HomeMy WebLinkAboutRes 26-29 RESOLUTION NO. 26-29
A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY
OF APACHE JUNCTION, ARIZONA, AUTHORIZING THE CITY OF
APACHE JUNCTION TO ENTER INTO THE FIRST AMENDMENT TO
THE INTERGOVERNMENTAL/DEVELOPMENT AGREEMENT BETWEEN
THE CITY OF APACHE JUNCTION AND PINAL COUNTY COMMUNITY
COLLEGE DISTRICT.
WHEREAS, the City of Apache Junction ("City") and Pinal
County Community College District, dba Central Arizona College
("CAC") , wish to amend the March 13, 2010
Intergovernmental/Development Agreement ("IGA") ; and
WHEREAS, CAC did not complete certain private
infrastructure improvements as obligated under the IGA; and
WHEREAS, the City and CAC desires completion of certain
private infrastructure improvements whereby City will complete
them with CAC reimbursing City for the improvements; and
WHEREAS, pursuant to A.R.S . § 11-952 (A) , public entities
may enter into IGAs with other municipalities and governmental
entities for joint or cooperative activities; and
WHEREAS, the City and CAC have crafted the attached written
First Amendment which formalizes the arrangement.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL
OF THE CITY OF APACHE JUNCTION ARIZONA, AS FOLLOWS :
1) The mayor and city council approve the form of the First
Amendment to the IGA between the City of Apache Junction
and Pinal County Community College District set forth in
Attachment A; and the mayor is hereby authorized to sign
the First Amendment on behalf of the city.
2) The city manager and/or his designee is authorized and
directed to take all steps necessary to carry out the
purpose and intent of this resolution and to fulfill all
the duties required under the First Amendment.
RESOLUTION NO. 26-29
PAGE 1 OF 2
PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
APACHE JUNCTION, ARIZONA, THIS o��d DAY OF 1�jh Q
_<, 2 0
SIGNED AND ATTESTED TO THIS d DAY OF _fey yJ to
20�.
WALTER "CHIP" WILSON
Mayor
ATTEST:
EVIE MCKINNEY
City Clerk
APPROVED AS TO FORM:
4 6 2-26
RICHARD J. STERN
City Attorney
RESOLUTION NO. 26-29
PAGE 2 OF 2
ATTACHMENT A
FIRST AMENDMENT INTERGOVERNMENTAL/DEVELOPMENT AGREEMENT
BETWEEN THE CITY OF APACHE JUCNTION AND PINAL COUNTY COMMUNITY
COLLEGE DISTRICT
FIRST AMENDMENT TO INTERGOVERNMENTAUDEVELOPMENT AGREEMENT
BETWEEN THE CITY OF APACHE JUNCTION AND
PINAL COUNTY COMMUNITY COLLEGE DISTRICT
THIS AMENDMENT is made and entered into this
2026 by and between the CITY OF APACHE JUNCTION, ARIZONA, an Arizona
municipal corporation ("City"), and PINAL COUNTY COMMUNITY COLLEGE
DISTRICT dbaCENTRAL ARIZONA COLLEGE, a public education institution of the
State of Arizona ("CAC"). City and CAC are sometimes referred to collectively as
"Parties" or individually as a "Party."
RECITALS
A. The Parties entered into the Intergovernmental/Development
Agreement ("IGA") on March 13, 2010.
B. CAC did not complete certain Private Infrastructure Improvements
as obligated under the IGA.
C. The Parties desire completion of certain Private Infrastructure
Improvements whereby City will complete them with CAC reimbursing City for the
work.
AGREEMENT
NOW THEREFORE, in consideration of the mutual promises expressed in
this Amendment, and other good and valuable consideration, the receipt and
adequacy of which is hereby acknowledged, the Parties agree to amend the
Agreement as follows:
A. Section 4 entitled "City's Obligations" is hereby amended by adding
the following subsection (d) to the Section:
d. Design and construct a twelve (12) acre-foot stormwater
retention basin as shown on Exhibit A-1."
B. Section 5 entitled "CAC's Obligations" is hereby amended by adding
the following subsection (f) to the Section:
f. Reimburse City for all costs associated with the design and
construction of the stormwater retention basin within three (3) years after
completion of the stormwater retention basin. The Parties understand that the
expected cost of the stormwater retention basin is and will not exceed One Million
Eight Hundred Thousand Dollars and No Cents ($1,800,000.00). All such costs
shall be certified by the City Engineer as actual costs due and payable based on
Engineer Estimates after construction is completed. CAC will pay City an
estimated Six Hundred Thousand Dollars and No Cents ($600,000.00) upon
invoice from City on January 1st of each year from 2027 through and including
2029."
C. New Exhibit A-1 entitled "Central Arizona College Palm Wash
Project' is added.
D. Exhibit D entitled "Public Infrastructure Improvements" is hereby
amended by adding the following sentence to end of the Exhibit:
°'Stormwater Retention Basin to accommodate twelve (12) acre-feet,
as shown on the attachment, no later than December 31, 2026."
E. Exhibit E entitled "Improvement Construction Timeline" is hereby
amended by adding the following sentence to end of the Exhibit:
"Stormwater Retention Basin to accommodate twelve (12) acre-feet.
Completion Date: December 31, 2026."
F. Exhibit F entitled "Private Infrastructure Improvements" is hereby
amended by adding the following sentence to end of the Exhibit:
"Design/construction of a twelve (12) acre-foot retention basin, as
noted in the attachment, no later than December 31, 2026."
Except as expressly amended herein, all other terms and provisions of the
Agreement shall remain in full force and effect until the Agreement expires or is
terminated.
[Signatures follow on next page)
2
IN WITNESS WHEREOF, the Parties have caused this Amendment to be
signed by their duly authorized representatives as of the day and year first
above written.
CAC
PINAL COUNTY COMMUNITY COLLEGE
DISTRICT dba CENTRAL ARIZON COLLEGE, a
public education institution of the State of
Arizona
By: [Name]
Its: [Title]
CITY OF APACHE JUNCTION, ARIZONA, an
Arizona municipal corporation
By: Walter "Chip" Wilson
Its: Mayor
ATTEST:
Evie McKinney
City Clerk
APPROVED AS TO FORM:
R. Joel Stern
City Attorney
3
EXHIBIT A-1
Wtt 1w[P fr]1:7� �\As2M,'•4 1KL{[n'.4[w1LtIK[MIMIO/0
ir
I
� I
RD
lz
11.oRAoiNo a ��-n o Ka a i
�$' DMINAO!t•LAN 4 ORAINAOB AN 4
ir
$_� scam..- se�-e — w�co solwo..... w.a_ _.. w�ao '�a[ao- --- � -aw'» .�'a' aw +•
$WINASTER AD
m
i-j
A `I
a l _
��t a
TOP OF SLOPE
TOEa SLOPE ��•t48W IOPK XOK TOE OF SLOR
EaEV.t1yW IFFY•t/01.F/ EIEV•t11t.W TOP O.BFJIY
EIEV•t/fb W TOP OF KRY
IIPPEP in1TPLL TEO COCPE TE ROCn tut PE. rPK�E POMT E1FWt./Sm
IOv+EP SLOPE/t 1'TP. OK I�hP M� YINV.CTIwFRi rPECRIOPnyq F kv.l TfTrt11PIP.'E
ELEV•trplMy ELEY.ttMm
WM \
O r E tr
'Of OE Two co cAETE
G UPPER TO LOWER BASIN BERM roc a aoK —.ro /.'" `ELEV°F.mm
WtTe.nil ELEV•tEy W
SVIOPPOE PREP.(.WPYCTOP Stull$Y PE.TWY
A OOPPI ASWOESSI PERFYOSTOSPEC
lis TOfORM•WOOTMWP NVAO.PwELWHLS
wPrt+wM GEnEPwL c_r..;Tt>ooE/11P.ry
WEIEflf
N Arx)Ps
POW
UPPER TO LOWER BASIN SPILLWAY PROFILE
_- TOE OE xoPF TOE oP XaE -- ,.PT„Y.,,
ELEV,fI�n } rElEV SLopiSIlE1 r
REP Pa l
"�^-- � .'tt110YF IOTmY OPn...cE
YMFPM EASFYf!/t P O w
TOE 01 SLOPE TOE OP ROPE
ELEV.TKWn AEE ET"AnOn VMIES T
REP PLl1n1 RER IL.an)
�1 TYP.WINCHESTER EARTHEN CHANNEL SECTION rrP s P.T.. �
PROPER1YlNF
z (� G,BION CHANNEL STABILIZATION STRUCTURE
V.wEI',`tPP*
INTp1
EJOSTm6
c 1 OE
a non XOKvPP CSDTNO QE
aEV _
ElP [s To TO PEFtPP.
IKP PLIWI
TYP.SOUTH PROPERTY LINE SECTION "Tam—
TOE OP SLOPE oP,Oe
.p ro.w, FLEV.tIN W rn FJOTwO
CMRV!0.OP0
p� F
1 VMiES.tr I,r.
TYP.PRIVATE ROAD AND BASIN SECTION
a 0
p? r w
Z lQl OF rER.t raT,La TfO COnCPFTS rao[n wT PCP Tv or rf.Y �— CRY Of APACHE JUNCTION
E1.EV.t1OSW E1EV.tTESm PUBLIC WORKS DEPARTMENT
PUBLIC IPEOPTEI•now rn r vPl1E1
CAC PALM WASH BASMIS_
a UPPER TO LOWER BASIN SPILLWAY SECTION DETAIL 1
a �,,P. F
57.
I�
:gMRiRt�CIN.«MOTE n eCwSTRvcT,clN,wT£1, �'i
ARR631MIS SIDE APRLC9,"HK voE I
F yltErAR•EnelRn
w3lglfrTAt CMA,MEL AI G w-c •TOR OF GMIMEI ELOF[(VMESI
RIG£FdNI FOR1rE•,f+X M ET FORIn.n.2. ELFL+111B.r5
-loo
► u .E.a ii- r,l t- /fIEV IbfMFm f /t_• .•Irx
A f
- r 10F OE c.--*I
♦ TORd CMANEEL
Ilr FLN•lli !0 (MJITIO wI\Y♦
1 - 6EV•1TISM.. I � _ _ �._ _._ _ ___ I l � � ELM IINE
• � l
• - •ORCNSIONS FER PLAN�''� � '1- _ « -- ..� - ♦ L�Lj + f
.iv0+ / r y _ �L CAMTRALTOR TO VEIEE•E O[RTM ` __
GON-3 S'TO R"T£LFn10NE CABLE - _. _
CONIRACTOM TO VERRV DERTN 1 1
� ~`- RMO PI(110
• ti$nA9M RA0 F L E"n.G I r(IBER'611 C CARL BOII QAVF/l7B
FLMIn(M COMTAACTOR 1.W.—pf— —y- _ I OUTLET NEAT
`"AELRMG(R(O 1:—TFRLBE ��� KIN•11M.i'
Cf AnCTp1 TO A—OEITw
EJ STRIG 1—TEN LM;I ,W xe xG
C MAC1ORTOVE—MFTW 1 -
1 =
!R:LVIIONf£1U3T CONP M I FIEf31AEGA3 UNE.
COTIGCIOR TO VERIFY OBFT`♦' --
EJII1TM017 WA1E'R LIIE.I,i ' q I MY�AwRrfRfIRE WERA Yar
CONi RAC10R 10 V£REV OV'N
lA3TM TM 1,£A LINE,
CONTRACTdi TO vERRY OEFTI•
4L I
r 1
r aAR3 I
n PALM WASH DIVERSION STRUCTURE PROFILE s
ri M BAIl13RAOEp
,f'ON CEMIER
DETAIL AA
REBAR REINFORCEMENT
a
VARf313r TM
'.ro Oc�l++n+£t GAEIIIAOE
IAEIfEMf rSABOV[BOrtW ROw
+ MMu1M TOE co YOF£
\�• --- vAgF3MWE
� I IrfR RAMI�
lOF or 1LEn
�EtEV•1Tuw
— 1 VME9ITM YRI _
tl�NCCUTOFF MNLL AI } ,11+R1 NAlvu 1
IR NOT►MT OF ��•11
CNANIEL xc'— Jr .(, 01.a 111 Rr•
TION
PALM WASH DIVERSION STRUCTURE WEIR/CHANNEL UBUCBm
CITY WORKAPACS
E.11111ETMEN
U ,�,o w.l vueuc woBlcs oEVAmuErar
r L`,,• CAC PALM WASH BASINS
Y TYP.WINCHESTER CONCRETE CHANNEL SECTION nErAILt
�01 T0341f
s I.1 a