HomeMy WebLinkAbout1982 07.23 City Council Special Agenda Qp,CHF
o ,,,A • �Y
.c,
,.. • k.. ,,,, --,
,_ ,,,,,..„ ..
--,..
0 ,50i 4,'!fit.a' Z
"qRiZONP„ iit o L p `2 ace oLnction
DATE: July 23, 1982
Approver for Agenda J `-!._-._
MEMORANDUM TO: The Honorable Mayor and Members Doe item #
of the City Council
First Reading J
THROUGH: � k City Manager Second Reading
Director of Public Works p y!ic Hearing
FROM: Operations Supervisor Old Business
4-r-'isfew Business
REGARDING: Bids For Road Construction Materials
And Road Oil (Agenda Item)
In conjunction with the planned road project as approved by
the City Council, the Operations Division has estimated
materials and oil required for the project to be done by joint
effort between Pinal County and the City of Apache Junction.
In calling suppliers for interest in bidding, we have deter-
mined that competitive bids may be difficult to obtain due to
the proximity of suppliers and the nature of the bid. The
estimated cost for road materials is $14,497. 50 and the esti-
mated cost for road oil is $13, 530. 00.
Bids having been received and reviewed indicated lowest best
qualified bidder for road materials to be Asphalt Mining &
Concrete Company, cost per ton is as follows:
1. 4500 tons at $4. 25 per ton for ABC
2. 190 tons at $11. 44 per ton for 3/8"
Cold Coated Chip
Bids having been received and reviewed indicated lowest best
qualified bidder for road oil to be Arizona Refining, cost
per ton is as follows:
1. 35 tons at $243 . 00 per ton for MC-250
2. 25 tons at $193 . 00 per ton for RS-2
I recommend acceptance of the lowest best qualified bidders
as described.
DD/emb
1001 NORTH IDAHO • APACHE JUNCTION,ARIZONA 85220.0190 • TELEPHONE(602)982-8002
�QACHF✓
Wk >4
1+ �e. 434.
,.f' . 1• a O
y 4.
Z
�R NP it o� C pache unction
►zo
AGGREGATES, PLANT MIX, AND ROAD OIL
PROJECT NO. PW-82-6
JULY 23, 1982
Those Present: Kathleen Connelly, City Clerk
Douglas Dobson, Operations Supervisor
Rich Broman, Director of Public Works
Art Allen, City Engineer
Lori Clark, Administrative Secretary
Representatives of three companies
submitting bids
On July 11, 1982, through July 16, 1982, a public notice was published in the
Mesa Tribune inviting bid proposals for the Aggregates, Plant Mix, and Road
Oil for street repairs. The written bids were to be submitted by 10:00 a.m. ,
on July 23, 1982, in compliance with bid specifications and the total amount
of the bid.
The bids, opened and read by the City Clerk, Kathleen Connelly, were as follows:
Saguaro Petroleum and Asphalt Arizona Refining Company
P.O. Box 6536 P.O. Box 1435
Phoenix, Arizona 85005 Phoenix, Arizona 85005
Surety Bond = $1,355.50 Surety Bond = 10% of total bid
FOB: MC-250 $ 236.25 per ton FOB: MC-250 $231.00 per ton
RS-2 $ 189.00 per ton RS-2 $184.00 per ton
Delivery: MC-250 $258.00 per ton Delivery: MC-250 $243.00 per ton
RS-2 $195.00 per ton RS-2 $193.00 per ton
AMCON
P.O. Box 1106
Mesa, Arizona 85201
Surety Bond = 10% of total bid
FOB: Aggregates $2.50 per ton
3/8" cold coated chips $9.00 per ton
Delivery: Aggregates $4.25 per ton
3/8" cold coated chips $11.44 per ton
Continued . . .
1001 NORTH IDAHO • APACHE JUNCTION,ARIZONA 85220-0190 • TELEPHONE(602)982-8002
Aggregates, Plant Mix and Road Oil Cont'd . . .
/C ilee xe-e-t,1
Kathleen Connelly
City Clerk
WITNESS:
L ri Clark
Administrative Secretary
Douglas Dotison
Operations Supervisor
odkk oft.
O� PQACHF✓G'G 0.4
'IP/ZONP VDity o75 C479ache unction
SUGGESTED MOTION:
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
APACHE JUNCTION, ARIZONA, THAT THE CONTRACT FOR PUBLIC WORKS
PROJECT PW-82-85 ROAD MATERIALS, BE AWARDED AS FOLLOWS :
FOR ABC: ASPHALT MINING AND CONCRETE COMPANY
(AMCON) , 4500 TONS AT $4.25 PER TON
FOR COLD COATED ASPHALT MINING AND CONCRETE COMPANY
CHIP: (AMCON) , 190 TONS AT $11.44 PER TON
FOR MC-250: ARIZONA REFINERY, 35 TONS AT $243. 00
(ROAD OIL) PER TON
FOR RS-2 : ARIZONA REFINERY, 25 TONS AT $193. 00
(ROAD OIL) PER TON
BE IT FURTHER RESOLVED THAT AUTHORIZATION BE GIVEN TO THE
DIRECTOR OF PUBLIC WORKS, THROUGH THE CITY MANAGER, TO PURCHASE
ROAD MATERIALS AND ROAD OIL IN THE AMOUNTS NEEDED TO COMPLETE
THE PROPOSED PROJECT, AS PREVIOUSLY APPROVED BY THE CITY
COUNCIL.
1001 NORTH IDAHO • APACHE JUNCTION,ARIZONA 85220-0190 • TELEPHONE(602)982-8002
(0 P4C)6/ P Ili
ROLL CALL VOTE SHEET
NOTES (----,
/61 7/ 6-7/
67 ,2---),ta_-
.
,)-1:-(7-/ / g 7 _3- . 2„
ITEM # MEETING OF
MOTION BY: SECONDED BY:
YES NO ABSTAINED
1/4
VICE MAYOR HILL
COUNCILMAN. STEELSMITH /
COUNCILMAN HUDSON v/
COUNCILMAN EIDSON I
YOR CLARKE _ 1�� �c I
J.COUNCILMAN DAMIANO (I
_COURCILMAN SHANKS I
UNANITMOUS , IN FAVOR OPPOSED ABSTAINED
TOTAL
ROLL CALL VOTE SHEET
NOTES
2/tAL)
20 (1 (/ P 114
1)21
(9
ITEM # MEETING OF
MOTION BY : (-0 SECONDED BY : /"
i
Y y'S NO ABSTAINED
COUNCILMAN EIDSON
COUNCILMAN DAMIANO /
RCL I
COUNCILMAN STEELSM
ITH '��
COUNCILMAN SHANKS V
,COUNCILMAN HUDSON
VICE MAYOR HILL
UNANIMOUS IN FAVOR OPPOSED . ABSTAINED
TOTAL
ROLL CALL VOTE SHEET
NOTES
9
ITEM # MEETING OF
S ONE o9/
MOTION BY: EC D D BY:
YES NO ABSTAINED
MAYOR CI ARKE
ClUNCILMP IZPMIANO
CO1JNCIUAN STEELSMITkl
CO11N_C 1 I MAN HUDSON
CnhNCTI P"AN SEANKS t/
—COUNCILMAN FTDSON
VICE MAYOR- HILL I/
UNANI!".OUS , IN FAVOR OPPOSED ABSTAINED
TOTAL
PQACHF✓
O
gR/ZONP S%it a ac�2e unction
SUGGESTED MOTION:
BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
APACHE JUNCTION, ARIZONA, THAT THE CONTRACT FOR PUBLIC WORKS
PROJECT PW-82-85 ROAD MATERIALS, BE AWARDED AS FOLLOWS:
FOR ABC: ASPHALT MINING AND CONCRETE COMPANY
(AMCON) , 4500 TONS AT $4. 25 PER TON
FOR COLD COATED ASPHALT MINING AND CONCRETE COMPANY
CHIP: (AMCON) , 190 TONS AT $11.44 PER TON
FOR MC-250: ARIZONA REFINERY, 35 TONS AT $243. 00
(ROAD OIL) PER TON
FOR RS-2 : ARIZONA REFINERY, 25 TONS AT $193. 00
(ROAD OIL) PER TON
BE IT FURTHER RESOLVED THAT AUTHORIZATION BE GIVEN TO THE
DIRECTOR OF PUBLIC WORKS, THROUGH THE CITY MANAGER, TO PURCHASE
ROAD MATERIALS AND ROAD OIL IN THE AMOUNTS NEEDED TO COMPLETE
THE PROPOSED PROJECT, AS PREVIOUSLY APPROVED BY THE CITY
COUNCIL.
1001 NORTH IDAHO • APACHE JUNCTION,ARIZONA 85220-0190 • TELEPHONE(602)982-8002
PQACHF✓G
(-----
11 ;;,, -.
IZO / cOity o 4paci e 2unctian
DATE: July 23, 1982
MEMORANDUM TO: The Honorable Mayor and Members
of the City Council
THROUGH: f City Manager
Director of Public Works
i
FROM: Operations Supervisor
REGARDING: Bids For Road Construction Materials
And Road Oil (Agenda Item)
In conjunction with the planned road project as approved by
the City Council, the Operations Division has estimated
materials and oil required for the project to be done by joint
effort between Pinal County and the City of Apache Junction.
In calling suppliers for interest in bidding, we have deter-
mined that competitive bids may be difficult to obtain due to
the proximity of suppliers and the nature of the bid. The
estimated cost for road materials is $14,497. 50 and the esti-
mated cost for road oil is $13, 530. 00.
Bids having been received and reviewed indicated lowest best
qualified bidder for road materials to be Asphalt Mining &
Concrete Company, cost per ton is as follows:
1. 4500 tons at $4 . 25 per ton for ABC
2. 190 tons at $11. 44 per ton for 3/8"
cold Coated Chip
Bids having been received and reviewed indicated lowest best
qualified bidder for road oil to be Arizona Refining, cost
per ton is as follows:
1. 35 tons at $243 . 00 per ton for MC-250
2. 25 tons at $193 . 00 per ton for RS-2
I recommend acceptance of the lowest best qualified bidders
as described.
DD/emb
1001 NORTH IDAHO • APACHE JUNCTION,ARIZONA 85220-0190 • TELEPHONE(602)982-8002