache Junction City Council Meeting. I further understand that this activity may be audio and/or video recorded and I hereby consent to the minor being audio and/or video recorded during his/her participation with the likelihood that their image will appear on cable TV and the internet video stream showing their participation. A.R.S. § 1-602 (A)(9). Signature of Parent/Guardian Date 08/26/2019 Meeting location: Q� FJ. City of Apache Junction : Arizona n� City Council Chambers o at City Hall Agenda 300 E.Superstition Blvd. Apache Junction,AZ I 85119 City Council.Work Session. apacheju nction az.gov Ph:(480)982-8002 Monday,Way 6,2024 7:00 PM City Council Chambers A. CALL TO ORDER- B. ROLL CALL C: AGENDA ITEMS 1.' 24-330.. Presentation and discussion of cases P-23-63-PZ&P-23764-GPA, by Jason Barney and John Hartman:with:Olsen Recker/Guadalupe Properties LLC, represented by Greg Davis with (plan Consulting. . . Case P-23-64-GPA is a proposed general plan i:and use map amendment to re-designate 18.acres at the southeast corner of US-60 and Goldfield Road from Commercial to High.Density .Residential. Case P.-23-63-PZ is the companion rezoning case to the ' ' map amendment, proposing to rezone the 18 acre area from General Commercial by Planned Development:("B-1/PD") and B=1/PD to High Density Multiple-Family Residential by.Planned Development ("RM=2/PD"). sponsors: KelseySchattnik .. Attachments: P-23-63-PZ&P-23=64-GPA-.CC WS MEMO.bdf. 1. Narrative.pdf 2. Site Plan.pdf 3. :Elevations and Floor.Plans.pdf 4. Landscape Plans.pdf 5. Wall Plans.pdf ; 6. Final Participation Report(Silveray).Pdf:. 7. GPA Extemal Agency Responses.pdf 8. Resident Letters(4.25.24).odf 9. Updated Protest Petition 03.20.2024.pdf - 10. Vicinity.Map.pdf . 11: Traffic Impact AnalVsis.pdf q. 12. Market Study(applicant).pdf. 13. P-24=63=PZ&P-24-64-GPA:PZ Staff Report.vdf - City of Apache Junction;Ariiona Page 1 - Printed on 5/2/2624 ;' .. City Council Work Session Agenda May 6,2024 2. 24-345 Presentation and discussion on the second amendment to the :. . professional services6' reement.between a City of Apache_Junction and Central Arizona Council on Developmental Disabilities for senior transportation services. . Sponsors: Jamie Sullivan Attachments: Memo to Council Senior Transportation Services Second Amendment DRAFT EXECUTED 2017 CACDD Contract EXECUTED First Amendment 2022 D. ADJOURNMENT Copies of this:agenda and additional information on any of the:items.listed above may be obtained from the City Clerk's office located at 300 E Superstition Blvd,Apache Junction,AZ 85119,Monday through Thursday from 7.00a-6:00p, excluding holidays. The City of Apache Junction invites and welcomes people of all abilities to use our programs,sites and facilities:Specific requests.may be made by contacting the Human Resources Office at(480)474-2617 or..TDD(480)983-0095. The Apache Junction.City Council may vote to go into Executive Session.for legal advice on any item listed-on.this agenda pursuant to A.R.S.§38-431.03(A)(3);this notice is given-pursuant to A.R.S.§ 38-431.02 to the members,of the City Council and the public.. .. . . city ofApache Junction;Ark6na Page 2 Printed on 5/212024 f - - City of Apache Junction,-Arizona : Meet`nglo�location: City Council Chambers .: at City Hall.. 300 E.Superstition Blvd Agendl . '�8a C3t Apache Junction,AZ City Council.Meeting 85119 apac eiunctioriaz.gov Ph:(480)982-8002 Tuesday;May 7;2024 7:00 PM City Council Chambers A.__ CALL TO ORDER B:::: INVOCATION AND PLEDGE OF-ALLEGIANCE _ C. ROLL CALL 4. D: . CONSENT AGENDA The council may,at this time;fake single action on any,or all items listed as consent agenda items.. . These may include,.but are not limited to,acceptance of agenda, acceptance of minutes, appointments, acceptance of resignations and adoption of certain resolutions_and other items which do not require a public hearing. The consent agenda is a timesaving-device of which the mayor and city council is to receive documentation on these items from the city manager for their review prior to the meeting. An member of the council may remove any item from the consent agenda for discussion and cause a separate vote on the matter later in the agenda. 1. 24-335 Consideration of acceptance:of agenda. Sponsors: '::: Jennifer Pena 2.. 24-336 Consideration of approval of minutes of,the regular meeting of April 16, 2024. Sponsors: ::. Jennifer Pena ... Attachments: CCMIN 2024 04 16 MINUTES DRAFT 3. 24-250 Consideration of approval of-the.proposed.Resolution No. 24-04. .. authorizing:the city to enter into the.Intergovernmental-Agreement(IGA) Amendment No. 1 with Arizona Department of Transportation (ADOT),. for additional federal funds to cover the increased construction costs in the amount.of$354,067 for bicycle and pedestrian improvements on Delaware Wive,from 16th Avenue to Broadway Avenue:.:: Sponsors: Raquel.Schatz Attachments: Res 24-04 Council Memo 20240415.0f . . Res 24-04 IGA Amendment.pdf 21-0008125-Dist C-T0309 01 D 03D 01 C-Amend-1.odf City of Apache Junction;Ariiona Page 1. Printed on 5/2/2624 City Council Meeting Agenda May 7,2024 . 4. _:: .24-252 Consideration of approval on the proposed:Resolution No 24-06 authorizing the city to enter into the Intergovernmental Agreement(IGA) Amendment.No..:2 with Arizona Department of Transportation(ADOT) .for additional federal funds to cover the increased construction costs in the-amount of$333,671.for-roadway and safety improvements on Winchester:Road.from 29th Avenue to Southern Avenue. Sponsors:. .: Raquel Schatz Attachments: Res 24-06 Council Memo 20240415.pdf Res 24-06 IGA Amendment.pdf 21-0008238-Amend TWo-Dist C-T032401C7FINAL:bdf 5. 24-271 . .. Consideration of approval of.Resolution No.-24714 and Resolution No.. : . 24-17, Resolutions of the Mayor and City Council of the City of Apache Junction,Arizona; designating Angelie Hawley.as Chief Fiscal Officer.. for.officially submitting and certifying the accuracy of fiscal years 20.24 and 2025 expenditure limitation reports to the Arizona Auditor General. Sponsors: Matt Busby .Attachments: Resolution 24-14 CFO Designation Resolution'24-17 CFO.Designation FY25 E. AWARDS, PRESENTATIONS AND PROCLAMATIONS Awards,presentations from other organizations,proclamations:issued by the mayor,and acknowledgement.of distinguished guests_and:visitors, and staff presentation of receipt of grantor donated-funds are permitted at this time. P Y ... 6. 24-347. Formal resentation b mayor of,ce.rt.ificates of graduation to the participants of.the 2024 Citizen Leadership Institute. :Sponsors: Matt'McNulty. - - 7. 24-348 Proclamation designating-the week of May 12-18, 2024, as:'Peace: Officer Memorial Week". :sponsors: Michael Poole y Attachments: Proclamation 05 2024 Peace Officer Week .8. 24=328 Proclamation designating May 18; 2024, as"Kids to Parks Day. Sponsors: Jamie.Sullivan. Attachments:.: '05 2024 Kids to Parks Day . 9. .24-308 :Proclamation designating the week of May 1925- , 2024, as"Publiic: .. .. . .Works.Week." Sponsors: . Ted Wolff :Attachments: 05 2024:National Public Works Week City of Apache Junction;Arkona Page 2. Printed on 5/2/2024 City Council Meeting Agenda May 7,2024 . 10.; 24-332 ::Proclamation designating May 2024 as Building;Safety Month.. _._ .. , sponsorsc Adrian Alegria Attachmentsc 05 2024 Building Safety Month F. REGIONAL INTERGOVERNMENTAL UPDATES . The mayor or any member of council may at this time:present a brief summary of any regional intergovernmental updates. However,no discussion shall take place on such items except for clarifying comments related.to substance, time and-location: 11.. 24-337 Brief summa of inter overnmental u dates from mayor and ry 9 p Y councilmembers. . . Sponsors: ::: Chip,VVilson G. CITY MANAGER'S REPORT The city manager:members of city staff orfhose individuals designated by the manager may present information pertinent to items under consideration or information related to the operation of the.'city. There : shall.however be,no discussion of thi s*time except for clarification inquiries. .... 12; 24-339 .. Y 9.City Mana Report:. er s Sponsors:. .: Bryant Powell .'.. 13.= : 24-355 Update on the Youth Advisory Council's accomplishments this year. Sponsors: B ant Powell rY 14. : .. .24-356 :Presentation by Michel Barry, Director of:Development at a Scottsdale . .Training & Rehabilitation Services (STARS):. . Sponsors: . Eli Richardson and:Bryant Powell 15. :: .. .24-340 . . . 'Announcement of Current Events. Sponsors: :. IRichardson H. PUBLIC-HEARINGS Public hearings required by applicable law shall be conducted by the council and any person-shall be given the opportunity to speak.All remarks shall be,addressed fo the council as a whole and not to any member.thereof.Such remarks shall be limited to five f5)minutes unless additional time is granted by;.. the mayor.This time limitation shall not apply to applicants and their agents appearing before the council. I. OLD BUSINESS The;council shall consider any-business that has been previously considered and which is still unfinished. to include those items previously postponed or tabled.No member of the public shall be permitted to speak on these items unless invited to do-so by the mayor after first.submitting a written : .... request-to-speak form with,the city clerk. J:::: NEW BUSINESS .. . .. .. The.council shall consider anybusiness not yet considered. No member of the public shalf be permitted . .. to speak on these items unless invited to do so by the mayor after first submitting.a written .... . .. request-to-speak form.with the city clerk. .. . .. City ofApache Junction;Arizona Page 3- Printed on 5/2/2024 City Council Meeting, A4efida May 7,2024 16.: .,_ :24-357 Presentation and discussion with Detective frank Nicholls of A;1PD's Community Response onse Enforcement Unit, introducing new K-9 . . workmate;Tessa. sponsors: Michael Pooley. K.:: . COUNCIL DIRECTION TO STAFF-.. This item allows the mayor and city council to direct staff on specifically listed:matters.' L: SELECTION:OF MEETING DATES, TIMES,LOCATIONS, AND. PURPOSES M. CALL TO PUBLIC .. .. At this time the public has the privilege to.address the council with:requests, communications,comments or suggestions relating:to city business..;411 speakers must have-already:submitted a written`Request to _. . . . .. Speak"form.to the city clerk no,later:than the conclusion of.fhe city managers:report portion of the agenda..lf there is a group speaking.on the same ifein, they should select a spokesperson.All such. . .. remarks shall be:addressed to the council:as a whole and not to any,member thereof. The:mayor:is, : . authorized to ask:a speaker to stop speaking.and leave the podium or to adjourn-the meeting.if anyone . .: becomes disorderly, uncivil,makes personal attacks or continues to speak about items that are not within the jurisdiction of the.city after being warned such'issues are beyond the jurisdiction of the city to act. The council may not answer questions of the speaker, discuss tne.matter with one anofher,.but may, at the conclusion::1).respond to criticism by a speaker, 2)ask the- manager to review a matter.,3) ... . .. .. .. . . ... . . ask the city manager to place:the matter on a future agenda.Each speaker must approach the podiurim, .. .. speak-into'the microphone,.provide their name and address:.There is a three(3)-minute time limit per.: speaker. N. ADJOURNMENT Copies of this agenda and additional information on any of the it6his'listed above may be obtained from the City Clerk's office located at 300 E Superstition Blvd,Apache Junction,'AZ 85119,Monday through Thursday from 7:00a-6:00p, excluding holidays. The City of Apache Junction invites and welcomes people of all abilities to use our programs,sites and facilities. Specific requests may be made by-contacting the Human Resources Office at(480)474-2617 or:TDD(480)983-0095. The Apache Junction City Council may vote to go into Executive Session.for legal advice on any item . . listed on this agenda.pursuant to A.R.S.§:38-431.03(A)(3);this notice is given pursuant to:A.R:S.§ 38-431.02_to the members of the City Council and fhe:public.: mq CitY of Apache Junction;Arizona Page 4. Printed on 51212024 - CITY OF:APACHE JUNCTION -Mayor's M. . amp ay Script _. .- .. Ues. ay, May 071-2024 A. CALLTO ORDER 1 would Like to cafl this City of-AApache Junction Council Meeting of May 7,Q2024, t6j order and ask everyone to: put their cell phones on silentl B.- INVOCATION AND PLEDGE OF ALLEGIANCE The invocation will be led by ___:_ & the pledge by:Councilmembe_ C. -ROLL CALL . Ro.If Call D. CONSENTAGENDA As a reminder : All items under the Consent Agenda will be approved with one. eqs motion If'a councilinernber wishes t6r' rh6ve an item for:further discussion, the _fequest will be.made prior to approving the consent agenda and will be moved to N.ew Business. 1: Consideration of acceptance of agenda. 2: „ Consideration of approval of minutes of the;regular meeting.of April 16, 20.24. 3. Consideration of-approval of the proposed Resolution :No. 24-04:authorizing the city to enter_into the Intergovernmental Agreement (IGA), Amendment No:=.l:with Arizona Department :of Transportation (ADOT) for additional federal funds to cover the increased construction costs in the amount of$354,067 for bicycle and pedestrian improvements on :Delaware Drive from 16th Avenue to Broadway Avenue. :4. Consideration of approval:o.f.the proposed-Resolution No. :24-06 authorizing the city to enter into.t .e:lntergovernmenta Agreement. IGA Amendment No.'2 with: .. ... . .. Arizona Department of Transportation (ADOT.).for additional federal funds to _ _. . _ . - . cover the1ricreased construction costs in the'amount of$333,671 for roadway: a rid safety improvements on Winchester Road from 29t Avenue:to Southern Avenue:.. :: ::. 5: Conside.ration of approval'of Resolution No; 24-14 and Resolution No. 24-17 Resolutions of the Mayor and City:Council of the City.of Apache Junction, Arizona; designating Angelie Hawley as Chief Fiscal:Officer for off iciallysubmitting and; certifying the accuracy of fiscal years 2024 and 2025 expenditure limitation reports to the Arizona Auditor General. „ Do I.have a motion on:the-consent a enda? wait- or the motion and the-2nd ;Roll Calll E. AWARDS, PRESENTATIONS AND PROCLAMATIONS -.. er p p _ .. 6. Presentation of certificates of raduation to the artici -ants of the 2024 Citizen Leadershi In p: stitute. . ;..Matthew McNulty. . 7: Proclamation;designating;the-week of May-1:2718, 2024, as."Peace Officer Mernorial Week." -- Chief Poole y: 8 Proclamation designating:May'18, 2024, as ..Kids y. :to Parks Da ; Jamie Sullivan 9. Proclamation designating the_Week of May-19-25, 2024, as :"Public Works'Week:"I - ;-_- - Ted .10. Proclamation designating May-2024 as "Bui.lding-Safety Month."�.. rian Alegria F. REGIONAL INTERGOVERNMENTAL UPDATES -- - 11. ;Regional"Intergovernmental -meeting updates from.Cou G: CITY MANAGER'S REPORT Bryant'to:report - 12, City Manager's.Report-'.! 13. 'Update on Youth Advisory Council' � jJ Underwood: i 14. Presentation by.Michael Barry on Scottsdale Training &.Rehabilitation.Services (STARS) EIi Richardson to introduce Mr. Barry f 15. Announcement of Current_Events : Eli Richardson to report: :` H.. PUBLIC HEARINGS. I. OLD BUSINESS J. NEW BUSINESS: : ,Presentation ari.d discussion on the Community Response Enforcerrierit Unit and. the introduction of.new K-9 workmate,.Tessa Ch ief P00 ley" K: '0OUNCIL DIRECTION TO STAFF .L.: .SELECTION OF:MEETING DATES,.TIMES, LOCATIONS AND PURPOSES M. CALL T.O PUBLIC I would dike to remind everyone that-the:Call to the P:ub.liic.is a courtesy a:nd:not ,: .required by-la:w, It is:a time for the publican express requests, communications, comments.and 'suggestions�.. _ .. Request to speak forms must be completed and handed Lathe city clerk before the; ,en of the city manager's report. - Al,.issues shall be.preser ted.in, a profess oClal.mannerwithout perso6al.8tta S Underth.e open meet'ing.law the COUNCIL•CANNOT ENGAGE IN DISCUSSION, on the issues presented, but may respond to criticism and may direct staff to:f— ollow up witlithe speaker:d'irectlysnd/orplace this matter on a.future agenda for council I d i scussion. The:re:is:a.three-minute:I:i.mit for each:spea:ker. Does council have any requests of staff to followup o? . N. ADJOURNMENT— Fradjourn:this meeting. 7, 2024 Consent Agenda Items Nos. 1-5 move the consent.agenda be accepted:and approved as.presented.. Meeting location: City of Apache Junction, Arizona City Council Chambers of City Hall .. Special Meeting Agenda 300 E Superstition Blvd �"i2 tip` Apache Junction,AZ: , Special Meeting of the Apache Junction 85119 - City Council apachejunctionaz.gov Ph:,(480)982-8002 ,,. . Monday,May 6,2024 7:00 PM CALL TO ORDER`. ROLL CALL CONSENT AGENDA . AGENDA ITEMS PUBLIC.HEARING OLD BUSINESS wo NEW.BUSINESS 1. 24-300 Presentation and discussion with the mayor:and city council on the Fiscal Year 2024-2025 budget,,classification and compensation plan for city employees, and the Public:Safety Personnel.Retirernent System PSPRS Pension FundingPolicy. Y � ) Y• Sponsors: Matt Busby Attachments: Tentative Budget Fiscal Year 2024-2025 Tentative Fiscal Year 2024-2025 Water Utilities Community Fac ... ... ... ... ... ... Tentative Fiscal Year 2024-2025 City:of:Apache Junction Classi. Tentative FY24-25 CAJ Recruit and Sworn Class and Comp PIa Pension PolicV FY 2024-2025 ADJOURNMENT .. . Copies of this agenda and:additional information on.any of the items listed:above may be obtained.fcom the.City Clerk's office located'at 300 E Su erstition Blvd,-Apache Junction,AZ 8511.9' Monday throe ii Thursday from.7;00a-6:00p, excluding:holidays. The City of Apache Junction invites and welcomes people of all abilities to vse our programs,sites:and facilities:Specific requests may be rr►ade by.contactinj the Human Resources Office of 480 474-2617 or TDD(480)983-0095: City of Apache Junction;Arizona Page 1. Printed on 5/2/2024