HomeMy WebLinkAboutORD1389ORDINANCE NO. 1389
AN ORDINANCE OF THE MAYOR AND CITY COUNCIL OF THE CITY OF
APACHE JUNCTION, ARIZONA, APPROVING A PLANNED DEVELOPMENT
MAJOR AMENDMENT, CASE PZ-2-13,FOR A 3.99 NET ACRES, CR-
5/PD (MULTI -FAMILY RESIDENCES/TOWNHOMES BY PLANNED
DEVELOPMENT) -ZONED SUBDIVISION KNOWN AS "IDAHO CREEK VILLAS
- PHASE 3", APPROVED BY ORDINANCE NO. 1155 AND LOCATED AT
THE SOUTHEAST CORNER OF W. TEPEE STREET AND N. PLAZA DRIVE,
BY AMENDING THE DEVELOPMENT PLAN FOR THE PROPERTY AND
CHANGING THE NAME OF THE DEVELOPMENT TO "APACHE JUNCTION
VILLAS"; REPEALING ANY CONFLICTING PROVISIONS; AND
PROVIDING FOR SEVERABILITY.
WHEREAS, on December 17,1985, Ordinance No. 456 was passed and
adopted by the Mayor and City Council, approving a rezoning and a
planned development plan for the proposed "Quail Creek Apartments"
development, to be constructed in three phases, of which Phase 1 was
built; and
WHEREAS, on August 6, 2002, Ordinance No. 1155 was passed and
adopted by the Mayor and City Council, approving a new planned
development plan for the former "Quail Creek Apartments,Phases 2 and
3" and renaming said properties,"Idaho Creek Villas - Phases 2 and
3"; and
WHEREAS, on May 2, 2006, Resolution Nos. 06-14 and 05-07 were
passed and adopted by the Mayor and City Council, approving the
preliminary and final subdivision plats, respectively,for "Idaho
Creek Villas - Phases 2 and 3"; and
WHEREAS,"Idaho Creek Villas - Phase 3" was never constructed
and changed ownership several times over the years; and
WHEREAS, on April 16, 2013, Resolution No. 13-13 was passed and
adopted by the Mayor and City Council, vacating and dissolving the
final subdivision plat for "Idaho Creek Villas - Phase 3", allowing
for the recombination of the property into a single parcel,
reflecting new ownership, and providing an opportunity for a new
development to be called "Apache Junction Villas", a seniors only,
rental housing development, constructed under the State's Low Income
Housing Tax Credit Program, and approving other changes pertaining to
interior and exterior amenities and improvements; and
ORDINANCE NO. 1389
PAGE 1 OF 6
WHEREAS, the new owners of the property, Pathfinder TRF Six LLC
and Adams Construction and Management Company, represented by Beus
Gilbert PLLC, desire to implement a new plan of development for the
property to include: increasing the number of housing units from 47
two-story townhomes units, to 26 one-story duplex rental units (52
total units); and reconfiguring the common areas and recreational
amenities to include a clubhouse and other gathering and socializing
open space areas; and
WHEREAS, the new owners wish to develop the "Apache Junction
Villas" under the State of Arizona's Low Income Housing Tax Credit
Program; and
WHEREAS, on March 26, 2013, the Apache Junction Planning and
Zoning Commission voted 6-0 to recommend approval of the planned
development major amendment case PZ-2-13, subject to the submitted
conceptual planned development plans and the conditions of approval
prescribed herein; and
WHEREAS, case PZ-2-13 is being processed concurrently with case
SD -1-13, which vacates and dissolves the former final subdivision
plat for "Idaho Creek Villas - Phase 3", said plat vacation also
recommended for approval subject to conditions, by a 6-0 vote of the
Planning and Zoning Commission; and
WHEREAS, the City Council hereby determines that the proposed
planned development major amendment conforms to the general criteria
as specified in Section 1-15-9 CR-5 Multiple Family Residence Zone
(except as otherwise conditioned herein), and Article 1-19 Planned
Development Zoning District of the City of Apache Junction Zoning
Ordinance,including integration with the surrounding neighborhood,
adequate traffic accommodation, adequate public facilities, extension
of infrastructure, and that the design and uses should result in
enhancements to the social, built, and natural environments in the
City.
NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF
APACHE JUNCTION, ARIZONA, AS FOLLOWS:
SECTION I IN GENERAL
That a planned development major amendment for the parcel of
land legally described as:
ORDINANCE NO. 1389
PAGE 2 OF 6
Lots 1 through 47, inclusive, and Tracts A and B, of Idaho
Creek Villas - Phase 3, according to the plat recorded in
Cabinet G, Slide 59, records of Pinal County, Arizon;
be and hereby is approved, subject to the following conditions
of approval:
1)Street improvements on Tepee Street and Plaza Drive,
including but not limited to, the extension of pavement
and the provision of sidewalks, curbs, gutters,
streetlights and fire hydrants, normally required for
CR-5-zoned properties, shall be required as part of this
planned development approval.
2)All on -site and off -site improvements (including
drainage and retention structures)shall be constructed
in compliance with applicable city codes, including but
not limited to, the Zoning Ordinance, Engineering
Guidelines, Building and Fire Safety Codes, and the
Landscape and Screening Requirements, except as
otherwise conditioned herein.
3)Four additional fire hydrants shall
the property, one each at the east
"Adams Street" and one each at the
"Durr Street".Adams and Durr are
not public streets.
be located within
and west ends of
east and west ends
private driveways,
4)The proposed clubhouse amenity area near the east
entrance shall be complemented by a neighborhood
gathering amenity area to include a 12' x 12' shade
pavilion, benches and ambient shade trees.Such
improvements shall be shown on the final landscape
plans,subject to Planning Staff review and approval.
of
5)The Tepee Street and Plaza Drive frontages of the
property shall be landscaped in accordance with the
City's Landscape and Screening Requirements.Decorative
masonry walls shall also complement said street
frontages,in accordance with the submitted conceptual
landscape plans.The final landscape plans shall also
incorporate internal landscaping, including around the
retention basins, xeriscaped front yards and pedestrian
walkways shaded by trees natural to the desert.Six
ORDINANCE NO. 1389
PAGE 3 OF 6
foot masonry walls shall also be required along the
south and east perimeters of the property.Final
landscape plans are subject to Planning Staff review and
approval.
6)The proposed duplex units shall be constructed in
accordance with the model type submitted by the
applicants as part of this PD amendment request.The
homes shall be designed with southwestern architectural
features, shall provide ground mounted air conditioning
units and architectural treatments on all four sides of
the buildings so as to preclude flat or blank facades,
including pop -outs and roofline and color variations to
add visual interest.
7)All applicable permits shall be applied for and plans
shall be designed to current City codes prior to any
construction on the lots.Inclusively, all applicable
fees, including development fees, shall be paid at the
time of permits issuance on a per -duplex building basis.
8)The final planned development plan shall reflect
substantial compliance and consistency with the Planned
Development concepts presented with case PZ-2-13,
including the site and the conceptual landscape plans
date stamped 3-21-13, incorporated by reference herein,
and as otherwise specified through these conditions of
approval.
9)All common areas and tracts within and immediately
adjacent to the proposed development, including
perimeter buffer walls and interior and exterior common
area landscaping shall be owned and maintained by the
management company of the proposed Apache Junction
Villas.
10)Minimum setbacks and building separations specific to
this Planned Development property shall be as follows:
a) Front Yard (north side) - 15 feet;
b) Side Yard (east side) - 15 feet;
c) Street side yard (west side) - 15 feet;
d) Rear yard (south side) - 35 feet;
e) Minimum distance between buildings (side to side)
10';
ORDINANCE NO. 1389
PAGE 4 OF 6
KATHLEEN CONNELLY
City Clerk
ORDINANCE NO. 1389
PAGE 5 OF 6
f) Minimum distance between buildings (back to back) -
12'.
11)The developers shall add a second ramada along the
property's west boundary as long as it does not
interfere with drainage.
12)A Right Turn Only sign shall be placed at the exit onto
Plaza from the northern private drive, and a No U -Turn
sign shall be placed at the intersection of Plaza and
Tepee.
SECTION II REPEALING ANY CONFLICTING PROVISIONS:
All ordinances and parts of ordinances in conflict with the
provisions of this ordinance are hereby repealed.
SECTION III PROVIDING FOR SEVERABILITY:
If any section, sub -section, sentence, phrase, clause or portion
of this ordinance, or any part of the code adopted herein by
reference,is for any reason held to be invalid or unconsti-
tutional by the decision of any court of competent jurisdiction,
such decision shall not affect the validity of the remaining
portions thereof.
PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF
APACHE JUNCTION, ARIZONA, THIS 16th DAY OF April , 2013.
SIGNED AND ATTESTED TO THIS 25th DAY OF April , 2013.
ATTEST:
e 7
JOHN INSALACO
Mayor
APPROVED AS TO FORM:
2 G - i 3
RICHARD JOEL STERN
City Attorney
ORDINANCE NO. 1389
PAGE 6 OF 6