Loading...
HomeMy WebLinkAboutORD749ORDINANCE NO.749 AN ORDINANCE OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA,ADOPTING THE "APACHE JUNCTION FIVE YEAR STREET IMPROVEMENT PLAN"; REPEALING ANY CONFLICTING PROVISIONS;AND PROVIDING FOR SEVERABILITY. BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA,AS FOLLOWS: SECTION 1 IN GENERAL That certain document entitled "APACHE JUNCTION FIVE YEAR STREET IMPROVEMENT PLAN",three copies of which are on file in the office of the City Clerk,which document was made a public record by Resolution No.90-27 of the City of Apache Junction,Arizona,is hereby referred to,adopted and made a part hereof as i f fully set out in this ordinance. SECTION I I REPEALING ANY CONFLICTING PROVISIONS All ordinances and parts of ordinances in conflict with the provisions of this ordinance,or any part of the code adopted herein by reference,are hereby repealed. SECTION III PROVIDING FOR SEVERABILITY I f any section,subsection,sentence,phrase,clause ordinance,or any part of the code adopted herein by reference,is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction,such decision shall not affect the validity of the remaining por— tions thereof. or portion of this PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA,THIS 17TH DAY OF JULY ,1990. SIGNED AND ATTESTED TO THIS 19TH DAY OF ATTEST: KATHLEEN CONNELLY City Clerk APPROVED AS TO FORM: DAVilli -F`.AL City.Attorney JULY KENNETH BLUNTSCHLY Mayor ,1990. APACHE JUNCTION FIVE YEAR STREET IMPROVEMENT PLAN FISCAL YEARS 1990-1991 Through 1994-1995 PREFACE This Five -Year plan consists of an estimate of revenues for each of the five years and lists major street improvements by the year they are intended to be constructed.Residential streets are listed separately,in order of importance and are intended to be constructed as soon as right-of-way is acquired,plans are completed,effected utilities are relocated, funds are available and City construction forces can schedule the work. I Development of today's program began with the City's "Streets and Storm Drainage Construction Program",as prepared in April,1988 by Parsons, I ,Brinkerhoff, Quade & Douglas.That report ranked a total of 20 major and 31 residential streets.Since acceptance of said report, a variety of projects have been completed, new priorities have arisen and revenues have fluctuated. Therefore, a new program was prepared. I This program is based upon the following assumptions: 1.Street improvements will also include drainage improvements whenever a need is evident.Drainage improvements may be constructed in conjunction with street improvements or can be phased in one year, followed by the street the next year. 2.Sales Tax or General Fund continues to provide additional revenues at a •constant $750,000 per year for years 2 thru 5. 3.Cooperative projects with Arizona Department of Transportation stated in a 1989 Letter of Intent are not included.Scope of work and amount of funding have not been agreed upon by ADOT.Years 2 and 3 may include extra revenue and project costs after final decision is made.However, work outside ADOT right-of-way related to those projects are included. A.Construction costs are composed of right-of-way, drainage, curbs, sidewalks and pavement only when applicable.However,pavement costs reflect materials only.The City has committed to building streets with their own forces.Labor,equipment,fuel and repairs are part of the annual Operation and Maintenance budget of the Public Works Department, which is deducted from revenues to determine what is available for Capital Improvements. 5.Pavement material costs are estimated to be $32,000 per lane mile in FY 90/91. 6.Curb, gutter and sidewalk are estimated to be $95,000 per mile per side. 7.After the second year, revenues show a 4% per year growth and expenditures grow 375% per year. Ii APACHE JUNCTION STREETS FIVE YEAR CAPITAL IMPROVEMENT PLAN FY90/91 FY91/92 FY92/93 FY93/94 FY94/95 I.Anticipated Revenues for Streets 1 General FundHighway User Revenue $1:( 6 7 $1:675506M $ .750M $ .750M $ .750M 1.771 1.895 2.028 LTAF .142 .136 .136 .136 .136 I County 1/2 0 Tax .500 .510 Previous Yr Carryover .445 0 .515 .520 0 0 .525 u 0 $3.731M $3.052M $3:172M $3.301M $3.439M II.Anticipated Expenditures for Operation and Maintenance and Administration $2.358M $2.359M $2.426M $2.500M $2.625M III.Available for Capital Improvements $1.373M $ .693M $ .746M $ .801M $ .814M CAPITAL IMPROVEMENT PLAN FOR STREETS FISCAL YEAR JULY, 1990 THRU JUNE, 1991 Available Funds:$1,373,000 A.Projects Continued from FY 89 /90 1.Superstition Blvd. 2.Superstition Blvd. 3.Royal Palm Rd. (E. side) 4.Tomahawk Rd. 5.Ironwood Dr. 6.Broadway Ave. 7.Broadway Ave. Ironwood to Idaho @ Weekes Wash Granada North 1300' Tepee to SR 88 @ US 60 Meridian to Ironwood Meridian to Idaho H. Committed Projects (r:ouncil Approved) 1.CDBG Streets 2.Idaho Rd. 3.Southern Ave. C.New Priorities 1.Broadway Ave. 2.Broadway Ave. 3.Ironwood Dr. 4.Winchester Rd. 5.Idaho Rd. 6.Ironwood Dr. D. See Residential Street List Palo Verde, Virginia, etc. @ Broadway & @ SR88 Meridian to Delaware @ Delaware Meridian to Ironwocd @ Southern @ US 60 @ Superstition @ Superstition Drainage, widen 5 -lane FAU Box Culvert Curb, gutter, sidewalk Pave 2 -lanes Reconstruct Traffic Signal R/W Condemnations Utility Relocation Curb, sidewalk, pave Traffic Signals w/ADOT R/W, design -drain -pave 2 -lane ($1,000's) $410 21 27 10 26 13 80 $587 $108 80 90 $278 Traffic Signal, Intersection $130 widening, drainage Drainage Traffic Signal Median Realignment Traffic Signal Traffic Signal 100 75 53 75 75 $508 -0- $1.373 CAPrEAL IMPROVEMENT PLAN FOR STREETS Fiscal Year July, 1991 thru June, 1992 Broadway Ave. Tomahawk Rd. Available $693,000 Meridian to Ironwood @ US 60 Fiscal Year July, 1992 thru June, 1993 Broadway Ave. Superstition Blvd. Tomahawk Rd. Southern Ave. Superstition Blvd. Curb, sidewalk, widen 5 -lane R/W, realign median Available $746,000 Ironwood to Idaho Meridian to Ironwood Southern to US 60 Winchester to Tomahawk @ Delaware Drainage, widen 5 -lanes Drainage, wide 5 -lanes Widen 3 -lanes Drain, widen, reconstruct Traffic Signal Fiscal Year July, 1993 thiu June, 1994 Available $801,000 Delaware Dr. Ironwood Dr. Tamahawk Rd. Idaho Rd. Baseline Rd. Lost Dutchman Blvd. See Residential Street List Broadway to Superstition US 60 to Lost Dutchman SR 88 to Lost Dutchman SR 360 to Baseline Idaho to Tomahawk Idaho to Goldfield R/W, drainage, widen 3 -lanes R/W, widen to 5 -lanes Pave 2 -lanes Pave 2 -lanes Pave 2 -lanes Pave 2 -lanes Fiscal Year July, 1994 thru June, 1995 Available $814,000 Meridian Dr. Delaware Dr. 16th Ave. Ironwocd Dr. Baseline Ave. See Residential Street List Southern to Superstition 16th to Southern Delaware to Saguaro SR 360 to Baseline Ironwood to Idaho Joint County, widen R/W, drainage, pave 2 -lanes Widen 3 -lanes Pave 2 -lanes Pave 2 -lanes ($1,000's) $383 310 $693 $400 160 48 68 70 $746 $260 238 37 37 80 135 14 $801 $178 60 53 40 85 398 $814 R-9001 R-9002 R-9003 R-9004 R-9005 R-9006 R-9007 R-9008 R-9009 R-9010 R-9011 R-9012 R-9013 R-9014 R-9015 R-9016 R-9017 R-9018 R-9019 R-9020 R-9021 R-9022 Y-9023 R-9024 R-9025 R-9026 R-9027 R-9028 Foothill St. San Marcos Dr. Cortez Rd. Delaware Dr. Cactus Rd. Royal Palm Rd. Valley Dr. Cortez Rd. Cortez Rd. Windsong St. Shiprock St. Warner Dr. Wickiup Wickiup Rd. 2nd Ave. Gold Dr. Arizona Rd. Greasewood St. 26th Ave. Royal Palm Rd. Cactus Wren St. 6th Ave. Raindance Rd. Lawther Dr. Bowman Rd. Starr Rd. 12th Ave. Royal Palm Rd. RESIDENTIAL STREETS Ironwood to Idaho Tepee to Lost Dutchman Junction to Superstition Foothill to Lost Dutchman Junction to Superstition Broadway to Superstition Tepee to Lost Dutchman Superstition to Tepee Tepee to Lost Dutchman Delaware to Ironwood Gold to Valley Tepee to Foothill Superstition to Tepee Broadway to Scenic Idaho to Arizona Greasewood to Tepee 4th to 2nd Ironwood to Valley Winchester to Royal Palm SR 360 to Southern Gold to Valley Wickiup to Starr Southern to 20th Ave. Ohio to Superstition 12th to Broadway Superstition to Tepee Tomahawk to Cortez Southern to US 60 Drain & Pave Drain & Pave Pave Pave Pave Drain & Pave Pave Pave Drain & Pave Pave Pave 'Pave Drain & Pave Drain & Pave Pave Pave Pave Pave Pave Pave Pave Drain & Pave Pave Pave Pave Drain & Pave Pave Curb/sidewalk FY90/91 Basis Miles $1,000's 1 $85 .5 42 . 5 32 . 25 18 . 5 32 1 80 .5 32 .5 32 .5 42 .5 32 .12 8 .25 .18 .5 42 .75 63 .63 40 .38 24 .12 8 .25 16 .12 8 .5 32 .12 8 .5 42 .25 18 .12 8 .12 8 .5 42 .5 32 1 95 $939 LOST DUTCHMAN BLVD. TEPEE ST., SUPERSTITION BLVD.. U.S.60 BROADWAY AVE. 16th,AVE, SOUTHERN AVE. FREEWAY BASELINE AVE. GUADALUPE AVE. C / I X UJ C I 1-1_ 114104040140 Illemis • IR O N W O O D D R . _I\ SA N M A R C O S D R . •ft RO Y A L P A L M R D . •:( CX LAJ GO L D F I E L D RD . CITY OF APACHE JUNCTION ROADWAY IMPROVEMENT SCHEDULE FISCAL YEAR •90 /91 Traffic Signals I. LOST DUTCHMAN BLVD. TEPEE ST. SUPERSTITION BLVD. U.S.60 BROADWAY AVE. 16th,AVE, SOUTHERN AVE. FREEWAY BASELINE AVE. s.s.s 2E DE L A W A R E D R . ce Co 0 CC o I • •• I R O Y A L P A L M R D . I I 1 ac ce :c <NJIi!I w b.-tilIV CY 9 " 0 I.. 7/ GO L O F I E L D R D . 1111Iffille GUADALUPE AVE. CITY OF APACHE JUNCTION •ROADWAY IMPROVEMENT SCHEDULE FISCAL YEAR 91 /92 OZ CZ X 42 i i C I LaJ IJJLOST DUTCHMAN BLVD.x cl ....... -TEPEE Si. SUPERSTITION BLVD. U.S.60 BROADWAY AVE. 16th,AVE, SOUTHERN AVE. FREEWAY BASELINE AVE. GUADALUPE AVE. a 0 SA N M A R C O S D R , 8 8 Cit LIC - J > - 0 1 OL 7j0400060/4111004041011.414 1 1101114104041•1 cac r.4 % 1C7 5 91b GO L D F I E L D R D . CITY OF APACHE JUNCTION ROADWAY IMPROVEMENT SCHEDULE FISCAL YEAR 92 /93 Traffic Signals LOST DUTCHMAN BLVD. TEPEE ST. SUPERSTITION BLVD. U.S.60 BROADWAY AVE. 16th,AVE, SOUTHERN AVE. FREEWAY BASELINE AVE. GUADALUPE AVE. ME R I D I A N D R . DE L A W A R E D R . I X tie toq c ; cc 8 8ccxcc808- J c r NC CC - J Cle 0 -:C LaJ -1 NJ- J =lal n t ,LT A . ¢E g I-0...c.bs-0 . - 1 0 a'w —4444411.41.41.41.""lel"9.44t 414141°41.5 1 11414"14.144111 L _ CITY OF APACHE JUNCTION ROADWAY IMPROVEMENT SCHEDULE FISCAL YEAR 93 /94 cie LOST DUTCHMAN BLVD. TEPEE ST. SUPERSTITION BLVD. U.S.60 BROADWAY AVE. 16th.AVE. SOUTHERN AVE. FREEWAY BASELINE AVE. .. c)n Lai a tX < 3 i< - J 0 1.1 I X 0 . 0 SA N M A R C O S D R , C;Ce RO Y A L P A L M R D , NJ 47Pc) GO L D F I E L D R D . 2 *ii04104. • 6aa 011iblUNIIIUMNIMINION14 ELI CITY OF APACHE JUNCTION ROADWAY IMPROVEMENT SCHEDULE FISCAL YEAR 94 /95