HomeMy WebLinkAbout2026 09.01 City Council Regular Agenda O4 City of Apache Junction, Arizona Meeting location:
( (
�i'
. City Council Chambers
1U Z at City Hall
Agenda 300 E.Superstition Blvd
\gilONr Apache Junction,AZ
City Council Meeting 85119
apachejunctionaz.gov
Ph:(480)982-8002
Doors are open to the public at least 15 minutes prior to the
posted meeting start time.
Tuesday,September 1,2026 7:00 PM City Council Chambers
A. CALL TO ORDER
B. INVOCATION AND PLEDGE OF ALLEGIANCE
C. ROLL CALL
D. CONSENT AGENDA
The council may, at this time, take single action on any or all items listed as consent agenda items.
These may include, but are not limited to, acceptance of agenda, acceptance of minutes, appointments,
acceptance of resignations and adoption of certain resolutions and other items which do not require a
public hearing. The consent agenda is a timesaving device of which the mayor and city council is to
receive documentation on these items from the city manager for their review prior to the meeting. Any
member of the council may remove any item from the consent agenda for discussion and cause a
separate vote on the matter later in the agenda.
1. 26-403 Consideration of acceptance of agenda.
Sponsors: Evie McKinney
2. 26-411 Consideration of approval of minutes of the regular meeting of August
4, 2026.
Sponsors: Evie McKinney
Attachments: CCMIN 2026 08 04 MINUTES DRAFT
3. 26-408 Consideration of approval of a professional services agreement with
Arrington Watkins Architects, LLC, for design and construction
administration of City Services Expansion in an amount not to exceed
$5,805,795.
Sponsors: Trina Harrison
Attachments: Staff Memo to Council
Agreement-Arrington Watkins Architects, LLC
Presentation- Design City Services Expansion
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
City Council Meeting Agenda September 1,2026
4. 26-414 Consideration of approval of professional services agreement between
the City of Apache Junction and Excalibur Charter School -Avalon K-8,
for a grant-funded school resource officer in the amount of$
161,669.31 for a contract term of July 1, 2026, through June 30, 2027.
Sponsors: Michael Pooley
Attachments: Staff Memo to City Council
Excaliber Agreement
SRO Presentation Council
5. 26-416 Consideration of approval of professional services agreement between
the City of Apache Junction and Apache Trail High School, for a
grant-funded school resource officer in the amount of$ 161,669.31 for
a contract term of July 1, 2026, through June 30, 2027.
Sponsors: Michael Pooley
Attachments: Staff Memo to Council
Apache Trail High School Agreement
SRO Presentation Council
6. 26-429 Consideration of award of contract to M.R. Tanner Construction for the
asphalt concrete overlay on Ironwood Drive between Elliot Avenue and
Guadalupe Avenue. The work would be through the City of Buckeye
cooperative Job Order Contract No. 2025081 in the amount of
$543,991.00 plus a 10% contingency for unforeseen change orders in
the amount of$54,399.00 for a total project cost not to exceed
$598,390.10. Work is planned within September-October 2026.
Sponsors: Shane Kiesow
Attachments: Staff Memo to Council
M. R. Tanner Agreement
7. 26-441 Consideration of approval of the Land Use Assumptions and
Infrastructure Improvements Plan. The City's development fee
consultant, TischlerBise, has prepared a draft Land Use Assumptions
and Infrastructure Improvements Plan in preparation for updating the
Development Fee Study and adopting the associated implementing
ordinance and resolution.
Sponsors: Sidney Urias
Attachments: Staff Memo to Council
DRAFT Apache Junction LUA IIP& Fees 06.23.26
E. AWARDS, PRESENTATIONS AND PROCLAMATIONS
Awards,presentations from other organizations,proclamations issued by the mayor, and
acknowledgement of distinguished guests and visitors, and staff presentation of receipt of grant or
donated funds are permitted at this time.
City of Apache Junction,Arizona Page 2 Printed on 8/31/2026
City Council Meeting Agenda September 1,2026
8. 26-409 Presentation of 40-year Service Award to Lucretia Pelletier.
Attachments: Pelletier 40 Year Service- Presentation
F. REGIONAL INTERGOVERNMENTAL UPDATES
The mayor or any member of council may at this time present a brief summary of any regional
intergovernmental updates. However, no discussion shall take place on such items except for clarifying
comments related to substance, time and location.
9. 26-404 Brief summary of intergovernmental updates from mayor and
councilmembers.
Sponsors: Chip Wilson
G. CITY MANAGER'S REPORT
The city manager, members of city staff or those individuals designated by the manager may present
information pertinent to items under consideration or information related to the operation of the city. There
shall however be no discussion at this time except for clarification inquiries.
10. 26-405 City Manager's Report
Sponsors: Bryant Powell
H. PUBLIC HEARINGS
Public hearings required by applicable law shall be conducted by the council and any person shall be
given the opportunity to speak.All remarks shall be addressed to the council as a whole and not to any
member thereof. Such remarks shall be limited to five(5)minutes unless additional time is granted by
the mayor. This time limitation shall not apply to applicants and their agents appearing before the council.
11. 26-436 Presentation, discussion, and public hearing on automated license
plate readers and other crime detection prevention technology
employed by the Apache Junction Police Department.
Sponsors: Michael Pooley
I. OLD BUSINESS
The council shall consider any business that has been previously considered and which is still unfinished
to include those items previously postponed or tabled. No member of the public shall be permitted to
speak on these items unless invited to do so by the mayor after first submitting a written
request-to-speak form with the city clerk.
J. NEW BUSINESS
The council shall consider any business not yet considered. No member of the public shall be permitted
to speak on these items unless invited to do so by the mayor after first submitting a written
request-to-speak form with the city clerk.
K. COUNCIL DIRECTION TO STAFF
This item allows the mayor and city council to direct staff on specifically listed matters.
L. SELECTION OF MEETING DATES, TIMES, LOCATIONS, AND PURPOSES
City of Apache Junction,Arizona Page 3 Printed on 8/31/2026
City Council Meeting Agenda September 1,2026
M. CALL TO PUBLIC
At this time the public has the privilege to address the council with requests, communications, comments
or suggestions relating to city business.All speakers must have already submitted a written "Request to
Speak"form to the city clerk no later than the conclusion of the city manager's report portion of the
agenda. If there is a group speaking on the same item, they should select a spokesperson.All such
remarks shall be addressed to the council as a whole and not to any member thereof. The mayor is
authorized to ask a speaker to stop speaking and leave the podium or to adjourn the meeting if anyone
becomes disorderly, uncivil, makes personal attacks or continues to speak about items that are not
within the jurisdiction of the city after being warned such issues are beyond the jurisdiction of the city to
act. The council may not answer questions of the speaker, discuss the matter with one another, but may,
at the conclusion: 1)respond to criticism by a speaker;2)ask the city manager to review a matter;3)
ask the city manager to place the matter on a future agenda. Each speaker must approach the podium,
speak into the microphone,provide their name and address. There is a three (3)minute time limit per
speaker.
N. ADJOURNMENT
Copies of this agenda and additional information on any of the items listed above may be obtained from
the City Clerk's office located at 300 E Superstition Blvd,Apache Junction,AZ 85119, Monday through
Thursday from 7:00a-6:00p, excluding holidays.
The City of Apache Junction invites and welcomes people of all abilities to use our programs, sites and
facilities. Specific requests may be made by contacting the Human Resources Office at(480)474-2617
or TDD(480) 983-0095.
The Apache Junction City Council may vote to go into Executive Session for legal advice on any item
listed on this agenda pursuant to A.R.S. §38-431.03(A)(3);this notice is given pursuant to A.R.S. §
38-431.02 to the members of the City Council and the public.
City of Apache Junction,Arizona Page 4 Printed on 8/31/2026
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
U =i 85119
Agenda Item No. 1.
'�QizO$ File ID: 26-403
Sponsor: Evie McKinney Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of acceptance of agenda.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
U =i 85119
Agenda Item No.2.
'�QizoN* File ID: 26-411
Sponsor: Evie McKinney Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of approval of minutes of the regular meeting of August 4, 2026.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
City of Apache Junction, Arizona Meeting location:
City Council Chambers
}. 1 Meeting Minutes at City Hall
300 E.Superstition Blvd
City Council Meeting Apache Junction,AZ
85119
apachejunctionaz.gov
Ph:(480)982-8002
Doors are open to the public at least 15 minutes prior to the
posted meeting start time.
Tuesday,August 4,2026 7:00 PM City Council Chambers
A. CALL TO ORDER
Mayor Wilson called the meeting to order at 7:00 p.m.
B. INVOCATION AND PLEDGE OF ALLEGIANCE
Councilmember Heck gave the invocation and Councilmember Soller led the meeting attendees
in the Pledge of Allegiance.
C. ROLL CALL
Present: 7- Mayor Wilson
Vice Mayor Schroeder
Councilmember Nesser
Councilmember Heck
Councilmember Johnson
Councilmember Cross
Councilmember Soller
Staff in Attendance:
Bryant Powell, City Manager
Matt Busby, Assistant City Manager
Evie McKinney, City Clerk
Joel Stern, City Attorney
Rudy Esquivias, Development Services Director
Liz Langenbach, Parks & Recreation Director
Ryan Kaup, Economic Development Director
Angelie Hawley, Finance Director
Mike Loggins, Public Works Director
Amy Greening, Deputy City Clerk
Cindy Ewer, Commander
Joseph Penze, Commander
D. CONSENT AGENDA
Councilmember Soller moved,seconded by Councilmember Nesser to approve the Consent
Agenda.
26-390 Consideration of acceptance of agenda.
City of Apache Junction,Arizona Page 1
City Council Meeting Meeting Minutes August 4,2026
2. 26-389 Consideration of approval of minutes of the regular meeting of July 21, 2026.
3. 26-395 Consideration of approval of Resolution No. 26-31, authorizing acceptance of
a DUI Abatement grant from the Governor's Office of Highway Safety.
4. 26-396 Consideration of approval of Resolution No. 26-35 authorizing an
intergovernmental agreement with Department of Public Safety for Vehicle
Theft Task Force.
5. 26-393 Consideration of approval of Resolution No. 26-32 authorizing an
intergovernmental agreement with Department of Public Safety for Gang and
Immigration Intelligence Team Enforcement Mission.
6. 26-394 Consideration of approval of Resolution No. 26-33 authorizing an
intergovernmental agreement for participation in the East Valley Child
Abduction Response Team.
E. AWARDS, PRESENTATIONS AND PROCLAMATIONS
F. REGIONAL INTERGOVERNMENTAL UPDATES
7. 26-391 Brief summary of intergovernmental updates from mayor and
councilmembers.
Councilmember Johnson invited the community to attend the "9/11 25th Anniversary Memorial"
event on Friday September 11, 2026, at 8:00 a.m. at the Veterans Memorial Gazebo.
Mayor Wilson and several Council members attended the ribbon cutting for American
Leadership Academy Radiance. He stated that the school presented him with a football helmet
and he showed a picture of the ribbon cutting.
G. CITY MANAGER'S REPORT
8. 26-392 City Manager's Report
City Manager Bryant Powell announced that the Boards and Commissions application period is
open now through September 15, 2026, and invited residents to apply. He also stated that with
the new school year that has started, there will be a new Youth Advisory Council and they will be
attending the League Annual Conference later this month.
Mr. Powell shared a picture from the library's 40th anniversary celebration, that included 2
previous library directors, Spencer Paden and Pam Loui with the current director Pam Harrison.
He announced the Salt River Project(SRP)will be drawing down Canyon Lake for a period of
time starting in September.
H. PUBLIC HEARINGS
I. OLD BUSINESS
City of Apache Junction,Arizona Page 2
City Council Meeting Meeting Minutes August 4,2026
J. NEW BUSINESS
9. 26-397 Consideration of approval of Resolution No. 26-37, a resolution of the mayor
and city council of the City of Apache Junction, Pinal and Maricopa Counties,
Arizona, declaring and adopting the results of the Primary Election held on
July 21, 2026. State law requires that the city council canvass the votes and
adopt the election results no later than 20 days following an election.
Councilmember Nesser moved,seconded by Councilmember Soller that Resolution No.26-37,a
resolution of the mayor and city council of the City of Apache Junction, Pinal and Maricopa
Counties,Arizona,declaring and adopting the results of the Primary Election held on July 21,
2026, be approved.
Yes: 7- Mayor Wilson, Vice Mayor Schroeder, Councilmember Nesser, Councilmember
Heck, Councilmember Johnson, Councilmember Cross and Councilmember
Soller
No: 0
City Clerk Evie McKinney presented that Arizona Revised Statutes §16-642 (A) requires that the
city council convene not less than six (6) not more than twenty(20)days following an election
for purposes of canvassing the returns of the election. Arizona Revised Statutes §16-646
specifies the information requirements of the canvass.
When the results of the canvass are determined, the City Clerk must enter upon the records a
statement known as the official canvass which must show the number of ballots cast city wide
and by precinct, the number of ballots rejected city wide and by precinct, the office titles and
candidate names, the number of votes cast city wide and by precinct for each candidate, and
the number of active registered voters in the city. Even though the law does not specify that the
canvass must be done as a resolution, most Arizona cities and towns use a resolution format.
Ms. McKinney stated that the Primary Election date was permanently moved to the second to
last Tuesday in July when Governor Hobbs signed House Bill 2022. She went over
comparisons from the 2024 Primary Election for voter turn out to the 2026 Primary Election,
which had 6,290 ballots cast, an increase of 2,511 registered voters making the total count
29,790 with a 21% voter turnout. She also requested Council approval for Resolution No. 26-37.
Councilmembers had no concerns.
10. 26-388 Presentation and discussion on a professional services agreement with
Arrington Watkins Architects, LLC, for design and construction administration
of City Services Expansion in an amount not to exceed $5,805,795.
CIP Program Manager Trina Harrison presented an agreement with Arrington Watkins
Architects, LLC, to provide construction documents and construction administration services for
the City Services Expansion project at Ironwood and Horton Drive. This project will deliver
multiple new community assets, including a police substation, branch library, community park
with lake, and a park maintenance building to include a shared yard with Public Works.
City of Apache Junction,Arizona Page 3
City Council Meeting Meeting Minutes August 4,2026
The project site lies within the 6,600 acres annexed in October 2021 as part of the Superstition
Vistas area. Under the development agreement, D.R. Horton conveyed the 22-acre parcel to the
City of Apache Junction for future municipal use. This conveyance reduces the overall project
cost expenditures by$7 million.
On September 16, 2025, Arrington Watkins Architects, LLC was ratified through RFQ 25MP-001
to prepare the master plan and design for the City Services Expansion project. With the master
plan now complete, the project is ready to advance into the next phase. This requires approval
of a new scope of work, schedule, and fee for preparation of construction documents and
construction administration services. Continuing with the same architect maintains project
continuity and ensures alignment with the approved master plan.
City Managerment Staff recommends approval of the contract with Arrington Watkins
Architects, LLC, utilizing RFQ 25MP-001 in an amount not to exceed $5,805,795.00, including
contingency. This fee encompasses the comprehensive design and construction administration
services necessary to deliver a police substation, branch library, maintenance building and yard,
community park, lake, associated parking, and supporting infrastructure on unimproved land as
a single, integrated project rather than separate standalone projects.
The contract will be on the consent agenda for the September 1st City Council Meeting, unless
otherwise directed by City Council.
Vice Mayor Schroeder asked for clarification on the cost.
Ms. Harrison responded to Vice Mayor.
11. 26-402 Presentation, discussion, and possible consideration of Resolution No. 26-38
for vacation of the dedicated right-of-way on the East and North side of
Parcels APN 101-23-004F and APN 101-23-004G, located at the northwest
corner of Old West Highway and Idaho Road, for the purpose of cleaning up
right-of-way that has no beneficial use for the City of Apache Junction.
Vice Mayor Schroeder moved,seconded by Councilmember Johnson that Resolution No.26-38,
Resolution No.26-39,and Resolution No.26-40 to be brought back for further discussion on a
future agenda before December 31,2026.
Yes: 7- Mayor Wilson, Vice Mayor Schroeder, Councilmember Nesser, Councilmember
Heck, Councilmember Johnson, Councilmember Cross and Councilmember
Soller
No: 0
Public Works Director Mike Loggins presented Items 11, 12 and 13 together. He went over the
background and location of each area and stated they are no longer necessary for public use.
He stated that the businesses located next to these areas have been using the space for
storage and parking for many years and that the city is no longer using this right-of-way (ROW).
City of Apache Junction,Arizona Page 4
City Council Meeting Meeting Minutes August 4,2026
Councilmember Soller asked what the term exception meant that was shown on one of the
maps.
Councilmember Cross confirmed that once the properties are vacated that the businesses will
take ownership of it.
Councilmember Johnson questioned why these extinguishments should be considered before
the decisions are made for design of the property not to these areas.
Councilmember Cross asked who is liable if someone falls and injures themselves on these
properties.
Vice Mayor Schroeder agreed with Councilmember Johnson and does not feel like the city
should be in any hurry to extinguish the properties .
Councilmember Heck asked if the city has maintained these properties at all and expressed that
he agreed with Vice Mayor Schroeder and Councilmember Johnson.
Councilmember Cross asked if the properties are big enough for a 2 lane road.
Mayor Wilson asked for clarification on where these properties are located compared to the city
owned property.
Vice Mayor Schroeder expressed more concern about extinguishing these properties at this
time, in the event someone wants to negotiate for the 6 acres of land that runs along the area.
He recommended a postponement of this topic.
City Manager Bryant Powell, City Attorney Joel Stern and Vice Mayor Schroeder discussed what
the motion needs to include.
12. 26-406 Presentation, discussion, and possible consideration of Resolution No. 26-39
for vacation of the dedicated right-of-way on the East and North side of
Parcels APN 101-23-004E, APN 101-23-007A and APN 101-23-009A, located
at the northwest corner of Old West Highway and Idaho Road, for the
purpose of cleaning up right-of-way that has no beneficial use for the City of
Apache Junction.
This Item was addressed under Item No. 11.
13. 26-407 Presentation, discussion, and possible consideration of Resolution No. 26-40
for vacation of the dedicated right-of-way on the on the East and North side of
Parcel APN 101-11-0240, located at the northwest corner of Old West
Highway and Idaho Road, for the purpose of cleaning up right-of-way that has
no beneficial use for the City of Apache Junction.
This Item was addressed under Item No. 11.
K. COUNCIL DIRECTION TO STAFF
L. SELECTION OF MEETING DATES, TIMES, LOCATIONS, AND PURPOSES
City of Apache Junction,Arizona Page 5
City Council Meeting Meeting Minutes August 4,2026
M. CALL TO PUBLIC
Karen Konfederak, 1971 N. Hilton Road, Apache Junction, requested that Council include on a
future agenda a discussion of a donation and placement of a bronze America250 marker from
the Apache Trail Chapter of the Daughters of the American Revolution.
Donna Carr, 2178 W. Virginia Street, Apache Junction, spoke about data processing centers
and wanting to get them on the ballot for people to vote to ban them.
N. ADJOURNMENT
Mayor Wilson adjourned the meeting at 7:42 p.m.
ACCEPTED THIS DAY OF , 2026, BY THE MAYOR AND CITY
COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA.
SIGNED AND ATTESTED TO THIS DAY OF , 2026.
Walter"Chip"Wilson
Mayor
ATTEST:
Evie McKinney
City Clerk
City of Apache Junction,Arizona Page 6
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
� ;= Agenda Item Cover Sheet Apache Junction,AZ
85119
Agenda Item No. 3.
'��PizoN� File ID: 26-408
Sponsor: Trina Harrison Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of approval of a professional services agreement with Arrington Watkins
Architects, LLC, for design and construction administration of City Services Expansion in an
amount not to exceed $5,805,795.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
City of Apache Junction
Home of the Superstition Mountains
DATE: AUGUST 3, 2026
TO: MAYOR AND CITY COUNCIL MEMBERS
THROUGH: BRYANT POWELL, CITY MANAGER
FROM: TRINA HARRISON, CIP PROGRAM MANAGER
SUBJECT: AGREEMENT FOR CITY SERVICES EXPANSION DESIGN AND CONSTRUCTION
ADMINISTRATION
Executive Summary
Staff respectfully requests that the mayor and city council approve entering into an
agreement with Arrington Watkins Architects, LLC to provide construction documents
and construction administration services for the City Services Expansion project at
Ironwood and Horton Dr. This project will deliver multiple new community assets,
including a police substation, branch library, community park with lake, and a park
maintenance building with a shared yard with Public Works.
Background
The project site lies within the 6,600 acres annexed in October 2021 as part of the
Superstition Vistas area. Under the development agreement, D.R. Horton conveyed the
22-acre parcel to the City of Apache Junction for future municipal use. This
conveyance reduces the overall project cost expenditures by $7 million.
On September 16, 2025, Arrington Watkins Architects, LLC was ratified through RFQ
25MP-001 to prepare the master plan and design for the City Services Expansion
project. With the master plan now complete, the project is ready to advance into the
next phase. This requires approval of a new scope of work, schedule, and fee for
preparation of construction documents and construction administration services.
Continuing with the same architect maintains project continuity and ensures alignment
with the approved master plan.
Analysis and Recommendation
Staff recommends approval of the contract with Arrington Watkins Architects, LLC
utilizing RFQ 25MP-001 in an amount not to exceed $5,805,795, including contingency.
This fee encompasses the comprehensive design and construction administration
services necessary to deliver a police substation, branch library, maintenance building
and yard, community park, lake, associated parking, and supporting infrastructure on
unimproved land as a single, integrated project rather than separated standalone
projects.
Next Steps
This contract will be placed on the consent agenda for the September 1St City Council
Meeting, unless otherwise directed by City Council.
ARCHITECT & ENGINEERING SERVICES AGREEMENT
BETWEEN CITY OF APACHE JUNCTION AND
ARRINGTON WATKINS ARCHITECTS, LLC FOR DESIGN AND CONSTRUCTION
ADMINISTRATION OF CITY SERVICES EXPANSION
THIS AGREEMENT is made as of the day of 2026 (the
"Effective Date") by and between the CITY OF APACHE JUNCTION, an Arizona
municipal corporation ("City"), and ARRINGTON WATKINS ARCHITECTS , LLC,
an Arizona limited liability companylcorporation ("Consultant"), sometimes
collectively referred to as the "Parties" or individually as a "Party" for the
project entitled CITY SERVICES EXPANSION.
RECITALS
A. City desires to retain an architect/engineer ("A/E") team to provide
comprehensive design and construction administration services and to make
payment for the same in accordance with the terms and conditions set forth in
this Agreement, including all attachments and addenda which are appended to
it.
B. The open market procedures have been satisfied to the extent they
apply.
C. The Parties have set forth below contemplated services Consultant
will provide to City, including payment terms for such services and products.
AGREEMENT
NOW, THEREFORE, in consideration of the Recitals noted above, the
mutual covenants and conditions below, and other good and valuable
consideration, the receipt and sufficiency of which are hereby acknowledged,
the Parties agree as follows:
1. CONSULTANT'S DUTIES: Consultant agrees to perform the
professional services detailed in Exhibit A (the "Services") within the time
frames set forth on Exhibit B (the "Schedule")
2. COMPENSATION: In accordance with Exhibit C (the
"Compensation") and the terms and conditions of this Agreement, City shall
compensate Consultant for the Services in an amount not to exceed Five Million
Eight Hundred Five Thousand Seven Hundred Ninety-Five Dollars and Zero
Cents ($5,805,795.00) (the "Contract Amount").
3. CONSULTANT BILLING: Consultant shall invoice City on a percent
complete by phase basis in a total amount not to exceed the Contract Amount.
City agrees to process for payment invoices received from Consultant within
thirty (30) calendar days following receipt of such invoices, provided Consultant
fulfills all duties and obligations set forth in this Agreement. Review of invoices
by City may include an inspection of the Services.
4. TERM: The term of this Agreement shall commence on August 3,
2026 and end on June 30, 2030. This Agreement may be extended upon mutual
written consent of the Parties provided that any amendment shall be executed
by an authorized signatory of the Parties and provide in writing the amended
term of the Agreement and, if applicable, a specified dollar amount of additional
payment to be owed by City to Consultant.
5. CITY'S STANDARD. OF PERFORMANCE: City shall furnish
Consultant with all data, information and other supporting services necessary
for Consultant to perform the Services. City shall not be responsible for
discovering deficiencies in the technical accuracy of the Services.
6. CONSULTANT'S STANDARD OF PERFORMANCE: The Services
shall be performed by qualified professionals licensed in Arizona, selected and
paid by Consultant and acting in the interest of the Consultant. While performing
the Services, Consultant and its subcontractors shall exercise the reasonable
professional care and skill customarily exercised by reputable members of
Consultant's profession practicing in the Phoenix Metropolitan Area and shall
use reasonable diligence and best judgment while exercising its professional
skill and expertise. Consultant shall be responsible for all errors and omissions
Consultant or its subcontractors commit in the performance of this Agreement.
Consultant shall correct any deficiencies in the technical accuracy of the
Services without additional compensation except to the extent such corrective
action is directly attributable to deficiencies in any information provided by City.
7. NOTICES: All notices to a Party required under this Agreement
shall be in writing and sent by first class certified mail, postage prepaid, return
receipt requested, addressed to the following:
If to City: City of Apache Junction
City Manager
300 East Superstition Boulevard
Apache Junction, AZ 85119
If to Consultant ARRINGTON WATKINS ARCHITECTS, LLC
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
8. INSURANCE: Consultant, at its own expense, shall purchase and
maintain during the Term the minimum insurance required by this Agreement
with companies duly licensed, possessing a current A.M. Best, Inc. Rating of
2
B++6, or approved unlicensed in the State of Arizona with policies and forms
satisfactory to City.
All insurance required by this Agreement shall be maintained in full force and
effect until the Services are satisfactorily completed and formally accepted by
City; failure to do so may, at the sole discretion of City, constitute a material
breach of this Agreement.
Consultant's Insurance shall be primary insurance as respects the City, and any
insurance or self-insurance maintained by City shall not contribute to it.
Any failure to comply with the claim reporting provisions of the insurance
policies or any breach of an insurance policy warranty shall not affect coverage
afforded under the insurance policies to protect City.
The insurance policies, except Workers' Compensation, shall contain a waiver
of transfer rights of recovery (subrogation) against City, its agents, officers,
officials and employees for any claims arising out of Contractor's acts, errors,
mistakes, omissions, work or service.
The insurance policies may provide coverage which contains deductibles or
self-insured retentions. Such deductible and/or self-insured retentions shall not
be applicable with respect to the coverage provided to City under such policies.
Consultant shall be solely responsible for the deductible and/or self retention
and City, at its option, may require Consultant to secure payment of such
deductibles or self-insured retentions by a surety bond or an irrevocable and
unconditional letter of credit.
The insurance policies required by this Agreement, except Workers'
Compensation and Professional Liability, shall name City, its agents, officers,
officials and employees as Additional Insureds.
Consultant shall expressly bind any subcontractors, or any other lower tier
subcontractors, used in the performance of any aspect of the Services, to the
insurance requirements in this Agreement, making such obligations applicable
to the other contractor to the same extent as it is applicable to Consultant. The
purpose of this provision is to require any lower tier contractor, regardless of
level, to provide insurance and indemnity required by this Agreement.
REQUIRED COVERAGE
A. Commercial General Liability
Consultant shall maintain throughout the Term Commercial General Liability
insurance with a limit of not less than $1,000,000 for each occurrence with a
$2,000,000 Products/Completed Operations Aggregate and a $2,000,000
General Aggregate limit. The policy shall include coverage for bodily injury,
3
broad form property damage, personal injury, products and completed
operations and blanket contractual coverage including, but not limited to, the
liability assumed under the indemnification provisions of this Agreement, which
coverage will be at least as broad as that on Insurance Service Office, Inc.
Policy Form No. CG 00011093, or the equivalent thereof.
Such policy shall contain a severability of interest provision, and shall not
contain a sunset provision or commutation clause, nor any provision which
would serve to limit third party action over claims.
The Commercial General Liability additional insured endorsement shall be at
least as broad as the Insurance Service Office, Inc.'s Additional Insured, Form
B, CG 20101185, or the equivalent thereof, and shall include coverage for
Consultant's operations and products and completed operations.
If Consultant sublets any part of the Services, Consultant shall purchase and
maintain, at all times during prosecution of the Services, an Owner and
Contractor's Protective Liability insurance policy for bodily injury and property
damage, including death, which may arise in the prosecution of the Services.
Coverage shall be on an occurrence basis with a limit not less than $1,000,000
per occurrence, and the policy shall be issued by the same insurance company
that issues Consultant's Commercial General Liability insurance.
B. Automobile Liability
Consultant shall maintain Commercial/Business Automobile Liability insurance
with a combined single limit for bodily injury and property damage of not less
than $1,000,000 each occurrence with respect to Consultant's owned, hired,
and non-owned vehicles assigned to or used in performance of the Services.
Coverage will be at least as broad as coverage code 1, "any auto", (insurance
Service Office, Inc. Policy Form CA 00011293, or the equivalent thereof). Such
insurance shall include coverage for loading and off-loading hazards. If
hazardous substances, materials or wastes are to be transported, MCS 90
endorsement shall be included and $5,000,000 per accident limits for bodily
injury and property damage shall apply.
C. Workers' Compensation
Consultant shall carry Workers' Compensation insurance to cover obligations
imposed by federal and state statutes having jurisdiction over Consultant's
employees engaged in the performance of the Services; and Employer's Liability
insurance of not less than $100,000 for each accident, $100,000 disease for
each employee, and $500,000 disease policy limit.
By execution of this Agreement, Consultant certifies as follows:
4
"I am aware and understand the provisions of A.R.S. § 23-901 etseq.
which requires every employer to be insured against liability for
workers' compensation or to undertake self-insurance in
accordance with the provisions of this chapter, and I will comply with
such provisions before commencing the performance of the work of
this Agreement."
If Consultant has no employees for whom Workers' Compensation insurance is
required by federal or state statutes, Consultant shall submit a declaration or
affidavit to City so stating and covenanting to obtain such insurance if and when
Consultant employs any employees subject to coverage.
0. Professional Liability
Consultant shall maintain Professional Liability insurance covering acts, errors,
mistakes and omissions arising out of the work or services performed by
Consultant, or any person employed by Consultant, with a limit of not less than
$1,000,000 each claim.
E. Certificates of Insurance
Prior to commencing the Services, Consultant shall furnish City with Certificates
of Insurance, or formal endorsements as required by the Agreement, issued by
Consultant's insurer(s), as evidence that policies providing the required
coverages, conditions and limits required by this Agreement are in full force and
effect. City shall not be obligated, however, to review same or to advise
Consultant of any deficiencies in such policies and endorsements, and such
receipt shall not relieve Consultant from, or be deemed a waiver of, City's right
to insist on strict fulfillment of Consultant's obligations under this Agreement.
The form of the certificates of insurance and endorsements shall be subject to
the approval of the Apache Junction City Attorney's Office, shall comply with the
terms of this Agreement. Policies or certificates and completed forms of City's
Additional Insured Endorsement (or a substantially equivalent insurance
company form acceptable to the City Attorney) evidencing the coverage
required by this Agreement shall be delivered to City Attorney, City of Apache
Junction, 300 East Superstition Boulevard, Apache Junction, AZ 85119. The
policy or policies shall be in the usual form of public liability insurance, but shall
also include the following provision:
"Solely as respects work done by or on behalf of the named insured for
the City of Apache Junction, it is agreed that the City of Apache Junction
and its officers and employees are added as additional insureds under
this policy."
5
In the event any insurance policies required by this Agreement are written on a
"claims made" basis, coverage shall extend for two (2) years past completion
and acceptance of Consultant's work or services and as evidenced by annual
Certificates of Insurance.
Consultant shall require its insurers to provide City thirty (30) calendar days'
prior written notice of any nonrenewal, cancellation, or material change in the
coverage under such policy reducing coverage to below contractually-required
amounts. If a policy does expire during the Term, a renewal certificate must be
sent to City thirty (30)calendar days prior to the expiration date.
9. APPLICABLE LAW AND VENUE: The terms and conditions of this
Agreement shall be governed by and interpreted In accordance with the laws of
the State of Arizona. Any action at law or in equity brought by either party for
the purpose of enforcing a right or rights provided for in this Agreement, shall
be tried in a court of competent jurisdiction in Pinal County, State of Arizona.
The parties hereby waive all provisions of law providing for a change of venue in
such proceeding to any other county. In the event either Party shall bring suit to
enforce any term of this Agreement or to recover any damages for and on
account of the breach of any term or condition in this Agreement, it is mutually
agreed that the prevailing party in such action shall recover all costs including:
all litigation and appeal expenses, collection expenses, reasonable attorney
fees, necessary witness fees and court costs to be determined by the court in
such action.
10. FORCE MAJEURE: Neither City nor Consultant, as the case may be,
shall be considered not to have performed its obligations under this Agreement
in the event of enforced delay (an "Enforced Delay") due to causes beyond its
control and without its fault or negligence or failure to comply with applicable
laws, including, but not restricted to, acts of God, fires, floods, epidemics,
pandemics and related executive orders, quarantines, restrictions, embargoes,
labor disputes, and unusually severe weather or the delays of subcontractors or
materialmen due to such causes, acts of a public enemy, war, terrorism or act of
terror (including but not limited to bio-terrorism or eco-terrorism), nuclear
radiation, blockade, insurrection, riot, labor strike or interruption, extortion,
sabotage, or similar occurrence or any exercise of the power of eminent domain
of any governmental body on behalf of any public entity, or a declaration of
moratorium or similar hiatus (whether permanent or temporary) by any public
entity directly affecting the obligations under this Agreement. In no event will
Enforced Delay include any delay resulting from unavailability for any reason of
labor shortages, or the unavailability for any reason of particular Consultants,
subcontractors, vendors or investors desired by Consultant in connection with
the obligations under this Agreement. Consultant agrees that Consultant alone
will bear all risks of delay which are not Enforced Delay. In the event of the
occurrence of any such Enforced Delay, the time or times for performance of the
obligations of the Party claiming delay shall be extended for a period of the
Enforced Delay; provided, however, that the Party seeking the benefit of the
6
provisions of this Section 10 shall, within thirty (30) calendar days after such
Party knows or should know of any such Enforced Delay, first notify the other
Party of the specific delay in writing and claim the right to an extension for the
period of the Enforced Delay; and provided further that in no event shall a period
of Enforced Delay exceed ninety (90) calendar days.
11. TERMINATION: This Agreement may be terminated by either Party
for any reason upon two (2) months' written notice. If this Agreement is
terminated, City shall be reimbursed from Consultant the amount paid for any
undelivered and/or unaccepted products or services. City shall pay Consultant
for completed and acceptable work performed pursuant to this Agreement prior
to the date of termination.
12. INDEMNIFICATION: To the fullest extent permitted by law,
Consultant shall defend, indemnify and hold harmless City, its elected and
appointed officers, officials, special districts, agents, and employees from and
against any and all liability including but not limited to demands, claims, actions,
fees, costs and expenses, including reasonable attorney and expert witness
fees, arising from, or alleged to have arisen from, relating to, arising out of, or
alleged to have resulted from the acts, errors, mistakes, omissions, work or
services of Consultant, its agents, employees, or any tier of Consultant's
subcontractors in the performance of this Agreement, but only to the extent
caused by the negligence, recklessness or intentional wrongful conduct of
Consultant or its subcontractors in the performance of the Services or any
subcontract. Consultant's duty to defend, hold harmless and indemnify City, its
elected and appointed officers, officials, special districts, agents, and
employees shall arise in connection with any claim, damage, loss or expense
that is attributable to bodily injury, sickness, disease, death, or injury to,
impairment, or destruction of property including loss of use resulting therefrom,
caused by Consultant's acts, errors, mistakes, omissions, work or services in
the performance of this Agreement, including any employee of Consultant, any
tier of Consultant's subcontractor, or any other person for whose acts, errors,
mistakes, omissions, work or services Consultant may be legally liable, but only
to the extent caused by the negligence, recklessness, or intentional wrongful
conduct of Consultant or any tier of Consultant's subcontractors or any other
person for whose acts, errors, mistakes, omissions, work or services Consultant
may be legally liable in the performance of the Services or subcontract. The
amount and type of insurance coverage requirements set forth in this
Agreement will in no way be construed as limiting the scope of the indemnity in
this Section 12. The rights and obligations under this Section 12 shall survive
termination of this Agreement.
13. TAXES: Consultant shall pay as they become due all license, sales,
consumer, transaction privilege, use and other similar taxes for services
provided by Consultant which are legally enacted at the time the obligations
under this Agreement are performed.
7
14. PERMITS AND FEES: Unless otherwise provided in this Agreement,
Consultant shall secure and pay for all applicable permits, government fees,
licenses and inspections necessary for the proper execution and completion of
services which are customarily secured after execution of the Agreement.
Consultant shall give all notices and comply with all laws, ordinances, rules,
regulations and lawful orders of any public authority bearing on the
performance of the Services. Consultant represents and warrants that any
license necessary to perform the Services is current and valid. Consultant
understands that the activity described in this Agreement constitutes "doing
business in the City of Apache Junction" and Consultant agrees to obtain a
business license pursuant to Chapter 8 of the Apache Junction City Code, Vol. I,
and keep such license current during the Term. Consultant also acknowledges
that the tax provision of the Apache Junction Tax Code, Chapter 8A, may also
apply and if so, shall obtain a transaction privilege license and/or other licenses
as may be required by all applicable laws.
15. RECORDS: Records of Consultant's labor, payroll, and other costs
pertaining to this Agreement shall be kept on a generally recognized accounting
basis and made available to City for inspection on request. Consultant shall
maintain records for a period of at least two (2) years after expiration of this
Agreement, and shall make such records available during that retention period
for examination or audit by City personnel during regular business hours.
16. RIGHT OF CITY TO CONTRACT WITH OTHERS: Nothing in this
Agreement shall imply City is obligated to obtain the Services described in this
Agreement only through Consultant.
17. INDEPENDENT CONTRACTOR: City and Consultant agree and
understand that the relationship between both Parties is that of an independent
contractor. As such, Consultant is not entitled to receive any benefits to which
City employees are entitled by virtue of their employment with City. City shall not
be responsible for payment to employees of Consultant for salaries, related
taxes (including, but not limited to, federal Social Security tax as well as federal
and state unemployment taxes) and all other expenses related to their
employment or contractual relationship with Consultant.
18. WAIM R QF TERMS AND CONDITIONS: The failure of City or
Consultant to insist in any one or more instances on performance of any of the
terms or conditions of this Agreement or to exercise any right or privilege
contained herein shall not be considered as thereafter waiving such terms,
conditions, rights or privileges, and they shall remain in full force and effect.
19. COMPLIANCE WITH FEDERAL AND STATE LAWS: Consultant
understands and acknowledges the applicability of the American with
8
Disabilities Act, the Immigration Reform and Control Act of 1986 and the Drug
Free Workplace Act of 1989 to the services performed under this Agreement.
As required by A.R.S. § 41-4401, Consultant hereby warrants its compliance
with all federal immigration laws and regulations that relate to its employees and
A.R.S. § 23-214(A). Consultant further warrants that after hiring an employee,
Consultant will verify the employment eligibility of the employee through the E-
Verify program. If Consultant uses any subcontractors in performance of
services, subcontractors shall warrant their compliance with all federal
immigration laws and regulations that relate to its employees and A.R.S. § 23-
214(A), and subcontractors shall further warrant that after hiring an employee,
such subcontractor verifies the employment eligibility of the employee through
the E-Verify program. A breach of this warranty shall be deemed a material
breach of the Agreement that is subject to penalties up to and including
termination of this Agreement. Consultant is subject to a penalty of $100 per
day for the first violation, $500 per day for the second violation, and $1,000 per
day for the third violation. City at its option may terminate this Agreement after
the third violation. Consultant shall not be deemed in material breach of this
Agreement if the Consultant and/or subcontractors establish compliance with
the employment verification provisions of Sections 274A and 274B of the federal
Immigration and Nationality Act and the E-Verify requirements contained in
A.R.S. § 23-214(A). City retains the legal right to inspect the papers of any
Consultant or subcontractor employee who works under this Agreement to
ensure that the Consultant or subcontractor is complying with the warranty.
Any inspection will be conducted after reasonable notice and at reasonable
times. If state law is amended, the Parties may modify this paragraph consistent
with state law.
20. ENTIRE AGREEMENT: This Agreement and any attachments
represent the entire agreement between City and Consultant and supersede all
prior negotiations, representations or agreements, either express or implied,
written or oral. It is mutually understood and agreed that no alteration or
variation of the terms and conditions of this Agreement shall be valid unless
made in writing and signed by the Parties. Written and signed amendments shall
automatically become part of this Agreement, and shall supersede any
inconsistent provision therein; provided, however, that any apparent
inconsistency shall be resolved, if possible, by construing the provisions as
mutually complementary and supplementary.
21. BINDING EFFECT. ASSIGNMENT AND DELEGATION: City and
Consultant each bind themselves, their partners, successors, assigns and legal
representatives to the other Party and to the partners, successors, assigns and
legal representatives of such other Party in respect to all covenants,
agreements and obligations contained in this Agreement. Neither Party shall
assign the Agreement or sublet it as a whole or delegate the duties under this
Agreement, without the written consent of the other Party, nor shall Consultant
9
assign any monies due or to become due to it without the previous written
consent of City.
22. SEVERABILITY: City and Consultant each believe that the
execution, delivery and performance of this Agreement are in compliance with
all applicable laws. However, in the unlikely event that any provision of this
Agreement is declared void or unenforceable (or is construed as requiring City
to do any act in violation of any applicable laws, including any constitutional
provision, law, regulation, or City Code), such provision shall be deemed
severed from this Agreement and this Agreement shall otherwise remain in full
force and effect; provided that this Agreement shall retroactively be deemed
reformed to the extent reasonably possible in such a manner so that the
reformed agreement (and any related agreements effective as of the same date)
provide essentially the same rights and benefits (economic and otherwise) to the
Parties as if such severance and reformation were not required. Unless
prohibited by applicable laws, the Parties further shall perform all acts and
execute, acknowledge and/or deliver all amendments, instruments and consents
necessary to accomplish and to give effect to the purposes of this Agreement,
as reformed.
23. ACCURACY OF WORK: Acceptance of services or work by City
shall not relieve Consultant of the responsibility for subsequent correction of
any such errors and the clarification of any ambiguities. Consultant shall make
all necessary revisions or corrections resulting from errors and omissions on
the part of Consultant without additional compensation.
24. OWNERSHIP OF WORK PRODUCT. All documents or other work
product generated on behalf of City in connection with this Agreement are
property of City. Any use or reuse of the documents or work product created by
Consultant for projects they were not intended and/or without the professional
involvement of Consultant shall be at City's sole risk and without liability to
Consultant.
25. CONFIDENTIALITY. All Information received in the performance of
the Services shall be considered nonpublic and confidential. Consultant agrees
that neither it nor its contractors, agents or representatives shall communicate,
whether in writing or verbally, any information concerning the Services except
in strict compliance with the terms and conditions of an express authorization by
the City Attorney. This confidentiality provision shall not apply to communication
by Consultant with its subcontractors for the purposes of performing the
Services under this Agreement.
26. TIME IS OF THE ESSENCE: Time is of the essence with respect to
all provisions in this Agreement. Any delay in performance by either Party shall
constitute a material breach of this Agreement.
10
27. P QH BIT1QN TO CONTRACT WITH CONSULTANTS WHO ENGAGE
IN BOYCOTT OF THE STATE OF_ISRAEL: The Parties acknowledge A.R.S. §§ 35-
393 through 35-393.03, as amended, which forbids public entities from
contracting with Consultants who engage in boycotts of the State of Israel.
Should Consultant engage in any such boycott against the State of Israel, this
Agreement shall be deemed automatically terminated by operation of law. Any
such boycott is a material breach of this Agreement.
28. PROHIBITED USE OF FORCED LABOR. In accordance with A.R.S. §
35-394, Consultant hereby certifies and agrees that Consultant does not
currently and shall not for the duration of this Agreement use: 1) the forced
labor of ethnic Uyghurs in the People's Republic of China, 2) any services or
goods produced by the forced labor of ethnic Uyghurs in the People's Republic
of China, and/or 3) any suppliers, contractors or subcontractors that use the
forced labor or any services or goods produced by the forced labor of ethnic
Uyghurs in the People's Republic of China. If Consultant becomes aware during
the Term that Consultant is not in compliance with this Section 28, then
Consultant shall notify the City within five (5) business days after becoming
aware of such noncompliance. If Consultant does not provide the City with
written certification that Consultant has remedied such noncompliance within
one hundred eighty (180) calendar days after notifying the City of such
noncompliance, this Agreement shall terminate, except that if the Agreement
termination date occurs before the end of such one hundred eighty (180) day
remedy period, this Agreement shall terminate in accordance with the Term.
29. CONFLICTS OF INTEREST: This Agreement is subject to, and may
be terminated by City In accordance with, the provisions of A.R.S. § 38-511.
[Signatures on next page]
11
IN WITNESS WHEREOF, Consultant and City have executed this
Agreement as of the date first set forth above.
CONSULTANT:
ARRINGTON WATKINS ARCHITECTS, LLC,
an Arizona limited liability company
By: Matthew A. Gorman
Its: Principal Architect
CITY:
CITY OF APACHE JUNCTION, ARIZONA,
an Arizona municipal corporation
By: Walter"Chip"Wilson
Its: Mayor
ATTEST:
Evie McKinney
City Clerk
APPROVED AS TO FORM:
722.2 ,
R. Joel Stern
City Attorney
12
STATE OF ' ____ a. )
'` ) 88.
COUNTY OF M r; o )
The foregoing was subscribed and sworn to before me this
day of u , 202 , by Ma- - ('aerAun as -€ A- k -1- _-1- of
Arrington Watkins Architects, LLC, an Arizona limited liability company.
Notary Public
My Commission Expires: Noery PubH Sbb
STATE OF ARIZONA )
) ss.
COUNTY OF PINAL )
The foregoing was subscribed and sworn to before me this
day of , 20 , by Walter "Chip" Wilson, as Mayor of the City of
Apache Junction, Arizona, an Arizona municipal corporation.
Notary Public
My Commission Expires:
13
EXHIBIT A
SERVICES
See attached proposal from Arrington Watkins dated 7.14.26 for description of
services.
14
Atrirtgt n WatI tts Architects
July 14, 2026
Trina Harrison
CIP Program Manager
City of Apache Junction
300 E Superstition Boulevard
Apache Junction AZ 85119
Re: DESIGN AND CONSTRUCTION PHASE OF THE CITY SERVICES EXPANSION
FOR THE CITY OF APACHE JUNCTION RFQ PROJECT NO. 25220
Dear Trina,
Arrington Watkins Architects (AW), Richard Kennedy Architects (RKA), Dig Studio, and the rest
of our team are pleased to have this opportunity to work with the City of Apache Junction on the
City Services Expansion project. At your request, we are submitting this proposal to provide
architectural and engineering services for the project's design and construction phase of work.
The following is an overview of the scope as we understand it:
Description of the Project
As the City of Apache Junction population continues to grow, city facilities and services are
growing as well. The City Services Expansion will provide expanded services for the police
department, library department, parks and recreation, and public works department. The new
municipal campus is expected to include the following facilities: police substation, branch library,
park, 1.5-acre lake, park maintenance building with yard, and associated parking. The property
is approximately twenty-two acres of unimproved land.
A Master Plan and Programming process has been undertaken and completed. The results of
data collection, programming, staff meetings, public meetings, and conceptual plans form the
basis for moving the project forward.
Park: Approximately 12 acres and anticipated to include provisions for two (2) ball fields, two (2)
basketball courts, multi-purpose play fields, iconic playground, shaded gathering areas,
recreational amenities, and associated parking. A restroom is to be included which may
accommodate lake equipment.
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279-4373
FAX: (602)279.9110
Page 2
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
Lake: Anticipated to be approximately 1.5 acres. To be populated with fish to operate as a
fishing lake. To include a pump house with pumping system(s)dedicated to the lake and site
irrigation.
Library: Approximately 2.7 acres and to include a 15,000 SF branch library with associated
parking. Along with general library space, the building also includes a community room, meeting
rooms, maker space rooms, sensory spaces, lounge area, offices and patio space.
Police: Approximately 4.41 acres and anticipated to include a single-story, 27,000 SF (approx.)
police substation facility with associated secure and non-secure parking. The police substation
is anticipated to be a Risk Category IV building and as such will include coordination related to
seismic. The police substation is anticipated to include a communications center, fitness center,
briefing room, locker areas, recharge rooms, gun loading/unloading station, conference rooms,
interview rooms, office spaces, and storage rooms. The site includes evidence storage, a dump
station, fitness area, drone launch pad, dog training area, fleet preparation, and patio space. A
separate 400 SF (approx.) K9 kennel building is also included in this area and is anticipated to
be provided as air-conditioned space.
Park Maintenance: Approximately 1.2 acres and anticipated to include a 5,500 SF (approx.)
Parks Maintenance building and an associated maintenance yard. This building is anticipated to
include a mud room, crew room, lockers, multiple types of storage rooms, and a workshop area.
The developer of the surrounding streets and parcels will be providing complete design and
construction of the streets and utilities that are not within the legal boundary of the city's project
site. It is anticipated that the streets, curb, and sidewalks will be installed before construction
begins on the city owned property. Our team will design work within this site, extending work to
the back of sidewalk only. The city will provide our team with all necessary informational
documentation for the offsite work. Our team will coordinate utility locations with the developer
through the city. This team will design modifications along the west side of Ironwood Road and
in the right-of-way to create a new drive with deceleration lane into the property. Other driveway
locations for surrounding streets will be coordinated with the developer's design team.
Project Construction Budget:
$11,000,000 Park and Lake Component
$49,000,000 Library, Police, and Park Maintenance Building
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: {602)279-4373
FAX (602)279-9110 Page 1 2
Page 3
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
r DI
DEPAR7Wlr
I LA
WATER PLAY I.
DEPAR"AENT I FIELD "pR„
PARK t FELD
k i r' uun of woRK
.....................................— — — aleervoDsnEFi_ _ ________
Scope of work
The design team will design the site, buildings, and systems and will illustrate the construction
using plans, specifications, and supporting documents according to direction and published
standards of the city.
A. General Project Administration
1. As requested by the city and during design phases, the Architect will attend project
meetings as necessary to maintain the project budget and schedule; chair periodic
regular meetings and any additional meetings; set agendas and prepare and distribute
meeting minutes. Meetings under basic services include:
a) Regularly scheduled meetings with City staff and management.
b) Meetings required to obtain a permit.
c) Meetings with oversight committees(i.e., Facilities Review, Design Review
Panel, Council Subcommittees and various boards and public hearings).
2. The Architect will be responsible for submission of all required Contract documents
to the city's reviewing permitting agencies required under this Contract.
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279-4 I11
FAX (602(2799110 Page 1 3
Page 4
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
3. The Architect will prepare and maintain a project schedule after meeting with the
designated City project manager to determine appropriate submittal deadlines and
to coordinate project submissions.
4. Codes: The design team will provide design documentation meant to comply with
the formally adopted codes in effect at the time this contract is executed (2024 IBC
codes). Later changes to codes may be treated and new project scope.
This project will be broken down into phases:
1) Data collection (completed)
2) Programing (completed)
3) Master planning (completed)
4) Schematic Design w/Concept Design
5) Design Development
6) Construction Documents/ Permitting
7) Bidding support
8) Construction Administration
9)Warranty
B. Project Schedule:
Days to complete Project Phase
95 days 4) Schematic Design w/Concept Design
100 days 5) Design Development
90 days 6) Construction Documents (90%)
80 days Permitting (100% CD)
Concurrent w/permit 7) Bidding support
660 days 8) Construction Administration
730 days 9) Warranty
C. Phase 4)Schematic Design Phase(30%design)
During schematic design, the architect develops study drawings, documents, or other media
that illustrate the concepts of the design and include spatial relationships, scale, and form
for the owner to review. The first portion of this phase will be to develop design themes,
concept plans, massing, and refine site requirements. This concept (10% completion)will
be approved by the city before proceeding with more detailed work.
Schematic design also is the research phase of the project, when different materials are
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone (602)279-4373
FAX (602)279-9110 Page 1 4
Page 5
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
explored and options are tested. This phase produces a final schematic design, to which the
owner agrees after consultation and discussions with the architect. Opinion of probable cost
is provided by others.
1. The project engineers (civil, structural, mechanical, plumbing, electrical,
technology, security) will propose solutions using drawings and sketches. Refer to
Deliverables List.
2. Landscape architects will refine park elements and lake requirements and will
propose solutions using drawings and sketches. Refer to Deliverables List.
3. The design team will continue to consult with City staff to ascertain information
needed to meet the requirements of the Project and will confirm such requirements
in writing and/or by sketch to the city.
4. The design team will prepare a specification Table of Contents indicating the
expected materials and products to be included in the design.
5. If a CMAR contractor is used, the design team will expect participation of the
CMAR in design meetings. Additionally, the CMAR should conduct cost studies of
different design alternatives and advise on construction logistics. The CMAR
should offer market insights into trade availability, long lead materials and
products, and other issues that could affect the price and quality of the project.
6. At the request of the Architect, the Project Manager will establish a pre-design
meeting for design review with the Development Services Department prior to
completion of schematic design. The Architect will submit copies the necessary
documents required for Pre-Application process and Design Review process of the
preliminary site plan to the Development Services Department at the time the
request for a meeting is made.
7. General concepts of office and dispatch furniture configurations will be confirmed
in SD phase for the purposes of confirming room sizes, orientation, etc..
8. After completion of the schematic design and studies, the Architect will conduct a
page-turn meeting to familiarize the city staff with the submittal contents.
Documents will be reviewed using Bluebeam Revue sessions. Printed copies will
be provided to team members upon request.
9. Design team will participate in SD cost estimate reconciliation with CMAR.
10. The Schematic Design Phase will be considered completed when the city has
approved the schematic design plans.
11. Refer to Deliverables List for this phase.
D Phase 5) Design Development Phase(60% design)
1. After the schematic design studies and construction cost estimate are approved in
writing by the city, the Architect will prepare the design development documents.
These documents will consist of preliminary plans, elevations, other drawings, and
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: {602)279.4373
FAX; )602)2799110 Page I S
Page 6
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
specifications to fix and illustrate the size and character of the entire Project including
the kinds of materials, type of structure, mechanical, plumbing, electrical, security,
computer and telecommunications systems, and such other work as may be
appropriate. The goal of this phase is to finalize design decisions and product
selections.
2. The Architect will design the Project so that the construction will conform to the
requirements of Title 34, Arizona Revised Statutes regulating public buildings and
improvements.
3. The Architect will hold coordination meetings between the Architect and the
subconsultants to review and address coordination and integration of the plans provided
by the various disciplines.
4. After completion of the design development phase documents the Architect will
provide these to the city for review, comments and approval. The Architect will
conduct a page-turn meeting to familiarize the city staff with the submittal contents.
5. Design team will participate in DD cost estimate reconciliation with CMAR.
6. The Design Development Phase will be considered complete once the city has
approved the submitted design development plans, and agrees that the construction
cost estimate is within the established Project budget.
7. Refer to Deliverables List for this phase.
E. Phase 6) Construction Document/Permit Phase(100% design)
1. After the design development documents and construction cost estimate have been
approved in writing by the city,the design team will prepare final, permit-ready
construction drawings, plans, and specifications.
2. The design team will prepare drawings in BIM modeling software. The drawing format
will be a standard sheet size meeting city requirements.The city shall provide
standard cover sheets or other standard pages if they are to be incorporated.
3. The Architect will provide a standard construction contract General Conditions in the
Project specifications, which will be edited by the city.
4. Toward the end of the Construction Documents Phase and at other times, if
needed, the Architect will hold a plan coordination meeting between the Architect
and the subconsultants to review and address coordination and integration of the
plans provided by the various disciplines. The Architect will invite the Project Manager
to attend this meeting.
5. Upon completion of construction plans, specifications and contract documents, the
Architect will provide the design calculations, including structural, mechanical, electrical
and plumbing, and complete sets each of construction drawings, specifications and all
engineering contract documents for review and approval by the appropriate City
agencies. If desired, the Architect will conduct a page-turn meeting to familiarize the
city staff with the submittal contents.
3003 North Central Avenue
Suite 2400
Phoenix,Ar zona 85012
Telephone (602)279-4373
FAX (602)279-9110 Page 1 6
Page 7
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
6. If a CMAR contractor is used, the city may request the architect provide
unpermitted plans to the CMAR for sub bidding purposes, recognizing that
changes will occur and must be addressed through bid addendum.
7. The Architect will coordinate the building permit process and assist in filing the
required documents to secure approval of governmental authorities including city
permitting, AJ Water, AJ Sewer, Superstition Fire, ADEQ (lake), AZ Department of
Water Resources, and AZ Game and Fish Department. All filing and approval fees will
be paid by the City or reimbursed to the Architect if paid by the Architect.
8. The Architect will incorporate all corrections received from the reviewing entities into the
final bid set of contract documents. If required, the Architect will resubmit the revised
plans to the Development Services Department for approval.
9. After completion of the proposed construction documents and review by City staff, the
Architect will, if requested by the City, present all documents to the City Council for
review, comment, and approval.
10. Upon approval by the Council and/or the City representative of complete drawings,
plans, and specifications, the Architect will deliver to the City the final reproducible
drawings in BIM modeling software orAutoCAD. These documents will be sealed
and signed by the appropriate responsible party. The Architect will deliver to the City
the final specifications in: 1) one hard copy, and 2)one Adobe PDF file from the
original Microsoft Word format.All applications will be in the most current software
version.
11. The Construction Documents Phase will be considered complete when the final
submitted plans and specifications are approved for permit.
F. Phase 7) Bid Phase
1. The Architect will attend the pre-proposal or pre-bid conference.
2. The design team will respond to bidder technical questions (Request for Information or
RFI)and will prepare addenda related to documents originated by the design team.
The city will be responsible for distributing all addenda.
3. Architect will receive, review and approve/disapprove requests for substitutions,
and incorporate these substitution requests into the addenda as required.
4. The Bid Phase will be considered complete when the Project construction bid has been
awarded by the City Council.
G. Phase 8) Construction Administration and Observation Services Phase
1. The Architect will perform Construction Administration and Observation services on
the project assignments released under this Contract according to the direction and
standards of the city.
2. The Architect will attend the initial pre-construction conference which will be arranged
and called for by the city and respond to questions. The Architect representatives will
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 8501
Telephone: (602)279-4373
FAX (602)279-9110 Page 1 7
Page 8
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
attend project owner-architect-contractor (OAC) meetings during the course of
construction. Meetings may be weekly or less frequently.
3. The Architect will furnish the services of qualified staff during the progress of
construction. The Architect will coordinate the observation and perform
miscellaneous observation work as required to assure that the work is constructed
in accordance with the Contract documents and accepted standards of the
construction industry.The Architect, or Architect's authorized representative, will be
present to perform observations during placement of major work. The Architect
anticipates that the Contractor will provide a detailed schedule and a Quality
Control Plan that indicate times when the work should be reviewed in the field. The
Architect will not have the direct control of the individual construction workers and their
work. The direct control will be solely the responsibility of the Contractor, to the extent
provided by the Contract between the City and the Contractor.
4. The Architect will provide Construction Administration and Observation as required
for substantial compliance with, and final acceptance of,the Contract documents. The
Architect will keep the City informed of the progress of the work, endeavor to guard the
City against defects and deficiencies in the work of the Architect, and will reject work,
as appropriate, failing to conform to the Contract documents. The Architect or
Architect's authorized representative will keep adequate project records and field
reports of work observed during construction.
5. The Architect will make recommendations to the City on matters relating to the
interpretation of the Contract documents.
6. The Architect will review the Contractor's submittal schedule which will list all
submissions required by Contract documents.
7. The Architect will participate in the city's or contractor's tracking software to monitor the
timeliness and review progress of Contractor submissions.
8. The Architect will provide the necessary survey controls for the Contractor's
guidance and verify the correctness of the work as it progresses.
9. The Architect will review and approve or take other appropriate action on samples,
shop and setting drawings, testing, review and make recommendations on reports from
testing laboratories, and other submissions for conformance with the design concept of
the project and for compliance with the information given by the Contract
documents.
10. All Special Inspections will be done under the supervision of the Architect. This includes
all special electrical inspections, typical structural inspections, compaction testing,
concrete/asphalt testing and includes any associated certs or letters.
11, The Architect and design team will submit reports of the job site visit which will
summarize the activities at the time of the visit and progress made since the last visit.
These reports will be submitted to the city within 5 days.
12. The Architect will review and make recommendations to the City on all claims of
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279.4373
FAX (602)279-9110 Page 1 8
Page 9
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
the Contractor for extra work not covered in the Contract documents, and the
recommendations will be jointly reviewed by the Architect and the City for final
decisions.
13. For all changes, additions or deletions requested by the City, the Architect will
obtain all information required and present Architect's recommendations. The City will
either approve or deny the recommendation. Revisions to permitted designs will be
addressed as additional scope of work with appropriate fees.
14. The Architect will attend joint punch-list walkthroughs with the City to determine the
dates of substantial and final completion and so inform the City in writing, when
completed.
15. The Architect will provide project close-out related services including:
a. Conduct the Substantial Completion close-out inspection(s), prepare a project
punch list and verify that the items indicated on the list are corrected prior to final
acceptance.
16. Review all warranties, operating manuals, and other technical close-out paperwork at
the completion of the project. Review as-built documents provided by contractor.
17. The Architect will furnish the City a letter recommending acceptance of the work,
however, the City will retain the right to determine when, and if, the construction
work appears to be accomplished in accordance with the drawings, plans and
specifications. In this respect, the construction work may be inspected at any time
by the City Engineer and/or the Planning & Development Director and/or their
authorized representatives.
18. Incidental to the services for the project, the Architect agrees to notify the Contractor
and the City of any unsafe conditions which the Architect may see and recognize
as such at the construction site and take immediate corrective action, if required.
However, it is not intended that the Architect be responsible for safety at the project
site.
H. Phase 9)Warranty
1. When requested, approximately 30 days before end of warranty period, the
Architect will attend a warranty walk-through with the City to determine if any work,
equipment, or material requires corrective action under the Contractor's guarantee
clause. The Architect will then notify the City in writing of the results of said
inspection along with any recommendations.
I. Additional Services
1. Provide BIM model of each building for Contractor and trade participants to utilize. The
B1M model will be LOD 250 and created in accordance with a project specific BIM
Execution Plan. The model is intended for shop drawings, logistic planning, and field
work. Participate in limited clash detection meetings and resolution sessions with
3003 North Central Avenue
Suite 2400
Phoenix,Arirona 85012
Telephone: (602)279-4373
fAX. (602)279 9110 Page 19
Page 10
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
Contractor.
2. Special signage beyond code requirements.
a. Wayfinding and experiential graphics for Library
b. Interior graphics for Police Station
c. Park signage
d. Monument signs at multiple site entries
e. Digital signage
3. Stacks package for library shelving
4. Commercial furniture selection and specifications
5. Selection of specialty fixed equipment for Police that is not supplied by owner(appliances
and exercise equipment excluded).
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279-4373
FAX: (602)279-9110 Page 1 10
Page 11
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
Deliverables:
Refer to Attachment AA— Deliverables List
Project Schedule
We expect this project will take 365 calendar days from Notice to Proceed to delivery of final
permit. We expect this project will take 660 calendar days from contractor NTP to complete
construction. We have included a reasonable amount of time for client team feedback and data
collection, and we will advise you of any delays as they occur. A detailed schedule of activities
will be provided at the project kick-off.
Project Meetings
Arrington Watkins will lead progress meetings with the City Stakeholder Team. Meetings noted
above in the scope of work section are in addition to the City Stakeholder Team meetings;
however, in certain cases, the meetings may be combined if the schedule permits. Meetings are
assumed to be held remotely with the City's preferred remote meeting service unless
specifically noted otherwise. Arrington Watkins will be responsible for preparing the agenda,
taking meeting minutes, and distributing minutes to the team. Agenda and material used in the
meeting will be provided a min. of 48 hours ahead of the meeting, so users can be prepared.
Minutes will be distributed within 48 hours of the meeting's conclusion. If no comments are
received within five business days of the minutes' issuance, the minutes will become part of the
project record.
Clarifications and Exclusions
Arrington Watkins Architects has specific exclusions to the scope of work. Additional specific
exclusions are listed in each consultant's proposal. If any items noted below should have been
included, please let us know and we can make the necessary adjustments to our proposal:
1. Obtaining or assisting the City in obtaining NPDES, 404 and other environmental permits not
identified in the scope of work. Can be added as additional scope, but not expected.
2. Baseball field lighting design is excluded. Our engineer will work with lighting vendor to
coordinate site power and data connections to the vendor provided lighting design.
3. Off-site lighting, street lighting, and traffic-control lighting are excluded.
4. Misc, sports field elements will be designed by vendors, such as specialty field lighting,
backstop fencing, or outfield fencing. Some items may be purchased as assemblies such as
bleachers.
3003 North Central Ave
Suite 2400
Phoenix,Arizona 8501:
Telephone: (602)279-43'3
FAX: (602)279 9110 Page l 11
Page 12
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
5. LEED Certification (or other rating systems): All services related to LEED documentation
are excluded.
6. Life Cycle Analysis: All services related to LCA documentation are excluded.
7. Information Technology (IT)—Telephone (VOIP) & computer equipment: The specifying
of computers, consoles, and phone systems parts are excluded.
8. No public address system is included.
9. Selection of vending equipment is by others.
10. Selection of appliances for break rooms and similar spaces is by others.
11. Police memorial or monument designs
12. Public art integration with the project and electrical or structural work for public art.
13.Community outreach planning and documentation.
14.Audio-visual equipment design is excluded. Pathways and power will be provided.
15. Photovoltaic (solar) system design.
16. NEC 708 Critical Operations Power System (COPS) design is not expected and is
excluded.
17. Design of SCADA and telecommunications services for irrigation and lake pumping
systems should be by installer and product vendor.
18. Structural vaults for lake pumping/recirculation/aeration systems are not expected and
are excluded
19. Site use: The preparation of any entitlement services, conditional use-permits,
variances, zoning & use issues and lot line adjustments are excluded at this time.
20. Site Assessments: Archeological surveys, studies or reports; Endangered species
reports or studies; historical surveys or environmental reports are excluded.
21. Hazardous material abatement: identification of any hazardous materials on site is
excluded.
22.Civil technical specifications will not be prepared. MAG standards will be referenced.
23. Specialty or proprietary structural systems.
24. Deep foundations (micropiles, APG piles, etc.).
25. Blast-resistant design, progressive collapse analysis, and anti-ram analysis.
26. New site or building concepts after completion of schematic plans are excluded.
27. Dust Control Permit
28. Final field as-built survey is excluded (by contractor).
29. Record/As-Built in BIM model format.
30. Printing for contractor: AW will produce all documentation digitally in PDF format and
distribute to team members for printing.
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279.4373
FAX:)602)279-9110 Page l 12
Page 13
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
City of Apache Junction or PMCM Responsibilities
The City of Apache Junction will be responsible for providing the documents and completing
tasks in a timely manner to allow the project to progress. Following is a list of typical items and
tasks that may be required:
1. Coordinate interdepartmental communication
2. Participate in design meetings
3. Provide review and feedback at each phase.
4. Provide documents for known utilities and underground connection locations
5. Provide Title Report
6. Environmental survey and site assessments
7. Review the Contractors submittal schedule
8. Review and monitor contractor schedules
9. Manage material testing laboratories
10. Monitor and log Contractor correspondence
11. Ensure contractor compliance with the dust control measures
12. Prepare construction monthly progress reports
13. Prepare change orders and time extensions for the contractor
14. Review contractor payment requests
15. Review as-built documents periodically
16. Commissioning of systems and equipment
17. Review all warranties, files, operating manuals, logs and other close-out paperwork.
18. Review all lien waivers
19. Verify that additional construction materials are delivered to the City by the Contractor.
The A/E team acknowledges EDS Management is a representative of the Owner and provides
PMCM services. A/E will work closely with the Owner Representative / PMCM.
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)2794373
FAX: (602)279-9110 Page 1 13
Page 14
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
Team Responsibilities:
ARRINGTON WATKINS ARCHITECTS:
• Architectural Design of Police building and Park maintenance building and
associated site.
• Lead project design meetings.
• Coordinate meeting agendas & meeting notes.
• Project Management.
• Coordination of consultants, consultant documentation, consolidation of complete
design documentation.
RICHARD KENNEDY ARCHITECTS:
• Architectural Design /Concept Designs
• Attend and participate in project meetings.
• Lead design of library facility.
• Commercial furniture selection —all buildings
• Interior finishes scheme—all buildings
• Library shelving
DIG STUDIO (landscape/park/play):
• Landscape Design
• Park Design
• Lake Layout& Landscape design
WOOD PATEL(civil):
• Utility mapping for site (from existing documents)
• Supplemental topographic survey
• Grading and drainage plans
• Wet utility design
• Dry utility path coordination
• Horizontal layout and control
• Parking layouts and on-site paving
• Coordination with developer civil work
• Off site paving at Ironwood Road and curb cuts at ingress/egress
• Stormwater Management Plan
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279-4373
FAX: (602)279-9110 Page 114
Page 15
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
• ADEQ Water ATC, Sewer CA Submittal Coordination
• Water and sewer reports
VERDANTAS (lake and irrigation design):
• Lake pumping and circulation design
• Piping systems design
• Lake edge conditions design
• Landscape irrigation design
• Permitting assistance
LSW ENGINEERS (mechanical, plumbing, electrical, technology, security):
• Mechanical Design
• Plumbing Design
• Electrical Design
• Site lighting per dark sky initiative
• Power and data stub out to recreational field lighting (if any)
• Electrical Special Inspections
• IT Design, Wireless access points
• Security access system design (card readers)
• DAS (cellular reinforcement) layouts and specifications (final design by
contractor)
• Security CCTV
• ERRCS layouts and specifications (final design by contractor)
• Fire Alarm layouts and specifications (final design by contractor)
• Fire sprinkler specifications (final design by contractor)
BUEHLER (structural):
• Structural Design
o Buildings
o Ramadas
o Fencing
o Retaining walls
o Miscellaneous items identified in consultant proposal
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279-4373
FAX: (602(279-9110 Page I 15
Page 16
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
SPEEDIE I UES (Geotechnical and inspections):
• Geotechnical investigation and engineering report
• Structural Special Inspections
AIRPARK SIGNS AND GRAPHICS:
• Site signage design
• Monument signs at multiple site entries
• Park signage
• Digital signage
• Interior graphics
Professional Fee
Arrington Watkins will provide professional services with the scope as presented for a lump sum
fee, including City-controlled expense allowance.
Attached, you will find a spreadsheet outlining our fee to perform the services described above.
Should additional scope, not presented, be required these services will be provided at our
negotiated hourly billing rates.
Allowances
Along with the architectural/engineering fees totaled on the summary sheet, we have provided
totals for allowances. The allowances are provided for additional services that may be requested
by the City as part of this project. Allowances will only be used with prior written authorization
from the City's project manager. Allowance funds listed may not be adequate to complete all
required work in any category and the owner may need to provide a change order to fully fund
the work.
Expense Allowance: A general allowance in the amount to cover printing, mileage, meals (for
out of town consultants), presentation and model materials, display boards, and other costs
associated with production and outreach efforts (including delivery). Allowance will be billed
monthly at cost plus 10% as it is utilized by the design team.
Owner's Allowance: to be utilized upon Owner's approval for additional unforeseen work or
meetings. A proposal describing the work will be provided for approval. Work will not commence
until the owner issues an Authorized Use of Allowance approving the work.
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone: (602)279-4373
FAX: (602)279-9110 Page 1 16
Page 17
City of Apache Junction, CIP Department
City Services Expansion Design and Construction Services
July 14, 2026
Thank you for this opportunity to provide services. If this scope and fee are acceptable, we are
available to coordinate contract development.
If you have any questions or concerns, feel free to call the office at 602.279.4373.
Best regards,
Arrington Watkins Architects
Matthew Gorman
Principle Architect
Attachments:
1. Attachment AA Deliverables List
2. Attachment BB Fee Spreadsheet
3. Attachment CC Consultant Proposals
AW Project Number 2025.058
3003 North Central Avenue
Suite 2400
Phoenix,Arizona 85012
Telephone, (602)279-4373
FAX: (602)279-9110 Page 117
DESIGN AND CONSTRUCTION PHASE OF THE CITY SERVICES EXPANSION
FOR THE CITY OF APACHE JUNCTION RFQ PROJECT NO. 25220
ATTACHMENT AA - DELIVERABLES LIST
This deliverables list covers the basic expectations for submittals by phase. Each phase gets
progressively more specific in the information provided. Additional materials may be developed to
meet the needs of specific agency approval as needed.
There will be two primary sets of documents. 1)to address the Park and Lake work to be
completed by the developer's contractor. 2)to address the buildings and associated site work for
CMAR contract.
I. SCHEMATIC DESIGN PHASE SUBMISSION REQUIREMENTS
Basic plan backgrounds will be prepared in BIM or CAD and information may be layered
onto those using PDF mark ups, hand sketches, applied photos, tables and text as decided
by the design team to best rapidly establish information, demonstrate requirements, and
collect owner comments.
Concept Plans—1/16"or 1/8"or 114"scale Floor Plans (10%)
A. Concept Architectural Site Plans (10%)
1. Building locations and orientation
2. Parking, loading, and ADA spaces. Parking calculation/count.
3. Drives/walkway and ADA access routes
B. Concept Building Floor plan(s) (10%)
1. Identification of rooms/spaces with room size(area) and floor elevation changes
2. Doors and window locations.
3. Overall dimensions
C. Elevations (10%)
1. Several exterior elevations, showing massing,with fenestration, doors and other
pertinent features.
2. Proposed exterior material finishes
3. Rough vertical dimensions
Schematic Plans-1/16"or 1/8"or 1/4"scale Floor Plans (30%)
D. Architectural Site Plans
1. Building locations (with dimensions to property lines and other on-site improvements)
and orientation
2. Zoning setback dimensions
3. Coordinated limits of work between buildings
4. Parking, loading, and ADA spaces. Parking calculation/count
5. Drives/walkway and ADA access routes
6. Enlarged plans of special areas
Page 1
7. Identify unique area requirements
a) Trash areas
b) Generator area
c) Canine
d) Material storage
e) Exterior vehicle storage
8. Fence locations and proposed fence type/height
9. Gate identification and types(swing, sliding, powered, egress)
10. Security considerations, e.g., site lines, special lighting areas, vehicle barrier concepts
11. Context plan
E. Code Plans
1. Code Analysis plans w/keynotes and legend
2. Occupancy and use
3. Preliminary plumbing calculations
4. Preliminary construction type and area analysis
5. Fire wall locations
6. Code Analysis(zoning ordinance and building code requirements) - Identify areas where
variances could be required and reasons why compliance would be difficult.Analysis to
include construction type,occupancy,occupant load,exiting analysis, parking
requirements, accessibility issues,and other items pertinent to building and site.
7. Review special structural, fire, and NEC requirements with Building Official for the
Police Building.
F. Building Floor plan(s)
1. Identify special wall types (acoustic, physical security, and bullet resistant)
2. Identification of rooms/spaces with room size(area and dimensions) and floor
elevation changes
3. Overall dimensions
4. Restroom fixture layout
5. Ceiling types and heights
6. Preliminary door types
7. Preliminary window frame materials
8. Floor finish locations
9. Preliminary furniture, millwork and equipment layouts
10. Equipment schedule tied to plan items
G. Roof plans
1. Show equipment locations and access
2. Show drainage concept and pitch of roof
3. Identify materials and insulation values
H. Elevations
1. All exterior elevations showing massing with, fenestration, vents, scupper, downspout,
doors and other pertinent features.
2. Proposed material identification and finishes
3. Vertical dimensions
I. Sections
1. Longitudinal section.
Page 2
2. Cross section.
3. Special conditions as needed.
J. Civil site plans
1. Storm water retention area
2. Existing and proposed utilities with water, sewer, and reclaimed water mains. Fire line and
fire hydrants.
3. Proposed Service and Meter locations (coord. with plumbing)
4. Site gas proposed pathways
5. Fire lane, hydrant location clearances
6. Existing topography and proposed grading slopes
7. Paving areas, materials and loading information
8. Truck Turning Plans w/Radii (areas of concern)
9. Finish floor elevations
10. Proposed typical details
11. Fire Flow test data
K. Landscape concept site plans
1. Special areas, e.g., sports fields, picnic, playgrounds etc.
2. Plant palette
3. Preliminary landscape plan
4. Shade analysis/goals
5. Lake edge concepts
6. Lighting narrative for play fields, walkways and other areas.
7. Irrigation concept showing significant irrigation runs and equipment locations
8. Lake pumping equipment and circulation concept
L. Structural plans
1. Foundation concept/column locations
2. Preliminary framing plans for floor and roof
3. General notes and code requirements narrative for Cat II and Cat IV buildings
M. Mechanical /Plumbing Plans
1. Proposed HVAC unit locations
2. Pump locations
3. Ductwork trunk locations
4. Roof drain locations
5. Water heater locations and capacity
N. Electrical plans
1. Electrical rooms sizes
2. Gear locations
3. Generator preliminary location and sizing
0. Technology (AN, IT)
1. IT space sizing
2. Rack locations
P. Fire Alarm and Fire Sprinkler
1. Identify hazard levels/areas
2. Locate fire riser
3. Locate special (dry or other) sprinkler zones
4. Locate main fire alarm equipment
Paae 3
Q. Security Electronics
1. Floor plan with device locations (card access and CCTV)
2. Site plan with device locations (card access and CCTV)
3. Duress alarm locations
4. System functional narrative
R. Geotechnical site investigation report
S. Outline Specifications
1. Provide a written description of the following systems or updated masterplan narratives:
a) Structural, plumbing, mechanical and electrical systems including basis for design
b) Special systems
c) Exterior wall and roof system construction
d) Energy conservation considerations
e) General interior finish schedule
2. Table of Contents for all proposed material specifications
T. Renderings
4
II. DESIGN DEVELOPMENT PHASE SUBMISSION REQUIREMENTS
A. Plans—typically 1/8"and 1/4"= 1'0" scale unless noted
1) Dimensioned floor plans showing partitions, doors, windows and columns
2) Enlarged plans of special areas
3) Enlarged toilet room plans showing fixtures, dimensions and accommodations for
the disabled
4) Reflected ceiling plans showing lighting layout and mechanical diffusers
5) Roof plan(s) showing equipment, drains, hatches and traffic treads
6) Structural plan(s)showing foundation plans and major framing plans including major framing
members and columns and dimension column grid
B. Civil plans
1. Storm water retention area
2. Existing and proposed utilities with water, sewer, and reclaimed water mains. Fire line and fire
hydrants.
3. Proposed Service and Meter locations (coord. with plumbing)
4. Site gas proposed locations
5. Fire lane, hydrant location clearances
6. Existing topography and proposed grading slopes
7. Paving areas, materials and loading information
8. Truck Turning Plans w/Radii (areas of concern)
9. Finish floor elevations
10. Proposed typical details
11. Fire Flow test data
C. Landscape site plans
1. Special areas, e.g., sports fields, picnic, playgrounds etc.
2. Plant palette
3. Preliminary landscape plan
4. Shade analysis/goals
5. Lake edge details
6. Lighting requirements for play fields, walkways and other areas.
7. Irrigation concept showing significant irrigation runs and equipment locations
8. Lake pumping equipment and circulation concept
D. Structural plans
1. Exterior structural items, site fencing
2. Foundation plans/column locations
3. Typical Foundation details
4. Framing plans for floor and roof
5. Significant framing details
6. General notes, code requirements, and inspection requirements
E. Mechanical/Plumbing Plans
1. Enlarged mechanical room plans showing major mechanical equipment to scale and
equipment service space(e.g., filter pulls, boiler tube pulls,etc.)
2. Provide list of major mechanical equipment including type, size, capacity, etc.
3. Standard Mechanical and Plumbing notes and legends
4. Mechanical plans showing main and branch duct distribution
5. Coordinated ceiling plans
6. Hydronic pumps and piping mains for VAV (if used).
7. Gas and condensate line locations (if used)
8. Roof drains and leaders
F. Electrical plans
1. Site power plan
2. Site lighting
3. Enlarged electrical room, MDF, and IDF plans showing equipment to scale and equipment
5
service space
4. Electrical plans showing size of service and distribution system, lighting plan, and power
plan
5. Identify major electrical equipment including type, size, capacity, etc.
6. One-line diagrams and panel schedules
G. Technology (AN, IT)
1. Telephone and computer outlet plan
2, Locations for cable tray
3. Rack locations
4. Site plan
H. Fire Alarm and Fire Sprinkler
1. Identify hazard levels/areas
2. Locate fire riser
3. Locate special (dry or other) sprinkler zones
4. Locate main fire alarm equipment
I. Security Electronics
1. Floor plan with device locations (card access and CCTV)
2. Site plan with device locations (card access and CCTV)
3. System functional narrative
J. Elevations-typically 1/8"= 1'0"Scale
1) Same elevations as called for in Schematic Design phase but identifying all materials, colors,
light fixtures, louvers, roof mounted equipment, penthouses, downspouts, etc.
2) Interior elevations of identified in Section II.A.2 and A.3 above. Interior elevations shall show
all materials and pertinent vertical dimensions.
K. Sections
1) Typical wall sections through solid exterior walls
2) Typical exterior wall sections through window/store front construction at 1/4"= 1'-0"
minimum. Wall sections shall show materials, bond beams, lintels,flashing, masonry
coursing, beam bearing, roof construction, sill and head conditions and floor foundation
connection.
3) Cross section and longitudinal sections at 1/8"= 1'-0" minimum showing roof and floor
construction, ceiling height and major duct space
4) Section through roof penetrations at 112" = 1'-0" minimum showing curbs and flashing
L. Site Plan
In addition to Schematic Design information, provide:
1) Grading and drainage
2) Utility service entrance points
3) Landscape plan
4) Site lighting
5) Pavement sections
6) Monument sign locations
M. Specifications
1) Index of final specification sections.
2) Written descriptive specifications for most products,components, systems, and equipment
including technical description, size, color, warranty and other pertinent information.
3) Cut sheets of critical components (ex. plumbing and light fixtures, mechanical units, flooring
and ceiling materials, etc.)
4) One color board indicating interior and exterior materials and finishes.
Page 6
N. Code Evaluation
1) Written report of preliminary reviews with Development Services Department.
2) Disposition of variances identified in the Schematic Design phase.
Ill. CONSTRUCTION DOCUMENT SUBMISSION REQUJREMNI
A. During this phase, the design team shall complete all drawings, specifications and other
documents necessary for bidding the Project through a public bid and necessary to construct the
Project. The Architect shall submit the following:
1) Sealed prints of all drawings, specifications and calculations suitable for public bidding.
B. Building Permits
1) The Architect shall coordinate plan submittals to the Development Services Department with
the Project Manager. The city will pay the Development Services Department plan review
and permit fees.
2) The Architect shall submit the plans to the Development Services Department and provide a
copy of the receipt and the log number to the Project Manager.
3) The Architect shall follow the plans through the building permit plan review process, receive
the reviewed plans,and provide a copy of the comments to the Project Manager.
4) The design team shall make necessary corrections and resubmit to the Development
Services Department until the plans are considered permit-ready by the Development
Services Department.
5) The Architect shall notify the Project Manager if review comments substantially change any part
of the project.
IV. BID PHASE
A. Submit all final design plans including design addenda on electronic media approved by the City.
V. CONSTRUCTION PHASE
A. During this phase the design team will review work progress, perform site observations, and conduct
special inspections.
1. Copies of Architectural Supplemental Instructions(ASI).
2. Records of Request for Information (RFI), reviewed shop drawings,field observation reports.
3. Substantial completion forms
4. Inspection reports
7
(O L C 0 N7 0
m Y W (D m O 00
N
KN O w in w w
W o
g $ ()
N N
O () 69 64 N 64 64
a pp p
O N G S O O 000 pOp 0 S S
a m C, O UJ n O 6C, (() U)
Q)C 1) V) (0 Q (N <N 0)
N N n N. N
Y d
69 69 69 69 64 64 /A w 69
0 O Cl O O O pp
O 4) 6n 0 0 0 O
J) O C N C) O
u.. m W d N N N
b N r C") 0) M
CC7 �
R Q
69 69 64 IA 69 69 614 69
L y 0 0 O 0 0 0 0 0 o0p
N cam) N 60 h O (O (0 O t9
yaa ( Q 6D N O O
— 8 N N d Q
C.1� 6A w of H t9 4, 6A 6964
— o 0 0 0 0 0 0 0 0
m O O N V c0<0 (0 U) 0 0
6aa
N 6A ('1 aD ' N (O 0-
<N N N
j 0
0 e% N 69 W to W 69 69 69 69
U) U) 11') (0 U) 0 U) U) OO U)
C 1 N)0) 0) 0) N 1 V N 0 O U) O
a w N l7 t 60n ` r U) N
<N O) (N 0 O
W J N N 44 69 69 64 4, 69 V) w
LL pp p p
N 0 6n O S N- N U)
O n
z . N < N 0) m 0) (0 <0
Fm 0. Obi T m In (0 N
J 2 0 n) 0) 0)
� m
w w 69 69 64 49 60 64 69
z pp pp
0 O ti cn O U) U) 000 o U)') O O N 0)
U)y p p
•C Q (p S W O S O 0� 0) 1? 0. N
h (0 O C' U'1 0) 00 00 U) N
7 Y N Q N 01 UJ 0)N N U)
N
0% 69 69 fo 69 in 496964 69 69 to 69
Vj V) O 0 U) O <) 0 0000 U)00 U•) 00 O U)
co N M (0 (0 N V)0 00 0)00 V) 00 U) 0
Z 0) d 0- O 6c) t` N O 0 0)O 6A 0 n 0'R U7 0-
J (D N. (0 M 1` 01<0 yy rn O <Ooo w V) a N
O N 0 (0 0) n d 0. ( N U) )N N d N
Z~ - 0) 0) 0)
U 0w
Z a 6A 64 w 6n 6n v) 6n w to 69 69 V%64 69 v)w 6n w
p00 0
O N N 0 0 S OO O U7 0 O pOp p Op 0 C))
W w 01 N V) O Q 60 U) n O S O
0) N. ((00 N 6) 6) U) V)) Q m N N
U x Q d Nn v) M 0) 0)
aa 9 69 49 M 49 69 64 6449 69 6464 IA Vi
IL J p (0 V) 0 U) O 0000 U)00 (4) LU 00pp
Q a O O -N 4)000<000
y OOON
I 01 Cl! (D O) N 0(0 0) QO l"pp) <000(O
O (ND N C4 <O O d NUJ('07 N N(O b 6)0)0.- N1
N w O P) N O N •- (t)
U a t, V; 6n Oo
6n LU
W N 4 69 64 to 64 in 6n 69694949496949 69 69 44648949
` Q coN 0
(O J d d a 0
0
H
o Z J o w 0 0� c W
0d 'V °) a F Ow m — u
J N
Z0 a °i c
a z 'mac $
ti y Z a w CU)
UJ >
x ` N Z
W (nzO N Q cAv w Z w LU
z m c a
W oz > (u rn (n O z a 4 6n a ( a+ 4) 'C C W ro = W
O a.0 O w o. Q 3 m
V ? a LL wU Z Q 6n a U N 3 m U
> Z W i 6i ~ U W U 7 a. U Wi4U6u `9 � c n C UC�a2
.00 U) w z _ < W
a'W Q O 4) Q Z a C7 a <a W2 n o Z m �i is + U) Q c m a N
60UyZ � .�, U ^ w C7 ? <a 0 aaEaci � d0 u J 5m J
E (Do- o+z N o w z z a -aci=-a(no s a o °3 cnoo o
O (' 0 0 m U m v) m F- 4 rr
3 W LL O rn
RICHARD
KENNEDY
ARCHITECTS
July 2,2026
Mr. Matthew A. Gorman
Principal Architect
Arrington Watkins Architects,LLC
602-279-4373
mgorman@awarch.com
Reference: City of Apache Junction-Master Plan and Design of City Services Expansion
RFQ PROJECT NO. 25MP-001
Fee Proposal—Professional Architectural Services
Dear Mr.Gorman,
Richard I Kennedy Architects is pleased to provide this fee proposal to Arrington Watkins related to
the design and documentation of the City of Apache Junction project noted above. This letter
outlines our understanding of the scope of professional services we will provide as design architect
for the campus and architect of record for the Library. A scope letter and deliverables list was
prepared by AWA to define the overall project requirements for the team. Our associated fee
proposal assumes that the project does not change significantly in scope,deliverables,or durations
from these documents and our understanding as outlined below.
Project Duration&Delivery
• 12-month duration for design+documentation.
• 22-month total project duration from NIP through final move-in.
Project Deliverables:
• See separate attachments for deliverables list by phase provided by AWA.
• RKA is responsible for deliverable items for the Library building only unless noted otherwise
below.
Richard Kennedy Architects Responsibilities by Phase:
• Architectural Design/Concept Design-all buildings and site.
• Attend and participate in project meetings.
• Lead design and documentation of Library facility.
• Commercial office furniture selection,specification,and documentation —All buildings.
• Interior finishes scheme— All buildings.
• Schematic Design Phase{30%Design)
o Overall Campus
• Concept Development(10%Design)
• Lead refinement of conceptual site layout and campus design
characteristics.
• Lead development of overall exterior material palette.
• Lead development of conceptual massing for all buildings.
RKARCH.COM 4450 NORTH 12TH STREET SUITE 200 PHOENIX, ARIZONA 85014 USA 602.264.1955
• Schematic Design
• Design oversight for refinement of conceptual design to provide a
cohesive schematic design vision for the campus.
o Police Substation
• See overall campus above
• Review furniture layouts developed by AWA for alignment with future
office furniture selection/specification.
• Collaborate with AWA to select interior finishes.
o Library
■ Scope and deliverables per attached documents.
• Design Development Phase(60% Design)
o Overall Campus
• Provide continued design oversight for overall design cohesiveness and
alignment with original conceptual design intent.
o Police Substation
■ Collaborate with AWA on shared details
■ Develop office furniture sheets for inclusion in the DD package.
• Review and comment on AWA interior drawings for placement and layout
of interior finishes for public spaces.
o Library
■ Scope and deliverables per attached documents.
• Construction Document/Permit Phase(100%Design)
o Overall Campus
■ Provide continued design oversight for overall design cohesiveness and
alignment with original conceptual design intent.
o Police Substation
• Collaborate with AWA on shared details
■ Develop office furniture sheets and specifications for inclusion in the CD
package.
■ Review and comment on AWA interior drawings for placement, layout,
and detailing of interior finishes of public spaces.
o Library
■ Scope and deliverables per attached documents.
• Bid Phase
o Assist AW's support of Owner and CMAR during bidding process by answering
bidder RFls for the Library building
o Assist Owner in procurement of office furniture.
• Construction Administration and Observation Phase
o AWA to manage campus wide construction administration.
o RKA to provide construction administration services for Library building only.
o Assist Owner with review of office furniture installation and punch list generation—
Police and Library buildings.
• Warranty
o Attend a warranty walk-through of the Library building with CoAJ when requested
to determine if any work, equipment, or material requires corrective action under
the Contractor's guarantee clause.
RICHARDIKENNEDYARCHITECTS 2 OF 3
Clarifications& Exclusions
• AW to provide overall Project Management.
o RKA will review meeting minutes and other project management documents
prepared by AW and provide comments or clarifications as necessary.
• RKA will be Architect of Record for the Library building only.
• Park building furniture and interiors are excluded.
• Should Additional Services of RKA be requested, those services will be invoiced at the
hourly rate per labor category established for the project.
• Associated project reimbursables to be tracked and invoiced to AW monthly.
Proposed Design Fees
Basic Architectural Design Services
Campus
• Concept Design and Design Oversight $65,000
Library
• Schematic Design Phase $241,475
• Design Development Phase $287,645
• Construction Document/Permit Phase $436,120
• Bid Phase $15,000
• Construction Administration and Observation Phase $197,815
• Warranty $12,000
Subtotal $1,190,055
Total $1,255,055
Basic Interior Design Services
Police
• Interior Design-material palette and office furniture $62,500
Library
• Interior Design and FF+E $71,500
Total $134,000
Supplemental Services
• Book Stack Design and Documentation $29,900
Allowance
• Wayfinding and Experiential Graphics $28,300
• Reimbursables $5,000
Sincerely,
James E. Richard,AIA,Partner
Lead Design Principal
Richard I Kennedy Architects
RICI4ARDIKENNEDYARCHITECTS 3 OF 3
91230W.W.Washington Street,Suite 114,Tempe,AZ 85288
602.225.1575
BuehlerEngineering.com
July 10, 2026
Matthew Gorman
Arrington Watkins Architects
3003 North Central Avenue, Suite 2400
Phoenix, AZ 85012
MGorman@AWArch.com
Subject: Apache Junction City Services Expansion
Buehler Proposal No. 26-0758 Revision 2
Dear Matt,
Thank you for requesting a proposal to provide structural engineering services for the City Services
Expansion Project. This proposal is based on our review of the City of Apache Junction RFQ, the
design team scope letter, the deliverables list, and recent Project correspondence. Buehler
understands the overall Project construction budget is currently anticipated to be below $49 million,
and this proposal is based on the currently defined program, building count, and anticipated delivery
approach.
The Project consists of the design and construction of a new municipal campus on an approximately
22-acre site located on Ironwood Drive, south of Elliot Road, in Apache Junction, Arizona. The
development is expected to include primary facilities such as a police facility (approximately 27,000
SF), a branch library (approximately 15,000 SF), and a Parks building with associated yard facilities.
Buehler Engineering, Inc. (Buehler) understands the park and lake portions of the overall master
plan will be delivered under a separate package by others and are excluded from this proposal.
Structural services are limited to the Police Facility, Branch Library, Parks Building, and associated
building-related site structures including site walls 6'-0" or less around the parks and around any
potential secured parking areas identified in the schematic design phase.
The Project is transitioning from prior master planning efforts into active design. Key elements
including building configurations, site features, structural systems, and performance criteria remain
under development. Accordingly, Buehler's services are structured to support continued refinement
of the program, budget, and design criteria while maintaining flexibility as stakeholder input and
Project requirements evolve.
Building structures are anticipated to utilize structural steel framing, CMU bearing walls, or a
combination thereof, with lateral-force-resisting systems selected based on architectural
requirements, performance objectives, and Project budget. Foundations are anticipated to consist of
conventional shallow spread footings and slab-on-grade construction, subject to final geotechnical
recommendations. We anticipate some depressed slabs or trenches as part of our scope.
Los Angeles Phoenix I Roseville Sacramento I San Carlos I San Diego I San Francisco I San Luis Obispo
BUEHLER
Proposal No.26-0758 Revision 2
Certain facilities, including the Police Facility, may be classified as essential or Risk Category IV
facilities and may require enhanced structural performance criteria, including increased design
forces, redundancy, and coordination with specialty systems. Final classification and performance
requirements will be established in coordination with the Owner,Architect, and authority having
jurisdiction (AHJ). Buehler will develop the structural design criteria consistent with the final building
classification and coordinate with specialty systems associated with essential facility operations as
required. If the Police Facility is ultimately classified as a Risk Category IV facility, the fee herein
assumes typical structural requirements associated with such classification and does not include
blast resistance design, progressive collapse analysis, hardened construction criteria, anti-ram
protection design, or other specialized mission-critical facility requirements unless specifically
identified and authorized.
Arrington Watkins Architects(Client)and Buehler Engineering, Inc. (Buehler)agree as set forth
below:
SECTION 1: BUEHLER'S SCOPE OF SERVICES
Buehler shall provide for the Client, in accordance with this Agreement, structural engineering
services for the Project described above. Buehler anticipates orderly and continuous progress of the
Project and shall provide these services in accordance with generally accepted professional
practices for the intended use of the Project.
Buehler shall establish structural design criteria for the Project and coordinate with the design team
and specialty consultants to support the building uses and performance requirements. Buehler's
scope and fee are based on the current understanding of three primary buildings and associated site
structures. Significant changes to the number, size, complexity, or type of structures may require
adjustment to scope and fee.
Site structures, landscape features, and specialty elements not specifically identified as included in
Section 1.1 are assumed to be designed by others or delegated unless incorporated into this
Agreement through written authorization. Buehler will coordinate with the design team to establish
structural criteria and interface requirements for such elements as required for overall Project
integration.
Park and lake improvements are assumed to be provided under a separate Project package by
others. Preparation of phased construction documents, multiple bid packages,or early release
packages is not included unless specifically authorized. Revisions resulting from changes in
geotechnical recommendations after initial design assumptions are established may be considered
additional services.
1.1 Buehler's Scope of Work consists of providing construction drawings and supporting calculations
for the following:
Building Structures
• Primary gravity, lateral-force-resisting, and foundation systems for the Police Facility, Branch
Library, and Parks Building.
Page 2
BUEHLER
Proposal No. 26-0758 Revision 2
• Building structures are anticipated to utilize structural steel framing, CMU bearing walls, or a
combination thereof, supported by conventional shallow foundations and slab-on-grade
construction, subject to refinement during design and review of geotechnical
recommendations. The single-story library may have an alternate system depending on the
architectural vision and finishes.
• Structural design criteria for the Police Facility shall be developed in accordance with the
final building classification established by the Owner, Architect, and AHJ, including Risk
Category IV requirements if applicable.
• Individual building configurations, structural systems, and performance requirements may
vary by facility type and will be refined during design.
• Exterior cold-formed steel cladding and attachments, if required.
• Interior cold-formed steel framing support for partitions, ceilings, soffits, and attachments
where required for structural design and not specifically covered by SSMA design tables.
Building-Adjacent Structures
• Awnings or canopy structures directly attached to the buildings.
• Entry features, overhangs, and similar architectural elements integral to building structures.
• Localized retaining walls and site walls immediately adjacent to building perimeters required
to support grading transitions, generally limited to typical building-adjacent conditions, with
final limits to be established during design.
• Miscellaneous minor structures incidental to building operations (e.g., screen walls,
equipment enclosures)where structural support is integral to the building systems.
• Small park-related accessory structures specifically consisting of up to two picnic ramadas,
one dock/deck structure associated with the lake edge, typical monument sign foundations,
dumpster enclosure foundations, maintenance yard push walls, and one park restroom/pump
house building generally consistent with the current master planning program.
Delegated or Specialty Structures (Excluded from Base Scope)
• Large-span canopies, shade structures, architectural features, and other specialty structures
are anticipated to be delegated to specialty contractors or separate design professionals
unless specifically included in this Agreement.
• Lake liner systems, lake mechanical systems, shoreline stabilization systems, water-
retaining structures, aquatic features, fishing piers, basketball courts, volleyball courts,
pedestrian bridges, large park pavilions, recreational amenity structures, and other major civil
or landscape structures are not included in Buehler's base scope. Structural services
associated with one dock/deck structure, up to two picnic ramadas, and one park
restroom/pump house building are included as described herein.
• Specialty maintenance yard structures beyond the primary Parks Building program, including
fueling canopies, vehicle wash facilities, fleet maintenance structures, equipment shelters,
fleet operations structures, and similar operational facilities, are excluded unless specifically
identified in the architectural program and authorized as part of the structural scope. Please
note that minor structures associated with the fleet maintenance bay structure may be
included in our scope of work.
• Structural design associated with security, blast resistance, hardened construction, or
specialty performance criteria is not included unless specifically identified. We understand a
ballistic wall may be included in our scope of work at the lobby of the building (excluding
glass systems). We anticipate the loading requirements will be either prescriptive (provided
by the client) or performance based and provided by third party.
Page 3
BUEHLER
Proposal No.26-0758 Revision 2
• Buehler shall provide structural design criteria, loading requirements, and review of
delegated submittals for general conformance with the design intent where such systems are
delegated.
• Sports field and recreational facility structures including, but not limited to, ballfield fencing,
backstops, dugouts, scoreboards, bleachers, shade structures, sports lighting support
structures, netting systems, spectator amenities, maintenance buildings, concession
structures, and similar recreational facility improvements.
General Scope Items
• Structural support for the attachment of exterior building maintenance elements (davits, tie-
backs, etc.) based on layouts and reactions provided by others.
• Structural design criteria and loading information as required for delegated design of
elements by Specialty Contractor(s). See Section 3 for additional information regarding
delegated design.
• Providing phased deliverables as described in Section 2.
• BIM structural modeling in accordance with Exhibit B.
1.2 Buehler's Scope of Work includes providing structural calculations only for the following:
• Support, anchorage, and bracing for architectural components including, but not limited to
signage, artwork, etc.
• Support, anchorage, and bracing for MEPF equipment where required by code (i.e. floor-
mounted or roof-mounted equipment greater than 400 pounds and ceiling or wall-mounted
equipment greater than 20 pounds).
• Light pole foundations.
• Flagpole foundations.
Construction documents (drawings)for the items described in Section 1.2 shall be prepared by
the associated design professionals (Architect, Landscape Architect, Mechanical, Electrical,
Plumbing, Fire Protection (MEPF) Engineers, or other specialty consultants) and are not
included in Buehler's scope.
1.3 The following exhibits are included with this proposal:
• Exhibit B: BIM Services
Buehler will review the Terms and Conditions of the Consultant Agreement with the Client and may
request revisions as appropriate; however, the scope of services described herein is based upon
Buehler's understanding of the Project requirements as of the date of this proposal. Any obligations
imposed upon the Client by the Prime Agreement that materially expand Buehler's scope, schedule,
or level of effort beyond that described herein shall be considered Additional Services.
SECTION 2: BUEHLER'S SERVICES AND DELIVERABLES BY PHASE
2.1 Buehler shall provide structural engineering services as described in each of the phases below.
30% Schematic Design Phase
Buehler shall:
• Validate prior master planning assumptions and establish structural design criteria and
systems for the Project.
Page 4
BUEHLER
Proposal No.26-0758 Revision 2
• Review Owner/Client's requirements and establish the structural design criteria.
• Identify special Code and Agency approval issues.
• Make recommendations regarding basic structural systems.
• Review issues of concern and begin coordination with architectural, mechanical, and
electrical systems.
• Review the cost estimate and provide feedback for structural items.
• Identify pre-engineered and delegated structural systems.
• Review geotechnical information for the inclusion of required design parameters. Provide
preliminary foundation reactions for review by the Geotechnical Engineer.
• Attend weekly design meetings (virtually)as requested or required.
• Provide the following deliverables for this phase:
o Structural narrative and design criteria.
o Structural drawings in PDF format showing the following information:
• Preliminary foundation plan with column/footing layout.
• Preliminary framing plans with member depths.
• Preliminary lateral-force-resisting system layout.
o Outline specifications for expected structural materials. Specifications will be submitted in
CSI format using Microsoft Word.
60% Design Development Phase
Buehler shall:
• Incorporate 30% Schematic Design Phase review comments made by the Owner,
Contractor, or Architect.
• Prepare final structural narrative and design criteria.
• Review issues of concern and coordinate with architectural, mechanical, plumbing, fire
sprinkler(if provided during DD), and electrical systems.
• Review the cost estimate and provide feedback for structural items.
• Attend weekly design meetings (virtually) as requested or required.
• Provide the following deliverables at the 50% and 100% milestones of this phase:
o Structural drawings in PDF format.
• Progress foundation plan.
• Progress framing plans.
• Progress lateral-force-resisting system layout and elevations.
• Progress building sections.
• General notes and typical details.
o Preliminary structural specifications for the expected materials used on the Project.
Specifications will be submitted in CSI format using Microsoft Word.
100% Construction Document/Agency Review Phase
Buehler shall:
• Commence the 100% Construction Document Phase once the architectural model/design is
frozen and primary structural elements have been located such that no further movement will
occur.
• Incorporate 60% Design Development Phase review comments made by the Owner,
Contractor, or Architect.
• Finalize the preparation of the structural drawings.
• Finalize the preparation of the structural specifications.
• Finalize the preparation of the structural calculations.
• Prepare Test and Inspection Form for AHJ review and approval.
Page 5
BUEHLER
Proposal No. 26-0758 Revision 2
• Review the cost estimate and provide feedback for structural items.
• Attend weekly design meetings (virtually) as requested or required.
• Provide the following deliverables at the 50% and 100% milestones for this phase:
o Structural drawings and calculations.
Drawings and calculations will be submitted to the Client in PDF format for their use
in the reproduction and assembling of documents necessary for building permit
submittal and the construction of the Project.
o Structural specifications for the materials used on the Project. Specifications will be
submitted in CSI format using Microsoft Word.
o We understand the client may request a preliminary draft of the calculations for the
project at 90%. The calculations will be unsigned and a draft until the entire package is
submitted for permitting.
• Assist the Client in obtaining approval from the governmental AHJ over the Project.
• Respond to plan review comments on the structural drawings and specifications.
• Revise the structural drawings and specifications, as required, in response to plan review
comments.
• Assist other disciplines with responses to structural comments on their documents for
elements listed in Section 1.2. Provide PDF markups of revisions to other consultants'
drawings as required in response to those comments.
• Provide the following deliverables for this phase:
o Structural drawings, calculations, and specifications.
o Analytical models (if requested by AHJ).
o Plan review comment response letter.
Bidding Phase
Buehler shall:
• Issue Addenda as appropriate to clarify or correct the contract documents.
• Provide responses to Bidder submitted Requests-for-Information (RFIs) related to structural
components of the Project.
Construction Administration Phase
Buehler shall with reasonable promptness:
• Prepare supplemental drawings and interpretations in response to Requests-for-Clarification
by the Architect, Contractor, or the Owner.
• Review structural items within Contractor submittals for general conformance with the
information given in the contract documents.
• Visit the site (up to ten site visits total) periodically to observe work and to determine, in
general, if the structural portions of the constructed work are in accordance with the contract
documents. On the basis of this on-site observation, Buehler shall endeavor to guard the
Owner against apparent defects and deficiencies in the permanent work constructed by the
Contractor but shall not guarantee the performance of the Contractor. Buehler shall not be
required to make exhaustive or continuous on-site observations to check the quality or
quantity of the construction work and shall not be responsible for construction means,
methods, techniques, sequences, procedures, or for any safety precautions in connection
with the construction work. Buehler shall not be responsible for the Contractor's failure to
execute the work in accordance with the construction contract.
• Additional site visits requested by the Owner, Contractor, AHJ, or other project stakeholders
beyond those identified herein shall be considered additional services.
Page 6
BUEHLER
Proposal No.26-0758 Revision 2
SECTION 3: EXCLUSIONS AND CONTINGENT ADDITIONAL SERVICES
3.1 Exclusions and Contingent Additional Services are not included in Buehler's Services.
Contingent Additional Services may be delegated to other design professionals or added to
Buehler's Services under mutually agreed terms and when authorized by the Client.
3.2 Services specifically excluded are:
• Park structures, lake structures, pump houses, restroom buildings, lake liner systems, lake
mechanical systems, shoreline stabilization systems, pumphouses, water-retaining
structures, aquatic features, fishing piers, basketball courts, volleyball courts, pedestrian
bridges, large park pavilions, sports field improvements, recreational amenity structures
beyond those specifically identified in Section 1.1, and similar park-related facilities
associated with the separate DR Horton package.
• Buehler shall provide reasonable coordination and structural support design associated with
the included dock/deck structure and building interfaces adjacent to the lake. Structural
evaluation, analysis, or design associated with lake embankment stability, shoreline
stabilization design, global slope stability, groundwater influences, settlement impacts
associated with adjacent water features, retaining systems required due to proximity to the
lake, lake liner systems, lake mechanical systems, or foundation systems requiring special
consideration due to lake-adjacent conditions remains excluded. Services associated with
such conditions shall be considered Additional Services. Buehler will notify client if such
conditions exist.
• Structural services associated with future campus expansion areas, future buildings, future
development parcels, future phases, or conceptual master planning beyond the facilities
specifically identified in this proposal.
• Specialty or proprietary structural systems.
• The design of deep foundation elements (APG piles, micropiles, etc.).
• The design of ground improvements (GeoAggregate piers, Drilled Displacement Columns
(DDCs), etc.).
• The design of proprietary lateral-force-resisting systems or components.
• The design of construction shoring and erection bracing.
• The design of shoring and/or bracing for excavations.
• The design of structural support for and bracing of MEP and Fire Protection distribution
systems (ductwork, piping, conduit, cable trays, etc.).
• The design and anchorage of the following exterior cladding systems:
o Curtain wall systems.
o Storefront systems (designed by supplier and specified by the architect).
o Architectural precast concrete panels.
o GFRC panels.
o Decorative and mechanical louvers (rough opening system provided by design team)
• The design of exterior building maintenance elements and their anchorage to the structure.
• The preparation of construction cost estimates.
• Fees associated with permitting or use of any proprietary elements.
Page 7
BUEHLER
Proposal No.26-0758 Revision 2
• Special Structural Inspections (SSI) are not included in Buehler's scope and are assumed to
be provided by others. Buehler will identify required special inspections and prepare
associated Test and Inspection documentation. Based on similar projects, these services
may represent a notable project cost and should be considered during budgeting. If
requested, Buehler can assist the team in developing order-of-magnitude budgeting
information for these services once the project is further defined. If requested by the client,
Buehler can provide SSI services in coordination with third party providers.
3.3 Contingent Additional Services may include, but not be limited to, the following:
• Structural services associated with buildings or site structures requiring specialized design
due to proximity to lakes, ponds, drainage facilities, retention basins, shoreline
improvements, or other water-retaining features.
• Structural services associated with sports complexes, recreational facilities, athletic fields,
ballfields, backstops, dugouts, bleachers, scoreboards, sports lighting structures, spectator
facilities, or similar recreational improvements not specifically identified in Section 1.
• Services required due to significant changes in the Project including changes in size, use,
quality, complexity, schedule, budget, or methods of bidding.
• Services associated with multiple permit packages, phased building permits, early
procurement packages, deferred submittals, package resequencing, or other modifications to
the anticipated Project delivery strategy.
• Significant revisions required after the 60% Design Development Phase to reduce
construction cost due to reasons beyond the control of Buehler and the design team.
• Services resulting from damage as the result of fire, man-made disasters, or acts of God.
• The design of egress stairs, stair landings, and handrails unless specifically included in
Section 1.
• Anchorage design for nonstructural elements unless noted in Section 1.
• Attendance at meetings in excess of two hours per week on average over the duration of a
project phase.
• Publishing progress documents at milestones other than those identified in Section 2.
• Preparing and/or publishing construction documents for the purposes of early procurement
or permitting unless noted in Section 2.
• Services related to the review and design of alternate or substitute primary and secondary
systems submitted by the Contractor after substantial design completion. Buehler
understands this is a team effort and that structural systems and support systems will be
validated in coordination with the design team, contractor and design-assist partners prior to
completion of the 60% Design Development milestone.
• Services resulting from errors or omissions in construction, including but not limited to
redesign or additional site observations.
• Review and analysis of Contractor's construction equipment loads and support.
Page 8
BUEHLER
Proposal No. 26-0758 Revision 2
SECTION 4: BUEHLER'S COMPENSATION
4.1 The Client shall compensate Buehler for Basic Services as a lump sum fee as indicated below:
30% Schematic Design Phase.........................................................$67,500.00
60% Design Development Phase............................................ ...$93,750.00
100% Construction Document/Agency Review Phase..................$125,500.00
$125,500.00
Bidding Phase....................................................................................$8,250.00
Construction Administration Phase..................................................$58,375.00
Total Fixed Fee.............................................................................$353,375.00
This fee assumes the following:
• Preparation of one structural drawing package for the Police Facility and Parks Building
and one structural drawing package for the Branch Library, with generally consistent
structural systems, detailing, and design criteria utilized across the campus. Additional
building packages, permit packages, or significant departures from the anticipated
campus design approach may require adjustment to Buehler's fee and schedule.
• An approximately 27,000 SF of Police Facility space, approximately 15,000 SF of library
space, and a single Park Maintenence Building. Significant increases in building area,
program complexity, or structural scope may require an adjustment to Buehler's fee.
• Structural services associated with one dock/deck structure, up to two picnic ramadas,
monument sign foundations, maintenance yard push walls, dumpster enclosure
foundations, and one park restroom/pump house building as currently anticipated.
Significant expansion of these features or addition of other park-related facilities may
require adjustment to Buehler's fee.
4.2 Buehler's hourly rates are as follows:
Senior Principal.....................................................................................$230.00
Principal.................................................................................................$210.00
Senior Professional...............................................................................$185.00
Professional...........................................................................................$160.00
Designer................................................................................................$130.00
Senior Technician..................................................................................$130.00
Technician.............................................................................................$115.00
Clerical...................................................................................................$100.00
4.3 Where permitted by the Owner-Architect agreement, miscellaneous out-of-pocket project-related
expenses including but not limited to shipping costs, travel, etc. shall be paid at the incurred
cost. Mileage shall be charged at the IRS Standard Business Mileage rate in effect at the time of
the travel.
Page 9
BUEHLER
Proposal No.26-0758 Revision 2
If you have any questions, please do not hesitate to contact me. Otherwise, please sign and return a
copy of this proposal as your authorization to proceed with the services and your acceptance of this
proposal. If you do not sign the proposal but provide verbal authorization to proceed with the
services, it is our understanding that you have accepted this proposal as written.
This Agreement is entered into as of the date first written above.
BUEHLER CLIENT
Aeff ollowell, SE Matthew Gorman
For Buehler Engineering, Inc. For Arrington Watkins Architects
jhollowell@buehlerengineering.com
Title Date
Page 10
BUEHLER
EXHIBIT B: BIM SERVICES
SECTION B1: BIM SERVICES PROVIDED
1. BIM Services Provided:
• Buehler will provide Building Information Models (BIMs)developed using Revit Structure throughout the design
and permitting phases of the Project.
• The anticipated end-use of the model is for the creation of structural contract documents and model-based
design coordination.Any other use shall receive prior authorization from the Engineer.
• Structural model element and system representations will be per the Level of Development(LOD) Matrix below.
Model elements may be provided during Schematic Design at the discretion of the Engineer if necessary for
Engineer to communicate design intent.
Where categories and subcategories of elements are shown in the matrix (as in for steel elements), the LOD
shown for the subcategory governs over that for the category it falls under.
MATERIAUCATEGORY Schematic Design Construction
Design (SD) Development(DD) Documents (CD)
STEEL
Primary Structural Systems - 200 300
• Structural Columns - 200 300
• Floor and Roof Framing' - 200 300
• Braced Frames - 200 300
Secondary Structural Elements - - -
• Structural Connections - - -
• Beam Bracing/Kickers2 - - 300
• Braced Frame Gusset Plates - - 300
Miscellaneous Metal Framing - - -
• Monument Stair Framing - 200 300
• Egress Stair Framing - - -
CONCRETE/CMU
Structural Floors/Slabs - 200 300
Foundations, Grade Beams - 200 300
Structural Concrete/CMU Walls - 200 300
Non-Structural CMU Partition Walls° - - -
Notes:
'. Steel joist systems will not be modeled as discrete elements.
2 Modeling of bracing and kickers is limited to those elements that provide support for primary structural
elements only. Kickers and bracing for non-structural elements including, but not limited to, ceilings and
distributed utility systems are excluded from the structural model.
Gusset Plates will be included in the Engineer's BIM model if and only if gusset plate design is not
delegated to a specialty designer.
4 Non-Structural CMU Partition Walls may be modeled at LOD 100 for coordination.This effort is
anticipated to occur one time only. Any additional coordination (i.e., relocated walls, openings, etc.)is
not included.
Exhibit B: Page 1
BUEHLER
SECTION B2: EXPANDED BIM SERVICES
1. In addition to the BIM services provided in section B1.1, Expanded BIM Services may be provided as follows:
• Buehler may provide model elements up to a Level of Development of 350 at their sole discretion.
• Buehler may, at their sole discretion, exceed the LOD for any element shown in the matrix above to facilitate
the creation of 2D documents.
• Buehler may elect to provide quantity takeoffs and schedules to assist with procurement and scheduling
provided additional release forms acknowledging the limitations of the in-progress BIM models are signed by
all parties.
SECTION B3: EXCLUDED AND CONTINGENT ADDITIONAL BIM SERVICES
1. The following BIM services are excluded from the base scope of work for this Project, but may be provided
contingent upon receipt of additional compensation (to be negotiated):
• The development of the structural Building Information Model(s)for anything beyond the end-use stated in
section"B1: BIM Services Provided".
• The development of the structural Building Information Model(s)for anything beyond the LOD stated in in
section"B1: BIM Services Provided".
• Continued development and updating of the structural Building Information Model(s)beyond the design and
permitting phases of the Project.
• Preparation of Record or As-Built Building Information Model(s)at the completion of the Project.
Exhibit B: Page 2
LSWEngineers 2333 W.Northern Av Phoenix. AZ 85021
www Iswengineers corn
602 249132O
July 7, 2026
Arrington Watkins Architects
3003 N Central Ave, Suite 2400
Phoenix,AZ 85012
Attn: Matt Gorman
Re: City of Apache Junction South Campus City Services Expansion
LSW Proposal No. PR2026-071
Mr. Gorman:
We are pleased to offer our engineering services for City of Apache Junction South Campus, which will
be located east of Ironwood Drive and south of Elliot Road.
PROJECT UNDERSTANDING
This project is understood to be the design for a new City Services Expansion for the City of Apache
Junction, based on the recently completed Master Plan and Programming effort.The Master Plan
identifies six (6) distinct areas as follows: Park, Lake, Library, Police, Parks Maintenance (PM), and
Shared Site.
• Park:Approximately 12.1 acres and anticipated to include provisions for two(2) ball fields,two
(2) basketball courts, multi-purpose fields, shaded gathering areas, recreational amenities,
restroom building, and associated parking.
• Lake: Anticipated to be approximately 1.5 acres.To be populated with fish to operate as a
fishing lake. To include a pump house with pumping system(s)dedicated to the lake and an
associated restroom.
• Library: Approximately 2.68 acres and to include a 15,000 SF branch library with associated
parking. Along with general library space,the building also includes a community room, meeting
rooms, maker space rooms, sensory spaces, lounge area, patio space, and offices.
• Police:Approximately 4.41 acres and anticipated to include a single-story, 27,000 SF police
substation facility with associated parking. The police substation is anticipated to be a Risk
Category IV building and as such will include coordination related to seismic.The police
substation is anticipated to include a communications center,fitness center, locker areas,
recharge rooms, gun loading/unloading station, conference rooms, interview rooms, office
spaces, and storage rooms.The site includes evidence storage, a dump station, fitness area,
drone launch pad, dog training area, fleet preparation, and patio space. A separate 400 SF K9
kennel building is also included in this area and is anticipated to be provided as air conditioned
space.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
July 7,2026
LSW Page 2
• Parks Maintenance:Approximately 1.1 acres and anticipated to include a 5,500 Parks
Maintenance building and an associated maintenance yard.This building is anticipated to
include a mud room,crew room, lockers, multiple types of storage rooms, and a workshop area.
• Shared Site:Approximately 1.04 acres.This site is anticipated to include a retention basin as well
as three(3)sand volleyball courts and associated parking.
The project delivery system is understood to be split in two different delivery methods.The Park and
Lake site areas will be constructed by DR Horton's selected CMAR.The remainder of the project will be
delivered using Construction Manager at Risk(CMAR)delivery method.The total construction budget
for the project and site, not including the lake and park, is anticipated to be approximately$49 million.
In cooperation with the distinct delivery methods mentioned above, it is understood that the Park and
Lake site areas will require their own separate design and permit package(Package 1),the Library site
area will require its own separate design and permit package(Package 2),and the Police, PM and Shared
Site will be under their own separate design and permit package (Package 3).
Our mechanical, plumbing,electrical and technology engineering services for this project will consist of
the following.Services not indicated below are considered outside of our basic scope and will be
provided upon request as an additional service.
It is our understanding that the design of this project will include deliverables as defined below. It is our
understanding that the site will utilize one planning and zoning package to cover all areas of the project.
Additional deliverables shall be separated per each construction package(3 total packages). Package 1
shall include the Park and Lake areas. Package 2 shall include the Library area. Package 3 shall include
the Police, Parks Maintenance and Shared Site areas.The design duration for this project is understood
to be 12 months.The construction duration for this project is understood to be 24 months.
Planning and Zoning Site Submittal
1. Provide Design Review Board (DRB), Planning Submittal or Site Plan Submittal site lighting
planning documents indicating the exterior lighting system component locations and associated
illuminance calculations. The submittal documents will also include exterior lighting fixture cut
sheets. It is anticipated that this submittal shall be one submittal applicable to the entire project
and three (3)separate site submittals for each package is not anticipated.
Schematic Design Phase
1. Assist the architectural design team with site space planning and initial engineering systems
space requirements in the development of the conceptual planning building floor plans
2. Provide basic schematic level design drawing showing the engineering systems intended for this
project.
3. Provide a written narrative describing the engineering systems intended for this project.Assist
the architectural design team refining further the engineering systems space requirements in
the development of the schematic building floor plans.
4. Provide a table of contents for project specifications intended for the project.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
•LSW July 7, 2026
Page 3
Design Development Phase
1. Prepare design development drawings showing all main engineering systems equipment
locations and sizes. Equipment weights will be shown as needed for the Structural Engineer.The
drawings will also include the following:
a. Routing of mechanical duct mains.
b. Mechanical zoning layout and thermostat locations for review.
c. Routing of main plumbing utilities and invert elevations as needed for the Civil Engineer.
d. Routing of cable tray.
e. Routing of site electrical and technology duct banks.
2. Provide engineering systems equipment cut sheets for review.
3. Assist the architectural design team in the development of the ceiling plan.
Construction Documents Phase
1. Completion of the engineering design drawings for permit submission.
2. Completion of the engineering specifications for permit submission.
3. Finalizing the design drawings and specifications addressing the Plan Review and Owner
comments.
Bid Phase
1. Assist the team with bid phase services.This is anticipated to include:
a. Response to bidder questions and provide design clarifications.
b. Respond to requests for substitutions.
SCOPE OF WORK
Mechanical
The mechanical scope for this project is anticipated to include:
1. Complete heating,cooling, and ventilation load calculations.
2. Design of packaged DX heating and cooling unitary equipment,and all associated ductwork, air
distribution, condensate piping,and controls.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
LSW July 7,2026
Page 4
3. Design of variable air volume(VAV)air handling units, including VAV terminal units with electric
heat, all associated ductwork,air distribution, and controls.
a. It is understood that the Communications/Dispatch area of the Police Substation
building requires continuous operation even in the event of a building outage.As such
coordination shall take place for this system to be provided with standby power.
4. Design of dedicated split system DX cooling in MDF/IDF and elevator machine rooms, including
piping and controls.
S. Design of general environmental air exhaust systems, including restrooms, locker rooms,janitor
closets,and other similar spaces,and all their associated ductwork,exhaust inlets, and controls.
6. Design of workshop exhaust systems per the mechanical code and equipment requirements,
including all associated ductwork,exhaust inlets, and controls.
7. Design of K9 kennel ventilation system, including crossflow heat exchanger with outside air and
exhaust air airstreams, DX heating and cooling equipment, all associated ductwork,air
distribution,condensing piping, and controls.
Plumbing
The plumbing scope for this project is anticipated to include:
1. Selection of plumbing fixtures as located on the Architectural plans and the sizing and routing of
the associated domestic cold/hot water and the waste and vent piping for these fixtures to 5'-0"
beyond the building perimeter.The domestic water service is understood to be provided from a
municipal service low in adequate capacity and pressure for this project.Therefore, booster
pump system(s) are anticipated as part of the scope of this project.
a. Domestic water sizing and routing additionally to account for equipment such as ice
makers. If required by City of Apache Junction maintenance staff,trap primers shall be
provided to floor drains.
2. Sizing and selection of the domestic water heater system.
3. Sizing and routing of the roof primary drains, overflow drains and associated drain piping to
5'-0" beyond the building perimeter.The roof plan and locations of the roof primary/overflow
drains are provided by your office.
4. If utilized, sizing and routing of the natural gas piping for connection to the gas appliances from
the gas meter. Current understanding of project scope anticipates natural gas at Police and
Library buildings.
a. It is anticipated that each building on site shall be provided with its own separate gas
meter.As such,coordination is included to communicate with the gas company to verify
understanding of the layout of the campus and the total number of gas meters expected
for the site.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
LSW July 7, 2026
Page 5
5. Selection of the air compressor and the sizing and routing of the associated compressed air
piping to Owner-identified points of connection.
6. Sizing and routing of drainage for K9 kennel drainage which is anticipated to include design for a
hair interceptor.
Electrical
The electrical scope for this project is anticipated to include:
1. Design of the electrical power distribution for this project, including connection to the
equipment, receptacles, lighting, and Owner equipment.Our design includes coordination with
the local power utility company,sizing and location of the main service entrance section and
distribution switchgear.
a. Design of an NEC 708(COPS)System is understood not to be considered for the
building.
b. It is understood that power distribution shall be included for the following areas around
the site: lake pump system(s), ramadas, restrooms, vehicle gates, man gates.
2. General Lighting: Our design includes selection of lighting fixtures, locating the lighting fixtures
and the associated switching/control of the lighting systems. Specialty Lighting fixtures for the
Library Book Collections and Story Time sections will be coordinated with architectural team for
proper illumination of the space. Selection of specialty lighting such as theatrical, merchandise
or art displays,chandeliers, lighting fixtures selected by others, etc., is not included in the base
scope of services.
3. Lighting system illumination and energy compliance calculations for lighting fixtures selected by
LSW are included if required by the local jurisdiction. Illumination calculations of the book
collection areas are included.An illumination and energy compliance calculation for lighting
fixtures selected by others is not included.
4. Site Lighting: Our design includes the overall site lighting, including exterior building-mounted
lighting,walkway lighting, and parking area lighting per AHJ requirements (including Dark Sky
compliance). Offsite lighting,street lighting,and traffic control lighting systems are not included
in the base scope of services. Sports lighting for multi-purpose fields,volleyball courts,
basketball courts, and ball fields, is not included in the base scope of services; however,our
design includes power distribution to such lighting as defined by Others.
a. Alternate scope(included if determined to be required during programming):Site
lighting for volleyball and basketball courts by LSW including general illumination—
competition-level sports lighting design is not included.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
LSW July 7,2026
Page 6
5. Emergency and Standby Power Systems: Our design includes sizing and selection of the
generator(s),transfer switches,distribution switchgear,and power circuiting.
6. Design for a redundant UPS system and electrical distribution for the Communication Center
7. Lightning Protection System: Performance based design for bidding purposes.The installation
drawings will be a deferred submittal by the LSP Vendor.
Technology Systems
The technology scope for this project is anticipated to include:
1. Site Design:Our design includes intended conduit and/or duct bank routing, manhole/vault
layout, and building entrance locations.
2. Passive Network Cabling: Our design service includes cabling system design from outlet
locations to the Main Equipment Room (MER)or Telecommunications Room (TR),cable support
and pathway system,and outside plant fiber-optic and multiple pair copper cabling including
sports lighting and lake pump system connectivity as required and defined by Others.
a. Anticipated cabling systems include:building network for workstation, office, meeting
spaces, IP-cameras, and digital signage; wireless distribution;and BAS.
3. Buildout of the MER/TR Rooms: Our design includes room/rack layout, cable support and
pathway system,telecommunication grounding,and passive component rack layouts.
4. CAN Distribution:Our design service includes community antenna television distribution
design,including coax cabling to the termination point in the MER/TR Rooms and specifications
for distribution electronics(transceivers,amplifiers, etc.).
5. Intercommunication System:Our design service includes the building paging and/or mass
communication system, including specifications for the electronic equipment, including
distribution amplifiers, input/output modules, phone interface modules, microphones, and
speakers.
6. Distributed Antenna System (DAS) (cellular service):Our design includes rough-in for a DAS.The
final design of cabling and devices is to be by the Contractor's selected DAS Vendor.
7. Emergency Responder Radio Communication System (ERRCS):Our design includes design for the
ERRCS system including interconnection between Police and Library Buildings.Although the
ERRCS testing occurs after the construction of the buildings, based on the size of the facility,we
are anticipating a need for the system. Design will include specifications for the system, but the
final design will not occur until the preliminary testing has ben completed.
8. Access Control/Security System:Our design service includes the access control, intrusion
detection,card reader,door monitoring,door control, motion sensor,and duress systems, and
associated control panels.The door hardware will be specified by the Architect.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
July 7, 2026
LSW Page 7
9. Camera Surveillance: Our design includes camera layout and associated cabling and pathways,
camera specification, and video recording requirements.
10. Coordination with Audio/Visual Designer: Our design includes coordination with an Audio/Visual
designer to allocate proper rough-in, rack space, power,etc. as required by audio/visual design.
The Audio/Visual designer is understood to be part of the CMAR.
Fire Sprinkler
The fire sprinkler scope for this project is anticipated to include:
1. Performance based specification addressing the fire sprinkler system design for bidding
purposes.The installation drawings (including detailed piping drawings and calculations)will be
a deferred submittal by the Fire Sprinkler Contractor.
Fire Alarm
The fire alarm scope for this project is anticipated to include:
1. Performance based fire alarm system design for bidding purposes, including device placement, a
typical riser diagram,and specifications.The installation drawings(including detailed wiring
diagrams, load calculations,voltage drop calculations, etc.) will be a deferred submittal by the
Fire Alarm Contractor.
GENERAL
Our scope will include the following general engineering services for the project:
1. Attend up to thirty(30) 1-hour biweekly design team meetings and twelve (12) 2-hour Owner
meetings during the design phase of this project. Biweekly design team meetings are anticipated
to be held virtually and Owner meetings are anticipated to be held in-person.
2. Design using Revit with models stored on an ACC/BIM360 Project HUB. It is required that while
our model is in ACC/BIM360,the model shall remain independent from all disciplines outside
of our scope of work, and any revisions to the model shall be made by our staff only. It is
anticipated that the architectural model elements will be"frozen" 7 days before each milestone
deliverable.
3. Provide one set of drawings in electronic portable document format(PDF) at each intermediate
deliverable.
4. Provide one final set of signed and sealed drawings in electronic portable document format
(PDF)at the completion of design.
5. Provide one final set of signed and sealed specifications in electronic portable document format
(PDF)at the completion of design.
6. Our bid phase services will include attendance at the Pre-Bid Meeting and review of the bidding
contractors RFIs.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
LSW July 7,2026
Page 8
7. Our construction phase services will include the following:
a. Review of the Contractor shop drawings, RFls,CORs,AUAs,and CUAs.
b. Perform up to twenty(20)field observations during construction to confirm that the
work is proceeding in accordance with the plans and specifications and prepare a
written report on our findings.
1) It is anticipated that Package 1 (Park and Lake)will require three (3)site
observations, Package 2 (Library)will require five(5)observations,and Package
3(Police, PM and Shared Site)will require twelve{12)observations.
c. Perform up to six(6)special inspections as required by the local authority having
jurisdiction will require additional services. It is understood that electrical special
inspections will be required for each generator,SES, and ATS switches. It is anticipated
that no mechanical special inspections are required.
d. Perform up to six(6)total warranty walks: three (3)warranty walks post-construction
approximately 11-1/2 months after construction completion and three(3) warranty
walks post-construction approximately 22 months after construction completion. It is
anticipated that a two warranty walks will be conducted for each of Packages 1, 2 and 3.
e. Coordination with the Project Commissioning Agent during the construction phase.
f. Review the Contractor-prepared Operation and Maintenance Manual.
g. Prepare HVAC, plumbing,electrical and technology record drawings in AutoCAD format
from the Contractor-prepared as-built redlines. No verification of accuracy is included;
therefore,the record drawings will not be signed and sealed.
PROFESSIONAL FEE
Our fee for the work outlined above is a lump sum amount as follows:
Concept Planning $17,120.
Schematic Design 153,815.
Design Development 234,365.
Construction Documents 371,385.
Bid Phase 14,210.
Construction Phase Services 256,625.
Special Inspections 10,035.
Base Contract Total $1,057,555.
NOTE:This fee includes all travel expenses incurred within the metropolitan Phoenix area.Travel
outside the metropolitan Phoenix area will be billed as a reimbursable expense, including, but not
limited to,travel, rentals, meals, lodging,and reasonable incidental expenses.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
LSW July 7, 2026
Page 9
This fee does not include plotting or printing of sets of our drawings or other discipline's drawings for
interprofessional coordination or distribution.
This fee is quoted on a lump sum basis. The breakdown of the fee into phases or tasks is for your
convenience.The fee will be billed 100% at the end of the project, unless the scope of the project is
changed by written agreement.
CLIENT SERVICES
Services requested of the Client and/or Owner include the following:
1. Provide access to the building maintenance staff to answer questions.
2. Provide all connection requirements for Owner-provided equipment.
3. Provide a project title block and updated background files in a timely manner to meet the
established project deliverables.
4. Distribute meeting agendas before each meeting in order for us to assign appropriate staff to
the meeting; and promptly distribute meeting minutes after each meeting.
5. Provide the following building and Owner information:
a. Building Occupancy Classification.
b. Building Construction Type.
c. Building Hazard Classification.
d. Building Seismic and Risk Category.
e. Owner's Fire Suppression Insurance Requirements.
6. Provide a water flow and pressure test to document the water main capabilities.
7. Provide a PDF set of the drawings at each established deliverable.
8. Provide a PDF of the complete set of drawings and of the project specification book at the
completion of the design phase for our use during construction.
EXCLUSIONS
1. Cost estimating.
2. Meetings or virtual meetings beyond those listed.
3. Analysis of, preparing designs for, or assisting in design modifications to any unlisted equipment
for the purpose of obtaining a field listing from a Nationally Recognized Testing Laboratory
(NRTL) acceptable to the Authority Having Jurisdiction (AHJ). LSW assumes that all Owner-
furnished equipment and equipment specified by others will be Listed and Labeled.
Arrington Watkins Architects
LSW Proposal No. PR2026-071
July 7, 2026
LSW Page 10
4. Photovoltaic design.
5. Motorola R-56 grounding design.
6. Audio/Visual equipment selection. It is understood that the owner shall hire a separate
consultant for this and LSW scope of services is rough-in only.
7. Arc Flash Hazard Analysis and coordination study. Specifications will indicate for the electrical
contractor to provide with their electrical equipment submittals.
8. All work associated with LEED certification of the project.
9. Building Information Modeling(BIM) beyond an LOD-200 or clash-free modeling including
COBie,Uniformat, MasterFormat, OmniClass, etc., input data.
10. Building energy consumption calculations or modeling.
11. Design of stair pressurization, smoke removal, or smoke evacuation systems.
12. Documenting energy code compliance of the building envelope or other systems not in our
scope of services described above.
13. Utility company energy rebate data collection and/or submission.
14. Life cycle cost analysis.
15. Owner changes after completion of the associated design development
documents.
16. Any design services caused by scope changes.
17. Preparation of the electrical coordination or power system study.
18. Preparation of Revit or BIM reco►d drawings.These drawings are assumed to be provided by the
Contractor.
19. Additional documentation or meetings for fire code compliance, including,but not limited to,
a Hazard Mitigation Analysis,fire testing documentation,or meetings with the fire department
to show compliance with the adopted Fire Code amendments related to battery energy storage
systems (BESS).
20. Work in relation to the delinquency or insolvency of the Contractor(s).
Arrington Watkins Architects
LSW Proposal No. PR2026-071
LSW July 7, 2026
Page 11
ADDITIONAL SERVICES
Additional services will be performed on an hourly basis at our standard billing rates or a separate fixed
fee contract as determined by your firm. Our current rate structure is shown below for your reference.
Hourly contracted work will be invoiced based on our rates in effect at the time of such requests.
2026: Principals $240.00
Sr. Engineers $215.00
Sr. Project Manager $210.00
Project Manager $180.00
Engineers $175.00
Field Observers $140.00
Sr. Designers $145.00
Designers $125.00
Project Coordinator $125.00
Project Assistant $100.00
BIM Operators $90.00
Admin $85.00
Outside Services Our cost plus 10%
This proposal is effective for not more than 30 days.
LSW accepts the AIA C401 contract and requests that you prepare this document reflecting the terms
and conditions of this proposal for our mutual execution prior to our beginning work.
We appreciate this opportunity and look forward to working with your firm on this project.
Regards,
LSW ENGINEERS ARIZONA, INC.
Rick D'Andrea, P.E.
Vice President
RJD:gek:jps
Please indicate your acceptance of this proposal by signing and returning one copy of this letter for our
files.
APPROVED: DATE:
YOUR PROJECT/REFERENCE NO.:
https://us-partner-integrations.egnyte com/msoffice/wopi/files/1a25522d-7f39-4362-b7f6-
b395ae1ef204/WOPlserviceld_TP EGNYTE_PLUS/WOPlUserld 65.Iswengineers egnyte com/PR2026-071 city of Apache Junction South
Campus City Services Expansion fee letter R3.docx
Revised July 7, 2026
June 5, 2026
Civil Engineering Mr. Matthew A. Gorman
Water Resources
Land Survey Principal Architect
Construction Management Arrington Watkins Architects
3003 North Central Avenue, Suite 240
7878 N 16`,St#205 Phoenix, AZ 85012
Phoenix.AZ 85020
www woodpalel.com
602.549.4320
MGORMAN(@awar(:h com
Michael T.Young,PE Re: Apache Junction City Service Expansion Package 1
Dann L.Moore.PE Apache Junction, Arizona
.Jeobrey tD Golonia,F CEM
LS Professional Civil Engineering Services
Robert D Golonia,PE RLS g g
N-cholas E.Brown,PE
Darrel W Matthews,PE Dear Mr. Gorman:
Ronald J.Barbala.PLS,CFedS
Ethan A.Boyle,PE
FrankM Koo,PE Thank you for inviting Wood, Patel & Associates, Inc. (WOODPATEL) to submit this
Gabriel S Rios,RLS Professional Civil Engineering services Agreement to Arrington Watkins Architects(Client)
JohnG Ritchie,PE for Apache Junction City Service Expansion Package 1. WOODPATEL has successfully
Derek C Nichols,PE
Johh completed projects in Apache Junction. This has allowed to develop an understanding
M Bu1ka,PE p p � pac us g
Daniel J.Cronin.PMP of the expectations, design requirements and polices required to meet the project goals
James G Tailton,CFM
Joseph C.Daconta.FE.CFM PH,PMP We understand this project will consist of a 13.7-acre development including a 12.1-acre City
Brian J.Diehl.RLS
Matthew R.Pruit.PE,CFM park and associated fishing lake located at the southwest corner of Ironwood Road and
Isaac J.Thomas,PE,CFM Horton Drive in Apache Junction, Arizona. Our services are based on the Client email dated
Anthony K.Humphrey.PE June 1, 2026.
Zachary Radowch.PE
Venkata S.Bayareddy,PE.CFM
Aaron K.Feldberg PE Below is our scope of services and fee summary for Professional Civil Engineering services
Jett M.Thies,PE,CFM based on our understanding of the project and without specific meetings with the City of
Aaron Morrison PE Apache Junction, These items follow an industry standard outline of services for Preliminary
Erik R.Myers,RLS
Jacob McGinley,PE Design, Construction Documents, and Post Design.
Carton Marquez Valdez,PE
Kirk J.Pangus,RLS,CFedS
Dylan Stubbs,PE
Jesse J.Cabral,PE
Brian Gish,RLS
EMERITUS
Darrel E.Wood,PE,RLS
Ashok C.Patel,PE,RLS
Page 1 of 8
FEES
1. LAND SURVEY.....................................................................................................................................................$2,250
a. Supplemental Topographic Survey for Design (West Ironwood Expansion)
2. SCHEMATIC DESIGN (30%)..............................................................................................................................$22,860
a. Onsite Grading & Drainage Plan
b. Drainage Calculations
c. Onsite Paving Plan
d. Onsite Fireline, Domestic Water& Sewer
e. Reclaimed Water Plan
f. Details Sheet
g. Autoturn Assistance
3. DESIGN DEVELOPMENT (60%)........................................................................................................................$21,100
a. Onsite Grading & Drainage Plan
b. Drainage Calculations
c. Earthwork Calculations
d. Onsite Paving Plan
e. Onsite Fireline, Domestic Water& Sewer
f. Reclaimed Water Plan
g. Details Sheet
h. Autoturn Assistance
4. CONSTRUCTION DOCUMENTS .......................................................................................................................$22,450
a. Onsite Grading & Drainage Plan
b. Drainage Calculations
c. Earthwork Calculations
d. Stormwater Management Plan
e. Onsite Paving Plan
f. Onsite Fireline, Domestic Water& Sewer
g. Reclaimed Water Plan
5. CIVIL SUBMITTALS AND PERMITTING ASSISTANCE.....................................................................................$4,260
a. Civil Submittals/Permitting
b. Cost Estimation Coordination
c. ADEQ Water ATC, Sewer CA Submittal Coordination
6. MEETINGS, CONFERENCE CALLS, SITE VISITS.............................................................................................$2,960
a. Site Visit and Investigation
b. Plan Review Meeting (Assume 4, 1-hour Virtual Meetings)
7. BIDDING ASSISTANCE .......................................................................................................................................$2,510
a. Pre-bid Conference
b. RFI & Design Review
8. CONSTRUCTION ADMINISTRATION AND OBSERVATION...........................................................................$36,790
a. Site Visit and Observations (Assume 1 Visit/Month For 1-Year)
b. Meeting Attendance (Assume 24, 1-Hr Virtual Mtg)
c. RFI and submittal review
d. ADEQ Water AOC, Sewer DA Observations
e. Punch walk and record drawings
9. WARRANTY..........................................................................................................................................................$1,260
a. Site Warranty Walk-Through
TOTAL.......................................................................................$116,400
wUu1JYA I tL
Apache Junction City Service Expansion Package 1
SCOPE ASSUMPTIONS
• A final Architectural Site Plan will be provided by the Client in AutoCAD format. This scope does not include
developing a proposed site plan for design team use or jurisdictional submittal.
• If stated above, WOODPATEL will assist the design team by reviewing the site geometry of the final Architectural
AutoCAD site plan prior to final engineering. Curb radii, drive widths and parking stall layout will be adjusted as
necessary to meet local code and fire department turning movement standards.
• WOODPATEL understands the Client will engage a general contractor to conduct construction budget reviews of
the design development and construction documents. WOODPATEL will consider reasonable requests for value
engineering (VE) alternatives proposed by the general contractor and authorized by the Client. However,
WOODPATEL reserves the right to negotiate additional scope for extensive civil design revisions with the Client
resulting from proposed VE alternatives by the general contractor.
• Additional services required to meet Client, Owner or Contractor phasing requirements of Construction Documents
can be completed under separate contract, if required.
• Civil documents will reference jurisdictional standards and details. Separate specifications will not be prepared.
• Regional and/or comprehensive Master Studies can be completed under separate contract, if required.
• Offsite utility extensions, roadway or intersection improvements are not included unless stated above.
• Civil documents will reference a Geotechnical Report, prepared by others, for pavement and soil information.
Proposed pavement and/or hardscape sections shall be provided by the Geotechnical Engineer.
• Civil documents will reference structural plans for retaining wall design information.
• Mechanical pumping or lifting will not be required for utility systems.
• Construction inspection or certification services are not included unless stated above.
• Existing utilities will be shown based on information made available to WOODPATEL. Non-destructive subsurface
utility investigation (potholing) is recommended for this project.
• This scope does not include dry utility (power, gas, telecommunications, etc.) design or service coordination.
WOODPATEL will contact the local area dry utility providers to coordinate potential conflicts with the civil design
shown on the plans and provide design information to the dry utility providers for their use. The civil plans can
show proposed dry utility routing, conduit locations, service lines and meter locations if provided by the dry utility
designer.
• Supplemental topographic survey is limited to hardscape tie-in areas only.
• Unless stated above, topographic and boundary survey information shall be provided by the Client in AutoCAD
format. WOODPATEL is not responsible for the accuracy of survey work performed by others.
• If stated above, Record Drawings can be prepared based on contractor provided redlines. This scope does not
include construction staking or field as-built survey.
• Assistance with Civil related LEED credits is not included.
• A Drainage Report or Water and Wastewater Basis-of-Design Reports are not anticipated for this project. The
Drainage Report and Water and Wastewater Basis-of-Design Reports will be performed under Package 2.
• Design Coordination Meetings are not included in this project. Design Coordination Meetings will be performed
under Package 2.
• Reimbursable expenses include, but are not limited to, subconsultant utility map and as-built document collection,
subconsultant fire hydrant flow testing, civil document plots and copies for jurisdictional submittals, delivery,
mileage, and other direct costs incurred by WOODPATEL in the process of providing civil engineering services for
the projects.
WOO0PATEL
Apache Junction City Service Expansion Package 1
WOODPATEL is pleased to offer this professional services agreement to Arrington Watkins Architects. If this agreement
meets with your approval, please indicate by signing below and returning one copy to us.
Sincerely,
Wood, Patel &Associates, Inc.
Nicholas E. Brown, PE Jacob McGinley, PE
Vice President Project Manager
JM/cp
Y\WPVProposalsWunicipal Dept Apache Junction City Service Expansion-Package I(PARK&LAKi-)Abb Civil Scop Arrington Watkins Architects M Gorman Rev 07-07-26.docx
AUTHORIZATION & ACCEPTANCE FOR PROFESSIONAL SERVICES
Accepted for
(Organization Responsible for Payment)
Accepted by
(Name and Title)
Signature Date
WOODPATEL July 7.2026
Apache Junction City Service Expansion Package 1 Page 7 of 8
2026 HOURLY FEE SCHEDULE
ENGINEERING & SURVEYING
ProjectManager 4.............................................................................................................................................$290
ProjectManager 3.............................................................................................................................................$270
ProjectManager 2.............................................................................................................................................$250
ProjectManager 1.............................................................................................................................................$230
ProjectManager................................................................................................................................................5210
Engineer6.........................................................................................................................................................$230
Engineer5.........................................................................................................................................................S210
Engineer4.........................................................................................................................................................S190
Engineer3.........................................................................................................................................................$170
Engineer 2..................................................................................................... ...........$160
.........................................
Engineer1.........................................................................................................................................................$140
Technician6......................................................................................................................................................$180
Technician5......................................................................................................................................................$160
Technician4......................................................................................................................................................$140
Technician3......................................................................................................................................................$120
Technician2......................................................................................................................................................$100
Technician1........................................................................................................................................................$90
Surveyor6.........................................................................................................................................................$200
Surveyor5.........................................................................................................................................................$180
Surveyor4.........................................................................................................................................................$160
Surveyor3.........................................................................................................................................................$140
Surveyor2.........................................................................................................................................................$120
Surveyor1.... . ................................................................................................................................................$100
2-Man Survey Crew..........................................................................................................................................$195
1-Man Survey Crew..........................................................................................................................................$135
CONSTRUCTION MANAGEMENT
ConstructionManager 3....................................................................................................................................$230
ConstructionManager 2....................................................................................................................................$210
ConstructionManager 1....................................................................................................................................$180
ConstructionObserver 3...................................................................................................................................$135
ConstructionObserver 2...................................................................................................................................$120
ConstructionObserver 1 ...................................................................................................................................$105
REIMBURSABLE COSTS
Reproductions and Outside Delivery Service...................................................................................Cost Plus 10%
Office Travel..................................................................................................Based on Current Standard IRS Rate
Fuel Surcharge...................................................................................................................Determined by Distance
WO0DPATEL
Apache Junction City Service Expansion Package 1
Apache Junction City Service Expansion -Package 1 (PARK&LAKE) Contract No.:
Proposal No.(No Number) Date 07/07/2026
Task Work Task Description Cost
1.0 LAND SURVEY
A SUPPLEMENTAL TOPOGRAPHIC SURVEY FOR DESIGN(WEST IRONWOOD EXPANSION) $ 2,250.00
2.0 SCHEMATIC DESIGN(30%)
A ONSITE GRADING&DRAINAGE PLAN $ 9,340.00
B DRAINAGE CALCULATIONS $ 1,140.00
C ONSITE PAVING PLAN $ 1.490.00
D ONSITE FIRELINE,DOMESTIC WATER&SEWER $ 4.650.00
E RECLAIMED WATER PLAN $ 3,050.00
F DETAILS SHEET $ 1,170.00
G AUTOTURN ASSISTANCE $ 2,020.00
3.0 DESIGN DEVELOPMENT(60%)
A ONSITE GRADING&DRAINAGE PLAN $ 7,800.00
B DRAINAGE CALCULATIONS $ 1,140.00
C EARTHWORK CALCULATIONS $ 530.00
D ONSITE PAVING PLAN $ 1,700.00
E ONSITE FIRELINE,DOMESTIC WATER&SEWER $ 3,690.00
F RECLAIMED WATER PLAN $ 3,370.00
G DETAILS SHEET $ 1,170.00
H AUTOTURN ASSISTANCE $ 1,700.00
4.0 CONSTRUCTION DOCUMENTS
A ONSITE GRADING&DRAINAGE PLAN $ 8,860.00
B DRAINAGE CALCS $ 1,350.00
C EARTHWORK CALCULATIONS $ 1,060.00
D STORMWATER MANAGEMENT PLAN $ 2,130.00
E ONSITE PAVING PLAN $ 2,310.00
F ONSITE FIRELINE,DOMESTIC WATER&SEWER $ 3,690.00
G RECLAIMED WATER PLAN $ 3,050.00
5.0 CIVIL SUBMITTAL&PERMITTING ASSISTANCE
A CIVIL SUBMITTALS I PERMITTING $ 660.00
B COST ESTIMATION COORDINATION $ 1,350.00
C ADEQ WATER AOC,SEWER CA SUBMITTAL COORDINATION $ 2,250.00
6.0 MEETINGS,CONFERENCE CALLS,SITE VISITS
A SITE VISIT AND INVESTIGATION $ 1,480.00
C PLAN REVIEW MEETING(ASSUME 4 EA 1-HR VIRTUAL MTG) $ 1,480.00
7.0 BIDDING ASSISTANCE
A PRE-BID CONFERENCE $ 500.00
B RFI AND DESIGN REVIEW $ 2,010.00
8.0 CONSTRUCTION ADMINISTRATIOIN AND OBSERVATION
A SITE VISIT AND OBSERVATIONS(ASSUME 1 VISIT/MONTH FOR 1 YEAR) $ 15,840.00
B MEETING ATTENDANCE(ASSUME 24 EA 1-HR VIRTUAL MTG) $ 5,040.00
C RFI AND SUBMITTAL REIVEW $ 9,420.00
D ADEQ WATER AOC,SEWER DA OBSERVATIONS $ 2,140.00
E PUNCH WALK AND RECORD DRAWINGS $ 4,350.00
9.0 WARRANTY
A SITE WARRANTY WALK-THROUGH $ 1,260.00
Subtotal $ 116,440.00
Total $ 116,440.00
4,.,x.. Clly S.1VK4 EIMO •P4eM404 I(PARK&(.41601
Ca*a1 Np
PloP6441 H.INO 14 4041) Dii 07.070026
Pd.dpl F16rAPNIRO UW ErO4w4. 0404 n.11M ] •Srm7 044412.005246.044146.04246.044146.04F*d -
$76) Tnlr4$U1 1NANd4T 0441416447 140.4444 044,
]416u4 rw W.A T k D.. 6v, Wary 111
PI{4 PY TNAS 74466 IwAI PILI 74044
32K60 $ IILM $ 210.11 6 160.00 6 100 0' 3 +20.00 S 23000 $ 14000 $ t 0500 100%
1.6 LAND SURVEY
A $I,)PPLEMEHTAL TOPOGRJPHCCSURVEY FOR 0061074 WEST PONN000PRPA*SIOH. 1 1 4 6 12 S 2.250.00'
20 SCNEYATC DESIGN ISO%) . _ _
A IONSRE GRADING&DRANAGE PLAN 2 12 24 12 4 51 $ 9.34100
8 DRAINAGE CALCULATIONS 1 1 4 6 $ 1 140.00
C i0N511E PAVING PLAN 1 4 4 11 S 1 A6000
O IONS MEFOTELINE DOMESTIC WATER&SEWER 1 4 10 6 27 S 465000
E 9EClJ414D WATER PLAN 1 4 1 4 17 S 3.05000
F TALS SHEET 1 2 4 7 S 1 170.00
O AVTOTURN ASSISTANCE 2 0 2 12 1 1.02000
3.0 DESIGN DEVELOPMENT 160%) _
w SUE GRADING€ORANAGE PLAN 2 10 24 a 44 1 7.60000
B DRAINAGE CALCIMTIONS I 1 4 6 S 1 14000
G EARTHWORK CALCULATIONS 1 1 3 S 530.00
O 14SIIEPAWOGPIAO S 4 4 10 1 1 700.00
B ONSIIE FOOELNE DOMESTC WATER&SEWER 1 4 12 4 21 S 3.&90.00
F RECLAIMED WATER PUN 1 4 10 4 1$ 6 3.370.00
O DETAILS SHEET I 2 A 7 S 117000
H AUTOTURN ASSISTANCE 7 0 10 $ 1 70000
4.0 ON$3RVCTgkDOCVMENT3
A Y.5RE GRADING 6 DRAINAGE PLAN 2 66 24 12 so a 5,&6000
B 0.4114400 CM C3 1 2 4 7 S 135000
G TTMIO010 CALCUUTIOH5 2 a 0 •-1 1060,00
O ISTORSAVATER MV4AGEMENT PW1 1 4 S 13 3 2,13100
E 7264000 740025 PUN I 1 1 4 0 13 S 2.31000
F JOI451TE FNELNE.DOMESTIC WATER&SEWER I 4 0 a 2) 3 3.66000
O TECLAMED WATER PLAN 1 4 0 4 17 1 3050,00
BJ owl S120M)rtA1&PERMITTING ASSISTANCE
A CNL5VBMIrtALS PERMITTING 2 2 4 S 66000
B COST ESTIMATION COORDINATION 6 2 4 7 1 135000
C lADEO WATER AOC SEW ER CA SUBMITTAL COORONA710H { 4 4 4 13 S 2.250,00
60 MEETNGS.CONFERENCE CALLS.SITE VISITS
A I5REVSR ANDONE$T 4* 74 4 4 $ $ 1.40000
II,—REVIEW MEE ING(ASSUME 4 EA I-HR NRTUAL MTGI 4 4 $ B IA6006
01001467.0 BONO ARS13TANCE
A PRE BD CONFERENCE 1 1 7 B 50000
B RFI AN0 DESIGN REVIEV: 1 4 4 2 11 B 2.01000
1.0 GON$TRVCTIONAOMNLSTRATNDN AND 00SERVATIDN
A SITE VGR AND GOSERVATIOHS 1ASSUME 1 VI$ITIMONTH FOR I•YEAR) 72 0 70 $ 15.00000
0 614 01045 ATTENDANCE(4000114040.0 IJIR VNTVAL MMG) 24 24 S 5,01000
C RF i AND SLIEA4TFAL RE NW E 4 10 28 50 $ 9420,OOT
O AOEQ WATER ROC,SEWER DAOBSERVAT)ON5 6 4 2 12 1 2,140,00
E PUICH WALT(AND RECORD DRAW NGS 1 0 4 12 2 25 $ 1,350.00
1.1 RARRMITY
A 5110054000074134W006-J}010660 0 B $ 1,260.00
10010101. S 111,440.00
g1wH— 0 25 230 244 100 -n 1 4 0 0
TaU1040NI B • i 75.0.00 $08,30000i$ 30,0400016 16960051$ 2640,00 S 23000 S 56000 3 1.17000 f -
10TAL f 116,41040
- -
, 14 .r/1
4 , //
1 11
'I* i 4
fr
I I I!
1 •
'I ;;
�r f f � I'll t11ft ,"' 'a:, !� j lIIJ ley •
Revised July 7, 2026
June 5, 2026
Civil Engineering Mr. Matthew A. Gorman
Water Resources
Land Survey Principal Architect
Construction Management Arrington Watkins Architects
3003 North Central Avenue, Suite 240
www.woodpatel.com Phoenix, AZ 85012
602.549.4320
Michael T.Young.PE
Dann L.Moore,PE MGORMANawarch.com
Jeffrey R.Minch,PE,CFM
Robert O. Re: Apache Junction City Service Expansion Package 2
Nicholas E.Brown.PE Apache Junction, Arizona
Daniel W.Matthews,PE
Ronald J Barbala,PLS,CFedS Professional Civil Engineering Services
Ethan A.Boyle.PE
Frank M.Koo.PE Dear Mr. Gorman:
Gabriel S.Rios,RLS
John G.Ritchie,PE
Derek C.Nichols,PE Thank you for inviting Wood, Patel & Associates, Inc. (WOODPATEL) to submit this
JohnM.Buka,PE Professional Civil Engineering services Agreement to Arrington Watkins Architects
Daniel J.Cronin,PMP (Client) for Apache Junction City Service Expansion Package 2. WOODPATEL has
James G.Taill H,CFM successfully completed projects in Apache Junction. This has allowed us to develop an
Joseph C.Daconta,PE,CFM,PH,PMP P P 1 P
Steven C.McKee,PE understanding of the expectations, design requirements and polices required to meet the
Brian J.Diehl,RLS project goals.
Matthew R.Pruitt,PE,CFM
Isaac J.Thomas,PE,CFM
Anthony K.Humphrey,PE We understand this project will consist of a 9.3-acre Park Maintenance Building/Yard with
ZacharyRadovich,PE an associated Police Station and Library located at the southwest corner of Ironwood Road
VenkataS.Bayareddy,PE,CFM and Horton Drive in Apache Junction, Arizona. Our services are based on the Client email
Aaron K.Feldberg.PE dated June 1, 2026.
Jett M,Thies,PE,CFM
Aaron Morrison,PE
David G.Laredo,PE Below is our scope of services and fee summary for Professional Civil Engineering services
Erik R,Myers,RLS based on our understanding of the project and without specific meetings with the City of
Jacob McGinley,PE Apache Junction,These items follow an industry standard outline of services for Preliminary
Marquez Valdez,PE P
Kirk J,Pangus,RLS,CFedS Design, Construction Documents, and Post Design.
Dylan Stubbs,PE
Jesse J.Cabral,PE
Brian Gish.RLS
Lindsay M.Lee,PE
EMERITUS
Darrel E.Wood,PE.RLS
Ashok C.Patel,PE.RLS
FEES
1. SCHEMATIC DESIGN (30%)..............................................................................................................................$23,310
a. Onsite Grading & Drainage Plan
b. Drainage Calculations
c. Onsite Paving Plan
d. Offsite Paving Plan (Ironwood Entrance)
e. Onsite Fireline, Domestic Water& Sewer
f. Public Waterline Plan
g. Fire Flow Test
h. Details Sheet
i. Autoturn Assistance
2. DESIGN DEVELOPMENT (60%)........................................................................................................................$24,510
a. Onsite Grading & Drainage Plan
b. Drainage Calculations
c. Earthwork Calculations
d. Onsite Paving Plan
e. Offsite Paving Plan (Ironwood Entrance)
f. Onsite Fireline, Domestic Water& Sewer
g. Public Waterline Plan
h. Water System Basis of Design Calculations
I. Wastewater System Basis of Desing Calculations
j. Details Sheet
k. Autoturn Assistance
3. CONSTRUCTION DOCUMENTS .............................................................................................................. ..$36,110
a. Onsite Grading & Drainage Plan
b. Drainage Calculations
c. Earthwork Calculations
d. Stormwater Management Plan
e. Onsite Paving Plan
f. Offsite Paving Plan (Ironwood Entrance)
g. Onsite Fireline, Domestic Water& Sewer
h. Public Waterline Plan
i. Water System Basis of Design Calculations
j. Wastewater System Basis of Desing Calculations
4. CIVIL SUBMITTALS AND PERMITTING ASSISTANCE.....................................................................................$4,500
a. Civil Submittals/Permitting
b. Cost Estimation Coordination
c. ADEQ Water ATC, Sewer CA Submittal Coordination
5. MEETINGS, CONFERENCE CALLS, SITE VISITS.............................................................................................$8,000
a. Site Visit and Investigation
b. Design Coordination Meeting (Assume 24, 1-hour Virtual Meeting)
c. Plan Review Meeting (Assume 4, 1-hour Virtual Meeting)
6. BIDDING ASSISTANCE.......................................................................................................................................$2,510
a. Pre-bid Conference
b. RFI & Design Review
WOODPATEL July 7, 2926
Apache Junction City Service Expansion Package 2 Page 2 of 9
7. CONSTRUCTION ADMINISTRATION AND OBSERVATION...........................................................................$40,430
a. Site Visit and Observations (Assume 1 Visit/Month For 1-Year)
b. Meeting Attendance (Assume 24, 1-Hr Virtual Meeting)
c, RFI and Submittal Review
d. ADEQ Water AOC, Sewer DA Observations
e. Punch Walk and Record Drawings
8. WARRANTY..........................................................................................................................................................$1,260
a. Site Warranty Walk-Through
TOTAL.......................................................................................$140,630
SCOPE ASSUMPTIONS
• A final Architectural Site Plan will be provided by the Client in AutoCAD format. This scope does not include
developing a proposed site plan for design team use or jurisdictional submittal.
• If stated above, WOODPATEL will assist the design team by reviewing the site geometry of the final Architectural
AutoCAD site plan prior to final engineering. Curb radii, drive widths and parking stall layout will be adjusted as
necessary to meet local code and fire department turning movement standards.
• WOODPATEL understands the Client will engage a general contractor to conduct construction budget reviews of
the design development and construction documents. WOODPATEL will consider reasonable requests for value
engineering (VE) alternatives proposed by the general contractor and authorized by the Client. However,
WOODPATEL reserves the right to negotiate additional scope for extensive civil design revisions with the Client
resulting from proposed VE alternatives by the general contractor.
• Additional services required to meet Client, Owner or Contractor phasing requirements of Construction Documents
can be completed under separate contract, if required.
• Civil documents will reference jurisdictional standards and details. Separate specifications will not be prepared.
• Regional and/or comprehensive Master Studies can be completed under separate contract, if required.
• Offsite utility extensions, roadway or intersection improvements are not included unless stated above.
• Civil documents will reference a Geotechnical Report, prepared by others, for pavement and soil information.
Proposed pavement and/or hardscape sections shall be provided by the Geotechnical Engineer.
• Civil documents will reference structural plans for retaining wall design information.
• Mechanical pumping or lifting will not be required for utility systems.
• Construction inspection or certification services are not included unless stated above.
• Existing utilities will be shown based on information made available to WOODPATEL. Non-destructive subsurface
utility investigation (potholing) is recommended for this project.
• This scope does not include dry utility (power, gas, telecommunications, etc.) design or service coordination.
WOODPATEL will contact the local area dry utility providers to coordinate potential conflicts with the civil design
shown on the plans and provide design information to the dry utility providers for their use. The civil plans can
show proposed dry utility routing, conduit locations, service lines and meter locations if provided by the dry utility
designer.
• Supplemental topographic survey is not included with this project. Supplemental survey of the west side of
Ironwood Drive will be performed under Package 1.
• It is assumed this design will run concurrently with offsite design associated with the Radiance development.
WOODPATEL will coordinated with the offsite design provided by Others. WOODPATEL is not responsible for the
accuracy of survey work performed by others.
• If stated above, Record Drawings can be prepared based on contractor provided redlines. This scope does not
include construction staking or field as-built survey.
vvuuurM I cL
Apache Junction City Service Expansion Package.:.
• Assistance with Civil related LEED credits is not included.
• Reimbursable expenses include, but are not limited to, subconsultant utility map and as-built document collection,
subconsultant fire hydrant flow testing, civil document plots and copies for jurisdictional submittals, delivery,
mileage, and other direct costs incurred by WOODPATEL in the process of providing civil engineering services for
the projects.
• This scope includes permitting with City of Apache Junction, Apache Junction Water District, Apache Junction
Sewer District and Superstition Mountain Fire and Medical.
• This scope includes permitting with ADEQ for the public water and public sewer systems only.
WOODPATEL. July 7,2026
Apache Junction City Service Expansion Package 2 Page 4 of 9
WOODPATEL is pleased to offer this professional services agreement to Arrington Watkins Architects. If this agreement
meets with your approval, please indicate by signing below and returning one copy to us.
Sincerely,
Wood, Patel&Associates, Inc.
Nicholas E. Brown, PE Jacob McGinley, PE
Vice President Project Manager
JM/cp
V IWPPProposai\MunirFpal DepMpache Junction City Service Expansion Package 2(BLOGs&SITE)Abb Civi Scop Arrington Watkins Architects M Gorman Rev 07-07-26.docx
AUTHORIZATION & ACCEPTANCE FOR PROFESSIONAL SERVICES
Accepted for
(Organization Responsible for Payment)
Accepted by
(Name and Title)
Signature Date
WOODPATEL July 7,2026
Apache Junction City Service Expansion Package 2 Page 8 of 9
2026 HOURLY FEE SCHEDULE
ENGINEERING & SURVEYING
ProjectManager 4.............................................................................................................................................$290
ProjectManager 3.............................................................................................................................................$270
ProjectManager 2.............................................................................................................................................$250
ProjectManager 1.............................................................................................................................................$230
ProjectManager................................................................................................................................................S210
Engineer6.........................................................................................................................................................$230
Engineer5.........................................................................................................................................................$210
Engineer4.........................................................................................................................................................$190
Engineer3......................................................................................................................................................._.$170
Engineer2.........................................................................................................................................................$160
EngineerI.........................................................................................................................................................$140
Technician6......................................................................................................................................................$180
Technician5......................................................................................................................................................$160
Technician4......................................................................................................................................................$140
Technician3......................................................................................................................................................$120
Technician2......................................................................................................................................................$100
Technician 1........................................................................................ ..........$90
......................................................
Surveyor6.........................................................................................................................................................$200
Surveyor5.........................................................................................................................................................$180
Surveyor4.........................................................................................................................................................$160
Surveyor3.........................................................................................................................................................$140
Surveyor2.........................................................................................................................................................$120
Surveyor1.........................................................................................................................................................$100
2-Man Survey Crew..........................................................................................................................................$195
1-Man Survey Crew..........................................................................................................................................$135
CONSTRUCTION MANAGEMENT
ConstructionManager 3....................................................................................................................................$230
ConstructionManager 2....................................................................................................................................S210
ConstructionManager 1....................................................................................................................................S180
ConstructionObserver 3...................................................................................................................................S135
ConstructionObserver 2 ..................................................................................................................................$120
Construction Observer 1 ...................................................................................................................................$105
REIMBURSABLE COSTS
Reproductions and Outside Delivery Service...................................................................................Cost Plus 10%
Office Travel..................................................................................................Based on Current Standard IRS Rate
Fuel Surcharge................................................................................................................... Determined by Distance
WOODPATEL
Apache Junction City Service Expansion Package 2
Apache Junction City Service Expansion-Package 2(BLDGs&SITE) Contract No.:
Proposal No.(No Number) Date:07/0712026
Task Work Task Description Cost
1.0 SCHEMATIC DESIGN(30%)
A ONSITE GRADING&DRAINAGE PLAN $ 8,500.00
B DRAINAGE CALCULATIONS $ 1,140.00
C ONSITE PAVING PLAN $ 1,490.00
D OFFSITE PAVING PLAN(IRONWOOD ENTRANCE) $ 2,310.00
E ONSITE FIRELINE,DOMESTIC WATER&SEWER $ 3,370.00
F PUBLIC WATERLINE PLAN $ 1,990.00
G FIRE FLOW TEST $ 1,320.00
H DETAILS SHEET $ 1,170.00
I AUTOTURN ASSISTANCE $ 2,020.00
2.0 DESIGN DEVELOPMENT(00%)
A ONSITE GRADING&DRAINAGE PLAN $ 7,380.00
B DRAINAGE CALCULATIONS $ 1.140.00
C EARTHWORK CALCULATIONS $ 530.00
D ONSITE PAVING PLAN $ 1,700.00
E OFFSITE PAVING PLAN(IRONWOOD ENTRANCE) $ 2,630.00
F ONSITE FIRELINE,DOMESTIC WATER&SEWER $ 3,050.00
G PUBLIC WATERLINE PLAN $ 1,670.00
H WATER SYSTEM BASIS OF DESIGN CALCULATIONS $ 1,770.00
I WASTEWATER SYSTEM BASIS OF DESIGN CALCULATIONS $ 1,770.00
J DETAILS SHEET $ 1,170.00
K AUTOTURN ASSISTANCE $ 1,700.00
3.0 CONSTRUCTION DOCUMENTS
A ONSITE GRADING&DRAINAGE PLAN $ 8,660.00
B DRAINAGE REPORT $ 5,740.00
C EARTHWORK CALCULATIONS $ 1,060.00
O STORMWATER MANAGEMENT PLAN $ 2,130.00
E ONSITE PAVING PLAN .$ 2,630.00
F OFFSITE PAVING PLAN(IRONWOOD ENTRANCE) $ 2,630.00
G ONSITE FIRELINE.DOMESTIC WATER&SEWER $ 3,910.00
H PUBLIC WATERLINE PLAN $ 2,950.00
I WATER SYSTEM BASIS OF DESIGN REPORT $ 3,200.00
J WASTEWATER SYSTEM BASIS OF DESIGN REPORT $ 3,200.00
4.0 CIVIL SUBMITTAL&PERMITTING ASSISTANCE
A CIVIL SUBMITTALS I PERMITTING $ 900.00
B COST ESTIMATION COORDINATION $ 1,350.00
C ADEQ WATER AOC,SEWER CA SUBMITTAL COORDINATION $ 2,250.00
5.0 MEETINGS,CONFERENCE CALLS,SITE VISITS
A SITE VISIT AND INVESTIGATION $ 1,480.00
B DESIGN COORDINATION MEETING(ASSUME 24 EA 1-HR VIRTUAL MTG) $ 5,040.00
C PLAN REVIEW MEETING(ASSUME 4 EA 1-HR VIRTUAL MTG) $ 1,480.00
6.0 BIDDING ASSISTANCE
A PRE-BID CONFERENCE S 500.00
B RFI AND DESIGN REVIEW $ 2,010.00
7.0 CONSTRUCTION ADMINISTRATIOIN AND OBSERVATION
A SITE VIST AND OBSERVATIONS(ASSUME 1 VISITIMONTH FOR 1-YEAR) $ 15,840.00
B MEETING ATTENDANCE(ASSUME 24 EA 1-HR VIRTUAL MTG) $ 5,040.00
C RFI AND SUBMITTAL REIVEW $ 11,560.00
D ADEQ WATER AOC,SEWER DA OBSERVATIONS $ 3,640.00
E PUNCH WALK AND RECORD DRAWINGS $ 4,350.00
8.0 WARRANTY
A SITE WARRANTY WALK-THROUGH $ 1,260.00
Subtotal $ 140,630.00
Total $ 140,630.00
Apache J o Lboo Clry SIMo EopanolN,-Pookaga 2(BLDG.6 SITE)
ConbaU No.
Propoul H.IN.Num01r) 0.10:07/07/2026
. 1 — 16�d4nHMnb
P16 .1 PT) Prolacl M.o.,. Eaglnal.01. CARD Pr0)1c1 S.M.615 ' 2.11.1500.007
0
61.006, Took WNy Took DN (PEI TM kp l(OTT) T1.01,061.1, Cao 1h" TKhoa. Gao
1�^ Alva-ncn Ob'al III
PN-1 PM T.N4 TIU✓S Toh3 PILL I.h-4
f JV_V: S 210.00 f 160.00 S 160.00 103010 S 230.00 S 14000 S 19500• 100%
7 1.0 TSCHEMATIC DESIGN(30%)
A ON5TEE GRADING 6 DRAINAGE PLAN 2 8 74 2 4 50 $ 6.500,00
B ;DRAINAGE CALCULATIONS I 1 4 6 $ 1.140.00
C ONSITE PAVING PLAN 1 4 4 9 $ 1,490,00
O OFFSITE PAVING P1.20(IRONWOOD ENTRANCE) 1 2 6 4 13 1 2.310.00
E ONSITE FIREUNE DOMESTIC WATER A SEWER 1 4 6 19 $ 3,370,00
F IJBLIC WATERLINE PLAN 1 4 4 11 f 1,990,00
G FIRE FLOW TEST 1 1 ( 2 $ 50000 504 S 1.320,00
H DETAILS SHEET 1 2 4 7 S 1.170,00
I UTOTURN ASSISTANCE 2 9 2 12 1 2,020,00
20 DESIGN DEVELOPMENT -. -
A ONSITE GRADING 6 ORAI RAGE PLAN 6 20 02 42 $ 7,380.00
B DRAINAGE CALCULATIONS 1 1 , 4 6 $ 1140.00
C EARTHWORI(CALCULATIONS 1 J 3 S 53D 00
D 014517E PAVING PLAN 2 4 4 10 S 1700.00
E OFFSITE PAVING PLAN(IRONWOOD ENTRANCE) 1 1 8 4 15 S 2,630 30
F ONSITE FIRELINE DOMESTIC WATER 6 SEWER 1 4 8 4 11 S 3.050.00
G PUBLIC WATERLINE PLAN 1 1 4 1 9 $ 1.61000
H WATER SYSTEM 04/05 07 DESIGN CALCULATIONS 1 4 4 9 S 1 17000
I WASTEWATER SYSTEM BASIS OF DESIGN CALCULATIONS 1 4 4 9 S 177000
J DETAILS SHEET I 2 4 7 S 117000
K AUTOTURN ASSISTANCE 2 8 10 $ 1 700.00
3.0 CONSTRUCTION DOCUMENTS
A 065 11€GRADING 6 DRAINAGE PLAN 2 8 24 16 50 S 8.660.00
1
B DRAINAGE REPORT 2 4 14 B 4 34 f 5.740,00
C EARTHWORK CALCULATIONS 2 A 6 $ 1,060,00
D STORMWATER MAANGEMEN-PLAN 1 4 8 13 $ 2,130.00
E ON511E PAVING PLAN 1 1 2 4 8 15 f 2.630.001
F OFFSITE PAVING PLAN 7)60649000 ENTRANCE) 1 • 2 4 8 15 S 2.630.°0;
G ONSETS FIREUNE DOMESTIC WATER 6 SEWER 1 2 13 8 23 1 3,910.00
H PUBLIC WATERLINE PLAN 1 2 • 6 17 1 2,95000
I WATER SYSTEM BASIS OF DESIGN REPORT 1 3 • 4 3 19 1 3,200.00
J WASTEWATER SYSTEM BASIS OF DESIGN REPORT 1 3 • 4 7 19 $ 3,200.00
4,0 CIVIL SUBMITTAL 6 PERMITTING ASSISTANCE -
A CIVIL SUBMITTALS I PERMITTING 2 4 ) 6 S 900.00
B III'COST ESTIMATION COORDINATION 1 2 4 7 S 1.350.00
C IADEO WATER AOC.SEWER CA SUBMITTAL COORDINATION 1 4 4 4 13 S 225000
1
1-0 MEETINGS,CONFERENCE CALLS,SRE VISITS
A ISBE VL4H AND INVESTIGATION 4 4 6 S 140000
B DESIGN COORDINAIIIIN MEETNGIASSUME 24 EA I.HR VIRTUAL MTG) 24 24 S 5040.00
C PLAN REVIEW MEETING(ASSUME 4 EA I-HR VIRTUAL MTG) 4 4 6 S 1,880.00
6.0 BIDDING ASSISTANCE
A PRE-BET CONFERENCE 1 1 2 S 50000
t
B IRFIAND DESIGN REVIEW 1 4 4 2 11 $ 2010.00
7,0 'CONSTRUCTION ADMINISTRATION AND OBSERVATION
A SITE VIST AND OBSERVATIONS(ASSUME I VISIT/MONTHFOR 1-YEAR) 72 B 78 $ 1564000
B MEETING ATTENDANCE(ASSUME 24 69 1440 VIRTUAL MSG) 21 24 S 5045 00
C RFI AND SUBMITTAL RENEW 4 24 32 2 62 1 1156000
D 4100 WATER ADC.SEWER DA OBSERVA7IONS 12 4 4 211 1 3,64080
E 111CM WALK AND RECORD DRAWINGS 1 4 4 12 2 25 5 4 35C 00
•D ARRANTV
A 1118 WARR/WTY WALK-THROUGN 6 6 $ 1.26000
56600TAl S 140,630.001 0004 Tole D111oS Hoots $ 9�8WA0 $9,0;9.00 $ 45,1*00 $ 2 292 3.18000 S X55600016 0
� 0 ° - if ° _�f600 D0
TOTAL 1 146,630,00
A� T
It • t !L ! ' . 'aF
Ia
� r
ii
Au
; H
1 i !
k �
•
i
+ 4�; a-.. "fl' �.
j .
Cl mi; i L4
■
DI'*
June 5, 2026 Revised July 2, 2026
Matt Gorman, AIA
Arrington Watkins Architects
3003 N. Central Ave, Suite 2400
Phoenix, AZ 85012
MGORMAN(a�awarch.com
Re: City of Apache Junction City Campus South - Landscape Design Scope of Work
Dear Matt:
The following scope of work is to provide landscape architectural services for City's new Police Substation, Public
Works Facility, a new Library, and park facility on approximately ^'22-acres. The project will also include off-site
road improvements that may require a street landscape design
The project will require a team of design professionals including:
Arrington Watkins Architects—Architecture- Prime Consultant, Police Substation and Parks Maintenance
Facility
Richard & Kennedy Architects—Architecture- Library
Wood Patel--Civil Engineering Police Substation, Library, Park Improvements
Dig Studio— Landscape Architecture- Police Substation, Library, Park Improvements
Verdantas— Irrigation Design--Lake and Irrigation design
We are anticipating that Dig Studio will be contracted as sub-consultant to Arrington Watkins Architects.
Please review the attached scope of work and call with any questions.
Sincerely,
J othner, PLA, ASLA Chad Atterbury, PLA, SLA
Principal Partner Principal Partner
m. 602-218-2015
Enclosed: Scope of Service and Fee
3003 N.Central Ave Phoenix,Arizona 85012
PROJECT LOCATION
Our proposal covers the work effort anticipated to complete the landscape and hardscape improvements for the
Police Substation, Library, and Park. We anticipate that 3-separate design packages, plus an overall Site Plan
submittal will be required, including:
1. Police, Library, Parks Maintenance
2. Park
3. Lake
+ 45,325.4 SF r? _
1.04 AC -) -- ' 'a...
• {116,776.1 SF- { p I
r Y Jp2.68ACA
• * • .528,043.3 SF
• % ' 12.1 AC
1#� •�6,8T0.6 S rF •
.2AC t \ DZ1
1.1 AC.B SF
y 62,146.7 SF ` 4 I
( !
• I 182247.3 SF "J^ F4
I } 4.41 AC ' - .. � _
s;...r r-r■■
Project Design Package Scope Areas
SCOPE OF WORK
PROJECT DESCRIPTION
The City of Apache Junction is developing a —22-acre site for a new Police Substation, Library, and Park. Initial
program includes:
Police Substation and Parks Maintenance Facility:
• Entry
• Exterior patios
• Memorial Plaza
Dig Studio,Inc. Apache Junction City Campus South
June 5,2026
• Perimeter Landscape
• Parking lot landscape
Library:
• Entry
• Exterior patios
• Perimeter Landscape
• Children's Patio Park/Play Connectivity
• Parking lot landscape
Park:
• Group Ramadas
• (2) Youth Baseball (With Fence/safety netting)
• (1) Multi-purpose field (Sized to accommodate 2 youth fields)
• Destination Playground
• (3) Sand Volleyball
• Basketball Court(s)
• Restroom
• Fitness/Walking Paths
• ^'1.25 Ac Urban Fishing Lake
• Parking
• Adjacent building integration
Dig will coordinate our work with the following team members under separate contracts with the City or sub-
contracts with Arrington Watkins Architects.
Arrington Watkins Architects —Architecture - Prime Consultant, Police Substation & Parks Maintenance
Facility
Richard & Kennedy Architects—Architecture - Library
WoodPatel—Civil Engineering Police Substation, Library, Park Improvements
Dig Studio—Landscape Architecture- Police Substation, Library, Park Improvements
Verdantas— Irrigation Design— Lake and Irrigation design
The design of this project will include illustrative site plan, schematic design through permit/bid ready contract
documents (plans and specification) for the site improvements described above. We will work in coordination
with the overall team to develop a coordinated set of documents.
SCOPE OF SERVICES
All work outlined below will be completed in accordance with a project schedule prepared by Arrington Watkins
Architects (AW) and the City of Apache Junction.
TASK 2.0 SCHEMATIC DESIGN (30%)
2.01 Schematic Design Documents - Upon Client approval of Preferred Master Plan documents and completion
Dig Studio,Inc. Apache Junction City Campus South
June 5,2026
of site survey work, the Design Team will prepare 30%Schematic Design drawings per their individual scopes of
work, produced digitally in AutoCAD and 3D modeling programs such as SketchUp for review and written
comments by Client.These 30%Schematic Design plans will define the schematic details,materiality and character
of amenities, and program essentials of the project. These drawings will meet Apache Junction Parks
Requirements as well as City of Apache Junction submittal requirements.
2.02 Preliminary Estimations of Probable Construction Cost - Dig will coordinate and assist the Construction
Manager of Risk(CMAR)the initial estimate of probable cost of construction for the site improvements. This will
occur for both the buildings and associated site as well as the park and Lake. It is anticipated that the cost estimate
prepared by the CMAR(s)will be itemized and quantified with unit prices based on recent and available unit pricing
received on previous contracts.
2.03 Schematic Design Coordination Meetings— Dig will attend project coordination meetings with the design
team to review the design progress and overall status of the project. We are anticipating that these meeting will
include design presentations and reviews, coordinating with other project disciplines, and discuss project issues
and schedule.
TASK 3.0: DESIGN DEVELOPMENT PHASE(60%)
Upon Client written approval of the 30% Schematic Design documents, and agreeance on limits of work and
project budget,the Design Team will prepare 60%Design Development drawings responding to written comments
by the City.These Detailed Design Development plans will define the construction details, layout of key program
elements,mainline infrastructure of the project scope.These drawings will meet City of Apache Junction submittal
requirements. Dig Studio will review and comment on Sub-Consultant's drawings prior to submittal to the Client.
3.01 Hardscape Plans — Dig, in coordination with the Design Team, will prepare design development level
documents based on the approved layout of the design and any adjustments to the probable cost. The hardscape
plan will utilize horizontal and vertical control coordinate points for staking the location of paving, walls,fences,
planting, courts, play features,splash pad,etc. The materials and finishes of the hardscape will be identified and
detailed on the plan. Dig will provide installation details for all hardscape components.All structural components
will be coordinated with the project structural engineer and the hardscape plans will reference the details shown
on the structural plans if needed.All structural requirements will be prepared by the Teams Structural Engineer.
3.02 Landscape Plans—Dig will prepare the landscape design development level documents that respond to the
hardscape/site plan and any adjustments to the probable cost. The landscape plan will identify the locations of
play fields, inert groundcover for dust control and the location of new plant and relocated material. The plan will
also include a complete plant key, materials schedule, and quantities. Dig will provide installation details for all
landscape components.
3.03 Irrigation Plans—Dig will coordinate an overall irrigation plan with Verdantas.
3.04 Grading, Drainage and Utility Plans—WoodPatel will prepare the grading and drainage plans. WoodPatel
will coordinate the required utilities to the site, including irrigation tap locations.
3.05 Electrical Plans — The Electrical Engineer will prepare electrical designs for the park and open space
improvements. The drawings will support the park and open space lighting and irrigation controller connections.
D g Studio,Inc. Apache Junction City Campus South
June 5,2026
All landscape accent lighting will be coordinated with the electrical engineer and will reference from the layout
and details shown on the electrical plans. Site Lighting shall adhere to Dark Sky requirements.
3.06 Preliminary Estimations of Probable Construction Cost-Dig will review the preliminary and final estimate of
probable cost for construction of hardscape, landscape, and irrigation components as described. The CMAR's
estimate will be itemized and quantified with unit prices to support the overall cost.
3.07 Design Development Coordination Meetings- Dig will participate in weekly project conference calls and/or
coordination meetings with the design team to review the status of the project, coordinate with other project
disciplines, and discuss project issues and schedule.
TASK 4.0 CONSTRUCTION DOCUMENTS
Upon Client written approval of 60% documents, cost estimate, and receipt of written City review comments, Dig
Studio and the Design Team, in coordination with AW, will develop 90% Construction drawings and technical
sections for specifications(In MasterSpec format)to construct the work.The Design Team will also prepare written
responses to Client&City comments.The Client shall be responsible for construction budget verification, Bidding
and Contract Requirements and General Requirements divisions of the specifications.
The Design Team shall prepare working drawings and technical sections of specifications to conform to applicable
codes and regulations of governmental bodies having jurisdiction over the work. Dig Studio will coordinate our
services with those of all other Sub-consultants and to maintain a construction budget in accordance with that
established by the Client. Dig Studio will compile the specifications into one document for submittal purposes.
The Design Team will coordinate with MAG and City of Apache Junction standard specifications and use as
required.
4.01 Hardscape Plans — Dig, in coordination with the Design Team, will prepare Construction document level
documents based on the approved layout of the design and any adjustments to the probable cost. The hardscape
plan will utilize horizontal and vertical control coordinate points for staking the location of paving, walls, fences,
planting, courts, play features, splash pad, etc. The materials and finishes of the hardscape will be identified and
detailed on the plan. Dig will provide installation details for all hardscape components.All structural components
will be coordinated with the project structural engineer and the hardscape plans will reference the details shown
on the structural plans if needed. All structural requirements will be prepared by the Teams Structural Engineer.
4.02 Landscape Plans — Dig will prepare the landscape Construction document level documents that respond to
the hardscape/site plan and any adjustments to the probable cost. The landscape plan will identify the locations
of play fields, inert groundcover for dust control and the location of new plant and relocated material. The plan
will also include a complete plant key,materials schedule, and quantities. Dig will provide installation details for
all landscape components.
4.03 Irrigation Plans—Dig will coordinate an overall irrigation plan with Verdantas.
4.04 Grading, Drainage and Utility Plans—Wood Patel will prepare the grading and drainage plans. Wood Patel
will coordinate the required utilities to the site, including irrigation tap locations.
Dig Studio,Inc. Apache Junction City Campus South
June 5,2026
4.05 Electrical Plans — The Electrical Engineer will prepare electrical designs for the park and open space
improvements. The drawings will support the park and open space lighting(adhering to Dark Sky Requirements)
and irrigation controller connections. All landscape accent lighting will be coordinated with the electrical
engineer and will reference from the layout and details shown on the electrical plans.
4.06 Final Estimate of Probable Construction Cost - Dig will review the final estimate of probable cost for
construction of hardscape, landscape, and irrigation components as described. The CMAR's estimate will be
itemized and quantified with unit prices to support the overall cost.
4.07 Design Development Coordination Meetings-Dig will participate in weekly project conference calls and/or
coordination meetings with the design team to review the status of the project, coordinate with other project
disciplines, and discuss project issues and schedule.
TASK 5.0 100%PERMIT SET(Final'For Permit'PS&E)
Upon Client written approval of 90%Construction Documents and receipt of written City review comments, Dig
Studio and the Design Team will develop 100%Construction drawings and technical sections for specifications(In
MasterSpec format) to construct the work. The Design Team will also prepare written responses to Client&City
comments. The Client shall be responsible for construction budget verification, Bidding and Contract
Requirements and General Requirements divisions of the specifications. Based on direction from the City, Design
Team scope and labor estimates for 100% Construction Documents. The Design Team shall prepare working
drawings and technical sections of specifications to conform to applicable codes and regulations of governmental
bodies having jurisdiction over the work. In developing working drawings and technical sections of specifications.
The Design Team will coordinate with fabricators to develop play element detailing that meets the design intent.
TASK 6.0 CONSTRUCTION OBSERVATION
The Design Team will provide Construction Phase Services required for the implementation of the Construction
Documents to observe that the design is installed per the drawings and specifications. Dig Studio will provide all
Construction Documents to the City to be used in the City's bidding process.The City will manage the bidding and
contracting process through the CMAR.
6.01 Construction Observation —Dig will be available to provide in-field design direction, submittal review and
general construction observation services to ensure design intent.
o Site Meetings (Dig Studio)— Dig Studio Team will attend bi-weekly site meetings and field visits (up to
24) to review items related to our scope of work to ensure that the project is implemented per the
construction drawings.
o Construction Submittal Review and Project Management — Dig Studio will provide field reports and
review: shop drawings,and material submittals as necessary. Dig Studio will clarify or make revisions to
the drawings and details as needed to facilitate the construction process.
TASK 7.0 MEETINGS
7.1 Meetings Dig will attend and participate in City coordination and review meetings.
Dig Studio,Inc. Apache Junction City Campus South
June 5,2026
DELIVERABLES
It is anticipated that all design packages will be submitted to City of Apache Junction for the required project
review/permitting process. All hardcopy submittals will be printed on bond paper. Project submittals and
deliverables are as follows:
Task 2.0—Schematic Design (30%)
- (24" x 36" prints and PDFs)
- Landscape Theming Graphics (Rendered Hardscape/Landscape Plan,Sections)
- Title/Sheet Index
- Hardscape Plan and Details
- Rough Grading and Drainage Plans (coordinated with Civil Engineer)
- Landscape Plan, Plant Materials List and Details
- CMAR Cost Estimate Assistance
Task 3.0—Design Development(60%)
60% Design Development (24" x 36")
- Design Development Documents(advanced plans describe in SD)
- Probable Cost Estimate Review
- Outline Specifications
Task 4.0—Construction Documents (90%)
90% Permit/Bid Ready Construction Documents(24" x 36")
- Complete Contract Documents Set
- Specifications
- Updated Cost Estimate Review
Task 5.0—Permit Set(100%)
100% Permit/Bid Ready Construction Documents (24" x 36" sealed/signed prints and PDFs)
- Complete Contract Documents Set
- Specifications
- Final Cost Estimate Review
Task 6.0-Construction Observation
- Dig Studio will review bidders' questions related to Dig Studio scope of work items.
-Field reports related to review of Dig Studio scope of work items.
-RFI responses related to Dig Studio scope of work items.
-Addenda related to Dig Studio scope of work items (maximum of 3).
-Final Punch List
Task 7.0—Meetings
-Public Meeting(1 anticipated)
-Council Work Session (1 anticipated)
-City Review Meetings(20 anticipated)
Dig Studio,Inc Apache Junction City Campus South
June 5,2026
COST PROPOSAL
FEE SUMMARY
The scope of work has been separated per design packages described on page 2.
1. Police Substation and Public Works Facility
Task 2.0 Schematic Design (30%) $10,750
Task 3.0 Design Development(60%) $15,500
Task 4.0 Construction Documents(90%) $13,250
Task 5.0 Construction Documents(100% $3,000
Task 6.0 Construction Observation $2,500
Total Police and Public Works $45,000
2. Library
Task 2.0 Schematic Design (30%) $15,250
Task 3.0 Design Development(60%) $17,750
Task 4.0 Construction Documents(90%) $15,500
Task 5.0 Construction Documents(100% $3,500
Task 6.0 Construction Observation $5,500
Total Library $57,500
3. Community Park
Task 2.0 Schematic Design (30%) $69,500
Task 3.0 Design Development (60%) $77,800
Task 4.0 Construction Documents (90%) $65,500
Task 5.0 Construction Documents(100%) $18,200
Task 6.0 Construction Observation $40,500
Total Community Park $271,500
Total Combined Fees by Major Task
Schematic Design $95,500
Design Development $111,050
Construction Documents $118,950
Construction Administration $48,500
Total Fee $374,000
Reimbursable Expenses(travel/minor printing/CA) $2,500
Reimbursable expenses are in addition to the fees above and will be billed at direct cost.
Dig Studio,Inc. Apache Junction City Campus South
June 5,2026
DIG STUDIO DESIGN PERSONNEL AND HOURLY RATES
Category Amount
Principal P3 $ 260.00
Principal P2 $ 230.00
Principal P1 $ 210.00
Associate Principal $ 190.00
Designer VI $ 175.00
Designer V $ 157.00
Designer IV $ 147.00
Designer III $ 136.00
Designer II $ 126.00
Designer I $ 121.00
Administration $ 147.00
END SCOPE OF WORK
Dig Studio,Inc Apache Junction City Campus South
June 5,2026
verdantas ntas 300 F Boardwalk Collins,alk CO Unit 4B
5
Fort C , C 80525
970-229-9668
July 1, 2026
Jeff Lothner
Dig Studio
3003 North Central Ave., Suite 800
Phoenix, AZ 85012
jeff@digstudio.com
RE: Apache Junction City Services Expansion—Irrigation and Lake Design
Jeff:
We are pleased to submit this Irrigation Engineering Services Scope and Fee Proposal for the
Apache Junction City Services Expansion project. Our proposal is based on the information you
have provided.
The defined Scope of Work to be performed and our proposed Fees to be charged are
described in Exhibits A and B, respectively, followed by the Terms and Conditions under which
we are available to proceed.
If you wish to contract our services, please return this Agreement, signed by an authorized
representative.
When we receive the executed Agreement from you, we will confer with you about the schedule.
Please note that our fee is subject to review if this agreement is not executed within 90 days.
Please contact us with any questions you may have. We look forward to our work with you.
Respectfully submitted,
on e e�
Ro Perez
Vsrdantas corn
! City Services ,Apache Junction Arizona
July 1, 2026
EXHIBIT A: SCOPE-OF-WORK
We propose providing the following lake and irrigation engineering services and deliverables:
Task 1.0: Lake, Pump and Irrigation Construction Documents (30%, 60%, 90% & Final)
Task 1.1 — Lake Liner and Mechanical System Design; Provide design and coordination, plans,
details and specifications for the following items:
• Details for lake grading, edge treatment, lining systems, fish habitat and
piping penetrations.
• Details for intake screen, wet well and intake pipe routing to service the
irrigation and lake recirculation pumping systems.
• Details for lake recirculation pumping system, irrigation pumping system,
mechanical aeration system and other specialized details.
• Routing and sizing of re-circulation system piping and aeration system piping
between the mechanical system enclosure, lake edge and aeration diffusers
within lake.
• Coordinate with the project electrical engineer to determine electrical service
connections. Electrical services and components will be specified on
electrical drawings.
• Coordinate with the project architect and landscape architect to determine the
location, size, and configuration of enclosure for the irrigation and lake re-
circulation pumping systems. Enclosure structural and architectural elements
will be specified on project architectural or structural drawings.
• Coordinate with the project civil engineer to determine size and location of
lake water source piping and controls, and lake overflow discharge
connection into storm or sanitary sewer system if necessary. Piping
connections from water source to lake, and for storm or sanitary sewer will be
specified on civil drawings.
• Technical Specifications in CSI format for items included in this task.
Task 1.2 — Irrigation System Design Park; Provide irrigation system coordination, layout, sizing,
details and specifications. Irrigation design within our scope of work will include the
following:
• Provide Irrigation Notes and Legend of Equipment.
• Provide Irrigation Plan Sheets at 1" = 30' scale including:
o Irrigation controller location
o Irrigation mainline routing with pipe sizing
o Irrigation control valve locations and sizes
o Sprinkler& drip lateral layout with pipe sizing
• Irrigation Detail Sheets showing irrigation component assembly. These
details are anticipated to be Verdantas standard details.
• Technical Specifications in CSI format for items included in this task.
Task 1.3 — Irrigation System Design Library; Provide irrigation system coordination, layout,
sizing, details and specifications. Irrigation design within our scope of work will
include the following:
• Provide Irrigation Notes and Legend of Equipment.
• Provide Irrigation Plan Sheets at 1" = 30' scale including:
o Irrigation controller location
o Irrigation mainline routing with pipe sizing
Verdantas.com
► City Serv-ces ,Apache Junction Arizona
July 1,2026
<, Irrigation control valve locations and sizes
Sprinkler& drip lateral layout with pipe sizing
• Irrigation Detail Sheets showing irrigation component assembly. These
details are anticipated to be Verdantas standard details.
• Technical Specifications in CSI format for items included in this task.
Task 1.4—Irrigation System Design Police\Public Works; Provide irrigation system coordination,
layout, sizing, details and specifications. Irrigation design within our scope of work
will include the following:
• Provide Irrigation Notes and Legend of Equipment.
• Provide Irrigation Plan Sheets at 1"= 30' scale including:
<: Irrigation controller location
o Irrigation mainline routing with pipe sizing
Irrigation control valve locations and sizes
o Sprinkler& drip lateral layout with pipe sizing
• Irrigation Detail Sheets showing irrigation component assembly. These
details are anticipated to be Verdantas standard details.
• Technical Specifications in CSI format for items included in this task.
Deliverables for each task item under Task 1.0 will be provided at 30%, 60% and 90%
completion level for Apache Junction and agency review. Signed and sealed Final Construction
Documents will be provided after addressing 90% review comments and prior to
commencement of bidding and construction.
POST-DESIGN SERVICES
Task 2.0 Construction Phase Services
Construction Phase services provided upon Client request include:
Task 2.1 —Pre-construction Meeting; Participate in one meeting on-site prior to beginning
construction with the Dig Studio team, Apache Junction and Contractor
representatives to review and discuss the existing site conditions and construction
document package. Provide technical support and supplementary documentation
during Contracting Process as necessary to respond to City, Contractor and design
team questions.
Task 2.2 -Submittal Review; Provide contractor submittal reviews as required to confirm that
the proposed equipment meets the design intent. It is anticipated that eight(8)
reviews of Contractor submittals will be required prior to construction. These reviews
are anticipated to include:
• Two reviews of irrigation system materials, equipment and shop drawings
• Two reviews of irrigation and lake re-circulation pumping system materials,
equipment and shop drawings
• Two reviews of lake aeration systems, lake lining systems, lake level controls,
and lake edge materials, equipment, and shop drawings
Each submittal review will be responded to via a memorandum describing review
comments, an indication of required clarifications or corrections, or approval.
Task 2.3 -RFI/ASI Response; Respond to contractor RFI's and develop ASI documentation via
email as required during construction process.
Task 2.4 -Construction Observation Site Visits; Provide the following on-site observation
meetings and site reviews during construction to ensure that the items listed meet
the requirements of the construction documents:
Verdantas.com
► City Services ,Apache Junction Arizona
July 1, 2026
• Two interim visits to review progress of irrigation system, pumping system
and lake construction
Each interim site visit will be documented by a memorandum describing observations
and recommendations or corrective actions to be taken.
Task 2.5 — Substantial Completion and Operational Review; Provide the following on-site
observation upon substantial completion of construction to ensure that the items
listed meet the requirements of the construction documents:
• One visit to review operation of irrigation system, pumping systems, and lake
aeration mechanical system
The substantial completion site visit will be documented by a memorandum and
punch-list report describing observations and recommendations or corrective actions
to be taken.
Task 2.6 - Electronic Record Drawings; Provide electronic record drawings for the design under
our scope of work based on contractor field notes and legible redline prints.
ASSUMPTIONS AND EXCLUSIONS
The following assumptions and exclusions have been made by Verdantas relative to our scope
of work and engineering services:
• It is assumed the water supply system is of sufficient size, capacity, and operable
condition to provide irrigation water and evaporative losses required for this project.
Water supply design to lake is excluded from this scope.
• Fees and submittal schedule will be based on the agreed to number of meetings, site
visits, document submittals, and quantity of plan sheets prior to commencement of
contract. If additional meetings, site visits, submittals and/or plan sheets are required,
fees will be adjusted and submittal schedule will be revised accordingly. It is assumed
that Dig Studio will provide printing, packaging and delivery for submittal documentation,
those expenses are excluded from this contract.
• Base plans, planting plans, grading plans and hardscape plans will be provided by
others in AutoCAD format for our use. Because changes in base information and/or
landscape design can significantly affect irrigation, lakes, and pumping system design
and layout, any such changes will necessitate our charging additional fees. Therefore,
the fees quoted presume these plans will be provided by the appropriate sub-consultants
at a level of completion that corresponds with the current submittal level prior to
beginning our work.
• Contact information for water, electrical, and other utility services will be provided by
others for our coordination purposes. Water services will be coordinated with appropriate
civil and mechanical subconsultants; specifications and details will be shown on their
plans. Electrical, lighting, SCADA and telecommunication services for irrigation and
pumping system will be coordinated with appropriate design team utility subconsultants;
specifications and details will be shown on their plans.
• Architectural and Structural design of a building, enclosure, or vault for the lake
pumping/re-circulation/aeration systems is not included. Verdantas will assist with space
planning for these elements within a building or enclosure that is specified and detailed
by the project architectural and structural consultants.
• Geotechnical investigation or evaluation of existing conditions is not included in this
scope of work; it is assumed that these services will be conducted by others and the
results will be provided in writing for our review during the design process.
• Field surveying of existing conditions, and design of irrigation system demolition,
salvage, renovation plans are not included in this scope of work.
Verdantas.com
► City Services ,Apache Junction Arizona
July 1, 2026
EXHIBIT B
FEES:
DESIGN & ENGINEERING SERVICES
TASK 1.0: Lake & Irrigation Construction Documents (60%, 90% & Final Design)
Task 1.1 Lake Liner& Mechanical System Design................................$ 38,750
$ 38,750
Task 1.2 Irrigation System Design Park..................................................$ 8,500
Task 1.3 Irrigation System Design Library..............................................$ 5,500
Task 1.4 Irrigation System Design Police\Public Works.........................$ 6,000
Subtotal Design & Engineering Services (inc expenses)........$ 58,000
POST-DESIGN SERVICES
TASK 2.0 Construction Phase Services
Task 2.1 Pre-construction Meeting (1 total)..............................................$1,500
Task 2.2 Submittal Review (4 reviews total)............................................$ 2,500
Task 2.3 RFUASI Response (as required)................................................$ 1,500
Task 2.4 Interim Construction Meetings/Site Visits (2 visits total)..........$ 5,000
Task 2.5 Substantial Completion (1 visit total)........................................$ 2,500
Task 2.6 Electronic Record Drawings..................................................... 1,500
Sub-total Post-design Services (inc expenses)...................... $ 14,500
$ 14,500
Total for all services listed (including expenses)......................................... $$ 72,500
�O Verdantas.com
uEs
4 UES ,
3331E Wood St.
Phoenix,Arizona 85040
p. 602.997.6391 I TeamUES.com
June 12, 2026
Arrington Watkins Architects
3003 North Central Avenue,Suite 2400
Phoenix, AZ 85012
Attention: Matthew A. Gorman
mgorman@awarch.com
Reference: Geotechnical Engineering Services
Apache Junction City Services Expansion
SWC Ironwood Road & Horton Drive
Apache Junction, AZ
Proposal No: 325 GEO
UES Professional Solutions 30, LLC (UES),formerly Speedie & Associates, is pleased to provide our scope of work and cost
proposal to provide Geotechnical Engineering services for the above referenced site, that will assist your team in
developing cost effective site development, pavement, and foundation design. Work on this project will be carried out
under the overall supervision of a registered Professional Engineer in the state of Arizona. This letter describes our
understanding of the project, our scope of services, schedule, and fees.
PROJECT INFORMATION
We understand that design and construction will consist of a 27,000 square foot police substation with associated vehicle
storage,a 15,000 square foot library, a 5,500 square foot park maintenance facility with associated equipment storage and
a 12.1 acre park with multi-purpose fields, baseball/softball fields, sport courts, shade structures a restroom building and
a 1.43 acre urban fishing lake on undeveloped land. The buildings are assumed to be one or two stories with slab on grade
and masonry or steel frame construction.Structural loads will be light to moderate and no special considerations regarding
settlement tolerances are known at this time. Adjacent areas will be landscaped or paved to support light to moderate
volumes of auto and truck traffic. Landscaped areas will be utilized for storm water retention and disposal.
SCOPE OF SERVICES
Geotechnical Investigation-We will drill and sample the test borings requested to determine subsoil conditions and
provide samples for laboratory testing. Sufficient laboratory tests will be conducted to classify the soils encountered and
provide data for engineering design. We presently anticipate drilling the following borings to the depths indicated below
existing ground surface or auger refusal, whichever comes first. Access to the site by conventional truck-mounted drilling
equipment is assumed to be free and unencumbered.
Tfllill:.1pII D-
Police Substation (and future building) 4-5 10-20
Library 3 10-20
Parks Maintenance 2 10-20
Park Facilities 4 10-20
Parking&Driveways 5 Y 5
Environmental Consulting I Geotechnical Engineering I Materials Testing&Inspections
Occupational Health&Safety I Building Sciences&Code Compliance I Virtual Design Consulting
q1 UES'. Apache Junction City Services Expansion
Proposal No.325-GEO
June 12,2026
Page 2
infiltration/Percolation Tests-A fee is provided to excavate and conduct shallow infiltration/percolation tests meeting City
of Apache Junction requirements. Maximum depth that UES can conduct these tests is 6 feet below existing grades. If
deeper tests are required,the client would need to contract an earthwork contractor to excavate and backfill test pits.The
City now requires dual ring infiltration tests per ASTM 03385 be conducted. This method requires a backhoe to excavate
test pits, installation of large ring devices and a minimum of 6 hours of continuous readings.The tests would be conducted
at the proposed depths of the retention basins per the Grading and Drainage plans provided by the client.
We will mark the proposed boring/excavation locations in the field with the location to be approved by the client and
owner. UES will take reasonable precautions to avoid damage to subterranean structures, pipelines and utilities including
notifying AZ811 (Blue Stake),subcontracting a private utility locator and reviewing all as-built utility plans provided by the
client. The client (and owner) agree UES is not responsible for any damages to underground structures, pipelines and
utilities that are not traceable, not called to our attention and/or correctly shown on the plans furnished to UES.
After completion of the field exploration and laboratory testing programs, the results will be evaluated to develop
geotechnical design recommendations and prepare a geotechnical engineering report. The following information will be
included in the report:
• A summary of project information
• A brief discussion of our field exploration and laboratory testing programs
• A plan indicating the approximate locations of our explorations
• Logs of the explorations and results of laboratory tests
• A discussion of the existing surface conditions at the time of our field exploration program
• A discussion of the subsurface conditions encountered within the depths explored
• Design data,allowable bearing pressure and depth for shallow spread footings
• Alternate foundation systems and design data as indicated by soil conditions and foundation loads
• Settlement estimate for each foundation system considered
• Seismic Site Classification based on borings and published ground motion data
• Lateral pressures on temporary and permanent retaining and foundation walls
• Groundwater conditions,if any,to the depths which will influence design and/or construction of the
proposed development
• Swell potential of in-situ and compacted soils and recommendations for control if highly expansive
• On-site pavement design to provide economy and adequate service
• Suitability of site soils for use as compacted fill and preferred earthwork methods, including clearing,
stripping, excavation and construction of engineered fill
• Local excavation and trenching conditions and stability considerations
• Corrosion potential of subsoils
• Add-Alternate: Infiltration/percolation tests for storm water design
COST OF SERVICES
Charges for our services have been determined on the basis of our standard Fee and Rate Schedule, a copy of which is
attached and made a part hereof for any additional design work requested.We propose to provide the design services set
forth herein for the following lump sum amounts, which includes all testing, engineering, reimbursable expenses and an
electronic pdf format file of the report emailed upon completion. Should we be informed that hard copies of the report
are needed,there will be an additional charge of$50.00 per report.
3331 E Wood St.,Phoenix,Arizona 85040
p.602.997.6391 1 TeamUES.com
uEs", Apache Junction City Services Expansion
Proposal No. 32S-GEO
June 12, 2026
Page 3
Geotechnical Investigation with Report $11,800.00 Accept O Decline O
Add-Alternate: $3,000.00 First Test' 2 Accept O#_ Decline O
Infiltration/Percolation Tests $ 1,000.00 Additional Tests
Notes: 1The first test incorporates the cost of the backhoe service.
Z Conducted on the same mobilization as the initial percolation test.
We have the staff available to begin work immediately upon notice to proceed. Currently about 10 business days are
required to mark, obtain utility clearances and begin auger borings. Fieldwork for auger borings should take two days
(weather and land use permitting). Lab testing will require about 3 weeks. Upon request, we can provide preliminary
information within a few days after drilling the site. The complete report will be issued within ten business days of lab
testing completion. This schedule is subject to change depending on the workload when Notice to Proceed is received.
As always,we stand ready to make reasonable adjustments to this schedule to meet our clients' needs.
CLOSURE
This proposal is valid for 6 months. If the client does not accept this proposal or UES does not initiate services within that
time period, the client must give UES an opportunity to re review the proposed scope of work and fee to determine
whether or not modifications need to be made and/or a new proposal drafted and submitted for client review.
We appreciate the opportunity to submit this proposal for your consideration. If the terms set forth are satisfactory,please
fill out the information on the Proposal Acceptance Form with a signature authorizing acceptance of scope of work and
Terms and Conditions.
Respectfully,
UES
Kenneth M. Euge II
Geotechnical Project Manager
Attachments: Proposal Acceptance Form
Engineering Services 2026 Fee and Rate Schedule
Terms& Conditions
3331 E Wood St., Phoenix,Arizona 85040
p. 602.997.6391 1 TeamUES.com
UES.P/I U E 9 Apache Junction City Services Expansion
Proposal No. 325-GEO
June 12, 2026
Page 4
GEOTECHNICAL
PROPOSAL ACCEPTANCE FORM
UES Professional Solutions 30, LLC (UES) Date: June 12, 2026
Proposal No 325-GEO
Project Name:Apache Junction City Services Expansion
Project Location: SWC Ironwood Road& Horton Drive,Apache Junction,AZ
The undersigned hereby accepts all the Terms and Conditions set forth in this Proposal and warrants that he/she has full authority to
bind the Client
PROPOSAL ACCEPTED BY:
Signature Date
PRINTED NAME: TITLE:
CLIENT FIRM:
ADDRESS:
CITY/STATE/ZIP:
CLIENT CONTACT: TELEPHONE:
EMAIL:
*****REQUIRED INFORMATION (Must be completed in order to process)"...
Check box if
ACCOUNTS PAYABLE CONTACT: O same as above
ADDRESS:
CITY/STATE/ZIP:
EMAIL: TELEPHONE:
Land Owner's Name:
Address:
Project Legal
Description:
Project County:
REPORT DISTRIBUTION
COMPANY CONTACT EMAIL ADDRESS
3331 E Wood St., Phoenix,Arizona 85040
p.602.997.6391 1 TeamUES,com
r
UES .
ENGINEERING SERVICES
2026 Fee and Rate Schedule
Fees for services will be based upon the time worked on the project at the following rates:
iri-
Principal I $ 220.00 •
Project Manager 175.00
Sr. Geolo isUEn ineer 175.00
Special Inspector Architectural 135.00
Project Engineer/Geologist 135.00
Project Scientist 135.00
Senior Environmental Specialist 135.00
Environmental Specialist 110.00
Special Inspector(Structural/Geotechnical 110.00
Staff Engineer/Geologist 110.00
Sr. Engineering Technician 90.00
Draftsman 80.00
Materials Testing Technician 80.00
Clerical/Administrative 70.00
REIMBURSABLE EXPENSES
Light Truck Mileage Rate: $0.70 per mile
The following items are reimbursable to the extent of actual expenses plus 25%:
1. Transportation, lodging and subsistence for out of town travel
2. Special mailings and shipping charges
3. Special materials and equipment unique to the project
4. Duplication or reprinting/copying reports
TEST BORINGS AND FIELD INVESTIGATIONS
On projects requiring test borings, test pits, or other explorations, the services of reputable contractors to perform
such work shall be obtained.
SUBCONTRACTORSISUBCONSULTANTS CHARGES
Any charges for subcontractors/subconsultants are subject to a 25%handling fee if invoiced by Speedie&Associates
or such charges can be directly paid by the CLIENT.
SPECIAL RATES
The following rates may be subject to a 35% increase:
➢ Overtime—time over 8 hours per weekday and on Saturday
➢ Sunday and Holidays
➢ Rush orders
MINIMUM CHARGES
A three-hour minimum is charged for field testing and inspection services.
EXPERT WITNESS
Deposition and testimony; 4-hour minimum, $300.00 per hour.
The following Terms and Conditions are included and hereto made a part of this agreement.
Page 1 of 1
Revised 1/1/26
EXHIBIT B
SCHEDULE
Days to complete Phase
95 days (From Notice to Proceed) Schematic Design with Concept
Design
100 days Design Development
90 days Construction Documents (90%CDs)
80 days Permitting (100% CDs)
Concurrent w/permit Bidding Support
660 days Construction Administration
2 years after Substantial Completion Warranty
EXHIBIT C
COMPENSATION
CONSULTANTS'FEE
TASK OR ARCHITECT COMSULT'S
SERVICES PFIASE TOTAL All FEE TOTALS KM &1.I4.r LSW Wood P.k1 Wood P41.1 DIO S0 Vwdrtn a JE9
SCHEMATIC DE510N 3 1.062000 S 435 520 5 620.560 f 241.175 $ 87.600 3 170.93.5 3 23,880 8 23,310 S 95 500 S 5.400
DESIGN DEVELOPMENT $ 1370.540 S 57)120 S 707.420 $ 267.645 3 93.730 S 234.388 S 21100 $ 24,510 S 1"1,050 $ 25.000
CONSTRUCTION DOCUUENTSIPERMIT S 1 720015 5 563.260 $ 1'56.735 $ 438.'20 $ 123,500 $ 171,383 $ 29,570 $ 48.610 $ I'8950 3 26.500
86)0000 SUPPORT $ 69.20 5 26.120 $ 43.060 $ 45.000 $ 6,200 $ 1411C $ 2610 S 5.510 $ 600
CONSTRUCTION ADLBNISTRATIOH $ 1}18 655 S 351 100 S 667.555 $ 200,615 $ 58.375 $ 258,825 $ 36558 $ 41690 L 480561 $ 14,500
BASIC SERVICU SUBTOTAL S 5 241.310 1 15450. 1 1190066 L,38.3S S 1 D4I 520 1 .11I'80 S 140830 S 374.000 3 72 000 'L_,,...., L
SUPPLEMENTARY SERVICES
AdM.IW S,-" S 2.250 3 },250 3 2 25C
Carps Carc.pl D..qn..d Owr>i s 65.000 1 55.000 S 65.000
15055 04050.Fvn4u.S80,1,,. $ 139500 3 5000 S 114,000 S 134,000
Lora"Y 51416 D..qn S 20.900 S 26.900 S 20 900
Sp.W EIo0,k.1Irupec9on. f 10.465 3 450 S 10.035 S 10.35
O.a'.chY[.I 1009.95.800 f 12.400 S 600 S 11.600 3 11500
I0'40 410o e.1M1 f 0.000 S 6.000 0 6.000
6465•8i6'PLrNEHTARY3115TOTA4 S 5506)49 S 1559900 S 3m7SS S 1110956 '1353.215 }1057550 i 11{0.44Q 3 181052 } 1"4.1101' I 17907 8 S li,6CC
TOTAL SERVICES $5506.345
W.frld4S Syrup..11d¢.pl.a 1 520001 3 4 500 S 4e.)00 $ 26.300 I $ 20.600
5pecMa15',5t.a8boIedo i1 I,,.c,cRm. $ 133.000I$ 6.000 S 125.000 $125000
CM,,.,'.AWw.nc. 5 100.000
Rwnbur..91. 5 130501$ 5000 $ 8650 S 5.000 IS 1.500 } 1500 1 600 3 750 4 2500 S 1500 3 300
I. 15'.050 3,732355 1,452,250, 361675 1059055 117040 141360 L 3105005 73500 1. 10. 1
TOTAL SERVICES.ALLOWANCES 55.805,795
I
1
1
1
1
■ 11 II
1
1 I
■
DESIGN AND CONSTRUCTION
ADMINISTRATION SERVICES AGREEMENT
City Services Expansion Project
August 4, 2026
Background
• RFQ25MP-001 Master Plan and Design Services
• Awarded September 16, 2025
• Master planned the City Services Expansion project
• Programmed the amenities with department stakeholders
• Understand and know the needs of each department
• Recent Arrington Watkins LLC projects :
• City of Phoenix Police Headquarters Master Plan, Design and
Construction
• City of Mesa Gateway Branch Library
• City of Surprise Asante Public Library
• Town of Gilbert Regional Park
Purpose
• Present the contract for design and construction
administration services to support the City Services
Expansion project at Ironwood & Horton Drive
Project
a o Elliot Road
te- I PARCEL 18.18
19.54 AC
-- ---
-h PARCEL.18.19 COMM
•18.60 AC
Ii
40 x I �PARK
i0' ''��C__ 1 W
I p11IiR0W1
:CEL 1821 r� 2bAt� i I B'PUFF
9.26 AC S 3 2D'L5 Y
0'x110' {y r�r u 1
Cr PARCEL 18.175
17.27 AC . y
' 40'x 110x/
\ r �' r -F
i
` r
y I -\ rr y y
PARCEL 18.15 • rJ rr !I I_
18.65 AC ] r PARCEL 18.5
50'x 120' Jr FPARCEL 18.6 y 22.44 AC
16,18 AC 1
\ �' Oi`aerr�f SCHOOL I' PtJ5LTC FRAGILLTIES
O
�`\fir �Q�
PARCEL 18.7 �
\\ 32.17 AC
F/ \ 50'x120
PARK ,
7.70 AC F 2 r I 40'LS
J r
r� r Ji I
\\ &TRAIL ❑
4' \\ PARCEL 15.4 1
\\\� �� \\ 21.54 AC
\\ 50' 120'
\ r rr \\ JrJ
ICEL 18.8 sir \ rJrJ A
.5.98 AC ./,'
\\
1\ =rJ
i r• PARCEL 18.3 \yr
i J� 27.06 AC rJ
• Description
• • , •
. • • u
• I • I :r ,.
• • •
ti
• sr 4
N _ ilM4
Scope of Work
• Design all buildings and associated infrastructure
• Schematic Design, Design Development & Construction Documents
• Twelve ( 12) month process
• Permitting & Bid Phase
• Submit for required plan review and permitting
• Support CM@R Guaranteed Maximum Price (GMP) development
• Respond to Request for Information and Substitution Requests
• Construction Administration Ar
• Warranty wa I k
Total Estimated Project
September 2025 June 2026 Master Plan and Programming $ 70,446
February 2025 June 2026 PMCM Master Plan and Programming $49,025
April 2025 June 2029 PMCM Design and Construction $2,664,301
Soft Costs (Utility designs and permits, geotechnical, PreApp and $300,000
Design Review fees, and outreach)
September 2026 June 2030 Design and Construction Administration $5,805,795
October 2026 / August 2027 CMAR Preconstruction $603,250
2027 2029 CMAR Construction $49,163,743
Soft Costs (Plan review, specialty furniture for 911 dispatch consoles $8,651,000
and library stacks, office furniture, appliances, specialty equipment,
exercise equipment, arts contribution, move costs, Audio Visual, IT,
Security Cameras, Access Control and other miscellaneous project
costs)
Total Estimated Project Budget $67,907,560
Park & Fishing Lake Construction by others $11,000,000
Conveyed Land by others $7,000,000
Total Estimated Project Value $85,907,560
Next Steps
• Staff recommends approval of the contract in the
amount of $ 5, 805, 795 with Arrington Watkins
Architecture, LLC
• Contract will be placed on the September 1, 2026
City Council Meeting consent agenda , unless
otherwise directed by City Council
• Upcoming
• Fall 2026 — Preconstruction Contract
• Fall 2027 — Construction Contract Ar
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
85119
Agenda Item No.4.
'�'PizoN�' File ID: 26-414
Sponsor: Michael Pooley Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of approval of professional services agreement between the City of Apache
Junction and Excalibur Charter School -Avalon K-8, for a grant-funded school resource officer
in the amount of$ 161,669.31 fora contract term of July 1, 2026, through June 30, 2027.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
Apache Junction Police Department
Memorandum
Date: August 5, 2026
To: Mayor Chip Wilson and the City Council
From: Chief Michael Pooley
Subject: School Resource Officer - Excalibur Charter School - Avalon K-8
The City of Apache Junction Police Department is requesting approval for
assignment of a School Resource Officer to serve at the above-noted school.
The Arizona Department of Education has approved funding of an officer at
the cost up to $161,669.31, to include officer salary and benefits.
This salary is funded annually and it is requested by the city to continue the
commitment to enhance child safety.
PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF APACHE
JUNCTION AND EXCALIBUR CHARTER SCHOOL- AVALON K-8
THIS AGREEMENT is made as of the .. .__. day of 2026 (the
"Effective Date") by and between the CITY OF APACHE JUNCTION, an Arizona
municipal corporation ("City"), and EXCALIBUR CHARTER SCHOOL - AVALON
K-8, an Arizona domestic non-profit corporation ("School"), both of which may
be hereinafter referred to collectively as the "Parties" or individually as a
"Party", for the project entitled "School Resource Officer Services".
RECITALS
A. School desires City to assign a police officer its School as a School
Resource Officer ("SRO") for services noted in § 5 of this Agreement, and City is
willing to assign an SRO to School for such purposes under the terms and
conditions of this Agreement.
B. The Parties are authorized by A.R.S. §§ 15-342(13) and 11-952 to enter
into this agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals and the
mutual promises and covenants set forth herein, and for other consideration,
the receipt and adequacy of which is hereby acknowledged, the Parties agree
as follows:
1 . ELIGIBLE SCHOOL LOCATIONS. The following school is within the
City of Apache Junction:
Avalon K-8, 1045 S. San Marcos Dr, Apache Junction, AZ 85120.
2. TERM AND TERMINATION. The term of this Agreement starts on
July 1-, 2026 and ends on June 30, 2027 unless renewed by both Parties and
funding is available. This Agreement shall commence on the Effective Date
however, either Party may terminate this Agreement for any reason upon thirty
(30) calendar days' written notice to the other Party by first class certified U.S.
mail, postage prepaid, addressed to the other Party as set forth in § 11 of this
Agreement.
3. RELATIONSHIP OF PARTIES. City shall have the status of an
independent contractor for purposes of this Agreement and this Agreement is
not intended to, and will not constitute, create, give rise to, or otherwise
recognize a joint venture, partnership, or formal business association or
organization of any kind between the Parties, and the rights and obligations of
the Parties shall only be those expressly set forth in this Agreement.
The assigned SRO shall be an employee of City and shall be subject to its control
and supervision. The assigned SRO will be subject to current procedures in
effect for City police officers, including attendance at all mandated training and
testing to maintain state peace officer certification. The assigned SRO shall
fulfill duties as a law enforcement officer as certified by the Arizona Police
Officers Standards and Training board ("AZ POST"). School shall not interfere
with the assigned SRO duties as a sworn law enforcement officer.
City understands that School is responsible for the safety of students on campus
during curriculum hours. If School receives information that the assigned SRO
may have engaged in unprofessional, illegal, or immoral conduct, School will
immediately provide such information to City. If City receives information from
any credible source indicating that the assigned SRO may have engaged in
unprofessional, illegal, or immoral conduct that would affect the officer's ability
to safely and/or professionally perform duties for School, City will immediately
provide such information, as allowed by law, to School.
If any alleged unprofessional, illegal, or immoral conduct might affect the SRO's
ability to safely and/or professionally perform duties for School, the School will
be able to remove the SRO from the campus and City will immediately remove
the SRO from School assignment to allow City and/or School to investigate the
allegations. City agrees to temporarily assign a replacement to School in this
situation and if a replacement officer cannot be provided, School will be
credited for each day an officer is not assigned to the campus. School, at its sole
discretion, may refuse the assignment of any officer who has previously been
removed from School because of allegations of unprofessional, illegal, or
immoral conduct.
School shall reimburse City for the costs of SRO's compensation for: 1) days
School is in session and the SRO is present at School; 2) During the summer
when School is not in session but SRO is present due to summer planning days,
preparing lesson plans, safety program 3) when the SRO is not at School due to
an off-campus activity at Schools' request; 4) when SRO is involved in activity
stemming from action taken by the officer while in service of School, including
attendance at court; and 5) when the SRO is working an alternative work
schedule as agreed upon by City and School. City is responsible for the costs of
SRO's compensation for all other hours of work performed by SRO.
4. COMPENSATION:
A. Cost of Wages for Anticipated Scheduled Hours. School
agrees to pay City up to One Hundred Sixty One Thousand Six Hundred
Sixty Nine Dollars and Thirty One Cents. ($161 ,669.31) for SRO services
rendered during the Fiscal Year 2026-2027 in consideration for the SRO
services provided by City as set forth in § 5 below.
2
B. Overtime. The SRO must seek approval from the School's
principal, or the principal's designee, and the appropriate City police
department supervisor before working on SRO-related overtime (i.e.,
those matters pertaining to School, its students, or its employees). School
shall pay one hundred percent (100%) of any SRO overtime worked as the
result of SRO-related functions. City shall pay one hundred percent (100%)
of any SRO overtime that results from City-related activities (i.e., those
matters that do not involve School, its students, or its employees).
C. Payment and Late Fees. Payment to City from School is due
within thirty (30) calendar days of School's receipt of a monthly itemized
invoice. School agrees to pay interest ("late fees") in the amount of ten
percent (10%) per annum on any balance that remains unpaid more than
fifteen (15) calendar days after the due date. City may, at its discretion,
waive late fees on a case-by-case basis.
D. Budget. Each Party will establish and maintain a budget
according to its established rules and regulations.
5. SRO'S RESPONSIBILITIES AND GOALS.
A. The SRO shall have the following responsibilities:
i. Establish and maintain a professional working relationship
with School administrators.
ii. Provide appropriate police and enforcement services at
School.
iii. Participate with School security team to conduct safety
assessments and recommend improvements and enhance
student safety.
iv. Prepare and deliver law-related education lessons upon
School request and approval.
v. Develop collaborations with community resources, identifying
services offered that could benefit students.
vi. Plan in-service training for School staff on topics including,
but not limited to; student safety, substance abuse, gang
related information, law related education, etc..
vii. Collaborate with School administration to analyze criminal
incident reports and disciplinary records as a means of
identifying patterns and developing strategies to address
3
problems.
viii. Work with community-based and youth recreational and
leadership development activities that complement and
reinforce School safety priorities.
ix. Attend training opportunities.
x. Complete required training and reports as dictated by the
School's Safety Grant.
xi. Contact the parent or guardian of students who have not
provided School with proof of identification in accordance
with A.R.S. § 15-828.
xii. Prepare and maintain such records of SRO and activities as
are required by the operational needs of the Apache Junction
Police Department.
B. An SRO shall use good faith efforts to achieve the following
goals:
i. Work cooperatively with School administrators to establish an
effective administrative review of truancy and repetitive
incidents with the objective of reducing truancy.
ii. Refer juveniles or their parents/guardians to appropriate
social service agencies for assistance when a need is
determined.
iii. Instruct administrators and faculty members in: (a) the
identification of abused or neglected children; (b) the
reporting of abuse or neglect; and (c) the actions that can be
taken to prevent further abuse or neglect.
iv. Take appropriate steps, including enforcement and reporting
action, consistent with a police officer's duty, upon the
discovery of child abuse, drug use, or any other crime.
v. Work cooperatively with School administration and staff to
provide a safe learning environment for all staff and students.
6. SCHOOL SAFETY PROGRAM• DUTIES AND RESPONSIBILITIES.
A. The parties agree to participate in the School Safety
Program as established by A.R.S. § 15-154 and as described
4
more fully in the School Safety Program Guidance Manual,
which is attached here as Exhibit A and incorporated into this
Agreement by this reference.
B. Each party agrees to assume the roles and responsibilities
assigned to that party by the School Safety Program Guidance
Manual, with the exception of any law-related education
courses.
7. TIME AND PLACE OF PERFORMANCE.
A. City shall assign one police officer to School beginning on
July 1 , 2026. City will ensure that the assigned SRO will provide the
services under this Agreement in a full-time, forty (40) hour a week
capacity when school is in session and as the administration requests
during out-of-session breaks. The assigned officer will wear uniforms
as authorized by City.
B. The SRO's activities will be restricted to the assigned school
grounds except for:
i. Follow-up home visits when needed as a result of School-
related matters.
ii. Incentive programs approved in writing (for example, by e-
mail) between the police department supervisor and the
School principal, or the principal's designee.
iii. In response to off campus, but School-related, criminal
activity.
iv. Attendance at off-campus events or meetings at School's
request.
v. Attendance at training.
vi. In response to emergency police activities.
vii. As directed by any police department supervisor.
viii. During days that Schools is not in session or on days that SRO
is not assigned to out-of-session breaks, the assigned SRO
shall perform his or her regular duties as determined by City.
8. SCHOOL RESPONSIBILITIES.
5
A. School will provide the SRO with an office at School sites and
such equipment and office supplies as is necessary for performance of
the duties noted in this Agreement, including a desk, chair, telephone,
computer and e-mail linkages, and filing space capable of being secured.
B. Upon termination, all property or equipment used by the
Parties in the performance of their responsibilities under this Agreement
shall remain the property of the Party that purchased the property or
equipment.
9. STATUS MEETINGS. By mutual agreement, the Parties may meet from time
to time for purposes of discussing the status and conduct of the work being
performed under this Agreement and addressing any problems that have come
to the Parties' attention and their views as to how such problems may be
resolved, including amending the terms and conditions of this Agreement.
10. RESOLUTION OF DISPUTES. In the event a dispute for any reason arises
and pursuant to A.R.S. § 15-154(F), the parties shall meet and discuss within
three (3) business days. Any dispute not resolved by mutual agreement of the
parties shall be decided in accordance with the applicable Arizona laws.
11 . ENTIRE AGREEMENT. This Agreement and any attachments represent
the entire agreement between the Parties and supersede all prior negotiations,
representations or agreements, either express or implied, written or oral. It is
mutually understood and agreed that no alteration or variation of the terms and
conditions of this Agreement shall be valid unless made in writing and signed by
the Parties hereto. Written and signed amendments shall automatically become
part of the supporting documents, and shall supersede any inconsistent
provision therein; provided, however, that any apparent inconsistency shall be
resolved, if possible, by construing the provisions as mutually complementary
and supplementary. All amendments to this Agreement must be in writing and
approved by the City Council and School Governing Board.
12. NONDISCRIMINATION. Both Parties shall comply with all applicable state
and federal employment laws, rules, regulations and executive orders that all
persons shall have equal access to employment and educational opportunities
regardless of race, color, religion, sex, age, national origin, disability, veteran's
status, political affiliation, and/or genetic code and shall comply with Executive
Order 2009-09.
13. NOTICES: All notices to the a Party required under this Agreement shall
be in writing and sent by first class certified mail, postage prepaid, return
receipt requested, addressed to the following:
If to City: Apache Junction Police Department
Attn: Chief of Police
6
300 East Superstition Boulevard
Apache Junction, AZ 85119
If to School: Excalibur Charter Schools
Avalon K-8
1045 S. San Marcos Dr
Apache Junction, AZ 85120
14. INSURANCE: School, at its own expense, shall purchase and maintain
the herein stipulated minimum insurance with companies duly licensed,
possessing a current A.M. Best, Inc. Rating of B++6, or approved unlicensed in
the State of Arizona with policies and forms satisfactory to City.
All insurance required herein shall be maintained in full force and effect until all
work or service required to be performed under the terms of the Agreement is
satisfactorily completed and formally accepted; failure to do so may, at the sole
discretion of City, constitute a material breach of this Agreement.
School's insurance shall be primary insurance as respects the City, and any
insurance or self-insurance maintained by City shall not contribute to it.
Any failure to comply with the claim reporting provisions of the insurance
policies or any breach of an insurance policy warranty shall not affect coverage
afforded under the insurance policies to protect City.
The insurance policies, except Workers' Compensation, shall contain a waiver
of transfer rights of recovery (subrogation) against City, its agents, officers,
officials and employees for any claims arising out of School's acts, errors,
mistakes, omissions, work or service.
Insurance policies may provide coverage which contains deductibles or self-
insured retentions. Such deductible and/or self-insured retentions shall not be
applicable with respect to the coverage provided to City under such policies.
School shall be solely responsible for the deductible and/or self-retention and
City, at its option, may require School to secure payment of such deductibles or
self-insured retentions by a surety bond or an irrevocable and unconditional
letter of credit.
City reserves the right to request and to receive, within ten (10) working days,
certified copies of any or all of the herein required insurance policies and/or
endorsements. City shall not be obligated, however, to review same or to advise
School of any deficiencies in such policies and endorsements, and such receipt
shall not relieve School from, or be deemed a waiver of, City's right to insist on
strict fulfillment of School's obligations under this Agreement.
7
The insurance policies, except Workers' Compensation and Professional
Liability, required by this Agreement, shall name City, its agents, officers,
officials and employees as Additional Insureds.
REQUIRED COVERAGE
Commercial General Liability
School shall maintain Commercial General Liability insurance with a limit of not
less than $1,000,000 for each occurrence with a $2,000,000
Products/Completed Operations Aggregate and a $2,000,000 General
Aggregate limit. The policy shall include coverage for bodily injury, broad form
property damage, personal injury, products and completed operations and
blanket contractual coverage including, but not limited to, the liability assumed
under the indemnification provisions of this Agreement, which coverage will be
at least as broad as that on Insurance Service Office, Inc. Policy Form No. CG
00011093, or the equivalent thereof.
Such policy shall contain a severability of interest provision, and shall not
contain a sunset provision or commutation clause, nor any provision which
would serve to limit third party action over claims.
The Commercial General Liability additional insured endorsement shall be at
least as broad as the Insurance Service Office, Inc.'s Additional Insured, Form
B, CG 20101185, or the equivalent thereof, and shall include coverage for
School's operations and products and completed operations.
Workers' Compensation
School shall carry Workers' Compensation insurance to cover obligations
imposed by federal and state statutes having jurisdiction of School's employees
engaged in the performance of the work or services and Employer's Liability
insurance of not less than $100,000 for each accident, $100,000 disease for
each employee, and $500,000 disease policy limit.
By execution of this Agreement, School certifies as follows:
"I am aware and understand the provisions of A.R.S. § 23-901 etseq.
which requires every employer to be insured against liability for
workers' compensation or to undertake self-insurance in
accordance with the provisions of this chapter, and I will comply with
such provisions before commencing the performance of the work of
this Agreement."
If School has no employees for whom workers' compensation insurance is
required, School shall submit a declaration or affidavit to City so stating and
8
covenanting to obtain such insurance if and when School employs any
employees subject to coverage.
In case any work described herein is subcontracted, School will require
subcontractors to provide Workers' Compensation and Employer's Liability
insurance to at least the same extent as required of School.
Certificates of Insurance
Prior to commencing work or services under this Agreement, School shall
furnish City with Certificates of Insurance, or formal endorsements as required
by the Agreement, issued by School's insurer(s), as evidence that policies
providing the required coverages, conditions and limits required by this
Agreement are in full force and effect. The form of the certificates of insurance
and endorsements shall be subject to the approval of the Apache Junction City
Attorney's Office, shall comply with the terms of this Agreement, and shall be
issued and delivered to City Attorney, City of Apache Junction, 300 East
Superstition Boulevard, Apache Junction, AZ 85119.
In the event any insurance policies required by this Agreement are written on a
"claims made" basis, coverage shall extend for two (2) years past completion
and acceptance of School's work or services and as evidenced by annual
Certificates of Insurance.
If a policy does expire during the life of the Agreement, a renewal certificate
must be sent to City thirty (30) calendar days prior to the expiration date.
All Certificates of Insurance shall be identified with bid serial number and title.
Policies or certificates and completed forms of City's Additional Insured
Endorsement (or a substantially equivalent insurance company form acceptable
to the City Attorney) evidencing the coverage required by this section shall be
filed with the City and shall include the City as an additional insured. The policy
or policies shall be in the usual form of a public liability insurance, but shall also
include the following provision:
"Solely as respects work done by or on behalf of the named insured
for the City of Apache Junction, it is agreed that the City of Apache
Junction and its officers and employees are added as additional
insureds under this policy."
Insurance required herein shall not expire, be canceled, or materially changed
without thirty (30) calendar days' prior written notice to City.
15. INDEMNIFICATION. Each party (as "Indemnitor") agrees to the extent
permissible under Arizona law to indemnify, defend, and hold harmless the other
party (as "Indemnitee") from and against any and all claims, losses, liability,
9
costs, or expenses (including reasonable attorneys' fees) (collectively referred
to as "Claims") arising out of bodily injury of any person, including death, or
property damage, but only to the extent that such Claims which result in
vicarious/derivative liability to the Indemnitee are caused by the act, omission,
negligence, misconduct, or other fault of the Indemnitor, its officers, officials,
agents, employees, or volunteers.
16. APPLICABLE LAW AND VENUE: The terms and conditions of this
Agreement shall be governed by and interpreted in accordance with the laws of
the State of Arizona. Any action at law or in equity brought by either party for
the purpose of enforcing a right or rights provided for in this Agreement, shall
be tried in a court of competent jurisdiction in Pinal County, State of Arizona.
The Parties hereby waive all provisions of law providing for a change of venue in
such proceeding to any other county. In the event either Party shall bring suit to
enforce any term of this Agreement or to recover any damages for and on
account of the breach of any term or condition in this Agreement, it is mutually
agreed that the prevailing party in such action shall recover all costs including:
all litigation and appeal expenses, collection expenses, reasonable attorney
fees, necessary witness fees and court costs to be determined by the court in
such action.
17. FORCE MAJEURE: Neither City nor School, as the case may be, shall be
considered not to have performed its obligations under this Agreement in the
event of enforced delay (an "Enforced Delay") due to causes beyond its control
and without its fault or negligence or failure to comply with applicable laws,
including, but not restricted to, acts of God, fires, floods, epidemics, pandemics,
quarantine, restrictions, embargoes, labor disputes, and unusually severe
weather or the delays of subcontractors or materialmen due to such causes,
acts of a public enemy, war, terrorism or act of terror (including but not limited
to bio-terrorism or eco-terrorism), nuclear radiation, blockade, insurrection,
riot, labor strike or interruption, extortion, sabotage, or similar occurrence or
any exercise of the power of eminent domain of any governmental body on
behalf of any public entity, or a declaration of moratorium or similar hiatus
(whether permanent or temporary) by any public entity directly affecting the
obligations under this Agreement. In no event will Enforced Delay include any
delay resulting from unavailability for any reason of labor shortages, or the
unavailability for any reason of particular Schools, subcontractors, vendors or
investors desired by School in connection with the obligations under this
Agreement. School agrees that School alone will bear all risks of delay which
are not Enforced Delay. In the event of the occurrence of any such Enforced
Delay, the time or times for performance of the obligations of the Party claiming
delay shall be extended for a period of the Enforced Delay; provided, however,
that the Party seeking the benefit of the provisions of this Section shall, within
thirty (30) calendar days after such Party knows or should know of any such
Enforced Delay, first notify the other Party of the specific delay in writing and
claim the right to an extension for the period of the Enforced Delay; and
10
provided further that in no event shall a period of Enforced Delay exceed ninety
(90) calendar days.
18. RECORDS: Records of School's labor, payroll, and other costs pertaining
to this Agreement shall be kept on a generally recognized accounting basis and
made available to City for inspection on request. School shall maintain records
for a period of at least two (2) years after termination of this Agreement, and
shall make such records available during that retention period for examination
or audit by City personnel during regular business hours.
19. INDEPENDENT CONTRACTOR: City and School agree and understand
that the relationship between both Parties is that of an independent contractor.
20. WAIVER OF TERMS AND CONDITIONS: The failure of City or School to
insist in any one or more instances on performance of any of the terms or
conditions of this Agreement or to exercise any right or privilege contained
herein shall not be considered as thereafter waiving such terms, conditions,
rights or privileges, and they shall remain in full force and effect.
21. COMPLIANCE WITH FEDERAL AND STATE LAWS: School understands
and acknowledges the applicability of the American with Disabilities Act, the
Immigration Reform and Control Act of 1986 and the Drug Free Workplace Act of
1989 to the services performed under this Agreement.
As required by A.R.S. § 41-4401, School hereby warrants its compliance with all
federal immigration laws and regulations that relate to its employees and A.R.S.
§ 23-214(A). School further warrants that after hiring an employee, School will
verify the employment eligibility of the employee through the E-Verify program. If
School uses any subcontractors in performance of services, subcontractors
shall warrant their compliance with all federal immigration laws and regulations
that relate to its employees and A.R.S. § 23-214(A), and subcontractors shall
further warrant that after hiring an employee, such subcontractor verifies the
employment eligibility of the employee through the E-Verify program. A breach
of this warranty shall be deemed a material breach of the Agreement that is
subject to penalties up to and including termination of this Agreement. School is
subject to a penalty of $100 per day for the first violation, $500 per day for the
second violation, and $1,000 per day for the third violation. City at its option
may terminate this Agreement after the third violation. School shall not be
deemed in material breach of this Agreement if the School and/or
subcontractors establish compliance with the employment verification
provisions of Sections 274A and 274B of the federal Immigration and Nationality
Act and the E-Verify requirements contained in A.R.S. § 23-214(A). City retains
the legal right to inspect the papers of any School or subcontractor employee
who works under this Agreement to ensure that the School or subcontractor is
complying with the warranty. Any inspection will be conducted after reasonable
11
notice and at reasonable times. If state law is amended, the Parties may modify
this paragraph consistent with state law.
Both parties will ensure that the dissemination and disposition of educational
records complies at all times with the Family Educational Rights and Privacy Act
of 1974 and any subsequent amendments thereto.
22. SEVERABILITY: City and School each believe that the execution, delivery
and performance of this Agreement are in compliance with all applicable laws.
However, in the unlikely event that any provision of this Agreement is declared
void or unenforceable (or is construed as requiring City to do any act in violation
of any applicable laws, including any constitutional provision, law, regulation, or
city code), such provision shall be deemed severed from this Agreement and
this Agreement shall otherwise remain in full force and effect; provided that this
Agreement shall retroactively be deemed reformed to the extent reasonably
possible in such a manner so that the reformed agreement (and any related
agreements effective as of the same date) provide essentially the same rights
and benefits (economic and otherwise) to the Parties as if such severance and
reformation were not required. Unless prohibited by applicable laws, the
Parties further shall perform all acts and execute, acknowledge and/or deliver
all amendments, instruments and consents necessary to accomplish and to give
effect to the purposes of this Agreement, as reformed.
23. SUCCESSORS, ASSIGNMENT & DELEGATION: City and School each
bind themselves, their partners, successors, assigns and legal representatives
to the other Party hereto and to the partners, successors, assigns and legal
representatives of such other Party in respect to all covenants, agreements and
obligations contained in this Agreement. Neither Party to the Agreement shall
assign the Agreement or sublet it as a whole or delegate the duties hereunder,
without the written consent of the other, nor shall School assign any monies due
or to become due to it without the previous written consent of City.
24. PROHIBITION TO CONTRACT WITH CONSULTANTS WHO ENGAGE IN
BOYCOTT OF THE STATE OF ISRAEL: The Parties acknowledge A.R.S. §§ 35-
393 through 35-393.03, as amended, which forbids public entities from
contracting with Schools who engage in boycotts of the State of Israel. Should
School under this Agreement engage in any such boycott against the State of
Israel, this Agreement shall be deemed automatically terminated by operation of
law. Any such boycott is a material breach of contract.
25. CERTIFICATION PURSUANT TO A.R.S. § 35-394. In accordance with
Arizona Revised Statutes § 35-394, School hereby certifies and agrees that
School does not currently and shall not for the duration of this Agreement use:
1) the forced labor of ethnic Uyghurs in the People's Republic of China, 2) any
services or goods produced by the forced labor of ethnic Uyghurs in the
People's Republic of China, and/or 3) any suppliers, contractors or
12
subcontractors that use the forced labor or any services or goods produced by
the forced labor of ethnic Uyghurs in the People's Republic of China. If School
becomes aware during the term of this Agreement that School is not in
compliance with this Section, then School shall notify the City within five (5)
business days after becoming aware of such noncompliance. If School does not
provide the City with written certification that School has remedied such
noncompliance within one hundred eighty (180) days after notifying the City of
such noncompliance, this Agreement shall terminate, except that if the
Agreement termination date occurs before the end of such one hundred eighty
(180) day remedy period, this Agreement shall terminate on such contract
termination date.
26. CONFLICTS OF INTEREST: This Agreement is subject to, and may be
terminated by City in accordance with, the provisions of A.R.S. § 38-511 .
13
IN WITNESS WHEREOF, School and City have executed this Agreement as
of the date first set forth above.
SCHOOL:
EXCALIBUR CHARTER SSCHOOL-
AVALON K-8, INC., an Arizona domestic
non-profit corporation
By:
Its: PRINCIPAL
CITY:
CITY OF APACHE JUNCTION, ARIZONA,
an Arizona municipal corporation
By: Walter "Chip" Wilson
Its: Mayor
ATTEST:
Evie McKinney
City Clerk
APPROVED AS TO FORM:
- 4 S- .2G
R. Joel Stern
City Attorney
14
STATE OF F\(' Zo(A
) ss.
COUNTY OF Qnztl )
The foregoing was subscribed and sworn to before me this y day of
20&a, by Kchcwk MCord as pr,_G_ _ of Excalibur
Charter School -Avalon K-8, an Arizona domestic non-profit corporation.
My Commission Expires:
vPt4R � as I
l
STATE OF ARIZONA )
) ss.
COUNTY OF PINAL )
The foregoing was subscribed and sworn to before me this _ day of
, 20_, by Walter "Chip" Wilson, as Mayor of the City of
Apache Junction, Arizona, an Arizona municipal corporation.
Notary Public
My Commission Expires:
EXHIBIT A
Arizona Department of Education School Safety Program Guidance Manual
(Attached)
����►tf lllt�li
School Resource Officer Manual
This manual is specific for sites that were awarded a School Resource Officer(SRO).This
will detail roles,responsibilities,and requirements for the officer while funded by the School Safety
Program.
A School Resource Officer for the purpose of this manual is a full authority peace officer
whose full time assignment with their law enforcement agency is as a School Resource Officer on a
school campus.
• This Section IS:
o For officers whose full time assignment with their law enforcement agency is as a
School Resource Officer on a school campus.
i For retired,post certified,who can only be assigned as a School Resource Officer
such as the Arizona Retired Police Officer—School Resource Officer position at
Phoenix Police Department.
• This Section IS NOT:
o This section IS NOT for full authority reserve officers working full-time as a School
Safety Officer(SSO).
o This section IS NOT for a former officer that is not affiliated with a law enforcement
agency and who retired in good standing. For the officers who retired in good
standing manual,click here.
o This section IS NOT for JPOs.For the JPO manual,click here.
o This section IS NOT for SSOs. For the SSO manual,click here.
School Resource Officer Manual
Section 1:Program Requirements
Cooperative Apree+troe nu
Intergovernmental Agreement IGA
The Hiring Process
When School is not jç Smsmon_
Azepq Suvisar Requirements
OtR.er AttYvitw Log
Offer rr.arsfs 4R':P5
Officer Continuity
Officer Performance Assessmeol
Section 2:SRO Requirements
Role H1:Law Enforcement Professional
Role 92:Law-Related£d.,cator"
Role#3:Positive Role Model
Section a; rohibit j X42{ {lggl Reso�unee Officers;
Section 4:Tiered SuDoorts and Instruction
Section 1: Program Requirements
The following are the requirements of the School Safety Program.Noncompliance with program
requirements may result in a desk review,site visit,corrective action plan,and even loss of current
and/or future grant funding.
Cooperative Agreement:
The Cooperative Agreement is a document submitted to Grants Management Enterprise
(GME)to ensure that the local education agency(LEA)applying for the School Safety Program Grant
has contacted and informed their local law enforcement agency of their intent and desire for an officer.
This agreement does not require the law enforcement agency to provide an officer to the school if they
are awarded funding and is not a legally binding agreement.This document is simply a statement of
intent that allows the law enforcement agency to be aware an officer may be requested as a School
Resource Officer.
Intergovernmental Agreement(IGA)
For each site receiving funding under the School Safety Program,an Intergovernmental Agreement
(IGA)must be developed between the awarded district/charter and the law enforcement agency.The
document shall be completed annually,within 30 days of the first session of the new school year.The
agreement shall be kept on file at each funded site and with ADE through their monitoring platforms.
This document must be available for the Site Administrator and the School Resource Officer to
review.
ARS 15-154 requires that the IGA include a dispute resolution process between the district-charter and
the law enforcement agency.
The Intergovernmental Agreement is a general term for a contract that is developed jointly and agreed
upon by the district/charter,site administrator,and law enforcement or probation department.This
written agreement outlines the purpose of the partnership and the fundamental responsibilities of each
entity.The terms set forth in the IGA shall be in accordance with the established guidelines of the
School Safety Program.
Required Language:
A.R.S.11-952.Subsections B through J indicate the minimum requirements that must be
present in an IGA in the state of Arizona.That text is listed below:
"B.Any such contract or agreement shall specify the following:
I. Its duration.
2. Its purpose or purposes.
3. The manner of financing the joint or cooperative undertaking and of establishing and
maintaining a budget for the undertaking
4. The permissible method or methods to be employed in accomplishing the partial or
complete termination of the agreement and for disposing of property on such partial
or complete termination.
5. If a separate legal entity is formed pursuant to subsection A,the precise organization,
composition,title and nature of the entity.
6. Any other necessary and proper matters.
C.No agreement made pursuant to this article shall relieve any public agency of any
obligation or responsibility imposed on it by law.
D.Except as provided in subsection E,every agreement or contract involving any public
agency or public procurement unit of this stale made pursuant to this article,before its
execution,shall be submitted to the attorney for each such public agency or public
procurement unit,who shall determine whether the agreement is in proper form and is within
the powers and authority granted under the laws of this state to such public agency or public
procurement unit.
E.A federal department or agency or public agency of another state that is a party to an
agreement or contract made pursuant to this article is not required to submit the agreement or
contract to the attorney for the department or agency unless required under federal law or the
law of the other slate.
F.Appropriate action by ordinance or resolution or otherwise pursuant to the laws applicable
to the governing bodies of the participating agencies approving or extending the duration of
the agreement or contract shall be necessary before any such agreement,contract or extension
may be filed or become effective.
G.An agreement or contract may be extended as many times as is desirable,but each
extension may not exceed the duration of the previous agreement.
H.Payment for services under this section shall not be made unless pursuant to a fully
approved written contract.
1.A person who authorizes payment of any monies in violation of this section is liable for the
monies paid plus twenty percent of such amount and legal interest from the date of payment.
J.Notwithstanding any other provision of law,public agencies may enter into a contract or
agreement pursuant to this section with the superior court,justice courts and municipal courts
for related services and facilities of such courts for a term not to exceed ten years,with the
approval of such contract or agreement by the presiding judge of the superior court in the
county in which the court or courts that provide the facilities or services are located."
In addition to the requirements in A.R.S. 11-952,an IGA for SSP School Resource
Officers shall also contain the statements below:
I. The SRO/JPO shall fulfill their duties as a sworn law enforcement officer for the State
of Arizona.
2. No district/charter/or site administrator shall interfere with the duties of the SROIJPO
as a sworn law enforcement officer.
3. The district or charter and partnering law enforcement agency shall define a dispute
resolution process.
4. All entities shall accept the School Safety Program requirements contained in the SSP
Manual.
5. The roles and responsibilities of all entities shall be accepted as established by the
School Safety Program requirements contained in the School Safety Program Manual.
6. The district shall pay within 30 days of receipt of the invoice from the law
enforcement or juvenile probation department.
7. The district shall pay late fees as established between the district and law
enforcement/probation department and denoted in the IGA.Late fees shall not be paid
from School Safety Grant funds.
8. The District will provide the police officer with an office at the officer's assigned
school and resources to fulfill their duties
The Hiring Process
School Resource Officers are often assigned to awarded sites based on the availability of officers
within the partnering law enforcement agency.When there is a shortage of officers available,the Site
Administrator may not get any say in who the officer assigned to their school is.However,if there is a
surplus of available officers to assist schools,the following steps may help to determine the best fit for
the awarded site.
The selection process should identify officers who are best suited to the work as a school resource
officer or juvenile probation officer.That officer should be committed to the goals of the School
Safety Grant.
Because the School Safety Program is a partnership between the school and law
enforcement/probation department,involving the school administration in the selection process is
necessary.After the final candidates have been selected by the department/agency,a school
administrator becomes a part of the selection.It is important that the school becomes involved
because!
• The school administrator brings to the selection process the needs of the school.
• The school administrator brings to the selection process the type of personality that will work
best in a specific school environment.
• The school administrator brings to the selection process insights into what is required to be
effective in the school community.
• The correct applicant is more likely to be selected with the school's involvement.
• There is more of a buy-in from the school to successfully integrate the officer into the school
c:onimunity when they have been part of the selection process.
• The school administration brings to the selection process a critical understanding of the
School Safety Program.
In situations when only one officer is available for the position, the school still should have the
opportunity to review the candidate before the decision is made.
Candidates should meet the minimum qualifications recommended in this guidance to ensure an
effective collaboration between the school, officer, and agency. Exceptions may occur. Under
mitigating circumstances and with the ADE's grant manager's approval, the position may be filled
through an alternative option.
When School is not in Session:
The School Safety Grant is awarded for a typical 10-month school year.The site administrator,officer,
and police department have the option of extending services for 12 months to include when school is
not in session.This may include intersession and summer break.Applications should reflect a 10
month salary unless the II or 12 month salary is specifically referenced and supported on the
application.To maintain the integrity of the program,teachers and students are present on campus
during intersession or summer break.
Terms of an II or 12 month position shall be established on the application as well as the IGA.
Officer Activities when School is not in Session must address Priority Focus Areas and activities
during this time must be recorded in the Officer Activity Log.
Agency Supervisor Requirements
School Resource Officers are managed by an Agency Supervisor through their Law Enforcement
Agency.The agency supervisor's roles and responsibilities can be found in this manual here.
Officer Activity Log
To ensure consistent documentation and accountability,officers are required to use the SSP Officer
AsibI.cyI.,. to record all of their activities to exclude travel lime,lunch and breaks.Daily logs that
reflect less than 6 hours of logged activities will be flagged and may result in additional monitoring
and/or follow-up.This log serves as a tool to verify alignment with the SSP standards and SSPT's
Pnonty Focus Areas.SSP Program Proposal.
80%of the officers logged activities must be spent on activities that address the Priority Focus
Areas or Program Proposal of the school they're serving.This will be captured in the SSP Officer
Activity Log.Activities that are PFA related may also include necessary activities to continue serving
the schools.The 20%of non-PFA related activities should prioritize crisis intervention and other
severe needs for student and campus safety that may not perfectly align with the school's Priority
Focus Areas.The 20%is NOT a time allotment for prohibited activities such as school duty.If the
School Resource Officer's non-PFA related activities exceed 20%,it will be up to the discretion of the
School Safety Program whether or not corrective action is necessary following review.Examples
fitting within the 80%;
• Priority Focus Area aligned activities
• Training for the School Safety Program
• Qualifications for AZPost or required law enforcement agency training
The activity log is required to be shared with the agency supervisor and the site administrator.
The site administrator and agency supervisor are responsible for supporting,overseeing,and
reviewing the officer's activity log to ensure compliance with the requirements of the SSP Grant.
Data collected through the activity logs will be used for reporting purposes to the Arizona Department
of Education(ADE). Activity logs must be maintained in an organized and accessible format and
made available upon request by ADE,as well as submitted when required.Activity Log responses
must never contain Personally Identifiable Infonnation(Pll)of students to keep in accordance with
ft1J :•aws and guidance.
Office Space And Office Supplies
A clearly defined location must be established for the school resource officer to conduct confidential
school and law enforcement business as stated in their IGA.
Officer Continuity_
It is recommended that the officer,who is receiving proper supervision and favorable evaluations from
law enforcement supervisors and school administration,remain in their position without rotation from
their assignment to support established positive and trusting relationships.ADE recommends
maintaining consistent officer assignments.It is recommended that the school resource officer who
receives poor evaluations from law enforcement supervisors with input from school administration
should be removed from the position.
Officer Performance Assessment
The site administrator is required to complete an officer performance assessment twice a year(once
in the first semester before the progress report,and once in the second semester).The
assessment must be shared with the officer's supervisor.The evaluation is meant to assist the officer
and his/her supervisor in meeting the intent of the grant and effectively carrying out their duties.It is
not meant to supplant the official evaluation process used by the officer's department or agency.It is at
the discretion of the law enforcement agency or probation department to include the school's
evaluation in the officer's official folder.Only officers who have performed in a satisfactory manner
should be considered for further service in the School Safety Program
Section 2: SRO Requirements
Section 2 details requirements of SROs as part of the School Safety Program.SRO's are required to
perform activities that address their school's Priority Focus Areas,SSP Program Proposal through the
3 roles of an SSP SRO.
Role#1: Law Enforcement Professional
Law Enforcement Professional means SROs will act with the full author tty of a law enforcement
officer by utilizing their expertise of law enforcement and discretion to enforce law violations.
Please note:When involving an officer where a violation of the law has occurred,it will leave the decision
to cite or arrest wholly within the officer's discretion.
Within the role of Law Enforcement Professional,SROs may:
• Respond to emergency situations:The officer will utilize their training and expertise to
assist in an emergency situation.In the event of life threatening emergencies such as assaults
that have or will result in injury,threats,active shooter,etc,the officer should act immediately
and without hesitation.
• Act as a first responder: Emergencies may occur on school property that do not require a use
or threat of force.Situations such as flooding,building collapses,fires,or individual medical
emergencies may occur.Within these scenarios the officer will use their expertise to help
respond to and control coordinate the situation with school personnel.
First aid/CPR:The officer may need to render aid until more equipped responders
arrive on the scene.
Crowd Control:The officer may use their expertise to help control the flow or
placement of crowds.
ri Collaboration/coordination with other first responders:The officer may use their
knowledge of their school to help inform and direct other first responders that arrive
on the scene of an emergency.
• Investigate law violations: Investigations must be limited to suspected violations of the law
(e.g.assault,illegal drugs,bullying,weapons,etc.)and should be conducted as they would in
any other assignment.If possible and appropriate,using an alternative officer(e.g.someone
on patrol)when making an arrest on your campus is preferred.This will help maintain
relationships with staff and students and avoid the stigma that may come with being seen
arresting a student/staff member.
• Provide safety consultations:Reviewing safety concerns with school administrators and staff
to find possible solutions and develop plans.This may involve reviewing Emergency
Operations Plans,drafting policy and procedures,participation in drills and exercises,as well
as collaborating with local emergency response agencies.The officer is available in this role
to provide[heir expertise to the school however it is needed.
• Provide training/lessons:Provide training to school staff on how to properly and safely
conduct searches in addition to identifying and handling potentially dangerous substances and
weapons.
• Perform safety surveillance:
1 perimeter check
o scanning the environment for safety risks:
• Unidentified or suspicious items
• Addressing suspicious/unidentified persons on campus
• Monitoring parking lot for suspicious vehicles or people
• Monitoring cameras
o oversight of hardening measures
• Perimeter fences and gates are monitored and secured
• During school hours,checking for locked classroom doors
• Identifying and addressing staff members not following safety procedures
• Conduct Behavioral Threat Assessments:Be part of a multidisciplinary behavioral threat
assessment team to identify and mitigate concerning or threatening behaviors and evaluate the
need for interventions and services.
• Use de-escalation strategies:Using de-escalation strategies to prevent an individual from
escalating their actions to that of a crime.
• Implement CPTED:Crime Prevention Through Environmental Design(CPTED)uses six
core tenants to create an environment where crime is less likely to occur and more likely to be
responded to by the community and law enforcement.The six core tenants are natural
surveillance,activity support,maintenance,target hardening,territorial reinforcement,and
access control.
• Collaborate with local law enforcement:School Resource Officers may act as a contact
point between schools and local law enforcement.This allows for the officer to help
implement crime prevention strategies of the agency,coordinate plans between the school and
the agency,and foster a worker relationship between both organizations.
o Share information with local law enforcement:Provides information to the
appropriate investigative units of crimes or leads that come to the attention of the
officer.
Role#2: Law-Related Educator*
*Exceptions may occur in the Native American/Trihal jnri.sdictions.
Law-related educators means officers teach students the fundamental principles and skills needed to
become responsible citizens in a deniocracv.As law-related educators,SROs draw on their expertise
about the lair and their law enforcement experiences.
Law Related Education(LRE)is the teaching of rules,laws,and the legal system that actively
involves students to prepare them for responsible citizenship.U also provides instructions in legal
rights,responsibilities,and the role of the citizen and requires students to practice the application of
LRE in potential real-life situations.
(Adopted by the Arizona Center for Law-Related Education from the Virginia Institute for Law and
Citizenship Studies.)
LRE provided within the School Safety Program is developed and curated by the Arizona Foundation
for Legal Services and Education(AZFLSE).
Minimum Required LRE hours:30 hours per semester(60 annually)
Within the role of Law Related Educator,Officers provide LRE instruction in three ways:
Student Focused:
1. t rivcrsal IRE-Universal LRE typically includes 1-2 lessons per topic.These lessons are
targeted for specific classrooms or grade levels experiencing specific concerns identified in
your needs assessment.
2. Cohort LRE-Cohort LRE typically includes 4-6 lessons per topic.These lessons are targeted
for specific classrooms or grade levels experiencing specific concerns identified in your needs
assessment.
AdultFocused:
3. CTgnuituu y1Ceacher LRE:-These lessons are targeted towards providing information or
training to your school's parents/community and teachers.
When teaching LRE the classroom teacher MUST be present in the classroom with the officer.The
officer must never be in the classroom alone with students.
If an officer needs assistance with LRE curriculum or lesson planning,the officer can contact Diana
Strouth,Instruction Specialist(Arizona Foundation for Legal Services&Education),at 602-773-3431
or by email at Diana.Strouth( azflse.org
Role#3: Positive Role-Model
Positive Role Model means SROs are officers that build meaningful relationships with students and
the school community while demonstrating,teaching,and reinforcing positive behavior,
decision-making,and interpersonal.skills.In this role.the SRO,rerves as a consistent example of
self-regulation.empathy,and responsible conduct,using everyday interactions and structured
activities to influence student behavior in a positive direction.
"Positive Role Model"adapted from The Successful School Resource Officer Program by Anne J Atkinson.
PhD
Law enforcement officers can best serve as positive role models by:
• Mentoring students who may commit or have committed law violations to:
increase their knowledge of consequences of committing said law violation
■ Restorative practices are an alternative to traditional punitive discipline.
Teaching and utilizing regulation and de-escalation techniques,regulation
skills,and emotional awareness can help students to avoid future actions and
consequences that may be detrimental for them.SROs are not to be involved
in disciplinary practices,but they can be involved in restorative practices.
o Providing replacement behaviors/solutions andlor connecting students to resources
that would lead them towards positive outcomes rather than law violations
• e.g,self-regulation,social skills etc.
• Character Education:is the effort to teach and impart ethics to children
through modeling and instructional strategies.Programs such as Character
Counts focus on particular pillars of trustworthiness,respect,responsibility,
fairness,caring,and citizenship.Providing guidance and targeted interactions
with students can help to promote these core values within students.
• Reinforces school rules and good choices through school positive behavior rewards
systems,such as PSIS.
• Models self-regulation and social skills,this may include:
When responding to crisis situations and modeling for students and adults.
Teaching staff how to respond to crisis situations appropriately through de-escalation.
• Providing prevention programming for risk behaviors such as:
Substance abuse prevention
Violence prevention
Bullying prevention
Responding to peer pressure
etc.
• Show genuine interest in students and the school community by:
Building relationships
Showing compassion and empathy
Seek to understand and work with students/school community to solve problems
• Risk behavior/crime prevention resources:
SRO newsletteriwebpage: Provides the school community with strategies and
information on risk behaviors and crime prevention.
n Coffee Chat with the officer: Short lonI or group sessions with parents about risk
behavior and crime prevention.
• Referrals to community resources:The officer can use their connections to different
resources to refer students,staff,and families to appropriate services or connect with
appropriate individuals,This may include things like referrals to the court,community
resources,or DCS.
*Officer Srratrgres for Prrorr Focus Areas
Section 3: Prohibited use of School Resource Officers:
School Resources Officers on the School Safety Program are a supplemental role to the staff on the
campus.The duties and responsibilities of the officers funded by the School Safety Program grant
must relate to the safety and security of the students,staff,and campus as informed by the Priority
Focus Areas.Below are examples of prohibited activities for officers.
• Prohibited:Teaching LRE without the classroom teacher.School Resource Officers may
not be alone in the classroom with students.Being responsible for the class of students limits
the officer's ability to respond to scenarios that may arise at the school.Additionally,officers
do not have the same classroom management techniques or the ability to discipline students if
needed.
O Appropriate Action:The teacher is required to be in the classroom during LRE
instruction.
• Prohibited:Stationary assignments.School Resource Officers must not be assigned to stay
in one particular area(e.g.always at lunch,recess,or in one hallway).
Appropriate Action_If they do spend more time in one location over others,there
must be a reason for this outlined in the Priority Focus Areas(or Program Proposal if
PFAs have not been identified).
• Prohibited: Being a disciplinarian.School Resource Officers are not responsible for
disciplining students on their campus.The school will have their own discipline matrix that is
used by the staff and they should implement it if the need arises.
Appropriate Action:Disciplinary actions should be handled by school staff and
administrators.Officers may remind students of school rules and appropriate
behavior.Officers should inform school personnel of misbehavior_
• Prohibited:Assigned school duty.School Resource Officers may not have a regular duty
assignment such as Traffic,Lunch,or Detention duties.
Appropriate Action:Officers can provide appropriate interventions in these areas
that address Priority Focus Areas or the Program Proposal_
• Prohibited:Acting as a substitute.School Resource Officers may not be used in place of a
substitute teacher to cover a teacher's absence.
Appropriate Action:Officers are performing tasks associated with the school's
PFAs.
• Prohibited:Intimidation.The presence of a School Resource Officer must not be used as a
threat or intimidation tactic with students.This includes explicit statements about what actions
an SRO could take by an administrator to imply consequences or stakes from the presence of
an officer.The presence of a School Resource Officer may not be used to control a classroom
either.If a teacher is having difficulty managing their students,it is the administrator's or
teacher's responsibility to find a solution.
{a Appropriate Action:The officer may be present during situations that involve law
violations or address PFAs.
■ rme,i involving an officer where a violation of the law has occurred, it will leave the
decision to cite or arrest wholly within the officer s discretion.
• Prohibited:School Investigations.School Resource Officers should not investigate school
policy violations.
ti Appropriate Action:School Resource Officer investigations must be focused on
suspected violations of the law.If an action or activity would not cause the officer to
start a criminal investigation outside their placement at the school,they should not be
investigating within the school.
• Prohibited:Operating Outside of School Hours.School Resource Officers may not work
outside of the hours listed in their IGA.
o Appropriate Action:School Resource Officers may volunteer for coaching and
extracurricular activities,but compensation relating to those activities should be
outlined in their IGA and will not be covered by the SSP grant.
O Appropriate Action:School Resource Officers work within the hours listed in their
IGA at the school campus.
o Appropriate Action: School Resource Officers may work security for events that
occur outside of regular school hours if the two following criteria are met-
■ 1.The actions of the officer directly addresses the school's Priority Focus
Areas written in the Continuous Improvement plan.
■ 2.The school and the officer come to an agreement on what hours will be
flexed or who will pay the officer's overtime if there is no flexing The
School Safety Program does not cover overtime expenses.Overtime costs
should be covered in the IGA that the school signed.
• If the school chooses to flex the officers hours for this coverage,the
school will be uncovered by an officer during the agreed time if
anything were to happen,unless they pay for coverage elsewhere.
• Prohibited:Working at other schools.School Resource Officers must not be used to
provide services to other school sites unless the conditions below are met.
• Appropriate Action.The School Resource Officer must only serve the school(s)listed in
the grant proposal
• Appropriate Action:The School Resource Officer may provide services outside the
assigned school(s)for the following exception:
„ Exception: In the event of an emergency at another location in the district or
surrounding area,the School Resource Officer may provide services and assistance
to that location.Please note:this exception will still count as a non-PFA related
activity.
Section 4: Tiered Supports and Instruction
Role#1: Law Enforcement Professional Role # : Law-Related Educator Role#3: Positive Role Model
Active Shooter Incident Training Restorative Practices
School Community Training - Following the spirit of creating a positive
Must be certified mstructor school climate.
Student/staff training(officer is not
Referrals implementing as a consequence)
Juvenile Court
Home visit
Welfare check
Truancy(Not m truancy officer capacity)
DCS requests officer presence
- Unable to successfully contact parents through
M .- other means of communication
Crisis Intervention
De-escalation
E..� First ResponderLaw Enforcement Officer
Active Shooter
Unauthorized person on campus
Dangerous situation in surrounding community
(shelter-in-place)
•.—i - First aidICPR
- Collaboration with local law enforcement
Investigations
Referred by Administration after they have
investigated a school policy violation and
determined a violation of the law occurred
Violations of the law
Reported weapon on campus
Reported credible threat to school
Mandatory resorted incidents
Prevention TrainingslLessons(Not LRE) Cohort Law Related Education Targeted Role Model Skills
Substance abuse prevention training - Targeted at specific grade levels or groups - College&Career Readiness/life skills
Violence prevention of students - Student engagement in civics through
O Gang violence - Based on needs assessment data volunteer opportunities
Dating violence - Collaborating with student leadership
Domestic violence {olnmURity glp ' acher L>!.wt groups to have student leaders lead
Bullying prevention Education school connectedness initiatives(e.g.,
Check-in/Check-out {CIC } - Targeted at teachers and parents to student recognition/positive initiatives)
h�ractcr r ] tjv,t increase awareness on specific topics
- Based on needs assessment data Targeted Relationship Building
Student relationship activities
Universal LRE lessons: - Lunch Bunch,volunteering at events,
- Why LRE? cc.
Role of an SRO - Community relationship activities
Donuts for dads,coffee chats,etc.
Coordinating Relational Mapping
Informal Counselor/Mentor
cheek-in/Check-out (CICO)
Daily_Risk Vic_Vulnerability Assessments Universal Role Model Skills
Presence known by school community - Caring for the school community
Checks for risks/vuln. activities
- Several times throughout the day - Neighborhood/school cleanup
O - After student arrival - Greeting School Community
- Lunch periods+Aftemoon - Daily Relationships Building
- Before student release - Positive Reinforcement
- After student release - P,
- Opportunities for families to connect
._ Safety Consultations with the officer
o School Policies - Open door policy
School`district Handbooks - Share school phone number
I;mer eP ney{potations Planning fEOP} - Officer website/newsletter
Drills(Fire,lock down,bus,etc.) - Etc.
Collaboration with local law enforcement
CPTEDIIII ] Character Education
- Character Education; C'h aract cr Count s!
Agency Required Trainings&AZPost Qualifications
L;ltits&P:otess.iuttaligm;Crime Pvention;Community Policing;CulturalAwarcuess;Victi '. .Trauma;Bchaeiara[J tca]ih Crisis
Respvasc;[ttteq ersonal ComiuLLCicalion; First Aid(Initial Assessment,Shuck,Bleeding/Related lniuries, ' ); Search ;
• Investigation of Specific Crimes;Liquor Control;NFucutiis and Dan us gera Druts;Assault;S xidjt' Qlf iisCS;Irc.spa5s;Criminal Damage;
• Theft; judicial lttl _idl 1 d. f CnB :Fnhiic Order(?f₹enses:3Jjsol Co iKc the Educational]nstitution;
Weapon&Explosives;Drug Offenses;Obaecnity;Sexual Exploitation of Children;Fs�mi1y Olfenses;Report Writine;Juvenile Law an
Froccdures;Cik-i]l.iabiliiv Issues;Bias-Motivated Crimes;Organ] Crinie Activity; Firearms Oualificaiions,McdicaL'Phvsi;al
SSPT Meeting Grant Requirements
Trained
Using data to drive decisions
Maintains an SSP Officer Activity Log
Creates and implements an operational plan
Apache email High School has
secured a grant ($161,669.31)
through June 30, 2027 from the
L - Arizona Department of Education
to extended the current School
PnLiCE ij
e -.
i1 Resource Officer
T' i' I\
4O
A (Q14
.
I I I / I , I
•
- _ _ . • . ' • 1 1
• A •H ELEMENTARV5CHOOLK8 • • 00 1
MIELCOME OFFICER HATCH
OUR NEW SRO
S
••- , �/ / ter -
• - •� .--r;'-'r:��ice.� _ _
L. -~• •
-�- . : - rF �.
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
85119
Agenda Item No. 5.
'�'PizoN�' File ID: 26-416
Sponsor: Michael Pooley Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of approval of professional services agreement between the City of Apache
Junction and Apache Trail High School, for a grant-funded school resource officer in the
amount of$ 161,669.31 for a contract term of July 1, 2026, through June 30, 2027.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
Apache Junction Police Department
Memorandum
Date: August 5, 2026
To: Mayor Chip Wilson and the City Council
From: Chief Michael Pooley
Subject: School Resource Officer- Apache Trail High School
The City of Apache Junction Police Department is requesting approval for
assignment of a School Resource Officer to serve at the above-noted school.
The Arizona Department of Education has approved funding of an officer at
the cost up to $161,669.31, to include officer salary and benefits.
This salary is funded annually and it is requested by the city to continue the
commitment to enhance child safety.
PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF APACHE
JUNCTION AND Leona Group -Apache Trail High School
THIS AGREEMENT is made as of the . day of - 2026 (the
"Effective Date") by and between the CITY OF APACHE JUNCTION, an Arizona
municipal corporation ("City"), and Leona Group - Apache Trail High School, an
Arizona domestic non-profit corporation ("School"), both of which may be
hereinafter referred to collectively as the "Parties" or individually as a "Party",
for the project entitled "School Resource Officer Services".
RECITALS
A. School desires City to assign a police officer its School as a School
Resource Officer ("SRO") for services noted in § 5 of this Agreement, and City is
willing to assign an SRO to School for such purposes under the terms and
conditions of this Agreement.
B. The Parties are authorized by A.R.S. §§ 15-342(13) and 11-952 to enter
into this agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals and the
mutual promises and covenants set forth herein, and for other consideration,
the receipt and adequacy of which is hereby acknowledged, the Parties agree
as follows:
1. ELIGIBLE SCHOOL LOCATIONS. The following school is within the
City of Apache Junction:
Apache Trail High School, 945 West Apache Trail, Apache Junction,
AZ 85120.
2. TERM AND TERMINATION. The term of this Agreement starts on
July 1 , 2026 and ends on .Jtine 30, 2027 unless renewed by both Parties and
funding is available. This Agreement shall commence on the Effective Date
however, either Party may terminate this Agreement for any reason upon thirty
(30) calendar days' written notice to the other Party by first class certified U.S.
mail, postage prepaid, addressed to the other Party as set forth in § 11 of this
Agreement.
3. RELATIONSHIP OF PARTIES. City shall have the status of an
independent contractor for purposes of this Agreement and this Agreement is
not intended to, and will not constitute, create, give rise to, or otherwise
recognize a joint venture, partnership, or formal business association or
organization of any kind between the Parties, and the rights and obligations of
the Parties shall only be those expressly set forth in this Agreement.
The assigned SRO shall be an employee of City and shall be subject to its control
and supervision. The assigned SRO will be subject to current procedures in
effect for City police officers, including attendance at all mandated training and
testing to maintain state peace officer certification. The assigned SRO shall
fulfill duties as a law enforcement officer as certified by the Arizona Police
Officers Standards and Training board ("AZ POST"). School shall not interfere
with the assigned SRO duties as a sworn law enforcement officer.
City understands that School is responsible for the safety of students on campus
during curriculum hours. If School receives information that the assigned SRO
may have engaged in unprofessional, illegal, or immoral conduct, School will
immediately provide such information to City, If City receives information from
any credible source indicating that the assigned SRO may have engaged in
unprofessional, illegal, or immoral conduct that would affect the officer's ability
to safely and/or professionally perform duties for School, City will immediately
provide such information, as allowed by law, to School.
if any alleged unprofessional, illegal, or immoral conduct might affect the SRO's
ability to safely and/or professionally perform duties for School, City will
immediately remove the SRO from School to allow City and/or School to
investigate the allegations. City agrees to temporarily assign a replacement to
School in this situation and if a replacement officer cannot be provided, School
will be credited for each day an officer is not assigned to the campus. School, at
its sole discretion, may refuse the assignment of any officer who has previously
been removed from School because of allegations of unprofessional, illegal, or
immoral conduct.
School shall reimburse City for the costs of SRO's compensation for: 1) days
School is in session and the SRO is present at School; 2) During the summer
when School is not in session but summer planning days, preparing lesson
plans, safety program 3) when the SRO is not at School due to an off-campus
activity at Schools' request; 4) when SRO is involved in activity stemming from
action taken by the officer while in service of School, including attendance at
court; and 5) when the SRO is working an alternative work schedule as agreed
upon by City and School. City is responsible for the costs of SRO's
compensation for all other hours of work performed by SRO.
4. COMPENSATION:
A. Cost of Wages for Anticipated Scheduled Hours. School
agrees to pay City up to One Hundred Sixty One Thousand Six Hundred
Sixty Nine Dollars and Thirty One Cents. ($161,669.31) for SRO services
rendered during the Fiscal Year 2026-2027 in consideration for the SRO
services provided by City as set forth in § 5 below.
2
B. Overtime. The SRO must seek approval from the School's
principal, or the principal's designee, and the appropriate City police
department supervisor before working on SRO-related overtime (i.e.,
those matters pertaining to School, its students, or its employees). School
shall pay one hundred percent (100%) of any SRO overtime worked as the
result of SRO-related functions. City shall pay one hundred percent (100%)
of any SRO overtime that results from City-related activities (i.e., those
matters that do not involve School, its students, or its employees).
C. Payment and Late Fees. Payment to City from School is due
within thirty (30) calendar days of School's receipt of a monthly itemized
invoice. School agrees to pay interest ("late fees") in the amount of ten
percent (10%) per annum on any balance that remains unpaid more than
fifteen (15) calendar days after the due date. City may, at its discretion,
waive late fees on a case-by-case basis.
D. Budget. Each Party will establish and maintain a budget
according to its established rules and regulations.
5. SRO'S RESPONSIBILITIES AND GOALS.
A. The SRO shall have the following responsibilities:
i. Provide appropriate police and enforcement services at
School.
ii. Participate with School security team to conduct safety
assessments and recommend improvements and enhance
student safety.
iii. Prepare and deliver law-related education lessons upon
School request and approval.
iv. Develop collaborations with community resources, identifying
services offered that could benefit students.
v. Plan in-service training for School staff on topics including,
but not limited to; student safety, substance abuse, gang
related information, law related education, etc..
vi. Collaborate with School administration to analyze criminal
incident reports and disciplinary records as a means of
identifying patterns and developing strategies to address
problems.
vii. Work with community-based and youth recreational and
3
leadership development activities that complement and
reinforce School safety priorities.
viii. Attend training opportunities.
ix. Complete required training and reports as dictated by the
School's Safety Grant.
x. Contact the parent or guardian of students who have not
provided School with proof of identification In accordance
with A.R.S. § 15-828.
xi. Prepare and maintain such records of SRO and activities as
are required by the operational needs of the Apache Junction
Police Department.
B. An SRO shall use good faith efforts to achieve the following
goals:
i. Work cooperatively with School administrators to establish an
effective administrative review of truancy and repetitive
incidents with the objective of reducing truancy.
ii. Refer juveniles or their parents/guardians to appropriate
social service agencies for assistance when a need is
determined.
iii. Instruct administrators and faculty members in: (a) the
identification of abused or neglected children; (b) the
reporting of abuse or neglect; and (c) the actions that can be
taken to prevent further abuse or neglect.
iv. Take appropriate steps, including enforcement and reporting
action, consistent with a police officer's duty, upon the
discovery of child abuse, drug use, or any other crime.
v. Work cooperatively with School administration and staff to
provide a safe learning environment for all staff and students.
6. TIME AND PLACE OF PERFORMANCE.
A. City shall assign one police officer to School beginning on
/ , 2026. City will ensure that the assigned SRO will provide the
services under this Agreement in a full-time, forty (40) hour a week
capacity when school is in session and as the administration requests
during out-of-session breaks. The assigned officer will wear uniforms as
4
authorized by City.
B. The SRO's activities will be restricted to the assigned school
grounds except for:
i. Follow-up home visits when needed as a result of School-
related matters.
ii. Incentive programs approved in writing (for example, by e-
mail) between the police department supervisor and the
School principal, or the principal's designee.
iii. In response to off campus, but School-related, criminal
activity.
iv. Attendance at off-campus events or meetings at School's
request.
v. Attendance at training.
vi. In response to emergency police activities.
vii. As directed by any police department supervisor.
viii. During days that Schools is not in session or on days that SRO
is not assigned to out-of-session breaks, the assigned SRO
shall perform his or her regular duties as determined by City.
7. SCHOOL RESPONSIBILITIES.
A. School will provide the SRO with an office at School sites and
such equipment and office supplies as is necessary for performance of
the duties noted in this Agreement, including a desk, chair, telephone,
computer and e-mail linkages, and filing space capable of being secured.
B. Upon termination, all property or equipment used by the
Parties in the performance of their responsibilities under this Agreement
shall remain the property of the Party that purchased the property or
equipment.
8. STATUS MEETINGS. By mutual agreement, the Parties may meet
from time to time for purposes of discussing the status and conduct of the work
being performed under this Agreement and addressing any problems that have
come to the Parties' attention and their views as to how such problems may be
resolved, including amending the terms and conditions of this Agreement.
5
9. ENTIRE AGREEMENT. This Agreement and any attachments
represent the entire agreement between the Parties and supersede all prior
negotiations, representations or agreements, either express or implied, written
or oral. It is mutually understood and agreed that no alteration or variation of the
terms and conditions of this Agreement shall be valid unless made in writing and
signed by the Parties hereto. Written and signed amendments shall
automatically become part of the supporting documents, and shall supersede
any inconsistent provision therein; provided, however, that any apparent
inconsistency shall be resolved, if possible, by construing the provisions as
mutually complementary and supplementary. All amendments to this Agreement
must be in writing and approved by the City Council and School Governing
Board.
10. NONDISCRIMINATION. Both Parties shall comply with all applicable
state and federal employment laws, rules, regulations and executive orders that
all persons shall have equal access to employment and educational
opportunities regardless of race, color, religion, sex, age, national origin,
disability, veteran's status, political affiliation, and/or genetic code and shall
comply with Executive Order 2009-09.
11. NOTICES: All notices to the a Party required under this Agreement
shall be in writing and sent by first class certified mail, postage prepaid, return
receipt requested, addressed to the following:
If to City: Apache Junction Police Department
Attn: Chief of Police
300 East Superstition Boulevard
Apache Junction, AZ 85119
If to School: Leona Group Schools
Apache Trail High School
945 West Apache Trail
Apache Junction, AZ 85120
12. INSURANCE: School, at its own expense, shall purchase and
maintain the herein stipulated minimum insurance with companies duly licensed,
possessing a current A.M. Best, Inc. Rating of B++6, or approved unlicensed in
the State of Arizona with policies and forms satisfactory to City.
All insurance required herein shall be maintained in full force and effect until all
work or service required to be performed under the terms of the Agreement is
satisfactorily completed and formally accepted; failure to do so may, at the sole
discretion of City, constitute a material breach of this Agreement.
School's insurance shall be primary insurance as respects the City, and any
insurance or self-insurance maintained by City shall not contribute to it.
6
Any failure to comply with the claim reporting provisions of the insurance
policies or any breach of an insurance policy warranty shall not affect coverage
afforded under the insurance policies to protect City.
The insurance policies, except Workers' Compensation, shall contain a waiver
of transfer rights of recovery (subrogation) against City, its agents, officers,
officials and employees for any claims arising out of School's acts, errors,
mistakes, omissions, work or service.
Insurance policies may provide coverage which contains deductibles or self-
insured retentions. Such deductible and/or self-insured retentions shall not be
applicable with respect to the coverage provided to City under such policies.
School shall be solely responsible for the deductible and/or self-retention and
City, at its option, may require School to secure payment of such deductibles or
self-insured retentions by a surety bond or an irrevocable and unconditional
letter of credit.
City reserves the right to request and to receive, within ten (10) working days,
certified copies of any or all of the herein required insurance policies and/or
endorsements. City shall not be obligated, however, to review same or to advise
School of any deficiencies in such policies and endorsements, and such receipt
shall not relieve School from, or be deemed a waiver of, City's right to insist on
strict fulfillment of School's obligations under this Agreement.
The insurance policies, except Workers' Compensation and Professional
Liability, required by this Agreement, shall name City, its agents, officers,
officials and employees as Additional Insureds.
REQUIRED COVERAGE
Commercial General Liability
School shall maintain Commercial General Liability insurance with a limit of not
less than $1,000,000 for each occurrence with a $2,000,000
Products/Completed Operations Aggregate and a $2,000,000 General
Aggregate limit. The policy shall include coverage for bodily injury, broad form
property damage, personal injury, products and completed operations and
blanket contractual coverage including, but not limited to, the liability assumed
under the indemnification provisions of this Agreement, which coverage will be
at least as broad as that on Insurance Service Office, Inc. Policy Form No. CG
00011093, or the equivalent thereof.
Such policy shall contain a severability of interest provision, and shall not
contain a sunset provision or commutation clause, nor any provision which
would serve to limit third party action over claims.
7
The Commercial General Liability additional insured endorsement shall be at
least as broad as the Insurance Service Office, Inc.'s Additional Insured, Form
B, CG 20101185, or the equivalent thereof, and shall include coverage for
School's operations and products and completed operations.
Workers' Compensation
School shall carry Workers' Compensation insurance to cover obligations
imposed by federal and state statutes having jurisdiction of School's employees
engaged in the performance of the work or services and Employer's Liability
insurance of not less than $100,000 for each accident, $100,000 disease for
each employee, and $500,000 disease policy limit.
By execution of this Agreement, School certifies as follows:
"I am aware and understand the provisions of A.R.S. § 23-901 etseq.
which requires every employer to be insured against liability for
workers' compensation or to undertake self-insurance in
accordance with the provisions of this chapter, and I will comply with
such provisions before commencing the performance of the work of
this Agreement."
If School has no employees for whom workers' compensation insurance Is
required, School shall submit a declaration or affidavit to City so stating and
covenanting to obtain such insurance if and when School employs any
employees subject to coverage.
In case any work described herein is subcontracted, School will require
subcontractors to provide Workers' Compensation and Employer's Liability
insurance to at least the same extent as required of School.
Certificates of Insurance
Prior to commencing work or services under this Agreement, School shall
furnish City with Certificates of Insurance, or formal endorsements as required
by the Agreement, issued by School's insurer(s), as evidence that policies
providing the required coverages, conditions and limits required by this
Agreement are in full force and effect. The form of the certificates of insurance
and endorsements shall be subject to the approval of the Apache Junction City
Attorney's Office, shall comply with the terms of this Agreement, and shall be
issued and delivered to City Attorney, City of Apache Junction, 300 East
Superstition Boulevard, Apache Junction, AZ 85119.
In the event any insurance policies required by this Agreement are written on a
"claims made" basis, coverage shall extend for two (2) years past completion
8
and acceptance of School's work or services and as evidenced by annual
Certificates of Insurance.
If a policy does expire during the life of the Agreement, a renewal certificate
must be sent to City thirty (30) calendar days prior to the expiration date.
All Certificates of Insurance shall be identified with bid serial number and title.
Policies or certificates and completed forms of City's Additional Insured
Endorsement (or a substantially equivalent insurance company form acceptable
to the City Attorney) evidencing the coverage required by this section shall be
filed with the City and shall include the City as an additional insured. The policy
or policies shall be in the usual form of a public liability insurance, but shall also
include the following provision:
"Solely as respects work done by or on behalf of the named insured
for the City of Apache Junction, it is agreed that the City of Apache
Junction and its officers and employees are added as additional
insureds under this policy."
Insurance required herein shall not expire, be canceled, or materially changed
without thirty (30) calendar days' prior written notice to City.
13. APPLICABLE LAW AND VENUE: The terms and conditions of this
Agreement shall be governed by and interpreted in accordance with the laws of
the State of Arizona. Any action at law or in equity brought by either party for
the purpose of enforcing a right or rights provided for in this Agreement, shall
be tried in a court of competent jurisdiction in Pinal County, State of Arizona.
The Parties hereby waive all provisions of law providing for a change of venue in
such proceeding to any other county. In the event either Party shall bring suit to
enforce any term of this Agreement or to recover any damages for and on
account of the breach of any term or condition in this Agreement, it is mutually
agreed that the prevailing party in such action shall recover all costs including:
all litigation and appeal expenses, collection expenses, reasonable attorney
fees, necessary witness fees and court costs to be determined by the court in
such action.
14. FORCE MAJEURE: Neither City nor School, as the case may be,
shall be considered not to have performed its obligations under this Agreement
in the event of enforced delay (an "Enforced Delay") due to causes beyond its
control and without its fault or negligence or failure to comply with applicable
laws, including, but not restricted to, acts of God, fires, floods, epidemics,
pandemics, quarantine, restrictions, embargoes, labor disputes, and unusually
severe weather or the delays of subcontractors or materialmen due to such
causes, acts of a public enemy, war, terrorism or act of terror (including but not
limited to bio-terrorism or eco-terrorism), nuclear radiation, blockade,
insurrection, riot, labor strike or interruption, extortion, sabotage, or similar
9
occurrence or any exercise of the power of eminent domain of any governmental
body on behalf of any public entity, or a declaration of moratorium or similar
hiatus (whether permanent or temporary) by any public entity directly affecting
the obligations under this Agreement. In no event will Enforced Delay include
any delay resulting from unavailability for any reason of labor shortages, or the
unavailability for any reason of particular Schools, subcontractors, vendors or
investors desired by School in connection with the obligations under this
Agreement. School agrees that School alone will bear all risks of delay which
are not Enforced Delay. In the event of the occurrence of any such Enforced
Delay, the time or times for performance of the obligations of the Party claiming
delay shall be extended for a period of the Enforced Delay; provided, however,
that the Party seeking the benefit of the provisions of this Section shall, within
thirty (30) calendar days after such Party knows or should know of any such
Enforced Delay, first notify the other Party of the specific delay in writing and
claim the right to an extension for the period of the Enforced Delay; and
provided further that in no event shall a period of Enforced Delay exceed ninety
(90) calendar days.
15. RECORDS: Records of School's labor, payroll, and other cots
pertaining to this Agreement shall be kept on a generally recognized accounting
basis and made available to City for inspection on request. School shall maintain
records for a period of at least two (2) years after termination of this Agreement,
and shall make such records available during that retention period for
examination or audit by City personnel during regular business hours.
16. INDEPENDENT CONTRACTOR: City and School agree and
understand that the relationship between both Parties is that of an independent
contractor.
17. WAIVER OF TERMS AND CONDITIONS: The failure of City or School
to insist in any one or more instances on performance of any of the terms or
conditions of this Agreement or to exercise any right or privilege contained
herein shall not be considered as thereafter waiving such terms, conditions,
rights or privileges, and they shall remain in full force and effect.
18. COMPLIANCE WITH FEDERAL AND STATE LAWS: School
understands and acknowledges the applicability of the American with
Disabilities Act, the Immigration Reform and Control Act of 1986 and the Drug
Free Workplace Act of 1989 to the services performed under this Agreement.
As required by A.R.S. § 41-4401, School hereby warrants its compliance with all
federal immigration laws and regulations that relate to its employees and A.R.S.
§ 23-214(A). School further warrants that after hiring an employee, School will
verify the employment eligibility of the employee through the E-Verify program. If
School uses any subcontractors in performance of services, subcontractors
shall warrant their compliance with all federal immigration laws and regulations
10
that relate to its employees and A.R.S. § 23-214(A), and subcontractors shall
further warrant that after hiring an employee, such subcontractor verifies the
employment eligibility of the employee through the E-Verify program. A breach
of this warranty shall be deemed a material breach of the Agreement that is
subject to penalties up to and including termination of this Agreement. School is
subject to a penalty of $100 per day for the first violation, $500 per day for the
second violation, and $1,000 per day for the third violation. City at its option
may terminate this Agreement after the third violation. School shall not be
deemed in material breach of this Agreement If the School and/or
subcontractors establish compliance with the employment verification
provisions of Sections 274A and 274B of the federal Immigration and Nationality
Act and the E-Verify requirements contained in A.R.S. § 23-214(A). City retains
the legal right to inspect the papers of any School or subcontractor employee
who works under this Agreement to ensure that the School or subcontractor is
complying with the warranty. Any inspection will be conducted after reasonable
notice and at reasonable times. If state law is amended, the Parties may modify
this paragraph consistent with state law.
19. SEVERABILITY: City and School each believe that the execution,
delivery and performance of this Agreement are in compliance with all
applicable laws. However, in the unlikely event that any provision of this
Agreement is declared void or unenforceable (or is construed as requiring City
to do any act in violation of any applicable laws, including any constitutional
provision, law, regulation, or city code), such provision shall be deemed severed
from this Agreement and this Agreement shall otherwise remain in full force and
effect; provided that this Agreement shall retroactively be deemed reformed to
the extent reasonably possible in such a manner so that the reformed agreement
(and any related agreements effective as of the same date) provide essentially
the same rights and benefits (economic and otherwise) to the Parties as if such
severance and reformation were not required. Unless prohibited by applicable
laws, the Parties further shall perform all acts and execute, acknowledge and/or
deliver all amendments, instruments and consents necessary to accomplish and
to give effect to the purposes of this Agreement, as reformed.
20. SUCCESSORS, ASSIGNMENT & DELEGATION: City and School
each bind themselves, their partners, successors, assigns and legal
representatives to the other Party hereto and to the partners, successors,
assigns and legal representatives of such other Party in respect to all
covenants, agreements and obligations contained in this Agreement. Neither
Party to the Agreement shall assign the Agreement or sublet it as a whole or
delegate the duties hereunder, without the written consent of the other, nor
shall School assign any monies due or to become due to it without the previous
written consent of City.
21. PROHIBITION TO CONTRACT WITH CONSULTANTS WHO ENGAGE
IN BOYCOTT OF THE STATE OF ISRAEL: The Parties acknowledge A.R.S. §§ 35-
11
393 through 35-393.03, as amended, which forbids public entities from
contracting with Schools who engage in boycotts of the State of Israel. Should
School under this Agreement engage in any such boycott against the State of
Israel, this Agreement shall be deemed automatically terminated by operation of
law. Any such boycott is a material breach of contract.
22. CERTIFICATION PURSUANT TO A.R.S. § 35-394. In accordance
with Arizona Revised Statutes § 35-394, School hereby certifies and agrees that
School does not currently and shall not for the duration of this Agreement use:
1) the forced labor of ethnic Uyghurs in the People's Republic of China, 2) any
services or goods produced by the forced labor of ethnic Uyghurs in the
People's Republic of China, and/or 3) any suppliers, contractors or
subcontractors that use the forced labor or any services or goods produced by
the forced labor of ethnic Uyghurs in the People's Republic of China. If School
becomes aware during the term of this Agreement that School is not in
compliance with this Section, then School shall notify the City within five (5)
business days after becoming aware of such noncompliance. If School does not
provide the City with written certification that School has remedied such
noncompliance within one hundred eighty (180) days after notifying the City of
such noncompliance, this Agreement shall terminate, except that if the
Agreement termination date occurs before the end of such one hundred eighty
(180) day remedy period, this Agreement shall terminate on such contract
termination date.
23. CONFLICTS OF INTEREST: This Agreement is subject to, and may
be terminated by City in accordance with, the provisions of A.R.S. § 38-511.
12
IN WITNESS WHEREOF, School and City have executed this Agreement as
of the date first set forth above.
SCHOOL:
Leona Grou -Apache Trail High School
By:
Its: PRINetPAL
CITY:
CITY OF APACHE JUNCTION, ARIZONA,
an Arizona municipal corporation
By: Walter "Chip" Wilson
Its: Mayor _ _ATTEST:
Evie McKinney
City Clerk
APPROVED AS TO FORM:
- - c ,2
R. Joel Stern
City Attorney
1
STATE OF • zo'ic )
) ss.
COUNTY OF A C?+iGaj )
The foregoing was subscribed and sworn to before me this /' day of
., 20 , by 3 �A c� as -_ .{,rte r _ _ of Leona
Group-Apache Trail High School, an Arizona domestic non-profit corporation.
il
Notary PLib1IC
My Commission Expires: I___ _ _
i Eddie Wheeler
Notary Public
Maricopa County,Arizona
6( r My Comm. Expires 08-19-28
Commission No.676156
STATE OF ARIZONA )
) ss.
COUNTY OF PINAL )
The foregoing was subscribed and sworn to before me this day of
, 20 , by Walter "Chip" Wilson, as Mayor of the City of
Apache Junction, Arizona, an Arizona municipal corporation.
Notary Public
My Commission Expires:
Apache email High School has
secured a grant ($161,669.31)
through June 30, 2027 from the
L - Arizona Department of Education
to extended the current School
PnLiCE ij
e -.
i1 Resource Officer
T' i' I\
4O
A (Q14
.
I I I / I , I
•
- _ _ . • . ' • 1 1
• A •H ELEMENTARV5CHOOLK8 • • 00 1
MIELCOME OFFICER HATCH
OUR NEW SRO
S
••- , �/ / ter -
• - •� .--r;'-'r:��ice.� _ _
L. -~• •
-�- . : - rF �.
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
� ;z Agenda Item Cover Sheet Apache Junction,AZ
85119
Agenda Item No.6.
'�'PizoN►' File ID: 26-429
Sponsor: Shane Kiesow Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of award of contract to M.R. Tanner Construction for the asphalt concrete
overlay on Ironwood Drive between Elliot Avenue and Guadalupe Avenue. The work would be
through the City of Buckeye cooperative Job Order Contract No. 2025081 in the amount of
$543,991.00 plus a 10% contingency for unforeseen change orders in the amount of
$54,399.00 for a total project cost not to exceed $598,390.10. Work is planned within
September- October 2026.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
PQpCHE�
ti Public Works Department
Home of the Superstition Mountains
gHIZON
Date: August 18, 2026
To: Mayor and Members of the City Council
Through: Bryant Powell, City Manager
Mike Loggins, Public Works Director
From: Shane Kiesow, Public Works Deputy Director
Subject: Project# HFS26-13 Award
City staff respectfully requests city council consideration of award of contract to M.R. Tanner
Construction for project no. HFS26-13 for the asphalt concrete overlay of Ironwood Dr. from
Elliot Ave. to Guadalupe Ave. for a not to exceed amount of$598,390.10 including 10%
contingency for unforeseens. Project is budgeted for this fiscal year through the Pinal County
half-cent road excise tax monies dedicated for the purpose of street maintenance.
This work was discussed with council at the June 15, 2026 City Council regular session under
Public Works' "Fiscal Year 2027 CIP & Street Maintenance Plan." The work involves the
rehabilitation of the north-bound lanes through a mill and asphalt concrete overlay of Ironwood
Dr. from Elliot Ave. to Guadelupe Ave. The work will last for about four days within the
September-October 2026 timeframe. Work would occur during the daytime hours characterized
by a single roadway lane closure. This work will not result in any full street closure.
575 E. Baseline Avenue, Apache Junction, AZ 85219
• Voice (480) 982-1055 • FAX (480) 983-5752 or (480) 982-8005
STREET MAINTENANCE AGREEMENT
BETWEEN CITY OF APACHE JUNCTION
AND M.R. TANNER CONSTRUCTION
PROJECT NO.: HFS26-13
"Ironwood Drive Overlay"
THIS AGREEMENT is made as of the day of 2026 (the
"Effective Date")by and between the CITY OF APACHE JUNCTION, an Arizona
municipal corporation ("City"), and M.R. TANNER CONSTRUCTION, an Arizona
corporation ("Contractor"), sometimes collectively referred to as the "Parties",
or individually as a "Party".
RECITALS
A. Contractor asserts its willingness, ability and qualifications to
provide the completed products, goods and services (the "Work") called for in
City of Buckeye Cooperative Job Order Contract No. 2025081, Contractor's
Estimate dated May 13, 2026 (the "Contract Documents"), or as more fully
described in Exhibit A.
B. For purposes of this Agreement, the "Contract" shall include the
general requirements of both this Agreement and the Contract Documents.
C. City and Contractor desire to set forth their respective
responsibilities and the manner and terms upon which Contractor shall
complete the Work.
D. City has complied with the public bidding requirements under
Arizona Revised Statutes ("A.R.S.")Title 34, and Apache Junction City Code,
Vol. I, Chapter 3: Administration, Article 3-7: Procurement Procedures, or such
work is categorically exempt from such process.
AGREEMENT
NOW, THEREFORE, in consideration of the Recitals noted above, the
mutual covenants and conditions below, and other good and valuable
consideration, the receipt and sufficiency of which are hereby acknowledged,
the Parties agree as follows:
1. PROJECT DESCRIPTION: Contractor shall do and perform or cause
to be done and performed in a good workmanlike manner, the Work set forth in
accordance with and as more fully described in the Contract Documents.
2. COMPENSATION AND PAYMENTS: The total amount payable by the
City to the Contractor is an amount not to exceed Five Hundred Forty Three
Thousand Nine Hundred One Dollars ($543,991) (the "Contract Sum") for the
performance of the Work under the Contract Documents, except for changes
authorized by properly executed change orders. All contracts will be operable
for their full term at the rates quoted in the initial bid proposal. Upon notice that
the Work is ready for final inspection or acceptance, a City representative shall
promptly cause an inspection to be made. Payment to Contractor on the basis
of a certified and approved estimate of the Work performed during the
preceding calendar month under Contact Documents may include payment for
material and equipment, but to ensure the proper performance of such
Contract, City shall retain ten percent of the amount of each estimate until final
completion and acceptance of all material, equipment and Work covered by the
Contract Documents. An estimate of the Work submitted shall be deemed
approved and certified for payment seven (7) calendar days after the date of
submission unless before that time the City prepares and issues a specific
written finding setting forth those items in detail in the estimate of the Work that
are not approved for payment under Contract Documents. City may withhold an
amount from the payment sufficient to pay the expenses City reasonably expects
to incur in correcting the deficiency set forth in the written finding. Payments
shall be paid on or before fourteen (14) calendar days after the estimate of the
Work is certified and approved. The estimate of the Work shall be deemed
received by City on submission to any person designated by City for the
submission, review or approval of the estimate of the Work. Final payment shall
not become due until the Contractor submits to the City all required lien waivers,
releases and any other data establishing payment or satisfaction of all
Contractor's obligations. If any subcontractor refuses to furnish a release or
waiver required by City, Contractor may furnish a bond to indemnify City against
any such lien. If any such lien remains unsatisfied after all payments are made,
Contractor shall refund to City all monies that the latter may be compelled to pay
in discharging such liens, including all costs and reasonable attorney fees.
3. TERM: The Term of this Agreement shall commence on September
2, 2026 and end on December 31, 2026. This Agreement may be extended upon
mutual written consent of the Parties provided that any amendment shall be
executed by an authorized signatory of the Parties and provide in writing the
amended term of the Agreement and, if applicable, a specified dollar amount of
additional payment to be owed by City to Contractor.
2
4. CONTRACTOR'S STANDARD OF PERFORMANCE: The Work shall
be performed by qualified professional construction contractors and suppliers
licensed in Arizona, selected and paid by Contractor and acting in the interest of
Contractor. While performing the Work, Contractor and its subcontractors shall
exercise the reasonable professional care and skill customarily exercised by
reputable members of Contractor's profession practicing in the Phoenix
Metropolitan Area and shall use reasonable diligence and best judgment while
exercising its professional skill and expertise. Contractor shall be responsible
for all errors and omissions committed by Contractor or its subcontractors in
the performance of the Work.
5. LABOR AND MATERIALS: Unless otherwise provided in the Contract
Documents, Contractor shall provide, pay for and insure under the requisite
laws and regulations all labor, materials, equipment, tools and machinery,
water, heat, utilities, transportation, other facilities and services necessary for
the proper execution and completion of the Work, whether temporary or
permanent, and whether or not incorporated or to be incorporated in the Work.
6. INSPECTIONS AND QUALITY OF WORK: Contractor understands
and agrees that City will inspect the Work. Contractor agrees that City will have
the exclusive right to determine, in its sole discretion, whether the Work has
been performed in accordance with the Contract Documents. Contractor
further agrees to make such corrections to the Work as may be directed by City
to conform to the Contract Documents without requirement of a change order or
any additional charge or cost to City whatsoever. The Work will be of good
quality, free from faults and defects, and in conformance with the Contract
Documents.
7. WARRANTY: Contractor shall guarantee the Work against defective
labor, workmanship and/or materials for a period of one (1) year from the date of
its final acceptance by City (the "Warranty Period"), ordinary wear and tear and
unusual abuse or neglect excepted. Any omission on the part of City to
condemn defective work or materials at the time of construction shall not be
deemed an acceptance and Contractor will be required at its sole cost to
correct defective work or materials before final acceptance. If City notifies
Contractor of defective labor, workmanship, or materials during the Warranty
Period, Contractor shall begin correcting the defect within fourteen (14)
calendar days of receipt of written notice from City. Such work shall include the
repair or replacement of other work or materials damaged or affected by
making the warranty repairs or corrective work all at no additional cost to City.
In the case of Work materials or equipment for which warranties are required by
the special provisions of the Contract Documents, Contractor shall provide or
secure from the appropriate subcontractor or supplier such warranties
addressed to and in favor of City and deliver same to City prior to final
acceptance of the Work. Delivery of such warranties shall not relieve
3
Contractor from any obligation assumed under any other provision of the
Contract. The warranties and guarantees provided in this Section 7 shall be in
addition to and not in limitation of any other warrantees, guarantees or remedies
required by law, and shall survive the expiration of this Agreement for the time
period mentioned above.
8. TAXES: Contractor shall pay as they become due all license, sales,
consumer, transaction privilege, use and other similar taxes for the Work or
portions of the Work which are legally enacted at the time bids are received
whether or not yet effective or subsequently applicable due to acts of
jurisdictions or bodies other than City.
9. PERMITS AND FEES: Unless otherwise provided in the Contract
Documents, Contractor shall secure and pay for all permits, government fees,
licenses and inspections necessary for the proper execution and completion of
the Work which are customarily secured after execution of the Contract, and
which are legally required. Contractor shall give all notices and comply with all
laws, ordinances, rules, regulations and lawful orders of any public authority
bearing on the performance of the Work. City permits for this Work will be
provided to Contractor at no cost. Contractor understands that the activity
described in the Contract constitutes "doing business in the City of Apache
Junction" and Contractor agrees to obtain a business license pursuant to
Chapter 8 of the Apache Junction City Code, Vol. I, and keep such license
current until the Work, including any Work during the Warranty Period, is
accepted by the City. Contractor also acknowledges that the tax provision of
the Apache Junction Tax Code, Chapter 8A, may also apply and if so, shall
obtain a transaction privilege license and/or other licenses as may be required
by the city code. Any activity by subcontractors within the corporate city limits
will invoke the same licensing regulations on the subcontractors, and
Contractor shall require its subcontractors obtain and keep all applicable
licenses current. Further, Contractor agrees to pay all applicable privilege and
use taxes that are applicable to the activities, products and services provided
under this Agreement.
10. INDEPENDENT CONTRACTOR: City and Contractor agree and
understand that the relationship between the Parties is that of an independent
contractor. As such, Contractor is not entitled to receive any benefits to which
City employees are entitled by virtue of their employment with City. City shall
not be responsible for payment to employees of Contractor for salaries, related
taxes (including, but not limited to, federal social security tax as well as federal
and state unemployment taxes) and all other expenses related to their
employment or contractual relationship with Contractor. Contractor shall be
responsible to City for the acts and omissions of its employees, subcontractors
and their agents and employees and other persons providing any of the
materials under any contract document.
4
11. SUPERINTENDENT: Contractor shall employ a competent project
superintendent who shall be in attendance at the Project site during the
progress of the Work. The superintendent shall represent and be the community
agent of Contractor and communications given to the superintendent shall be as
binding as if given to Contractor. Important communications shall be confirmed
in writing. The designated superintendent shall be designated for each project
and communicated to City before work is performed.
12. PROGRESS SCHEDULE: Contractor shall, immediately after
entering into this Agreement, generate an estimated progress schedule for the
Project, which shall be maintained and updated during the construction of the
Project. Work may progress during regular City business hours only if it is
determined by City not to disturb normal operations.
13. INDEMNIFICATION: To the fullest extent permitted by law,
Contractor shall defend, indemnify and hold harmless City, its elected officials,
appointed officers, special districts, agents, and employees from and against
any and all liability including but not limited to demands, claims, actions,fees,
costs and expenses, including reasonable attorney and expert witness fees,
arising from, or alleged to have arisen from, relating to, arising out of, or alleged
to have resulted from the acts, errors, mistakes, omissions, work or services of
Contractor, its agents, employees, or any tier of Contractor's subcontractors in
the performance of this Agreement, but only to the extent caused by the
negligence, recklessness or intentional wrongful conduct of Contractor or its
subcontractors in the performance of the Work under this Agreement or any
subcontract. Contractor's duty to defend, hold harmless and indemnify City, its
elected officials, appointed officers, special districts, agents, and employees
shall arise in connection with any claim, damage, loss or expense that is
attributable to bodily injury, sickness, disease, death, or injury to, impairment,
or destruction of property including loss of use resulting therefrom, caused by
an Contractor's acts, errors, mistakes, omissions, work or services in the
performance of this Agreement including any employee of Contractor, any tier of
Contractor's subcontractor or any other person for whose acts, errors,
mistakes, omissions, Work or services Contractor may be legally liable, but only
to the extent caused by the negligence, recklessness or intentional wrongful
conduct of Contractor or any tier of Contractor's subcontractors or any other
person for whose acts, errors, mistakes, omissions, Work or services
Contractor may be legally liable in the performance of the Work under this
Agreement or any subcontract. The amount and type of insurance coverage
requirements set forth in this Agreement will in no way be construed as limiting
the scope of the indemnity in this Section 13. The rights and obligations under
this Section 13 shall survive the expiration or earlier termination of this
Agreement.
14. SUBCONTRACTORS: All subcontractors chosen by Contractor will
be subject to City's approval. All subcontractors shall be identified by
5
Contractor prior to award of contract. Contractor shall make no substitutions
for any subcontractor, person or entity previously selected without the approval
of City.
15. APPLICABLE LAW AND VENUE: The terms and conditions of this
Agreement shall be governed by and interpreted in accordance with the laws of
the State of Arizona. Any action at law or in equity brought by either Party for
the purpose of enforcing a right or rights provided for in this Agreement, shall
be tried in a court of competent jurisdiction in Pinal County, State of Arizona.
The Parties hereby waive all provisions of law providing for a change of venue in
such proceeding to any other county. In the event either Party shall bring suit to
enforce any term of this Agreement or to recover any damages for and on
account of the breach of any term or condition in this Agreement, it is mutually
agreed that the prevailing Party in such action shall recover all costs including:
all litigation and appeal expenses, collection expenses, reasonable attorney
fees, necessary witness fees and court costs to be determined by the court in
such action.
16. INSURANCE:
16.1 General Provisions. Contractor, at its own expense, shall purchase
and maintain during the Term the insurance required by this Agreement with
companies duly licensed, possessing a current A.M. Best, Inc. Rating of B++6, or
approved unlicensed in the State of Arizona with policies and forms satisfactory
to City.
All insurance required by this Agreement shall be maintained in full force and
effect until the Services are accepted by the City. Failure to do so may, at the
sole discretion of City, constitute a material breach of this Agreement.
Contractor's insurance shall be primary insurance as respects the City, and any
insurance or self-insurance maintained by City shall not contribute to it.
Any failure to comply with the claim reporting provisions of the insurance
policies or any breach of an insurance policy warranty shall not affect coverage
afforded under the insurance policies to protect City.
The insurance policies, except Workers' Compensation, shall contain a waiver
of transfer rights of recovery (subrogation) against City, its agents, officers,
officials and employees for any claims arising out of Contractor's acts, errors,
mistakes, omissions, work or service.
The insurance policies may provide coverage which contains deductibles or
self-insured retentions. Such deductible and/or self-insured retentions shall not
be applicable with respect to the coverage provided to City under such policies.
Contractor shall be solely responsible for the deductible and/or self-retention
and City, at its option, may require Contractor to secure payment of such
6
deductibles or self-insured retentions by a surety bond or an irrevocable and
unconditional letter of credit.
The insurance policies required by this Agreement, except Workers'
Compensation, shall name City, its elected officials, agents, officers, and
employees as Additional Insured Parties.
Contractor shall expressly bind any subcontractors, or any other lower tier
subcontractors, used in the performance of any aspect of the Services, to the
insurance requirements in this Agreement, making such obligations applicable
to the other subcontractor to the same extent as it is applicable to Contractor.
The purpose of this provision is to require any lower tier subcontractor,
regardless of level, to provide insurance and indemnity required by this
Agreement.
16.2 Commercial General Liability. Contractor shall maintain throughout
the Term Commercial General Liability insurance with a limit of not less than
$1,000,000 for each occurrence with a $2,000,000 Products/Completed
Operations Aggregate and a $2,000,000 General Aggregate limit. The policy
shall include coverage for bodily injury, broad form property damage, personal
injury, products and completed operations and blanket contractual coverage
including, but not limited to, the liability assumed under the indemnification
provisions of this Agreement, which coverage will be at least as broad as that on
Insurance Service Office, Inc. Policy Form No. CG 00011093, or the equivalent
thereof.
Such policies shall contain a severability of interest provision and shall not
contain a sunset provision or commutation clause, nor any provision which
would serve to limit third party action over claims.
The Commercial General Liability additional insured endorsement shall be at
least as broad as the Insurance Service Office, Inc.'s Additional Insured, Form
B, CG 20101185, or the equivalent thereof, and shall include coverage for
Contractor's operations and products and completed operations.
If Contractor sublets any part of the Services, Contractor shall purchase and
maintain, at all times during prosecution of the Services an Owner and
Contractor's Protective Liability insurance policy for bodily injury and property
damage, including death, which may arise in the prosecution of the Services.
Coverage shall be on an occurrence basis with a limit of not less than
$2,000,000 per occurrence, and the policy shall be issued by the same
insurance company that issues Contractor's Commercial General Liability
insurance.
16.3 Automobile Liability. Contractor shall maintain
Commercial/Business Automobile Liability insurance with a combined single
7
limit for bodily injury and property damage of not less than $1,000,000 each
occurrence with respect to Contractor's owned, hired, and non-owned vehicles
assigned to or used in performance of the Services. Coverage will be at least as
broad as coverage code 1, "any auto", (Insurance Service Office, Inc. Policy
Form CA 00011293, or the equivalent thereof). Such insurance shall include
coverage for loading and off-loading hazards. If hazardous substances,
materials or wastes are to be transported, federal mandatory motor carrier
safety ("MCS") 90 endorsement shall be included and $5,000,000 per accident
limits for bodily injury and property damage shall apply.
16.4 Workers' Compensation. Contractor shall carry Workers'
Compensation insurance to cover obligations imposed by federal and state
statutes having jurisdiction over Contractor's employees engaged in the
performance of the Services; and Employer's Liability insurance of not less than
$100,000 for each accident, $100,000 disease for each employee, and $500,000
disease policy limit.
By execution of this Agreement, Contractor certifies as follows:
"I am aware and understand the provisions of A.R.S. § 23-901 et seq.
which requires every employer to be insured against liability for workers'
compensation or to undertake self-insurance in accordance with the
provisions of this chapter, and I will comply with such provisions before
commencing the performance of the Services of this Agreement."
If Contractor has no employees for whom Workers' Compensation insurance is
required by federal or state statutes, Contractor shall submit a declaration or
affidavit to City so stating and covenanting to obtain such insurance if and when
Contractor employs any employees subject to coverage.
16.5 Certificates of Insurance. Prior to commencing the Services,
Contractor shall furnish City with Certificates of Insurance, or formal
endorsements as required by the Agreement, issued by Contractor's insurer(s),
as evidence that policies providing the required coverages, conditions and
limits required by this Agreement are in full force and effect. City shall not be
obligated, however, to review same or to advise Contractor of any deficiencies
in such policies and endorsements, and such receipt shall not relieve Contractor
from, or be deemed a waiver of, City's right to insist on strict fulfillment of
Contractor's obligations under this Agreement.
The form of the certificates of insurance and endorsements shall be subject to
the approval of the Apache Junction City Attorney's Office, shall comply with the
terms of this Agreement. Policies or certificates and completed forms of City's
Additional Insured Endorsement (or a substantially equivalent insurance
company form acceptable to the City Attorney) evidencing the coverage
required by this Agreement shall be delivered to City Attorney, City of Apache
8
Junction, 300 East Superstition Boulevard, Apache Junction, AZ 85119. The
policy or policies shall be in the usual form of public liability insurance, but shall
also include the following provision:
"Solely as respects work done by or on behalf of the named insured for
the City of Apache Junction, it is agreed that the City of Apache Junction
and its elected officials, officers, agents and employees are added as
additional insured parties under this policy."
In the event any insurance policies required by this Agreement are written on a
"claims made" basis, coverage shall extend for two (2) years past completion
and acceptance of Contractor's work or services and as evidenced by annual
Certificates of Insurance.
Contractor shall require its insurers to provide City thirty (30) calendar days'
prior written notice of any nonrenewal, cancellation, or material change in the
coverage under such policy reducing coverage to below the amounts required
by this Agreement. If a policy does expire during the life of the Agreement, a
renewal certificate must be sent to City thirty (30) calendar days prior to the
expiration date.
17. CHANGE ORDERS: A change order is a written order from City to
Contractor issued after execution of the Contract authorizing a change in the
Work and setting forth the amount of the adjustment, if any, in the Contract Sum
and the extent of the change, if any, in the Progress Schedule. Change Orders
do not invalidate the Contract. Changes in the Work shall be performed under
the applicable provisions of the Contract Documents, and the Contractor shall
proceed promptly, unless otherwise provided in the Change Order. A Change
Order signed by the Contractor indicates the Contractor's agreement therewith,
including the adjustment in the Contract Sum and Progress Schedule or the
method for determining them.
18. BINDING EFFECT SUCCESSORS, ASSIGNMENT AND DELEGATION:
City and Contractor each bind themselves, their partners, successors, assigns
and legal representatives to the other Party and to the partners, successors,
assigns and legal representatives of such other Party in respect to all
covenants, agreements and obligations contained in the Contract. Neither Party
shall assign this Agreement or sublet it as a whole or delegate the duties under
the Agreement, without the written consent of the other Party, nor shall
Contractor assign any monies due or to become due to it without the previous
written consent of City.
19. WRITTEN NOTICE: Written notice shall be deemed to have been
duly served if delivered in person to the individual or member of the firm or
entity, or to an office of the corporation for whom it was intended or if delivered
at or sent registered or certified mail, return receipt requested, and first-class
9
postage prepaid to the last business address known to them who gives the
notice.
20. DAMAGES: Contractor shall be responsible for and promptly
remedy any damage or loss of property caused in whole or in part by the
Contractor, a subcontractor, or anyone directly or indirectly employed by
Contractor, or by anyone for whose acts Contractor may be liable and for which
Contractor is responsible under the Contract, except where such damage or
loss is directly attributable to the negligent acts or omissions of City or by
anyone for whose acts City may be liable and not attributable to the fault or
negligence of the Contractor. City shall make claims regarding all damage or
loss to Contractor within a reasonable time after the first observance of such
injury or damages.
21. PAYMENT AND PERFORMANCE BONDS: City shall have the right to
require Contractor to furnish bonds covering the faithful performance of the
Contract and the payment of all obligations arising under the Contract.
22. SAFETY: Contractor shall take, and shall cause its employees,
agents, officers, directors, consultants and subcontractors to take all
reasonable precautions for the safety of and shall provide all reasonable
protection to all persons and property at the Project site and all persons and
property which may be affected by the performance of the Work.
23. RIGHTS AND REMEDIES: The duties and obligations and the rights
and remedies available under the Contract shall be in addition to and not a
limitation of any duties, obligations, rights and remedies otherwise imposed or
available by law. No action or failure to act by City or Contractor shall constitute
a waiver of any right or duty afforded to any of them under the Contract, nor
shall any action or failure to act constitute an approval of or an acquiescence to
any breaches under the Contract except as may be specifically agreed to by the
Parties in writing.
24. FORCE MAJEURE: Neither City nor Contractor, as the case may be,
shall be considered not to have performed its obligations under this Agreement
in the event of enforced delay (an "Enforced Delay") due to causes beyond its
control and without its fault or negligence or failure to comply with applicable
laws, including, but not restricted to, acts of God, fires, floods, epidemics,
pandemics and related executive orders, quarantine, restrictions, embargoes,
labor disputes, and unusually severe weather or the delays of subcontractors or
materialmen due to such causes, acts of a public enemy, war, terrorism or act of
terror (including but not limited to bio-terrorism or eco-terrorism), nuclear
radiation, blockade, insurrection, riot, labor strike or interruption, extortion,
sabotage, or similar occurrence or any exercise of the power of eminent domain
of any governmental body on behalf of any public entity, or a declaration of
moratorium or similar hiatus (whether permanent or temporary) by any public
10
entity directly affecting the obligations under this Agreement. In no event will
Enforced Delay include any delay resulting from unavailability for any reason of
labor shortages, or the unavailability for any reason of particular contractors,
consultants, subcontractors, vendors or investors desired by Contractor in
connection with the obligations under this Agreement. Contractor agrees that
Contractor alone will bear all risks of delay which are not Enforced Delay. In the
event of the occurrence of any such Enforced Delay, the time or times for
performance of the obligations of the Party claiming delay shall be extended for
a period of the Enforced Delay; provided, however, that the Party seeking the
benefit of the provisions of this Section 24 shall, within thirty (30) calendar days
after such Party knows or should know of any such Enforced Delay, first notify
the other Party of the specific delay in writing and claim the right to an extension
for the period of the Enforced Delay; and provided further that in no event shall a
period of Enforced Delay exceed ninety (90) calendar days.
25. TERMINATION:
25.1 TERMINATION BY CITY. City may terminate this Agreement in whole
or part if the city manager or his or her designee determines Contractor has
failed to fulfill its obligations under the Contract through no fault of City. Such
termination may be effected by City giving Contractor not less than ten (10)
calendar days written notice by certified mail, return receipt requested of City's
intent to terminate. Contractor shall have ten (10) calendar days to cure the
failure to the satisfaction of City. City may terminate this Agreement or a portion
thereof if conditions encountered during the progress of the Work make it
impossible or impracticable to proceed with the Work. If City terminates this
Agreement for reasons of default by Contractor, the amount of compensation
provided for in this Agreement shall be reduced to reflect the percentage of
Work completed and the Contractor shall not be entitled to payment for
anticipated profits or unperformed services.
25.2 TERMINATION BY CONTRACTOR. Contractor may terminate this
Agreement if City fails to make payment as agreed upon in this Agreement. Any
other termination will be deemed a breach of contract by Contractor.
Contractor shall provide Notice of Termination to City by Certified U.S. Mail ten
(10) calendar days before such termination takes effect.
26. RECORDS: Records of Contractor's labor, payroll and other costs
pertaining to the Contract shall be kept on a generally recognized accounting
basis and made available to City for inspection on request. Contractor shall
maintain records for a period of at least two (2) years after expiration of this
Agreement and shall make such records available during that retention period
for examination or audit by City personnel during regular business hours.
27. ENTIRE AGREEMENT: This Agreement and any attachments and the
Contract Documents represent the entire agreement between City and
11
Contractor and supersede all prior negotiations, representations or
agreements, either express or implied, written or oral. It is mutually understood
and agreed that no alteration or variation of the terms and conditions of this
Agreement shall be valid unless made in writing and signed by the Parties.
Written and signed amendments shall automatically become part of the Contract
and shall supersede any inconsistent provision therein; provided, however, that
any apparent inconsistency shall be resolved, if possible, by construing the
provisions as mutually complementary and supplementary.
28. SEVERABILITY: City and Contractor each believe that the execution,
delivery and performance of this Agreement are in compliance with all
applicable laws. However, in the unlikely event that any provision of this
Agreement is declared void or unenforceable (or is construed as requiring City
to do any act in violation of any applicable laws, including any constitutional
provision, law, regulation, or city code), such provision shall be deemed severed
from this Agreement and this Agreement shall otherwise remain in full force and
effect; provided that this Agreement shall retroactively be deemed reformed to
the extent reasonably possible in such a manner so that the reformed agreement
(and any related agreements effective as of the same date) provide essentially
the same rights and benefits (economic and otherwise) to the Parties as if such
severance and reformation were not required. Unless prohibited by applicable
laws, the Parties further shall perform all acts and execute, acknowledge and/or
deliver all amendments, instruments and consents necessary to accomplish and
to give effect to the purposes of this Agreement, as reformed.
29. TIME IS OF THE ESSENCE: Time is of the essence with respect to
all provisions in this Agreement. Any delay in performance by either Party shall
constitute a material breach of this Agreement.
30. CONFLICT OF INTEREST: The Contract is subject to, and may be
terminated by City in accordance with, the provisions of A.R.S. § 38-511.
31. PROHIBITION TO CONTRACT WITH CONTRACTORS WHO
ENGAGE IN BOYCOTT OF THE STATE OF ISRAEL: The Parties acknowledge
A.R.S. §§ 35-393 through 35-393.03, as amended, which forbids public entities
from contracting with Contractors who engage in boycotts of the State of Israel.
Should Contractor engage in any such boycott against the State of Israel, this
Agreement shall be deemed automatically terminated by operation of law. Any
such boycott is a material breach of this Agreement.
32. PROHIBITED USE OF FORCED LABOR: In accordance with A.R.S.
§ 35-394, Contractor hereby certifies and agrees that Contractor does not
currently and shall not for the duration of this Agreement use: (1) the forced
labor of ethnic Uyghurs in the People's Republic of China, (2) any services or
goods produced by the forced labor of ethnic Uyghurs in the People's Republic
of China, and/or (3) any suppliers, contractors or subcontractors that use the
12
forced labor or any services or goods produced by the forced labor of ethnic
Uyghurs in the People's Republic of China. If Contractor becomes aware during
the Term that Contractor is not in compliance with this Section 32, then
Contractor shall notify the City within five (5) business days after becoming
aware of such noncompliance. If Contractor does not provide the City with
written certification that Contractor has remedied such noncompliance within
ninety (90) calendar days after notifying the City of such noncompliance, this
Agreement shall terminate, except that if the Agreement termination date
occurs before the end of such ninety (90) day remedy period, this Agreement
shall terminate automatically.
33. COMPLIANCE WITH FEDERAL AND STATE LAWS: Contractor
understands and acknowledges the applicability of the American with
Disabilities Act, the Immigration Reform and Control Act of 1986 and the Drug
Free Workplace Act of 1989 to the services performed under this Agreement.
As required by A.R.S. § 41-4401, Contractor hereby warrants its compliance
with all federal immigration laws and regulations that relate to its employees and
A.R.S. § 23-214(A). Contractor further warrants that after hiring an employee,
Contractor will verify the employment eligibility of the employee through the E-
Verify program. If Contractor uses any subcontractors in performance of
services, subcontractors shall warrant their compliance with all federal
immigration laws and regulations that relate to its employees and A.R.S. § 23-
214(A), and subcontractors shall further warrant that after hiring an employee,
such subcontractor verifies the employment eligibility of the employee through
the E-Verify program. A breach of this warranty shall be deemed a material
breach of the Agreement that is subject to penalties up to and including
termination of this Agreement. Contractor is subject to a penalty of $100 per
day for the first violation, $500 per day for the second violation, and $1,000 per
day for the third violation. City at its option may terminate this Agreement after
the third violation. Contractor shall not be deemed in material breach of this
Agreement if the Contractor and/or subcontractors establish compliance with
the employment verification provisions of Sections 274A and 274B of the federal
Immigration and Nationality Act and the E-Verify requirements contained in
A.R.S. § 23-214(A). City retains the legal right to inspect the papers of any
Contractor or subcontractor employee who works under this Agreement to
ensure that the Contractor or subcontractor is complying with the warranty.
Any inspection will be conducted after reasonable notice and at reasonable
times. If state law is amended, the Parties may modify this paragraph consistent
with state law without effectuating an official amendment to this Agreement.
Email notification of the modification would be sufficient notice.
34. ORDER OF PRECEDENCE: Should there be any discrepancy or
inconsistency between the terms and conditions of this Agreement and any
terms and conditions in any exhibit to this Agreement, the terms and conditions
of this Agreement shall control and prevail.
13
IN WITNESS WHEREOF, Contractor and City have executed this
Agreement as of the date first set forth above.
CONTRACTOR:
M.R. TANNER CONSTRUCTION, an Arizona
corporaor►
By: Chad Montoya
Vice President
Its:
CITY:
CITY OF APACHE JUNCTION, ARIZONA,
an Arizona municipal corporation
By: Walter "Chip"Wilson
Its: Mayor
ATTEST:
Evie McKinney
City Clerk
APPROVED AS TO FORM:
Richard J. Stern
City Attorney
14
STATE OF Arizona )
) ss.
COUNTY OF Maricopa )
The foregoing was subscribed and sworn to before me this 17th
day of August , 2026, by Chad Montoya as
Vice President of M.R. Tanner Construction, an Arizona
corporation.
;•' 40.NoPublic
My Commission Expires (o
'ci,
', ,A�•. XP •p6•q
STATE OF ARIZONA )
ss.
COUNTY OF PINAL )
The foregoing was subscribed and sworn to before me this
day of , 2026, by Walter "Chip" Wilson, as Mayor of the
City of Apache Junction, an Arizona municipal corporation.
Notary Public
My Commission Expires:
15
EXHIBIT A
My ANNER
® ONSTRUCTION
1327 W.SAWN PEDRO$TAE ET (ilLbER'l.AZ 85233
To: FACHE JUNCTION CITY OF Contact
Address 575 F BASEI:NE AVF Ptwtts: 480 474.500)
APACHE XNVCTION,AZ 85119 Pau:
Pro$Ict Nam.: Ache Anctan koowood Northbound Rented 7.13.2026 •id Number:
ProjectiocaMoa: •id Data:
Item N Item Deacrlptloru fstfrnated 0u.ntWv Unit Unit Prim Total Price
MILL&OVERLAY
1 2.0'MILL AC 16,660.00 SY $3.75 $62,550.00
2 2.0 OVERLAY(117•PMTR) 16,680.00 SY $22.20 $370,296.00
3 PRELOWER UTILITIES 1.00 EACH $575.00 $575.00
4 ADJUST WATER VALVE 1.00 EACH $670.00 s670.00
5 TRAFFIC CDNTR01 1.00 LS $43,000.00 $43,000.00
6 Ort D.PY OFFICERS 1.00 1-5 328,400.00 $28,400.00
7 STRIPING-TEMP&30 DAY fhERMO 1.00 15 $20,800.00 $20,800.00
8 STRIPING.RUE St I'REINSTA1J 1.00 1.5 $9,300.00 $9,300.00
9 SURVEY-STRI-ING,RUMBLE STRIP.WATER VALVE AS- 1.00 Is $8,400.00 38,400.00
BUILT&LAYOUT AFTER PAVING
Total Price tot abor.MILL 9 OVERLAY Itarnt: =543,991.00
Bid Price Subtotal: $543,991.00
Total did Price- $543,901,00
Notes:
• °RICING AND CONTRACT CONDITIONS BASED ON CITY Of BUCKEYE JOC CONTRACT NO 2025081
16
Ironwood Project Location and Limits
-
-' ,; , INo1hb0Und *1
and #2 lanes -
�• �• k .
�1
Start northbound
lane only
■
.r
-
r - _, w
s• Y
17
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
U =i 85119
Agenda Item No. 7.
'�'PizoN* File ID: 26-441
Sponsor: Sidney Urias Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Consideration of approval of the Land Use Assumptions and Infrastructure Improvements Plan.
The City's development fee consultant, TischlerBise, has prepared a draft Land Use
Assumptions and Infrastructure Improvements Plan in preparation for updating the
Development Fee Study and adopting the associated implementing ordinance and resolution.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
( CHEdO
�_ y= City of Apache Junction
Development Services Department
'�RizoNA
Date: September 1, 2026
To: Honorable Mayor and City Council Members
Through: Bryant Powell, City Manager
Rudy Esquivias, Development Services Director
Sidney Urias, Development Services Deputy Director
Subject: City Council Meeting - September 1, 2026:
Land Use Assumptions, Infrastructure Improvements Plan
Adoption for Development Impact Fees Update
Background
Development fees are governed by Arizona Revised Statutes § 9-463.05,
which requires municipalities to update their Development Fee Study,
which includes the Land Use Assumptions and Infrastructure
Improvements Plan, at least every five years.
The Land Use Assumptions (LUA) identify the City' s projected growth in
population, housing, and employment, and where that growth is expected
to occur, while the Infrastructure Improvements Plan (IIP) outlines
the public facilities and capital improvements needed to support that
projected growth. Together, these documents are used to evaluate and
develop recommended updates to the City' s Development Fees, which may
result in increases or decreases based on projected growth and
infrastructure needs.
Development fees are one-time charges on new developments that help
pay for the infrastructure and services needed to support growth for
Streets, Parks & Recreation, Libraries, and Police. They ensure that
growth pays for growth rather than placing the burden on existing
taxpayers, help maintain current levels of service, and provide a fair
and consistent way to fund needed improvements. Development Fees also
support sustainable, planned growth, improve the accuracy of capital
planning and budgeting, and ensure that fees reflect the actual costs
of the facilities and services new development requires .
As part of the Development Fee update, the City has hired consulting
firm TischlerBise to assist with reviewing and recommending any
adjustments to the current fees . Upon adoption of the updated LUA,
IIP, and updated Development Fees, Staff will process a text amendment
to formally incorporate the new fees into City Code, Volume II, Land
Development Code, Chapter 7 : Development Fees .
Development Fee Update
September 1, 2026
City Council Memo
City Council Work Session
On April 20, 2026, Ben Griffin of TishlerBise presented an overview of
the proposed Development Impact Fees study to the City Council. The
presentation included a detailed summary of the research conducted,
demographic and growth analyses, population projections, and the
methodology used to calculate the proposed fees . Mr. Griffin explained
how anticipated growth and future infrastructure needs were evaluated
to determine an equitable fee structure that would ensure new
development contributes its proportionate share toward public
facilities and services .
The discussion also included a comparative analysis of development
impact fees assessed by neighboring Valley municipalities . This
provided context for the proposed fee schedule and demonstrated how
the City' s proposed rates align with those of comparable communities.
City Council Public Hearing
On July 7, 2026, Ben Griffin of TishlerBise presented an overview of
the proposed Development Impact Fee Study to the City Council. Mr.
Griffin discussed how projected growth and future infrastructure needs
were evaluated to ensure new development contributes its proportionate
share toward the cost of public facilities and services . No opposition
or concerns were expressed by members of the public or the development
community.
sCdey urn
Prepared by Sidney Urias
Development Services Deputy Director
Attachments :
-Exhibit #1 - Draft Apache Junction Land Use Assumptions,
Infrastructure Improvements Plans, and Development Fee Report
-Exhibit #2 - City Council Memo
Development Fee Update
September 1, 2026
City Council Memo
DRAFT
Land Use Assumptions,
Infrastructure Improvements Plan,
and Development Fee Report
Prepared for:
Apache Junction, Arizona
June 23, 2026
TischlerBiSe
FISCAL I ECONOMIC I PLANNING
4701 Sangamore Road
Suite S240
Bethesda, MD 20816
301.320.6900
www.TischlerBise.com
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
[PAGE INTENTIONALLY LEFT BLANK]
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
TABLE OF CONTENTS
EXECUTIVESUMMARY................................................................................................................................1
ARIZONA DEVELOPMENT FEE ENABLING LEGISLATION........................................................................1
NecessaryPublic Services.........................................................................................................................................................1
InfrastructureImprovements Plan.......................................................................................................................................2
QualifiedProfessionals..............................................................................................................................................................2
Conceptual Development Fee Calculation.........................................................................................................................3
Evaluationof Credits/Offsets..................................................................................................................................................3
INTRODUCTION TO DEVELOPMENT FEES...............................................................................................3
REQUIREDFINDINGS..............................................................................................................................4
DEVELOPMENT FEE REPORT......................................................................................................................5
DEVELOPMENT FEE COMPONENTS.........................................................................................................6
PROPOSED DEVELOPMENT FEES............................................................................................................7
CURRENT DEVELOPMENT FEES..............................................................................................................8
DIFFERENCE BETWEEN PROPOSED AND CURRENT DEVELOPMENT FEES.............................................8
LIBRARYFACILITIES...................................................................................................................................9
METHODOLOGY......................................................................................................................................9
PROPORTIONATESHARE........................................................................................................................9
SERVICEAREA..................................................................................................................................... 10
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT............................................................................. 11
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES.................................... 11
11
Library Facilities-Incremental Expansion....................................................................................................................12
FutureDebt Credit.....................................................................................................................................................................14
Development Fee Report-Plan-Based.............................................................................................................................15
PROJECTED DEMAND FOR SERVICES AND COSTS................................................................................ 15
Library Facilities-Incremental Expansion....................................................................................................................16
LIBRARY FACILITIES DEVELOPMENT FEES......................................................................................... 17
RevenueCredit/Offset..............................................................................................................................................................17
Library Facilities Development Fees..................................................................................................................................17
LIBRARY FACILITIES DEVELOPMENT FEE REVENUE........................................................................... 18
PARKS AND RECREATIONAL FACILITIES IIP........................................................................................... 19
ProportionateShare..................................................................................................................................................................19
ServiceArea..................................................................................................................................................................................20
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT............................................................................. 21
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES.................................... 21
21
Developed Park Land-Incremental Expansion...........................................................................................................22
ParkAmenities-Incremental Expansion........................................................................................................................24
Trails-Incremental Expansion...........................................................................................................................................26
Development Fee Report-Plan-Based.............................................................................................................................27
PROJECTED DEMAND FOR SERVICES AND COSTS................................................................................ 27
Developed Park Land-Incremental Expansion...........................................................................................................28
ParkAmenities-Incremental Expansion........................................................................................................................29
Trails-Incremental Expansion...........................................................................................................................................30
PARKS AND RECREATIONAL FACILITIES DEVELOPMENT FEES........................................................... 31
RevenueCredit/Offset..............................................................................................................................................................31
Parks and Recreational Facilities Development Fees.................................................................................................31
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
PARKS AND RECREATIONAL FACILITIES DEVELOPMENT FEE REVENUE ............................................ 32
POLICEFACILITIES IIP............................................................................................................................ 33
ProportionateShare..................................................................................................................................................................33
ServiceArea..................................................................................................................................................................................34
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT............................................................................. 3 5
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES.................................... 35
35
PoliceFacilities-Plan-Based................................................................................................................................................36
FutureDebt Credit.....................................................................................................................................................................38
Police Vehicles-Incremental Expansion.........................................................................................................................39
Police Equipment-Incremental Expansion...................................................................................................................40
Development Fee Report-Plan-Based.............................................................................................................................41
PROJECTED DEMAND FOR SERVICES AND COSTS................................................................................ 41
PoliceFacilities-Plan-Based................................................................................................................................................42
Police Vehicles-Incremental Expansion.........................................................................................................................43
Police Equipment-Incremental Expansion...................................................................................................................44
POLICE FACILITIES DEVELOPMENT FEES............................................................................................ 45
RevenueCredit/Offset..............................................................................................................................................................45
Police Facilities Development Fees.....................................................................................................................................45
POLICE FACILITIES DEVELOPMENT FEE REVENUE ............................................................................. 46
STREETFACILITIES I IP............................................................................................................................ 47
ProportionateShare..................................................................................................................................................................47
ServiceArea..................................................................................................................................................................................48
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT............................................................................. 49
Residential Trip Generation Rates......................................................................................................................................49
Nonresidential Trip Generation Rates..............................................................................................................................50
TripRate Adjustments.............................................................................................................................................................51
CommuterTrip Adjustment...................................................................................................................................................51
Adjustmentfor Pass-By Trips...............................................................................................................................................51
AverageWeekday Vehicle Trips..........................................................................................................................................52
NationalAverage Trip Length...............................................................................................................................................52
ExpectedVehicle Miles Traveled.........................................................................................................................................53
LocalAdjustment Factor.........................................................................................................................................................53
LocalTrip Lengths......................................................................................................................................................................54
LocalVehicle Miles Traveled.................................................................................................................................................54
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES.................................... 55
55
Street Improvements-Incremental Expansion...........................................................................................................56
Development Fee Report-Plan-Based.............................................................................................................................57
PROJECTED DEMAND FOR SERVICES AND COSTS................................................................................ 58
STREET FACILITIES DEVELOPMENT FEES........................................................................................... 59
RevenueCredit/Offset..............................................................................................................................................................59
Street Facilities Development Fees.....................................................................................................................................59
STREET FACILITIES DEVELOPMENT FEE REVENUE............................................................................. 60
APPENDIX A: FORECAST OF REVENUES OTHER THAN FEES................................................................... 61
REVENUEPROJECTIONS....................................................................................................................... 61
APPENDIX B: PROFESSIONAL SERVICES.................................................................................................. 62
APPENDIX C: LAND USE DEFINITIONS.................................................................................................... 63
RESIDENTIAL DEVELOPMENT.............................................................................................................. 63
NONRESIDENTIAL DEVELOPMENT....................................................................................................... 64
APPENDIX D: LAND USE ASSUMPTIONS.................................................................................................. 65
ii TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
SUMMARY OF GROWTH INDICATORS.................................................................................................. 65
RESIDENTIAL DEVELOPMENT.............................................................................................................. 68
Recent Residential Construction.........................................................................................................................................68
OccupancyFactors.....................................................................................................................................................................69
ResidentialEstimates...............................................................................................................................................................70
ResidentialProjections............................................................................................................................................................70
NONRESIDENTIAL DEVELOPMENT....................................................................................................... 71
Nonresidential Square Footage Estimates......................................................................................................................71
NonresidentialEstimates........................................................................................................................................................72
NonresidentialProjections.....................................................................................................................................................72
DEVELOPMENT PROJECTIONS............................................................................................................. 74
Outsideof Auction Property..................................................................................................................................................75
AuctionProperty........................................................................................................................................................................76
APPENDIX E:STREET INVENTORY........................................................................................................... 77
iii
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
[PAGE INTENTIONALLY LEFT BLANK]
iv Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
The City of Apache Junction, Arizona, contracted with TischlerBise to document land use assumptions,
prepare the Infrastructure Improvements Plan (hereinafter referred to as the "IIP"), and update
development fees pursuant to Arizona Revised Statutes ("ARS") § 9-436.05 (hereafter referred to as the
"Enabling Legislation"). Municipalities in Arizona may assess development fees to offset infrastructure
costs to a municipality for necessary public services. The development fees must be based on an
Infrastructure Improvements Plan and Land Use Assumptions.The IIP for each type of infrastructure is in
the middle section of this document. The proposed development fees are displayed in the Development
Fee Report in the next section.
Development fees are one-time payments used to construct system improvements needed to
accommodate new development. The fee represents future development's proportionate share of
infrastructure costs. Development fees may be used for infrastructure improvements or debt service for
growth related infrastructure. In contrast to general taxes, development fees may not be used for
operations, maintenance, replacement, or correcting existing deficiencies. This update of Apache
Junction's Infrastructure Improvements Plan and associated update to its development fees includes the
following necessary public services:
1. Library Facilities
2. Parks and Recreational Facilities
3. Police Facilities
4. Street Facilities
This plan includes all necessary elements required to be in full compliance with SB 1525.
ARIZONA DEVELOPMENT FEE ENABLING LEGISLATION
The Enabling Legislation governs how development fees are calculated for municipalities in Arizona.
Necessary Public Services
Under the requirements of the Enabling Legislation,development fees may only be used for construction,
acquisition or expansion of public facilities that are necessary public services. "Necessary public service"
means any of the following categories of facilities that have a life expectancy of three or more years and
that are owned and operated on behalf of the municipality: water, wastewater, storm water, library,
street,fire, police,and parks and recreational.Additionally,a necessary public service includes any facility
that was financed before June 1, 2011, and that meets the following requirements:
1. Development fees were pledged to repay debt service obligations related to the construction of
the facility.
2. After August 1, 2014, any development fees collected are used solely for the payment of principal
and interest on the portion of the bonds, notes, or other debt service obligations issued before
June 1, 2011,to finance construction of the facility.
TischlerBise
1
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Infrastructure Improvements Plan
Development fees must be calculated pursuant to an IIP. For each necessary public service that is the
subject of a development fee, by law,the IIP shall include the following seven elements:
1. A description of the existing necessary public services in the service area and the costs to update,
improve, expand, correct or replace those necessary public services to meet existing needs and
usage and stricter safety, efficiency, environmental or regulatory standards, which shall be
prepared by qualified professionals licensed in this state, as applicable.
2. An analysis of the total capacity,the level of current usage and commitments for usage of capacity
of the existing necessary public services, which shall be prepared by qualified professionals
licensed in this state, as applicable.
3. A description of all or the parts of the necessary public services or facility expansions and their
costs necessitated by and attributable to development in the service area based on the approved
Land Use Assumptions, including a forecast of the costs of infrastructure, improvements, real
property, financing, engineering and architectural services, which shall be prepared by qualified
professionals licensed in this state, as applicable.
4. A table establishing the specific level or quantity of use, consumption,generation or discharge of
a service unit for each category of necessary public services or facility expansions and an
equivalency or conversion table establishing the ratio of a service unit to various types of land
uses, including residential, commercial, and industrial.
5. The total number of projected service units necessitated by and attributable to new development
in the service area based on the approved Land Use Assumptions and calculated pursuant to
generally accepted engineering and planning criteria.
6. The projected demand for necessary public services or facility expansions required by new service
units for a period not to exceed ten years.
7. A forecast of revenues generated by new service units other than development fees, which shall
include estimated state-shared revenue, highway users revenue, federal revenue, ad valorem
property taxes, construction contracting or similar excise taxes and the capital recovery portion
of utility fees attributable to development based on the approved Land Use Assumptions and a
plan to include these contributions in determining the extent of the burden imposed by the
development.
Qualified Professionals
The IIP must be developed by qualified professionals using generally accepted engineering and planning
practices. A qualified professional is defined as "a professional engineer, surveyor, financial analyst or
planner providing services within the scope of the person's license,education,or experience."TischlerBise
is a fiscal, economic, and planning consulting firm specializing in the cost of growth services. Our services
include development fees,fiscal impact analysis,infrastructure financing analyses,user fee/cost of service
studies, capital improvement plans, and fiscal software.TischlerBise has prepared over 800 development
fee studies over the past 30 years for local governments across the United States.
2 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Conceptual Development Fee Calculation
In contrast to project-level improvements, development fees fund growth-related infrastructure that will
benefit multiple development projects, or the entire service area (usually referred to as system
improvements). The first step is to determine an appropriate demand indicator for the particular type of
infrastructure.The demand indicator measures the number of service units for each unit of development.
For example, an appropriate indicator of the demand for parks is population growth and the increase in
population can be estimated from the average number of persons per housing unit. The second step in
the development fee formula is to determine infrastructure improvement units per service unit,typically
called level-of-service (LOS) standards. In keeping with the park example, a common LOS standard is
improved park acres per thousand people. The third step in the development fee formula is the cost of
various infrastructure units.To complete the park example,this part of the formula would establish a cost
per acre for land acquisition and/or park amenities.
Evaluation of Credits/Offsets
Regardless of the methodology, a consideration of credits/offsets is integral to the development of a
legally defensible development fee. There are two types of credits/offsets that should be addressed in
development fee studies and ordinances. The first is a revenue credit/offset due to possible double
payment situations, which could occur when other revenues may contribute to the capital costs of
infrastructure covered by the development fee. This type of credit/offset is integrated into the fee
calculation,thus reducing the fee amount.The second is a site-specific credit or developer reimbursement
for dedication of land or construction of system improvements. This type of credit is addressed in the
administration and implementation of the development fee program. For ease of administration,
TischlerBise normally recommends developer reimbursements for system improvements.
INTRODUCTION TO DEVELOPMENT FEES
Development fees are one-time payments used to fund capital improvements necessitated by future
development. Development fees have been utilized by local governments in various forms for at least fifty
years. Development fees do have limitations and should not be regarded as the total solution for
infrastructure financing needs. Rather, they should be considered one component of a comprehensive
portfolio to ensure adequate provision of public facilities with the goal of maintaining current levels of
service in a community. Any community considering facility fees should note the following limitations:
1) Fees can only be used to finance capital infrastructure and cannot be used to finance ongoing
operations and/or maintenance and rehabilitation costs.
2) Fees cannot be deposited in the General Fund. The funds must be accounted for separately in
individual accounts and earmarked for the capital expenses for which they were collected.
3) Fees cannot be used to correct existing infrastructure deficiencies unless there is a funding plan in
place to correct the deficiency for all current residents and businesses in the community.
TischlerBise
3
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
REQUIRED FINDINGS
There are three reasonable relationship requirements for development fees that are closely related to
"rational nexus" or "reasonable relationship" requirements enunciated by a number of state courts.
Although the term "dual rational nexus" is often used to characterize the standard by which courts
evaluate the validity of development fees under the U. S. Constitution, we prefer a more rigorous
formulation that recognizes three elements: "impact or need," "benefit," and "proportionality."The dual
rational nexus test explicitly addresses only the first two, although proportionality is reasonably implied,
and was specifically mentioned by the U.S.Supreme Court in the Dolan case.The reasonable relationship
language of the statute is considered less strict than the rational nexus standard used by many courts.
Individual elements of the nexus standard are discussed further in the following paragraphs.
Demonstrating an Impact.All future development in a community creates additional demands on some,
or all, public facilities provided by local government. If the supply of facilities is not increased to satisfy
that additional demand, the quality or availability of public services for the entire community will
deteriorate. Development fees may be used to recover the cost of development-related facilities, but only
to the extent that the need for facilities is a consequence of development that is subject to the fees.The
Nollan decision reinforced the principle that development exactions may be used only to mitigate
conditions created by the developments upon which they are imposed. That principle clearly applies to
development fees. In this study, the impact of development on improvement needs is analyzed in terms
of quantifiable relationships between various types of development and the demand for specific facilities,
based on applicable level-of-service standards.
Demonstrating a Benefit. A sufficient benefit relationship requires that development fee revenues be
segregated from other funds and expended only on the facilities for which the fees were charged. Fees
must be expended in a timely manner and the facilities funded by the fees must serve the development
paying the fees. However, nothing in the U.S. Constitution or the State enabling Act authorizing
development fees requires that facilities funded with fee revenues be available exclusively to
development paying the fees. In other words, existing development may benefit from these
improvements as well.
Procedures for the earmarking and expenditure of fee revenues are typically mandated by the State
Enabling Legislation, as are procedures to ensure that the fees are expended expeditiously or refunded.
All requirements are intended to ensure that developments benefit from the fees they are required to
pay.Thus, an adequate showing of benefit must address procedural as well as substantive issues.
Demonstrating Proportionality. The requirement that exactions be proportional to the impacts of
development was clearly stated by the U.S. Supreme Court in the Dolan case (although the relevance of
that decision to development fees has been debated) and is logically necessary to establish a proper
nexus. Proportionality is established through the procedures used to identify development-related facility
costs,and in the methods used to calculate development fees for various types of facilities and categories
of development.The demand for facilities is measured in terms of relevant and measurable attributes of
development.
4 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Development fees for the necessary public services made necessary by new development must be based
on the same level of service (LOS) provided to existing development in the service area. There are three
basic methodologies used to calculate development fees. They examine the past, present, and future
status of infrastructure. The objective of evaluating these different methodologies is to determine the
best measure of the demand created by new development for additional infrastructure capacity. Each
methodology has advantages and disadvantages in a particular situation and can be used simultaneously
for different cost components.
Reduced to its simplest terms, the process of calculating development fees involves two main steps: (1)
determining the cost of development-related capital improvements and (2) allocating those costs
equitably to various types of development. In practice, though, the calculation of development fees can
become quite complicated because of the many variables involved in defining the relationship between
development and the need for facilities within the designated service area. The following paragraphs
discuss basic methodologies for calculating development fees and how those methodologies can be
applied.
• Cost Recovery(past improvements)-The rationale for recoupment, often called cost recovery, is
that new development is paying for its share of the useful life and remaining capacity of facilities
already built, or land already purchased, from which new growth will benefit. This methodology
is often used for utility systems that must provide adequate capacity before new development
can take place.
• Incremental Expansion (concurrent improvements) - The incremental expansion methodology
documents current LOS standards for each type of public facility, using both quantitative and
qualitative measures. This approach assumes there are no existing infrastructure deficiencies or
surplus capacity in infrastructure. New development is only paying its proportionate share for
growth-related infrastructure. Revenue will be used to expand or provide additional facilities, as
needed, to accommodate new development. An incremental expansion cost method is best
suited for public facilities that will be expanded in regular increments to keep pace with
development.
• Plan-Based (future improvements) -The plan-based methodology allocates costs for a specified
set of improvements to a specified amount of development. Improvements are typically identified
in a long-range facility plan and development potential is identified by a land use plan.There are
two basic options for determining the cost per demand unit: (1) total cost of a public facility can
be divided by total demand units (average cost), or(2)the growth-share of the public facility cost
can be divided by the net increase in demand units over the planning timeframe (marginal cost).
TischlerB 5
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
DEVELOPMENT FEE COMPONENTS
Shown below, Figure 1 summarizes service areas, methodologies, and infrastructure cost components for
the proposed fees.
Figure 1: Proposed Development Fee Service Areas, Methodologies,and Cost Components
Library Library Facilities N/A Library Development Fee Population,
Service Area Facilities Report Jobs
Parks and
Developed Park
Parks and Recreational Development Fee Population,
N/A Land,Park
Recreational Facilities Service Report Jobs
Amenities,Trails
Area
Police Facilities,
Police Facilities Police Vehicle, Population,
Police N/A Development Fee
Service Area Police Equipment Vehicle Trips
Report
Street Facilities Street Development Fee
Street N/A VMT
Service Area Improvements Report
Calculations throughout this report are based on an analysis conducted using Excel software. Most results
are discussed in the report using two, three, and four decimal places, which represent rounded figures.
However,the analysis itself uses figures carried to their ultimate decimal places; therefore,the sums and
products generated in the analysis may not equal the sum or product if the reader replicates the
calculation with the factors shown in the report(due to the rounding of figures shown, not in the analysis).
6 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
PROPOSED DEVELOPMENT FEES
Development fees for residential development will be assessed per dwelling unit, based on the type of
unit. Nonresidential development fees will be assessed per square foot of floor area, based on the
development type. The fee schedule includes three new nonresidential categories. Institutional was
previously included in office and other services, lodging (assessed per room) was previously included in
commercial, and assisted living (assessed per bed) was included in office and other services.
The proposed fees represent the maximum allowable fees. Apache Junction may adopt fees that are less
than the amounts shown; however, a reduction in development fee revenue will necessitate an increase
in other revenues, a decrease in planned capital improvements, and/or a decrease in level-of-service
standards. All costs in the Development Fee Report represent current dollars with no assumed inflation
over time. If costs change significantly over time, development fees should be recalculated.
Figure 2: Proposed Development Fees
Residential Fees per Development Unit
•. •••
•
Single Family Housing Unit $714 $2,057 $1,449 $4,843 $9,063
Multi-Family Housing Unit $564 $1,624 $1,145 $2,406 $5,739
Recreational Vehicle Housing Unit $538 $1,551 $1,093 $2,406 $5,588
Nonresidential Fees per Development Unit
•
Industrial Square Foot $0.05 $0.15 $0.76 $1.00 $1.96
Commercial Square Foot $0.12 $0.35 $5.09 $4.47 $10.03
Office&Other Services Square Foot $0.13 $0.39 $1.65 $2.17 $4.34
Institutional Square Foot $0.17 $0.51 $1.48 $1.95 $4.11
Lodging Room $23 $69 $1,237 $1,087 $2,416
Assisted Living Bed $56 $165 $877 $1,156 $2,254
7
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
CURRENT DEVELOPMENT FEES
Current development fees for residential development are assessed per dwelling unit, based on the type
of unit. Current development fees for nonresidential development are assessed per square foot of floor
area, based on the type of development.
Figure 3: Current Development Fees
Residential Fees per Development Unit
Single Family Housing Unit $550 $1,707 $1,229 $3,250 $6,736
Multi-Family Housing Unit $432 $1,340 $965 $1,779 $4,516
Recreational Vehicle Housing Unit $425 $1,318 $949 $1,779 $4,471
Nonresidential Fees per Development Unit
Industrial Square Foot $0.07 $0.22 $0.68 $0.92 $1.89
Commercial Square Foot $0.10 $0.30 $3.40 $4.72 $8.52
0ffice&0ther Services Square Foot $0.16 $0.46 $1.51 $2.04 $4.17
Institutional Square Foot $0.14 $0.40 $0.99 $1.34 $2.87
Lodging Room $27 $79 $1,115 $1,545 $2,766
Assisted Living Bed $29 $86 $362 $490 $967
DIFFERENCE BETWEEN PROPOSED AND CURRENT DEVELOPMENT FEES
The differences between the proposed and current development fees are displayed below in Figure 4.
Figure 4: Difference Between Proposed and Current Development Fees
Residential Fees per Development Unit
Single Family Housing Unit $164 $350 $220 $1,593 $2,327
Multi-Family Housing Unit $132 $284 $180 $627 $1,223
Recreational Vehicle Housing Unit $113 $233 $144 $627 $1,117
Nonresidential Fees per Development Unit
Industrial Square Foot ($0.02) ($0.07) $0.08 $0.08 $0.07
Commercial Square Foot $0.02 $0.05 $1.69 ($0.25) $1.51
0ffice&0ther Services Square Foot ($0.03) ($0.07) $0.14 $0.13 $0.17
Institutional Square Foot $0.03 $0.11 $0.49 $0.61 $1.24
Lodging Room ($4) ($10) $122 ($458) ($350)
Assisted Living Bed $27 $79 $515 $666 $1,287
8 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
ARS§ 9-463.05 (T)(7)(d) defines the facilities and assets that can be included in the Library Facilities lIP:
"library facilities of up to ten thousand square feet that provide a direct benefit to development,
not including equipment, vehicles or appurtenances."
METHODOLOGY
The library facilities lIP includes components for library facilities and the cost of preparing the library
facilities lIP and related development fee report. The incremental expansion methodology is used for
library facilities, and the plan-based methodology is used for the development fee report.
PROPORTIONATE SHARE
ARS § 9-463.05 (B)(3) states that the development fee shall not exceed a proportionate share of the cost
of necessary public services needed to accommodate new development. The library facilities lIP and
development fees allocate the cost of necessary public services between residential and nonresidential
based on functional population.The Arizona Office of Economic Opportunity estimates Apache Junction's
2022 population equal to 39,811 persons. Based on 2022 estimates from the U.S. Census Bureau's
OnTheMap web application, 5,801 inflow commuters traveled to Apache Junction for work in 2022. The
proportionate share is based on cumulative impact hours per year with a resident potentially impacting
library facilities 4,380 hours per year and an inflow commuter potentially impacting library facilities 500
hours per year. For library facilities, residential development generates 98 percent of demand and
nonresidential development generates the remaining two percent of demand.
Figure L1: Proportionate Share
Residential 39,811 persons' 4,380 174,371,304 98%
Nonresidential 5,801 inflow commuters2 500 2,900,500 2%
Total 177,271,804 100%
1.Arizona Office of Economic Opportunity,2022.
2.U.S.Census Bureau,OnTheMap Application and LEHD Origin-Destination Employment Statistics,Version 6.25.2,2022.
Residential Impact:12 hours per day X 365 days per year
Nonresidential Impact:2 hours per day X 5 days per week X 50 weeks per year
The proportionate share of costs attributable to residential development will be allocated to population
and then converted to an appropriate amount by type of housing unit. Since nonresidential data were
unavailable by specific nonresidential use, TischlerBise recommends using employment density as the
best demand indicator for nonresidential demand for library services. Employment density is highest for
office development and lowest for industrial development. Commercial development, such as a shopping
center, and institutional development fall between the other two categories.This ranking of employment
densities is consistent with the relative demand for library services from nonresidential development.
TischlerBise
9
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
SERVICE AREA
Apache Junction provides library access within the city limits; therefore, there is a single service area for
the library facilities IIP.
Figure 12: Library Facilities Service Area
•
Ir
Maricopa County f
Pinal County
8 Tonto
.'National
Forest
Superstition Wilderness Area
Apache
Junction
s6
Gold Canyon
Community
202
MESA
C 60
o�
U �
hoe
Gate
Ai
24
QUEEN CREEK
O
LEGEND
® Municipal Boundary National Forest Other Municpal Boundaries
N
Pinal County Island .% Wilderness Area Mesa
County Boundary Airport Boundary Queen Creek April 06,2022
0 10,000 20,000
Feet
G:\Data\Working\zScratch W orkspace\SCollins\CityLimlts_Letter.mxd
10 Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT
ARS§ 9-463.05(E)(4) requires:
"A table establishing the specific level or quantity of use, consumption, generation or discharge of
a service unit for each category of necessary public services or facility expansions and an
equivalency or conversion table establishing the ratio of a service unit to various types of land
uses, including residential, commercial and industrial."
Figure L3 displays the demand indicators for residential and nonresidential land uses. For residential
development, the table displays the number of persons per household. For nonresidential development,
the table displays the number of jobs per development unit (square foot, room, or bed).
Figure 13: Ratio of Service Unit to Development Unit
Residential Development
.-
SingleFamily Housing Unit 2.52
Multi-Family Housing Unit 1.99
MobileHome/RV Housing Unit 1.90
Nonresidential Development
11111
�- •• • III I
-
Industrial Square Foot ,0.0009
Commercial Square Foot 0.0021
Office&Other Services Square Foot 0.0023
Institutional Square Foot 0.0030
Lodging Room 0.4073
Assisted Living Bed 0.9764
1. U.S.Census Bureau,2019-2023 American Community Survey 5-Year Estimates.
2.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES
ARS§9-463.05(E)(1) requires:
"A description of the existing necessary public services in the service area and the costs to upgrade,
update, improve, expand, correct or replace those necessary public services to meet existing needs
and usage and stricter safety, efficiency, environmental or regulatory standards, which shall be
prepared by qualified professionals licensed in this state, as applicable."
ARS§ 9-463.05(E)(2) requires:
"An analysis of the total capacity, the level of current usage and commitments for usage of
capacity of the existing necessary public services, which shall be prepared by qualified
professionals licensed in this state, as applicable."
TischlerB 11
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Library Facilities- Incremental Expansion
Existing Level of Service
Apache Junction currently provides 31,444 square feet of library facilities, and Apache Junction plans to
construct additional library facilities to serve future development. To allocate the proportionate share of
demand for library facilities to residential and nonresidential development, this analysis uses
proportionate share shown in Figure L1. Apache Junction's existing level of service for residential
development is 0.5674 square feet per person (31,444 square feet X 98 percent residential share/54,314
persons). The nonresidential level of service is 0.1170 square feet per job (31,444 square feet X two
percent nonresidential share/5,373 jobs).
Figure 14: Existing Level of Service
Existing Square Feet 31,444
Residential
Residential Share 98%
2026 Population 54,314
Square Feet per Person 0.5674
Nonresidential
Nonresidential Share 2%
2026 Jobs 5,373
Square Feet perJob 0.1170
Source:Apache Junction Public Library
If Apache Junction maintains its existing level of service over the next 10 years, future development will
demand 19,361 square feet of library facilities. The Enabling Legislation limits library facilities to "ten
thousand square feet that provide a direct benefit to development." To comply with the Enabling
Legislation,Apache Junction will maintain a lower, adjusted level of service as discussed on the next page.
Figure 15: Projected Demand
Demand for Library Facilities
Residential' . .-
2026 54,314 5,373 30,815.1 628.9 31,444.0
2027 58,482 5,541 33,179.9 648.6 33,828.5
2028 62,650 5,710 35,544.6 668.3 36,212.9
2029 66,818 5,878 37,909.4 688.0 38,597.4
2030 70,986 6,046 40,274.1 707.7 40,981.8
2031 75,154 6,204 42,638.9 726.1 43,365.0
2032 79,322 6,361 45,003.6 744.5 45,748.1
2033 83,490 6,518 47,368.4 762.9 48,131.3
2034 85,312 6,675 48,402.0 781.3 49,183.4
2035 86,708 6,833 49,194.1 799.7 49,993.8
2036 88,105 6,990 49,986.5 818.1 50,804.6
10-Yr Increase 33,791 1,617 19,171.4 189.3 19,360.6
12 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Adjusted Level of Service
The Enabling Legislation limits library facilities to "ten thousand square feet that provide a direct benefit
to development."To comply with the Enabling Legislation, Apache Junction plans to construct additional
library facilities of 10,000 square feet or less to serve future development. Based on projected residential
growth of approximately 11,000 housing units in Superstition Vistas over the next 10 years, Apache
Junction plans to construct 15,000 square feet of library facilities to serve future development in
Superstition Vistas (10,000 square feet eligible) and 2,500 square feet in other parts of the city. Apache
Junction will use an adjustment factor of approximately 65 percent (12,500 square feet/ 19,361 square
feet) to calculate the adjusted level of service, and Apache Junction will maintain the adjusted level of
service throughout the library facilities service area.
To allocate the proportionate share of demand for library facilities to residential and nonresidential
development,this analysis uses proportionate share shown in Figure L1.Apache Junction's adjusted level
of service for residential development is 0.3663 square feet per person (20,302 adjusted square feet X 98
percent residential share/54,314 persons). The nonresidential level of service is 0.0756 square feet per
job (20,302 adjusted square feet X two percent nonresidential share/5,373 jobs).
Apache Junction plans to construct a future library with 15,000 square feet at a cost of$12,750,000, and
the analysis uses the construction cost of$850 per square foot as a proxy for future library facility costs.
For library facilities,the cost is$311.36 per person (0.3663 square feet per person X$850 per square foot)
and $64.24 per job (0.0756 square feet per job X$850 per square foot).
Figure 16:Adjusted Level of Service
Future Library Cost • $12,750,000
Future Library Square Feet 15,000
Cost per Square Foot $850
• IET1Th
Existing Square Feet 31,444
LOS Adjustment ustment 65%
Adjusted Square Feet 20,302
Residential
Residential Share 98%
2026 Population 54,314
Square Feet per Person 0.3663
.-
Nonresidential
Nonresidential Share 2%
2026 Jobs 5,373
Square Feet perJob 0.0756
•- .. .I I
Source:Apache Junction Public Library
TischlerB 13
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Future Debt Credit
Apache Junction will likely issue debt to construct future library facilities. This analysis includes a credit
for future debt payments on future debt. A credit is necessary since future development will pay the
development fee and will also contribute to future debt payments on the future library debt.
Apache Junction plans to construct a library with 15,000 square feet at a cost of $12,750,000, and the
analysis uses this cost as a proxy for future library facilities. Apache Junction will likely issue library debt
in two years, so the analysis reduces the future debt issuance by two years of projected library facility
development fee revenue ($2,300,000). The analysis also reduces the future debt issuance based on the
existing library development fee fund balance of $2,000,000 and ineligible share of the planned library
equal to $4,250,000 (statutory limitation over 10,000 square feet). As shown below, future library debt
equals$4,200,000($12,750,000 total cost-$2,300,000 projected library facility development fee revenue
- $2,000,000 existing fund balance-$4,250,000 ineligible share) and will be repaid through 2048.Annual
payments are divided by projected development to determine the credit per person or job. To account
for the time value of money, annual payments per person and per job are discounted using a net present
value formula based on a discount rate of 4.00 percent.The net present value of future debt payments is
$28.81 per person and $7.27 per job, and the analysis includes these amounts as a credit in the
development fee calculation.
Figure 17: Future Debt Credit
2026 $0 $0 54,314 $0.00 $0 5,373 $0.00
2027 $0 $0 58,482 $0.00 $0 5,541 $0.00
2028 $141,043 $138,222 62,650 $2.21 $2,821 5,710 $0.49
2029 $146,685 $143,751 66,818 $2.15 $2,934 5,878 $0.50
2030 $152,552 $149,501 70,986 $2.11 $3,051 6,046 $0.50
2031 $158,655 $155,481 75,154 $2.07 $3,173 6,204 $0.51
2032 $165,001 $161,701 79,322 $2.04 $3,300 6,361 $0.52
2033 $171,601 $168,169 83,490 $2.01 $3,432 6,518 $0.53
2034 $178,465 $174,896 85,312 $2.05 $3,569 6,675 $0.53
2035 $185,603 $181,891 86,708 $2.10 $3,712 6,833 $0.54
2036 $193,028 $189,167 88,105 $2.15 $3,861 6,990 $0.55
2037 $200,749 $196,734 89,113 $2.21 $4,015 7,052 $0.57
2038 $208,779 $204,603 90,121 $2.27 $4,176 7,115 $0.59
2039 $217,130 $212,787 91,129 $2.34 $4,343 7,178 $0.61
2040 $225,815 $221,299 92,137 $2.40 $4,516 7,240 $0.62
2041 $234,848 $230,151 93,145 $2.47 $4,697 7,340 $0.64
2042 $244,241 $239,357 94,153 $2.54 $4,885 7,440 $0.66
2043 $254,011 $248,931 95,161 $2.62 $5,080 7,539 $0.67
2044 $264,172 $258,888 96,169 $2.69 $5,283 7,639 $0.69
2045 $274,738 $269,244 97,177 $2.77 $5,495 7,739 $0.71
2046 $285,728 $280,013 98,185 $2.85 $5,715 7,838 $0.73
2048 $297,157 $291,214 99,193 $2.94 $5,943 7,938 $0.75
Total $4,200,000 $4,116,000 100,201 $46.97 $84,000 8,038 $11.92
Discount Rate 4.00% Discount Rate I 4.00%
..
14 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Development Fee Report-Plan-Based
The 2026 cost to prepare the library facilities IIP and related development fee report totals $13,040.
Apache Junction plans to update its report every five years, so the 10-year cost is $26,080. Based on this
cost, proportionate share,and 10-year projections of future development from the Land Use Assumptions
document, the cost is $0.76 per person and $0.32 per job.
Figure 18: lIP and Development Fee Report
ip... - ...
Library $13,040 $26,080 Residential 98% Population 33,791 $0.76
Nonresidential 2% Jobs 1,617 $0.32
Parks and $15,250 $30,500 Residential 98% Population 11,971 $2.50
Recreational Nonresidential 2% Jobs 671 $0.91
Police $13,500 $27,000 Residential 82% Population 33,791 $0.66
Nonresidential 18% Vehicle Trips 6,512 $0.75
Street $25,650 $51,300 All Development 100% VMT 52,115 $0.98
Total $67,440 $134,880
PROJECTED DEMAND FOR SERVICES AND COSTS
ARS§9-463.05(E)(5) requires:
"The total number of projected service units necessitated by and attributable to new development
in the service area based on the approved land use assumptions and calculated pursuant to
generally accepted engineering and planning criteria."
ARS§ 9-463.05(E)(6) requires:
"The projected demand for necessary public services or facility expansions required by new service
units for a period not to exceed ten years."
As shown in the Land Use Assumptions document, Apache Junction's population is expected to increase
by 33,791 persons and employment is expected to increase by 1,617 jobs over the next 10 years. To
maintain the adjusted level of service,Apache Junction will need to construct 12,500 square feet of library
facilities over the next 10 years. The following page includes a more detailed projection of demand for
services and costs for the library facilities IIP.
schlerBise 15
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Library Facilities- Incremental Expansion
Apache Junction plans to maintain its adjusted level of service for library facilities over the next 10 years.
Based on a projected population increase of 33,791 persons,future residential development demands an
additional 12,378 square feet of library facilities(33,791 additional persons X 0.3663 adjusted square feet
per person). With projected nonresidential growth of 1,617 jobs, future nonresidential development
demands an additional 122 square feet of library facilities(1,617 additional jobs X 0.0756 adjusted square
feet per job). Future development demands 12,500 square feet of library facilities at a cost of$10,625,000
(12,500 square feet X $850 per square foot). Apache Junction plans to construct 15,000 square feet of
library facilities to serve future development in Superstition Vistas, and it will construct additional library
facilities as needed in the remainder of the library facilities service area.
Figure 19: Projected Demand
0.3663 Square Feet per Person
Library Facilities $850
0.0756 SquareFeet perJob
Demand for Library Facilities
Population •.
2026 54,314 5,373 19,895.5 406.0 20,301.5
2027 58,482 5,541 21,422.3 418.8 21,841.0
2028 62,650 5,710 22,949.0 431.5 23,380.5
2029 66,818 5,878 24,475.8 444.2 24,920.0
2030 70,986 6,046 26,002.6 456.9 26,459.5
2031 75,154 6,204 27,529.4 468.8 27,998.2
2032 79,322 6,361 29,056.1 480.7 29,536.8
2033 83,490 6,518 30,582.9 492.6 31,075.5
2034 85,312 6,675 31,250.3 504.5 31,754.8
2035 86,708 6,833 31,761.7 516.3 32,278.0
2036 88,105 6,990 32,273.3 528.2 32,801.5
10-Yr Increase 33,791 1,617 12,377.8 122.2 12,500.0
Auction Property(Growth) $6,793,855 $60,776 $6,854,631
Outside Auction Property(Growth) $3,727,279 $43,089 $3,770,369
Recent Development(Fund Balance) $1,960,000 $40,000 $2,000,000
Ineligible Expenditures(Statutory Limit) $4,165,000 $85,000 $4,250,000
Total Expenditures $16,646,134 $228,866 $16,875,000
16 Tisch BISe
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
LIBRARY FACILITIES DEVELOPMENT FEES
Revenue Credit/Offset
A revenue credit/offset is not necessary for library facilities development fees, because costs generated
by projected development exceed revenues generated by projected development. Appendix A contains
the forecast of revenues required by Arizona's Enabling Legislation (ARS § 9-463.05(E)(7)).
Library Facilities Development Fees
Infrastructure components and cost factors for library facilities are summarized in the upper portion of
Figure L10.The cost per service unit for library facilities is$283.31 per person and $57.29 per job.
Library facilities development fees for residential development are assessed according to the number of
persons per household. The fee of$714 for a single-family unit is calculated using a cost per service unit
of$283.31 per person multiplied by a demand unit of 2.52 persons per household.
Nonresidential development fees are calculated using jobs as the service unit.The fee of$0.05 per square
foot of industrial development is derived from a cost per service unit of $57.29 per job multiplied by a
demand unit of 0.0009 jobs per square foot(0.90 jobs per 1,000 square feet).The fee of$23 per room of
lodging development is derived from a cost per service unit of$57.29 per job multiplied by a demand unit
of 0.4073 jobs per room.
Figure 110: Library Facilities Development Fees
.. ..
Library Facilities $311.36 $64.24
Future Debt Credit ($28.81) ($7.27)
Development Fee Report $0.76 $0.32
Total $283.31 $57.29
Residential Fees per Development Unit
ujin .-
SingleFamily I Housing Unit 2.52 $714 $550 $164
Multi-Family Housing Unit 1.99 $564 $432 $132
Recreational Vehicle Housing Unit 1.90 $538 $425 $113
Nonresidential Fees per Development Unit
uuuI.IIlLIJill
Industrial Square Foot 0.0009 $0.05 $0.07 ($0.02)
Commercial Square Foot 0.0021 $0.12 $0.10 $0.02
Office&Other Services Square Foot 0.0023 $0.13 $0.16 ($0.03)
Institutional Square Foot 0.0030 $0.17 $0.14 $0.03
Lodging Room 0.4073 $23 $27 ($4)
Assisted Living Bed 0.9764 $56 $29 $27
1.See Land Use Assumptions
schlerBise 17
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
LIBRARY FACILITIES DEVELOPMENT FEE REVENUE
Appendix A contains the forecast of revenues required by Arizona's enabling legislation (ARS § 9-
463.05(E)(7)). In accordance with state law, this report includes an IIP for library facilities needed to
accommodate future development. Projected fee revenue shown in Figure L11 is based on the
development projections in the Land Use Assumptions document and the updated library facilities
development fees. If development occurs at a more rapid rate than projected, the demand for
infrastructure will increase and development fee revenue will increase at a corresponding rate. If
development occurs at a slower rate than projected, the demand for infrastructure will also decrease,
along with development fee revenue. Projected development fee revenue equals $9,666,594, and
projected expenditures equal $15,915,806. Existing development's share of $4,250,000 will be funded
with non-development fee revenue.
Figure L11: Library Facilities Development Fee Revenue
• •. tcM1i1F U
Library Facilities $10,625,000 $2,000,000 $4,250,000 $16,875,000
Future Debt Credit ($985,274) $0 $0 ($985,274)
Development Fee Report $26,080 $0 $0 $26,080
Total $9,665,806 $2,000,000 $4,250,000 $15,915,806
.- .- .-
Year Hsg Unit Hsg Unit KSF KSF KSF KSF
Base 2026 12,015 2,859 373 1,166 758 293
Year 1 2027 13,515 3,054 401 1,211 780 293
Year 2 2028 15,015 3,249 429 1,256 801 293
Year 3 2029 16,515 3,444 458 1,302 822 293
Year 4 2030 18,015 3,639 486 1,347 844 293
Year 5 2031 19,515 3,834 509 1,390 862 295
Year 6 2032 21,015 4,029 532 1,433 879 297
Year 7 2033 22,515 4,224 556 1,475 897 299
Year 8 2034 23,084 4,419 579 1,518 915 301
Year 9 2035 23,484 4,614 602 1,561 933 303
Year 10 2036 23,884 4,809 626 1,604 950 305
10-Year Increase 11,869 1,950 253 438 192 13
Projected Revenue $8,474,466 $1,099,800 $12,630 $52,560 $24,960 $2,178
18 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
. .
ARS§9-463.05 (T)(7)(g)defines the facilities and assets that can be included in the Parks and Recreational
Facilities lIP:
"Neighborhood parks and recreationalfacilities on real property up to thirty acres in area, or parks
and recreational facilities larger than thirty acres if the facilities provide a direct benefit to the
development. Park and recreationalfacilities do not include vehicles, equipment or that portion of
any facility that is used for amusement parks, aquariums, aquatic centers, auditoriums, arenas,
arts and cultural facilities, bandstand and orchestra facilities, bathhouses, boathouses,
clubhouses, community centers greater than three thousand square feet in floor area,
environmental education centers, equestrian facilities, golf course facilities, greenhouses, lakes,
museums, theme parks, water reclamation or riparian areas, wetlands, zoo facilities or similar
recreationalfacilities, but may include swimming pools."
The Parks and Recreational Facilities IIP includes components for developed park land, park amenities,
trails, and the cost of preparing the Parks and Recreational Facilities IIP and related Development Fee
Report.The incremental expansion methodology is used for developed park land and park amenities.The
plan-based methodology is used for trails and the Development Fee Report.
Proportionate Share
ARS § 9-463.05 (B)(3) states that the development fee shall not exceed a proportionate share of the cost
of necessary public services needed to accommodate new development. The parks and recreational
facilities IIP and development fees allocate the cost of necessary public services between residential and
nonresidential based on functional population. The Arizona Office of Economic Opportunity estimates
Apache Junction's 2022 population equal to 39,811 persons. Based on 2022 estimates from the U.S.
Census Bureau's OnTheMap web application, 5,801 inflow commuters traveled to Apache Junction for
work in 2022. The proportionate share is based on cumulative impact hours per year with a resident
potentially impacting parks and recreational facilities 4,380 hours per year and an inflow commuter
potentially impacting parks and recreational facilities 500 hours per year. For parks and recreational
facilities, residential development generates 98 percent of demand and nonresidential development
generates the remaining two percent of demand.
Figure PR1: Proportionate Share
Residential 39,811 persons' 4,380 174,371,304 98%
Nonresidential 5,801 inflow commuters2 500 2,900,500 2%
Total 177,271,804 100%
1.Arizona Office of Economic Opportunity,2022.
2.U.S.Census Bureau,OnTheMap Application and LEHD Origin-Destination Employment Statistics,Version 6.25.2,2022.
Residential Impact:12 hours per dayX 365 days per year
Nonresidential Impact:2 hours per day X 5 days per week X 50 weeks per year
schlerBise 19 Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Service Area
Apache Junction plans to provide a uniform level of service and equal access to parks and recreational
facilities within the city; therefore, there is a single service area for the Parks and Recreational Facilities
IIP. As defined by the Development Agreement for Superstition Vistas (October 2021), Apache Junction
will not assess parks and recreational facilities fees to development within the"Auction Property"because
public parks and trails are directly provided by the developers.
Figure PR2: Parks and Recreational Facilities Service Area
• •
Maricopa County
Pinal County
88 TontoI : - = _____________
.'National,
Forest
Superstition Wilderness Area
Junction
60
Gold Canyon
Community
202
MESA II
� 60
f
m
Auction
Property o
hoenix-Mesa
Gateway
Airport
24
QUEEN CREEK
v 'o
m U
o m
LEGEND
® Municipal Boundary National Forest Other Municpal Boundaries N
Final County Island .% Wilderness Area Mesa
Q County Boundary Airport Boundary Queen Creek April 06,2022 /V
Auction Properly0 10,000 20.000
Feet
G\Oata\Worklnu\zSpratcM1Wor000ace\SCoIIIns\City LimltsLettermxtl
20 Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT
ARS§ 9-463.05(E)(4) requires:
"A table establishing the specific level or quantity of use, consumption, generation or discharge
of a service unit for each category of necessary public services or facility expansions and an
equivalency or conversion table establishing the ratio of a service unit to various types of land
uses, including residential, commercial and industrial."
Figure PR3 displays the demand indicators for residential and nonresidential land uses. For residential
development, the table displays the number of persons per household. For nonresidential development,
the table displays the number of jobs per development unit (square foot, room, or bed).
Figure PR3: Ratio of Service Unit to Development Unit
Residential Development
•ITflppjiiiiiii .1
Development .-
Ulill
Single Family Housing Unit , 2.52
Multi-Family Housing Unit 1.99
MobileHome/RV Housing Unit 1.90
Nonresidential Development
11111�- .. 1.11 1
,
.-
IU
Industrial Square Foot 0.0009
Commercial Square Foot 0.0021
Office&Other Services Square Foot 0.0023
Institutional Square Foot 0.0030
Lodging Room 0.4073
Assisted Living Bed 0.9764
1. U.S.Census Bureau,2019-2023 American Community Survey 5-Year Estimates.
2.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES
ARS§ 9-463.05(E)(1) requires:
"A description of the existing necessary public services in the service area and the costs to upgrade,
update, improve, expand, correct or replace those necessary public services to meet existing needs
and usage and stricter safety, efficiency, environmental or regulatory standards, which shall be
prepared by qualified professionals licensed in this state, as applicable."
ARS§ 9-463.05(E)(2) requires:
"An analysis of the total capacity, the level of current usage and commitments for usage of
capacity of the existing necessary public services, which shall be prepared by qualified
professionals licensed in this state, as applicable."
schlerBise 21
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Developed Park Land- Incremental Expansion
Apache Junction currently provides 2,202.2 acres of park land.This includes 143.2 acres of developed park
land and 2,059.0 acres of undeveloped park land. Due to the availability of undeveloped land, Apache
Junction does not plan to acquire additional park land during the 10-year IIP timeframe. Instead, Apache
Junction will develop a portion of the existing undeveloped park land.
Figure PR4: Existing Park Land
.. .. .
Arroya Verde Retention 11.0 11.0 0.0
City Hall Park 3.0 3.0 0.0
Dutchman Dog Park 3.4 3.4 0.0
Flatiron Park 4.0 4.0 0.0
Focal Point 1.0 1.0 0.0
Ironwood Linear Park 6.2 6.2 0.0
Little League Facility 3.0 3.0 0.0
MGC 4.4 4.4 0.0
Painted Sky Park 12.0 12.0 0.0
Prospector Park 265.0 40.0 225.0
Renaissance Point Retention 8.0 8.0 0.0
Rodeo Grounds 20.0 10.0 10.0
Rigeline Linear Park 8.2 8.2 0.0
Sheep Drive Park 1,628.0 0.0 1,628.0
Silly Mountain Park 200.0 4.0 196.0
Superstition Shadows park 23.0 23.0 0.0
Veteran's Memorial Park 2.0 2.0 0.0
Total 2,202.2 143.2 2,059.0
Source:Apache Junction Parks and Recreation Department
22 Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
To allocate the proportionate share of demand for developed park land to residential and nonresidential
development, this analysis uses the proportionate share shown in Figure PR1. The existing LOS for
residential development is 0.00258 developed acres per person (143.2 developed acres X 98 percent
residential share / 54,314 persons). For nonresidential development, the existing LOS is 0.00053
developed acres per job (143.2 developed acres X two percent nonresidential share/5,373 jobs).
The analysis includes a cost of$40,000 per acre for development costs not captured in the park amenities
component (site development, grading, utilities, etc.). For developed park land, the cost is $103.37 per
acre (0.00258 developed acres per person X $40,000 per acre) and $21.33 per job (0.00053 developed
acres per job X$40,000 per acre).
Figure PR5: Existing Level of Service
Developed Cost per Acre1 • $40,000
, ! II! 1 flTF1Th.
Existing Developed Acres 143.2
Residential
Residential Share 98%
2026 Population 54,314
Developed Acres per Person 0.00258
Nonresidential
Nonresidential Share 2%
2026 Jobs 5,373
Developed Acres per Job 0.00053
Source:Apache Junction Parks and Recreation Department
1. Includes infrastructure costs but excludes acquisition costs.
TischlerBise 23
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Park Amenities- Incremental Expansion
Apache Junction currently provides 154 park amenities in its existing parks,and the city plans to construct
additional park amenities to serve future development. Based on costs provided by Apache Junction's
Parks and Recreation Department to construct recent park amenities,the total cost of Apache Junction's
existing park amenities is$37,692,708.The average cost is$244,758 per park amenity($37,692,708 total
cost/ 154 park amenities).
Figure PR6: Existing Park Amenities
5 . 5
Ball Field 7 $937,085 $6,559,594
Basketball Court 4 $217,295 $869,180
Concession/Restroom 9 $500,000 $4,500,000
Dog Park 2 $1,200,000 $2,400,000
Horseshoe Pit 5 $2,716 $13,581
Multipurpose Field 4 $882,761 $3,531,045
Parking Lot 15 $252,062 $3,780,934
Pickle Ball Court 14 $200,000 $2,800,000
Playground 7 $679,047 $4,753,329
Pool 1 $2,409,802 $2,409,802
Primitive Vault Restroom 2 $60,000 $120,000
Racquetball Court 4 $108,648 $434,590
Ramada(large group) 11 $101,857 $1,120,428
Ramadas(single) 7 $16,297 $114,080
Ramadas(small group) 20 $61,114 $1,222,285
Security Fencing 25 $28,683 $717,074
Shuffleboard Court 3 $21,730 $65,189
Skate Park 1 $543,238 $543,238
Splashplad 1 $108,648 $108,648
Tennis Court 8 $162,971 $1,303,770
Volleyball Court 4 $81,486 $325,943
Total 154 $244,758 $37,692,708
Source:Apache Junction Parks and Recreation Department
24 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
To allocate the proportionate share of demand for park amenities to residential and nonresidential
development, this analysis uses the proportionate share shown in Figure PR1. Apache Junction's existing
LOS for residential development is 0.0028 units per person (154 amenities X 98 percent residential share
/54,314 persons). For nonresidential development,the existing LOS is 0.0006 units per job(154 amenities
X two percent nonresidential share/5,373 jobs).
Based on the total cost of Apache Junction's existing park amenities, the average cost for new park
amenities is$244,758 per amenity($37,692,708 total cost/ 154 amenities).The analysis uses this cost as
a proxy for future park amenity costs. For park amenities,the cost is$680.10 per person (0.0028 units per
person X$244,758 per amenity) and $140.31 per job (0.0006 units per job X$244,758 per amenity).
Figure PR7: Existing Level of Service
Average Cost per Unit • $244,758
•2IL $ !ThTFITh.
Existing Units 154
Residential
Residential Share 98%
2026 Population 54,314
Units per Person 0.0028
Nonresidential
Nonresidential Share 2%
2026 Jobs 5,373
Units perJob 0.0006
•- .• a1
Source:Apache Junction Parks and Recreation Department
TischlerB 25
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Trails-Incremental Expansion
Apache Junction currently provides 20.6 miles of trails, and the city plans to construct additional trails to
serve future development. To allocate the proportionate share of demand for trails to residential and
nonresidential development, this analysis uses the proportionate share shown in Figure PR1. Apache
Junction's existing LOS for residential development is 0.0004 miles per person (20.6 miles X 98 percent
residential share/54,314 persons). For nonresidential development, the existing LOS is 0.0001 miles per
job (20.6 miles X two percent nonresidential share/5,373 jobs).
The 2022 IIP used a trail cost of $75,000 per mile provided by Apache Junction's Parks and Recreation
Department.The analysis inflates the 2022 IIP cost based on Engineering News-Record's construction cost
index to estimate the current trail construction cost of$81,500 per. For trails,the cost is$30.29 per person
(0.0004 miles per person X$81,500 per mile) and $6.25 per job(0.0001 miles per job X$81,500 per mile).
Figure PR8: Existing Level of Service
Equestrian Trail 18.6
Multi-Use Unpaved Trail 2.0
Total 20.6
1Toii
Cost per Mile' • $81,500
Existing Trails(miles) 20.6
Residential
Residential Share 98%
2026 Population 54,314
Miles per Person 0.0004
I .
Nonresidential
Nonresidential Share 2%
2026 Jobs 5,373
Miles perJob 0.0001
.-tITr1,
Source:Apache Junction Parks and Recreation Department
1. 2022 cost adjusted to 2026 cost using ENR Construction Cost index.
26 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Development Fee Report-Plan-Based
The cost to prepare the Parks and Recreational Facilities IIP and development fees totals$15,250.Apache
Junction plans to update its report every five years, so the 10-year cost is $30,500. Based on this cost,
proportionate share, and 10-year projections of future development from the Land Use Assumptions
document, the cost is $2.50 per person and $0.91 per job.
Figure PR9: lIP and Development Fee Report
ip... - ...
Library $13,040 $26,080 Residential 98% Population 33,791 $0.76
Nonresidential 2% Jobs 1,617 $0.32
Parks and $15,250 $30,500 Residential 98% Population 11,971 $2.50
Recreational Nonresidential 2% Jobs 671 $0.91
Police $13,500 $27,000 Residential 82% Population 33,791 $0.66
Nonresidential 18% Vehicle Trips 6,512 $0.75
Street $25,650 $51,300 All Development 100% VMT 52,115 $0.98
Total $67,440 $134,880
PROJECTED DEMAND FOR SERVICES AND COSTS
ARS§ 9-463.05(E)(5) requires:
"The total number of projected service units necessitated by and attributable to new development
in the service area based on the approved land use assumptions and calculated pursuant to
generally accepted engineering and planning criteria."
ARS§ 9-463.05(E)(6) requires:
"The projected demand for necessary public services or facility expansions required by new service
units for a period not to exceed ten years."
As shown in the Land Use Assumptions document, Apache Junction's population in the parks and
recreational facilities service area is expected to increase by 11,971 persons and employment is expected
to increase by 671 jobs over the next 10 years.To maintain the existing levels of service,Apache Junction
needs to develop 31.3 acres of park land, construct approximately 34 park amenities, and construct 4.5
miles of trails over the next 10 years. The following pages include a more detailed projection of demand
for services and costs for the Parks and Recreational Facilities IIP.
schlerBise 27 Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Developed Park Land-Incremental Expansion
Apache Junction plans to maintain its existing level of service for developed park land over the next 10
years. Based on a projected population increase of 11,971 persons, future residential development
demands an additional 30.9 developed acres (11,971 additional persons X 0.00258 developed acres per
person).With projected employment growth of 671 jobs,future nonresidential development demands an
additional 0.4 developed acres (671 additional jobs X 0.00053 developed acres per job). Future
development demands 31.3 developed acres of park land at a cost of$1,251,787(31.3 developed acres X
$40,000 per developed acre).
Figure PR10: Projected Demand
0.00258 Dev.Acres per Person
Developed Park Land $40,000
0.00053 Dev.Acres perJob
Demand for Developed Park Land
Population •.
2026 54,314 I 5,373 140.4 2.9 143.2
2027 55,511 5,447 143.5 2.9 146.4
2028 56,708 5,520 146.6 2.9 149.5
2029 57,905 5,594 149.6 3.0 152.6
2030 59,102 5,668 152.7 3.0 155.8
2031 60,299 5,731 155.8 3.1 158.9
2032 61,496 5,793 158.9 3.1 162.0
2033 62,693 5,856 162.0 3.1 165.1
2034 63,890 5,918 165.1 3.2 168.3
2035 65,087 5,981 168.2 3.2 171.4
2036 66,285 6,044 171.3 3.2 174.5
10-Yr Increase 11,971 671 30.9 0.4 31.3
cfZVN -. .- . �.
28 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Park Amenities- Incremental Expansion
Apache Junction plans to maintain its existing level of service for park amenities over the next 10 years.
Based on a projected population increase of 11,971 persons,future residential development demands an
additional 33.3 park amenities(11,971 additional persons X 0.0028 amenities per person).With projected
employment growth of 671 jobs, future nonresidential development demands an additional 0.4 park
amenities (671 additional jobs X 0.0006 amenities per job). Future development demands 33.6 additional
park amenities at a cost of$8,235,575 (33.6 amenities X$244,758 per amenity).
Figure PR11: Projected Demand
0.0028 Units per Person
Park Amenities $244,758
0.0006 Units perJob
Demand for Park Amenities
•- UflIrsiiii.i1iFThUF1U raw
2026 54,314 5,373 150.9 3.1 154.0
2027 55,511 5,447 154.2 3.1 157.4
2028 56,708 5,520 157.6 3.2 160.7
2029 57,905 5,594 160.9 3.2 164.1
2030 59,102 5,668 164.2 3.2 167.5
2031 60,299 5,731 167.6 3.3 170.8
2032 61,496 5,793 170.9 3.3 174.2
2033 62,693 5,856 174.2 3.4 177.6
2034 63,890 5,918 177.5 3.4 180.9
2035 65,087 5,981 180.9 3.4 184.3
2036 66,285 6,044 184.2 3.5 187.6
10-Yr Increase 11,971 671 33.3 0.4 33.6
-. .- •4
schlerBise 29 Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Trails-Incremental Expansion
Apache Junction plans to maintain its existing level of service for trails over the next 10 years. Based on a
projected population increase of 11,971 persons, future residential development demands an additional
4.4 miles of trails (11,971 additional persons X 0.0004 miles per person). With projected employment
growth of 671 jobs, future nonresidential development demands an additional 0.1 miles of trails (671
additional jobs X 0.0001 miles per job). Future development demands approximately 4.5 miles of trails at
a cost of$366,827 (4.5 miles X$81,500 per mile).
Figure PR12: Projected Demand
0.0004 Miles per Person
Trails $81,500
0.0001 Miles perJob
Demand for Trails
••. • •.
•- UflIrsiiii.i1iFThUF1U raw
2026 54,314 5,373 20.2 0.4 20.6
2027 55,511 5,447 20.6 0.4 21.1
2028 56,708 5,520 21.1 0.4 21.5
2029 57,905 5,594 21.5 0.4 22.0
2030 59,102 5,668 22.0 0.4 22.4
2031 60,299 5,731 22.4 0.4 22.9
2032 61,496 5,793 22.9 0.4 23.3
2033 62,693 5,856 23.3 0.4 23.8
2034 63,890 5,918 23.7 0.5 24.2
2035 65,087 5,981 24.2 0.5 24.7
2036 66,285 6,044 24.6 0.5 25.1
10-Yr Increase 11,971 671 4.4 0.1 4.5
-. .- .. .
30 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
PARKS AND RECREATIONAL FACILITIES DEVELOPMENT FEES
Revenue Credit/Offset
A revenue credit/offset is not necessary for parks and recreational facilities fees, because costs generated
by projected development exceed revenues generated by projected development. Appendix A contains
the forecast of revenues required by Arizona's Enabling Legislation (ARS § 9-463.05(E)(7)).
Parks and Recreational Facilities Development Fees
Infrastructure components and cost factors for parks and recreational facilities are summarized in the
upper portion of Figure PR13.The cost per service unit is$816.26 per person and $168.80 per job.
Parks and recreational facilities fees for residential development are assessed according to the number of
persons per household.The fee of$2,057 for a single-family unit is calculated using a cost per service unit
of$816.26 per person multiplied by a demand unit of 2.52 persons per household.
Nonresidential development fees are calculated using jobs as the service unit.The fee of$0.15 per square
foot of industrial development is derived from a cost per service unit of$168.80 per job multiplied by a
demand unit of 0.0009 jobs per square foot(0.90 jobs per 1,000 square feet).The fee of$69 per room of
lodging development is derived from a cost per service unit of$168.80 per job multiplied by a demand
unit of 0.4073 jobs per room.
Figure PR13: Parks and Recreational Facilities Development Fees
.. ..
Developed Park Land $103.37 $21.33
ParkAmenities $680.10 $140.31
Trails $30.29 $6.25
Development Fee Report $2.50 $0.91
Total $816.26 $168.80
Residential Fees per Development Unit
ujin .-
SingleFamily Housing Unit 2.52 $2,057 $1,707 $350
Multi-Family Housing Unit 1.99 $1,624 $1,340 $284
Recreational Vehicle Housing Unit 1.90 $1,551 $1,318 $233
Nonresidential Fees per Development Unit
IluuI.IIlLIJill hi
Industrial I Square Foot 0.0009 $0.15 $0.22 ($0.07)
Commercial Square Foot 0.0021 $0.35 $0.30 $0.05
Office&Other Services Square Foot 0.0023 $0.39 $0.46 ($0.07)
Institutional Square Foot 0.0030 $0.51 $0.40 $0.11
Lodging Room 0.4073 $69 $79 ($10)
Assisted Living Bed 0.9764 $165 $86 $79
1.See Land Use Assumptions
schlerBise 31
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
PARKS AND RECREATIONAL FACILITIES DEVELOPMENT FEE REVENUE
Appendix A contains the forecast of revenues required by Arizona's Enabling Legislation (ARS § 9-
463.05(E)(7)). In accordance with state law,this report includes an IIP for parks and recreational facilities
needed to accommodate new development. Projected fee revenue shown in Figure PR14 is based on the
development projections in the Land Use Assumptions document and the updated development fees for
parks and recreational facilities shown in Figure PR13. If development occurs at a more rapid rate than
projected, the demand for infrastructure will increase and development fee revenue will increase at a
corresponding rate. If development occurs at a slower rate than projected,the demand for infrastructure
will also decrease, along with development fee revenue. Projected development fee revenue equals
$9,884,070, and projected expenditures equal $9,884,690.
Figure PR14: Parks and Recreational Facilities Development Fee Revenue
sIfflhI.JlIIi)
Developed Park Land $1,251,787 $0 $1,251,787
Park Amenities $8,235,575 $0 $8,235,575
Trails $366,827 $0 $366,827
Development Fee Report $30,500 $0 $30,500
Total $9,884,690 $0 $9,884,690
___ _IIF1 . 1tT
Year Hsg Unit Hsg Unit KSF KSF KSF KSF
Base 2026 9,944 2,859 373 1,166 758 293
Year 1 2027 10,344 2,954 401 1,178 769 293
Year 2 2028 10,744 3,049 429 1,190 779 293
Year3 2029 11,144 3,144 458 1,202 789 293
Year 4 2030 11,544 3,239 486 1,214 800 293
Year 5 2031 11,944 3,334 509 1,224 806 295
Year 6 2032 12,344 3,429 532 1,233 813 297
Year 7 2033 12,744 3,524 556 1,243 820 299
Year8 2034 13,144 3,619 579 1,252 826 301
Year 9 2035 13,544 3,714 602 1,262 833 303
Year 10 2036 13,944 3,809 626 1,272 840 305
10-Year Increase 4,000 950 253 106 81 13
Projected Revenue $8,228,000 $1,542,800 $37,950 $37,100 $31,590 $6,630
• . -• 2AW41
32 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
I
ARS§ 9-463.05 (T)(7)(f) defines the facilities and assets that can be included in the Police Facilities IIP:
"Fire and police facilities, including all appurtenances, equipment and vehicles. Fire and police
facilities do not include a facility or portion of a facility that is used to replace services that were
once provided elsewhere in the municipality, vehicles and equipment used to provide
administrative services, helicopters or airplanes or a facility that is used for training firefighters or
officers from more than one station or substation."
The Police Facilities IIP includes components for police facilities, police vehicles, police equipment, and
the cost of preparing the Police Facilities IIP and related Development Fee Report. The incremental
expansion methodology, based on the current level of service, is used for police vehicles and police
equipment.The plan-based methodology is used for police facilities and the Development Fee Report.
Proportionate Share
ARS § 9-463.05 (B)(3) states that the development fee shall not exceed a proportionate share of the cost
of necessary public services needed to accommodate new development. The Police Facilities IIP and
development fees will allocate the cost of police services between residential and nonresidential based
on functional population. Based on 2022 estimates from the U.S. Census Bureau's OnTheMap web
application, residential development accounts for approximately 82 percent of functional population and
nonresidential development accounts for the remaining 18 percent.
Figure P1: Proportionate Share
Residential Demand Person
Population 39,251 Hours/Day Hours
Residents Not Working 20,458 20 409,160
Employed Residents 18,793
Employed in ApacheJunction 1,110 14 15,540
Employed outsideApacheJunction 17,683 14 247,562
Residential Subtotal 672,262
Nonresidential
Non-working Residents 20,458 4 81,832
Jobs Located in ApacheJunction 6,911
Residents Employed in ApacheJunction 1,110 10 11,100
Non-Resident Workers(inflow commuters) 5,801 10 58,010
Nonresidential Subtotal 150,942
Total 823,204
Source:Arizona Office of Economic Opportunity(population),U.S.Census Bureau,OnTheMap Application and LEHD
Origin-Destination Employment Statistics,Version 6.25.2(employment).
TischlerB 33
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Service Area
Apache Junction's Police Department strives to provide a uniform response time within the city limits;
therefore,there is a single service area for the Police Facilities IIP.
Figure P2: Police Facilities Service Area
Maricopa County
Pinal County 7/
88 Tonto
National.
'Fore'st,
Superstition Wilderness Area'
Apache
Junction
60
Gold Canyon
Community
202 �
MESA
C 60
hoenix
Gate
Airp 24
QUEEN CREE
U
O R
U C
LEGEND
® Municipal Boundary National Forest Other Municpal Boundaries N y
j Final County Island Wilderness Area Mesa / �
Q County Boundary s Airport Boundary Queen Creek April 06,2022
0 10,000 20,000
Feet
G:,0ata\Working\z5cratch W orkspace\s Collins\CityLimits_Letter.mxd
34 Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT
ARS§ 9-463.05(E)(4) requires:
"A table establishing the specific level or quantity of use, consumption, generation or discharge of
a service unit for each category of necessary public services or facility expansions and an
equivalency or conversion table establishing the ratio of a service unit to various types of land
uses, including residential, commercial and industrial."
Figure P3 displays the demand indicators for residential and nonresidential land uses. For residential
development, the table displays the number of persons per household. For nonresidential development,
the table displays the number of average weekday vehicle trips generated per development unit (square
foot, room, or bed).
Figure P3: Ratio of Service Unit to Development Unit
Residential Development
Single Family Housing Unit 2.52
Multi-Family Housing Unit 1.99
Mobile Home/RV Housing Unit 1.90
Nonresidential Development
IIVl [.i.iiiiiiii,4,i- ILl II II Ii Ill Ill
..11111 •IiI. .
Industrial Square Foot 0.0036 50% 0.0018
Commercial Square Foot 0.0364 33% 0.0120
Office&Other Services Square Foot 0.0078 50% 0.0039
Institutional Square Foot 0.0107 33% 0.0035
Lodging Room 5.8400 50% 2.9200
Assisted Living Bed 4.1400 50% 2.0700
1. U.S.Census Bureau,2019-2023 American Community Survey 5-Year Estimates.
2.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES
ARS§9-463.05(E)(1) requires:
"A description of the existing necessary public services in the service area and the costs to upgrade,
update, improve, expand, correct or replace those necessary public services to meet existing needs
and usage and stricter safety, efficiency, environmental or regulatory standards, which shall be
prepared by qualified professionals licensed in this state, as applicable."
ARS§ 9-463.05(E)(2) requires:
"An analysis of the total capacity, the level of current usage and commitments for usage of
capacity of the existing necessary public services, which shall be prepared by qualified
professionals licensed in this state, as applicable."
35
Tisch Bise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Police Facilities—Plan-Based
Apache Junction currently provides 20,000 square feet of police facilities, but this is not sufficient to serve
existing development and future development.
Figure P4: Existing Police Facilities
PoliceStation 15,500
Animal Control 4,500
Total 20,000
Source:Apache Junction Police Department
Apache Junction plans to construct 66,200 square feet of police facilities at a cost of$51,160,000 to serve
all development through 2046. Part of the planned construction includes the replacement of the existing
4,500-square-foot animal control facility with a larger 7,500-square foot facility,so only the 3,000-square-
foot expansion is eligible for development fees. As shown below, the analysis excludes replacement
facilities in the cost calculation, so the eligible cost of police facilities is $49,360,000 to construct 61,700
square feet.The eligible construction cost is$800 per square foot.
Figure P5: Planned Police Facilities
r.imimi*IT1Ik' . . . . .-
Substation 29,000 $23,200,000 $800
Substation-Dispatch 6,000 $6,000,000 $1,000
Evidence Storage 15,000 $12,000,000 $800
Vehicle Storage 8,700 $6,960,000 $800
Animal Control (Expand) 3,000 $1,200,000 $400
Subtotal 61,700 $49,360,000 $800
Animal Control (Replace) 4,500 $1,800,000 $400
Total 66,200 $51,160,000
Source:Apache Junction Police Department
36 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
To allocate the proportionate share of demand for police facilities to residential and nonresidential
development, this analysis uses functional population outlined in Figure P1. Apache Junction's existing
level of service for residential development is 0.3019 square feet per person (20,000 square feet X 82
percent residential share / 54,314 persons). The existing nonresidential level of service is 0.1928 square
feet per vehicle trip (20,000 square feet X 18 percent nonresidential share/ 18,675 vehicle trips).
Apache Junction plans to increase the existing level of service by constructing 61,700 square feet of
additional police facilities. To ensure future development does not pay for a higher level of service than
what is provided to existing development,this analysis allocates the 20,000 square feet of existing police
facilities and 61,700 square feet of planned police facilities, for a total of 81,700 square feet of police
facilities, to all development in 2046.The planned LOS for residential development is 0.6823 square feet
per person (81,700 square feet X 82 percent residential share / 98,185 persons). For nonresidential
development, the planned LOS is 0.5269 square feet per vehicle trip (81,700 square feet X 18 percent
nonresidential share/27,909 vehicle trips).
Based on estimates provided by Apache Junction shown in Figure P5, the eligible construction cost for
future police facilities is $800 per square foot. For police facilities,the cost is $545.86 per person (0.6823
square feet per person X$800 per square foot)and$421.54 per vehicle trip(0.5269 square feet per vehicle
trip X$800 per square foot).
Figure P6: Planned Level of Service
Cost per Square Foot $800
• I1TFI7I..
Existing Square Feet 20,000
Additional Square Feet 61,700
Planned Square Feet 81,700
Residential
Residential Share 82%
2046 Population 98,185
Square Feet per Person 0.6823
.- . :.
Nonresidential
Nonresidential Share 18%
2046 VehicleTrips 27,909
Square Feet per VehicleTrip 0.5269
Source:Apache Junction Police Department
TischlerB 37 ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Future Debt Credit
Apache Junction will likely issue debt to construct future police facilities.This analysis includes a credit for
future debt payments on future debt. A credit is necessary since future development will pay the
development fee and will also contribute to future debt payments on the future police facilities debt.
Apache Junction plans to construct 61,700 square feet of eligible police facilities at a cost of$51,160,000
to serve existing and future development.Apache Junction will likely issue debt in one year,so the analysis
reduces the future debt issuance by one year of projected police facility development fee revenue
($1,000,000).The analysis also reduces the future debt issuance based on the existing police development
fee fund balance of$3,000,000 and ineligible share of the planned police facilities equal to $23,320,027
(see Figure P11). As shown below, future police debt equals $23,839,973 ($51,160,000 eligible cost -
$1,000,000 projected police facility development fee revenue - $3,000,000 existing fund balance -
$23,320,027 existing development share) and will be repaid through 2046. Annual payments are divided
by projected development to determine the credit per person or vehicle trip. To account for the time
value of money,annual payments per person and per vehicle trip are discounted using a net present value
formula based on a discount rate of 4.00 percent. The net present value of future debt payments is
$146.58 per person and $110.42 per vehicle trip, and the analysis includes these amounts as a credit in
the development fee calculation.
Figure P7: Future Debt Credit
- -- - - r . ! 1 ' lIMrII$
2026 $0 $0 54,314 $0.00 $0 18,675 $0.00
2027 $800,588 $656,482 58,482 $11.23 $144,106 19,353 $7.45
2028 $832,612 $682,741 62,650 $10.90 $149,870 20,030 $7.48
2029 $865,916 $710,051 66,818 $10.63 $155,865 20,708 $7.53
2030 $900,553 $738,453 70,986 $10.40 $162,099 21,386 $7.58
2031 $936,575 $767,991 75,154 $10.22 $168,583 22,019 $7.66
2032 $974,038 $798,711 79,322 $10.07 $175,327 22,653 $7.74
2033 $1,012,999 $830,659 83,490 $9.95 $182,340 23,287 $7.83
2034 $1,053,519 $863,886 85,312 $10.13 $189,633 23,920 $7.93
2035 $1,095,660 $898,441 86,708 $10.36 $197,219 24,554 $8.03
2036 $1,139,486 $934,379 88,105 $10.61 $205,108 25,187 $8.14
2037 $1,185,066 $971,754 89,113 $10.90 $213,312 25,379 $8.41
2038 $1,232,468 $1,010,624 90,121 $11.21 $221,844 25,570 $8.68
2039 $1,281,767 $1,051,049 91,129 $11.53 $230,718 25,761 $8.96
2040 $1,333,038 $1,093,091 92,137 $11.86 $239,947 25,952 $9.25
2041 $1,386,359 $1,136,815 93,145 $12.20 $249,545 26,278 $9.50
2042 $1,441,814 $1,182,287 94,153 $12.56 $259,526 26,605 $9.75
2043 $1,499,486 $1,229,579 95,161 $12.92 $269,908 26,931 $10.02
2044 $1,559,466 $1,278,762 96,169 $13.30 $280,704 27,257 $10.30
2045 $1,621,844 $1,329,912 97,177 $13.69 $291,932 27,583 $10.58
2046 $1,686,718 $1,383,109 98,185 $14.09 $303,609 27,909 $10.88
Total $23,839,973 $19,548,778 $228.75 $4,291,195 $173.68
Discount Rate 4.00% Discount Rate 4.00%
38 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Police Vehicles- Incremental Expansion
Apache Junction has 101 police vehicles with a total cost of$9,061,939, and the city plans to expand the
fleet to serve future development. To allocate the proportionate share of demand for police vehicles to
residential and nonresidential development,this analysis uses functional population outlined in Figure P1.
Apache Junction's existing level of service for residential development is 0.0015 units per person (101
vehicles X 82 percent residential share / 54,314 persons). The existing nonresidential level of service is
0.0010 units per vehicle trip (101 vehicles X 18 percent nonresidential share/ 18,675 vehicle trips).
Based on the total cost of Apache Junction's existing police vehicles, the average cost for a new police
vehicle is$89,722 per vehicle ($9,061,939 total cost/101 vehicles). The analysis uses this cost as a proxy
for future police vehicle costs. For police vehicles,the cost is$136.81 per person (0.0015 units per person
X$89,722 per vehicle) and $87.34 per vehicle trip (0.0010 units per vehicle trip X$89,722 per vehicle).
Figure P8: Existing Level of Service
5 . 5
Community Service Vehicle 3 $51,238 $153,714
Bear Cat G3 1 $350,000 $350,000
Command Van 1 $1,800,000 $1,800,000
Jail Vehicle 2 $93,109 $186,218
Motorcycle 9 $51,200 $460,800
Mustang 1 $77,559 $77,559
Patrol Vehicle-Marked 42 $89,302 $3,750,679
Patrol Vehicle-Unmarked 33 $50,489 $1,666,137
Traffic Vehicle 5 $82,376 $411,880
Cadet Van 1 $51,238 $51,238
Property and Evidence 3 $51,238 $153,714
Total 101 $89,722 $9,061,939
Average Cost per Unit • $89,722
•I'AI ( 1ThTFIVI
Existing Units 101
Residential
Residential Share 82%
2026 Population 54,314
Units per Person 0.0015
.-
Nonresidential
Nonresidential Share 18%
2026 VehicleTrips 18,675
Units per VehicleTrip 0.0010
•- •
Source:Apache Junction Police Department
schlerBise 39 Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Police Equipment-Incremental Expansion
Apache Junction has 201 units of police equipment with a total cost of$2,546,000, and the city plans to
acquire additional units to serve future development.To allocate the proportionate share of demand for
police equipment to residential and nonresidential development,this analysis uses functional population
outlined in Figure P1. Apache Junction's existing level of service for residential development is 0.0030
units per person (201 units X 82 percent residential share/ 54,314 persons). The nonresidential level of
service is 0.0019 units per vehicle trip (201 units X 18 percent nonresidential share/18,675 vehicle trips).
Based on the total cost of Apache Junction's existing police equipment,the average cost for a new unit is
$12,667 per unit($2,546,000 total cost/201 units).The analysis uses this cost as a proxy for future police
equipment costs. For police equipment,the cost is$38.44 per person (0.0030 units per person X$12,667
per unit) and $24.54 per vehicle trip (0.0019 units per vehicle trip X$12,667 per unit).
Figure P9: Existing Level of Service
DescriptionS 5 . 5
Dispatch Console 6 $100,000 $600,000
Radio Server Infrastructure 1 $200,000 $200,000
Mobile Radio Equipment 94 $9,000 $846,000
Portable Radio 100 $9,000 $900,000
Total 201 $12,667 $2,546,000
Average Cost per Unit • $12,667
• iThTFI7b.
Existing Units 201
Residential
Residential Share 82%
2026 Population 54,314
Units per Person 0.0030
.-
Nonresidential
Nonresidential Share 18%
2026 VehicleTrips 18,675
Units per VehicleTrip 0.0019
•tviiYLIT1I.. 44
Source:Apache Junction Police Department
40 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Development Fee Report-Plan-Based
The cost to prepare the Police Facilities IIP and related Development Fee Report totals $13,500. Apache
Junction plans to update its report every five years, so the 10-year cost is $27,000. Based on this cost,
proportionate share, and 10-year projections of new residential and nonresidential development from
the Land Use Assumptions document,the cost is$0.66 per person and $0.75 per vehicle trip.
Figure P10: lIP and Development Fee Report
ip... - ...
Library $13,040 $26,080 Residential 98% Population 33,791 $0.76
Nonresidential 2% Jobs 1,617 $0.32
Parks and $15,250 $30,500 Residential 98% Population 11,971 $2.50
Recreational Nonresidential 2% Jobs 671 $0.91
Police $13,500 $27,000 Residential 82% Population 33,791 $0.66
Nonresidential 18% Vehicle Trips 6,512 $0.75
Street $25,650 $51,300 All Development 100% VMT 52,115 $0.98
Total $67,440 $134,880
PROJECTED DEMAND FOR SERVICES AND COSTS
ARS§ 9-463.05(E)(5) requires:
"The total number of projected service units necessitated by and attributable to new development
in the service area based on the approved land use assumptions and calculated pursuant to
generally accepted engineering and planning criteria."
ARS§ 9-463.05(E)(6) requires:
"The projected demand for necessary public services or facility expansions required by new service
units for a period not to exceed ten years."
As shown in the Land Use Assumptions document, Apache Junction's population is expected to increase
by 33,791 persons and nonresidential vehicle trips generated are expected to increase by 6,512 trips over
the next 10 years.To reach the planned level of service,Apache Junction plans to construct an additional
61,700 square feet of police facilities over the next 20 years. To maintain the existing levels of service,
Apache Junction needs to acquire approximately 58 police vehicles and approximately 115 units of police
equipment over the next 10 years.The following pages include a more detailed projection of demand for
services and costs for the Police Facilities IIP.
schlerBise 41
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Police Facilities-Plan-Based
Apache Junction plans to increase its existing level of service by constructing 61,700 square feet of police
facilities over the next 20 years. Based on a projected population increase of 43,871 persons, future
residential development demands approximately 29,934 square feet of police facilities(43,871 additional
persons X 0.6823 square feet per person).With projected vehicle trip growth of 9,234 vehicle trips,future
nonresidential development demands approximately 4,866 square feet of police facilities (9,234
additional vehicle trips X 0.5269 square feet per vehicle trip). Future development demands
approximately 34,800 square feet of police facilities at a cost of$27,839,973 (34,800 square feet X $800
per square foot).
Existing residential development demands approximately 37,060 square feet of police facilities (54,314
persons X 0.6823 square feet per person) and existing nonresidential development demands
approximately 9,840 square feet of police facilities (18,675 vehicle trips X 0.5269 square feet per vehicle
trip).Since Apache Junction currently provides 20,000 square feet of police facilities,existing development
currently demands an additional 31,400 square feet of police facilities (46,900 square feet demanded by
existing development - 20,000 square feet available to existing development + 4,500 square feet of
replacement animal control facilities)to reach the planned level of service. Existing development's share
of the planned police facilities is approximately$23,320,027.
Figure P11: Projected Demand
0.6823 Square Feet per Person
Pol ice Facilities $800
0.5269 SquareFeet per Vehicle Trip
Demand for Police Facilities
• .- • •- •
2026 54,314 18,675 37,059.8 9,840.3 46,900.0
2027 58,482 19,353 39,903.7 10,197.4 50,101.1
2028 62,650 20,030 42,747.7 10,554.5 53,302.2
2029 66,818 20,708 45,591.6 10,911.6 56,503.2
2030 70,986 21,386 48,435.6 11,268.7 59,704.3
2031 75,154 22,019 51,279.6 11,602.5 62,882.1
2032 79,322 22,653 54,123.5 11,936.4 66,059.9
2033 83,490 23,287 56,967.5 12,270.2 69,237.7
2034 85,312 23,920 58,210.6 12,604.1 70,814.7
2035 86,708 24,554 59,163.2 12,937.9 72,101.1
2036 88,105 25,187 60,116.2 13,271.8 73,388.0
2041 93,145 26,278 63,555.1 13,846.7 77,401.8
2046 98,185 27,909 66,994.0 14,706.0 81,700.0
20-Yr Increase 43,871 9,234 29,934.2 4,865.7 34,800.0
•- . .,
Existing Development Expenditures $18,427,162 $4,892,866 $23,320,027
Total Expenditures $42,374,557 $8,785,443 $51,160,000
42 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Police Vehicles- Incremental Expansion
Apache Junction plans to maintain its existing level of service for police vehicles over the next 10 years.
Based on a projected population increase of 33,791 persons,future residential development demands an
approximately 52 vehicles (33,791 additional persons X 0.0015 vehicles per person). With projected
vehicle trip growth of 6,512 trips,future nonresidential development demands approximately six vehicles
(6,512 additional vehicle trips X 0.0010 vehicles per vehicle trip). Future development demands
approximately 58 police vehicles at a cost of$5,191,821 (57.9 units X$89,722 per vehicle).
Figure P12: Projected Demand
0.0015 Units per Person
Police Vehicles $89,722
0.0010 Units per Vehicle Trip
Demand for Police Vehicles
••. •
• •- • •- •
2026 54,314 18,675 82.8 18.2 101.0
2027 58,482 19,353 89.2 18.8 108.0
2028 62,650 20,030 95.5 19.5 115.0
2029 66,818 20,708 101.9 20.2 122.0
2030 70,986 21,386 108.2 20.8 129.1
2031 75,154 22,019 114.6 21.4 136.0
2032 79,322 22,653 121.0 22.1 143.0
2033 83,490 23,287 127.3 22.7 150.0
2034 85,312 23,920 130.1 23.3 153.4
2035 86,708 24,554 132.2 23.9 156.1
2036 88,105 25,187 134.3 24.5 158.9
10-Yr Increase 33,791 6,512 51.5 6.3 57.9
ctT -. .- •Iwii
schlerBise 43
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Police Equipment-Incremental Expansion
Apache Junction plans to maintain its existing level of service for police equipment over the next 10 years.
Based on a projected population increase of 33,791 persons, future residential development demands
approximately 103 units (33,791 additional persons X 0.0030 units per person). With projected vehicle
trip growth of 6,512 trips, future nonresidential development demands approximately 13 units (6,512
additional vehicle trips X 0.0019 units per vehicle trip). Future development demands approximately 115
units at a cost of$1,458,670 (115.2 units X$12,667 per unit).
Figure P13: Projected Demand
0.0030 Units per Person
Police Equipment $12,667
0.0019 Units per Vehicle Trip
Demand for Police Equipment
UJifl
••. •
2026 54,314 18,675 164.8 36.2 201.0
2027 58,482 19,353 177.5 37.5 215.0
2028 62,650 20,030 190.1 38.8 228.9
2029 66,818 20,708 202.8 40.1 242.9
2030 70,986 21,386 215.4 41.4 256.8
2031 75,154 22,019 228.1 42.7 270.7
2032 79,322 22,653 240.7 43.9 284.6
2033 83,490 23,287 253.4 45.1 298.5
2034 85,312 23,920 258.9 46.3 305.2
2035 86,708 24,554 263.1 47.6 310.7
2036 88,105 25,187 267.4 48.8 316.2
10-Yr Increase 33,791 6,512 102.5 12.6 115.2
ctT -.!tflI
44 Tisch BISe
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
POLICE FACILITIES DEVELOPMENT FEES
Revenue Credit/Offset
A revenue credit/offset is not necessary for police facilities development fees, because costs generated
by projected development exceed revenues generated by projected development. Appendix A contains
the forecast of revenues required by Arizona's Enabling Legislation (ARS § 9-463.05(E)(7)).
Police Facilities Development Fees
Infrastructure components and cost factors for police facilities are summarized in the upper portion of
Figure P14.The cost per service unit for police facilities is$575.19 per person and $423.75 per vehicle trip.
Police facilities development fees for residential development are assessed according to the number of
persons per household. The fee of$1,449 for single-family unit is calculated using a cost per service unit
of$575.19 per person multiplied by a demand unit of 2.52 persons per household.
Nonresidential development fees are calculated using vehicle trips as the service unit. The fee of $0.76
per square foot of industrial development is derived from a cost per service unit of$423.75 per vehicle
trip multiplied by a demand unit of 0.0018 vehicle trips per square foot(1.80 vehicle trips per 1,000 square
feet).The fee of$1,237 per room of lodging development is derived from a cost per service unit of$423.75
per vehicle trip multiplied by a demand unit of 2.92 vehicle trips per room.
Figure P14: Police Facilities Development Fees
SIliI.I.1l1:l1
Police Facilities $545.86 $421.54
Future Debt Credit ($146.58) ($110.42)
Police Vehicles $136.81 $87.34
Police Equipment $38.44 $24.54
Development Fee Report $0.66 $0.75
Total $575.19 $423.75
Residential Fees per Development Unit
Single Family I Housing Unit 2.52 $1,449 $1,229 $220
Multi-Family Housing Unit 1.99 $1,145 $965 $180
Recreational Vehicle Housing Unit 1.90 $1,093 $949 $144
Nonresidential Fees per Development Unit
11111 •
Industrial Square Foot 0.0018 $0.76 $0.68 $0.08
Commercial Square Foot 0.0120 $5.09 $3.40 $1.69
Office&Other Services Square Foot 0.0039 $1.65 $1.51 $0.14
Institutional Square Foot 0.0035 $1.48 $0.99 $0.49
Lodging Room 2.9200 $1,237 $1,115 $122
Assisted Living Bed 2.0700 $877 $362 $515
1.See Land Use Assumptions
schlerBise 45
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
POLICE FACILITIES DEVELOPMENT FEE REVENUE
Appendix A contains revenue forecasts required by Arizona's Enabling Legislation (ARS § 9-463.05(E)(7)).
Projected fee revenue shown in Figure P15 is based on the development projections in the Land Use
Assumptions document and the updated police facilities development fees. If development occurs faster
than projected, the demand for infrastructure will increase along with development fee revenue. If
development occurs slower than projected,the demand for infrastructure will decrease and development
fee revenue will decrease at a similar rate. During the next 10 years, projected development fee revenue
equals $22,188,671, and projected expenditures equal $52,165,311. Since the development fee
calculations for police facilities include all development through 2046, Apache Junction will collect
development fees for planned police facilities beyond the 10-year IIP period. Existing development's share
of planned police facilities equal to $23,320,027 may not be funded with development fees.
Figure P15: Police Facilities Development Fee Revenue
iifflsisiitiñ
Police Facilities $27,839,973 $23,320,027 $51,160,000
Future Debt Credit ($5,672,180) $0 ($5,672,180)
Police Vehicles $5,191,821 $0 $5,191,821
Police Equipment $1,458,670 $0 $1,458,670
Development Fee Report $27,000 $0 $27,000
Total $28,845,284 $23,320,027 $52,165,311
Year Hsg Unit Hsg Unit KSF KSF KSF KSF
Base 2026 12,015 2,859 373 1,166 758 293
Year 1 2027 13,515 3,054 401 1,211 780 293
Year 2 2028 15,015 3,249 429 1,256 801 293
Year 3 2029 16,515 3,444 458 1,302 822 293
Year 4 2030 18,015 3,639 486 1,347 844 293
Year 5 2031 19,515 3,834 509 1,390 862 295
Year 6 2032 21,015 4,029 532 1,433 879 297
Year 7 2033 22,515 4,224 556 1,475 897 299
Year 8 2034 23,084 4,419 579 1,518 915 301
Year 9 2035 23,484 4,614 602 1,561 933 303
Year 10 2036 23,884 4,809 626 1,604 950 305
10-Year Increase 11,869 1,950 253 438 192 13
Projected Revenue $17,198,181 $2,232,750 $192,280 $2,229,420 $316,800 $19,240
I11 ! '4 "-
46 Tisch BISe
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
ARS§ 9-463.05 (T)(7)(e) defines the facilities and assets that can be included in the Street Facilities IIP:
"Street facilities located in the service area, including arterial or collector streets or roads that
have been designated on an officially adopted plan of the municipality, traffic signals and rights-
of-way and improvements thereon."
The Street Facilities IIP includes components for street improvements and the cost of preparing the Street
Facilities IIP and related Development Fee Report.The incremental expansion methodology, based on the
current level of service, is used to calculate the components for street improvements, and the plan-based
methodology is used for the Development Fee Report.
Proportionate Share
ARS § 9-463.05 (B)(3) states that the development fee shall not exceed a proportionate share of the cost
of necessary public services needed to accommodate new development. The Street Facilities IIP and
development fees will allocate the cost of necessary public services between residential and
nonresidential based on trip generation rates,trip adjustment factors, and trip lengths.
TischlerB 47 ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Service Area
Apache Junction plans to provide a uniform level of service and equal access to street facilities within the
city; therefore, there is a single service area for the Street Facilities IIP. As defined by the Development
Agreement for Superstition Vistas (October 2021),Apache Junction will not assess street facilities fees to
development within the "Auction Property."
Figure Si:Street Facilities Service Area
Marion pa County
Pinal County i
88 Tonto
National
Forest
.'Superstition'Wilderness�A—
Apache
Junction
60
Gold Canyon
Community
j _ __
202
MESA
60
AUCtIOn �,
Property "c
m
'bonnie-Mesa
Gateway
deport
24
QUEEN CREEK
o �
U o
m U
o m
LEGEND N
W ..
® Municipal Boundary National Forest Other Municpal Boundaries N -
Pinal County Island Wilderness Area Mesa
lO County Boundary Airport Boundary Queen Creek April 06,2022
Auction Property 0 10,000 20,000
Feet
G'.\Dar.—rk,ng—.r-h W orkspace\SCollins\City Limita_Le[ter.mztl
48 Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
RATIO OF SERVICE UNIT TO DEVELOPMENT UNIT
ARS§ 9-463.05(E)(4) requires:
"A table establishing the specific level or quantity of use, consumption, generation or discharge of
a service unit for each category of necessary public services or facility expansions and an
equivalency or conversion table establishing the ratio of a service unit to various types of land
uses, including residential, commercial and industrial."
Apache Junction will use vehicle miles traveled (VMT) as the demand units for street facilities fees.
Components used to determine VMT include average weekday vehicle trip generation rates, adjustments
for commuting patterns and pass-by trips, and trip length weighting factors.
Residential Trip Generation Rates
As an alternative to simply using the national average trip generation rate for residential development,
the ITE publishes regression curve formulas that may be used to derive custom trip generation rates,using
local demographic data. Key independent variables needed for the analysis (i.e., vehicles available,
housing units, households, and persons) are available from American Community Survey data. Shown in
Figure S2, single-family units generate 8.19 average weekday vehicle trip ends per unit, and multi-family
units generate 4.07 average weekday vehicle trip ends per unit.
Figure S2:Average Weekday Vehicle Trip Ends by Housing Type
Households by StructureType2
lilt
Owner-Occupied 24,136 7,156 6,796 13,952 1.73
Renter-Occupied 5,593 1,175 2,826 4,001 1.40
Total 29,729 8,331 9,622 17,953 1.66
Single-Family 20,983 58,509 14,022 91,397 74,953 9,157 8.19 9.09
Multi-Family 18,479 42,236 15,707 62,179 52,208 12,822 4.07 4.46
Total 39,462 100,745 29,729 153,576 127,161 21,979 5.79
1.Vehicles available by tenure from Table B25046,American Community Survey,2023 5-Year Estimates.
2.Households by tenure and units in structure from Table B25032,American Community Survey,2023 5-Year Estimates.
3.Total population in households from Table B25033,American Community Survey,2023 5-Year Estimates.
4.Vehicle trips ends based on persons using formulas from ITE Trip Generation.Forsingle-family housing(ITE 210),the fitted curve equation is
EXP(0.89*LN(persons)+1.72)[ITE 2017].To approximate the average population of the ITE studies,persons were divided by 38 and the equation result
multiplied by 38.For multi-family housing(ITE 221),the fitted curve equation is(2.29*persons)-81.02[ITE 2017].
5.Vehicle trip ends based on vehicles available using formulas from ITE Trip Generation.For single-family housing(ITE 210),the fitted curve equation is
EXP(0.99*LN(vehicles)+1.93)[ITE 2017].To approximate the average numberof vehicles in the ITE studies,vehicles available were divided by 55 and the
equation result multiplied by 55.For multi-family housing(ITE 220),the fitted curve equation is(3.94*vehicles)+293.58[ITE 2012].
6.Housing units from Table B25024,American Community Survey,2023 5-Year Estimates.
7.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
TischlerB 49 ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Nonresidential Trip Generation Rates
For nonresidential development, TischlerBise uses trip generation rates published in Trip Generation,
Institute of Transportation Engineers, 12th Edition (2025). The prototype for industrial development is
Light Industrial (ITE 110) which generates 3.60 average weekday vehicle trip ends per 1,000 square feet
of floor area. Assisted living development uses Assisted Living (ITE 254) as a proxy and generates 4.14
average weekday vehicle trip ends per bed. For lodging development, the proxy is Hotel (ITE 310), and
this type of development generates 5.84 average weekday vehicle trip ends per room. Institutional
development uses Hospital (ITE 610) and generates 10.70 average weekday vehicle trip ends per 1,000
square feet of floor area. For office & other services development, the proxy is General Office (ITE 710),
and it generates 7.83 average weekday vehicle trip ends per 1,000 square feet of floor area.The prototype
for commercial development is Shopping Center(ITE 820)which generates 36.39 average weekday vehicle
trips per 1,000 square feet of floor area.
Figure S3:Average Weekday Vehicle Trip Ends by Land Use
110 Light Industrial 1,000 Sq Ft 3.60 4.02 0.90 1,117
130 Industrial Park 1,000 Sq Ft 2.68 3.93 0.68 1,466
140 Manufacturing 1,000 Sq Ft 4.27 2.67 1.60 625
150 Warehousing 1,000 Sq Ft 1.38 5.05 0.27 3,659
254 Assisted Living bed 4.14 4.24 0.98 N/A
310 Hotel room 5.84 14.34 0.41 N/A
520 Elementary School student 2.27 22.50 0.10 N/A
525 High School student 1.94 21.95 0.09 N/A
540 Community College student 1.15 14.61 0.08 N/A
550 University/College student 1.46 8.89 0.16 N/A
565 Day Care student 3.79 19.30 0.20 N/A
610 Hospital 1,000 Sq Ft 10.70 3.57 3.00 334
620 Nursing Home bed 3.06 3.31 0.92 N/A
710 General Office(avg size) 1,000 Sq Ft 7.83 3.44 2.28 439
720 Medical-Dental Office 1,000 Sq Ft 34.03 11.78 2.89 346
730 Government Office 1,000 Sq Ft 22.59 7.45 3.03 330
770 Business Park 1,000 Sq Ft 9.97 5.42 1.84 544
820 Shopping Center(avg size) 1,000 Sq Ft 36.39 17.42 2.09 479
1.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
50 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Trip Rate Adjustments
To calculate street facilities fees, trip generation rates require an adjustment factor to avoid double
counting each trip at both the origin and destination points.Therefore,the basic trip adjustment factor is
50 percent. As discussed further in this section, the development fee methodology includes additional
adjustments to make the fees proportionate to the infrastructure demand for each type of development.
Commuter Trip Adjustment
Residential development has a larger trip adjustment factor of 67 percent to account for commuters
leaving Apache Junction for work. According to the 2022 National Household Travel Survey (see Table 8-
2) weekday work trips are typically 36 percent of production trips (i.e., all out-bound trips, which are 50
percent of all trip ends). As shown in Figure S4, the U.S. Census Bureau's OnTheMap web application
indicates 94 percent of resident workers traveled outside of Apache Junction for work in 2022. In
combination,these factors (0.36 x 0.50 x 0.94=0.17)support the additional 17 percent allocation of trips
to residential development.
Figure 54: Commuter Trip Adjustment
III Jil n-i1ITII
iThF1Isiiiiinui
Employed Residents 18,793
Residents Living and Working in ApacheJunction 1,110
Residents Commuting Outside Apache Junction for Work 17,683
Percent Commuting out of Apache Junction 94%
Additional Production Trips1 17%
Source:U.S.Census Bureau,OnTheMap Application(version 6.25.2)and LEND Origin-Destination Employment Statistics,2022.
1.According to the 2022 National Household Travel Survey*(see Table 8-2), home-based work trips are typically 36 percent of
"production"trips, in other words, out-bound trips (which are 50 percent of all trip ends). Also,LED OnTheMap data from 2022
indicate that 94 percent of Apache Junction's workers travel outside the city for work. In combination,these factors(0.36 x 0.50 x
0.94=0.17)account for 17 percent of additional production trips.The total adjustment factor for residential includes attraction
trips (50 percent of trip ends)plus the journey-to-work commuting adjustment (17 percent of production trips)for a total of 17
percent.*http://nhts.ornl.gov/publications;Summary of Travel Trends: 2022 National Household Travel Survey(Table 8-2.Travel
Characteristics for Weekday Versus Weekend)
Adjustment for Pass-By Trips
For commercial and institutional development,the trip adjustment factor is less than 50 percent because
these types of development attract vehicles as they pass by on arterial and collector roads. For example,
when someone stops at a convenience store on the way home from work, the convenience store is not
the primary destination. For the average shopping center, ITE data indicate 34 percent of the vehicles that
enter are passing by on their way to some other primary destination. The remaining 66 percent of
attraction trips have the commercial site as their primary destination. Because attraction trips are half of
all trips,the trip adjustment factor is 66 percent multiplied by 50 percent,or approximately 33 percent of
the trip ends.
TischlerB 51
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Average Weekday Vehicle Trips
Shown below in Figure S5, multiplying average weekday vehicle trip ends and trip adjustment factors
(discussed on the previous page) by Apache Junction's existing development units provides the average
weekday vehicle trips generated by existing development. As shown below, Apache Junction's existing
development in the street facilities service area generates 110,738 vehicle trips on an average weekday.
Figure S5:Average Weekday Vehicle Trips by Land Use
SingleFamily HU 210 8.19 67% 9,944 54,566
Multi-Family HU 220 4.07 67% 2,859 7,796
MobileHome/RV HU 220 4.07 67% 10,892 29,701
Industrial KSF 110 3.60 50% 373 672
Commercial KSF 820 36.39 33% 1,166 14,001
Office&Other Services KSF 710 7.83 50% 758 2,969
Institutional KSF 610 10.70 33% 293 1,033
Total 110,738
National Average Trip Length
To calculate street facilities fees, it is necessary to determine the average trip length on Apache Junction's
arterial network.To do this,the analysis uses national trip generation rates and average trip lengths from
the 2022 National Household Travel Survey.
Figure 56: National Average Trip Lengths
•
Residential 13.75
Industrial 8.70
Commercial 5.80
Office and Other 8.70
Institutional 8.70
Source: U.S. Department of Transportation,Federal
Highway Administration,2022 National Household
Transportation Survey,adjusted for land use
52 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Expected Vehicle Miles Traveled
The national average trip length should be adjusted to reflect actual local demand on Apache Junction's
arterial network. To do this, TischlerBise determines expected demand (VMT) on Apache Junction's
complete transportation network by multiplying the national average trip lengths by average weekday
vehicle trips. Based on this analysis, Apache Junction's existing development generates an expected
1,387,739 VMT.
Figure 57: Expected Vehicle Miles Traveled
•. • •
Single Family 54,566 13.75 750,279
Multi-Family 7,796 13.75 107,198
Mobile Home/RV 29,701 13.75 408,394
Industrial 672 8.70 5,844
Commercial 14,001 5.80 81,207
Office&Other Services 2,969 8.70 25,828
Institutional 1,033 8.70 8,989
Total 1,387,739
1.Average weekday vehicle trips from Figure S5
2.2022 National Household Transportation Survey
3.TischlerBise calculation,Average Weekday Vehicle Trips X National Average Trip Length
Local Adjustment Factor
Expected VMT reflects anticipated travel demand on the entire roadway system;therefore, it is necessary
to calibrate demand to the arterial system. To calibrate demand on the arterial system, actual travel
demand,based on local traffic counts obtained from the Arizona Department of Transportation (Appendix
E), is compared to expected travel demand. The ratio between actual VMT and expected VMT provides
the local adjustment factor used to adjust national average trip lengths by type of land use.
Figure 58: Local Adjustment Factor
A•
Actual VMTon Arterials' 205,513
Expected VMT on Arterials 1,387,739
Actual to Expected VMT 0.15
1.TischlerBise analysis of trip counts published by ADOT
TischlerBise53
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Local Trip Lengths
Shown below in Figure S9, TischlerBise applies the local adjustment factor to the national average trip
lengths to calculate the local trip lengths. The analysis will use the local trip lengths shown below to
calculate VMT.
Figure 59: Local Trip Lengths
Residential 13.75 0.15 2.0363
Industrial 8.70 0.15 1.2884
Commercial/Retail 5.80 0.15 0.8589
Office and Other 8.70 0.15 1.2884
Institutional 8.70 0.15 1.2884
Source:2022 NHTS and TischlerBise analysis; local adjustmentfrom Figure S8
Local Vehicle Miles Traveled
Shown below are the demand indicators for residential and nonresidential land uses related to vehicle
miles traveled (VMT). For residential development, the table displays VMT per housing unit. For
nonresidential development,the table displays VMT per development unit (square foot, room, or bed).
Figure 510: Ratio of Service Unit to Development Unit
Residential Development Ulill .- Ill . •-
SingleFamily Housing Unit 8.19 67% 2.0363 11.17
Multi-Family Housing Unit 4.07 67% 2.0363 5.55
Mobile Home/RV Housing Unit 4.07 67% 2.0363 5.55
Nonresidential Development
- ..UlLs1sIifllilUI'iI III 1111.- �.
Industrial Square Foot 0.0036 50% 1.2884 0.0023
Commercial Square Foot 0.0364 33% 0.8589 0.0103
Office&Other Services Square Foot 0.0078 50% 1.2884 0.0050
Institutional Square Foot 0.0107 33% 1.2884 0.0045
Lodging Room 5.8400 50% 0.8589 2.5081
Assisted Living Bed 4.1400 50% 1.2884 2.6670
1.TischlerBise calculation.
2.TischlerBise calculation based on OnTheMap Application(version 6.25.2)and LEHD Origin-Destination Employment Statistics,
2022;and 2022 National Household Travel Survey.
3. 2022 National Household Travel Survey and TischlerBise analysis.
4.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
54 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
ANALYSIS OF CAPACITY,USAGE,AND COSTS OF EXISTING PUBLIC SERVICES
ARS§ 9-463.05(E)(1) requires:
"A description of the existing necessary public services in the service area and the costs to upgrade,
update, improve, expand, correct or replace those necessary public services to meet existing needs
and usage and stricter safety, efficiency, environmental or regulatory standards, which shall be
prepared by qualified professionals licensed in this state, as applicable."
ARS§ 9-463.05(E)(2) requires:
"An analysis of the total capacity, the level of current usage and commitments for usage of
capacity of the existing necessary public services, which shall be prepared by qualified
professionals licensed in this state, as applicable."
As shown in Appendix E, the City of Apache Junction provided an inventory of arterial road segments,
including segment lengths and lane quantities. TischlerBise obtained average daily traffic (ADT) counts
from the Arizona Department of Transportation (ADOT). Multiplying each segment's length by the number
of lanes yields the number of lane miles per segment, and multiplying the traffic counts and segment
lengths provides the average weekday vehicle miles traveled (VMT). Apache Junction's arterial road
network consists of 165.37 lane miles and 205,513 VMT.
Shown below, Figure S11 documents the capacity of Apache Junction's arterial road network. Apache
Junction's arterial road network is designed to operate at Level of Service D or better. Based on data
published by the Florida Department of Transportation, a mile segment of an arterial road operating at
Level of Service D should maintain a daily volume ranging from 12,300 vehicles for a two-lane arterial
without left-turn lanes (6,150 vehicles per lane) to 32,700 vehicles for a four-lane arterial with raised
medians and left-turn lanes (8,175 vehicles per lane). Applying these capacities to Apache Junction's
arterial road network shown in Appendix E generates arterial capacity of 1,059,803 vehicle miles of
capacity (VMC) and a weighted average of 6,409 vehicles per lane (1,059,803 VMC/ 165.37 arterial lane
miles).
Existing daily volume on Apache Junction's arterial road network is approximately 205,513 VMT. The
resulting VMC to VMT ratio is 5.16(1,059,803 VMC/205,513 VMT).The baseline VMC/VMT ratio for any
incremental expansion method is 1.0 (i.e., VMC =VMT); therefore, the current ratio of 5.16 exceeds the
current LOS ensuring new capacity built with development fee funds will not exceed the current LOS.
Figure 511:Arterial Network Capacity and Usage
Fks...
Vehicle Miles of Capacity 1,059,803
Total Arterial Lane Miles 165.37
Capacity per Lane Mile 6,409
Vehicle Miles of Travel 205,513
VMT per Lane Mile 1,243
VMC/VMT Ratio 5.16
55
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Street Improvements-Incremental Expansion
Apache Junction provided a list of street improvements to use as a proxy for future growth-related street
improvements. Based on the eligible cost of these projects(excludes the cost to repair or replace existing
lanes), the average cost is $2,772,239 per lane mile ($294,134,579 eligible cost / 106.10 lane miles).
TischlerBise applies the average cost per lane mile to the projected demand for additional lane miles of
street improvements over the next 10 years.Apache Junction may use development fees to construct the
projects shown in Figure S12 or to construct other growth-related street improvements in the street
facilities service area. Apache Junction should not use development fees to construct a developer's share
of half-street improvements.
Figure 512: Potential Arterial Improvements
BaselineAvenue I Meridian Driveto Ironwood Drive 4 Lanes 1.00 2 2 2.00 $15,000,000
BaselineAvenue Ironwood Drive-East Goldfield Road 5 Lanes 3.00 2 3 9.00 $22,000,000
Broadway Ave Old West Hwy to Mountainview Road 1 Lane 2.50 2 1 2.50 $6,250,000
Delaware Drive Superstition Blvd to Lost Dutchman 3 Lanes 0.90 2 1 0.90 $2,250,000
GuadalupeAvenue Meridian Drive to Delaware Drive 6 Lanes 0.70 2 4 2.80 $7,000,000
Idaho Road US 60 to BaselineAvenue 6 Lanes 0.50 4 2 1.00 $2,500,000
Ironwood Drive Superstition Blvd to Lost Dutchman 3 Lanes 1.00 2 1 1.00 $2,500,000
Ironwood Drive US 60 to BaselineAvenue 6 Lanes 0.50 4 2 1.00 $2,500,000
Ironwood Drive Baseline Avenue to Elliot Avenue 6 Lanes 2.00 4 2 4.00 $10,000,000
Ironwood Drive Ray Avenue to 5R24 New 6 Lanes 1.50 4 2 3.00 $7,500,000
Meridian Drive Lost Dutchman to ApacheTrail 3 Lanes 1.50 2 1 1.50 $3,750,000
Meridian Drive ApacheTrail to Southern Avenue 5 Lanes 1.50 2 3 4.50 $11,250,000
Meridian Drive Baseline Avenue to Houston Avenue New 6 Lanes 0.50 0 6 3.00 $7,500,000
Meridian Drive Elliot Avenueto GuadalupeAvenue New6 Lanes 1.00 0 6 6.00 $15,000,000
Meridian Drive Ray Avenueto 5R24 6 Lanes 1.50 0 6 9.00 $22,500,000
Southern Avenue San Marcos to Idaho 5 Lanes 0.50 2 3 1.50 $3,750,000
Southern Avenue Meridian Drive to Delaware Drive 5 Lanes 0.50 2 3 1.50 $3,750,000
Southern Avenue Tomahawk to Old West Hwy New 3 Lanes 1.00 0 3 3.00 $7,500,000
Superstition Ave SR 88 to Arroya Road 1 Lane 2.30 2 1 2.30 $5,750,000
Tomahawk Road US 60 to Old West Highway 5 Lanes 1.30 3 2 2.60 $6,500,000
Tomahawk Road Old West Hwy to SR 88 5 Lanes 2.00 2 3 6.00 $15,000,000
Southern Ave Tomahawk Rd to Wickiup Rd Alignment 5 Lanes 0.25 2 3 0.75 $1,911,819
Southern Ave Cortez Rd to Starr Rd 3 Lanes 1.00 2 1 1.00 $5,735,457
Traffic Signal Meridian Dr/Lost Dutchman Blvd n/a n/a n/a n/a n/a $2,000,000
Traffic Signal Tomahawk Rd/Broadway Ave n/a n/a n/a n/a n/a $2,000,000
Traffic Signal Idaho Rd/Baseline n/a n/a n/a n/a n/a $2,000,000
Elliot Ave Meridian Dr to Idaho Rd 6 Lanes 2.00 0 6 12.00 $22,941,828
Elliot Ave Bridge-East of Idaho Rd 6 Lanes 0.25 0 6 1.50 $14,000,000
Ray Ave Meridian Dr to Idaho Rd 7 Lanes 2.00 3 4 8.00 $15,294,552
Ray Ave Idaho Rd to CAP Canal 7 Lanes 1.00 0 7 7.00 $13,382,733
Ray Ave Bridge-East of Idaho Rd 7 Lanes 0.25 0 7 1.75 $16,000,000
Idaho Rd Elliot Aveto RayAve 5 Lanes 2.00 2 3 6.00 $19,118,190
Total 106.10 $294,134,579
Source:Apache Junction Public Works Department
56 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
To allocate the proportionate share of demand for arterial improvements to residential and nonresidential
development, this analysis uses trip generation rates, trip adjustment factors, trip length weighting
factors, and average trip lengths shown in Figure 510.Apache Junction's existing LOS is 1.5604 lane miles
per 10,000 VMT (165.37 lane miles / 5.16 capacity ratio / (205,513 VMT / 10,000 VMT)). Based on an
average cost of$2,772,239 per lane mile, the street improvements cost is $432.58 per VMT(165.37 lane
miles/5.16 capacity ratio/205,513 VMT X$2,772,239 per lane mile).
Figure S13: Existing Level of Service
Eligible Cost • • $294,134,579
Lane Miles 106.10
Cost per Lane Mile $2,772,239
Adjusted Lane Miles 32.07
2026 VMT 205,513
Lane Miles per 10,000 VMT 1.5604
.-
Source:Apache Junction Public Works Department
Development Fee Report-Plan-Based
The cost to prepare the Street Facilities IIP and related Development Fee Report totals $25,650. Apache
Junction plans to update its report every five years, so the 10-year cost is $51,300. Based on this cost,
proportionate share, and 10-year projections of new residential and nonresidential development from
the Land Use Assumptions document,the cost is$0.98 per VMT.
Figure 514: lIP and Development Fee Report
Library $13,040 $26,080 Residential 98% Population 33,791 $0.76
Nonresidential 2% Jobs 1,617 $0.32
Parks and $15,250 $30,500 Residential 98% Population 11,971 $2.50
Recreational Nonresidential 2% Jobs 671 $0.91
Police $13,500 $27,000 Residential 82% Population 33,791 $0.66
Nonresidential 18% Vehicle Trips 6,512 $0.75
Street $25,650 $51,300 All Development 100% VMT 52,115 $0.98
Total $67,440 $134,880
schlerBise 57 Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
PROJECTED DEMAND FOR SERVICES AND COSTS
ARS§ 9-463.05(E)(5) requires:
"The total number of projected service units necessitated by and attributable to new development
in the service area based on the approved land use assumptions and calculated pursuant to
generally accepted engineering and planning criteria."
ARS§ 9-463.05(E)(6) requires:
"The projected demand for necessary public services or facility expansions required by new service
units for a period not to exceed ten years."
As shown in the Land Use Assumptions document,Apache Junction's housing stock in the street facilities
service area is expected to increase by 4,950 units and nonresidential floor area is expected to increase
by 453,000 square feet over the next 10 years. Based on the trip generation factors discussed in this
section, projected development generates an additional 52,115 VMT over the next 10 years.Shown below
in Figure S15, Apache Junction will need to construct approximately 8.13 lane miles of street
improvements over the next 10 years to maintain the adjusted levels of service. The growth-related cost
for street improvements is $22,543,795 (8.13 lane miles X$2,772,239 per lane mile).
Figure S15: Projected Travel Demand
ApacheJunction,Arizona i II liii II
2026 2027 2028 2029 2030 2031 2036
Single-Family Units 9,944 10,344 10,744 11,144 11,544 11,944 13,944 4,000
Multi-Family Units 2,859 2,954 3,049 3,144 3,239 3,334 3,809 950
Mobile Home/RV Units 10,892 10,892 10,892 10,892 10,892 10,892 10,892 0
Industrial KSF 373 401 429 458 486 509 626 253
Commercial KSF 1,166 1,178 1,190 1,202 1,214 1,224 1,272 106
Office&Other KSF 758 769 779 789 800 806 840 81
Institutional KSF 293 293 293 293 293 295 305 13
Single Family Trips 54,566 56,761 58,956 61,150 63,345 65,540 76,515 21,949
Multi-Family Trips 7,796 8,055 8,314 8,573 8,832 9,091 10,387 2,591
Mobile Home/RVTrips 29,701 29,701 29,701 29,701 29,701 29,701 29,701 0
Residential Trips 92,063 94,517 96,971 99,425 101,879 104,333 116,603 24,540
Industrial Trips 672 722 773 824 874 916 1,126 455
Commercial Trips 14,001 14,146 14,290 14,434 14,578 14,694 15,272 1,270
Office&Other Trips 2,969 3,009 3,050 3,090 3,130 3,157 3,287 319
Institutional Trips 1,033 1,033 1,033 1,033 1,033 1,041 1,078 45
Nonresidential Trips 18,675 18,910 19,146 19,381 19,616 19,808 20,764 2,089
Total Vehicle Trips 110,738 113,428 116,117 118,806 121,496 124,141 137,367 26,629
VMT 205,513 210,752 215,990 221,228 226,466 231,660 257,629 52,115
Lane Miles(Adjusted) 32.07 32.89 33.70 34.52 35.34 36.15 40.20 8.13
Lane Miles 165.37 169.59 173.80 178.02 182.23 186.41 207.31 41.94
58 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
STREET FACILITIES DEVELOPMENT FEES
Revenue Credit/Offset
A revenue credit/offset is not necessary for street facilities development fees, because costs generated
by projected development exceed revenues generated by projected development. Appendix A contains
the forecast of revenues required by Arizona's Enabling Legislation (ARS§9-463.05(E)(7)).
Street Facilities Development Fees
Infrastructure components and cost factors for street facilities are summarized in the upper portion of
Figure S16.The cost per service unit for street facilities is$433.56 per VMT.
Street facilities development fees for residential development are assessed according to VMT generated
per housing unit. For example, the fee of $4,843 for a single-family unit is calculated using a cost per
service unit of$433.56 per VMT multiplied by a demand unit of 11.17 average weekday VMT per unit.
Nonresidential development fees are calculated using VMT as the service unit.The fee of$1.00 per square
foot of industrial development is derived from a cost per service unit of$433.56 per VMT multiplied by a
demand unit of 0.0023 VMT per square foot(2.32 VMT per 1,000 square feet).The fee of$1,087 per room
of lodging development is derived from a cost per service unit of$433.56 per VMT multiplied by a demand
unit of 2.5081 VMT per room.
Figure 516: Street Facilities Development Fees
.. .-
Street Improvements $432.58
Development Fee Report $0.98
Total $433.56
Residential Fees per Development Unit
-•pII- S 111fl !1i .S .
.- Ii
Single Family Housing Unit 11.17 $4,843 $3,250 $1,593
Multi-Family Housing Unit 5.55 $2,406 $1,779 $627
Recreational Vehicle Housing Unit 5.55 $2,406 $1,779 $627
Nonresidential Fees per Development Unit
- - .. ..s
Industrial I Square Foot 0.0023 $1.00 $0.92 $0.08
Commercial Square Foot 0.0103 $4.47 $4.72 ($0.25)
Office&Other Services Square Foot 0.0050 $2.17 $2.04 $0.13
Institutional Square Foot 0.0045 $1.95 $1.34 $0.61
Lodging Room 2.5081 $1,087 $1,545 ($458)
Assisted Living Bed 2.6670 $1,156 $490 $666
1.See Land Use Assumptions
schlerBise 59 Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
STREET FACILITIES DEVELOPMENT FEE REVENUE
Appendix A contains revenue forecasts required by Arizona's Enabling Legislation (ARS § 9-463.05(E)(7)).
Projected fee revenue shown in Figure S17 is based on the development projections in the Land Use
Assumptions document and the updated street facilities development fees. If development occurs faster
than projected, the demand for infrastructure will increase along with development fee revenue. If
development occurs slower than projected,the demand for infrastructure will decrease and development
fee revenue will decrease at a similar rate. Projected development fee revenue equals approximately
$22,585,640, and projected expenditures equal $22,595,095.
Figure 517: Street Facilities Development Fee Revenue
'IfflhI.IIIli)
Street Improvements $22,543,795 $0 $22,543,795
Development Fee Report $51,300 $0 $51,300
Total $22,595,095 $0 $22,595,095
• • •- 111 • •- 111 • •- 111 • • III •
Year Hsg Unit Hsg Unit KSF KSF KSF KSF
Base 2026 9,944 2,859 373 1,166 758 293
Year 1 2027 10,344 2,954 401 1,178 769 293
Year 2 2028 10,744 3,049 429 1,190 779 293
Year3 2029 11,144 3,144 458 1,202 789 293
Year 4 2030 11,544 3,239 486 1,214 800 293
Year 5 2031 11,944 3,334 509 1,224 806 295
Year 6 2032 12,344 3,429 532 1,233 813 297
Year 7 2033 12,744 3,524 556 1,243 820 299
Year8 2034 13,144 3,619 579 1,252 826 301
Year 9 2035 13,544 3,714 602 1,262 833 303
Year 10 2036 13,944 3,809 626 1,272 840 305
10-Year Increase 4,000 950 253 106 81 13
Projected Revenue $19,372,000 $2,285,700 $253,000 $473,820 $175,770 $25,350
Total • • 1•
60 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
ARS§ 9-463.05(E)(7) requires:
"A forecast of revenues generated by new service units other than development fees, which shall
include estimated state-shared revenue, highway users revenue, federal revenue, ad valorem
property taxes, construction contracting or similar excise taxes and the capital recovery portion of
utility fees attributable to development based on the approved land use assumptions, and a plan
to include these contributions in determining the extent of the burden imposed by the
development as required in subsection B, paragraph 12 of this section."
ARS§ 9-463.05(B)(12) states,
"The municipality shall forecast the contribution to be made in the future in cash or by taxes,fees,
assessments or other sources of revenue derived from the property owner towards the capital
costs of the necessary public service covered by the development fee and shall include these
contributions in determining the extent of the burden imposed by the development. Beginning
August 1, 2014,for purposes of calculating the required offset to development fees pursuant to
this subsection, if a municipality imposes a construction contracting or similar excise tax rate in
excess of the percentage amount of the transaction privilege tax rate imposed on the majority of
other transaction privilege tax classifications, the entire excess portion of the construction
contracting or similar excise tax shall be treated as a contribution to the capital costs of necessary
public services provided to development for which development fees are assessed, unless the
excess portion was already taken into account for such purpose pursuant to this subsection."
REVENUE PROJECTIONS
Apache Junction does not have a higher-than-normal construction excise tax rate;therefore,the required
offset described above is not applicable. Shown in Figure Al, Apache Junction provided the required
forecast of non-development fee revenue from identified sources that can be attributed to future
development over a period of five years.These funds are available for capital investments; however, the
City of Apache Junction directs these revenues to non-development fee eligible capital needs including
maintenance, repair, and replacement.
Figure Al: Revenue Projections
NOTE TO STAFF: WE NEED TO UPDATE THIS.
TischlerB 61
ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
. . ; • .
As stated in Arizona's development fee enabling legislation, "a municipality may assess development fees
to offset costs to the municipality associated with providing necessary public services to a development,
including the costs of infrastructure, improvements, real property, engineering and architectural services,
financing and professional services required for the preparation or revision of a development fee pursuant
to this section, including the relevant portion of the infrastructure improvements plan" (see ARS § 9-
463.05.A). Because development fees must be updated at least every five years, but the IIP period is 10
years,the cost of professional services is allocated to the projected increase in service units over 10 years
(see Figure B1). Qualified professionals must develop the IIP, using generally accepted engineering and
planning practices. A qualified professional is defined as "a professional engineer, surveyor, financial
analyst or planner providing services within the scope of the person's license, education or experience".
Figure B1: Cost of Professional Services
£tF1i...
Library $13,040 $26,080 Residential 98% Population 33,791 $0.76
Nonresidential 2% Jobs 1,617 $0.32
Parks and $15,250 $30,500 Residential 98% Population 11,971 $2.50
Recreational Nonresidential 2% Jobs 671 $0.91
Police $13,500 $27,000 Residential 82% Population 33,791 $0.66
Nonresidential 18% VehicleTrips 6,512 $0.75
Street $25,650 $51,300 All Development 100% VMT 52,115 $0.98
Total $67,440 $134,880
62 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
APPENDIX1iI 1 1
RESIDENTIAL DEVELOPMENT
As discussed below, residential development categories are based on data from the U.S. Census Bureau,
American Community Survey. Development fees will be assessed to all new residential units. One-time
development fees are determined by site capacity(i.e., number of residential units).
Single Family:
1. Single-family detached is a one-unit structure detached from any other house, that is, with open
space on all four sides. Such structures are considered detached even if they have an adjoining
shed or garage.A one-family house that contains a business is considered detached if the building
has open space on all four sides.
2. Single-family attached (townhouse) is a one-unit structure that has one or more walls extending
from ground to roof separating it from adjoining structures. In row houses (sometimes called
townhouses), double houses, or houses attached to nonresidential structures, each house is a
separate, attached structure if the dividing or common wall goes from ground to roof.
3. Mobile home includes both occupied and vacant mobile homes, to which no permanent rooms
have been added. Mobile homes used only for business purposes or for extra sleeping space and
mobile homes for sale on a dealer's lot,at the factory,or in storage are not counted in the housing
inventory.
Multi-Family:
1. Includes units in structures containing two or more housing units, further categorized as units in
structures with "2, 3 or 4, 5 to 9, 10 to 19, 20 to 49, and 50 or more apartments."
Recreational Vehicle:
1. Includes any living quarters occupied as a housing unit that does not fit the other categories (e.g.,
houseboats, railroad cars, campers, and vans). Recreational vehicles, boats, vans, railroad cars,
and the like are included only if they are occupied as a current place of residence.
63
Tisch Bise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
NONRESIDENTIAL DEVELOPMENT
The proposed general nonresidential development categories (defined below) can be used for all new
construction. Nonresidential development categories represent general groups of land uses that share
similar average weekday vehicle trip generation rates and employment densities (i.e.,jobs per thousand
square feet of floor area).
Assisted Living: Establishments primarily providing either routine general protective oversight, assistance
with activities necessary for independent living to mentally or physically limited persons, or
establishments providing care for persons who are unable to care for themselves. By way of example,
Assisted Living includes assisted living facilities, nursing homes, rest homes, chronic care homes, and
convalescent homes.
Commercial: Establishments primarily selling merchandise, eating/drinking places, and entertainment
uses. By way of example, commercial includes shopping centers, supermarkets, pharmacies, restaurants,
bars, nightclubs, automobile dealerships, and movie theaters.
Industrial: Establishments primarily engaged in the production, transportation, or storage of goods. By
way of example, industrial includes manufacturing plants, distribution warehouses, trucking companies,
utility substations, power generation facilities, and telecommunications buildings.
Institutional: Public and quasi-public buildings providing educational, social assistance, or religious
services. By way of example, institutional includes schools, universities, churches, daycare facilities, and
government buildings.
Lodging: A place of lodging that provides sleeping accommodations and may include supporting facilities
such as restaurants, cocktail lounges, meeting and banquet rooms or convention facilities, limited
recreational facilities (pool, fitness room, etc.), and/or other retail and service shops.
Office and Other Services: Establishments providing management, administrative, professional, or
business services; personal and health care services. By way of example,Office and Other services includes
banks, business offices, hotels and motels, and hospitals.
64 TISCh BISe
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Arizona's Development Fee Act requires the preparation of Land Use Assumptions, which are defined in
Arizona Revised Statutes § 9-463.05(T)(6) as:
"projections of changes in land uses, densities, intensities and population for a specified service
area over a period of at least ten years and pursuant to the General Plan of the municipality."
The estimates and projections of residential and nonresidential development in this Land Use
Assumptions document are for all areas within Apache Junction.The current demographic estimates and
future development projections are used in the Infrastructure Improvements Plan (IIP) and in the
calculation of development fees. Current demographic data estimates for 2026 are used in calculating
levels of service(LOS) provided to existing development in Apache Junction.Arizona's Enabling Legislation
requires fees to be updated at least every five years and limits the IIP to a maximum of 10 years.
The Infrastructure Improvements Plan and the Development Fee Report include two service areas. The
citywide service area, shown in Figure D1, includes all areas of Apache Junction. This service area is used
for the Library Facilities IIP and the Police Facilities IIP. The second service area excludes the Auction
Property, known as Superstition Vistas, due to the terms of Development Agreement for Superstition
Vistas (October 2021). This service area, shown in Figure D2, is used for the Parks and Recreational
Facilities IIP and the Street Facilities IIP.
SUMMARY OF GROWTH INDICATORS
Key land use assumptions include population, housing units, employment, and nonresidential floor area
projections. Based on discussions with staff, TischlerBise projects development based on a combination
of Maricopa Association of Governments (MAG) projections and staff recommendations based on recent
and planned development. For the Auction Property, the analysis uses nonresidential development
projections included in the Auction Property Master Planned Community Plan (October 2021).
Development projections are summarized in Figure D11. These projections will be used to estimate fee
revenue and to indicate the anticipated need for growth-related infrastructure. However, development
fee methodologies are designed to reduce sensitivity to development projections in the determination of
the proportionate share fee amounts. If actual development occurs at a slower rate than projected, fee
revenue will decline, but so will the need for growth-related infrastructure. In contrast, if development
occurs at a faster rate than anticipated, fee revenue will increase, but Apache Junction will also need to
accelerate infrastructure improvements to keep pace with the actual rate of development. During the
next 10 years, residential development projections indicate a population increase of 33,791 persons in
13,819 housing units, and nonresidential development projections indicate an employment increase of
1,617 jobs in approximately 896,000 square feet of floor area.
65
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Figure D1: Citywide Service Area
Maricopa County
Pinal County
88 Tonto
National',
Forest
Superstition Wilderness Area
Apache —
Junction
60
Gold Canyon
.. Community
202
MESA
m 60
II
o�
n
hoenix-Me
Gateway
Airport
24
0 O
QUEEN CREEK
U
m U
o m
U C
m R
LEGEND
t Q ` �
Municipal Boundary National Forest Other Municpal Boundaries N
Pinal County Island Wilderness Area Mesa
County Boundary Airport Boundary Queen Creek April 06, 2022 A
0 10,000 20.000
Feet
66 Tisch re BI ise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Figure D2:Auction Property
Maricopa County
Pinal County
88 Tonto
National
Forest
LIEf
Superstition'Wil derness.Area
Ap-a.che
Junction
so
Gold Canyon
Community
202
MESA
-r ___________________ 60
AUcflOn �.
Property
hoenix-Me
Gateway
Airport U.
24
QUEEN CREEK
m U
a
LEGEND
® Municipal Boundary National Forest Other Municpal Boundaries
N
%% Pinal County Island Wilderness Area Mesa
r] County Boundary Airport Boundary Queen Creek April 06, 2022
0 10,000 20,000
Auction Property
Feet
schlerBise 67
Ti
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
RESIDENTIAL DEVELOPMENT
This section details current estimates and future projections of residential development including
population and housing units.
Recent Residential Construction
Development fees require an analysis of current levels of service. For residential development, current
levels of service are calculated using estimates of population and housing units. Figure D3 indicates the
number of housing units permitted from 2020 through 2025. According to building permit data, Apache
Junction's housing stock grew by an average of 603 units per year during this time.This includes an annual
increase of 465 single-family units, 116 multi-family units, and 22 manufactured/RV units.
Figure D3: Housing Permits
Single-Family Detached Housing Unit 118 174 46 742 962 637 2,679 447
Single-Family Attached Housing Unit 0 3 4 10 79 12 108 18
Single-Family Rental Housing Unit 0 45 150 166 190 0 551 92
Multi-Family Housing Unit 22 53 10 61 0 0 146 24
Manufactured Home Space 6 8 5 0 3 1 23 4
Recreational Vehicle Space 110 0 0 0 0 0 110 18
Total 256 283 215 979 1,234 650 3,617 603
Single Family Housing Unit 118 177 50 752 1,041 649 2,787 465
Multi-Family Housing Unit 22 98 160 227 190 0 697 116
Manufactured/RV Space 116 8 5 0 3 1 133 22
Total 256 283 215 979 1,234 650 3,617 603
Source:Apache Junction
68 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Occupancy Factors
According to the U.S. Census Bureau, a household is a housing unit occupied by year-round residents.
Development fees often use per capita standards and persons per housing unit (PPHU) or persons per
household (PPH) to derive proportionate share fee amounts. When PPHU is used in the fee calculations,
infrastructure standards are derived using year-round population. When PPH is used in the fee
calculations, the development fee methodology assumes a higher percentage of housing units will be
occupied, thus requiring seasonal or peak population to be used when deriving infrastructure standards.
Because of the seasonal nature of the Apache Junction's population, TischlerBise recommends that
Apache Junction assess development fees for residential development according to the number of
persons per household.
Occupancy calculations require data on population and the types of units by structure. Beginning in 2010,
the U.S. Census no longer obtained detailed information using a "long-form" questionnaire. Instead, the
U.S. Census Bureau switched to a continuous monthly mailing of surveys, known as the American
Community Survey (ACS), which has limitations due to sample-size constraints. For example, data on
detached housing units are now combined with attached single units (commonly known as townhouses,
which share a common sidewall, but are constructed on an individual parcel of land). For development
fees in Apache Junction,the single-family category includes detached units and attached units.The multi-
family unit category includes duplexes and all structures with two or more units on an individual parcel of
land.The mobile home/ RV category includes mobile homes, recreational vehicles, and all other units.
Figure D4 below shows the occupancy estimates for Apache Junction based on 2019-2023 American
Community Survey 5-Year Estimates. Single-family units averaged 2.52 persons per household, multi-
family units averaged 1.99 persons per household,and mobile home/RV units averaged 1.90 persons per
household. The average occupancy in Apache Junction was 2.20 persons per household. The estimates
shown below are used only to calculate occupancy factors and may not match population and housing
unit estimates shown throughout this report.
Figure D4: Occupancy Factors
Single-Family' 20,983 8,331 2.52 9,157 2.29 41.7% 9.02%
Multi-Family2 3,674 1,850 1.99 2,145 1.71 9.8% 13.75%
Mobile/RV3 14,805 7,772 1.90 10,677 1.39 48.6% 27.21%
Total 39,462 17,953 2.20 21,979 1.80 100.0% 18.32%
Source:U.S.Census Bureau,2019-2023 American Community Survey 5-Year Estimates
1. Includes detached and attached(townhouse)units.
2. Includes dwellings in structures with two or more units.
3. Includes mobile homes,RVs,and all other units.
TischlerBise69
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Residential Estimates
For 2020,data published by the U.S.Census Bureau includes 38,499 persons living in 22,149 housing units.
Residential Projections
Population and housing unit projections are used to illustrate the possible future pace of service demands,
revenues,and expenditures.To the extent these factors change,the projected need for infrastructure will
also change. If development occurs at a more rapid rate than projected, the demand for infrastructure
will increase at a corresponding rate. If development occurs at a slower rate than projected, the demand
for infrastructure will also decrease. For this study, the analysis assumes the occupancy factors shown in
Figure D4 will remain constant throughout the 10-year projection period.
Outside of Auction Property
TischlerBise projects residential development outside of the Auction Property based on recent
development trends and approved/planned development in the pipeline.Over the next 10 years,Apache
Junction staff project an additional 4,000 single-family units and 950 multi-family units. To convert
housing units to population, occupancy factors shown in Figure D4 are applied to the housing unit
projections shown in Figure D5. Based on these assumptions,the 10-year projections include an increase
of 11,971 persons and 4,950 housing units.
Figure D5: Residential Projections—Outside of Auction Property
Outside of
Auction Property BaseYear 1 2 3 4 5 10
Population 49,216 50,413 51,610 52,807 54,004 55,201 61,187 11,971
Housing Units
Single Family 9,944 10,344 10,744 11,144 11,544 11,944 13,944 4,000
Multi-Family 2,859 2,954 3,049 3,144 3,239 3,334 3,809 950
Mobile Home/RV 10,892 10,892 10,892 10,892 10,892 10,892 10,892 0
Total 23,695 24,190 24,685 25,180 25,675 26,170 28,645 4,950
Auction Property
For the Auction Property, TischlerBise projects residential development using housing unit projections
provided by Apache Junction staff. To convert housing units to population, occupancy factors shown in
Figure D4 are applied to the housing unit projections shown in Figure D6. Based on these assumptions,
the 10-year projections include an increase of 21,820 persons and 8,869 housing units.
Figure D6: Residential Projections—Auction Property
Auction Property
77- -971 -4-
3 4 5 10Population 14,011 16,982 19,953 26,918 21820
Housing Units
Single Family 2,071 ,11 4, 1 5,371 6,471 7,571 9,940 7,869
Multi-Family 0 100 200 300 400 500 1,000 1,000
MobileHome/RV 0 0 0 0 0 0 0 0
Total 2,071 3,271 4,471 5,671 6,871 8,071 10,940 8,869
70 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
NONRESIDENTIAL DEVELOPMENT
This section details current estimates and future projections of nonresidential development including jobs
and nonresidential floor area.
Nonresidential Square Footage Estimates
TischlerBise uses the term jobs to refer to employment by place of work. In Figure D7, gray shading
indicates the nonresidential development prototypes used by TischlerBise to derive employment
densities. For nonresidential development, TischlerBise uses data published in Trip Generation, Institute
of Transportation Engineers, 12th Edition (2025). The prototype for industrial development is Light
Industrial (ITE 110) has 1,117 square feet of floor area per employee. Institutional development uses
Hospital (ITE 610) and has 334 square feet of floor area per employee. For office & other services
development,the proxy is General Office (ITE 710); it has 439 square feet of floor area per employee.The
prototype for commercial development is Shopping Center (ITE 820) which has 479 square feet of floor
area per employee.
Figure D7: Nonresidential Demand Units
!JII rnirr-
. .
110 Light Industrial 1,000 Sq Ft 3.60 4.02 0.90 1,117
130 Industrial Park 1,000 Sq Ft 2.68 3.93 0.68 1,466
140 Manufacturing 1,000 Sq Ft 4.27 2.67 1.60 625
150 Warehousing 1,000 Sq Ft 1.38 5.05 0.27 3,659
254 Assisted Living bed 4.14 4.24 0.98 N/A
310 Hotel room 5.84 14.34 0.41 N/A
520 Elementary School student 2.27 22.50 0.10 N/A
525 High School student 1.94 21.95 0.09 N/A
540 Community College student 1.15 14.61 0.08 N/A
550 University/College student 1.46 8.89 0.16 N/A
565 Day Care student 3.79 19.30 0.20 N/A
610 Hospital 1,000 Sq Ft 10.70 3.57 3.00 334
620 Nursing Home bed 3.06 3.31 0.92 N/A
710 General Office(avg size) 1,000 Sq Ft 7.83 3.44 2.28 439
720 Medical-Dental Office 1,000 Sq Ft 34.03 11.78 2.89 346
730 Government Office 1,000 Sq Ft 22.59 7.45 3.03 330
770 Business Park 1,000 Sq Ft 9.97 5.42 1.84 544
820 Shopping Center(avg size) 1,000 Sq Ft 36.39 17.42 2.09 479
1.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
TischlerBise71
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Nonresidential Estimates
TischlerBise uses the term jobs to refer to employment by place of work. Shown below in Figure D8, 2026
MAG estimates for Apache Junction equal 5,373 jobs. Applying the employment multipliers shown in
Figure D7 to employment estimates shown in Figure D8 results in a nonresidential floor area estimate of
2,590,019 square feet.
Figure D8: Nonresidential Estimates
Industrial 334 6% 373,190
Commercial 2,436 45% 1,165,929
Office&Other Services 1,726 32% 758,294
Institutional 877 16% 292,607
Total 5,373 100% 2,590,019
1. Maricopa Association of Governments(MAG)
2.Trip Generation,Institute of Transportation Engineers,12th Edition(2025).
Nonresidential Projections
Employment and floor area projections are used to illustrate the possible future pace of service demands,
revenues,and expenditures.To the extent these factors change,the projected need for infrastructure will
also change. If development occurs at a more rapid rate than projected, the demand for infrastructure
will increase at a corresponding rate. If development occurs at a slower rate than projected, the demand
for infrastructure will also decrease.
Outside of Auction Property
Based on discussions with Apache Junction staff, TischlerBise projects nonresidential development
outside of the Auction Property based on MAG employment projections.To convert employment to floor
area, employment multipliers shown in Figure D7 are applied to the employment projections shown in
Figure D9. Based on these assumptions, the 10-year projections include an increase of 671 jobs and
453,000 square feet of nonresidential floor area.
Figure D9: Nonresidential Projections—Outside of Auction Property
Outside of
Auction Property BaseYear 1 2 3 4 5 10
Employment
Industrial 334 359 385 410 435 456 560 226
Commercial 2,436 2,461 2,486 2,511 2,536 2,556 2,657 221
Office&Other Services 1,726 1,750 1,773 1,797 1,820 1,835 1,911 185
Institutional 877 877 877 877 877 883 915 38
Total 5,373 5,447 5,520 5,594 5,668 5,731 6,044 671
Floor Area/Sq Ft(x1,000)
Industrial 373 401 429 458 486 509 626 253
Commercial 1,166 1,178 1,190 1,202 1,214 1,224 1,272 106
Office&Other Services 758 769 779 789 800 806 840 81
Institutional 293 293 293 293 293 295 305 13
Total 2,590 2,640 2,691 2,741 2,792 2,834 3,043 453
72 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Auction Property
For the Auction Property, TischlerBise projects nonresidential development using the Auction Property
Master Planned Community Plan (October 2021). The 10-year projections include an increase of
approximately 443,000 square feet of commercial and office development within development units 1
and 2. The master plan projects future industrial and institutional development in phases beyond
development units 1 and 2(the Retained Property).To convert floor area to employment, ITE employment
multipliers shown in Figure D7 are applied to the floor area projections shown in Figure D10. Based on
these assumptions, the 10-year projections include an increase of 946 jobs and approximately 443,000
square feet of nonresidential floor area.
Figure D10: Nonresidential Projections—Auction Property
Auction Property
Base Year 1 2 3 4 5 10
Employment
Industrial 0 0 0 0 0 0 0 0
Commercial 0 69 139 208 278 347 694 694
Office&Other Services 0 25 50 76 101 126 252 252
Institutional 0 0 0 0 0 0 0 0
Total 0 95 189 284 378 473 946 946
Floor Area/Sq Ft(x1,000)
Industrial 0 0 0 0 0 0 0 0
Commercial 0 33 66 100 133 166 332 332
Office&Other Services 0 11 22 33 44 55 111 111
Institutional 0 0 0 0 0 0 0 0
Total 0 44 89 133 177 222 443 443
TischlerBise73
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
DEVELOPMENT PROJECTIONS
Provided below is a summary of development projections used in the Development Fee Report. Base year estimates for 2026 are used in the fee
calculations. Development projections are used to illustrate a possible future pace of demand for service units and cash flows resulting from revenues
and expenditures associated with those demands. TischlerBise uses the development projections shown below in the Library Facilities IIP and the
Police Facilities IIP.
Figure D11: Development Projections Summary
Apache Junction,ArizonaLtflt1i
Base Year 1 2 3 4 5 6 7 8 9 10
Population 54,314 58,482 62,650 66,818 70,986 75,154 79,322 83,490 85,312 86,708 88,105 33,791
Housing Units
Single Family 12,015 13,515 15,015 16,515 18,015 19,515 21,015 22,515 23,084 23,484 23,884 11,869
Multi-Family 2,859 3,054 3,249 3,444 3,639 3,834 4,029 4,224 4,419 4,614 4,809 1,950
Mobile Home/RV 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 0
Total 25,766 27,461 29,156 30,851 32,546 34,241 35,936 37,631 38,395 38,990 39,585 13,819
Employment
Industrial 334 359 385 410 435 456 477 498 519 540 560 226
Commercial 2,436 2,530 2,625 2,719 2,814 2,903 2,993 3,082 3,172 3,261 3,351 915
Office&Other Services 1,726 1,775 1,823 1,872 1,921 1,961 2,002 2,042 2,082 2,123 2,163 437
Institutional 877 877 877 877 877 883 890 896 903 909 915 38
Total 5,373 5,541 5,710 5,878 6,046 6,204 6,361 6,518 6,675 6,833 6,990 1,617
Floor Area/Sq Ft(x1,000)
Industrial 373 401 429 458 486 509 532 556 579 602 626 253
Commercial 1,166 1,211 1,256 1,302 1,347 1,390 1,433 1,475 1,518 1,561 1,604 438
Office&Other Services 758 780 801 822 844 862 879 897 915 933 950 192
Institutional 293 293 293 293 293 295 297 299 301 303 305 13
Total 2,590 2,685 2,780 2,874 2,969 3,055 3,141 3,227 3,313 3,400 3,486 896
TischlerBise 74
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Outside of Auction Property
TischlerBise uses the development projections shown below in the Parks and Recreational Facilities IIP and the Street Facilities IIP.
Figure D12: Development Projections Summary
Outside of S . S 5 S • 55 5 5 5 54 5 5 .
Auction Property Base Year 1 2 3 4 5 6 7 8 9 10
Population 49,216 50,413 51,610 52,807 54,004 55,201 56,398 57,595 58,792 59,989 61,187 11,971
Housing Units
Single Family 9,944 10,344 10,744 11,144 11,544 11,944 12,344 12,744 13,144 13,544 13,944 4,000
Multi-Family 2,859 2,954 3,049 3,144 3,239 3,334 3,429 3,524 3,619 3,714 3,809 950
Mobile Home/RV 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 10,892 0
Total 23,695 24,190 24,685 25,180 25,675 26,170 26,665 27,160 27,655 28,150 28,645 4,950
Employment
Industrial 334 359 385 410 435 456 477 498 519 540 560 226
Commercial 2,436 2,461 2,486 2,511 2,536 2,556 2,576 2,596 2,616 2,637 2,657 221
Office&Other Services 1,726 1,750 1,773 1,797 1,820 1,835 1,850 1,866 1,881 1,896 1,911 185
Institutional 877 877 877 877 877 883 890 896 903 909 915 38
Total 5,373 5,447 5,520 5,594 5,668 5,731 5,793 5,856 5,918 5,981 6,044 671
Floor Area!Sq Ft(x1,000)
Industrial 373 401 429 458 486 509 532 556 579 602 626 253
Commercial 1,166 1,178 1,190 1,202 1,214 1,224 1,233 1,243 1,252 1,262 1,272 106
Office&Other Services 758 769 779 789 800 806 813 820 826 833 840 81
Institutional 293 293 293 293 293 295 297 299 301 303 305 13
Total 2,590 2,640 2,691 2,741 2,792 2,834 2,875 2,917 2,959 3,001 3,043 453
TischlerBise 75
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Auction Property
The development projections shown below represent projected development within the Auction Property.
Figure D13: Development Projections Summary
Auction Property
Base Year 1 2 3 4 5 6 7 8 9 10
Population 5,098 8,069 11,040 14,011 16,982 19,953 22,924 25,895 26,520 26,719 26,918 21,820
Housing Units
Single Family 2,071 3,171 4,271 5,371 6,471 7,571 8,671 9,771 9,940 9,940 9,940 7,869
Multi-Family 0 100 200 300 400 500 600 700 800 900 1,000 1,000
MobileHome/RV 0 0 0 0 0 0 0 0 0 0 0 0
Total 2,071 3,271 4,471 5,671 6,871 8,071 9,271 10,471 10,740 10,840 10,940 8,869
Employment
Industrial 0 0 0 0 0 0 0 0 0 0 0 0
Commercial 0 69 139 208 278 347 416 486 555 625 694 694
Office&Other Services 0 25 50 76 101 126 151 176 202 227 252 252
Institutional 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 95 189 284 378 473 568 662 757 852 946 946
Floor Area!Sq Ft(x1,000)
Industrial 0 0 0 0 0 0 0 0 0 0 0 0
Commercial 0 33 66 100 133 166 199 233 266 299 332 332
Office&Other Services 0 11 22 33 44 55 66 78 89 100 111 111
Institutional 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 44 89 133 177 222 266 310 354 399 443 443
76 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
. . . s .
16th Ave Cedar Dr to Delaware Dr 0.40 3.0 1.20 953 381 15,400 6,160
16th Ave Delaware Dr to Ironwood Dr 0.50 3.0 1.50 1,233 617 15,400 7,700
16th Ave Ironwood Dr to Idaho Rd 1.00 3.0 3.00 1,996 1,996 15,400 15,400
Apache Trail Meridian Dr.to Delaware Dr. 0.50 6.0 3.00 9,695 4,848 49,200 24,600
Apache Trail Delaware Dr. to Ironwood Dr. 0.50 6.0 3.00 10,392 5,196 49,200 24,600
Apache Trail Ironwood Dr. to Phelps 0.75 6.0 4.50 11,901 8,926 49,200 36,900
Baseline Ave W City limit to Ironwood Dr 0.80 2.0 1.60 5,626 4,501 12,300 9,840
Baseline Ave Ironwood Dr to Idaho Rd 1.00 2.0 2.00 3,640 3,640 12,300 12,300
Baseline Ave Idaho Rd to Tomahawk Rd 1.00 2.0 2.00 2,797 2,797 12,300 12,300
Baseline Ave Tomahawk Rd to Goldfield Rd 1.00 2.0 2.00 2,739 2,739 12,300 12,300
Broadway Ave Meridian Dr to Delaware Dr 0.50 5.0 2.50 5,572 2,786 31,100 15,550
Broadway Ave Delaware Dr to Ironwood Dr 0.50 5.0 2.50 5,271 2,636 31,100 15,550
Broadway Ave Ironwood Dr to Idaho Rd 1.00 5.0 5.00 4,555 4,555 31,100 31,100
Broadway Ave Old West Highway to Tomahawk Rd 0.50 2.0 1.00 1,226 613 12,300 6,150
Broadway Ave Tomahawk Rd to Goldfield Rd 1.00 2.0 2.00 1,315 1,315 12,300 12,300
Broadway Ave Goldfield Rd to Arroya Dr 0.75 2.0 1.50 1,207 905 12,300 9,225
Delaware Dr Southern Ave to 16th Ave 0.50 3.0 1.50 3,872 1,936 15,400 7,700
Delaware Dr 16th Ave to Broadway Ave 0.50 2.0 1.00 1,766 883 12,300 6,150
Delaware Dr Broadway Ave to Apache Trail 0.50 3.0 1.50 3,419 1,710 15,400 7,700
Delaware Dr Apache Trail to Superstition Blvd 0.50 2.0 1.00 1,712 856 12,300 6,150
Delaware Dr Superstition Blvd to Tepee St 0.50 2.0 1.00 1,546 773 12,300 6,150
Delaware Dr Tepee St to Lost Dutchman Blvd 0.50 2.0 1.00 777 389 12,300 6,150
Goldfield Rd Baseline Ave to US 60 0.50 5.0 2.50 732 366 31,100 15,550
Goldfield Rd US 60 to Southern Ave 0.50 4.0 2.00 872 436 24,500 12,250
TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
• � � •
Goldfield Rd Southern Ave to Broadway Ave 1.00 2.0 2.00 1,054 1,054 12,300 12,300
Goldfield Rd Broadway Ave to Superstition Blvd 1.00 2.0 2.00 804 804 12,300 12,300
Goldfield Rd Superstition Blvd to Lost Dutchman 1.00 2.0 2.00 739 739
Blvd 12,300 12,300
Idaho Rd Baseline Ave to US 60 0.50 2.0 1.00 2,271 1,136 12,300 6,150
Idaho Rd US 60 to Southern Ave 0.50 5.0 2.50 13,496 6,748 31,100 15,550
Idaho Rd Southern Ave to Broadway Ave 1.00 5.0 5.00 12,927 12,927 31,100 31,100
Idaho Rd Broadway Ave to North Apache Trail 0.80 5.0 4.00 4,216 3,373 31,100 24,880
Idaho Rd North Apache Trail to Superstition Blvd 0.25 5.0 1.25 5,141 1,285 31,100 7,775
Idaho Rd Superstition Blvd to Tepee St 0.50 2.0 1.00 2,867 1,434 12,300 6,150
Idaho Rd Tepee St to Lost Dutchman Blvd 0.50 2.0 1.00 2,004 1,002 12,300 6,150
Idaho Rd Lost Dutchman Blvd to McKellips Rd 1.00 2.0 2.00 1,315 1,315 12,300 12,300
Ironwood Dr Baseline Ave to US 60 0.50 5.0 2.50 15,826 7,913 31,100 15,550
Ironwood Dr US 60 to Southern Ave 0.50 5.0 2.50 9,070 4,535 31,100 15,550
Ironwood Dr Southern Ave to 16th Ave 0.50 5.0 2.50 9,400 4,700 31,100 15,550
Ironwood Dr 16th Ave to Broadway Ave 0.50 5.0 2.50 8,966 4,483 31,100 15,550
Ironwood Dr Broadway Ave to Apache Trail 0.50 5.0 2.50 6,335 3,168 31,100 15,550
Ironwood Dr Apache Trail to Superstition Blvd 0.50 5.0 2.50 4,369 2,185 31,100 15,550
Ironwood Dr Superstition Blvd to Tepee St 0.50 2.0 1.00 3,053 1,527 12,300 6,150
Ironwood Dr Tepee St to Lost Dutchman Blvd 0.50 2.0 1.00 2,212 1,106 12,300 6,150
Ironwood Dr Lost Dutchman Blvd to McKellips Rd 1.00 2.0 2.00 1,342 1,342 12,300 12,300
Lost Dutchman Blvd Meridian Dr to Delaware Dr 0.50 2.0 1.00 2,362 1,181 12,300 6,150
Lost Dutchman Blvd Delaware Dr to Ironwood Dr 0.50 2.0 1.00 2,451 1,226 12,300 6,150
Lost Dutchman Blvd Ironwood Dr to Idaho Rd 1.00 2.0 2.00 2,024 2,024 12,300 12,300
Lost Dutchman Blvd Idaho Rd to Tomahawk Rd 1.00 2.0 2.00 1,080 1,080 12,300 12,300
Lost Dutchman Blvd Tomahawk Rd to SR 88 0.40 2.0 0.80 770 308 12,300 4,920
Lost Dutchman Blvd SR 88 to Goldfield Rd 0.60 2.0 1.20 364 218 12,300 7,380
Meridian Dr Baseline Ave to US 60 0.50 2.0 1.00 6,034 3,017 12,300 6,150
78 TischlerBise
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
Meridian Dr US 60 to Southern Ave 0.50 2.0 1.00 7,699 3,850 12,300 6,150
Meridian Dr Southern Ave to Broadway Ave 1.00 2.0 2.00 5,129 5,129 12,300 12,300
Meridian Dr Broadway Ave to Apache Trail 0.50 2.0 1.00 5,129 2,565 12,300 6,150
Meridian Dr Apache Trail to Superstition Blvd 0.50 2.0 1.00 5,220 2,610 12,300 6,150
Meridian Dr Superstition Blvd to Lost Dutchman 1.00 1.0 1.00 3,033 3,033
Blvd 6,150 6,150
Meridian Dr Lost Dutchman Blvd to McKellips Rd 1.00 1.0 1.00 1,883 1,883 6,150 6,150
Old West Highway Phelps to Idaho Rd 0.25 6.0 1.50 8,804 2,201 49,200 12,300
Old West Highway Idaho Rd to Tomahawk Rd 1.50 4.0 6.00 8,979 13,469 32,700 49,050
Old West Highway Tomahawk Rd to Goldfield Rd 1.50 4.0 6.00 3,931 5,897 32,700 49,050
Tomahawk Rd Baseline Ave to US 60 0.50 5.0 2.50 2,631 1,316 31,100 15,550
Tomahawk Rd US 60 to Southern Ave 0.50 3.0 1.50 4,819 2,410 15,400 7,700
Tomahawk Rd Southern Ave to Old West Highway 0.75 2.0 1.50 3,049 2,287 12,300 9,225
Tomahawk Rd Old West Highway to Broadway Ave 0.25 2.0 0.50 1,686 422 12,300 3,075
Tomahawk Rd Broadway Ave to Superstition Blvd 1.00 2.0 2.00 1,601 1,601 12,300 12,300
Tomahawk Rd Superstition Blvd to North Apache Trail 0.75 2.0 1.50 526 395 12,300 9,225
Tomahawk Rd North Apache Trail to Lost Dutchman 0.80 2.0 1.60 344 275 12,300 9,840
Southern Ave Meridian Dr to Delaware Dr 0.50 2.0 1.00 5,396 2,698 12,300 6,150
Southern Ave Delaware Dr to Ironwood Dr 0.50 2.0 1.00 4,194 2,097 12,300 6,150
Southern Ave Ironwood Dr to San Marcos Rd 0.50 5.0 2.50 3,447 1,724 31,100 15,550
Southern Ave San Marcos Rd to Idaho Rd 0.50 2.0 1.00 3,447 1,724 12,300 6,150
Southern Ave Idaho Rd to Tomahawk Rd 1.00 5.0 5.00 1,805 1,805 31,100 31,100
Southern Ave Tomahawk Rd to Raindance Rd 0.25 2.0 0.50 1,472 368 12,300 3,075
Southern Ave Raindance Rd to Cortez Rd 0.25 4.0 1.00 1,472 368 24,500 6,125
Superstition Blvd Meridian Dr to Delaware Dr 0.50 5.0 2.50 6,554 3,277 31,100 15,550
Superstition Blvd Delaware Dr to Ironwood Dr 0.50 5.0 2.50 6,643 3,322 31,100 15,550
Superstition Blvd Ironwood Dr to Idaho Rd 1.00 5.0 5.00 5,631 5,631 31,100 31,100
Superstition Blvd Idaho Rd to SR 88 0.30 5.0 1.50 2,336 701 31,100 9,330
TischlerBise 79
FISCAL I ECONOMIC I PLANNING
DRAFT Land Use Assumptions, Infrastructure Improvements Plan,and Development Fee Report
Apache Junction,Arizona
•ii
Superstition Blvd SR 88 to Tomahawk Rd 0.66 2.0 1.32 1,816 1,199 12,300 8,118
Superstition Blvd Tomahawk Rd to Goldfield Rd 1.00 2.0 2.00 2,061 2,061 12,300 12,300
Superstition Blvd Goldfield Rd to Arroya Dr 0.70 2.0 1.40 1,503 1,052 12,300 8,610
Tepee St Meridian Dr to Delaware Dr 0.50 2.0 1.00 278 139 12,300 6,150
Tepee St Delaware Dr to Ironwood Dr 0.50 2.0 1.00 293 147 12,300 6,150
Tepee St Ironwood Dr to Idaho Rd 1.00 2.0 2.00 239 239 12,300 12,300
Total 55.71 165.37 320,356 205,513 1,059,803
80 TischlerBise
FISCAL I ECONOMIC I PLANNING
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
U =i 85119
Agenda Item No.8.
izON* File ID: 26-409
Sponsor: Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Presentation of 40-year Service Award to Lucretia Pelletier.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
1986
40 YEARS
OF DEDICATION .
APACHE JUNCTION PUBLIC LIBRARY - 1986-2026
_ s -
Celebrating Trish -- - -��
honoring four decades of commitment, excellence, and
teamwork
2026
1986 Library Clerk PUBLIC JUNCTION
BRAR N
August 26, 1986
1990
Senior Library Assistant
December 31, 1990 s _ �•
2015 Supervising Library Assistant > '
May 2, 2015 =-
4V' ___
40 YEARS OF SERVICE
- � �- '. '� __ Fir �_ ® 1{[[ I � J -- ,
r ' 1 NS
�� T T f ;
j ��
r
•
3 �
1 .e
Y " h
♦ , °�1U�b �Wi���
1 �iR'V
U' _______
._ ii!a1 11 _______
__ 4
�-l
/ I _ �R
:' ii IL II
__________ ui'
B t
k�' 'mss
yamEE'I T ; � I
- -- ________ I
e
;' ':
�'� ' - _ �wr^� •,�� �.Irr� ��fir.
■
h
THE FUTURE
BEG INS AT
THE LIBRARY I
Lhac�ie Junctaon - PuMic zf&ag
001 1 "Your caring, fr 'enclhi Library
FOR OFFICIAL USE ONLY
: JFRIENLS Of TuI L
ILR
ARY 7 ► �.
,,-e - :o -
Iii I IJ4j
}
aP� `jam * M-
Itk 'r
A f Y E A R S OF TáLL1
I':
MEMORIES
T AKE A DNUEO M[NE e _
pND TpG US W�T�1 4
A lifetime of local history lives
in the who shaped it.
people p
�• It
A_ c n1 `i i
_
s -
jj
IMI
1Ti /
cI •
4 I4%WJ I& i _
4 1 _____
, 1 I 1\ 1ft;ÜII1II
x
t
_____±
£1
___ o _ 'k
pIVIER� C ArlJ
*** . �-
***
- D E
q R �
3.n
4,f,
IMlllll�rl��� � �
}
__________ ;.. . . %
t -
- __ w -' .f f. - d i I1Il11111114
4p
d
1
i J
l
6
ligrr.Y ` F.1.
r •W1
1j
1 y�r
H .1
A}i - -
- :
rt
% ,f
7 �
y�~
i 7, ✓
p ) Al; MLLI --
I
R �
1 ;
: ' \ T _____
I_ _ I ,..
I : IL
ter., -1 +•!f
- .. p lam.•vo� ��
• ��,r,�i`eo`e �
� � ee
�O y
}i: j . � �� yIIh41YEARS OT BERM y ,�
I a � may, p✓ � ,
1 ii
___- - _
j . 1
I `
�� EXPRESS CHECKOUT 4,� a� ,•�
�� � w�rNirrr.imcnr�m+v
• -- 4 �• i� ANN WANA.e A W lIVIR
i �, is?4W IV.AAYAV fli ng'
_ AIr • i
II,1/ _ • t, * t t+ � �� �i'{ fir,.
1 * .; , s.r;� •.Rl.. _
ilkllt4
Si'
hank you , Trish
for 40 years of service
with the
Apache Junction Public Library !
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
85119
Agenda Item No. 9.
'�'PizoN�' File ID: 26-404
Sponsor: Chip Wilson Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Brief summary of intergovernmental updates from mayor and councilmembers.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
� ;= Agenda Item Cover Sheet Apache Junction,AZ
_ 85119
Agenda Item No. 10.
'��PizoN� File ID: 26-405
Sponsor: Bryant Powell Agenda Date: 9/1/2026
Index: in Control: City Council Meeting
City Manager's Report
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
►P�"E�c�, City of Apache Junction, Arizona 300ESuperstition
O� (�, Boulevard
Agenda Item Cover Sheet Apache Junction,AZ
85119
Agenda Item No. 11.
'�'PizoN�' File ID: 26-436
Sponsor: Michael Pooley Agenda Date: 9/1/2026
Index: In Control: City Council Meeting
Presentation, discussion, and public hearing on automated license plate readers and other
crime detection prevention technology employed by the Apache Junction Police Department.
City of Apache Junction,Arizona Page 1 Printed on 8/31/2026
CITY COUNCIL MEETING ROLL CALL Date: V( 1 c -7 ( 121P
Regular Special Exec Work
57:o) E: S:5: E:(p452. 57:03 E:'I*.ZZ
CITY COUNCIL: Present Ab/excused Present Ab/excused Present Ab/excused
MAYOR WILSON
VICE MAYOR SCHROEDER �✓ ✓ ✓
COUNCILMEMBER CROSS ✓ ✓ �✓
COUNCILMEMBER HECK �✓ ✓
COUNCILMEMBER JOHNSON ✓
COUNCILMEMBER NESSER ✓ ✓ �✓
COUNCILMEMBER SOLLER ✓ ✓
TOTAL
CITY STAFF:
Reg Spec/ Work Additional City Staff:
exec
City Manager Bryant Powell ✓ ✓ . - CO(r'Vnur4¢r 1enZe
Assistant City Manager Matt Busby ✓ L. ✓
Econ Director Ryan Kaup ✓ ✓ - Cnin -.L - (-er z e.
Mrkt Comm Director Kayla Fulmer '
Management Analyst Rob Wisler ,✓ ✓
City Clerk [vie McKinney
Deputy City Clerk Amy Greening t/ �/ ✓
City Attorney Joel Stern ,/ ✓ ✓
Public Safety Director Michael Pooley ✓ ✓
Public Safety Assistant Johnny John
Dev Services Director Rudy Esquivias ✓ f
Dev Sery Deputy Dir Sidney Urias / ./ '-
Building Safety Mgr Adrian Alegria
IT Director Doug Wirthgen
Planner Erica Hernandez
Planner Nick Leftwich
PW/Water Director Mike Loggins
City Engineer Emile Schmid Invocation:
PW Project Engineer Raquel Schatz Pledge: Cxucc
Municipal Judge Thomas McDermott
Finance Director Angelie Hawley
Library Director Pam Harrison
Park & Rec Director Liz Langenbach
HR Director Anna McCray 7
+
City Council
VOTE - ROLL CALL
ITEM # ZLR"�10 , '- -IO y I9 , LilJ I�I2 1 MEETING OF l ~ ` 2.O
MOTION BY: SECONDED BY:
NOTES: CO RSA+ Qll G
mIn4 Jyjau rar + V-0-a+ i c a64-r-4s Uci
S 'rn tAYI� - `� Sao f\- pa -- HS .
1"�1 T c�f)r Lam - 1►-r�r�r u +�-e_
Im rw�(N,n tY V)Lvn
YES NO ABSTAINED
CITY COUNCIL
COUNCILMEMBER NESSER
COUNCILMEMBER JOHNSON ✓ _ __
COUNCILMEMBER CROSS
COUNCILMEMBER HECK
COUNCILMEMBER SOLLER
VICE MAYOR SCHROEDER
MAYOR WILSON
TOTAL
UNANIMOUS IN FAVOR OPPOSED ABSTAINED
TOTAL
SHEET 2
S:Templates&Forms/City CouncilNote Call—City Council
CITY OF APACHE JUNCTION
Mayor's Script
Regular Meeting
Tuesday, September 1, 2026
A. CALL TO ORDER
I would like to call this City of Apache Junction Council Meeting of September 1, 2026, to
order and ask everyone to put their cell phones on silent.
B. INVOCATION AND PLEDGE OF ALLEGIANCE
The invocation will be led by & the pledge by
C. ROLL CALL
Roll call
D. CONSENT AGENDA
As a reminder—All items under the Consent Agenda will be approved with one motion. If
a Councilmember wishes to remove an item for further discussion, the request will be
made prior to approving the consent agenda and will be moved to New Business.
1. Consideration of acceptance of agenda.
2. Consideration of approval of minutes of the regular meeting of August 4, 2026.
3. Consideration of approval of a professional services agreement with Arrington
Watkins Architects, LLC, for design and construction administration of City Services
Expansion in an amount not to exceed $5,805,795.
4. Consideration of approval of professional services agreement between the City of
Apache Junction and Excalibur Charter School- Avalon K-S, for a grant-funded
school resource officer in the amount of $161,669.31 for a contract term of July 1,
2026, through June 30, 2027.
5. Consideration of approval of professional services agreement between the City of
Apache Junction and Apache Trail High School, for a grant-funded school resource
officer in the amount of $ 161,669.31 for a contract term of July 1, 2026, through
June 30, 2027.
6. Consideration of award of contract to M.R. Tanner Construction for the
asphalt concrete overlay on Ironwood Drive between Elliot Avenue and Guadalupe
Avenue. The work would be through the City of Buckeye cooperative Job Order Contract
No. 2025081 in the amount of $543,991.00 plus a 10% contingency for unforeseen
change orders in the amount of $54,399.00 for a total project cost not to exceed
$598,390.10. Work is planned within September- October 2026.
7. Consideration of approval of the Land Use Assumptions and Infrastructure Improvements
Plan. The City's development fee consultant, TischierBise, has prepared a draft Land Use
Assumptions and Infrastructure Improvements Plan in preparation for updating the
Development Fee Study and adopting the associated implementing ordinance and
resolution.
Do I have a motion on the consent agenda? Wait for Motion and 2nd
E. AWARDS, PRESENTATIONS AND PROCLAMATIONS
8. Presentation of 40-year Service Award to Trish Pelletier.
Pam Harrison
F. REGIONAL INTERGOVERNMENTAL UPDATES
9. Regional intergovernmental meeting updates from Council.
G. CITY MANAGER'S REPORT
10. City Manager's Report. Bryant to report
H. PUBLIC HEARINGS
11. Presentation, discussion, and public hearing on technology employed by the Police
Department.
Chief Pooley to report
Any discussion among the council? council can discuss
I will now open the Public Hearing. There is a 5-minute time limit, with a 1 minute
warning indicated by a yellow light. Please state your name and address for the
record. If you are with a group and would like to speak, please pick one
representative to address council. Also please be respectful of each speaker.
I will now close the public hearing.
NO MOTION
I. OLD BUSINESS
J. NEW BUSINESS
K. DIRECTION TO STAFF
L. SELECTION OF MEETING DATES, TIMES, LOCATIONS AND PURPOSES
M. CALL TO PUBLIC
I would like to remind everyone that the Call to the Public is a courtesy and not
required by law.
It is a time for the public to express requests, communications, comments and
suggestions.
Request to speak forms must be completed and handed to the city clerk before the
end of the city manager's report.
All issues shall be presented in a professional manner without personal attacks.
Under the open meeting law the COUNCIL CANNOT ENGAGE IN DISCUSSION on the
issues presented, but may respond to criticism and may direct staff to follow up
with the speaker directly and/or place this matter on a future agenda for council
discussion.
There is a three-minute limit with a 30 second warning indicated by a yellow light.
Does Council have any requests of staff to follow up on?
N. ADJOURNMENT— I adjourn this meeting.
9.01.2026
Consent Agenda Item Nos 1-7
MOVE THAT the consent agenda be accepted as presented,
AND THAT
Item No.'s 4 and 5 be approved with a retroactive date of July 1 , 2026.
nnorc- t o - nr► D
s�sE -E CBnnPv`�of
- - _ I
_ L4
N
� L
i .1I 4! V
z 3 Q--
a
W `
LI
a) LI
P '
c �
o w p
Q
E L o
z
Ct _ r
N 0
C
m
2 N
a,
p c
LJJW
i
4J I
t
I 151
C E
o
.0 l
w
u
�l� S
a
C ( �
ec
E
z
O
LUa.
LL
GJ
( yry
1.
U
G)
V
O.
' 1.
uz
�
r
V y
E � o
Ln
cç
z -
O z � �
W �►
w
J
LL
-C
4A
=
CJ z -- V
E
= N
Z 3 �
o Z C
Q ) $ e4 :j
w i.0
O `9 ln, —
C
C __
L ' o i
C 3 Vo
£ w
E r�
a, tv t L S °
-+ ( 5c:1.
O N
- 9 c:i .
I-. o +- - I - )
W 4 \J
O
C
3 � F
r
C) -- .- — -::è--
CD
� �
a.
nCi 9 s v
0�
R:L
- - -- 5 I
c d� pp Yl l
1
c t
S s a
Z
� a Q oil � � � art,,
LL
s
4
f4 a , 1
N a ��
3
cu
) it
O �� _� v
; ç\(
C rp q�
REVAMP and REVISE future plan
The people of Apache Junction wish to have it put on the agenda to revamp and revise the future plan of
Apache Junction and its downtown. We wish to have a meeting of the people of Apache Junction and
the city get our view on what we the people want before the city makes a map of their own. We would
like this to happen before you finish moving forward with the plans that the city has made. The choice is
up to the people. When the last voting took place a lot of people were not so informed and when it got
voted on a lot of people just voted yes without knowing what the city had planned. We would need a big
room open to the public so that it could fit the people. Don't tell us what you want to put in and where,
but let the people tell you what they want and where. Let them make the choice and then do you map.
We would like to have the input. It also needs to go out on social media about the time and the place so
that the people know. I am sure the people could come up with great ideas on what the down town
should look. Not all down towns need to be crammed with apartments. The building and zoning
approvals need to holt until the people can say what they want.
-a N a)
C a4-
O Cu te.-•
o
o E
N O >
O) U •
Co O U C
a)
-
N t i
_
Q O •£ "O s
d /r 0 > O Q
CO
N V O
N te. U d
0 ` t I- -O 'V
4) a) t:
N in
? 0 C L Q.
?+ o
0 - l E EE E6o4-
U +r
Z t ° a d E `o t
O 9 I N .I-C cn
O N U C
0L.. C 0
0 Co Ic ca
Z Y z a o o
D _Q O Ua N
XU)W
Q =0.. c
a ~ U) `fit �°
U C L L
Q co O N L' E O C O
O C N +-� -p O a)
L a)
C _
a O) C . IL
C E O o CL o c 0
L Q7 E •� "- N O c Q �. Co
�
O L y E
LU Q a) I
N i to
C 41 3O c O 0O -
0 E �_ Ol U
Co
N R O E m 0 > > 0c >. U
d Z N
o C
Q J NCo d Co Q
0
d? O D ci
` a) E =a Co Co _
—
— a cJ)o) _ ca
�a m — ate) . U Q Q- 3 Co
> CC r O •V O Q
00 (1 J
Co
r. Y Y - Q Q) O : U E
. 2 CtC
[1\J
NQ. o 0 a O — uj a
O
j -E N C N > O t N a) c 0
Ov OO 9 O Q w a �' CO
r+ w t .C ` O L
O N E _O - O
cn - Y Y '3 E N C t0 �, -O N
J 'Gci) Z U) /� O co V N Co
0) 7 7 �, Z CIL t/ Q C N O O CO
Co O O ` d N a) +. C
Co 3 3 v iia Q z O = E in
-0 a) a)
o o
o
Q
U = O
U) -
ca r-
a, vi
O i
Q
0 �+ o L c
E a' E o
a) y d o a)
a1 Q) > O O_
QJ N y L co
A O a) a)
C `L U E E E o
U s '�' O v
O O Q Y C O O
— w E _ Cl)
_ -0
I — a) () c E
ZLL. C O cv Z c cv
Y ° Z a .v o .2 Q)
Q
= Q ° O U O
a
wa c E a " `� aa)
XU) 0
C c w
U ` c
Q O } U N L' _� C C a?
O o = a� E °
OW t4 O 41 or )
a)
U � d R �`• c a c—
co
aD E E O ° Q ° c
�' E avi U)
U W
f4 O O C OC
U FE E aD 2 ° o ca
E o > > c c > o
w Z a' is m c
o E C o s O `o c o o
C Qi 0
U) C O
a S
y 0 U O L a) E c
O) 7 - (a
0 0 � c)
Y Y t4 p O I C O E ()
a) a1 Q O
EO O. a.
N > O
C O a Q) a) a)
` U 00 rO+ O Q .+ C - — ca
O V) O {— — O c6 or 0
3 E E € a,
Hz v m L o
cOn 3 3 w,
O ~ L C v0 L U)w c6 00 >' N Z d 2 U) a) C V) C -o m
ao 3 3 O LL Q H H3 Z U — EU .= )
-O W0)
C
Coo
Co U
O E 3
C
Q
O) U = o 5 m
v c
W+ L - L 1
O 0 CO
•0
!�_ o a
O O O
Z' L cn C
Q y E E a C o
O O U C 3 C
++ N > O a
CO
_ - L U
z d L
Co
O. tl1 E E
E E
O) O
a� 0 oq a °� C m L Q
� N CO '�
1•. I E E t � y
V 0 O Oy v° OCE
CO _ C CO
zY .2 z
� Q O s Uc N
W v ` Y a m o
= Va) O U cm -0
VO r a C c � >
U L
W W —. a� N — .E
Cl a>
O C -16- 'a "'
W -. C a a)
V a t �• - c �E L o Q- O S
C) E s •� O Q '- IO
14)
U W O a� H
U �•C0 W o -o U i
E C -�- m a� ca
E - to o > >> > C .C > 0> v
= w O L O L C O
C 01 •� o J r 2 y c Q. N
M C a) "
O a O Q
L O aD O aD E �a Cot ct3 tv
a) z 1L O - CO .a -
u am a 4 �, O a a> 3
a) L
00 Y r 7 {� •O O O I
�
— Q fp
O- Q� d CL O Or r U a
E N ,CL y C aW a) w
O Y Y Op a = 2 d O -OC
E C L - 10
� � O 0 (0 U c n � �
ai > > o F- r,� L o p, °� L
y y o o s CO
CO 3 3 0 � iia sQ r H H 3 z 0 — E � �-` i
-aa) a>
C >,
U
C `>'
O) U o Q
+_+ O U `
a) E -- co Q. CN
L f6 � a) cn CJ tD
p C 0 r 0), Co
C ca C L L
' CU)
O 4= N
oa m �, m Ea) a' o
(D O 41
> U) c M
L L L
a) a�
0)
? AOa) $ E E
C Q
r Q 41 4
EE L
�• O 'O _
O L v V U O �� C
U — "
0 Q Y C
� L o
o � N Q)
° I _ 0CE
ULL C 0 0 N L O
jY z a .� CJ -
Q C 0 O cn
a C E -Q
w 0.
O R ca
a O L O -0 N
a c, •
L E
aN o U y Z•
O - ra� o
2 U U L a)
V
a m C • • a y O
O O
E •� !� cu
U LU
E Qa (6 C
O
O �
•O
• o
O O t G
(� C °
C O} C COIU' w 0 Q 0
O to � J � � C a) _ N
• ' V a O Q O .C �.O
c O 0) O a) E
IMZ O. -ate. 0 cam C
a C w a a)IW
3
'' CC Y `' ,� p o O) m
IocO
0 as oIc
as ° 0 30 _p
E � a°� 'ai aci
0 d1 U' 0 -a C4
o YY 3 E - E r E a :v y Q "0 _
° CI ICO8
m O, wz fl. as Cl) o & U)
00 N — C- 'C Q Gi rn N .+ C C
- - O ii a -g Q H - 3 Z O E co — in
c° U 3r E
-o 2 >., 0)
a) cU •` 0 ^
c4 U
Q
}'
a) C
-C co =
O O + - Co
C >' C
�
0 c a) U)
o
I
t L C N
0o
N CD C
E a) C 0
a!
y w' a)
0 C i Co
C Q �] a)
O
Q
0 .1
Uf ,� U 0 v v�
o kI l a )
2 a) > 3
c o
I d aD
FO E CU
c o = c m
OL1 ° z a n u o .o
= Q a0
w a C E
2V) 0 CUca 1O U
o. C
Q > 4U E °cam
cc°n
O c
W C •-
E 0-o C
a) E L w; y m cco c
�, w c' C N
t 3 a°) C o m �.
U CU • T' E O ev '� 0)U U - Jc
E c t/1 ( O > > c t > CO
0
E IQ + U
E .o ar cl
r .C Z CU L a�
= 0 O L O
0 .c 4J N
C Q1 O
J O cp O CU — O
m Q O O cn 0 d - — Q
m
v a > °- E O N L3
O 0 0 , } -0 a) E
ro a ,o O O U CI) O Q a s
>, CC t
00 - rn CO
�c �c 0 3 -0 ( ° E C)
Q _ L _
aQ °' o a c � 0 .� c
E in � 0 C ° -C c a`°i -Oa s
U 00 .r O a •� CL m
0 CU —_ c�
YY 3 E � E E � .° o � L-' o
aa, nm 0
6 U 7 3 D o -C cU
o a - - 0 liCL < '' H H 3 Z 0
AUTOMATED LICENSE PLATE READER CASES
Charles Katz v. United States, 389 U.S. 347 (1967) U.S. Supreme Court (subjective
reasonable expectation of privacy)
United States v. Charles N. Matthews, 615 F.2d 1279(1980) U.S. Court of Appeals, 10th
Circuit(no reasonable expectation of license plate privacy as it is displayed in plain view to
the public)
United States v. Leroy Carlton Knotts, 460 U.S. 276 (1983) U.S. Supreme Court (a person
traveling in a car on public roads has no reasonable expectation of privacy for their physical
movements)
Texas v. Brown, 460 U.S. 730 (1983) U.S. Supreme Court (seizure of property in plain view
involves no invasion of privacy)
New York v. Benigo Class, 475 U.S. 106 (1986) U.S. Supreme Court(visual surveillance of
vehicles in plan view does not constitute an unreasonable search under the Fourth
Amendment and there is no reasonable expectation of privacy in reviewing a VIN inside a
car)
United States v. Walraven, 892 F.2d 972 (1989) 10th Circuit (no privacy interest exists in
license plates)
United States v. Curtis Ellison, 462 F.3d 557 (2006) U.S. Court of Appeals, 6th Circuit(so long
as an officer had a right to be in a position to observe a defendant's license plate, a driver
does not have a 4th Amendment reasonable expectation of privacy for their license plate
information)
United States v. Larry Lamar Wilcox, 415 F.App'x 990 U.S. (2011) Court of Appeals, 11'h
Circuit(predecessor technology to ALPR system capturing the plate on a public road and
in plain view does not violate the Fourth Amendment)
United States v. Jay Yang, 958 F.3d 851 (2020) U.S. Court of Appeals, 9th Circuit(use of
automated license plate readers do not violate the Fourth Amendment because the
location information does not invade a reasonable expectation of privacy)
United States v. Kumiko Martin, 753 F.Supp.3d 454 (2024) U.S District Court for the Eastern
District of Virginia (use of Flock camera evidence was not unconstitutional as it did not
track or monitor the defendant's physical movement when he robbed two victims this
vehicle; his vehicle appeared in 3 photos during a 30-day period).
Rinaldi v. Sylvester, No. 24-CV-272, 2025 WL 2682691 (S.D.N.Y. September 19, 2025) (ALPR
database does not constitute a search under the Fourth Amendment)
1
Stephanie Scholl V. Illinois State Police, 776 F. Supp. 3d 701 (N.D. III. 2025) U.S. District
Court for the Northern District of Illinois Eastern Division (Flock camera with ALPR does not
make the technology unconstitutional; GPS and cellphone tracking cases are inapplicable
because they track the whole of a person's physical movements)
Commonwealth v. Church, No. 0737-25-1, 2025 WL 2908089 Court of Appeals of Virginia
(law enforcement use of Flock does not violate the Fourth Amendment because limited
information on movements is collected and driving on a public street has no reasonable
expectation of privacy)
United States v. Jerry Brown, No. CR-25-188-D (2025)WL 2444596 U.S. District Court for the
Western District of Oklahoma (the use of Flock license plate data on a bank robber's
getaway car did not violate the Fourth Amendment.)
United States v. Lawrence Sturdivant, 786 F.Supp.3d 1098 (2025) U.S. District Court for the
Northern District of Ohio Eastern Division (Flock and ALPR data was collected on public
roads and through plain view on convenience store robber's car(26 photos over 6-week
period)and did not constitute a Fourth Amendment violation)
United States v. SidneyJamarJackson, No. 24-cr-10010-JWB (2025)WL 1530574 U.S.
District Court for the District of Kansas (Flock did not capture continuous or
comprehensive tracking of a drug trafficker)
Lee Schmidt v. City of Norfolk, 819 F.Supp.3d 492(2026) U.S. District Court for the Eastern
District of Virginia, Norfolk Division (the police department use of Flock and ALPR does not
constitute a search under the Fourth Amendment when collecting data)
Eddie Robinson v. Commonwealth, 87 Va.App. 262(2026) Court of Appeals of Virginia
Norfolk Division (Flock camera data use did not constitute a Fourth Amendment violation
as limited data was collected as a burglary suspect drove on a public street)
United States v. Porter, No. 25-60163(2026) 5th Circuit(Use of ALPR system did not
constitute a 4th Amendment search as the system did not continuously follow the
defendant who had aggravated assault charges on warrant status, did not document his
movements, nor track him to private property; the intermittent location points going
through 10 cameras was substantially more limited than cell-site or geofence data which
details a person's movements with a cellphone)
State v. Simonson, No. 40732-2-III, 2026 WL 242157 Washington Court of Appeals (Flock
cameras were used to locate a stolen Ford F-1 50; defendant did not have a reasonable
expectation of privacy in a license plate openly displayed on a public road; there was only
momentary public observation and not a continuous GPS or cellphone tracking effort)
2
' AUTOMATED LICENSE PLATE READER
(ALPR) & FLOCK CAMERA TECHNOLOGY
FACT SHEET & FAQS
•: c [.1uJI FREQUENTLY ASKED QUESTIONS
What is ALPR technology?
The Apache Junction Police Automated license plate reader (ALPR) technology uses cameras to capture
Department uses automatedl images of vehicle license plates and related vehicle information. Since 2022,
technology icense plate reader y AJPD has used ALPR technology provided by Flock Safety to convert license
provided by Flock
Safety as an investigative plate information into searchable data that may assist law enforcement during
resource to assist in protecting criminal investigations, public safety incidents, stolen vehicle investigations,
our community and supporting and missing person cases.
public safety efforts.
This fact sheet provides What do Flock ALPR cameras actually capture?
information about the A Flock ALPR camera is designed to capture vehicle related information visible
department's use of ALPR from a public roadway.
technology, including how it is • A license plate image
used, how access is
controlled, how long • The license plate number
information is retained, and the • The state that issued the plate, if available
policies and safeguards in • Vehicle characteristics such as make, model, color, and body style
place to ensure its appropriate . Date and time
use. • Camera location
What are Flock ALPR cameras not used for?
• • While a Flock ALPR camera does capture vehicle related information, it does
not:
The Apache Junction Police • Use facial recognition
Department recognizes that the • Identify people by their faces
use of technology in law • Collect biometric information
enforcement comes with a • Track a person's phone
responsibility to protect the • Track a vehicle by GPS in real time
public's trust.
• Issue traffic citations or code violations
AJPD is committed to using this • Monitor immigration status
technology responsibly, • Monitor people because of political, religious, or other protected activity
maintaining appropriate
safeguards around access and use, and holding personnel The system is used exclusively as a vehicle identification tool, not a people
accountable when those identification tool.
standards are not met.
How many ALPR cameras does AJPD have and where are they located?
AJPD currently has 30 ALPR cameras located throughout the community.
• ' Cameras are strategically placed along roadways and at locations selected to
provide useful vehicle information that can assist law enforcement in
responding to and investigating criminal activity. These locations are currently
For more information about
public safety technology used being evaluated and may change.
by AJPD-including how each
tool works, how information is A map showing the locations of AJPD's ALPR cameras can be found on the
collected and retained, privacy city website at www.apachejunctionaz.gov/flock.
considerations, frequently
asked questions, and applicable
department policies -please is ALPR technology used for general surveillance?
feel free to contact us or visit: No, AJPD does not use ALPR technology for general surveillance of the public.
www.apachejunctionaz.gav/flock The system is used exclusively for official and legitimate law enforcement
purposes. ALPR information is treated as an investigative lead and does not
replace officer judgment, independent investigation, or constitutional policing
practices.
AUTOMATED LICENSE PLATE READER
(ALPR) & FLOCK CAMERA TECHNOLOGY
FACT SHEET & FAQS
How does AJPD verify and use an ALPR alert in investigations?
AJPD treats ALPR information as an investigative lead, not as standalone proof. When practicable,officers should
verify an ALPR alert through the Arizona Criminal Justice Information System (ACJIS) before taking enforcement
action based solely on the alert. ALPR may be used in real time or following an incident to help identify vehicles
connected to crimes, stolen vehicles or plates, missing persons, wanted persons, or other investigations. Any
arrest or prosecution must be based on the totality of the evidence, not solely on ALPR information.
Can ALPR be used to monitor First Amendment activity?
No. The system is not to be used to monitor lawful activities protected by the First Amendment, such as religious
attendance, political events, protests, advocacy meetings, or other lawful activities.Any use of ALPR technology
must be tied to an official and legitimate law enforcement purpose in accordance with AJPD's ALPR Policy.
What data is available on how Flock ALPR cameras have helped solve active cases?
AJPD started tracking Flock related outcomes for its cases in July 2024. Since that time,the department has
recovered 34 stolen vehicles valued at approximately $670,000, and located nine missing persons with the
assistance of this technology.
How much Is the city paying for this technology?
The city entered into a five-year agreement with Flock Safety beginning in FY 2023-24 for 25 cameras, in addition
to five others contracted on an annual renewal. The total agreement represents an annual cost of approximately
$89,500. The cost supports AJPD's use of 30 total ALPR cameras, and the associated technology and services
provided by Flock Safety.
Who owns or controls AJPD's ALPR data?
Access to AJPD's ALPR data is controlled by the Apache Junction Police Department. Flock does not
independently share or sell the city's ALPR data.
Does AJPD share Flock ALPR data with other law enforcement agencies?
Yes. AJPD determines which agencies may access shared ALPR data. Currently AJPD only shares Flock ALPR
data with state, county, and local law enforcement agencies within Arizona. AJPD does not share Flock ALPR
data with federal agencies.This limited sharing supports public safety because stolen vehicles, wanted persons,
missing persons, suspect vehicles, and other criminal activity often cross jurisdictional boundaries. Allowing
vetted Arizona law enforcement agencies to access shared ALPR data has proven invaluable in helping identify
suspects, recover stolen vehicles, locate missing or endangered persons, and develop investigative leads more
quickly.
How long is ALPR data retained?
Data that is captured through Flock ALPR technology is retained for 30 days, unless the data is preserved as
evidence.
Are searches logged or able to be audited?
Yes. Access to ALPR data is subject to several accountability safeguards.These include secure login
credentials, documented access by user, date, and time, Flock-maintained audit and query records, and AJPD's
weekly system audits. Use of ALPR data is limited to authorized personnel for official and legitimate taw
enforcement purposes, and users must complete department-approved training. Any misuse would be treated as
a serious policy violation and could result in loss of access, internal review, and discipline, up to and including
termination.
How can I report a concern or suspected misuse?
AJPD feels strongly about the responsible use of this technology in ensuring public safety. Members of the
public who believe ALPR technology has been misused may utilize the Police Department's established
complaint form,which can be found on the city website at www.apachejunctionaz.gov/f lock.