Loading...
HomeMy WebLinkAboutORD1274ORDINANCE NO. 1274 AN ORDINANCE OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION,ARIZONA,AMENDING THE APACHE JUNCTION CITY CODE BY REPEALING CHAPTER 4 FEES,ARTICLE 4-4 PLANNING,ZONING,REVIEW AND SUBDIVISION FEES AND ARTICLE 4-5,SPECIAL SIGN PERMIT FEES;AND ADOPTING BY REFERENCE A NEW CHAPTER 4 FEES,ARTICLE 4-4 DEVELOPMENT SERVICES DEPARTMENT FEES;REPEALING ANY CONFLICTING PROVISIONS;PROVIDING FOR SEVERABILITY; ESTABLISHING AN EFFECTIVE DATE; AND PROVIDING FOR PENALTIES. WHEREAS, A.R.S. § 9-802 permits municipalities to enact the provisions of a code or public record theretofore in existence without setting forth such provisions in full text as long as the adopting ordinance is published in full text and at least three copies of the code or public record are filed in the office of the clerk of the municipality and are made available for public use and inspection; and • WHEREAS,pursuant to A.R.S.§§ 9-801(1)and 9-802,public records and codes which may be adopted by reference include fee schedules relating to planning,zoning review,subdivision and building permits as regulated by a municipality; and WHEREAS, at the March 6, 2006 work session of the Mayor and City Council,staff presented an;updateof the Building Safety Codes,Building Safety Permit--"Fees and Development Services Department Planning and Zoning Fees,including the addition of - new fees tor services which no fees are currently being charged; and WHEREAS,the presentation included a.comparison of the City's current building permit fees to other municipalities including Queen Creek, Goodyear, Gilbert, Avondale, Glendale and. Surprise; and WHEREAS, research uncovered that the City's building permit fees are approximately :sixty :percent .below the average as charged by the above -noted municipalities; and ORDINANCE NO. 1274 PAGE 1 OF 3 WHEREAS,staff believes the planning and zoning fees are also well below the average fees charged in the Phoenix metropolitan area; and WHEREAS,staff recommends that all of the Development Services Department Fees be increased to be more in line with comparable cities and towns in the Phoenix metropolitan area. NOW,THEREFORE,BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, AS FOLLOWS: SECTION I IN GENERAL 1.That the existing Apache Junction City Code,Chapter 4, Fees,Articles 4-4 Planning,Zoning Review,and Subdivision Fees and Article 4-5 Special Sign Permit Fees,are hereby repealed. 2.That certain document known as the "Apache Junction City Code, Chapter 4 FEES and Article 4-4 Development Services Department Fees,"three copies of which are on file in the office of the City Clerk, which document was made a public record by Resolution No.06-38 of the City of Apache Junction,is hereby referred to, adopted and made a part hereof as if fully set out in this ordinance, pursuant to A.R.S. § 9-802. SECTION II REPEALING ANY CONFLICTING ORDINANCES All ordinances and parts of ordinances in conflict with the provisions of this Ordinance or .any part of the codes adopted herein by reference are hereby repealed. SECTION III PROVIDING FOR.SEVERABILITY If any section,subsection,sentence, phrase,clause or portion of this ordinance or any part of the codes adopted herein by reference is for any -reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions thereof. ORDINANCE NO. 1274 PAGE 2 OF 3 SECTION IV ESTABLISHING EFFECTIVE DATE This ordinance shall take effect on November 1, 2006. SECTION V PROVIDING FO PENALTIES Any violation of any provision of this ordinance,or any provisions adopted herein,shall be punishable as a Class One Misdemeanor consistent with Apache Junction City Code, Chapter 1 GENERAL,Article 1-8 PENALTY. PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, THIS 5TH DAY OF SEPTEMBER,2006. SIGNED AND ATTESTED TO THIS 5TH DAY OF SEPTEMBER,2006. ATTEST: DOUGLAS EOLEMAN Mayor KATHLEEN CONNELLY City Clerk APPROVED AS TO FORM: 9306 RICHARD J. STERN City Attorney ORDINANCE NO. 1274 PAGE 3 OF 3 Article 4-4 DEVELOPMENT SERVICES DEPARTMENT FEES A.Building Permit Fees TOTAL VALUATION $1.00 TO $500.00 $33.00 $501.00 TO $2,000.00 $33.00 for the first $500.00 plus $5.00 for each additional $100.00 or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $97.00 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $545.00 for the first $25,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $897.00 for the first $50,000.00 plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $1,384.00for the first $100,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $5001 000.00:- $500,001.00 to $1,000,000.00 $4,503.00 for the first $500,000.00 plus $7.00 for each additional $1;000.00 or fraction thereof, .to and including $1,060;000.00. $1,000,001.00 and up $7,809.00 for the first •$1,000,000.00 plus $5.00 for each $1,000.00 or fraction thereof. 1 B.Building and Other Building Official -Related Fees (Applies to building, struoturalf :electrical, mechanical and plumbing) 1.Inspections outside of normal business hours (min.charge- 4 hours) ................................., $60.00 per hour 2.Re -inspection fees ........................,$6000 per hour 3.Inspections or services for 'which no fee.is;specifically indicated (min. charge -2 hours) ..........$60.00 per hour 4.Additional review required by changes, .additions or lost plans or plan review comment sheets (minimum charge -1 hour) on in house reviews ................ $60.00 per hour 5.For use of outide consultants for inspections .......... ............................................ Actual costs 6.Site plan review (or,revision)-,for residential standard plan .....................................75.00 per hour 7.Review of deferred submittals (Submitted after initial plan review) .......................$175.00 per submittal 8.Request for Certificate of Occupancy for change of Use Group .............................................$50.00 9.Replication of plans (when legally authorized ........... .................... Actual replication costs plus $50.00 10.Certificate of Completion for Commercial Shell Buildings ................................................ $100.00 11.Certificate of Occupancy for Commercial Buildings $100.00 12.Certificate of Occupancy for Commercial Tenant Improvement ......................................$50.00•13."Foundation only" permit ......................additional 25% of plan review fee 14.Sign permit ...........................based on valuation *Or the total hourly cost to the city, whichever is the greatest. This cost shall include supervision overhead, hourly wages and fringe benefits of the employees involved. **Actual costs include consultant's fees and city administration and overhead costs at a cost of $50.00 per hour with a minimum charge of one hour or normal plan review fees, whichever is greater. 2 C.Plan Review, Pool/Spas/Hot Tubs, Wrecking Buildings, Manufactured Home and Accessory Building Permit Fees Plan Review Fees. Plan review fee shall be 65% (percent) of the permit fees as shown in Building Valuation Data. In no case shall plan review fee be less than $25.00. Permit Fee Schedule. Unless otherwise indicated, the following fees will be applicable to residential and non-residential projects: Swimming Pools In -Ground ................................................$250.00 Spas/Hot Tubs "When standard pool/spa/hot tub plans are not on file with the Building Official, a $100.00 plan review fee will also be charged. Wrecking Buildings Residential accessory building or garage ...................$25.00 Single-family residence .................................. $100.00 Structures other than residential single-family .......... $100.00 Manufactured Home Permit Fee ...............................................$200.00 Plan review fee ...........................................$50.00 Factory Built Building Residential ..............................................$400.00 Commercial .....................$200.00 per lineal foot per story Temporary sales trailer Building permit ..........................................$200.00 Plan review ...............................................$50.00 Generators for Temporary Trailers(Each)...................$25.00 (Note: These fees do not include electrical:or development fees) 3 D.Building Valuations, Group 2006International Building Code, Types of Construction, Cost Per Sq. Ft. Occupancy & Type Cost/sql.. ft : Aver'age Cost/sq. ft Occupancy & Type Average 1.APARTMENT HOUSE:6.CONVALESCENT HOMES: Type I or II*88.70 Type I or LI 139.20 (Good) $109.20 Type II -A 96.60 Type V -Masonry Type III -A 99.00 (or Type III)72.40 Type V -A 93.30 Type V -Wood Fram 63.80 7.DWELLING: (Good) $82.00 , Type V -Masonry.75.70 Type I -Basement (Good) 96.90 Garage 37.40 Type V -Wood Frame 67.30 2.AUDITORIUMS:(Good) 92.40 Type I 104.80 Basements - Type II -A 75.90 Semi -Finished 20.10 Type II -B 71.80 (Good) 23.20 Type III -B 79.80 Unfinished 14.60 Type V -A 76.30 (Good) 17.70 Type V -V 71.20 8.FIRESTATIONS: 3.BANKS:Type I*114.40 Type I*148.10 Type II -A 75.30 Type II -A 109.10 Type II -B 71.00 Type II -B 105.60 Type III -A 82.40 Type III -A 120.40 Type III -B 78.90 Type III -B 116.10 Type V -A 77.30 Type V -A 109.10 Type V -B 73.30 Type V -B 104.50 9.HOMES FOR THE ELDERLY: 4.BOWLING ALLEYS:Type I 103.70 Type II -A 51.00 Type II -A 84.20 Type II -B 47.60 Type II -B 80.60 Type III -A 55.50 Type III -A 87.70 Type III -B 51.90 Type III -B 84.10 Type V -A 37.40 Type V -A 84.70 5.CHURCHES:Type V -B 81.80 Type I 99.20 10.HOSPITALS: Type II -A 74.50 Type I*163.20 Type II -B 70.80 Type III -A 135.10 Type III -A 81.00 Type V -A 128.90 Type III -B 77.40 Type V -A 75.70 Type V -B 71.20 4 Occupancy & Type Cost/sq. ft Average Occupancy & Type Cost/sq. ft Average 11.HOTELS AND MOTELS:16.OFFICES** Type I*101.00 Type I*106.80 Type III -A 87.50 Type II -A 71.50 Type III -B 83.40 Type II -B 68.10 Type V -A 76.20 Type III -B 77.20 Type V -B 74.70 Type III -A 73.80 12.INDUSTRIAL PLANTS:Type V -A 72.30 Type I 56.90 Type V -B 68.10 Type II -A 39.60 17.PRIVATE GARAGES: Type II -B 36.40 Wood Frame 24.30 Type III -A 43.60 Masonry 27.40 Type III -B 41.10 Open Carports 16.60 Tilt -up 30.00 18PUBLIC BUILDINGS: Type V -A .41.10 Type I*123.40 Type V -B 37.60 Type II -A 100.00 13.JAILS:Type . II -B 95.60 Type I 159.10 Type III -A 103.80 Type III -A 145.50 Type III -B 100.20 Type V - A 109.10 Type V -A 95.00 14.LIBRARIES:Type V -B 91.60 Type I 116.40 19.PUBLIC GARAGES: Type II -A 85.20 Type I*48.90 Type II -B 81.00 Type I or II.* Type III -A 90.00 (Open Parking)36.70 Type III -B 85.50 Type II -B 28.00 Type V -A 84.50 Type III -A 37.00 Type.V -B 81.00 Type III -B 32.90 15.MEDICAL OFFICES:Type V -A 33.70 Type I*119.50 20.RESTAURANTS: Type II -A 92.20 Type III - A . 97.40 Type II -B 87.60 Type III - B 94.10 Type III -A 100.00 Type V - A 89.20 Type III -A 93.10 Type V - B 85.70 Type V -A 90.20 Type V -B 87.00 5 Occupancy & Type Cost/sq. ft Average 21. SCHOOLS: Type I 111.20 Type II -A or II -B 75.90 Type III -A 81.20 Type III -B 78.10 Type V -A 76.10 Type V -B 72.60 22.SERVICE STATIONS: Type II -B 67.20 Type III -A 70.10 Type V -A 59.70 Canopies 28.00 23. STORES: Type 1 82.40 Type II -A 50.40 Type II -B 49.30 Type III -A 61.30 Type III -B 57.50 Type V -A 51.60 Type V -B 47.70 24.THEATERS: Type I 109.80 Type III or VA 80.00 Type II or VB 76.20 Type III -A 75.30 Type III -B 71.20 25 WAREHOUSES: Type I •49.40 Type II or VA 29.36 Type II or VB 27.50 Type III -A 33.20 Type III -B 31.60 EQUIPMENT AIR CONDITIONING: Commercial 4.20 Residential 3.50 SPRINKLER SYSTEMS 2.60 E.Electrical Permit Fess and Related Electrical Permit Fees ,.,Basic Permit 37.60 Supplemental Permit Swimming Pools , 79.20, Temp. Power Pole/Pedestal 37.60 Temp. lighting/receptacle outlets for construction sites, decorative light, Christmas tree sales lots, firework stands, etc. • Receptacle, switch, lighting:. . 63.80 First 20, each 1.76 Additional fixtures, each . Pole/platform mounted fixtures ,.37.60 Theatrical type lighting fixtures 1.60 Residential appliances or outlets such as wall mounted electric ovens, garbage disposals, dishwashers, etc.7.60 Signs-supplied/1 branch circuit 1.60 Addn. Branch circuit, each 19.50 Services: 600v or less/not over 200 amp . 48.00 600v or less/over 200 amp to 1000 amp., each 99.00 Over 600v or over 1000 amps 198.00 Electrical conduits, conductors which no fee is herein set forth -not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, etc. Motor<1 hp 7.60 <=10 hp 19.50 <=50 hp 39.00 <=100 hp 79.00 Motor>100 hp 118.00 Misc OTHER INSPECTION FEES: Reinspection fees (per hour)60.00 Additional plan review required by changes, additions or revisions to approved plan (per hour)60.00 Hourly fees -1/2 hour minimum 60.00 7 F.,Mechanical Permit Fees Basic permit 37.60 Inst/relocation each forced air/gravity type 29.12 Same as above/over 100,000 Btu/h Floor furnace inc. vents 23.68 Suspended heater, recessed wall heater or floor Each appliance vent installed & not included in 11.60 Heating appliance, refrigeration unit, cooling 23.68 Boiler compressor to & including three Boiler compressor over 3-15 horsepower over Ea. Evaporative cooler 17.00 Ea. Ventilation system not a portion of any 17.00 Ea. Hood 17.00 Ea. Appliance not previously classed 17.00 Generator 19.00 Incinerator 22.72 Wood stove 17.00 Fireplace 17.00 8 G.Plumbing Permit Fees Basic permit 32.00 Supplemental permit ' Ea. Plumbing fixture on one trap 11.00 Ea. Building sewer 56.00 Ea. Water heater vent 11.00 Ea. Gas piping system 1-5 outlets 8.00 Ea. Installation, alteration, repair piping, water treatment equipment. or water ,11.00 Ea. Repair or alteration of drainage, piping, each fixture vent 11.00 Ea. Lawn sprinkler system on any one meter 11.00 Atmospheric type vacuum breakers not in previous items: included 1 to 5 Over 5 Ea. Backflow device other than atmospheric type vacuum breakers:11.00 Backflow devices >2 8.00 Grease traps 56.00 Waste inceptors 64.00 Solar panel system 20.00 Hot tub system 36.00 Septic abandonment 48.00 H.Grading Plan Reviews 101 to 1,000 cubic yards (77.2 to 764.6 m 3) ................37.00 1,001 to 10,000 cubic yards (765.3 to 7645.5 m 3) ............49.25 10,001 to 100,000 cubic yards (7646.3 to 76,455 m 3) - $49.25 for the first 10,000 cubic yards (7645.5 m 3), plus $24.50 for each additional 10,000 cubic yards (7645.5 m 3) or fraction thereof. 100,001 to 200,000 cubic yards (76,456 to 152,911 m 3) - $269.75 for the first 100,000 cubic yards (76,455 m 3), plus $13.25 for each additional 10,000 cubic yards (7645.5 m 3) or fraction thereof. 200,001 cubic yards (152,912 m 3) or more - $402.25 for the first 200,000 cubic yards (152,911 m 3), plus $7.25 for each additional 10,000 cubic yards (7545.5 m 3) or fraction thereof. 9 Other Fees: Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed ...........................................$50.50* *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. I.Grading Permit Fees' 101 to 1,000 cubic yards (77.2 to 764.6 m 3) - $37.00 for the first 100 cubic yards (76.5 m 3) plus $17.50 for each additional 100 cubic yards (76.5 m 3) or fraction thereof. 1,001 to 10,000 cubic yards (765.3 to 7645.5 m 3) - $194.50 for the thirst 1,000 cubic yards (764.6 m 3), plus $14.50 for each additional 1,000 cubic yards (764.6 m 3) or fraction thereof. 10,001 to 100,000 cubic yards (7646.3 to 76,455 m 3) - $325.00 for the first 10,000 cubic yards (7645.5 m 3), plus $66.00 for each additional 10,000 cubic yards (7645.5 m 3) or fraction thereof. 100,001 cubic yards (76,456 m 3) or more - $919.00 for the first 100,000 cubic yards (76,455 m 3), plus $36.50 for each additional 10,000 cubic yards (7645.5 m 3) or fraction thereof. Other Inspections and Fees 1.Inspection outside of normal business hours, per hour (minimum charge -two hours) ...........................$60.00 2 2.Reinspection fees assessed under provisions of Section 305.8 per inspection ....................................... $60.00 2 3.Inspections for which no fee is specifically indicated, per hour (minimum charge -one-half hour) ..................$60.00 2 'The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project. 2 0r the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment hourly wages and fringe benefits of the employees involved. 10 J .Planning and Zoning Fees Conditional Use Permit (CUP)$700 Conditional Use Permit Amendment $700 Conditional Use Permit Extension -$700 Conditional Use Permit Continuance $250 Review & Letter Of Non -Conforming Use $270 Appeal of Zoning Administrator's Decision $250 Appeal of Development Fee Administrator $340 Written Interpretation of Zoning Administrator $150 Temporary Use Permit $250 Variance For Single Family Dwelling (SFD)$250 Variance For Commercial, Multi -Family or Industrial $600 Continuance Of Variance Case By Applicant $250 Verification Of Zoning Or Compliance Letter $230 Rezoning To SFD On 1.25 Gross Acres Or Less $1,450 Rezoning To SFD On Site Larger Than 1.25 Acres $1,450 & $50/acre to a . maximum of $5,500 Rezoning To Commercial, Industrial Or Multi -Family $1,450 & $50/acre to a maximum of $5,500 Rezoning To Planned Development $1,620 & $50/acre to a maximum of $5,500 Continuance Of Rezoning Case By Applicant $250 General Plan Amendment $2165 & $10/acre to a maximum of $5,500 Major Amendment To Planned Development $1,620 & $50/acre to a maximum of $5,500 Minor Amendment To Planned Development $230 Landscape Plan Review $137.50/sheet Land Split $100 Landscape Ordinance Appeal $250 Continuance Of Landscape Ordinance- Appeal by Applicant $125 11 Preliminary Plat $1,267 & $42/lot to a maximum of $5,500 Final Plat $716 & $17 /a cre Amend Final Plat Or Replat:-.,$500 Pre -Submittal Review Plan $200 Plat Recordation Fee And Document-. Handling Plus Actual Recording Fees $50 That Exceed $500 Per Case Shall Be Paid By The Applicant In Addition To The Fees Listed Above., Development Agreement $500 -New Agreement $2,000 -To Amend $1,000 -Amendment-Developer Initiated $2,500 12 K.Development Services Engineering Fees SWPPP Plans $250, up to 3 reveiws, $100 for each additional review Improvement Plan, Coversheet, G&D Plan, Utility -Plan Detail Sheet and Street Improvements $400, up to 3 reviews, $150 for each additional review Engineering Cost Estimate $100, upto 3 reviews, $35 for each additional review Legal Descriptions $100, upto 3 reviews, $35 for each additional review Drainage Report $250, upto 3 reviews, $100 for each additional review Nonrefundable Application Fee $25 Paving .$0.45/sy Manholes $40 ea Sidewalk $0.10/sf Sidewalk Ramps $25 ea Driveway '- -.'$0.25/sf Valley Gutter $0.25/sf Curbs $0.20/1f Scuppers .$40 ea Catch Basin $40 ea Fire Hydrant $25 ea Conduit, Pipelines, Culverts, Cable .<- " dia. $0.15/1f Conduit, Pipelines, Culverts, Cable > 4" dia. $0.45/1f Street Light Plan $250, up to 3 reviews, $100 for each additional review 13 •-•••'• .. , , $150, up to 3 reviews, $50 for each additional Traffic Impact Analysis Report review $250, up to 3 reviews, _$100.for each Traffic Signal ,Plans additional review $250, up to 3 reviews, $75 for each additional Pre -Plat review $300, up to 3 reviews, $100 for each Final Plat additional review $200, up to 3 reviews, $75 for each additional Geotechnical Report review $200, up to 3 reviews, $75 for each additional Sewer Analysis Report review $200, up to 3 reviews, $75 for each additional Water Analysis Report review 14 L.Special Sign Permit Fees Annual Special Sign Permit Fees 1.Offsite Development Sign,$300.00 one sign per application 2.Weekend Directional Sign:•_ a.up to five signs $300.00 b.six to ten signs -$350.00 c. - eleven to fifteen signs $400.00 Article 4-5 RESERVED FOR FUTURE USE 15