Loading...
HomeMy WebLinkAbout2024 05.21 City Council Regular Agenda City of Apache Junction, Arizona Meeting location: City Council Chambers at City Hall Agenda 300 E.Superstition Blvd g Apache Junction,AZ City Council Meeting 85119 apachejunctionaz.gov Ph:(480)982-8002 Doors are open to the public at least 15 minutes prior to the posted meeting start time. Tuesday, May 21,2024 7:00 PM City Council Chambers A. CALL TO ORDER B. INVOCATION AND PLEDGE OF ALLEGIANCE C. ROLL CALL D. CONSENT AGENDA The council may, at this time, take single action on any or all items listed as consent agenda items. These may include, but are not limited to, acceptance of agenda, acceptance of minutes, appointments, acceptance of resignations and adoption of certain resolutions and other items which do not require a public hearing. The consent agenda is a timesaving device of which the mayor and city council is to receive documentation on these items from the city manager for their review prior to the meeting. Any member of the council may remove any item from the consent agenda for discussion and cause a separate vote on the matter later in the agenda. 1. 24-341 Consideration of acceptance of agenda. Sponsors: Jennifer Pena 2. 24-419 Consideration of approval of minutes of the special meeting of May 6, 2024. Sponsors: Jennifer Pena Attachments: SP CCMIN 2024 05 06 MINUTES DRAFT 3. 24- 42 Consideration of approval of minutes of the regular meeting of May 7, 2024. Sponsors: Jennifer Pena Attachments: CCMIN 2024 05 07 MINUTES DRAFT City of Apache Junction,Arizona Page 1 Printed on 511612024 City Council Meeting Agenda May 21.2024 4^ Consideration of approval of the second amendment buthe professional services agreement between City of Apache Junction and Central Arizona Council on Developmental Disabilities. Sponsors:� Jamie Sullivan Attachments: Memo to Council EXECUTED 2017 QACQQ Contract EXECUTED First Amendment 2022 5_ Consideration of approval of Resolution No. 24-20. authorizing the City nf Apache Junction tn enter into an intergovernmental agreement with Apache Junction Unified School District#43 for grant-funded School Resource Officers. Sponsors: NYiohao| Poo|oy Attachments: Memo to City Council-IGA SRO AJUSD 6, Consideration of approval of Resolution 24-21, adopting the budget for Fiscal Year 2024-2O25 for Streetlight Improvement District No. 2021-02 Coyote Crossing subdivision. Sponsors: Ted Wolff Attachments: Council memo Coyote Crossing SLID No. 2021-02 Resolution 24-21 Coyote Crossing Budget 7, Consideration of approval of Public Works Capital Improvement Plan for Fiscal Years 2025 through 202S. Sponsors:� Ted Wolff Attachments: E. AWARDS, PRESENTATIONS AND PROCLAMATIONS Awards,presentations from other organizations,proclamations issued by the mayor, and acknowledgement of distinguished guests and visitors, and staff presentation of receipt of grant or donated funds are permitted at this time. F. REGIONAL INTERGOVERNMENTAL UPDATES The mayor or any member of council may at this time present a brief summary of any regional intergovernmental updates. However, no discussion shall take place on such items except for clarifying comments related bo substance, time and location. 8_ Brief summary of intergovernmental updates from mayor and ununci|membern. Sponsors: Chip Wilson City vr Apache Junction,Arizona Page Printed on 511612024 City Council Meeting Agenda May 21,2024 G. CITY MANAGER'S REPORT The city manager, members of city staff or those individuals designated by the manager may present information pertinent to items under consideration or information related to the operation of the city. There shall however be no discussion at this time except for clarification inquiries. 9. 24-344 City Manager's Report. Sponsors: Bryant Powell 10. 24-437 Announcement of Current Events. Sponsors: Jorge Gutierrez H. PUBLIC HEARINGS Public hearings required by applicable law shall be conducted by the council and any person shall be given the opportunity to speak.All remarks shall be addressed to the council as a whole and not to any member thereof. Such remarks shall be limited to five(5)minutes unless additional time is granted by the mayor. This time limitation shall not apply to applicants and their agents appearing before the council. 11. 24-420 Conduct a public hearing to receive input and discuss potential projects for the utilization of Fiscal Year 2024 ("FY24") Community Development Block Grant("CDBG") Regional Account ("RA") funds and State Special Project("SSP")funds. Sponsors: Misty Moseley Attachments: Staff report w CDBG Public Hearing##1LP21(002 City of Apache Junction,Arizona Page 3 Printed on 511612024 City Council Meeting Agenda May 21,2024 12, 24-421 Presentation, discussion, public hearing and consideration of Resolution No. 24-09 (case P-23-64-GPA), requested by Jason Barney and John Hartman with Olsen Recker/Guadalupe Properties LLC, and represented by Greg Davis with (plan Consulting for a proposed major general plan land use map amendment to redesignate 18 acres at the southeast corner of US-60 and Goldfield Road from Commercial to High Density Residential. (This is the companion case to Rezoning Case P-23-63-PZ). Sponsors: Kelsey Schattnik Attachments: P-23-63-PZ&P-23-64-GPA CC PH-MEMO. df DRAFT RESOLUTION NO,24-09. df 1. Narrativ� 2. Site Plan, df 3, Elevations and Floor Pians.pdf 4. Landsca e Plans. df 5, Wall Plans. df 6. Final Partici anon Report Silvera pdf 7. GPA External A enc Res oases. d# 8. Resident LettersJ4.25.24 pdf 9. Updated Protest Petition 03,20.2024,pdf 10. Vicinity Mamd# 11. Traffic Impact Analysis.pdf 12. Market Study(a plicant .pdf 13. P-24-63-PZ&P-24-64-GPA PZ Staff Re ort. df 13. 24-422 Presentation, discussion, public hearing and consideration of Ordinance No. 1547 (case P-23-63-PZ), requested by Jason Barney and John Hartman with Olsen Recker/Guadalupe Properties LLC, and represented by Greg Davis with (plan Consulting for a proposed planned development rezoning of 18 acres located at the southeast corner of US-60 and Goldfield Road from General Commercial by Planned Development("B-1/PD")and B-1/PD to High Density Multiple-Family Residential by Planned Development("RM-2/PD"). (This is the companion case to Major General Plan Amendment Case P-23-64-GPA). Sponsors: Kelsey Schattnik Attachments: P-23-63-PZ&P-23-64-GPA CC PH-MEMO. df DRAFT ORDINANCE NO. 1547. df CONDITIONS OF APPROVAL. df City of Apache Junction,Arizona Page 4 Printed on 5/16/2024 City Council Meeting Agenda May 21,2024 14. 24-423 Presentation, discussion, public hearing and consideration of Resolution No. 24-08, declaring as a public record that certain document filed with the City Clerk and entitled "Legal Descriptions and Zoning Conditions of Case No. P-23-63-PZ;" repealing any conflicting provisions and providing for severability. Sponsors: Kelsey Schattnik Attachments: P-23-63-PZ&P-23-64-GPA CC PH-MEMO. df DRAFT RESOLUTION NO.24-08e dt 1. OLD BUSINESS The council shall consider any business that has been previously considered and which is still unfinished to include those items previously postponed or tabled. No member of the public shall be permitted to speak on these items unless invited to do so by the mayor after first submitting a written request-to-speak form with the city clerk. J. NEW BUSINESS The council shall consider any business not yet considered. No member of the public shall be permitted to speak on these items unless invited to do so by the mayor after first submitting a written request-to-speak form with the city clerk. 15. 24-44 Presentation, discussion, and possible adoption of the Rodeo Grounds Event Center Master Plan. Sponsors: Liz Langenbach Attachments: Memo City Council Rodeo Grounds Master Plan-_May 2024 RODEO EVENT CENTER MASTER PLAN PRESENTATION-I K. COUNCIL DIRECTION TO STAFF This item allows the mayor and city council to direct staff on specifically listed matters. L. SELECTION OF MEETING DATES, TIMES, LOCATIONS, AND PURPOSES M. CALL TO PUBLIC At this time the public has the privilege to address the council with requests, communications, comments or suggestions relating to city business.All speakers must have already submitted a written "Request to Speak"form to the city clerk no later than the conclusion of the city manager's report portion of the agenda. If there is a group speaking on the same item, they should select a spokesperson.All such remarks shall be addressed to the council as a whole and not to any member thereof. The mayor is authorized to ask a speaker to stop speaking and leave the podium or to adjourn the meeting if anyone becomes disorderly, uncivil, makes personal attacks or continues to speak about items that are not within the jurisdiction of the city after being warned such issues are beyond the jurisdiction of the city to act. The council may not answer questions of the speaker, discuss the matter with one another, but may, at the conclusion: 1)respond to criticism by a speaker;2)ask the city manager to review a matter; 3)ask the city manager to place the matter on a future agenda. Each speaker must approach the podium, speak into the microphone,provide their name and address. There is a three(3)minute time limit per speaker. City of Apache Junction,Arizona Page 5 Printed on 5/16/2024 City Council Meeting Agenda May 21,2024 N. ADJOURNMENT Copies of this agenda and additional information on any of the items listed above may be obtained from the City Clerk's office located at 300 E Superstition Blvd,Apache Junction,AZ 85119, Monday through Thursday from 7:00a-6:00p, excluding holidays. The City of Apache Junction invites and welcomes people of all abilities to use our programs, sites and facilities. Specific requests may be made by contacting the Human Resources Office at(480)474-2617 or TDD(480)983-0095. The Apache Junction City Council may vote to go into Executive Session for legal advice on any item listed on this agenda pursuant to A.R.S. §38-431.03(A)(3);this notice is given pursuant to A.R.S. § 38-431.02 to the members of the City Council and the public. City of Apache Junction,Arizona Page 6 Printed on 5/16/2024 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 1. File ID: 24-341 Sponsor:Jennifer Pena Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of acceptance of agenda. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.2. File ID: 24-419 Sponsor:Jennifer Pena Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of approval of minutes of the special meeting of May 6, 2024. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction, Arizona Meeting location: City Council Chambers Meeting Minutes at City Hall 300 E Superstition Blvd Special Meeting of the Apache Apache Junction,AZ p g p 85119 Junction City Council apachejunctionaz.gov Ph:(480)982-8002 Monday,May 6,2024 7:00 PM City Council Chambers CALL TO ORDER Mayor Wilson called the special meeting of the Apache Junction city council to order at 7:00 p.m. ROLL CALL Present 7- Mayor Wilson Vice Mayor Schroeder Councilmember Cross Councilmember Heck Councilmember Johnson Councilmember Nesser Councilmember Soller Staff in Attendance: Bryant Powell, City Manager Matt Busby, Assistant City Manager Jennifer Pena, City Clerk Joel Stern, City Attorney Rudy Esquivias, Development Services Director Ted Wolff, Public Works Director Liz Langenbach, Parks& Recreation Director Patrick Ainsworth, Economic Development Director Pam Harrison, Library Director Angelie Hawley, Finance Director Anna McCray, Human Resources Director Connie Chow, Finance Controller Evie McKinney, Deputy City Clerk Sidney Urias, Planning Manager Kelsey Schattnik, Planner CONSENT AGENDA AGENDA ITEMS PUBLIC HEARING City of Apache Junction,Arizona Pagel Special Meeting of the Apache Meeting Minutes May 6,2024 Junction City Council OLD BUSINESS NEW BUSINESS 1. 24-300 Presentation and discussion with the mayor and city council on the Fiscal Year 2024-2025 budget, classification and compensation plan for city employees, and the Public Safety Personnel Retirement System (PSPRS) Pension Funding Policy. City Manager Bryant Powell introduced the Fiscal Year 2024-2025 budget, (FY24-25), classification and compensation plan, and explained some of the changes in this budget compared to previous years. He shared some upcoming challenges will be surrounding communities possibly becoming cities, which will impact our share of intergovernmental revenue, and the loss of the rental tax effective January 2025. Assistant City Manager Matt Busby gave special thanks and recognition to Controller Connie Chow for her dedication to serve and maintain the Finance department roles in the budget preparation during the interim of the vacant Finance Director position from January through April. Mr. Busby also commended Human Resources Director Anna McCray for the efforts she put forth on the salaries, benefits, and the classification and compensation schedule for the Police Department and all other city employees. Staff works well and does a great job in fine tuning our budget in a timely manner. Finance Director Angelie Hawley shared key budget assumptions of positive activity with sales tax, decrease in state shared revenues- rental tax eliminated effective January 2025, which will create an estimated decrease of$2.1 million, employee compensation increases and capital projects will proceed as planned for the General and Special Revenue Funds. Ms. Hawley presented various slides that reflected the budget summary, general fund revenues and expenditures, special revenue fund revenues and expenditures, capital projects for FY 2025, and some of the before and after completed capital projects for FY 2024. Council commented on the professionalism and hard work that staff has done to create this finished project, clarification on special revenues, and funding amount for the landfill. Assistant City Manager Matt Busby answered Council queries, and stated the next steps are to conduct a special meeting for tentative budget adoption to be held Monday, May 20th, 2024, and final budget adoption on June 17, 2024. ADJOURNMENT Mayor Wilson adjourned the meeting at 7:14 p.m. City of Apache Junction,Arizona Page 2 Special Meeting of the Apache Meeting Minutes May 6,2024 Junction City Council ACCEPTED THIS DAY OF 12024, BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA. SIGNED AND ATTESTED TO THIS DAY OF 12024. WALTER"CHIP"WILSON Mayor ATTEST: JENNIFER PENA City Clerk CITY COUNCIL MINUTES CERTIFICATION 1 hereby certify that the foregoing minutes are a true and correct copy of the minutes of the special meeting of the City Council of the City of Apache Junction, Arizona, held on the day of , 2024. 1 further certify that the meeting was duly called and held and that a quorum was present. Dated this day of 2024. JENNIFER PENA City Clerk City of Apache Junction,Arizona Page 3 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.3. File ID: 24-342 Sponsor:Jennifer Pena Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of approval of minutes of the regular meeting of May 7, 2024. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction, Arizona Meeting location: City Council Chambers Meeting Minutes at City Hall 300 E.Superstition Blvd CityCouncil Meeting Apache Junction,AZ g 85119 apachejunctionaz.gov Ph:(480)982-8002 Tuesday,May 7,2024 7:00 PM City Council Chambers A. CALL TO ORDER Mayor Wilson called the meeting to order at 7:02 p.m. B. INVOCATION AND PLEDGE OF ALLEGIANCE Councilmember Nesser gave the invocation and Councilmember Heck led the meeting attendees in the Pledge of Allegiance. C. ROLL CALL Present: 7- Mayor Wilson Vice Mayor Schroeder Councilmember Nesser Councilmember Heck Councilmember Johnson Councilmember Cross Councilmember Soller Staff in Attendance: Bryant Powell, City Manager Jennifer Pena, City Clerk Joel Stern, City Attorney Michael Pooley, Police Chief Rudy Esquivias, Development Services Director Ted Wolff, Public Works Director Liz Langenbach, Parks& Recreation Director Angelie Hawley, Finance Director Adrian Alegria Building Safety Manager/Building Official Evie McKinney, Deputy City Clerk D. CONSENT AGENDA Councilmember Heck moved,seconded by Vice Mayor Schroeder to approve the Consent Agenda. Yes: 7- Mayor Wilson, Vice Mayor Schroeder, Councilmember Nesser, Councilmember Heck, Councilmember Johnson, Councilmember Cross and Councilmember Soller No: 0 City of Apache Junction,Arizona Page 1 City Council Meeting Meeting Minutes May 7.2V24 1' Consideration of acceptance ofagenda. 2. 24-(336 Consideration 0f approval 0f minutes 0f the regular meeting Of April 10, 2024. 3. 24-250 Consideration Of approval 0f the proposed Resolution No. 24-O4 authorizing the city to enter into the Intergovernmental Agreement (|GA) Amendment No. 1 with Arizona Department of Transportation (A[}C)-[)for additional federal funds to cover the increased construction costs inthe amount Of$354.O07 for bicycle and pedestrian improvements 0D Delaware Drive from 18th Avenue to Broadway Avenue. 4. 24-252 Consideration Of approval On the proposed Resolution NO24-O0 authorizing the city tO enter into the |Ot8rgOv8rDDleDt8| Agngg08Dt (|GA) Amendment No. 2 with Arizona Department 0f Transportation (ADOT)for additional federal funds tO cover the increased construction costs inthe amount of$333,871 for roadway and safety improvements on Winchester Road from 29th Avenue to Southern Avenue. 5' 24-271| Consideration Of approval Of Resolution No. 24-14 and Resolution No. 24-17. Resolutions of the Mayor and City Council of the City ofApache Junction, Arizona, designating Ange|ie Hawley ae Chief Fiscal Officer for officially submitting and certifying the accuracy Of fiscal years 2024and 2U25 expenditure limitation reports to the Arizona Auditor General. E. AWARDS, PRESENTATIONS AND PROCLAMATIONS 6. 24-347. Formal presentation by mayor of certificates of graduation tothe participants of the 2O24 Citizen Leadership Institute. Production Marketing & Communications Specialist Matthew McNulty congratulated the 24th graduating class of the Citizens Leadership Institute and presented each of them with their certificate. A photo was taken with the class attendees, Mayor and Councilmembers. 7. 24-348 Proclamation designating the week Of May 12-18. 2O24. aS "Peace Officer Memorial VV88k" (|ounoi|memberSoUer read the proclamation. Apache Junction Police Chief Michael Poo|ey accepted the proclamation, and expressed his thanks to the Mayor and Council, on behalf of the Apache Junction Police Department. He shared that in law enforcement many officers lose their lives in the line ofduty. Ha stated the number uf police officers lost in the line of duty in2023 was 137. compared to58at this time in2024. Over 41 years ago, an Apache Junction Police Officer, Russell L. Duncan, was killed during a training accident. This Proclamation is memorial to honor those that have lost their lives like Officer Duncan, as well as those killed while protecting their communities. 8' Proclamation designating May 18, 2O24' GS "Kids tO Parks DGy." Counoi|mombnrNeoser read the proclamation. Parks and Recreation Superintendent Jamie Sullivan, and Parks and Recreation Management Analyst Riley King received the proclamation. City vr Apache Junction,Arizona Page City Council Meeting Meeting Minutes May 7,2024 Ms. Sullivan thanked the Mayor and Councilmembers for supporting this special day. She shared that this event began 14 years ago through the National Park Trust and is always held the third Saturday in May. She reminded everyone of the importance and value of our parks. So much so, that 84%of US adults seek high quality Parks and Recreation when choosing where they want to live. The public is invited to attend the festivities at Prospector Park, May 18, 2024, beginning at 7:00 p.m. 9. 24-308 Proclamation designating the week of May 19-25, 2024, as "Public Works Week." Vice Mayor Schroeder read the proclamation designating May 19th through May 25th, 2024, as Public Works Week and presented it to Public Works Director Ted Wolff. Mr. Wolff thanked the Mayor and Councilmembers on behalf of the Public Works Department for this recognition. He shared statistics that the department,which consists of 26 staff members, handles over 200 miles of road maintenance, 16,000 signs, 13 buildings, and 350 pieces of heavy equipment. In addition, the department is dedicated to 24 hour on-call service for flood and emergency situations. 10. 24-32 Proclamation designating May 2024 as "Building Safety Month." Councilmember Heck read the proclamation recognizing the month of May 2024 as Building Safety Month. Building and Safety Manager Adrian Alegria accepted the proclamation, and expressed his thanks and appreciation to the Mayor and Councilmembers. He shared that on Saturday May 4, 2024, the Development Services department held a community outreach event in recognition of Building Safety Month, where over 300 community members attended. Several local businesses contributed to the fun activities. Mr.Alegria shared his appreciation to Development Services Director Rudy Esquivias and Senior Permit Technician Leslie Castillo for the success of the event. Councilmember Heck attended this event and thanked the Development Services staff for a great job in presenting the much needed information. Councilmember Soller was also present and expressed how great it was to see the focus and energy placed on career training in trades and construction outside of college education. F. REGIONAL INTERGOVERNMENTAL UPDATES 11. 24-337 Brief summary of intergovernmental updates from mayor and councilmembers. Vice Mayor Schroeder commented on the recent event held at Blossom Rock, and how impressive this development is, and the amazing strides Apache Junction has done to make this happen. Mayor Wilson also commented on the lake and the various parks and playgrounds to be added, and the benefits these amenities will bring to the community. Mayor Wilson attended a Recognition of Volunteers event at Banner Hospital. The recognition was shared amongst volunteers from both the Ironwood and Goldfield facilities, where hours served ranged from 100 to 7,000. The volunteer program has grown tremendously over the past year, with an addition of over 50 new volunteers serving between both facilities. City of Apache Junction,Arizona Page 3 City Council Meeting Meeting Minutes May 7,2024 G. CITY MANAGER'S REPORT 12. 24-339 City Manager's Report. City Manager Bryant Powell shared the volunteering recently offered by a local veterans group to honor the Veteran's Memorial Park. A beautiful new sign has been placed and a picture was shared of the recent ribbon cutting ceremony. Councilmember Johnson added that many of our veterans in the city are very happy and honored by this new sign and the park overall. They are discussing how to raise corporate funds to obtain military insignias to have added to the park area. This would be no cost to the City, rather, purchases would be made by various companies within the city. Mr. Powell highlighted the May 4th Building Safety event, in that it was a great way of helping residents understand the importance of Building Safety and what the department does, as well as sharing with youth how essential it can be to become involved in a trade and earn a livable wage without college debt. 13. 24-35 Update on the Youth Advisory Council's accomplishments this year. Recreation Coordinator for Senior Services and School Programs JJ Underwood thanked the Mayor and Council for their support over the past year to the Youth Advisory Council, (YAC). He shared the various projects and volunteer hours contributed by YAC and introduced President Nathaly Alonso. Ms. Alonso presented a Year in Review video, that showcased the many events held by this group of young advocates. Council inquired if the events held were pre-planned, or organized originally by the group. Mr. Underwood explained these efforts are a combination of some pre-planned events, but many of them are the original ideas shared by YAC. 14. 24-356 Presentation by Michael Barry, Director of Development at Scottsdale Training & Rehabilitation Services (STARS). City Manager Bryant Powell introduced Director of Development with Scottsdale Training & Rehabilitation Services (STARS), Michael Barry. Mr. Barry shared a presentation on this organization that began in 1973,which was primarily developed to address the lack of services to the disabled individuals of all types in the city of Scottsdale. The mission now is to address the needs of cognitive and intellectual disabilities, by teaching life and job training skills. He expressed the interest for the organization and its growth is for Apache Junction to understand the scope of services offered by STARS, enlist help of STARS within the school district to help transitioning students into the adult world, and share the mission of STARS throughout the network of community and constituents. Mayor Wilson shared his appreciation for this type of organization and commented on the great benefits that can be achieved by getting involved with the training offered. 15. 24-340 Announcement of Current Events. Management Analyst Eli Richardson shared the following upcoming events: *Open House Party, Saturday May 11, 2024, Multi-Generational Center. This is being held to exhibit the amenities offered at the Center, without having to pay for a day pass. * Downtown Master Plan Update, May 8, 2024, 6:00pm at Multi-Generational Center. City Staff is looking for input and ideas to possibly weave into the downtown plan. City of Apache Junction,Arizona Page 4 City Council Meeting Meeting Minutes May 7,2024 * Free Dump Week, May 6-11, 2024. Allows for one truck load of refuse to Apache Junction Landfill for free * Letter Carriers' Food Drive for Superstition Community Food Bank, Saturday, May 11, 2024 H. PUBLIC HEARINGS I. OLD BUSINESS J. NEW BUSINESS 16. 24-357 Presentation and discussion with Detective Frank Nicholls of AJPD's Community Response Enforcement Unit, introducing new K-9 workmate, Tessa. Police Chief Michael Pooley introduced the newest Police Department member, Tessa, a 2 year old German Shorthair Pointer, who has been trained in 4 odors of narcotic detection. She works along side Detective Frank Nicholls. Chief Pooley expressed the value a canine officer can do that is heavily relied on for drug control and enforcement. Tessa will also be used in the schools for various demonstrations. Detective Nicholls shared the extensive training Tessa had completed prior to on-boarding with Apache Junction Police Department, as well as the furthered certifications with him after their introduction. Chief Pooley commented that Tessa is very active, and extremely eager to work everyday. He then thanked the Mayor and Council for their support in helping grow the Apache Junction Police Department with this added member. K. COUNCIL DIRECTION TO STAFF L. SELECTION OF MEETING DATES, TIMES, LOCATIONS, AND PURPOSES M. CALL TO PUBLIC Andre Meek, 1327 S. Belair Road, Apache Junction, commented on the Citizen's Leadership Institute graduates, and the Peace Officer Memorial Week Proclamation. Donna Carr, 2178 W.Virginia Street, Apache Junction, shared programs she had knowledge of that are comparable to the STARS organization, and her disapproval of the use of reclaimed water. Steve Kitzman, 1832 W. Shiprock, Apache Junction, encouraged the adoption of a regulation that would ban the feeding of pigeons, dove, quail and other wild birds and animals in the Apache Junction city limits. He shared damage he has experienced at his home, due to neighbors feeding of birds. Mr. Kitzman shared handouts to the City Clerk on a neighboring city Ordinance and a state law. Connie Wegeng, 1431 N. Cortez Road, Apache Junction, requested approval for a home she owns on S. Meridian Drive, to be relocated to an adjacent parcel. She submitted photos of the home to the City Clerk for distribution to Mayor and Councilmembers. City of Apache Junction,Arizona Page 5 City Council Meeting Meeting Minutes May 7,2024 Council requested staff to research the ordinance shared regarding feeding of birds and wild animals, and to look into the request of relocating the home on Meridian Drive. N. ADJOURNMENT Mayor Wilson adjourned the meeting at 8:25 p.m. ACCEPTED THIS DAY OF 2024, BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA. SIGNED AND ATTESTED TO THIS DAY OF 2024. WALTER"CHIP"WILSON Mayor ATTEST: JENNIFER PENA City Clerk CITY COUNCIL MINUTES CERTIFICATION I hereby certify that the foregoing minutes are a true and correct copy of the minutes of the regular meeting of the City Council of the City of Apache Junction, Arizona, held on the day of , 2024. 1 further certify that the meeting was duly called and held and that a quorum was present. Dated this day of 2024. JENNIFER PENA City Clerk City of Apache Junction,Arizona Page 6 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.4. File ID: 24-410 Sponsor:Jamie Sullivan Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of approval of the second amendment to the professional services agreement between City of Apache Junction and Central Arizona Council on Developmental Disabilities. City of Apache Junction,Arizona Page 1 Printed on 511612024 cityo a e ]unction Rlzo Home Of the Superstition Mountains Memorandum To: Honorable Mayor and Members of City Council. Memorandum Through: Liz Langenbach,Parks and Recreation Director Bryant Powell, City Manager Memorandum From: Jamie Sullivan,Recreation Superintendent Date: April 22nd 2024 Subject: Professional Service Agreement for Senior Transportation On August 15Y 2017, The City of Apache Junction entered into an agreement with Central Arizona Council On Developmental Disabilities("CACDD")to provide transportation services to our senior and disabled populations. Transportation services included: transportation to and from the MGC for weekday lunch,medical and shopping trips. The first amendment was created in 2022, extending the contract and adjusting pricing. This is the second amendment to the agreement. This program is funded through Pinal Gila Council for Seniors Citizens ("PGCSC"),the general fund, grants and participant donations. The notable changes in the amendment to the agreement are: • moving to a flat daily rate for group MGC transportation instead of a per person fee • moving to a flat daily rate for additional group trips instead of per person and mileage. • increasing individual medical/shopping trips from $6 per mile to $8 mile. These changes are within our total budgeted costs for senior services. Staff feel this is a fair adjustment resulting from market conditions. This is a great program providing various transportation options to the senior community. The partnership with CACDD has been very successful and staff recommend this contract for council's approval. 300 E.Superstition Blvd.•APACHE JUNCTION,AZ 85219*mavw.ajcitX.net •PHONE(480)983-2181•FAX(480)982-2438•TDD(480)983-0095 AGREEMENT FOR SENIOR TRANSPORTATION SERVICES BETWEEN CITY OF APACHE JUNCTIONI II PROJECT NO. PR-17-03 THIS AGREEMENT made and entered into by and between the-CITY.OF_. _. :A_. CH_. JUNCTION ("City"), an Arizona municipal corporation, and CentralArizona Council on Developmental Disabilities ("Contractor"), both whomshall collectively be referred o as the "Parties", or individually as y88 RECITALS A. Contractor has responded to ity's request for proposal via RFP No. PR-17-0 , in which Contractor asserts its willingness, ability and qualifications to provide this work service ( "Work"). B. City and Contractor desire to sat forth herein their respective responsibilities and the manner and terms upon whichContractors all render the services. C. City has complied with the public bidding requirements under Arizona Revised Statute Title 34 andApache Junction City Code, Volume 1, Chapter : Administration, rticl ® , Procurement Procedure. AGREEMENT NOW, THEREFORE, City retains Contractor to perform, and Contractor agrees to render the services in accordance with the terms and conditions set forth as follows: 1. PROJECT I TContractor shall o n o or cause t o performed in goodworkmanlike manner, the Work in accordance with the contract documents as fully described in the Notice Inviting Bid Proposals for Project No. -1 7-03, as well as Contractor's response, both of which include all required specifications, a copy of which are on file with the Citys Parks and Recreation Department. 2 PRICES: Prices shall be governed under attached i i "TransportationCosts", the Contraa-or'sresponseto Project No. -1 for performance of the Work. e CONTRACT T e Initial Term of this agreement shall be from 2017 to Jun , 2018. Thereafter, is agreement shall automatically e renewed for f Ad i io al cane-year( ) periods with e final end date of June 30, 2022. The City reserves i t unilaterally n the one-year( periods by thirty-one (3 ) days. . LABOR AND MATERIALS: Unless otherwise provided in the contract documents, Contractor s all provide, pay and insure under the requisite laws and regulations for all labor, transportation, and other related services necessary forte proper execution and completion o the Work whether temporary or permanent, and whether or not incorporated or to be incorporated in the Work. . TAXES: Contractor shall pay all license, sales, consumer, use n other similar taxes 1 for the Work or portions thereof provided by Contractor which are legally enacted at the time bids are received whether or not yet effective or subsequently applicable due to acts of jurisdictions or bodies other than City, Further, Contractor agrees to pay all applicable privilege and use taxes that are applicable to the Work under the Agreement. 6. PERMITS & FEES: Unless otherwise provided in the contract documents, Contractor shall secure and pay for all permits, governmental fees, licenses and inspections necessary for the proper execution and completion of Work which are customarily secured after execution of the contract and which are legally required. Contractor shall give all notices and comply with all laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the Work. Contractor represents and warrants that any license necessary to perform the Work under this Agreement is current and valid. Contractor understands that the activity described herein constitutes "doing business in the City of Apache Junction" and Contractor agrees to obtain a business license pursuant to Article 8-2 of the Apache Junction City Code, Vol. 1, and keep such license current during the term of this Agreement. Contractor also acknowledges that the tax provision of the Apache Junction Tax Code, Chapter 8A, may also apply and if so, shall obtain a privilege license. Any activity by subcontractors within the corporate city limits will invoke the same business and privilege license regulations on any subcontractors, and Contractor ensures its subcontractors will obtain any required licenses. If there are taxable activities, a business license shall be converted to a privilege license by the Contractor and any subcontractors through the City Clerk's Office. 7. INDEPENDENT CONTRACTOR: Contractor shall at all times during Contractor's performance of the services retain Contractor's status as an independent Contractor. Contractor's employees shall under no circumstances be considered or held to be employees or agents of City, and City shall have no obligation to pay or withhold state or federal taxes, or provide workers compensation or unemployment insurance for or on behalf of them or Contractor. Contractor shall supervise and direct the delivery of the materials using its best skill and attention. Except as provided in this Agreement, Contractor shall be solely responsible for all means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work required by the contract documents. Contractor shall be responsible to City for the acts and omissions of its employees, 8. INDEMNIFICATION: To the fullest extent permitted by law, Contractor shall defend, indemnify and hold harmless City, its elected officials, agents, and employees from and against any and all liability including but not limited to demands, claims, actions, fees, costs and expenses, including attorney and expert witness fees, arising from or connected with or alleged to have arisen from or connected with, relating to, arising out of, or alleged to have resulted from the acts, errors, mistakes, omissions, Work of Contractor, its agents, employees, or any tier of Contractor's subcontractors in the performance of this Agreement. Contractor's duty to defend, hold harmless and indemnify City, elected officials, appointees, agents, and employees shall arise in connection with any tortious claim, damage, loss or expense that is attributable to bodily injury, sickness, disease, death, or injury to, impairment, or destruction of property including loss of use resulting therefrom, caused by an Contractor's acts, errors, mistakes, omissions, or Work in the performance of this Agreement including any employee of Contractor, any tier of Contractor's subcontractor or any other person for whose acts, errors, mistakes, omissions, Contractor may be legally liable. 9. ENFORCED Neither City nor Contractor, as the case may be, shall be considered not to have performed its obligations under this Agreement in the 2 event of enforced delay(an "Enforced Delay") due to causes beyond its control and without its fault or negligence or failure to comply with Applicable Laws, including, but not restricted to, acts of God, fires, floods, epidemics, pandernics, quarantine, restrictions, embargoes, labor disputes, and unusually severe weather or the delays of subcontractors or materialmen due to such causes, acts of a public enemy, war, terrorism or act of terror(including but not limited to bio- terrorism or eco-terrorism), nuclear rad(ation, blockade, insurrection, riot, labor strike or interruption, extortion, sabotage, or similar occurrence or any exercise oft power of eminent domain of any governmental body on behalf of any public entity, or a declaration of moratorium or similar hiatus (whether permanent or temporary) by any publice ti irectly affecting the Work. In no event will Enforced Delay include any delay resulting from unavailability for any reason of labor shortages, or the unavailability fora reason of particular consultants, subcontractors, vendors or investors desired by Contractor in connection with the Work. Contractor agrees that Contractor alone will bear all risks of delay which are not Enforced Delay. In the event of the occurrence of any such Enforced Delay, the time or times for performance of the obligations of the Party claiming delay shall be extended for a period of the Enforced Delay,, provided, however, that the Party seeking the benefit of the provisions of this Section shall, within thirty(30) calendar days after such Party knows or should know of any such Enforced Delay, first notify the other Party of the specific delay in writing and claim the right to an extension fort period of the Enforced Delay; and provided further that in no event shall a period of Enforced Delay exceed ninety (90) calendar as. M GOVERNING LAW AND VENUE: The terms and conditions of this Agreement shall be governed by and interpreted in accordance with the laws oft State of Arizona. Any action at I aw or in equity brought by either Party for the purpose of enforcing a right or rights provided for in this Agreement, shall be tried in a court of competent jurisdiction in Pinal County, State of Arizona. The Parties hereby waive all provisions of law providing for a change of venue in such proceeding to any other county. In the event either Party shall bring suit toenforce any term of this Agreement or to recover any damages for and on account oft e breach of any term or condition in this Agreement, it is mutually agreed that the prevailing party in such action shall recover all costs including: all litigation and appeal expenses, collection expenses, reasonable attorneys' fees, necessary witness fees and court costs to be determined by the court insuch action. 11. INSURANCE: Contractor, at its own expense, shall purchase and maintain the minimum insurance and other additional requirements set forth herein. All insurance required herein shall be maintained in full force and effect until all or ors is required to be performed under the terms of the Agreement is satisfactorily completed and formally accepted; failure to do so may, at the sole discretion of the City constitute a material breach of this Agreement. Contractor's insurance shall be primary insurance as respect to City, and any insurance or self- insurance maintained by City shall not contribute to it. Any failure to comply with the claim reporting provisions of the insurance policies or any breach of an insurance policy warranty shall not affect coverage afforded under the insurance policies to protect it . The insurance policies, except Workers Compensation, shall contain waiver of transfer rights of recovery (subrogatioh) against City, its agents, officers, officials and employees for any claims arising out of Contractor's acts, errors, mistakes, omissions, Work or services. 3 The insurance policies may provide coverage which contains deductibles or self-insured retentions. Such deductible and/or self-insured retentions shall not be applicable with respect to the coverage provided to City under such policies. Contractor shall be solely responsible for the deductible and/or self-insured retention and City, at its option, may require Contractor to secure payment of such deductibles or self-insured retentions by a Surety Bond or an irrevocable and unconditional letter of credit. City reserves the right to request and to receive within ten (10) working days, certified copies of any or all of the herein required insurance policies and/or endorsements. City shall not be obligated, however, to review same or to advise Contractor of any deficiencies in such policies and endorsements, and such receipt shall not relieve Contractor from, or be deemed a waiver of City's right to insist on strict fulfillment of Contractor's obligations under this Agreement. The insurance policies, except Workers Compensation, required by this Agreement, shall name City, its agent, officers, officials and employees as additional insured parties. REQUIRED COVERAGE Commercial General Liability Contractor shall maintain Commercial General Liability insurance with a limit of not less than $1,000,000 for each occurrence with a $2,000,000 Products/Completed Operations Aggregate and a $2,000,000 General Aggregate Limit. The policy shall include coverage for bodily injury, broad form property damage, personal injury, products and completed operations and blanket contractual coverage including, but not limited to, the liability assumed under the indemnification provisions of this Agreement which coverage will be at least as broad as Insurance Service Office, Inc. Policy Form CG 00011-93 or any replacement thereof. In addition, automobile liability coverage of at least $1 million per occurrence or a combined single limit of at least $1,000,000 is required. The auto liability policy should contain endorsements for hired autos, non-owned autos and scheduled vehicles, as applicable to the Contractor's business. Such policy shall contain a severability of interest provision, and shall not contain a sunset provision or commutation clause, nor any provision which would serve to limit third party action over claims. The Commercial General Liability additional insured endorsement shall be at least as broad as the Insurance Service Office Inc.'s Additional Insured, Form CG 20101185, and shall include coverage for Contractor's operations and products and completed operations. If required by this Agreement, if Contractor sublets any part of the Work, services or operations, Contractor shall purchase and maintain, at all times during prosecution of the or , services or operations under this Agreement, City and Contractor's Protective Liability insurance policy for bodily injury and property damage, including death, which may arise in the prosecution of the Contractor's Work or operations under this Contract. Coverage shall be on an occurrence basis with a limit not less than $1,000,000 per occurrence, and the policy shall be issued by the same insurance company that issues Contractor's General Liability insurance. Workers Compensation Contractor shall carry Workers Compensation insurance to cover obligations imposed by federal 4 and state statutes having jurisdiction of Contractor's employees engaged in the performance of the Work; and Employer's Liability insurance of not less than $100,000 for each accident, $100,000 disease for each employee, and $500,000 disease policy limit. In case any or is subcontracted, Contractor will require subcontractor to provide Workers Compensation and Employer's Liability to at least the same extent as required of Contractor. Umbrella Policy Contractor shall carry an umbrella policy with a limit not less than $5,000,000. The umbrella policy shall cover claims that are uncovered by the primary policy and claims in excess of the primary policy. The umbrella insurance policy shall cover those claims as primary insurance and fill in the gaps in the underlying policies. CERTIFICATE OF INSURANCE Prior to commencing Work under this Agreement, Contractor shall furnish the City with Certificates of Insurance, or formal endorsements as required by Agreement, issued by Contractor's insurer(s), as evidence that policies providing the required coverages, conditions and limits required by this Agreement are in full force and effect. In the event any insurance policies required by this Agreement are written on a "claims made" basis, coverage shall extend for two (2) years past completion and acceptance of the Contractors Work or services and as evidenced by annual Certificates of Insurance, to be filed with the City Attorney of City. If a policy does expire during the life oft Agreement, a renewal certificate must be sent to City thirty(30) days prior tot expiration date. All Certificates of Insurance shall be identified with Bid serial era title. Insurance required herein shall not expire, be canceled, or materially changed without thirty(30) days' prior written notice to City. 12. SUCCESSORS &ASSIGNS: Neither party tothis agreement shall assign the obligations hereunder, nor shall the Contractor assign any monies due or to become due. 13. WRITTEN NOTICE: Written notice all be deemed to have been duly served if delivered in person tot individual or member of the firm or entity, or to an office oft e corporation for whom it was intended or if delivered at ors t registered or certified mail, return receipt requested, and first class postage prepaid tothe last business address known to them who gives the notice. 14. SAFETY: Contractor and/or its subcontractors shall be solely responsible for jobs fe y at all times. 15. RIGHTS & REMEDIES: The duties and obligations imposed by the contract documents and the nights and remedies available hereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law, No action or failure to act by City or Contractor shall constitute a waiver of any right or duty afforded any of them under the contract, nors all any action or failure to act constitute an approval of or an 5 acquiescence to any breaches hereunder except as may be specifically agreed to in writing. 16. TERMINATION OF CONTRACT: If, for any reason, the Contractor shall fall to fulfill in a timely and proper manner it's obligations under the contract, or if the Contractor shall violate any of the covenants, agreements, or stipulations of the contract, the City shall thereupon have the right to terminate the contract by giving written notice to the Contractor of such termination and specifying the effective date thereof. Notwithstanding the above, the Contractor shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of the contract by the Contractor. The Parties may terminate the contract at any time by giving at least ninety(90) calendar days Notice of Intent to Terminate. If the contract is terminated by the City as provided herein, the Contractor will be paid for the time expended and expenses incurred up to the termination date. 17. APPEALS: All contractual grievances shall be submitted in writing to the City Manager within five (5) calendar days after the difference of opinion or grievance occurs relating to any of the provisions of the terms of this Agreement. Within five (5) calendar days of receiving a written grievance, the City Manager shall respond in writing. The City Manager's decision shall be final and binding, subject only to a further appeal in the Pinal County Superior Court pursuant to A.R.S. § 12-901, of seq. 18. 'RECORDS: Records of Contractor's labor, payroll and other costs pertaining to this Agreement shall be kept on a generally recognized accounting basis and made available to City for inspection on request. Contractor shall maintain records for a period of at least three (3) years after termination of this Agreement, and shall make such records available during that retention period for examination or audit by City personnel during regular business hours. 19. AMENDMENT: It is mutually understood and agreed that no alteration or variation of the terms and conditions of this Agreement shall be valid unless made in writing and signed by the parties hereto, and that oral understandings or agreements not incorporated herein shall not be binding on the parties. 20. SEVERABILITY: City and Contractor each believe that the execution, delivery and performance of this Agreement are in compliance with all applicable laws. However, in the unlikely event that any provision of this Agreement is declared void or unenforceable (or is construed as requiring City to do any act in violation of any applicable laws, including any constitutional provision, law, regulation, or city code), such provision shall be deemed severed from this Agreement and this Agreement shall otherwise remain in full force and effect; provided that this Agreement shall retroactively be deemed reformed to the extent reasonably possible in such a manner so that the reformed agreement(and any related agreements effective as of the same date) provide essentially the same rights and benefits (economic and otherwise) to the Parties as if such severance and reformation were not required. Unless prohibited by applicable laws, the Parties further shall perform all acts and execute, acknowledge and/or deliver all amendments, instruments and consents necessary to accomplish and to give effect to the purposes of this Agreement, as reformed. 21. CONFLICT OF INTEREST: This Agreement is subject to, and may be terminated by City in accordance with, the provisions of A.R.S. § 38-511. 22. TIME IS OF THE ESSENCE: Time is of the essence with respect to all provisions in this 6 Agreement, Any delay in performance by either Party all constitute a material breach of this Agreement, 23. 'PROHIBITION TO CONTRACT WITH CONTRACTORS WHO ENGAGE IN BOYCOTT OF THE STATE OF ISRAEL: The Parties acknowledge A.R.S.§ 35-393 through 35:393 0-3, as amended, which forbids public entities from contracting with Contractors who engage in boycotts of the State of Israel. Should Contractor, or its subcontractors, undart is Agreement engage in any such boycott against the State of Israel, this Agreement is automatically terminated. Any such boycott is a material breach of contract and will subject Contractor to monetary damages. COMPLIANCE WITH FEDERAL AND STATE LAWS: Contractor understands and acknowledges the applicability of the American with Disabilities Act, the Immigration Reform and Control Act of 1986 and the Drug Free Workplace Act of 1989 tothe services performed under this Agreement. As required by A.R.S. §41-4401, Contractor hereby warrants its compliance with all federal immigration laws and regulations that relate to its employees and A.R.S. § 23-214(A). Contractor further warrants that after hiring an employee, Contractor will verify the employment eligibility of the employee through the E-Verify program, If Contractor uses any subcontractors in performance of services, subcontractors shall warrant their compliance with all federal immigration laws and regulations that relate to its employees and A.R.S. § 23-214(A), and subcontractors shall further warrant that after hiring an employee, such subcontractor verifies the employment eligibility of the employee through the E-Verify program. A breach of this warranty shall be deemed a material breach of the Agreement that is subject to penalties up to and including termination of this Agreement. Contractor is subject to a penalty of$100 per day for the first violation, $500 per day for the second violation, and $1,000 per day for the it violation. City at its option may terminate this Agreemeta r the third violation. Contractor shall not be deemed in material breach of this Agreement if the Contractor and/or subcontractors establish compliance with the employment verification provisions of'Sections 274A and 274B of the federal Immigration and Nationality Act and the E-Verify requirements contained in A.R.S. § 23-214(A). City retains the legal right to inspect the papers of any Contractor or subcontractor employee who works under this Agreement to ensure that the Contractor or subcontractor is complying with the warranty. Any inspection will be conducted after reasonable notice and at reasonable times. If state law is amended, the Parties may modify this paragraph consistent with state law. 7 IN WITNESS WHEREOFthe parties hereto have caused this Agreement to be signed by their duly authorized representative as of this day of r G� , 21 . CONTRACTOR: CENTRAL A IOA COUNCIL ON 7DEaVLOPMENITAL l A ILITI S Doug Bacon Title: Executive Director CITY: CITY OF APACHE JUNCTION n Arizona municipal corporation y; Jeff Serdy Title, City Mayor ATTEST: Kathleen Connelly City Cierk APPROVED A FORM: Richard J. Stem City Attorney STATE OFCOUNTY of_ 1 1 t� i The foregoing a subscribedan sworn fore this 1 ay of Cb� 9� by u Bacon, a Executive Director en#ral izona t 11 on evel p ental Disabilities. eta y Commission Expires r> MMY OMAN-CLOYD (seal) r, Naftepe tow" My CqW&-Jvprn Mar 6,2 STATE F A A } ) ss. COUNTY F l , y The foregoing as subscribed and sworn to before me this 3,Aay �-" 17 b Jeff er y, as Mayor f the City f padre-junction,ZIL Arizona, an Arizona municipal corporation® to Public y Commission Expires: k (seat) 1 F 1 n 1 1; EXIBIT A Transportation Costs ® TOTAL COST OF SERVICES: In accordance with the terms and conditions of this Agreement, City shall compensate Contractor for senior transportation services in an amount not to exceed $70,000 per year. This total is reliant on receiving all anticipated gift and grant funds and program revenue to supplement the City's expenses. 2. SENIOR TRANSPORTATION COSTS (HOME TO MGC): Senior transportation from clients' homes to and from the Multi-Generational Center("MGC") shall be charged at a rate of$15.00 per client per round-trip. The route shall be coordinated by the Parties and shall run Monday through Friday all days that the senior congregate meal program operates. A minimum of five (5) clients shall be charged each day that transportation to the MGC occurs. 3. SENIOR TRANSPORTATION COSTS (ADDITIONAL): Senior transportation to and from medical and shopping trips shall be charged at a rate of$4.00 per it and $24.00 per hour for each trip. Trips shall be scheduled on a case-by-case basis with the Contractor only as funds are available. 10 BETWEEN CITY OF APACHE JUNCTION AND CENTRAL FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT COUNCIL ON DEVELOPMENTAL DISABILITIES THIS is made and entered into this ("the Execution Date") } between CITY OF O , Arizonaan l corporation ("City"), CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES, r profit corporation ("Contractor"), ll ivl fr t i r individually "Party". PartiesRECITALS The enteredi r rs ittransportationservices t "Agreement")' _on August 28, 2017 for a year, and then withtic four one-year renewal periods, havel end date of June 30, 2022. B. Beyond that datei ill still need senior r ti ri s for meals,_medical and shoppingoutings. yearsC. The i it a t r t r- t r ' r six fiscal year 2027-2028. D. Due to the increased cost of fuel and other inflationary r ti l expenses the transportationcosts in Exhibit A need to be adjusted. E. Formal procurement for the servicesprovided r this Agreementr categorically F. This Firstt forth the renewal terms. AGREEMENT NOW, THEREFORE, i si r i mutual promises containedherein otherand good and valuablei r i , the receipt f which is herebyl ,the Parties agree to amend the Agreement as follows: Section : Prices shall be governedr attached Exhibit "'Transportation Costs". Sectionis Agreement shall be effectivebeginning July 1, 2022 and shall remain in full force and effect through , with additional one year renewal periodsi final end date of June 30, 2028, subject to the early termination optionin § 16 jermination Contract written notice t to terminate). H r, no later than 90 calendar days before the end of the second and fourth year this it t is in effect . ., April 2, 2024 and April 2, ), Contractor has the right to notifyi f proposed ri increase. If ies agree to a 'price increase, s shall writingbe reduced to r . Should the negotiations fail, this First Amendment will be deemed terminated immediately after June 30, 2024 or June 30, 2026, as applicable, without necessity tic intent r l t either Section : City and Contractor each bind themselves, their partners, successors, assigns and legal representatives to the other Party heretoto the partners, successors, ss legal representatives c other Party in respect to all covenants, agreements and_ obligations t I I r lAgreement._ It contract shall assignr _swhole delegatethe duties hereunder, l t writtent r r shall Contractor assigni t to become due to it without the previous written consent it . Except as expressly amended herein, all other terms and provisions Agreementc t the Parties shall remain l force and effect. IN WITNESS , the Parties have caused this Amendment to be signedtheir duly authorizedrepresentatives the year'first above written. COUNCILCENTRAL ARIZONA DEVELOPMENTAL DISABILITIES, 501 c) ) not for profit corporation —D!2� . ~ Its: Executive Director CITY: CITY OF APACHE JUNCTION, an Arizona municipal corporation Walterl l Its: jMayor Jennifer Pena City Clerk APPROVED AS TO FORM: R. Joel Stern City Attorney 3 EXHIBIT A Transportation Costs 1. TOTAL COST OF SERVICES: In accordance ith the terms and condition of is Agreement, City shall compensate r t r for senior transportation sri in amount not to , r r. is total is reliant receivingall anticipated gift and grants and program revenue to supplement the City's expenses. 2. SENIOR TRANSPORTATION COST(HOME TO m Senior transportation' from - clients'clients' home to and from l i- r i l Center " " shall be charged t a r 7.50 per client round trip. The route shall coordinated ishall r r Fridayall the days that the senior c r program A minimumof six clients shall be charged_ each day that transportation to the MGC occurs. 3. SENIOR TRANSPORTATION COSTS I ior transportation to and from medical and shopping rishall be chargedt a rate of$6 per mile r hour for each trip. Trips shall be scheduled case basisi t r only as funds are available. SECOND AMENDMENT TO PROFESSIONAL SERVICES S AGREEMENT BETWEEN CITY OF APACHE JUNCTION AND CENTRAL. ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES THIS SECOND AMENDMENT is made and entered Into this day of 2024, ("the Execution Date") by and between CITY OF AP'ACHE JUNCTION, ARIZONA, an Arizona municipal corporation ("City"'), and CENTRAL ARIZONA COUNCIL ON DEVELOPMENTAL DISABILITIES, a 501 c not-for- profit corporation ("Contractor"), sometimes each collectively referred to as the "Parties"' or individually as the `Party". RECITALS A. The Parties entered into an agreement t for senor transportation services (the "Agreement" can August 28, 2017 for one year, and then with automatic four 4 one-gear renewals, had a final contract end data of June 30, 2022 B. The Parties entered into a First Amendment beginning on July 1, 2022, ending on June 30, 2028 with one-year automatic renewal options being exercised. C. Since 2023, fuel and other inflationary operational expenses Increased significantly which the Parties agree need adjustment. [ . Formal procurement for the services provided under this Agreement are categorically exempted under A.J.C.C,, Vol. 1, Art. 5-7. E. This Second Amendment sets forth the above-noted terms; AG_REEMENT NOW, THEREFORE, in consideration of mutual promises contained herein and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the Parties agree to amend the Agreement as follows: Section 2. Pl_ICFS. Prices stall be governed under attached Exhibit A "Transportation Costs", for general cost of services, senior transportation costs (home to multi-generational center)and additional medicall"sho ping trips. Section 4. QQ` TI At T TERMS. This agreement shall be effective beginning on July 1, 2024 and shall remain in full force and effect through June 30, 2025, with five tS additional one-year renewal periods with the final end date; of June 30, 2028, subject to the early termination option in Section 16, Termination of Contract(90 day written notice of Intent to terminate); Except as expressly amended herein, all ether terms and provisions of the Agreement shall remain in full force and effect until the Agreement is terminated. IN WITNESS WHEREOF, the Parties have caused this Amendment to be signed by their duty authorized representatives as of the day and year first above written. CENTRAL ARIZONA COUNCIL ONDEVELOPMENTAL DISABILITIES, a Its; CI CITY OF APAC IE JUNCTION, ARIZONA, an Arizona municipal corporation By: Walter"ChI "Wilson Its: ae ATTEST: Jennifer Pena City Clerk APPROVED AS TO FORM: <�e-5-43-24 — R.Joel Stern City Attorney EXHIBIT A TRANSPORTATION COSTS . TOTAL COST OF SERVICES In accordance with the terns and conditions of this Agreement, City sell compensate Contractor for the senior transportation services in an amount not to exceed $ 70,000 per year. This total is reliant on receiving all anticipated d gift and grant funds and program revenue to supplement the City's expenses. 2< SENIOR TRANSPORTATION COST (HOME TO MGC): Senior transportation from client's home to and from theMulti-Generational' Center " C" shall be charged at a flat rate o $ 40 per day, for up to 18 clients, The route shall be coordinated by the Parties and shall run Monday through Friday for all days the senior's congregate areal program operates. Special routes requested to run Saturday or Sunday will be champed at a flat rate of 20 per day, for up to 18 clients . SENIOR TRANSPORTATION COST (Group shopping, food boxes, or other` extended days): Will be charged at an additional $ 0 per clay (Monday through Friday),for up to 18 clients: 4. SENIOR TRANSPORTATION COST (Additional): Senior transportation for clients I to 2 clients) from their home and from medical or individual shopping trips shall be charged at a rate of$8.00 per mile and $25.00 per hour rounded to the next 1/4 hour)for each trip. "Trips shall be scheduled on a case-by-case basis with the contractor only as fonds are available, City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.5. File ID: 24-416 Sponsor: Michael Pooley Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of approval of Resolution No. 24-20, authorizing the City of Apache Junction to enter into an intergovernmental agreement with Apache Junction Unified School District#43 for grant-funded School Resource Officers. City of Apache Junction,Arizona Page 1 Printed on 511612024 Apache Junction Police Department Memorandum Date: May 7, 2024 To: Mayor Chip Wilson and the City Council From: Chief Michael Pooley Subject: Resolution 24-20 - Revision to the Intergovernmental Agreement established with Apache Junction Unified School District. .......................................................................................................................................................................................................................................................................................... The Apache Junction Police Department (AJPD) is seeking approval for Resolution 24-20, an Intergovernmental Agreement to prolong the presence of School Resources Officers at the Apache Junction Unified School District (AJUSD) and to expand staffing at Desert Vista Elementary and Four Peaks Elementary Schools. The Arizona Department of Education has granted funding of $139,671 .89 to cover the salaries and benefits of these officers. ELEMENTARYINTERGOVERNMENTAL AGREEMENT BETWEEN CITY OF APACHE JUNCTION AND APACHE JUNCTION I I l T l RELIEF { " SCHOOLFUNDED RESOURCE,OFFICERJUNCTION I L HIS L 'Agreement") is made as of the 6ay of t tIv t " y r n CITY OF { 4CTION� l l lcorporation ("City") JUNCTIONl 1 L DISTRICT #43, a political subdivision of the Statef Arizona, on behalf of " Junction High School" ("School"). City and School are sometimes referred to her In collectively as t " I ,#or individually as a'Party," RECI -- A. School desires City to assign a policer to School to performI resource r r " " to providel r s In § 5 of this Agreement, and City is willingto assign a policeofficer to School for such purpose under the terms and conditionsf this Agreement. B. The Parties are authorizedjand 11-952 to enter into this Agreement, NOW, THEREFORE, in considerationthe foregoingRecitals and the mutual promises and covenantsset forth herein, n for other consideration, the receipt adequacy of which Is hereby acknowledged, the Partiest l t� s. City shall assign one policeofficer to School seven (7) calendar days prior to the commencement of the school year projected to be startingr about July 25, 2022 and July , 2023 for the first two years this r nt is in effect until the end of the correspondingl years projected to be ending 2022 and y , 2024 respectively, to performduties at Apache Junction High School at 2525 SouthIronwood Drive,Apache Junction, Termination. This Agreement shall commence on the Effectivet and shall continue until May , 2024, however, either Party may terminate this Agreement for any reason with thirty calendardays' prior writtentic t t other y first class I 1, postage _prepaid, addressed to the other Party as setf In§t I of this Agreement. 3. BAkLigaghig of Parties. City shall have the status of an independent contractor for purposes of this Agreement.This r t is not intended A)HS SRO IGA 2 22-2 2 -Page I of 12 to and will not constitute, create, give rise r otherwise recognize a joint venture, partnershi ; or formal usin s association or organization of any kind between the Parties, n the rights and obli ti s of the Parties shall only be those r sl set forth in this Agreement. The Parties agree that no person supplied y School to accomplishthe goals of this Agreement is a City employee. The assigned li be consideredn employee of Cityn ll be subject to its control and supervision.The assignedill be subject to current procedures in effect for City policeofficers, Including att n ll mandated training ti to maintain state is r certification, Theassigned SRO shall fulfill ti s a law enforcement officer as certifiedy the Artzona Police Officers Standardsr i in 'A *.School shall not Interfere it the assignedduff es as-a sworn law enforcement officer. City understands that School is responsible for s of students an campus duringcurriculum hours. if School receives information t the assigned SRO y have engagedin unprofessional, illegal, or immoral conduct, School ill immediately r vi information to City. If City receives- information fo tic from any crediblesource Indicatingt t t assigned have n i unprofessional, illegal, r Immoral conduct that would affect the officer's ability to safely and/or professionally performi for School, City will immediately provide uc information, as all y law,to School, f any allegedunprofessional, Illegal, or immoral ct might affect the SRO's ability to safely and/or professionally performduties for School, City will immediately r ov the from col to allow Cityand/or School t investigate the allegations. City agrees to temporarily assign a_ replacement police officer ch of in this situation and if a replacement r cannot be provided, c of will be credited for each day an officerIs not assigned to the campus. School, at its sole isc do ¢_ y refuse the i n t of any officer who has previously removed from School because of allegations of unprofessional, illegal,1, r immoral nduct. School shall reimburse City for the costsf ' compensation for: days School is in session and theis present at l; _when the SRO is not at the School u to an off-campus activity at School's request; n SRO Is involved In activity stemming ti taken by the officer while in service of School, including n nc t court; is working alternative work schedule as r upon y City School. it i responsible for t _costs _f 's compensation for all other hours of work performed a. Cost of r nticl ul urs; School agrees to pay City One HundredFifty SevenT s n ine Hundred Dollars and Ninetyi Centsfor Fiscal Year In consideration for the services provided by City as set forth in Section 5 below. b. vmust k approval from ool principal, or the principal's dsi ns rt appropriate;city policedepartment supervisor far workingI overtime , those r pertaining to the School, its students, or its l I shall pay one hundred percent f:any SRO overtime s the result of SRO-related functions. City shall pay one hundredr tt o of any SROovertimethat result from It -rl tod activities(I e.,those mattersthat do not involve the School,it students, or its employees). The SRO andCity shall make everyreasonable effort to ensurethat the SRO doesot Incur overtime costs in any given week, } c. Paymentt y t to City from o f is due within thirty { calendar days of the School'srclt of a monthlyItemized invoice.School agrees to pay Interest ("late } In the amount of ten percent t annum on any balance that remains unpaidmore than fifteen calendar days after the duet City may, at its discretion, waive late fees on a case-by-casesis< d. Budget. Each Party will establish an int in a budget according to Its established rules and regulations. 5. ' ss onsi illti Is . The .SRO shall have the oll ire r o si iliti s: i. Establish and maintain a professional working relationship wit School officials, Including but not limited to assistingIn repetitive truancy tt r that become moretime consuming for School's i i ti Ii. Provide appropriatepolice and nfor nt services at School. Ill. Work cooperatively with School administrators and parents to Identify students exhibiting high truancy rates. iv. Investigate all reported child abuse incidents Within the School's premises. v. Contact the parent or r i f students who have not "provided School with proof of identification in accordance with * . . . A, Prepare and maintain such records of their activities as arerequired y the operational needs of the Apache Junction Police Department. b. An SRO shall use goodi to achieve the following s: i. Work cooperatively withc o l administrators to establish a h effective administrativereview of truancy repetitive Incidents ith the objective of reducing truancy. H. Refer juveniles r their parents/guardlans to appropriatesocial service agencies for assistance when a need is determined. ill. Instruct ch cl administrators and faculty member in., identification of abused or neglected children; (b) the reporting of abuse or neglect; c the actionsthat can be taken to prevent further`abuse or neglect. iv# Provide educational programs in truancy, abuse, or any other topic mutually agreed upon by the Parties In writing. vim Take appropriate steps, including enforcement and reporting acte , consistent with a policeofficer's u , upon the discovery of child u , drug use, r any other crime. c, The SRO, at his or her discretion, may perform the following" additional t sk$ to enhance school efficiency: 1. Plan School security improvements. i. Prepare law-related educ tion lessons. iii, Develop collaborations wit a ity resources, identifying servis s offered that could benefit students. iv. Conduct School safety s s va Plan In-service training. A. Collaborate withSchool administration to analyzecriminal Incident reports and disciplinary records s a means of Identifying patterns and developing strategies to address problems. vi .Work with ni - sed and youth recreational leadership development ctiviti s that complement and reinforce Schocl safety priorities. viii, Attend training niti_ , Time andPlace f Perfor City it ensure t i a III provide the services under this , Agreement in a full-time, f hour a week capacity l is in session s School requests urin ut® f-s sic breaks. The assigned officer will wear uniforms as authorized by City. b. The "s activities will be restrictedto the assignedl grounds except for: If Follow-up home visits when needed as a result of School-related matt rs. ii. Incentive rc r approved in writing (for example, by it n the policei supervisor n s 's principal, or the principal's designee. ill. In response to off campus, but School-related,criminal activity. iva Attendance at off-campus events or meetings at School's request. . Attendance at training. vi. In response to emergency police activities, li. As directedy any police department supervisor. All.During days that School Is not In session, the assigned SRO shall perform is or r regular duties at a duty station t r in y City. Schools onsi it ti a. School will provide the SRO with an office at School and such equipment and office supplies as is necessary for performance of the dutiesnoted in"this Agreement, including chair,telephone, computer il linkages,and filing c l of being secured, b. Upon termination, all property or equipment used by the Partiesin the performance f their responsibilities n r this i shall remain the propertyof the Party that purchasedthe property or equipment. laWLM929M. By mutual agreement, the Parties y meet from time to time for purposes of discussing the status and conduct of the workinperformed under this Agreement and addressingany problems tt have come to the Parties' attention and this Views ast c such r l s may be l , including amendi r ' conditions of this Agreement. ntir r nt. This Agreement and any attachments represent tir agreement between the Parties and supersedeprior negotiations, representations, r agreements, either express or implied, ri n or oral. It i mutually n rst cd and agreedthat no alterationr variation of the terms conditions of thi r nt shall be valid ! ss made in writing and signed y the Partiesrt . Wriften andin n is shall automatically of the supportinga nt , and shall supersede any inconsistent provision therein; r vi , however, that any apparent inconsistency shall be resolved, possible, by construingprovisions as mutually complementary supplementary. All amendments to this r nt must be in writing approved the city council and school's board. _ 11.Notices. Except as otherwise required , any notice it r permitted iin-der this Agreement shall be in writing n shall be givenpersonal delivery, or y deposit in the United States mail, certified r registered, return receipt requested, st c prepaid, addressed to the s at their respective addresses setf l , or ats thr address' as a Party may designatein writing r t to the terms ofthis section, city:_ ApacheJunction lic Department Attn: i f Police 300 E.Superstition Blvd,Apache Junction,Arizona 85119 With a copy to: City of Apache Junction Attn: Attorney 300 E. Superstition Blvd.Apache Junction,Arizona 85119 School: Apache Junction Unified School District Attn: School Superintendent 1575 W. Southern Ave. Apache Junction,Arizona 85119 With a copy t ; Apache Junction i i District Chief Financial Officer1 T SouthernW. Apache Junction,Arizona 85119 12.Fin r ri tiBackr a k. l represents warrantsthat the meetsSIR all fingerprinting an round check clearancesr AZPOST requirements to serve as o peace officer in the t f Arizona. 1 l r i�tir t � The Parties warrant their respective li with all federal immigration laws andregulations relating to their respective employees ri h Party respectively warr is its respective lwith A.R.S. - 1 y breach of the warrantiesunder this r r ill be deemed a material breach of the Agreement and Is u act to penaltiesup to and including termination of the Agreement, 1 .j2v ili . The Parties each believethat the execution, delivery performance f this r e nt are in compliance withall applicable laws,_ However, in the unlikely event that any provisionf this r nt is declared i + r unenforceable (or is construedrequiring i to do any act in violation f any applicable laws, including any constitutional provision, law, regulation, or i ' _ t such provision shall be deemedsevered from this Agreement and this Agreement shall otherwise remain in full force neffect; provided that this Agreement shall retroactively reformed the extent reasonably possible in such a manner so that t reformedagreement herrelated agreements effectivef t tprovide essentially the same rights benefits (economic and otherwise) to the Partiesif such severance reformation r not required. nl ro i it y applicable laws, the Parties further shall perform all acts andcut 4_ acknowledge r deliver all amendments, instruments consents necessary to accomplishto give effect to the purposesf this r nt, as reformed. 1 . v rni n rn a The terms conditions f this Agreement ail be governedy and interpreted in accordance with the laws of the Statef Arizona. Any action at law or in equity brought by either Party for the purpose enforcing right or rights ri for in this Agreement shall be tried in a courtf competent jurisdiction in Pinal County, Arizona. The Partieshereby waive all provisions of law providing for a changef venue in such proceeding to any other county, In the event either Party shall bring suit to enforce any terms Agreement or to recover any damages for and on account of the breachf any term or condition in this Agreement, it is mutually agreed that the prevailing in such action shall recover ll costs including reasonable ttorn fees to be t r in y the court in such action. 16. uc sso i rat l t ligations and rights created i this Agreement are bindingon and shall inure to the benefit of the Parties 'n their successors, assigns and legal representatives. Neit y may assign, sublet or delegate the duties r n r, without' the prior written approval of the other Party. Such successor or assignee shall assume, in writing, all duties obligations hereunder of the prior party and shall further agree to be bound _n t ,f lty performthe terms of this r t. Cancellationfor Conflict f Interest, City col c t this r o nt is subject tocancellation nc ll tiny either Party pursuant to the provisionsf ARS. § - 18. on r ri tion. Each Party recognizes that the performance y either Party under this Agreement y t o tappropriation of funds to r by that y, Shouldeither Party fall to appropriate the necessaryfunds, that Party y terminate this Agreement as stated herein without further duty or obligation. Each Party agrees to give `c to the other Party as soon as reasonably pos i t after the unavailability of funds comes to the ,s attention, a In ornnifi tion and--lns-gran M. a. To the extent permitted by 1 , c In tutor) covenants n agrees t fully indefend and holdharmless the other Party In omn , its electedn ont officers, ply s, _and agents from and against any andall suits, actions, legal or administrative claims, demands or s o in r naturerelating tot is Agreement, including oy and expert Witnessfees, which, are the result f any act or omission of the Indemnifying i r employees, contractees, agents, and anyoneacting under its direction or control, th r reckless, intentional or negligent, In connection it r incident to this Agreement. If any action or claim shall be brought or asserted against either Party or its directors, officers, agents, t r employees for which indemnify y be sought from either Party, the Parties shall promptly notify one another in writing. The noticed Party shall,-within t` 1 working ys of receiving ch notice, assume the defensethereof, and the payment of all expenses, Including ny attorney fees andall court costs isshall be paidIncurred. b. Each Party warrants that it is properly and adequately Insured for the activities and performances provided is Agreement and agrees to maintain such insurance for the duration of the Agreement. it is understood that either Party may elect to self-insureobtain insurance r h a pooling agreement ith other governmental entities against any or all of the risk related to this Agreement. c. This section shall survive the expiration or early termination of this Agreement, 20.Workers'49 ns tire. An employee of either Party shall be deemed to be an employee" f both public agencies it r pursuant to this t solely forpurposes q n t ArizonaCompensation laws. I y rRshall be solely liable for any workers' compensation benefits, which may accrue. Each Party shall post a noticet to the provisions f - in substantially the following form: "All employees are hereby further notified that they may be required to workr the jurisdiction r control of or withinthe jurisdictional boundaries f another public agency pursuant to an intergovernmental r snt or contract, and under such circumstances they r laws of Arizona to be employees f both public agencies for ur s s of workers' compensation." 21. : llv Education Rights and ri cy 1in nth Parties will ensure that the dissemination and disposition of educational records complies t all times with the Family Educational Rights andPrivacy Act of 1974 s nt amendments thereto. 22.Time Is off_the Essence. Time is of the essenceit s ct to all provisions in this Agreement. Any delayIn performance by either Party shall constitute t breach f this Agreement. 23. r ibition to rnnfrgrt t ti s c n in tt f t t t f Israel. The Parties acknowledge A.R.S. 35-393 through , as " which forbids public entities from n c`ng with entities who engagein boycotts of the Stateof Israel. Should either Party engagen any such boycott against the Statef Israel, this Agreement shall be deemed automatically terminated by operation f law. Any such boycottits a material breach of contract. WITNESS IN WHEREOF, the Parties havecut this Agreement as of the date first set forth v . aCHOOL: { UNIFIED DISTRICT g Chelseally Its: District Board President ATTEST: Board I F CITY OF APACHE JUNCTION, I Arizonau l l I corporation t w Walter"'Chip"Wil n Its: Mayor 0ark r ity 1 STATE OF ARIZONA COUNTY OF L��W ss he 16 sari before this y f tk4 rogol"g was by hA Connolly, rPresident f theApache nti ifi I itrit E A, Rfi G of lip Pu a : issia 5fit2 My Commission Expires: s ,.EX0V*% K20,202Z )ssSTATE OF ARIZONA COUNTY OF PINAL fir i rl n r tbefore me this day of Mayor of Cityh nti n, rig n , rig n ii I c ti nacknowledged that he signedthe fir i nt nt I f i . Notaryl rrI jenniferDPena My Commission it COUNSEL L AS TO FORM: I have read this Agreement and have determinedis in proper form Is red Into withinthe powersf and authoritygranted r the laws f the StateArizona, i try _ __...Attorney, States i have read thisdetermined r t is in proper form and Is t r into r authority r t the laws f the Statef Arizona, City Attorney, Richard J. Stem _ t 12 JunctionApache July 7, 2022 Mayor Chip Wilson and CityCouncil From: Chief Michael Pooley Resolution 22-2 , Apache Junction Unified School District #43 _ IGA Agreement Apache Junction Police Department ) has been asked to partner with the Apache Junction Unified School District #43 J 3) in providing them with e school resource officer )for the Apache Junction High School with the position being filled an AJPD sworn police officer. The position Vill be 100 funded (salary n ne ) by a grant secured by AJUSD for two ) years. AJUSD #43 has committed to pay for any training the officer will need in order to fulfill the requirements of the grant, Resolution No. 22-26 which includes n intergovernmental agreement between the City Apache Junction and AJUSD , AJPD requests council approval of this partnership, The assigned officer would perform the following: • Provide law enforcement and police service to the students, administration, campus and the areas in the immediate t proximity tote school, will take reports, investigate criminal incidents and enforce state and city ordinances. • Regularly patrol the campus to deter criminal or delinquent activities; monitor uniform crime reportingstatistics I ) and act as a'liaison between AJPD and AJHS and • Develop and foster a partnership with AJUSD administrators in order to create secure and safe learning environment for students; assist school administrators to enforce their own policies and procedures; protect school administrators whie weapons and/or illegal drug searches areconducted. • e present in situations whore a student's emotional state may present a risk to other students and staff members; and-work In tandem with school administrators in emergency crisis planning and facility security. • e a highly visible participant within the school community y planning, regularly attending and participating in school-related eventsand functions; and build working relationships with the school's staff n renth Cher organizations. • Develop n teach classes with an emphasis on the positive role of police officers in society and other law-related education topics. • Work with ca e is advisors and behavioral coaches in providing outside agency student services. • Interact it students in the classroom and in the common areas with the intention of promoting law enforcement as a profession and to serve as a positive role model to students, RESOLUTION NO. 24-20 A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, AUTHORIZING THE CITY OF APACHE JUNCTION TO ENTER INTO AN INTERGOVERNMENTAL AGREEMENT WITH APACHE JUNCTION UNIFIED SCHOOL DISTRICT #43 FOR GRANT-FUNDED SCHOOL RESOURCE OFFICERS . WHEREAS, in 2022, through an Intergovernmental Agreement ("IGA") , the City of Apache Junction (`City") and the Apache Junction Unified School District #43 ("School") , entered into two separate agreements (the "2022 agreements") wherein the City assigned an Apache Junction Police Department ("AJPD") peace officer to serve as a school resource officer ("SRO") to the Apache Junction High School and Cactus Canyon Junior High School campuses to assist in the development and implementation of a school safety and educational program; and WHEREAS, in 2022, as per the IGA, the term of the 2022 agreements ends on May 31, 2024; and WHEREAS, the City and the School desire to continue their community partnership by entering into an amendment to the 2022 agreements for all SRO issues (hereinafter referred to as the "First Amendment" as set forth in Attachment A) ; and WHEREAS, pursuant to A.R. S . §§ 11-952 (A) , 15-155 and 15- 342 (13) , cities and schools may enter into IGAs with each other for joint or cooperative activities; and WHEREAS, the proposed First Amendment to the 2022 agreements set forth in Attachment A has been developed to allow the City and the School to continue their community partnership. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION ARIZONA, AS FOLLOWS : 1) The council hereby approves, and the mayor is authorized to execute the First Amendment to the SRO IGA as more fully set forth in Attachment A. 2) The chief of police is also authorized to participate in and designate staff to fulfill all the duties of the SRO program. RESOLUTION NO. 24-20 PAGE 1 OF 2 PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, THIS DAY OF , 2024 . SIGNED AND ATTESTED TO THIS DAY OF , 2024 . WALTER "CHIP" WILSON Mayor ATTEST: JENNIFER PENA City Clerk APPROVED AS TO FORM: RICHARD J. STERN City Attorney RESOLUTION NO. 24-20 PAGE 2 OF 2 ATTACHMENT A FIRST AMENDMENT TO THE INTERGOVERNMENTAL AGREEMENT BETWEEN CITY OF APACHE JUNCTION AND APACHE JUNCTION UNIFIED SCHOOL DISTRICT#43 FOR PROVIDING SCHOOL RESOURCE OFFICERS THIS FIRST AMENDMENT is made and entered into this day of , 2024, ("the Execution Date"), by and between the CITY OF APACHE JUNCTION, ARIZONA, an Arizona municipal corporation ("City"), and APACHE JUNCTION UNIFIED SCHOOL DISTRICT#43, a political subdivision of the State of Arizona, (the "District" or "School"), sometimes collectively referred to as the "Parties" or individually as a "Party". RECITALS A. In July 2022, the Parties entered into two separate but similarly-worded agreements (the "2022 agreements") wherein the City assigned an Apache Junction Police Department("AJPD") officer to serve as a school resource officer ("SRO") to the Apache Junction High School and Cactus Canyon Junior High School campuses to assist in the development and implementation of a school safety and educational program. B. The term of the 2022 agreements ends on May 31, 2024. C. The Parties desire to continue their community partnership by creating one comprehensive agreement modeled after the 2022 agreements for all SRO issues and it shall be referred to as the "First Amendment" to the 2022 agreements. AGREEMENT NOW, THEREFORE, in consideration of mutual promises contained herein and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the Parties agree to amend the 2022 agreements in this First Amendment as follows: 1) Section 1, Services, shall include the following eligible school locations for an AJPD SRO: a. Apache Junction High School, 2525 S. Ironwood Dr., Apache Junction, AZ b. Cactus Canyon Junior High School, 801 W. Southern Ave., Apache Junction, AZ c. Desert Vista Elementary School, 3701 E. Broadway Ave., Apache Junction, AZ 1 d. Four Peaks Elementary School, 1785 N. Idaho Rd., Apache Junction, AZ e. Superstition Mountain Elementary School, 550 S. Ironwood Dr., Apache Junction, AZ f. Peralta Trail Elementary School, 10965 E. Peralta Rd., Gold Canyon,AZ 2) Section 2, Term and Termination. This Agreement shall commence on the Effective Date and shall continue until June 30, 2029 with automatic one- year renewals for up to five additional years through 2034, however, either Party may terminate this Agreement for any reason upon thirty (30) calendar days'written notice to the other Party by first class certified U.S. mail, addressed to the other Party as set forth in § 11 of this Agreement. 3) Section 4(a), Costs and Payments. a) Cost of Wages for Anticipated Scheduled Hours. District agrees to pay City One Hundred Thirty Nine Thousand Six Hundred Seventy One Dollars and Seventy Nine Cents ($139,671.79) plus an increase of up to 10%per year for each SRO who provides services each fiscal year as more fully set forth in Section 5 below, however, the Parties acknowledge that such payment obligation is subject to and conditioned upon School receiving state School Safety Grant funding each fiscal year this Agreement is in effect. 4) Existing Section 5, SRO's Responsibilities and Goals, shall include the following new subsections: (vii) The SRO will partner with School Administrator and the SRO supervisor to meet the needs of the campus for law-related education ("LRE"). SROs shall provide LRE instruction as a prevention activity and opportunity to build relationships. The development and implementation of LRE must be based on a needs assessment. The LRE may be provided virtually, but the LRE reports shall be detailed and presented as per the School Safety Grant. (viii) Complete required training and reports as dictated by the School Safety Grant. 5) Existing Section 7(a), Time and Place of Performance is amended as follows and renumbered as Section 6(a), with existing Section 7(b) being renumbered as new Section 6(b): (a) City shall assign SRO to District beginning on July 25, 2024, except that the Parties shall have flexibility in actual start dates in order to build in SRO prep time before students are physically present on 2 campus for the new school year. City will ensure that the assigned SRO will provide the services under this Agreement in a full-time, forty (40) hour a week capacity when school is in session and as District requests during out-of-session breaks. The SRO will wear uniforms as authorized by City. 6) Existing Section 8, School Responsibilities, is renumbered as Section 7. 7) Existing Section 9, Status Meetings, is renumbered as Section 8. 8) Existing Section 10, Entire Agreement, is renumbered as Section 9. 9) New Section 10, Nondiscrimination. Both Parties shall comply with all applicable state and federal employment laws, rules, regulations and executive orders that all persons shall have equal access to employment and educational opportunities regardless of race, color, religion, sex, age, national origin, disability, veteran's status, political affiliation, and/or genetic code and shall comply with Executive Order 2009-09. 10) New Section 24, Retention and Inspection of Records. The Parties shall retain and shall contractually require each other to retain, all books, accounts, reports, files and other records relating to the performance of the Agreement for a period of five (5) years after the completion of termination of the Agreement and to make such documents open to the inspection and audit at reasonable times. IN WITNESS WHEREOF, the Parties have executed this First Amendment as of the date first set forth above. SCHOOL: APACHE JUNCTION UNIFIED SCHOOL DISTRICT #43, a political subdivision of the State of Arizona By: Dena Kimble Its: District Board President CITY: CITY OF APACHE JUNCTION, ARIZONA, an Arizona municipal corporation By: Walter "Chip" Wilson Its: Mayor 3 ATTEST: Jennifer Pena City Clerk STATE OF ARIZONA ) ) ss. COUNTY OF ) The foregoing was subscribed and sworn to before me this day Of , 2024 by Dena Kimble, District Board President of the Apache Junction Unified School District#43. Notary Public My Commission Expires: STATE OF ARIZONA ) ) ss. COUNTY OF PINAL ) The foregoing was subscribed and sworn to before me this day Of , 2024 by Walter "Chip" Wilson, Mayor of City of Apache Junction, Arizona, an Arizona municipal corporation, who acknowledged that he signed the foregoing instrument on behalf of City. Notary Public My Commission Expires: 5 COUNSEL APPROVAL AS TO FORM: I have read this Agreement and have determined such Agreement is in proper form and is entered into within the powers of and authority granted under the laws of the State of Arizona. Renee Osipov Date District Attorney Richard J. Stern Date City Attorney 6 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.6. File ID: 24-432 Sponsor:Ted Wolff Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of approval of Resolution 24-21, adopting the budget for Fiscal Year 2024-2025 for Streetlight Improvement District No. 2021-02 Coyote Crossing subdivision. City of Apache Junction,Arizona Page 1 Printed on 511612024 Public Works Department City of Apache Junction p Home of the Superstition Mountains MEMORANDUM DATE: May 8, 2024 TO: Mayor and Members of City Council THROUGH: Bryant Powell, City Manager Ted Wolff, Public Works Director FROM: Emile Schmid P.E., City Engineer SUBJECT: Streetlight Improvement District ("SLID") 2021-02-Coyote Crossing Subdivision Resolution 24-21 Adopting the SLID Budget for Fiscal Year 2024-2025 REQUEST Consideration and approval of the Budget Resolution for SLID No. 2021-02- Coyote Crossing subdivision. BACKGROUND The creation of a Streetlight Improvement District ("SLID") is a means whereby the electrical expenses of streetlights are paid by the levy and collection of taxes based on the number of properties within the SLID. SLIDs are created by the submittal of a formation petition, and the subsequent approval of three separate resolutions: 1) the intent to form a SLID; 2) ordering the installation of streetlights within the SLID, and 3) setting forth the initial annual SLID budget. The 12 residential parcels of the Coyote Crossing subdivision have been approved and the final plat has been recorded. Previously, Resolution 21-08 Intent to Form Streetlight Improvement District and Resolution 21-16 Ordering the Installation of Streetlights within the SLID were approved by council (March 16, 2021 and April 20, 2021 respectively) when all 12 lots of the Coyote Crossing subdivision were owned by SIG-AZ who on October 16, 2020, submitted to the city a unanimous petition for the formation of the SLID along with an exhibit showing the boundary of the SLID. The above budget resolution will be on the consent agenda at the May 21, 2024, city council regular meeting for final approval. RECOMMENDATION Staff respectfully requests mayor and city council approve Resolution 24-21 on consent agenda at the May 21, 2024 council meeting. ACTION REQUIRED This item will be for consideration and approval. 575 E. Baseline Avenue, Apache Junction, AZ 85119 Tel (480) 982-1055 + FAX (480) 983-5872 RESOLUTION LUT'I NO. 24-21 RESOLUTION OF THE MAYOR O S CITY COUNCIL CST` THE CITY F APAC E JUNCTION, A :IZONA, ADOPTING THE FINAL BUDGET FOR THE STREET LIGHTING IMPROVEMENTS DISTRICT RIC""T 2 21 02 CCYC E CROSSING, FOR FISCAL YEAR 2024 - 2025 BEGINNING JULY 1, 2524 AND ENDING JU E 30 2025 AND LEVYING UPON THE PROPERTY IN THE DISTRICT CAE BY AN EQUAL APPORTIONMENT OF THE TAXES NEEDED TO PAY THE EXPENSES SES SET FORTH Its THE BUDGET. WHEREAS, in accordance with the provisions of Arizona Revised Statutes ("A EmS ") 45- 1 , the Street Lighting Improvement District 202'1.-02-Coyote Crossing (the "District") , the mayor and l council received the proposed District budget riot to May 21 2024; and WHEREAS, notice of the hearing on the statements and estimates of expenses of the District (the "Budget") was duly published and the hearing conducted, All as required by laws and WHEREAS, the mayor and city council intend to adopt the fiscal year 2024 2025 final budget for the District; and WHEREAS, upon fixing, levying and assessing the amount to be raised by ad valorem taxes on all the real and personal property in the District or apportioned equally upon the number and classification of properties within the District, the city clerk is hereby directed to transmit a certified copy of this resolution to the assessor, recorder and board of" supervisors of Pin al County, Arizona, with a request to collect such taxes in the same manner s general city taxes NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF A ACHE JUNCTION ARIZO A, AS FOLLOWS: 1 End et Ado to ti The District budget attached hereto in Exhibit A in the amount of $226.08 is hereby adopted as the budget of the District for fiscal year 2024 - 2025 . 2. Amount to be Raised Taxes The amount of the District budget set forth in section 1 of this resolution is hereby fixed, levied and assessed as the amount to be raised by the leery of ad valorem taxes on all the real and personal property in the District or through are equal apportionment of taxes based d on the number and classification of properties withi the District . 'There is e.reby levied on each one hundred dollars ( I0g) of assessed value on all RESOLUTION NO. 24- 1 PACE 1 CE 3 property, both real and personal within the District not exempt from taxation, a tax rare sufficient {riot greater than one dollar and twenty cents ( 14 2 ) to provide a fund for the annual expenses of the SAID, said amount to be collected in the same manner as the collection of general city taxes. 2, No Invalidation of Proceedinas. No irregularity in the fixing, levying or assessing the amount to be raised by ad valorem tames or emission in the same, or irregularity of any kind in any proceedings shall invalidate such proceeding or invalidate any action to collect such taxes, including the conveyance of title b any tax deed, nor shall any failure or neglect of any officer or officers to perform any of the duties assigned to him or to then on the day within time specified will be an invalidation of any proceedings or of any action to collect such taxes or affect the validity of the assessment of the budget amount and levy of taxes or of the judgment or sale by which the collection of the same may be enforced, or in any manner affect the lien upon such property for the delinquent annual tees unpaid thereon, and no overcharge as to part of the taxes or of costs shall invalidate an proceedings for collecting of the taxes or the foreclosure, and all, acts of officers de facto shall be valid as if performed by officer de jure. 4 . tldtice of L . The city clerk and city finance director are each authorized and directed to provide the certified duplicate copies of this resolution and such other documents as may be necessary to cause Pinal County to luny, assess and collect the amounts described herein from ad valorem property takes, including the budget, to the Final County Board of Supervisors, County Assessor and County °Treasurer$ s Conflicting Resolutions Re ea d> All resolutions and parts of resolutions in conflict are hereby repealed. PASSED 7D ADOPTED BY THE MAYORAND CITY COUNCIL OF THE CITY OF SIGNED AND ATTESTED TO THIS DAY OF 2 Walter "Chip" Wilson Mayor RESOLUTION NO. 24-21 PAGE 2 OF ATTEST: JENNIFER PEN City Clerk APPROVED AS TO FORM; RICHARD J. STERN City Attorney RESOLUTION NO, 24-21 PAGE 3 CAE° EXHIBIT City of Apache Junction Street Light Improvement District 2021-02-Coyote Crossing Subdivision Budget FY 2024 - 2025 Streetlight Improvement .strict "SLI "") 021-0 Coyote Crossing Number of streetlights Energy cast per month per streetlight Monthly n gy cost for the SLID l . 4 Annual energy cast for the SLID $226.08 Number of residences in the SLID 12 Annual energy leery per residence 84 in the l . City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.7. File ID: 24-433 Sponsor:Ted Wolff Agenda Date:5/21/2024 Index: In Control: City Council Meeting Consideration of approval of Public Works Capital Improvement Plan for Fiscal Years 2025 through 2029. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction ' Home of the Superstition Mountains DATE: MAY 21, 2024 TO: MAYOR AND CITY COUNCIL MEMBERS THROUGH: BRYANT POWELL, CITY MANAGER FROM: ROBERT WISLER, MANAGEMENT ANALYST SUBJECT: PUBLIC WORKS CAPITAL IMPROVEMENT PLAN (CIP) PURPOSE City Staff recommends approval of the Public Works CIP as presented. BACKGROUND/DISCUSSION Pinal Regional Transportation Authority (PRTA) is doing a call for projects from governing agencies in the county as part of the development of a new Transportation Plan funded by a half-cent sales tax that is planned to be voted on by county residents in November 2025. The city intends to submit four projects for inclusion on PRTA's plan - the SR 24, SR 505, Ironwood Road improvement, and Meridian Road improvement. PRTA requires that for local projects to be included in the new regional plan, city council approval is required. Given these two projects are on the Public Works Department's CIP, staff requests that the Mayor and City Council acknowledge and approve the submittal of these two projects to be included in PRTA plan by approving the attached Public Works CIP. ANALYSIS AND RECOMMENDATION If the Public Works CIP is not approved, the city will be unable to submit Ironwood Road and Meridian Road improvements to PRTA and be unable to get PRTA funding for design and construction of these major infrastructure projects. FY25-29 Public Works CIP List Estimated Budget Fiscal Project Name Location CIP Type Scope of Work Cost Year Apache Trail Median Curbs Installation, Construction of curbing around medians. Includes Phase 5 From Superstition Harley crossover to Ocotillo Dr. New Construction scuppers and turn lane extensions where needed. 500,000 FY25 Bank and bottom lining with shotcrete and angular rip Palm Wash Channel Improvement South of 16th Ave.to Renaissance Ave. New Construction rap. 300,000 FY25 North side of Southern Ave.approx.between Design and construction of sidewalk and a maintenance Southern Ave.Sidewalk Infill Mardian Dr.and Delaware Dr. New Construction access driveway to Palm Wash. 400,000 FY25 Palm Springs Subdiv.Curb Installation Curb installation on select streets within subdivision. New Construction Desing and construction of curb&gutter. 750,000 FY25 Ocotillo Dr.Curb/Gutter/Sidewalk Improvement Ocotillo Dr.from 1 st Ave.to Broadway Ave. New Construction Construction of C/G/S. 750,000 FY25 Fiber Optic Trunk Line Extension and Installation of fiber and conduit with connection to traffic Connection to Traffic Signals Ironwood Dr.from Baseline Ave.to 36th Ave. New Construction signals at Baseline and 36th Ave. 250,000 FY25 Installation of storm drain system and widening of Delaware Dr.Improvement From Broadway Ave.to 16th Ave. New Construction roadway including addition of bike lanes. Grant FY25 Installation of storm drain system and widening of Winchester Rd.Improvement From Southern Ave.to 29th Ave. New Construction roadway with addition lane. Grant FY25 Lost Dutchman Blvd.Reconstruction, Reconstruct roadway base and pavement. Install bike Phase 4 From Meridian Dr.to Ironwood Dr. Reconstruction lanes. 1,000,000 FY25 Haven Hallow Subdiv.Street Pavement Includes reconstruction of streets within southern Reconstruction portion of this subdivision. Reconstruction Reconstruct roadway base and pavement. 450,000 FY25 Ironwood Dr.Repave From Superstition Blvd.to Apache Trail Rehabilitation Repave of existing asphalt pavement(mill&fill). 450,000 FY25 Broadway Ave.Repave From Meridian Dr.to Idaho Rd. Rehabilitation Repave of existing asphalt pavement(mill&fill). 1,600,000 FY25 Purchase needed ROW on Ironwood Dr.between Ironwood Dr.ROW Acquistion S.Ironwood between Baseline Ave.and Elliot Ave. ROW Baseline Ave.and Elliot Ave. 500,000 FY25 Superstition Blvd.Sidewalk Ramp Retrofit sidewalk ramps to ADA compliance for following Retrofit From Meridian Dr.to Idaho Rd. Safety/ADA years repave of pavement. 200,000 FY25 Southern Ave.and Tomahawk Southern Ave.trom Weekes Wash to Tomahawk Design and construction of storm drain,roadway Improvement Rd.and Tomahawk Rd.from Southern Ave.to New Construction widening and CIGIS installation. Grant FY26 Southern Ave./Delaware Dr.Traffic Signal Southern Ave.intersection with Delaware Dr. New Construction Design and construction of new traffic signal for location. 1,250,000 FY26 Meridian Dr.Capacity Improvements Ray Ave.to SR24 New Construction Design,ROW and construction for new roadway 6,000,000 FY26 Palm Wash Channel Improvement along Stabilize and shotcrete inslope and floor of Palm Wash Southern Ave. Southern Ave.west of Delaware Dr. New Construction channel. 500,000 FY26 Reconstruction of roadway base and pavement for south South Idaho R.Reconstruction From US60 To Baseline Ave. Reconstruction bound lane.Install bike lane. 450,000 FY26 Superstition Blvd.Repave From Meridian Dr.to SR88 Rehabilitation Repave of existing asphalt pavement(mill&fill). 1,900,000 FY26 Old West Highway Repave,Phase 1 From SR88 to Tomahawk Rd. Rehabilitation Repave of existing asphalt pavement(mill&overlay). 1,100,000 FY26 Apache Villas Sidewalk Ramp Design and reconstruct non-ADA conforming sidewalks Reconstruction Various areas throughout subdivision Safety/ADA within community in prep for street overlay in FY27. 650,000 FY26 Apache Trail/Delaware Dr.Traffic Signal Design and construction of updated sidewalk ramps,ped Improvement Apache Trail intersection with Delaware Dr. Safety/ADA button locations and ped crosswalk facilities. 250,000 FY26 Cactus Ka.ana Auto Can at r. Auto uenter ur.west Or omanaWK Ka.ana uactus Reconstruct roa way oase and pavement. ns a i e Pavement Reconstruction Rd.from Auto Center Dr.to Baseline Ave. Reconstruction lanes. 900,000 FY27 Hilton Rd.Reconstruction From Broadway Ave.to Superstition Blvd. Reconstruction Reconstruction of roadway base and pavement. 900,000 1 FY27 Broadway Ave.Repave From Goldfield Rd.to Arroya Dr. Rehabilitation Thick overlay of pavement. 300,000 FY27 Old West Highway Repave,Phase 2 From Tomahawk Rd.to US60 Rehabilitation Repave of existing asphalt pavement(mill&overlay). 1,700,000 FY27 4th Ave.Repave From Winchester Rd.to Goldfield Rd. Rehabilitation Repave of existing aphalt pavement(overlay). 800,000 FY27 esign,ROW ano construction to widen existing 2 ane Meridian Dr.Capacity Improvements From Guadalupe Ave.to Elliot Ave. New Construction to 4 or 6 lanes. 4,000,000 FY28 esign,Kuvv anci construction to wi en existing ianes to Ironwood Dr.Capacity Improvements From US60 To Baseline Ave. New Construction 4 or 6 lanes. 4,000,000 FY28 econs ruc ion or roa way Dase anci pavement. instan Delaware Dr.Reconstruction From Superstition Blvd.to Lost Dutchman Blvd. Reconstruction bike lanes. 1,200,000 FY28 N.Ironwood Dr.Reonstruction From Superstition Blvd.to Tepee St. Reconstruction Reconstruction of roadway base and pavement. 600,000 FY28 Southern Ave.Reconstruction From Cortez Rd.to Starr Rd. Reconstruction Reconstruction of roadway base and pavement. 500,000 FY28 Design,ROW and construction to widen existing 2 lane Meridian Dr.Capacity Improvements From Baseline Ave.to Houston Ave. New Construction to 4 or 6 lanes. 6,000,000 FY29 Design,ROW and construction to widen existing 2 lane Ironwood Dr.Capacity Improvements From Baseline to Elliot Ave. New Construction to 4 or 6 lanes. 8,000,000 FY29 Design,ROW and construction to widen existing 2 lane Ironwood Dr.Capacity Improvements From Ray Ave.to SR24 New Construction to 4 or 6 lanes. 6,000,000 FY29 TOTAL: 54,150,000 1 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.8. File ID: 24-343 Sponsor: Chip Wilson Agenda Date:5/21/2024 Index: In Control: City Council Meeting Brief summary of intergovernmental updates from mayor and councilmembers. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No.9. File ID: 24-344 Sponsor: Bryant Powell Agenda Date:5/21/2024 Index: In Control: City Council Meeting City Manager's Report. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 10. File ID: 24-437 Sponsor:Jorge Gutierrez Agenda Date:5/21/2024 Index: In Control: City Council Meeting Announcement of Current Events. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 11. File ID: 24-420 Sponsor: Misty Moseley Agenda Date:5/21/2024 Index: In Control: City Council Meeting Conduct a public hearing to receive input and discuss potential projects for the utilization of Fiscal Year 2024 ("FY24") Community Development Block Grant("CDBG") Regional Account ("RA")funds and State Special Project ("SSP")funds. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction W Finance Departivent ATE: May 21, 2024 TO: The Honorable Mayor and City Council THROUGH: Bryant Powell, City Manager Angelie Hawley, Finance Director F Misty Moseley-Helber, Grants Administrator SUBJECT: Public Hearing regarding FY24 CDBG REQUEST Presentation and discussion: 1. Conduct a public hearing to receive input and discuss potential projects for the utilization of Fiscal Year 2024 ("FY24") Community Development Block Grant("CDBG") Regional Account("RA") funds and State Special Project ("SSP") funds. Both programs are federal grant programs administered by the Arizona Department of Housing ("ADOH"). The CDBG RA funding is allocated to the community as long as a viable project is submitted. The SSP funding is awarded through a statewide competitive application process. BACKGROUND Since 1974, the Department of Housing and Urban Development has provided assistance to local communities to address the following national objectives: 1) Meet the needs of low and moderate income citizens; 2) Prevent/eliminate slums and blight in a community; and/or 3) Address urgent needs to the health/welfare of a community. Apache Junction has participated in the CDBG program since 1982. To participate in the programs and receive funds, a community must be able to document that citizens and officials have been given the opportunity to discuss community needs and suggest possible projects. Ultimately, the decision on which CDBG and SSP projects will be submitted rests with the elected officials in a community. During the public meetings the city is required to discuss the following: 1) Objectives of the CDBG Program A. Project benefits the low to moderate income population 1. Will benefit the entire community (if a city currently has a community-wide low-income percentage greater than 51%); 2. Will benefit a specific area of the community (a census tract with at least 51% low to moderate income); or 3. Will benefit a limited clientele as defined by the CDBG program. B. Project addresses slum and blight 1. Within an approved redevelopment area per ARS and ADOH. C. Project addresses an urgent need 1. This is classified under natural disasters (traditionally not eligible for the City of Apache Junction). 2) Type of Eligible Activities Although many projects are considered eligible under the CDBG program, the proposed project must be reflected in the ADOH's Consolidated Plan and Action Plan. Likewise, there are restrictions for projects being submitted under the SSP program including projects considered ready to go which means the environmental review and project design has been completed. Other projects shown preference include housing rehabilitation and equipment purchases. 3) Previous Use of CDBG Funds 4) Amount of Funds Available The City of Apache Junction is anticipating receiving $130,000 in CDBG RA funds. These funds are guaranteed to the community as long as a viable project is submitted for funding to ADOH. This application is due August 1, 2024. In years past, the city partnered with the Town of Payson to receive double funding every other year. The city chose to end that partnership in 2011. The city was approached by Gila County in April 2021 with a partnership proposal which is still in effect. The City of Apache Junction will receive Gila County's portion of funding in FY24, effectively doubling the amount to $130,000. Gila County received Apache Junction's portion of funding in FY23. The City of Apache Junction may submit an application for SSP funds in which the city may request up to $500,000. DISCUSSION Based upon the city's current low to moderate income status (which is 57.07%),the city can focus their CDBG and SSP efforts on projects that meet the following criteria: 1) Benefit the entire community (park improvements); 2) Assist persons within a limited clientele category (seniors, disabled); and/or 3) Assist homeowners who are proven to be low-income (housing rehabilitation). RECOMMENDATION/ACTION REQUIRED Staff respectfully recommends the city council: 1. Conduct a public hearing to receive input and discuss potential projects. 2 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 12. File ID: 24-421 Sponsor: Kelsey Schattnik Agenda Date:5/21/2024 Index: In Control: City Council Meeting Presentation, discussion, public hearing and consideration of Resolution No. 24-09 (case P-23-64-GPA), requested by Jason Barney and John Hartman with Olsen Recker/Guadalupe Properties LLC, and represented by Greg Davis with (plan Consulting for a proposed major general plan land use map amendment to redesignate 18 acres at the southeast corner of US-60 and Goldfield Road from Commercial to High Density Residential. (This is the companion case to Rezoning Case P-23-63-PZ). City of Apache Junction,Arizona Page 1 Printed on 511612024 City ofApache Junction Development Services Department CITY COUNCIL PUBLIC HEARING STAFF MEMO Date: May 8, 2024 To: Honorable Mayor and City Council Members Through: Bryant Powell, City Manager Rudy Esquivias, Development Services Director Sidney Urias, Planning Manager From: Kelsey Schattnik, Senior Planner Case Numbers : P-23-63-PZ & P-23-64-GPA Subject: May 21, 2024, City Council Public Hearing: P-23-63-PZ: Proposed Rezoning of approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") P-23-64-GPA: Proposed Major General Plan Amendment to redesignate approximately 18 acres from Commercial to High Density Residential Summary P-23-63-PZ Is a Planned Development (PD) Rezoning request by Greg Davis with Iplan Consulting, representing the property owner, Jason Barney with Olsen Recker/Guadalupe Properties LLC, to rezone approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM- 2/PD") near the southeast corner of the US-60 and Goldfield Road. The subject site is proposed to be developed with approximately 271 rental units to be known as Silveray on Goldfield. P-23-64-GPA Is a proposed Major General Plan Amendment of APNs 103-01- 0110, 103-01-0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170 and 103-01-0180, located near the southeast corner of Goldfield Rd. and US-60, from Commercial to High Density Residential (40 du/ac) . "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo Planning & Zoning Commission Hearing and Recommendation Due to the requirements for a Major General Plan Amendment, the Planning and Zoning Commission held two (2) public hearings for these cases . The General Plan requires that these meetings be held in two (2) different locations . The Planning and Zoning Commission held the first public hearing for P-23-63-PZ & P-23-64-GPA on March 26, 2024 in the Superstition Fire and Medical District' s Board Room located at 565 N. Idaho Road. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. At this meeting, Staff made a presentation and introduced the preliminary recommended conditions of approval for the Planned Development Rezoning and Major General Plan Amendment. The applicant also made a presentation and answered questions asked by the Commission. Eight (8) residents of Golden Vista Resort spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . Water pressure concerns 3 . Increased density 4 . Property value concerns 5 . Maintaining commercial land 6. Increased traffic The Planning and Zoning Commission held a second public hearing for P- 23-63-PZ & P-23-64-GPA on April 23, 2024 . Both Staff and the applicant gave a presentation. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. Five (5) residents spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . The desire for commercial development at this site. 3 . Increased density. Ultimately, the Planning and Zoning Commission voted 4-3 to recommend approval of P-23-63-PZ & P-23-64-GPA, subject to the conditions of approval that were recommended in the Staff Report, dated April 23, 2024, with the elimination of Project Specific Condition Numbers 1 & 2 . Project Specific Condition No. 1 would have required the developer to reserve 5 acres on the north side of Resort Boulevard to remain commercial. Project Specific Condition No. 2 provided a list of General Commercial Uses that would not be permitted. "Silveray on Goldfield" Cases P-23-63-Pz & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo The commissioners who voted in favor of the proposed development discussed the following: 1 . The benefit of developing a historically vacant property. 2 . The benefit of adding additional rooftops . 3 . Whether this site is viable for commercial use and noted that the approved development plan has been in existence for 20+ years and has yet to be developed. 4 . Recent trends of commercial development. 5 . Not wanting to keep commercial property that may never develop. The commission members who voted against the proposal discussed: 1 . The desire of an ownership product at this site as opposed to a rental product. 2 . The lack of desire to continue changing the voter approved General Plan. 3 . The concern of changing commercial to residential. 4 . Concerns regarding the lack of affordability with market rate housing. Staff Recommendation Staff is recommending approval of cases P-23-63-PZ and P-23-64-GPA subject to the full list of conditions found within the Planning and Zoning Commission staff report, including project specific conditions 1 and 2, which are described below: 1) Lot Numbers 1, 3, 4 and 5 of the existing Superstition Falls Subdivision shall remain zoned General Commercial by Planned Development ("B-1/PD") . 2) The permitted uses in the B-1 zoning district shall be those which are permitted by Zoning Ordinance, Article 1-5, § 1-5-3: Non-Residential Use Regulations, except that the following uses shall not be permitted herein: Motor vehicle dealer (new or used vehicles; and similar uses) ; Thrift store/used merchandise sales; Medical marijuana facilities and dual licensees; Swap meets; Tattoo and/or piercing services; Death care services/funeral homes; Commercial parking lots and garages; Check cashing stores; Psychiatric and substance abuse facilities; Nursing and residential care facilities; Homeless shelter; Community food and relief services; Commercial equestrian boarding, rentals, arenas and academies; Cemeteries/mausoleum; "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo Scenic and sightseeing terminal/parking; Assisted living facility; Group care home; Multi-family residential (including apartments, condominiums or townhouses) ; Similar uses designated by the Development Services Director not conducive to the City' s and community' s goals and objectives for successful community commercial development. City Council Work Session - May 6, 2024 On May 6, 2024, the City Council reviewed cases P-23-63-PZ and P-23- 64-GPA at a work session. This item was for presentation and discussion only. The Council primarily had questions regarding the proposed size and location of commercial zoning being recommended by Staff, why Pinal County was opposed to the General Plan Amendment, and details as to why surrounding residents were opposed to the project. Major General Plan Amendment Please note that a major general plan amendment requires a 2/3 majority vote (5 out of 7) of the Council for approval . If the general plan amendment is not approved, the rezoning case cannot be approved. Three motions are required: • Major General Plan Amendment (Resolution No. 24-09) • Planned Development Rezoning (Ordinance No. 1547 and Resolution No. 24-08) Attached: - Planning and Zoning Commission Staff Reports and attachments (March 23, 2024 & April 23, 2024) - Resolution No. 24-09 - Ordinance No. 1547 - Resolution No. 2408 "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo 1 From: Annette Braun <abr n2999 gmail.c m Tuesday, March 21,2023 9,32 A Kelsey Schattni [External] Rroadstor e Silvery development Good morning Kelsey, Gary and I live at 3710 S Goldfield Rd, and are very opposed to 2 story homes in the proposed development across from Goldfield Rd e have had this property since 2€ 18 and enjoy the views of Superstition Mountains.There are approximately 1000 residents whom enjoy these vies from across from this proposed development.Please note our objections to 2 story homes in this development. Thank you. Gary and Annette Braun Sent from my Wad t From: bdecorte( ml.rroccarrr Sent- Wednesday,April 12,2023 2:23 Pivl m Kelsey Schattni Subject- [External) Broadstone Silveray Development Kelsey, I am again writing to oppose the Brtaadstone Silveray proposed development near the southwest corner of the US 60 and S.Goldfield Road. I have recently become aware that there is an underground drainage system running through the property. There is a lame circular iron plate at the south end of the property near the La Dolce`vita development an just off the existing sidewalk which is,by the way, used by many walkers); If the development is approved, I was in hopes that the land would be reduced to level with the sidewalk and street before building SINGLE STORY HOMES on the existing elevated berm. I am concerned with the lass of the mountainous view from Malden Vista,located directly across the street:I purchased my property can the East wall of the restart because of this view and am concerned with the lass of property value if the scenic view is lost; 4 have also learned that there is a"wash" located toward the back of the proposed building site. Please acid this letter to my original communication ated March 27,2023. Thank you for your time and consideration regarding this proposed housing development, Sincerely, Carol De Corte Golden vista Resort Lot 481 Apache Junction,AZ 8511 I bdecorte@m.rr.com Sent: Monday, March 27, 0 3 Z. 9 Pt t Kelsey Schattnrk [External] BROADSTONE SILVERAY DEVELOPMENT Kelsey, 1 am writing to oppose the 6roadstone Silvery proposed development near the southwest corner of the US 60 and Goldfield Road. 1 am a resident and property owner in Golden Vista Resort,directly opposite the proposed planned development. This will directly affect my property value. 1 purchased this particular property in the resort because f the views of the typical desert area across the street and the spectacular views of Superstition Mountain, Slily Mountain, and the further mountains 1 am from Michigan. THIS VIEW 1S ARIZO Ali The proposed development will most certainly block mostof my view and therefore,decrease the value of my property located on the east wall of the resort. 1 urge the Apache Junction planning and Zoning Commission and the City Council to carefully consider the impact this proposed development will have on the neighboring community of Golden Vista and it's resident's property values and views. 1 am also concerned about the impact on our water system with the addition of this many new homes needing water. We,in Arizona,are continually reminded of the need to conserve our water usage because of drought conditions in recent years. The increased traffic and noise on goldfield is also a concern, not to mention the extended period of building disruption on goldfield and increased difficulty of golden Vista residents exiting our resort through our East Gate and Making a left turn. We will also be experiencing increased traffic on goldfield from new residents in the development south of Baseline Rd as they turn north on goldfield to access Highway 60, 1 understand the proposed development is a mix of 1 story and Z story houses, if the city should chase to approve development of this land, 1 would suggest the developer revise their plan and to build the Z story homes only north of the gas station,and therefore not blocking the golden Vista entire View,as would happen on the existing proposed snap of the community." Thank you for your time and consideration regarding this proposed building. Sincerely, Coral DeCorte Golden Vista Resort Lot 481 3710 S.goldfield Rd. Apache Junction,AZ 85119 t connie wigley <cywi @gmail.c m Sent: Thursday,March 23, 2023 4122 P g Kelsey Schattni Subject JExternall Broadstone Silveray Deveopment I am Connie WigieV and I live at 3710 S Goldfield rd.Apache Junction,AZ. I appose any 2 story buildings being built across from Golden Vista Resort;We bought in this area because of the view of the Superstition Mountains and the rural surroundings. This development will cause Mauch more traffic and will put an even greater strain on our water usage: Sincerely,Connie y Wigley Kelsell I Diane Breitbach <d ane.br itb ch r°na l.c m Sent Friday;March 24,2023 :57 AM Kelsey Schattnik Subject: ]External] Broadstone Silveray Development consideringHello Kelsey, I am a resident of Golden Vista Resort at 3710 S Goldfield Rd, Apache Junction, AZ 85119 and I understand that the property across the street from Golden Vista Resort has been sold and the developers are r concerningll increase traffic immensely in our area. With one and two story homes, that can imply a two or three car household, which causes a huge influx in the already busy streets. During months, we have the added traffic of the Renaissance Festival and i year the LPGA in reviewing planning r this development. r consideration Sincerely,appreciatedl Diane Breitbach Kelsey i Glenn Nelson <norskinelson@hotrmail.coi Thursday, March 23 2023 1026 a Kelsey Scattnik Subject- [External] Broadstone Silveray Deveopment e are on the wall of Golden Vista Resort with the mountains toward the east. We are very concerned of the information of the development that is planned to be developed on the east side of Goldfield Road. Our park is a property owned parka We may be temporary, but we have a stake in AZ and what happens locally or even state- ide e understand that two story houses are planned to be put up. We, my wife and I would prefer to see single level housing. We enjoy the view,have concerns of a two story site that would"allow persons of the second story to look down at our park residents/homes,and are concerned of the desired land/home owner that would e coming into the development. f, and all possible,we would suggest that the homes be a single level. Another concern for gas is Internet availability. Our park has struggled to have a reliable internet distribution within the park. We are finding that Internet providers are struggling to catch up to the growth, And this can also relate tot e cell phone. As a member of the utilities committee, I would like to be informed of plans of these two products and if possible, be provided with conversations or discussions of plans for the area. We are very concerned of a Internet provider within the park and if plans for a more reliable provider were combined into the development, this would provide the means to gain a more reliable internet program. Thank you for your consideration and review of the information above. Glenn and Josephine Nelson Lot 479 1 Kelsey Sc aftnik Lanny Aderman <Iraderrr an@yahoo coo Sent* Thursday, March 30,2023 810 PIv1 Kelsey Sc atmi [External) Silvery Development ► Kelsey, 1 am writing you with hopes that the development planned for the southeast corner of US 60 and Goldfield Rd will he re- considered to limit homes to one story. l understand that 2 Stagy homes are being planned for this development which will really restrict our view of Superstition Mountains. We live in the Golden Vista Resort across the street from the proposed development. Thank you for considering our request. Sincerely, Lanny Aderman Golden Vista resident. 3 313 Sent from yahoo Mail for iPad t Pam Oswald <p osa ld heatrn il.com Sent: Sunday, arch 26 2023 .33 AM Kelsey S h ttni Subject: [External] Proposed Silvery Development along S.Goldfield Rd. [am contacting you regarding the proposed horsing development near the corner of US-60 and Goldfield Rd. We own property in Golden Vista Resort along Goldfield Rd.,and enjoy our view of Silly Mountain and the Superstition Mountains. It would be very sac[ if 2-story homes are built as that would destroy viers of the nature and the mountains. Please consider limiting the new horses t -stagy so they don't obstruct views and try to keep all of Apache Junction more rural with scenic views for everyone. Thank you! Jim and Para Oswald Sent from Mail for Windows t Kelsey i Ron ward <cam r @hotmail.com> Sent: Wednesday, March 15,2023 141 PM Kelsey Schattni Subject: [External] l roadstone Silty ray Kelsey,We live at 3710 S Goldfield Rd lot 474 and are very apposed to the two story homes planed for the Broadstone development.Ail the surrounding homes are one stor : wd story house's will block the views of the mountain from old nwista the view is why we bought in Goldenvista, Thank you. Ronald Ward Sent from my iPhone t 4/3/24,9:21 AM Mail-Kelsey Schaftnik-Outlook [External] Silvery Development Candy DeBroux <cdebroux7@gmail.com> Sun 4/16/2023 1:57 PM ToXelsey Schattnik <kschattnik@apachejunctionaz.gov> Dear Ms. Schattnik, I am reaching out as I have heard of a proposed residential development being considered at the southeast corner of South Goldfield Road and Hwy 60. 1 would like to express my opposition to the development as planned. My husband and I specifically purchased our home in the Golden Vista Resort with our backyard on Goldfield Road so we can enjoy unencumbered views of the Superstition Mountains. To learn a development is being planned across the road from us with TWO STORY homes which will block our views is very disheartening. I strongly believe that any development being considered in this area should be limited to one story construction in line with the other homes in the area. The recently built Goldview subdivision (northwest corner of Hwy 60 and Goldfield Rd is all one story. Golden Vista is all one story_. Dolce Vita is all one story. There is no reason two story buildings should be considered in this neighborhood, especially to the EAST of existing one story homes. With the construction currently underway of thousands of new homes in Apache Junction to the south of Baseline Rd, there is ample opportunity for two story homes in those newly developed areas which would not impact existing homeowners. I realize the planning board and developer do not care about my ability to enjoy my backyard views, but please understand this also would inevitably reduce the value of our home (and our neighbors) once our views are gone. I would also be interested to know what plans are being made to accommodate the additional traffic on Baseline and Goldfield roads created by all these new homes along with water needs for thousands of new residents. We are constantly being reminded of the limited water supply in this area and the need to conserve water which makes me wonder where the water for all these new residents is going to come from. If this plan is allowed to proceed, I ask that only one story buildings be allowed in the development to preserve the views of the thousands who already live here. Thank you for your time and consideration of my concern. Sincerely, Candace DeBroux 3710 S Goldfield Rd, Lot 482 Apache Junction, AZ https://outlook.office365.com/mail/id/AAQkADhiMmEOMzlmLWUwMzgtNGRkNSlhOWViLTIlZGM3YjVhNzcOZQAQAH%2BXYdsR6HBDpnUsLWTQ7... 1/1 1 Sally Craiger <mscr lger@ msn.com> Sent: Monday, March 27,202 2:52 PIA Kelsey Schattnik Subject: [External) Broadstone Silveray, US 60 @ Goldfield Rd,AJ,AZ Good Monday,Kelseyl e have been year round residents of Golden Vista Resort,3710 S Goldfield Rd,tot 386,AJ,AZ for 10 years. Our primary concerns of the new development are water&traffic,All of AZ is still in major drought yet all we see is building&more building for more residents.yes,the tax dollars are important but we all need water to survive. Can Goldfield Rd support the traffic of this large new development? hat are AJs plans for water resources&traffic issues with any new evelopment7 e see the signs have Rene up, "New domes Coming Soon;" is Broadstone Silver ay a done deal? Superstition Vistas,almost building homes,will add hundreds of vehicles to US 60 @ Goldfield Rd. What's the plan for all of this new growth in AP Please add our concerns to the project case file. Thank you. Sally&Mike Craiger 480- S - 15 i From: Sharon Kinnan <golions28@gmaii.corn> Sent: Monday,October 23,2023 .S?AM Greg Mavis c Kelsey Schattnik Subject: - Re. (External) Silveray development plan on Goldfield Good morning Greg, Thanks for your response. Sharon n Sun,Oct 22,2023, 11:54 PM Greg Davis re iolanconsuutin oom wrote: Hello Sharon and thanks for reaching out to us about this proposal: No worries about missing the meeting—most of what we will present was in the letter and email is a great way to continue the conversation for any questions you have: Regarding water,the City of Apache Junction is the water provider and they have accounted for the eater to be used for this property in their 100 year Certificate of Assured Water Supply(CAWS). in fact,our proposal will actually reduce the anticipated water(along with sewer and electrical)demand for this property as the site is currently approved for much more intensive uses.The project will be served by a combination of existing and new lines in goldfield Road an Resort Boulevard.The City requires extensive modelling and testing to ensure existing residents do not see a drop in water pressure and if upgraded Braes/equipment are needed to avoid that scenario,they will require us to install them prior to any residents moving into our project:Water is an important issue in mulch of Arizona and fortunately the City ofApache Junction has planned ahead for properties such as ours to ensure an adequate supply exists foreveryone in the City. Regarding the potential height of the project,we were anticipating the concern over the loss of the views which is why we are limiting our development to 2-stories(30-feet)which,is what its permitted on the parcels around our property and we are doing more than just voluntarily limiting the height—we are actually snaking it a written part of the zoning approval(via the RD overlay)which means that any development,whether it be us or a future project,will have to comply with the 30-foot proposed height limit UNLESS they decide to go through the rezoning process again which will require another complete public process including a new neighborhood meeting and new public hearings. it is certainly possible for some future developer to propose that,but 1 can tell you from experience it is always much harder politically to increase height allowances in a situation like this where you have existing neighbors who care about their view,We recognize that we will be impacting the view of the Superstitions from some parts of the community since nothing is there today to obscure it(besides the Chevron canopy),but we hope the 30-feet proposed is a fain compromise given it is approve for 5-feet today. Hopefully l have answered your initial inquiry adequately, if not,or if you have additional questions,please let me know. Greg r 3/20/24 z:oopm Mai|'nvmvvSohaunix-Ovnoox RE: [External] S^lveraVdevelopment plan on Goldfield Greg DDV3 <gr8g@iplODCOOsUlting.[O0> Sun 10/22/20238:54PK4 To:3haron0nnan <go|ions7O@gmai|zom^ [cKe|seySchattnik <kszhattnik@apmchejunrhonazgov' Hello Sharon and thanks for reaching out tous about thisproposa|. No worries about missing the meeting...most of what we will present was in the letter and email is a great way to continue the conversation for any questions you have. Regarding water,the City of Apache Junction is the water provider and they have accounted for the vvaterto be used for this property in their 100yeer Certificate of Assured Water Supply(CAWS). In fact, our proposal will actually reduce the anticipated water(along with sewer and electrical) demand for this property asthesite is currently approved for much more intensive uses. The project will be served bya combination of existing and new lines in Goldfield Road and Resort Boulevard. The City requires extensive modelling and testing toensure existing residents do not see a drop in water pressure and if upgraded lines/equipment are needed to avoid that scenario,they will require us to install them prior to any residents moving into our project. Water|sanimportant issue in much of Arizona and fortunately the City of Apache Junction has planned ahead for properties such as ours to ensure en adequate supply exists for everyone in the City. Regarding the potential height of the project,we were anticipating the concern over the loss of the views which is why we are limiting our development to 2-stories (30-feet) which is what is permitted on the parcels around our property and we are doing more than just voluntarily limiting the height...vve are actually making it a written part of the zoning approval (via the PD overlay) which means that any development,whether it be us or a future project, will have to comply with the 30-foot proposed height limit UNLESS they decide to go through the rezoning process again which will require another complete public process including a new neighborhood meeting and new public hearings. It is certainly possible for some future developer to propose that, but | can tell you from experience it is always much harder politically to increase height allowances in a situation like this where you have existing neighbors who care about their view. VVe recognize that we will be impacting the view ofthe Superstitions from some parts of the community since nothing is there today to obscure it (besides the Chevron canopy), but vve hope the 3Ufee1 proposed is a fair compromise given it is approved for 45-feet today. Hopefully | have answered your initial inquiry adequately. |f not, orif you have additional questions, please let me know. Thanks, ...an~'' Gre9 [aVi5 48[].227A50 GhegOip.|aDcomUlt(n4.CzM From:Sharon SharonKinnen <Qo|ions78@gmaiicom> Sent:Sunday, October 22, 2O23 3:39PIVI To: Greg Davis<gneg@ip|anconsu|dn8zom> Cc: kschattnik@apachejunctionacgov Subject:Si|veraydeve|oprnent plan on Goldfield Dear Greg, Thank you for inviting residents the informational meeting at Golden Vista Oct. 24th. Unfortunately, | amunable to attend. However, | would like to ask e few questions and provide comments on some concerns that were not mentioned |n your letter. hnpu:8o"Uonk.mffioe3O5.onm/mai|/id0\AQkADh|MmEOMz|mLmUwMzgtNGRkNS1hOVVVLT|1ZGM3Y]VhNznOZQAQxHf3Jx|yOxBPiRnNvf\/ODXQY�3D 112 3/20/24 z:oopm Mai|'nvmvvSohaunix-Ovnoox The 1st and most important in this day is water. Where will it be coming from and how will this additional need affect existing residents' use? Second is the elevation. Your letter states that the plan istoVOLUNTARILY limit the height to 30feet, but voluntarily does not limit what actually can happen and who knows how long it will be before a developer changes plans and chooses to&oto4O foot height. Part of the beauty of this area is the Superstition Mountains and it would be very disappointing to loose that view. I have copied Kelsey Schattnik in this email to be sure AJ Planning and Zoning is aware of my concerns. Sincerely, GharonKinnan Owner a1 Golden Vista RVResort xopo:6h"Uook.mffioe3O5.00m/mai0d0\AQkADh|MmEOMdmLmUwMzgtNGRkN31hOVVVLT|1ZGM3Y]VhNzoOZQAQxH0Jx|yOxBPiRnNvfvDDXQ%3D 2/2 3/20/24,2:35 PM Mail-Kelsey Schattnik-Outlook [External] Silvery Development Lanny Aderman <Iraderman@yahoo.com> Thu 3/30/2023 8:10 PM ToXelsey Schattnik <kschattnik@apachejunctionaz.gov> Hi Kelsey, I am writing you with hopes that the development planned for the southeast corner of US 60 and Goldfield Rd will be re-considered to limit homes to one story. I understand that 2 story homes are being planned for this development which will really restrict our view of Superstition Mountains. We live in the Golden Vista Resort across the street from the proposed development. Thank you for considering our request. Sincerely, Lanny Aderman Golden Vista resident. 3/30/23 Sent from Yahoo Mail for iPad https://outlook.office365.com/maii/id/AAQkADhiMmEOMzlmLWUwMzgtNGRkNSlhOWViLT11ZGM3YjVhNzcOZQAQALg3ZzAoENFNjm3TeeD2mwM�/� Kelsey 1 From* Shelley Kaste <Ion li irl@ ahoo.com Saturday, March 25,2023 3:19 p T Kelsey Schattnik Subject: [External] Broadstone Silveray Development Dear Kelsey Schattnik, My husband and I live in Golden Vista Resort. The reason we chose GV Resort is because it is on the outskirts of town and close to superstition mountains, We enjoy the closeness to trails, the quietness, less traffic and;of course; the Superstition mountains,We purchased our tiny home here knowing that we own the lot and trailer and only pay county taxes and an HOA fee. If a new development goes in across the street,with two story family homes,what does that mean for us(sere at Golden Mists Resort? It means more noise, less view, more traffic, more property tax and special assessments. 1 think that would also discourage others from purchasing here, so thus, bringing our resale values down as well. Please let me know if there will be a town hall meeting on the subject,we would like to attend, if we are here. Thank You, Shelley Kaste Golden Vista Resident t 1 ti4/23,8:19 AM Fie:f External]Proposed silver ay project-Kelsey Schattnik-Outlook [External] ilry project Kelsey Schattnik <kschattnik@apachejunctionaz.gov Wed 11/8/2023 553 PM i Sammy, Thank you for reaching out to the City of Apache Junction with your thoughts and concerns regarding the proposed Silvery Development near the southwest corner of the US-60 and Goldfield Road. I will add this email to the project case file and staff spirt,which will be passed along to the Planning and Zoning Commission and City Council. I will also ensure that you are on the list to be notified of the public hearings ranee those are scheduled. Please feel free to reach out with any additional questions or concerns! Best, Kelsey Kelsey S hattnik,GEED Green Associate Senior Planner l Development Services Department City of Apache Junction,AZ 4 0 474-5 i kschattaaik aparh lunctsnn g Hour .Monday-Thursday Tarn- paai;closed on Fridays. From:Sammy sar rray r n4 ya o .co o Sent:Wednesday,November 8,2023 3:38 Ali] To* Kelsey Sc atmiik<kschattnik@apachejunctionaz.gov Subject: [External] Proposed sliveray project 1 als y,This area is made up of 55 and over parks and just mast is single family httpsi rsdt rr, dwlaC ustcaCirrlMj qQf- v5A CdpgnVfiiIvIlvI&r=Nsp ZGggel1J i rt- FT7 ° r► S tl l l c p K0 a7fAu iF.,Zg M1 igUsti- A F 710p Is Alit r C i 1F =13rt Im f * lay ' n C h xKVuDozO5uNN5mgkwuD YM&e= thoughts are to much traffic and vandalism and theft if the proposed sed project of apartments move forth.[ would like to sea a nice 55 and over community r single family homes go its R ntal property I believe would devalue ray property in Golden Vista R sort. f it goes commercial with a hospital or restaurants the twenty four hour lights Mould be uncomfortable .It is inevitable to not have- development but something with lass hustle and bustl ,perhapsa single level strife ma l.l'm familiar with owning rental property and managing aging property and 1 duet°t like ghat it would bacom .1 don't think Apache.Jct has a police dept to to handle a big rental property like this and then there is fire protection and wat r.` ou have old people out here that like their life style and it would be a big disruption and life style changa.l would like to be on the retailing list for further public meetings on this.Sammy Green, 7t1 bout ank 112 4/24/24,9:26 AM Mail-Kelsey Schattnik-Outlook [External] Correspondence to Commission et al Michael David Myers <stainedglasspoetry@live.com> Tue 4/16/2024 5:23 PM ToXelsey Schattnik <kschattnik@apachejunctionaz.gov> April 16, 2024 Dear Mr. Jesse Gage, Ms. Robin Barker, Mr. Ari Kalan, Ms. Sheryl Bigelow, Mr. Richard Cantwell, Mr. Dirk Begeman, Mr. Nick Leftwich, and Ms. Kelsey Schattnik, In Mr. Tom Lange's April 15, letter he notes the 2023 - 2024 donations that full time and part time Golden Vista residents donated to Apache Junction agencies and groups. In 2022, while I was President of the Stained Glass Club in Golden Vista, I donated handmade stained glass earrings and suncatchers to Arizona Coalition to End Sexual and Domestic Violence. The sale of these items raised $700 which provided direct service to victims and survivors of sexual and domestic violence. Each year I make stained glass service stars and donate these to Veterans, spouses of Veterans, First Responders, and personnel serving Police and Fire Departments. In addition, one resident in Golden Vista, Mr. Dennis Douglas, spends most of his time in Golden Vista's Workshop making small cars, trailers, and firetrucks from scraps of wood. For the past ten years, Mr. Douglas has sold these at the Annual March Artisan show in Golden Vista. He donates all the money generated to the Paws and Claws Care Center on Baseline. The other groups that Mr. Lange referred to in his letter have made donations every year. Since 2014, these donations total over $100,000. Mr. Leftwich's April 9th letter to the Commission states: "As new developments or rezonings are proposed, Planning Staff, the Planning and Zoning Commission, and the City Council must evaluate the highest and best use of commercial properties..." After the April 9 meeting, Mr. Lange gave Mr. Leftwich his drawing of the proposed commercial development on 8 acres. Mr. Lange's letter provides detailed information regarding his vision of the "Goldfield Gulch" development. Please consider that Mr. Lange's vision within those 8 acres IS the highest and best use of that property zoned commercial. When a developer is found, Mr. Lange's commercial vision will be a destination for some and a welcome addition for residents nearby, and all future residents. Tax dollars will be generated for Apache Junction. Please follow the recommendation of Mr. Patrick Roberts, Senior Planner, Pinal County Development Services who stated in his October 17, 2023, letter to Ms. Schattnik, in NOT supporting Silveray: "Pinal County staff would not offer our support (of the proposed Silveray development). Staff finds the request to convert the 18-acre subject site may detract from prime commercial parcels South of US-60. The location of these parcels having access to an arterial roadway and a major highway offer potential for higher levels of traffic consistent with retail requirements and exceeding the trip generation typical of a https://outlook.office365.com/mail/id/AAQkADhIMmEOMzlmLWUwMzgtNGRkNSlhOWViLT11ZGM3YjVhNzcOZQAQAD%2B%2Fnn%2BPTIZHunhXyj... 1/2 4/24/24,9:26 AM Mail-Kelsey Schattnik-Outlook multi-family development. The presence of such roadways may encourage the market area of potential commercial opportunities to support communities that are more distant and may attract revenue to Apache Junction. Proximity of existing residential uses to the site promotes a pedestrian scaled commercial development that may support existing residential development on both the West and East sides of the proposed development. Such commercial parcels would also support expansion of additional multi-family projects to the South, which are supported at present by the Pinal County Comprehensive Plan. Development of this multi-family project to the south of the General Commercial land-use designated parcels would be consistent with the High Density Residential land-use designation present within the Pinal County Comprehensive Plan. Staff would be amicable toward multi-family development south of the proposal area provided commercial designations remain that would support residential growth:' If you choose to change zoning to all or part of the 18 acres to high density resident, kindly consider keeping 8 acres zoned commercial and only support a one story owner based residential development for the remaining 10 acres. I hope each Commissioner will be influenced by the comments and concerns voiced by residents of Golden Vista. Golden Vista contains over 1000 tax paying homeowners in Apache Junction who will be negatively impacted by the proposed Silveray development. Although we have a vested interests in recommending that you do not support the Silveray development, we also believe such action will be the highest and best use of the property, and therefore better for all who live, visit, and will live in Apache Junction in the future. Before your next meeting, please walk along the sidewalk along Goldfield Road outside Golden Vista, then along the Dolce Vita entrance between the two parcels. With that in mind, please recommend to the City Council not to approve the Silveray development. Sincerely, Michael D Myers 3710 S. Goldfield Road #852 Apache Junction AZ 85119 https://outlook.office365.com/mail/id/AAQkADhiMmEOMzlmLWUwMzgtNGRkNS1 hOWViLT11ZGM3YjVhNzcOZQAQAD%2B%2Fnn%2BPTIZHunhXyj... 2/2 April 15, 202 Kelsey Scttnik Senior Planner, Development Services City of Apache- Junction 300 E Superstition Blvd Apache Junction, AZ 85119 RE: SILVERAY PROJECT Dear ids Schttnskt This letter to you and the Zoning Planning Commission will eve to update you with a couple fall owup points re the proposed SILVERAY development project on Goldfield Rd since my earlier letters of February and March 19, 2024 which contained - 170 signatures of Golden Vista Resort residents apposed to the development as proposed. While we are now resigned to the fact that: the beautiful pristine parcel of undeveloped land across Goldfield Rd from our resort will not be preserved for a City of Apache Junction Park, we are still hopeful that your imminent zoning change f this parcel can be limited to l--Story residential as opposed to the 2-Story residential. proposed by the SILVERAY developers.capers. We implore ore-both you and the Zoning & Planning Commissioners to please keep in mind that this arse parcel is surrounded on 3 sides by Story owner-occupied (for the most part) aver-55 residences. Our Golden Vista Resort (G R) has a 20' height restriction placed can homes by the city of Apache Junction. So it dregs the question, why should the City now approve s zoning of 30' high 2- Story r rental ( ! ) homes directly across Goldfield act from us which would significantly block our views of the Superstition Mountains? ! Also, the 27 s ) cunt high density of these proposed rental homes, along with more than a planned combined total of 500+ parking spaces all oted between garages, carports and open--air spaces, significantly would add to the local traffic on Goldfield Rd which already experiences bumper-to-bumper tracked up traf ice on Renaissance Festival weekends in February & March by these attempting to bypass the backed up traffzce on Hay 50m 1 single- story residential development would, of course, necessitate larger footprint for each building thereby reducing the number o residences and hence, the traffic. Single-story residences, whether owner-occupied or rental like the "Havenly upscale Rental" single starer residences currently being built near City Hall, would attract moreover- 5 residents which would be more in keeping with the current makeup of the surrounding neighborhoods owner-occupied vs rental residences should also be considered for this vacant parcel already surrounded by owner-occupied homes t is no secret that owners generally take more pride in the appearances of their residences over the hang term than do renters. also, homeowners ners take more civic pride in their communities as a whole. Just look at the attached list of donations our GVR CHRISTIAN WOMEN'SASSOCIATION has rude to Apache Junction and other nearby areas in 2024 alone! Nearly , 000 of the total money raised 11 34 ) from three resort patio sales and weekly can collections was donated to outside causes ! Only $2, 500 of the money raised was kept for causes within our own resort. Furthermore, all donated items not solved during the 3 four-hour patio sales were donated to Sunshine Acres Thrift Shop for their help in housing & supporting children and teens from problem homes. Additionally the GVR VETERAN'S a donated $6,000 out of $10,000 raised thru their weekly resort breakfasts to area veteran groups ! Both the Arizona Honor Flight veteran's group as well as the Final County veteran's center in Cass Grande received $3, 000 each from the GVR Veteran's Club. The GVR Chapel Services donates $2,000 annually to a needy area student as scholarship $ to attend a local technical college; GVR angel Tree Group collects up to_ 5,000 annually for kids at Christmastime, these funds are sent to City of Apache Junction who then disperses the funds in part to the Fire & Police depts, 'P '& for school kid's snacks . The VR tattler's Musical group donates $1,000 annually to Apache Junction high schools for their music programs. Also over 650 1s of food was donated by GVR residents to the Apache Junction Food Bank Now, ask ourselves: Would the proposed rental community be as civic-minded and generous?! Finally, the issue of possibly zoning some of this 1. -acre parcel for commercial/retail is a reoccuring topic with Zoning & Planning for both continued tax lase income to the City as well as area employment opportunities. The current developers cite 'lack of rooftops', i_e, lack of enough nearby bodies/customers for commercial & reta.il enterprises having little or no interest in this land. Perhaps the developers are only considering 'Big Box Stores' and like commercial enterprises? Please consider the following vision for what could be an exciting retail corridor development for either the current or other developers; Zone the entire approximately 3--acre parcel of land running parallel to and south of Try 60 as "A Planned Condominium RETAIL Pub" with aWestern-like 1. 1's Old 'Town Theme! With the - 1, 100 1 homes already in place plus the Dolce Vitae Resort and the new residential on the other 10 acres of the parcel in question fronting Goldfield lid and Resort Blvd plus the new developments going up south of Baseline, evert only the year-round local residents of the immediate area and the additional potential customers from : srrounding communities generated by the high visibility of this parcel from Hwy 60 should assure year-round customers enough to keep this kind of retail development lucrative! o many of 11 year-round residents would Like a nearby "destination cluster" of retail establishments that we could walk to, bicycle to, scooter to, etc; places like the following could be successful in a themed Western Old Town such as this s o maybe 3 'blocks' long with vide covered & railinged walkways along the store fronts; the :buildings would have manufactured, 'weathered woad' storefronts including the false cold western upper building facades of varied designs. 'These would be outlined in various colors of neon to attract motorists along Hwy 60. The walkways and building fronts could be lighted by old- style western & pedestrian friendly lantern lights There would e parking bath along the fronts of these 'Old Torn' blacks as well as ample parking behind, accessible by two drive-thru 'sheets' dividing the 3-blocks of establishments. Are 'architectural.' & business 'approval' ee l/cap it ee would initially approve businesses for this retail/restaurant/commercial corridor in keeping with the 1880's western theme, ie, no cell h ne, - fast toad chain stares, etc, would be allowed to buy into the condo-commercial i evelo e e t unless they could prove they would embrace the Cold West theme for their building & enterprise. After sufficient businesses have opened here the developers would religuist their architectural/approval functions to self-governing board of existing business condo owners Just consider.der the possibilities! !! This "GOLDFIELD GULCH" could have a central Saloon similar to the cold western TV show "Gunsmoke", The Long ranch possibly with a Beer Carden on one side and a restaurant can the other; a coffee shop & bakery would open at 6 or 7am, to attract people out for a morning walk or a strap beforework; a barber shop with lighted red & while pole of course, a hair & nail. Balers, an cold Time Ice Cream shop; both a General (Grocery) Store and a Mercantile (Hardware) Store both of these stores would offer more selection than a typical convenience store, but less than the 'Big Box' concerns miles away, the they could be satellites of these parent stares; a Boot Hill. Western ?ear;-sou eniers & jewelry; a Liquor/Beer & Wine shop with tr ve-thru; even a bank or S&L with drive th u; (each of the two preceding stores would be Located on the ends of the two streets that would pass between the 3 blocks of shags for drive--thr : convenience. Perhaps the local Police dept tight even fund a satellite "Sheriff's Office" & locate it on the corner opposite the drive-thru liquor store and close to the Saloon, visibility of which alone might help to 'keep the peace' . The police would not need regular hours, they would use the office on a came & go irregular day & night basis as a place to use a personal staff restr om, write up reports, eat their lunches, even have a short nap in the single io-1 cell equi. ed with single cot as long as a partner is also there for immediate response calls. A "Doc's Urgent are" would fit right in; as would a Stage Coach Depot Cafe/Deli ; an antique or consignment shop would e: ideal; a florist; a dry cleaner/tailor/laundry; an "I . rant's PizzaParlor." All fain and convenient shops & stares for us local residents and for tourists sts in the winter season. The development might be anchored can either side by a smaller but old--style elegant " r ha '° h a showing low-royalty-cost older movies, even time honored 's, Beath of which would keep ticket costs lower for all those over-55's who miss going to a good movie close by, t attinees included can heat afternoons and evenings without the h ssels of modern day purchasing of tickets online, also catering to those who resist trying to watch DVD's at home due to the hassels of tying to get their TV's back to TV mode. The opposite side of GOLDFIELD GULCH might sport a bawling alley r a roller rink/arcade (also to give area teens a place to ) ; even an ,ice Rink! (The 1, 2 5 population groups of GVR alone are Minnesotans, Wisconsinites & ;Canadians respectively! ) Each of the -block stretches of the establishments could have a central public "OuthouseAlley", known as 'Central, East & WestAllies' as well as some restr oms within various establishments 'Though different shops would have different opening and closing times as chosen by individual owners, the entire GOLDFIELD GULCH would close down at ll m leaving only a few parking lot/street/walkway lights for security, GOLDFIELD GULCH. "Build it and they will come! " Both retailers and customers ! Z ;;; i Thomas F Lange 710 S Goldfield Fed, Apache Junction, AZ 85119 4 CO to to to hi NJ NJ to to Us to to to yu 54 to X3 CD CO ctx to n to In 0 to —. �O fp ft� tfr e go ` iaxZT CA �r Ot I. vy to to To to to to to «. CA CA CA CA CA Is 0 CA CA to tA cy CA CA i 8 t NJ NJ t $ t t $ t t $ to i t t 8 t0 44 CM to of CA v 9 3 t t & 1 d :. On P on No in w —�- Ln { t t! Q dy h WD 4 CL SO CPA It c N 9 — 8 I co ul 1p A 4 0 In No CA C to i x�t J cm 0 co Co C CM t " w a µ ffi Kelsey Schattnik t Senior Planner/Development Services Dept, City of Apache Junction Dear Ms Sc a ik: e the undersigned,are writing to voice our concerns about the 2-story, high density, 0- it rental home development referred to as" ilveray"which is proposed for the land on the east side of Goldfield Rd south of Hwy 60, We are all residents ofGolden Vista e rt,an over -age community directly across the street from the proposed development. Of course, this large -story development would greatly obstruct our views of the Superstition Mountains but we are opposed to this high density rental development for a number of reasons for"the common good.. The development would be built on currently pristine undeveloped land which affords beautiful views of the Superstition Mtns. These views are enjoyed not only by us and other surrounding age® +communities but by so many Apache Junction locals&visitors alike,as is evidenced by the many vehicles that sometimes pull over to the side of Goldfield Rd, flashers on,for a quick minute,to appreciate and snap a couple cellp Otte p otos of the unobstructed view of these majestic mountains. This even includes busy tradespeople in their company trucks and vans. The greater the light how on the mountains or dramatic the cloud formations are,the greater the number of people that stop for a moment of awe:When there is the infrequent snow on the mountain it can become a parade of appreciators! Once this exquisite land parcel is given over for development it would be lost forever tot e public domain. Our Q is this. Would it be possible for the City of Apache Junction to put forth n appeal for would-be benefactors to come forward with donated funds so the City could purchase this land, assuming the City has no funds to do so,for a public p k?l This beautiful parcel of land could then be slowly groomed into a relatively low-maintenance park as more funds might come available.Development oft e park could be done in phases. Initially a contest might be held for area landscape architects and students of that discipline to submit master plans forte park in exchange for name recognition only over the years. Once a Master Plan is approved, Phase#1 could be a recontouring ofthe shallow drainage ravine into a retention pond that would benefit wildlife and enhance the future park. Phase#2 might be grading and paving of bath a one-way roadway with a wide designated bicycle lane winding around the inside park perimeter; separate pedestrian-only paved walkways would meander thru the grounds. This way all park users would enjoy their own spaces. The roadway and walking paths could be done forte most part casing the existing,natural contours of the land.To keep maintenance costs low only indigenous plants,trees and flora would be planted.Where would be NO athletic or c ildren's play facilities for the same reason. No lights would be needed for this y, dusk-to-dawn park where the singlegate and separate skit gate would locked unlocked of ce at the appropriate times on their regular rounds, Phase#3 might be restart s d a few shaded picnic pavilions,all placed to minimize obstruction of mountain._ views from GoldfieldOver a 20-year period,let's say,this pedestrian friendly park could become a jewel in the City of Apache Junction Parks system with many city residents coming out oftheir way to enjoy a peaceful walk here while communing with nature. Currently there is nothing like it within miles. However, if a park is completely out of the question for this exquisite Ian arcel,we would i Altar the i 1 n an e e ,etc tc li it e o `n trr sin le stt owner ccu ied ca es.given if it is a density cta ity like t e recently c feted roect at the Hwy 60 exit at Goldfield Rd they would no doubt sell out quickly for the developers given the fantastic views the homeowners would enjoy. The undeveloped strip of land running parallel to Hwy 60 and to the east of the Chevron gas station could remain zoned commercial for future restaurants,offices and ` e lie. With the high visibility they would have from the highway these commercial enterprises should be quite successful. Finally, the key issue here is the need to limit any residential evel ent to sin sto in lee ing th e s ca in taus o iesA a 2�sto development would attract families vtth c ild e teens;ntat at all i ee ing t e up oft e immediate ei orhoo s. -story development,therefore,would also mean much greater water usage and higher traffic levels;already ors pe ch wltd iaf e en °ss e Festival we have chaotic traffic hacked a on t l field eli t?. d a is already destined to get worse with the 1 p 0(+?!)residences being built south of Baseline at Ironwood beyond. On behalf of all of us we thank you for your careful consideration to these matters. Sincerely, u a F. Lange, et al 310 S GoldfiId lid,#48rcle 17- (03 Print name 10 kro-hiol v0ay, Print N"4_�� L. t# 2 -7"rat Lit ",NPrint Lit Print Lot# Print Lest# Print 1 Lot# Print Lot Print Lest 4 Pratt Lot# # Print t Lot# Print . t Print Narne: OA) ))a a-1.40 Lot# a7q Tart �t dr1t rLnt tit# `5 93 Print Name- Lot# Print Name: �,�3t# rint a Lot# rt Name- (5�rintNam Lot# trot Lit# v t w Print(�14) Lit## Print Name- LXY )eA Lot r Print NamelA7ZIle Lot# Print List DMrint Name: K rvi Lot# O?-q Print N s��l Lit ca �fv) Print Name- Lot## Print NwneLt t# 02>rint m �Yl Lot (��n ` t Lct## 03SPrint Name. - Lest Printcat -307 Print I Lot �6 fn OITT of rir ct Print Narne --Lo—t# Print Narne. Lot 603it Name.f-rct i t e. tit�# m Name:Print # VI ant b cat PrintName, cat ��VprintNarmne: Lot Y�ve L rizt gat Print # ,�33 cat rant a Lot # { 312-rixatName: L of# rt 4 Lot# rrr�t L, t# d.�L7 ra I tit Print t rint IDS -' L sit Ot/>0 Print Name: Lot # Z4.40 )IPrint Name: Tntli _rint at rat Lot# rint Nam o 6D5 rir WrintLot# rint4 Print e: Lotp ) Print `r1 1 Sae gl-v- 5 o # r n Lo # Print Lot rin : _ of# OrintN of Lot rrint b) Print ; t 707 tint e- itxt I t t tilt €: tit 6)Print Name: -Ov 1�fa� Lot Print » Lit t Print Name: r Print N .apt Z_:Prnint Lot# zat Lot Print gat d ' t gat# rint Name "` -- PrintNamme: cat rat -Lot# riot Lot#rz - t # Y m �t �T Print fill tic Print Lot# Print Print Nye: LLrent Lot Print t Print Lot L 1 -5 CIL Arly-� Erit t" t-# rat t Ist r rintLot# o'ZO (,C:,)rint ; -L-t-# -,2,�O rint Nwne: C\\a 0 5 Lot rintName- ,�)rint Pit _# �o Lot Lot# Fruit rin a rilnit Name: )rint . a t ' �i t 0 t .. ., rint Name, int 7t at . ��k' ��J�-- �L 0 1�# )rint . Ub Lot 5C4 N-" print e Lot rint I ` . Lot nt t t cat rt At �rninl cat# Print(/0)17 I --v2-7 t Print N t riot Namt # Print N n Print Name: Lot# (/3]jjrint P Name lkt Print Nanlek-Jd�kt,�I�-�a��4w ., Font N m " nt Lot# Print Name: Lot !)7Print 4 rrt �Lot Print rnt Nam # C/V-3 _Pj . t O rtrt 0 # rit ; Lot 4 �.,t ptNgn Lot#-22—1 Printt tint N.--e: D L # Print Lot # (3 Print(/ t D3rint Name: jkdyn�aqbot#-51 t it r° t It riot e Lot "rat Lot# rt Fruit I t : P rint xi Lot 0)PrintName: t int t�,cat rinit Name: T R 4 Lot t Print ht rit . t Lot rant t Print . t 17Jti t g Vicinity Map P - 23 - 63 - PZ & P - 23 - 64 - GPA Planned Development ("PD") Rezoning Request from General Commercial by Planned Development ("B-1/PD") and General Commercial by Planned Development ("B-1/PD") to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") and a Major General Plan Amendment from Commercial to High Density Residential . 71 i II r 171 � (a �aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa r a } i i Pr 4 k � a e 9 ' b m � rMHP/PD r Subject Sites N , w _ Date: 12/14/2023 MMOM s. 1 broadStonc vc ra Traffic Impact Analysis South of US-60 East of Goldfield Road in Apache .junction, Arizona '< August 2022 Project No. 22-1180 Prepared For: Alliance Residential Company 7135 East Camelback Road, Suite 360 " Scottsdale, AZ 85251 For Submittal to: Arizona Department of Transportation Town of Apache Junction Prepared By: • IvTech 10605 North Hayden Road Suite 140 Scottsdale, Arizona 85260 480-659-4250 ALLIANCE BROADSTONE SILVERAY TRAFFIC IMPACT ANALYSIS South of US-60 and east of Goldfield Road in Apache Junction, Arizona Prepared for: Alliance Residential Company 7135 East Camelback Road, Suite 360 Scottsdale, AZ 85251 For Submittal to: Arizona Department of Transportation Town of Apache ]unction Prepared By: d 0�,SS10NA( CivTech Inc. �, '\\OCAr,�. GI) Q) Y0 a �7 10605 North Hayden Road v'-r SEAN D. { Suite 140 MESSNER Scottsdale, Arizona 85260 °r Office: (480) 659-4250 tie ' Fax: (480) 659-0566 ' ONA 05 ' August 2022 CivTech Project No.22-1180 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis TABLE OF CONTENTS EXECUTIVE SUMMARY .....................................................................................................1 INTRODUCTION ...............................................................................................................3 StudyRequirements...........................................................................................................3 StudyArea ........................................................................................................................3 HorizonYears....................................................................................................................3 EXISTINGCONDITIONS...................................................................................................5 LandUse...........................................................................................................................5 SurroundingLand Use........................................................................................................5 RoadwayNetwork..............................................................................................................5 Intersection Configuration ..................................................................................................6 TrafficVolumes..................................................................................................................7 CapacityAnalysis.............................................................................................................10 Future Roadway Improvements ........................................................................................11 CrashHistory...................................................................................................................11 PROPOSED DEVELOPMENT.............................................................................................12 SiteLocation ...................................................................................................................12 SiteDensity/Intensity.......................................................................................................12 SiteAccess......................................................................................................................12 TripGeneration ...............................................................................................................13 Vehicle Trip Distribution And Assignment...........................................................................16 Future Background Traffic ................................................................................................16 TotalTraffic.....................................................................................................................16 TRAFFIC AND IMPROVEMENT ANALYSIS.......................................................................23 Turn Lane Warranting And Queue Length Analysis..............................................................24 SightDistance Analysis.....................................................................................................27 CONCLUSIONS ...............................................................................................................28 LIST OF REFERENCES.....................................................................................................29 TECHNICAL APPENDICES...............................................................................................30 CIVTech August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis LIST OF TABLES Table 1 — Level of Service Criteria for Controlled Intersections................................10 Table 2— Existing Peak Hour Levels of Service.........................................................11 Table3 — Intersection Crash Data Summary.............................................................12 Table4—Trip Generation..........................................................................................14 Table 5— Site Trip Distribution .................................................................................16 Table 6— Peak Hour Levels of Service.......................................................................23 Table 7— Driveway Right-Turn Lane Analysis...........................................................24 Table 8—AASHTO Sight Distance Requirements ......................................................27 LIST OF FIGURES Figure1 —Vicinity Map................................................................................................4 Figure 2— Existing Lane Configurations and Stop Controls........................................8 Figure 3 — Existing Peak Hour Traffic Volumes ...........................................................9 Figure 4—Site Plan and Access.................................................................................15 Figure5 —Trip Distribution.......................................................................................17 Figure 6 —Site Generated Traffic Volumes................................................................18 Figure 7 — 2024 Background Traffic Volumes ...........................................................19 Figure 8— 2027 Background Traffic Volumes ...........................................................20 Figure 9 — 2024 Total Traffic Volumes ......................................................................21 Figure 10 — 2027 Total Traffic Volumes ....................................................................22 Figure 11 — Proposed Lane Configurations and Traffic Control.................................26 CIVTech L August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis EXECUTIVE SUMMARY Alliance Residential Company proposes the development of a 275-unit multi-family residential complex located south of US-60 (Superstition Freeway) and east of Goldfield Road on property that is currently undeveloped desert landscape. Access to the site is provided by four (4) future access points along Resort Boulevard and one (1) future access point along Chevron Access. CivTech, Inc. has been retained by Alliance Residential Company to perform the traffic impact analysis for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. The following conclusions and recommendations have been documented in this study. GENERAL • The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/ 94 out) trips during the AM peak hour, and 139 (89 in/ 51 out) trips during the PM peak hour. • The existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564 (388 in/ 176 out) trips during the AM peak hour, and 747 (294 in/ 453 out) trips during the PM peak hour. o The proposed land uses generate approximately 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/ 399 out) fewer PM peak hour trips than the existing zoning allows. CRASH HISTORY • In total, there were 13 incidents within the study area from 2018-2020. There was a total of 15 injuries and 4 fatalities. EXISTING • The results of the existing conditions analysis indicate that all study intersections operate with acceptable levels of service (LOS B or better). OPENING YEAR • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. 2027 CAPACITY ANALYSIS • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. CIvTech 1 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis QUEUE STORAGE • The recommended storage lengths are provided for study horizon year 2027 using the total traffic projections. SIGHT DISTANCE • Sight visibility should be provided at all driveways according to the distances and sight triangles at public intersections should be maintained according to Section 10-3-4 of the City Code. C*1vTech 2 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis INTRODUCTION Alliance Residential Company proposes the development of a 275-unit multi-family residential complex located south of US-60 (Superstition Freeway) and east of Goldfield Road on property that is currently undeveloped desert landscape. Access to the site is provided by four (4) future access points along Resort Boulevard and one (1) future access point along Chevron Access. The vicinity of the site is provided in Figure 1. CivTech, Inc. has been retained by Alliance Residential Company to perform the traffic impact analysis for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. STUDY REQUIREMENTS This study analyzes the traffic impact due to the proposed complex on the surrounding street network. The study has been prepared in conformance with the Arizona Department of Transportation (ADOT) Trafc Engineering Guidelines and Processes (TGP) Section 240 Traffic Impact Analysis and Statement, August 2021. The specific objectives of the study are: • To determine whether the planned street system in the vicinity of the site is adequate to accommodate the increased traffic that results from the proposed development. • To recommend additional street improvements or traffic control devices, where necessary, to mitigate the additional site-generated traffic; and, • Evaluate the internal site circulation and provide recommendations if necessary. STUDY AREA The study area has been defined as including the following intersections: • Goldfield Road & Old West Highway • Goldfield Road & US 60/Old West Highway Exit • Goldfield Road & US 60 WB Off-Ramp • Goldfield Road & US 60 EB Off-Ramp • Goldfield Road & Chevron Access • Goldfield Road & Resort Boulevard • Chevron Access & Resort Boulevard HORIZON YEARS This study has been conducted to conform to ADOT TGP 240 Traffic Impact Analysis and Statement, prepared by ADOT in August 2021. Based on trip generation rates in the 111" edition of the Institute of Transportation Engineers' (ITE) Trip Generation Manual, the proposed development is anticipated to generate more than 100 but less than 500 trips during the highest peak hour. Therefore, ADOT requires the TIA for this development to evaluate the opening year and three years after build-out. It is assumed that the complex will open during 2024. CIVTech 3 August 2022 }r31 { a 010-0144 € 3 NORTH P 1I N �t L p C o u V "}e V �o `4 O/ Pq NZ Cm c� �y1aj wsRam p chevron Access '"60 Resort Blvd SITE € Figure I.- r Vicinity a Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis EXISTING CONDITIONS LAND USE The existing site is an approximately 17-acre section consisting of 7 parcels of undeveloped desert landscape. SURROUNDING LAND USE Surrounding the site are primarily single-family residential developments and retail uses. Approximately a mile north of the site is Mountain View Lutheran Church, Crossroads Southern Baptist Church, and some single-family homes. The existing Chevron gas station is located in an outparcel on the western edge of the project area and southeast of the site is a mobile home resort. East of the site is predominantly undeveloped land with single-family residential homes east of Mountain View Road. West of the site is more single-family homes and Golden Vista 55+ Resort. Per TGP 240, the project corresponds to a 'Small Development' and would require a Category I analysis. Such a TIA requires analysis of site access driveways and "adjacent signalized intersections and/or major unsignalized street intersections within a minimum of 1/2 mile." ROADWAY NETWORK The existing roadway network within the study area includes Goldfield Road, Old West Highway, US- 60 Highway, Chevron Access, and Resort Boulevard. Goldfield Road is a north-south road classified by the City of Apache Junction as a principal arterial roadway. South of Old West Highway, Goldfield Road consists of two travel lanes in each direction with a center two-way-left-turn lane (TWLTL); north of Old West Highway, Goldfield Road consists of only one lane in each direction of travel. Goldfield Road begins at the intersection with Baseline Road, south of the US 60, and continues north until terminating at the intersection with Lost Dutchman Boulevard. The posted speed limit is 35 miles per hour (mph) within the vicinity of the site. Old West Highway is a southeast-northwest road classified by the City of Apache Junction as a principal arterial. Old West Highway consists of two lanes in each direction of travel and a bicycle lane, separated by a 65-foot median along the entire length of road. Old West Highway begins east of the intersection with State Route (SR) 88 after transitioning from Apache Trail and continues southeast until merging with Goldfield Road at the northeast corner of the proposed site. The posted speed limit is 45 mph within the vicinity of the site. US 60 (Superstition Freeway) is an east-west United States highway north of the proposed site. Just east of the Goldfield Road interchange, US 60 is a divided highway with two travel lanes in each direction separated by a 45-foot raised median. West of the Goldfield interchange, the US 60 becomes an access-controlled freeway. US 60 provides direct access to SR-202, SR-87, SR-101, SR- 79, SR-188, I-10, and Old West Highway via an off-shoot just before the Goldfield Road interchange. The posted speed limit is 65 mph within the vicinity of the site. Chevron Access is a curvilinear unmarked driveway with a width large enough for one (1) lane of travel in direction. Chevron Access is located east of Goldfield Road and north of Resort Boulevard. There is no posted speed limit. CIvTec "1 5 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis Resort Boulevard is an east-west local road with one (1) lane in each direction of travel. Resort Boulevard begins east of Goldfield Road and terminates approximately 860-feet east of Chevron Access where it becomes Dolce Vista Way. There is no posted speed limit. INTERSECTION CONFIGURATION The intersection of Goldfield Road and Old West Highway (SE bound lanes) is a three-legged unsignalized "T" intersection with a stop sign on the southwest-bound approach. The southeast-bound approach consists of one dedicated left turn lane and two (2) through lanes. The southbound approach consists of a dedicated left turn lane only. Please note that the left turn lane intersects Goldfield Road "behind"a waiting westbound vehicle. Therefore, the movement is considered to be an approach to the next intersection. The intersection of Goldfield Road and Old West Highway(NW bound lanes) operates as a three- way/four-legged unsignalized intersection with a stop sign on the southwest-bound approach. The northwest-bound approach consists of two through lanes and a bicycle lane; there is a "no left turn"sign on this approach and right turns are channelized. The southeast-bound approach is a single left turn lane. The southwest-bound approach consists of one through lane and a dedicated right turn lane. The through lane goes across this intersection to allow for left turns onto southeast-bound Old West Highway. The intersection of Goldfield Road and US 60/01d West Highway Exit operates as an unsignalized "T" intersection with stop control on the westbound approach. The northbound and southbound approach consist of two (2) through lanes. The westbound approach consists of one (1) dedicated right- turn lane. The US-60 WB off ramp is a one-way road that allows access to the northbound Goldfield Road or northwest-bound Old West Highway, The intersections of Goldfield Road and US 60 Ramps operate as a diamond traffic interchange within the vicinity of the site with protected-permitted left turn phasing on the northbound and southbound approaches. The northbound approach consists of one dedicated left turn lane, two through lanes and one dedicated right turn lane. The westbound approach consists of one dedicated left turn lane, one shared left-turn/through/right-turn lane and one dedicated right turn lane. The southbound approach consists of one (1) dedicated left turn lane, two (2) through lanes and a dedicated right turn lane. The eastbound approach consists of an exclusive left turn lane, one (1) shared left- turn/through/right-turn lane, and one dedicated right turn lane. The intersection of Goldfield Road and Chevron Access operates as a four-legged unsignalized intersection with stop control in the eastbound and westbound approach. The northbound approach consists of two (2) through lanes and one (1) dedicated right-turn lane. The southbound approach consists of one (1) through lane and one (1) shared through/right-turn lane. The eastbound and westbound approach consist of one (1) shared left/through/right-turn lane. The intersection of Goldfield Road and Resort Boulevard operates as a "T" intersection with stop control in the westbound approach. The northbound approach consists of one (1) through lane and one (1) shared through/right-turn lane. The southbound approach consists of two (2) through lanes and a TWLTL that allows storage for left-turns. The westbound approach consists of one (1) shared left/right-turn lane. C i v T e c h 6 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis The intersection of Chevron Access and Resort Boulevard operates as a "T" intersection with stop control in the southbound approach. The southbound approach consists of one (1) shared left/right-turn lane. The eastbound approach consists of one (1) shared left-turn/through lane. The westbound approach consists of one (1) shared through/right-turn lane. The existing intersection lane configurations and traffic control is illustrated in Figure 2. TRAFFIC VOLUMES CivTech engaged Field Data Services of Arizona, Inc. to record traffic volumes at seven (7) study intersections within the project vicinity. Peak hour volume turning movement counts were performed from 7:00-9:00 AM and 4:00-6:00 PM on Thursday, July 13, 2022. Peak hour turning movement counts were conducted at the following study intersections: • Goldfield Road & Old West Highway • Goldfield Road & US 60 WB Off-Ramp (north) • Goldfield Road & US 60 WB Off-Ramp • Goldfield Road & US 60 EB Off-Ramp • Goldfield Road & Chevron Access • Goldfield Road & Resort Boulevard • Chevron Access & Resort Boulevard The existing traffic volumes observed for this study are presented in Figure 3 for the weekday AM and PM peak hours. Traffic volume data obtained for this study have been included in Appendix B. C*1 v T e c h 7 August 2022 � to��� t 4% } 4t" r4 LEGEND NORTH 13 7 Thru or Turning Movement Traffic Signal a Two-Way Left Turn-Lane Stop Sign Raised Median Aq P"'. Seed Limit Yield Sign 0 Bike Lane Qf�y Channelized Turn LaneEV t Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB X ° 4 4' "n�'�Bi#LNW:grfifiattSY�Si+h+7t4.W.%'hWLWSW'P?P%WWWWiu`"v"c":'{'3�Jd�'rt`"'tW,3�'U%t daT7tiu{,"a,`!"(%'s£Y7"i84}YStW¢FW4W.sk}v1+%ie�d+8£vfifi"> W%')fk"aW`aWtW::Si Yd4fNFLSi�.rck};ft`a'k"%i';ft'.?.6'^"'"%3S)"P?Y'§.Bk,F a'3`{�"21kN8?+hr<r l ui�y!ytSyt,%r,SY U5';7PWti+',i Wti& eW4fttil&vT{i3.WttfiStfW%f;'�?���'3fPdtStkW4a`R?'�!M`%"§tWR!sir"UW"tte"%ai'sJ";W'F:+W"fk`S,sNttSWWWsW'�R ''fG7G.;S"u'%'it6".iCi3a;�.�'��`�'yW&N`YfiYFSZd#.di:A+S°:,WASWsi+4r�°w>F,St;§':W;dM1�S%'2FA'ai rtW"yY uYaB,"%F'{4W4�lkS4d444 .,a d.,;Is,�Wy�ys- ..._ bRamp Chevron AccessdyQ 6` S Resort Blvd SITE r Yh"i trT"nt�t ` r 35 Goldfield Rd&US-60/Old West Hi hway Exit Aft On �i fit. 4tr l. t s, { s art i.rs{r�z�tjsr},�t{sS�ef,trr. tiLg;;Y4f4tYr���,+L,�3Lrr, Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Figure 2.- Existing n nfi r ti s and Traffic controls �n. ® • r ® ® ® ® ®® ® CivTech � , ,Nk,,, : r A o�V4 N I , a cc: 0/ .. ( Legend NORTH �..../,1 :.._ __�: ...�.- ..._..._._.� XX(XX)-AM(PM)Peak Hour Traffic Volumes _ '. WB Ramp Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB . .t��.:u>sasa*�r�2a':.sth�,;�t. rsss�s«s+r='.,txe'}z'ns^aitrr�rr✓nscrrr .rzrewaw,.nut�.:�$wa Hr~"iutr>vw��, ,snsscz x�azsnmxsm sel'„ yae u �+: utc ,x :sr xrees„ P , EB Ramp � ssg� ki. Chevron Access -w 60 Resort Blvd. SITE Goldfield Rd&US-60/Old West Highway Exit -------------------------- 2 { F: f' rl f � 1 i Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Figure t Existing TrafficVolumes • • • • • ® ® ®® ® CivTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis CAPACITY ANALYSIS Peak hour capacity analyses have been conducted for the study intersections based on existing intersection configurations and traffic volumes. All intersections have been analyzed using the methodologies presented in the Highway Capacity Manual(HCM), Updated 2016, Special Report 209, and using Synchro software, version 11.0 under the HCM 6th edition (2016) methodology. The concept of level of service (LOS) uses qualitative measures that characterize operational conditions within the traffic stream. The individual levels of service are described by factors that include speed, travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six levels of service are defined for each type of facility for which analysis procedures are available. They are given letter designations A through F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions. Levels of service for intersections are defined within ranges of average control delay per vehicle, the number of seconds a vehicle can expect to wait due to the presence of a traffic control device. Table 1 lists the level of service criteria for signalized and unsignalized intersections, respectively. Table 1 — Level of Service Criteria for Controlled Intersections . . A <_ 10 <_ 10 ..................................................................................................................................................................i......................................................................................_. B > 10-20 > 10-15 ........ _:: C > 20-35 > 15-25 ..........................................................................:............................................___.....________________.._................................_........_.._...._................................. D > 35-55 > 25-35 ..: .....:: _...::: _...:: __...> E > 55-80 > 35-50 .. ......... ......... ......... ........ .........( .J. ......_.. ....... ......... ( ._..� ..). ......... F > 80 or v c> 1 > 50 or v c > 1 Source:Exhibits 19-8,20 2,21-6,and 22-6,Highway Capacity Manual, 611 Edition(2016) Synchro 11.0 software calculates the LOS per the HCM 6th edition (2016) methodology. The 61h edition HCM documents the signalized LOS calculation methodology which takes into account lane geometry, traffic volumes and cycle length/phasing to compute LOS. Synchro analysis worksheets report individual movement delay/LOS and overall delay/LOS for signalized intersections; unsignalized intersection worksheets report the worst-case delay/LOS and the average overall intersection delay. Results of the existing level of service analyses are shown in Table 2 for both AM and PM peak hours. The existing conditions analysis worksheets have been included in Appendix C. C*1vTech 10 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis Table 2— Existing Peak Hour Levels of Service Bill ® ® ® . Goldfield Road and Old West Highway SEB 1-way Stop (WB) WB Left A (A)1 ) EB Thru B (B) 2 Goldfield Road and Old West Highway NWB 2-way stop (EB/WB) WB Thru B(B) WB Right A(A) 3 Goldfield Road and US-60/Old West Highway Exit 1-way stop (WB) WB Right A (A) NB A(A) (A) A 4 Goldfield Road and US-60 WB Ramp Signal SB WB A(a) Overall A(A) NB _ _A(A) (A) 5 Goldfield Road and US-60 EB Ramp Signal SB EB A A (D) Overall B (B) NB Left A(A) 6 Goldfield Rd &Chevron Access 2-way stop (EB/WB) SB Left A(A) EB Shared A(A) WB Shared A(A) 7 Goldfield Road & Resort Boulevard 1-way stop (WB) SB Left A (A) WB Shared A (A) 8 Chevron Access &Resort Boulevard 1-way stop (SB) SB Shared A (A) EB Left A(A) The results of the existing conditions analysis summarized in Table 2 indicate that all study intersections operate with acceptable levels of service (LOS B or better). FUTURE ROADWAY IMPROVEMENTS Upon review of the City of Apache Junction ongoing construction projects and current ADOT projects, there are no additional improvements proposed by ADOT or the City or Apache Junction within the study area. CRASH HISTORY Crash data for the study area was obtained from the City of Apache Junction for the last three (3) calendar years for which data is available (2018-2020). Crash data for all study intersections were provided. In total, there have been 13 incidents within the study area since the beginning of 2018. All crashes occurred at intersections along the length of Goldfield Road within the vicinity of the site. The summary of intersection crash data is presented in Table 3. CIVTech 11 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis Table 3 — Intersection Crash Data Summary Rollo Goldfield Rd&Old West Hwy SEB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ............................................................................................................................... ......................................... .............................................................................................................................I........................... Goldfield Rd&Old West Hwy NWB s 3 1 2 0 ' 4 1 0± 2 0 0 0 0 1 0 0 -- .: . - - - .I......: _. ._..:.. _ -_--_. .... .: ... ....w.._. .._ Goldfield Rd &Old West Hwy Exit 6 0 2 4 5 2 0 0 0 0 0 1 5 0 0 ----------- ----- ------------------------ ---------------------------------------- ----------------------------------------------------------------------------------- --------------------------------------------------------------------- Goldfield Rd&US-60 WB Ramp 4 2 0 1 6 1 0 0 1 0 0 3 0 0 0 _..__.: _ ._:. ... .. -_---_ .. Goldfield Rd&US-60 EB Ramp 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------- ----------------------------------------------------------------------------------- --------------------------------------------------------------------- Goldfield Rd&Chevron Access 0 0 0 0 ' 0 0 0 0 0 0 0 0 0 0 0 ----..-- _ ....: ----:..... --- ._... .. Goldfield Rd&Resort Blvd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Chevron Access&Resort Blvd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 The crash analysis worksheets are included in Appendix D. PROPOSED DEVELOPMENT SITE LOCATION The Alliance Residential Company proposed plan consists of a 17-acre multi-family residential complex located south of US-60 and east of Goldfield Road on currently undeveloped land. The complex is composed of approximately 275 proposed multi-family dwelling units (DU). SITE DENSITY/INTENSITY This development consists of approximately 275 units of proposed multi-family apartment complex. The complex is comprised of the following: • 3 Bedroom Townhomes — 82 DU's • 2 Bedroom Apartments — 104 DU's • 1 Bedroom Apartments — 89 DU's SITE ACCESS There is a total of five (5) proposed access points. • Access A — is a full movement access located approximately 100 feet east of Goldfield Road along Chevron Access. • Access B— is a full movement access located approximately 445 feet east of Goldfield Road along Resort Boulevard. • Access C— is a full movement access located approximately 735 feet east of Goldfield Road along Resort Boulevard. CIVTE'ch 12 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis • Access D— is a full movement access located approximately 925 feet east of Goldfield Road along Resort Boulevard. • Access E— is a full movement access located approximately 1055 feet east of Goldfield Road along Resort Boulevard. The proposed development site plans are provided in Figure 4. TRIP GENERATION The potential trip generation for the proposed development was estimated utilizing the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition and Trip Generation Handbook, 3'd Edition. The ITE Trip Generation Manual contains data collected by various transportation professionals for a wide range of different land uses. The data are summarized in the report and average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized land use. The report provides information for daily and peak hour trips. The anticipated trip generation is summarized in Table 4. Detailed trip generation calculations are provided in Appendix E. [Remainder of Page Left Intentionally Blank] C-IvTech 13 August 2022 Alliance Broadstone Silveray-Apache Junction, AZ Traffic Impact Analysis Table 4-Trip Generation Proposed Proposed Alliance Residential Complex ............. ....... ........ ................ .. .......... n Single-Family Rental nits .......................Apartments- -- --......................... ..........D U s........... g6y-o- o6�. ...........6.j�%o......................js.-............ ..................... .................... --------------I--------------- ----------------- ------------ ................. ................ Existing ZonedLand Use ..................................................................................................................................................................................................................................................................................................... ................................. Lot 1: Sit Down Restaurant 931 Sit Down Restaurant 10.803 KSF 55% 45% 61% 39% ------- -- -------------------------------_---------------------------------------------___ --------- -------------- ------------- Lot 3: Hotel or Motel 310 Hotel 178 Rooms 56% 44% 51% 49% .................................................................................................................................................................................................................................................................................................... ................................. Lot 4: Medical Office 720 Medical-Dental Office 8.276 KSF 79% 21% 30% 70% ................ ---------------------I I—— ------------------------- _. :-I..... . I.......... Lot 5: Medical Office 720 Medical-Dental Office 8.102 KSF 88% 12% 17% 83% .................................................................................................................................................................................................................................................................................................... ................................. Lot 6: Medical Office 720 Medical-Dental Office 7.928 KSF 79% 21% 30% 70% .......................I................ ------------------11 1---------------------I------------- ..........------ --------------- ................ ................................ Lot 7: Sit Down Restaurant 931 Sit Down Restaurant em 0 6. 7 KSF 800/( 200% 67% 33% ........... .............. %. ....... 0 ........... Lot 8: Medical Office 720 Medical-Dental Office 100.014 F 70 Proposed Alliance Residential Complex ........................................... ........... Single...-..Family.....k...e...n...t..a....L.......�.it...s.........................7...4. i -- -- b-.-4-5... ..........3...0.......................9.....4............ i.2..".-..-.... 6_.�6 ............64........................�f....................1...3...9 . ---- . ... .. ......I.... . . .. ---------- ­ --- ............. . Existing Zoned Land Use ................................................................................................................................................................................................................................................................................................................................. Lot 1:Sit Down Restaurant 107.2 1,158 9.57 57 46 103 9.05 60 38 98 ..........................................................:..... . ....I... .. ., I ­ I I..............-------I...................................I.,.............. ---------------------------1 11 1............. -------------I------------- ........................... Lot 3: Hotel or Motel 7.99 1,426 0.46 46 36 82 0.58 53 51 104 ................................................................................................................................................................................................................................................................................................................................ Lot 4: .................M....e...d...i..c..a...l...O....f..f..i.c..e 29.92 248 3.09 21 5 26 3.6..9........-------------I9--- --- ..... 22-- 31 ... I ---I. . .- ----- ......I---- ............ Lot 5: Medical Office 29.64 240 3.10 20 5 25 3.93 10 22 32 ................................................................................................................................................................................................................................................................................................................................. Lot 6: Medical Office 29.35 232 3.10 20 5 25 3.93 9 22 31 ............I.......................... ............................... ................................................. ------------- -----------­------------ ------------- ................................ Lot Sit..D.own Restaurant J.97:.?.......... 9.57 34 28 62 9.05 35 23 58 ..... ............................................... .................................................................... ......................................................................................................�4� Lot 8: Medical Office 36.0 3,600 2.41 190 51 3.93 118 275 Total Proposed Trips 2,038 30 94 124 89 51 139 .................. ................................................... ...................... ......................................I................. .......­­­.............................. ........ Total Existing Zoned Trips 1 7,596 388 176 564� 294 45'3.....................747 Proposed Difference 5,558. 359 80 439 203 399 602 Notes: *All average rates were calculated by dividing total trips generated using regression equation by the number of dwelling units. (See below.) KSF= 1,000 square feet;DUs=Dwellin2 Units IN ,III 111 0 Apartments[275 DU] TDay= 275*7.41 = 2,038 TAM = 275*0.45 = 124 Tpm= 275*0.5 = 139 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ ........................................................................................ Restaurant[10.803 KSF] TDay= 10.803*107.2= 1,158 TAM= 10.803*9.57= 103 TPm 10.803*9.05=98 ....................I................... I--------------1 11 ------------------- ---------- ­-----------------------I I-------------------------- ----...----- ............ ..................I.,..............I.- I., I Hotel [178 DU] TDay= 178*7.99= 1,426 TAM= 0.5*178-7.45= 82 Tpm 0.74*178-27.89=104 .............................................................................................................................................................................................................................................................................................................................................. Medical[8.276 KSF] TDay=42.97*8.276 108.01 = 248 TAM=0.9*LN(8.276)+ 1.34 26 Tpm 4.07*8.276-3.17=31 _I..... ­­ ­­­­...........­­­.......... ............... ..........­­­............ ........... Medical[8.102 KSF] TDay=42.97*8.102-108.01 = 240 TAM 8.102*3.1 25 TPm = 8.102*3.93 32 .................................................................----------------------------------------------------------------------------------------I------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Medical .............I..... [7.928 KSF].. TDay=42.97*7.928-108.01 232 TAM 0.9*LN(7.928)+ 1.34=2..5... .. Tpm=7.928*.3.93 =31 .... I..... - ---- I---- ------- ... ...- I I -----I.. .... .... .... .. . ......... Restaurant[6.447 KSF] TDay=6.447*107.2= 692 TAM =6.447*9.57= 62 TPm = 6.447*9.05 = 58 ................................................................................................................................................................................................................................................................................................................................................ Medical [100.014 KSF] I TDayi 100.014*36=3,600 TAM=0.9*LN(100.014)+ 1.34=2411 Tm= 100.014*3.93=393 The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/ 94 out) trips during the AM peak hour, and 139 (89 in/ 51 out) trips during the PM peak hour. By comparison, the existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564 (388 in/ 176 out) trips during the AM peak hour, and 747 (294 in/ 453 out) trips during the PM peak hour. The proposed land uses generate 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/ 399 out) fewer PM peak hour trips than the existing zoning allows. C*1 v T e c h 14 August 2022 NORTH 3G 36 33 3G 3G 3 I:i 7 4 G 6 y ., 36 36 jv 313 Q� 3G 3G 3G 36 36 313 9G i 3G -- --_ -- — _ go U r -u t r t o I � � s i f` I i Y to ! Y s N Y 1 3G Y iG Y 2 2 '. p I I Y 4WJ Y 2 2 Y 4 Y Y ( 3G II 3G i Y � 3G P 4 Y j, 3G I I I I 30 313 3G 3G 3G 36 36 f I I i 3G 36 1 Y Y Y 1 1 2 P 1 2 2 3G I � j I i 3G t I I I I 1 y � i 3G Y Y 2 117 1 7 PAY 2 3G I 1 � 'I r 3G I G� 3G 3 G 1, r � 3G '+ 3G i I I 1 .i < C i I I 1 1 _1) �_ 3G r �I 3G 3G p0ll 44 i 3G I 00 = 38 Q 3G 3G 38 5G 3G 36 36 4V i 1 I 39 31; y i 1 I 3G dG 1 36 2 Y Y I t I 36 Figure 4.- t Site Plan and Access e • e ® • 3617 ® tspol I ® , ® CivTech Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis VEHICLE TRIP DISTRIBUTION AND ASSIGNMENT A single trip distribution pattern was assumed for the proposed development. It is expected that the proposed development will generate trips based on future employment within a 7-mile radius of the site. Future total employment within a 7-mile radius of the site, as projected by the 2030 socio- economic data compiled by the Maricopa Association of Governments (MAG), was used as a basis to estimate trip distribution. The resulting trip distribution percentages for the study area are shown in Table S. The trip distribution calculations are included in Appendix F. Table 5 — Site Trip Distribution North on Goldfield Road (north of Old West Highway) 5% ........................................................................................................................................................................................................................................................................ Northwest on Old West Highway(west of Goldfield Road) 25% _....::. .......:.......__.............._...-.............._......._..:::..._.._.............._...............:__...............::...................:......._........:::...................::............. ......::.:. East on US-60 (east of Goldfield Road) 65% ........................................................................................................................................................................................................................................................................ West on US-60 (west of Goldfield Road) 5% Total 100% Figure 5 illustrates the trip distribution percentages noted in Table 5 on the roadway network within the study area. The percentages presented in Figure 5 were applied to the site trips generated to determine the AM and PM peak hour site traffic at the intersections within the study area. Figure 6 presents the resulting site generated traffic for the proposed development. FUTURE BACKGROUND TRAFFIC CivTech took historical daily traffic volumes from the ADOT's Transportation Management System website to estimate an average annual growth rate. Average daily traffic volumes at US-60 Exit 198 just west of Goldfield Road (Location ID: 6980) were considered. The location experienced an average annual increase of 1.9% per year from 2018 to 2019. To be conservative, this growth rate was rounded up so that a 2% annual growth rate (1.040 annual expansion factor for 2024, 1.104 for 2027) was applied to the volumes at the study intersections to obtain the future background traffic volumes. The background volumes for the opening year of 2024 are presented in Figure 7. The background volumes for the horizon year of 2027 are presented in Figure 8. Background traffic calculations are located within Appendix G. TOTAL TRAFFIC Total traffic was determined by adding the site generated traffic to the estimated projected background traffic. Total peak hour traffic volumes for the opening year of 2024 are shown in Figure 9. Total peak hour traffic volumes for the horizon year of 2027 are shown in Figure 10. CIVTE'ch 16 August 2022 0010" Qf�� NORTH LEGEND Trip Distribution Qc_ Q�Qr l� s 4 j yVg Ram i n SiYalm�k:Oil'bskS;tt3S''?�+?"'a�"a'#�i��z ?}`'�5i-U.N`t,s�3?v'';wrsit++iti `sc4tw4✓,''€:'taaGl afti`S�kWit'svri$+n'."(5 Chevron Rccess60 Resort Blvd. F 111,111,111, _M ITE � tk Figure t Trip Distribution ® . . . . . , CivTech � � 14 oa ... w......._ _ _ Legend NORTH L��%t XX(XX)-AM(PM)Peak Hour Traffic Volumes Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB WB Ram s 7{.. ".. G{?YYSinvrt.aw:%'%tY,%'3?fsite',4hBt+t,`%+UGR'.`{5.'%Yf%,"a'm"hk#'^C'%"Sfi't"%"YAF£9}:new,li{ .1ti.bt5'St4u&ik4@'4tA"%„ fL'd4'S'Pa+7uY+Pffi':��u?iF4Pt�{PS3&11f8S?":.P.;lPdr.%kS4!bt"G}1i%'krks;">34ta`Y4Y�'3t"fic*!'%7%itS Ya Q�.�s�a�w�.aY�7s�tw=ss�."�m�s, af;�rr�'r�ra2a� ... EB Ramp { Chevron Access- . • 6 %yr%,5 Resort Blvd SITE 4 Goldfield Rd&US-60/Old West Highway Exit ------------------------ { % t { i y� v � e a t i Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard i Access A and Chevron Access Access B and Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure t Site Generated Traffic a/ 4 1% espy y w,.v. of Legend NORTH ----------------------------------------- XX(XX)-AM(PM)Peak Hour Traffic Volumes WB Ramp Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB }7.SN�lDhP,t'.k'h3+'t"{.;1PdWkYrS!'S+4tS.?'+X2wYl.P.SiaParZ{SC29t++ '�,`S+ti'tY5 W}dRtt',�tivYt�`h*2+L�^tm'Gh4�i9W.ti;At@�iG'�9YJ;�Nts Si'�"IL?�Y3'fi.Aktd'tii�i's"+�""iE431a t�; §7d88R."�UY r��ts:�:t,�2z +�2�+�*s�a�,�rxt����..�+�asrn E t" ..... EB Ramp ......_ .. 'krac. R60 Chevron Access• Resort Blvd. " + 5k t + SITEr" Goldfield Rd&US-60/Old West Highway Exit ------------------ YJ�ts+� f Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Background raffia I iv c G u s Q�aNi k f { G }i tt" t x.„ 00 � Legend NORTH r. F� ------------------ XX(XX)-AM(PM)Peak Hour Traffic Volumes ........... .. WB Ramp ,,.. Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB wtN'.nhtiYF 3fft;FM1i"55:54a]'dry,".}&?3ikik5}'Yr;NYrtit}i�'tlkS'}:fM14.£;k�fYw"r}.iY"ki="}++'a�l4.ufiS:3+lYM"tt4:�il'i4'ti2>rr.*t.3szNY.}Y,se};}vq; INN'IS(38Sbfl53?} }} ;.tav,;t;;N4t:, "7pN Nix g3}NkP'N`N"'Y�4[I'S,'aN"NR 4fla?uZn'99'�Nk:CNN.:fxaitN�.'N`1'YN'NNNa"bPr7X�'4SL}RiaYY,`N'3bi},`N"d7N&s}2"PtN4ikC '"`7d�sv4}Xt3Gb%WAS'fS"55433'F,f'ih4Y'£FN?&kYY'h3s3.7SPra"+W,fiN'`N%N _....., p �'^ 1jaa���t�, ua�'n. nus�e,v:z�a, + rm�T' 'r'�' 2rk ''s.q, , Chevron Access 60" Resort Blvd. .w' SITE ,r �p Goldfield Rd&US-60/Old West Highway Exit ------------- P � Goldfield Road and US-60 WB Ramps Goldfield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard Background raffia Volumes 1V C z. 11%,"+ f . ...................... OS 14%% i< � t Legend NORTHF�%� XX(XX)-AM(PM)Peak Hour Traffic Volumes Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB wB ........... .. Ramp "�„' I z k�r�vs Ay��sr __., SVH2&{4tikv'tk"U°t$S$Fit"rk°§26iFYAi"viFhJms"#&4F.`?ttY(St9�,'Xi'Ssl'i;4'+'1�5"&�uFl?�2'. 'Y..„cShR?eixU"kb7'YA`7;8Y��1iW�'u5"S'�'Jt�t'�45'+.4rS++5;',zG�Stlkx"UY!is'3 .wi4:',G4&F3/."{`�fft�}'+4"'IatkSfSN&!+isN343"-i$2irfl4!3�€k{+k,..;f4J±e tl`v1k4;;y',y t}%+4'�". t: � ;�¢�.�wztws:�tut.'f'.t;AWIusl ON EBR m�$p Chevron Access r<jQ Resort Blvd. ti. SITE Goldfield Rd&US-60/Old West Highway Exit t Y Say^` 42� p i I - I Goldfield Road and US-60 WB Ramps Goldtield Road and US-60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard r i •® I d ' Access A and Chevron Access Access Band Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure 2024 Total Traffic ' • • • • • - • ® a® ® n 1 C O,„ 1% 0/ Legend NORTH �. o � } Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB XX(XX)-AM(PM)Peak Hour Traffic Volumes wa Ramp ,., v '� 't• . p,`55F,.,i�c24K^f YW"ti¢"�';�;l+.+Y�l3t,`§"�XS4C'2`�`�'htfi!bJSWx?N4k�':%b#RY:YS�1#};fdU7fi4€t";{fOWhi+u"stsk)Y`:�'SS§��s7'sN's''3�ii+"'a%Y 2i„RO.�+�: ,k4' 3�»Y�s�'+�„�+,4p., "4°c�rc�,��'.,,. 14 pp r.�g.,+,.�yz{�3�u4L;�G7k".,'k0;, .�.°Y3�' �MfP�k'41''b1'i4Ux'�"S2K�S"'+'+�` '�R➢%}k`,€IE�s v}`3S?'�."3"&'`"`�M" � �"'3`s$RfiPFkS6(t§k1Wt..e#'�t+"7Y9tt?Y�t?'v55o�n5iS5ii9Yk%3'�ktaII'VYh.�r"Y`rsv "`is?3X�a ttYz:�sw�"."YJl�kt�/�SkLY+�7ll�°�,:rlhTs•�V§StUh@'S,uSk":'�s'E"�"'�t'�'#'`.",!&'HL�ik§: • EB Ramp -.... uu,.;y i3 � Chevron Access f Resort Blvd. 17, 3 SITE Goldfield Rd&US-6U/Old West Highway Exit v Goldfield Road and US-6U WB Ramps Goldfield Road and US-6U EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard C i r i 7 I i 44 Access A and Chevron Access Access B and Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure s 2027 TotalTraffic CivTech t Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis TRAFFIC AND IMPROVEMENT ANALYSIS The overall intersection and approach levels of service are summarized in Table 6 for the 2024 and 2027 background and total traffic conditions. Detailed analysis worksheets for the 2024 background analysis can be found in Appendix H, worksheets for the 2027 background analysis can be found in Appendix I, worksheets for the 2024 total traffic analysis can be found in Appendix 3, and worksheets for the 2027 total traffic analysis can be found in Appendix K. Table 6 — Peak Hour Levels of Service IIONNEMSM i � • • MR 1 Goldfield Road and Old 1-way Stop WB Left A(A) A(A) A(A) A(A) West Highway SEB (WB) Goldfield Road and Old 2-Way Stop EB Thru B(B) B(B) B(B) B(B) 2 West Highway NWB (EB/WB) WB Thru B(B) B(B) B(B) B(B) WB Right A(A) A(A) A(A) A(A) Goldfield Road and US- 1-way stop 3 60/Old West Highway (WB) WB Right A(A) A(A) A(A) A(A) Exit NB A(A) A(A) A(A) A(A) Goldfield Road and US- SB A(A) A(A) A(A) A(A) 4 60 WB Ramp Signal WB D(D) D(D) D(D) D(D) Overall A(A) A(A) A(A) A(A) NB A(A) A(A) A(A) A(A) Goldfield Road and US- SB A(A) A(A) A(A) A(A) 5 Signal 60 EB Ramp EB D(D) D (D) D(D) D(D) Overall B(B) B(B) B(B) B(B) NB Left A(A) A(A) A(A) A(A) 6 Goldfield Rd& 2-way stop SB Left A(A) A(A) A(A) A(A) Chevron Access (EB/WB) EB Shared B(A) B(B) A(A) B(B) WB Shared` A(A) A(A) A(A) A(A) 7 Goldfield Road & 1-way stop SB Left A(A) A(A) A(A) A(A) Resort Boulevard (WB) WB Shared A(A) A(A) A(A) A(A) 8 Chevron Access& 1-way stop EB Left A(A) A(A) A(A) A(A) Resort Boulevard (SB) SB Shared A(A) A(A) A(A) A(A) 9/A Access A&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) EB Left A(A) A(A) 10/B Access B&Resort 2-way stop WB Left A(A) A(A) Boulevard (NB/SB) NB Shared A(A) A(A) SB Shared A(A) A(A) 11/C Access C&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) 12/D Access D&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) 13/E Access E&Resort 1-way stop EB Left A(A) A(A) Boulevard (SB) SB Shared A(A) A(A) CIVTech 23 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis The results of the Synchro analysis summarized in Table 6 indicate that all study intersections operate with overall acceptable levels of service (LOS 13 or better). TURN LANE WARRANTING AND QUEUE LENGTH ANALYSIS RIGHT-TURN LANE WARRANT ANALYSIS The City of Apache Junction Land Development Code, Chapter 10: Engineering Design Guidelines and Policies do not specify criteria warranting a right turn lane. Therefore, MCDOT guidelines are considered for this analysis. Per section 7.15 of the MCDOT Roadway Design Manual, a driveway right-turn deceleration lane is required when either of the following is met: A. The outside lane has an expected volume of 250 vph or greater and the right turn volume is greater than 55 vph. B. Any three of the below criteria are met: 1. At least 5,000 vehicles per day are using or are expected to be using the adjacent street. 2. The roadway's posted speed limit is greater than 35 mph. 3. At least 1,000 vehicles per day are using or are expected to use the driveway. 4. At least 30 vehicles are expected to make right-turns into the driveway within a one-hour period. All access points were evaluated under these criteria. The results are shown in Table 7. Table 7 is a summary of the 2027 peak hour right-turn volumes from the adjacent street onto the proposed driveways: Table 7 — Driveway Right-Turn Lane Analysis III;I III Elio ii i ill" i IIINg Access A &Chevron Access No No 7N o No No ------------------------------- ------------------------------------------------------- -- ------------------------------------------------------------------------------------------------------------------------------------------------------------- Access B & Resort Boulevard No No No No Yes .................- ............ Access C & Resort Boulevard No No No No No ............................................................................................................................................................................................................................................................................................................................................. Access D & Resort Boulevard No No No No No --------------------------------------------------------------------------------------------------------------------- I.------------------ ­-1.1.1-.......... ---------------------------------11--------------I I------------------------------ Access E & Resort Boulevard I No No No I No I No Due to the low expected future traffic volumes and low speed limit on Resort Boulevard & Chevron Access, neither criterion is met for the intersection. Therefore, a right-turn deceleration lane is not warranted for the site accesses. QUEUE STORAGE Adequate turn storage should be supplied on any approach where turn lanes are permitted and/or warranted. Per ADOT TGP 430 on Turn Lane Design, the configuration of a turn lane consists of a taper, an opening or"gap", and the storage length. A formula for calculating the length of the taper (which may not be required for right turn lanes) is provided in the TGP and the gap is specified in Table 430-1; both are based on posted or design speed, while the taper calculation also considers CivTech 24 August 2022 ,;�7 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis the width of the lane and whether widening for it will be to one side or symmetrical. The storage is comprised of two components: braking distance (also specified in TGP 430) and the queue, which can vary depending on the projected number of turns. There are several methods of determining the appropriate queue for a turning movement. One common method is outlined in A Policy on Geometric Design of Highways and Streets (the AASHTO "Green Book', a conservative methodology in which it is assumed that the turn lane should store the average number of turning vehicles arriving in a two-minute period, where unsignalized, or, in two signal cycles, where signalized. TGP 430 describes this method (without attributing it to the Green Book) as one way of estimating the queue, indicating that the minimum queue should be 50 feet (i.e., two passenger vehicles) where trucks are less than 10% of the total traffic volume of 85 feet (one 25-foot passenger vehicle + one 60-ft long truck) where trucks are greater than 10% of the total traffic volume. TGP 240 allows/suggests the use of another method, one outlined in the Highway Capacity Manual. This method is used by the Synchro software to report the 95th percentile number of vehicles to the back of the queues. CivTech rounds this number up to the nearest whole number of vehicles and multiplies by 25 feet to convert the number of vehicles to a required queue. The equations used for the calculations are shown below, and the resulting turn lane storage requirements for the study intersections are summarized in Table 8. Detailed queue storage calculation worksheets using the AASHTO method are included in Appendix L. Proposed lane configurations are shown in Figure 11. Table 8— ueue Storal a Len the Ms Goldfield Road and 1-way SB Left 195' 405' 90' 85' 100, 25' (5)195' 1 Old West Highway Stop WB Left 25' 245' 60' 45' 150' 25' (5>25' SEB (WB) ...................................................................................................................................................................................................................................................................................................................................... Goldfield Road and 2-Way 2 Old West Highway Stop] WB Right 55' 245' 60' 40' 100, <25' (5)55, NWB (EB/WB) .. . _11 �. ------ .. .__..: .W----- .._ Goldfield Road and 1-way 3 US-60/Old West Stop WB Right M_ 405' 90' 85' 225' 25' (5)_ HighwayExit (WB) ...................................................................................................................................................................................................................................................................................................................................... NB Left 445' 245' 60' 40' 200'i 25' t5445' Goldfield Road and WB Left 190, 405' 90' 85' 125' 40' (5�190, 4 US-60 WB Ramp Signal SB Right 140' 245' 60' 40' 250' <25' (5}140' WB Right_ 185, 405' 90' 85' 150` <25' (5)185 .. -....:.. . .... .....� . _ _ ...:.... .......... .. . - ..._.....n ... - -._1.._ SB Left 440' 245' 60' 40' 325' <25' (5440' Goldfield Road and EB Left 125' 405' 90' 85' 275' 100, (5)125' 5 US-60 EB Ramp Signal NB Right 120' 245' 60' 40' 150' <25' (5)120' EB Right 125' 405' 90' 85' 225' 35' (5)125' --------------------------------------------------------------- .................................... ..................................... ..............................---------------------------------------------------------------------- Goldfield Rd& 2-way NB Left (I)TWLTL 245' 60' 40' 100, <25' (3)TWLTL 6 Stop; SB Left (3)TWLTL 245' 60' 40' 125' 25' (3)TWLTL Chevron Access (EB/WB) NB Right 75' 245' 60' 40' 100` <25' (5)75' ------ _....: _ -I. ------- _ _.. Goldfield Road& 1-way 7 Resort Boulevar d Stop SB Left (3>TWLTL 245' 60' 40' 175' 25' �3>TWLTL (WB) (1) Measured from beginning of stop bar (2) HCM 95th percentile queue reported in vehicles/lane,assuming 1 vehicle—25 feet. (3) Two-way-left-turn-lane(TWLTL)provides excess storage for the left-turn lane. (4) Queue for right turns is an exit road from the US-60. (5) Existing conditions meet queue storage requirements. CivT+t ch 25 August 2022 5� + Fah LEGEND NORTH13 t 1 Thru or Turning Movement Traffic Signal A � Two-Way LeftTurn-Lane " Stop Sign Raised Median Qo', Speed Limit Bike Lane ' Yield Sign O r 4rrp'f` — Channelized Turn Lane t ,}...... Development Improvements O F �F Goldfield Rd&Old West Hwy SEB Goldfield Rd&Old West Hwy NWB Ram a. {. aY3Y;5RUk"f}3;4"3k?pytr 1 ,., btFk'{+\Y§AY3fx.Ydtb;'t'rkT".T44;FU7:#i•1�'`51RYaaEY1m'+?3f"liSIY"a L4;23Abt's"d�hC'.ib7;3f 7'"2`tk3?'.�s.3's4`t355)2A".'2{3Y55;i".,`'F4%E4'Ehi!NX&Y1c,hFYi'�vh:}:+"'r"N"4"t`"SYTkU§,W4H`Y.'""WYk Xtt3,F"iitn'G`+ =,gAQ{g5k`,F»' 'i5h.•tit, L/"� 4Y44'n4 " awzv"'as,r4 o acts^; raa .r'<a � trt�u,:3yntr����y?tr��p �r, g ., a� :�u,�t�ntr.�'..�•:a&v�mve���rr ;�awrs~ rer r ss ;�.,zrrtrare�+ ra�+a�ur��:e�es ��s,�aLs`� m EE Ramp f m, r Chevron Access b�0%� Resort Blvd. t � ��, SITE 35 rfY, Goldfield Rd&US-601O1d West Highway Exit A tAft tt b $ f4E n t I � r t" t4' r t {pr 1 Y �+ �€'1� ��1`'.' 1 rrpy�"�=rysrYttt't45YjlFrsR"��a�tk;#rs%'rtrRts£�3%ti,xt%.r�lY"%Yst%,k�r„t�'r�,,,57H`yAtix`rr jt(4r,L'rt�t i,"?r�"`hsfy%t�rt✓nrq�+;{.��� �....,t�rr�sr�t�tY!n�4h�x�rr�,tt+�� Y '.,�:r...T,tha����%,t�sr,21 � >r..tt����s#��ra,�" Goldfield Road and US-60 WB Ramps Goldfield Road and US 60 EB Ramps Goldfield Road and Chevron Access Goldfield Road and Resort Boulevard Chevron Access and Resort Boulevard AWAt r t d�gr t 3 f v�+ i� „k e < 4 I 4' 3 § Y f {}ff4 t .,.. r r�� ...s a ,�, to ,y. r r , r4 rr., ...•., ,.r w _ ,r w, ...r v r a ,. � r =, r t„W =#,..,.. 7 r., .rrr irY....., t?}, ,...px�,r.�p t'{ ! t[n§Y tt...fr X'tPp44 % t tt : ,t,r.r r _.u+.,.z}"Y{,7 Is;37. ;`.. J6}.S'•k: S. € 4;...p%rt ,4 }1 }�4��r��,aP�ju�•��4p)l Access A and Chevron Access Access B and Resort Boulevard Access C and Resort Boulevard Access D and Resort Boulevard Access E and Resort Boulevard Figure i 1 r Proposed Large Configurations and Traffic controls CivTech u Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis SIGHT DISTANCE ANALYSIS Adequate sight distance must be provided at intersections and site access driveways to allow safe turning movements. There must be sufficient unobstructed sight distance along both approaches of a street/driveway intersection and across their included corners to allow operators of vehicles to see each other in time to prevent a collision. The City of Apache Junction maintains sight distance requirements within their Engineering and Design Guidelines and Policies Manual. The City of Apache Junction measures sight distance using AASHTO methodology. Sight distance calculations according to AASHTO guidelines are summarized in Table 9. Table 8—AASHTO Sight Distance Requirements Chevron Access 15/25 265' 310' 225' Resort iBoulevard 20/30 225' 1 260' 185' Sight visibility should be provided at all driveways according to the distances shown in Table 9 and that sight triangles at public intersections are maintained according to Section 10-3-4 of the City Code. Sight distance worksheets and Section 10-3-4 of the City Code have been included within Appendix M. C*1vTech 27 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis CONCLUSIONS The following conclusions and recommendations have been documented in this study. GENERAL • The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/ 94 out) trips during the AM peak hour, and 139 (89 in/ 51 out) trips during the PM peak hour. • The existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564 (388 in/ 176 out) trips during the AM peak hour, and 747 (294 in/ 453 out) trips during the PM peak hour. o The proposed land uses generate approximately 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/ 399 out) fewer PM peak hour trips than the existing zoning allows. CRASH HISTORY • In total, there were 13 incidents within the study area from 2018-2020. There was a total of 15 injuries and 4 fatalities. EXISTING • The results of the existing conditions analysis indicate that all study intersections operate with acceptable levels of service (LOS B or better) with the existing traffic control devices. OPENING YEAR • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. 2027 CAPACITY ANALYSIS • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS B or better) with the lane configurations and stop controls as shown in Figure 11. QUEUE STORAGE • The recommended storage lengths are provided for study horizon year 2027 using the total traffic projections. SIGHT DISTANCE • Sight visibility should be provided at all driveways according to the distances and sight triangles at public intersections should be maintained according to Section 10-3-4 of the City Code. Ci1VTPCh 28 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis LIST OF REFERENCES Highway Capacity Manual, Sixth Edition: A Guide for Multimodal Mobility Analysis Transportation Research Board, Washington, D.C., 2018. Manual on Uniform Tralfc Control Devices U.S. Department of Transportation, Federal Highways Administration, Washington, D.C., 2009. Roadway Design Manual, Maricopa County Department of Transportation, Phoenix, Arizona, Revised April 2004. Trip Generation Manual, 11th Edition, Institute of Transportation Engineers, Washington, D.C., 2017. Trip Generation Handbook, 3rd Edition, Institute of Transportation Engineers, Washington, D.C., 2014. A Policy on Geometric Design of Highways and Streets ("AASHTO Green Book") 61" Edition, The American Association of Highway Transportation Officials, page 9-127, Washington, D.C., 2011. CIVTeCh 29 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis TECHNICAL APPENDICES APPENDIX A: REVIEW COMMENTS AND RESPONSES (RESERVED) APPENDIX B: EXISTING TRAFFIC COUNTS APPENDIX C: EXISTING PEAK HOUR ANALYSIS APPENDIX D: CRASH ANALYSIS WORKSHEETS APPENDIX E: TRIP GENERATION CALCULATIONS APPENDIX F: TRIP DISTRIBUTION CALCULATIONS APPENDIX G: BACKGROUND GROWTH CALCULATIONS APPENDIX H: 2024 NO BUILD PEAK HOUR ANALYSIS APPENDIX I: 2027 NO BUILD PEAK HOUR ANALYSIS APPENDIX 3: 2024 BUILD PEAK HOUR ANALYSIS APPENDIX K: 2027 BUILD PEAK HOUR ANALYSIS APPENDIX L: QUEUE STORAGE ANALYSIS APPENDIX M: SIGHT DISTANCE ANALYSIS CIVTech 30 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX A REVIEW COMMENTS AND RESPONSES (Reserved) ,C4'0'--E—E, C i v T e c h Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX B EXISTING TRAFFIC COUNTS C i v T e C h Intersection Turning Movement Prepared by: IRCDATA SERVICES OF ARIZOINA,I IO. 520.31GX745 Project #: 22-1400-001 TMC SUMMARY OF Goldfield Rd& O/d West Highway APPROACH LANES 0 22 11EFIF-1 V `p a Ln O 0 Old West Highway Old West Highway AM MD PM TOTAL w TOTAL AM MD PM z 35 16 19 CONTROL 0 0 0 = �0 0 0 s-way stop 0 0 0 0 Q. O 297 112 185 ss �� 0 0 0 a z rn Ln V LOCATION#: 22-1400-001 0 z TURNING MOVEMENT COUNT a 00 0 o Goldfield Rd&Old West Highway oNA � (Intersection Name) h o ce .� W EDNESDAY 06/29J22 a� Day Date 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 400 PM Intersection Turning Movement Prepared by: IBCO DATA SERVICES OF ARIZOINA,IrIO. 520.31GX745 Project #: 22-1400-002 TMC SUMMARY OF Goldfield Rd& US-60 WS Off-Ramp(north) APPROACH LANES 22 �O 11EN__ 4- 1� V `p a O N O O US-60 WB Off-Ramp(north) a o O US-60 WB Off-Ramp(north) AM MD PM TOTAL w TOTAL AM MD PM z g 0 0 0 � CONTROL 162 110 272 O �0 0 0 L:::::* s-Way Stop � 0 0 0 � d O 0 0 0 WB z rn Ln V o 0 0 a '4 LOCATION#: 22-1400-002 0 TURNING MOVEMENT COUNT a O o ildfield Rd&US-60 WS Off-Ramp(nori o H (Intersection Name) h Ln o .�ce WEDNESDAY 06/29J22 a� Day Date 'a APPROACH LANES p COUNT PERIODS AM 700AM 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 400 PM Intersection Turning Movement Prepared by: IRCDATA SERVICES OF ARIZOINA,I IO. 520.31GX745 Project #: 22-1400-003 TMC SUMMAR Y OF Goldfield Rd& US-60 WS Off-Ramp APPROACH LANES 22 d 11HP- F-1 W `p C:) a 01� s Ln 00 O O N O US-60 WB Off-Ramp c CO US-60 WB Off-Ramp AM MD PM TOTAL w TOTAL AM MD PM z O O � CONTROL S 2 7 = �0 0 0 C:::::* O Signal 0 0 0 K O Ell 0 0 �� 7 19 26 a z rn U0 V a N O O LOCATION#: 22-1400-003 0 TURNING MOVEMENT COUNT Q M 00 O Goldfield Rd&US-60 WB Off-Ramp a ❑� (Intersection Name) oce .� W EDNESDAY 06J29J22 a� Day Date 'a APPROACH LANES p COUNT PERIODS AM 700AM 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 715 AM NOON PEAK HOUR PM PEAK HOUR 500 PM Intersection Turning Movement Prepared by: IRCDATA SERVICES OF ARIZOINA,I IO. 520.31GX745 Project #: 22-1400-004 TMC SUMMARY OF Goldfield Rd& US-60 ES Ramps APPROACH LANES 22 o ❑❑ V aLr) 0 US-60 EB Ramps Q `' rn US-60 EB Ramps AM MD PM TOTAL w TOTAL AM MD PM z 145 60 85 CONTROL 0 0 0 = �0 0 0 Signal 0 0 0 0 Q. o 73 30 43 �� 0 0 0 a z rn Ln V a - C:> LOCATION#: 22-1400-004 0 TURNING MOVEMENT COUNT a o Goldfield Rd&US-60 ES Ramps o H (Intersection Name) o ce .� WEDNESDAY 06J29J22 a� Day Date 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 715 AM NOON PEAK HOUR PM PEAK HOUR 415 PM Intersection Turning Movement Prepared by: IRCDATA SERVICES OF ARIZOINA,IrIO. 520.31GX745 Project #: 22-1400-005 TMC SUMMARY OF Goldfield Rd& Chevron Access APPROACH LANES 22 011EF- F-1 V a CT, Ln 00 0 Chevron Access Q M M Chevron Access AM MD PM TOTAL w TOTAL AM MD PM z g 3 5 CONTROL 21 28 49 2 0 2-way stop 1 0 1 0, 0 1 0 1 EB&wB �� 2 4 6 a D S z rn U0 V a CO LOCATION#: 22-1400-005 0 TURNING MOVEMENT COUNT a o co Goldfield Rd&Chevron Access (Intersection Name) oCie -' .� WEDNESDAY 06J29J22 a� Day Date 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 445 PM Intersection Turning Movement Prepared by: IRCDATA SERVICES OF ARIZOINA,I IO. 520.31GX745 Project #: 22-1400-006 TMC SUMMARY OF Goldfield Rd&Resort Blvd APPROACH LANES o ❑❑ ` o V CO a o O Resort Blvd c N Resort Blvd AM MD PM TOTAL w TOTAL AM MD PM z 0 0 CONTROL 27 17 44 ? �0 0 0 C:::::* s-way stop 0 0 0 0 a O E 0 0 wB �� 2 2 4 a ll rn U0 V I C) ton Ln LOCATION#: 22-1400-006 0 TURNING MOVEMENT COUNT Q o LNf) M Goldfield Rd&Resort Blvd o H (Intersection Name) 0 oO ce .� WEDNESDAY 06J29J22 a� Day Date 'a APPROACH LANES p COUNT PERIODS AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 445 PM Intersection Turning Movement Prepared by: IRCDATA SERVICES OF ARIZOINA,I IO. 520.31GX745 Project #: 22-1400-007 TMC SUMMARY OF Chevron Access& Resort Blvd APPROACH LANES y W N UHI OF 111FIR L S a M o 1-4 U 0 Resort Blvd c M Resort Blvd AM MD PM TOTAL w TOTAL AM MD PM z g 8 6 2 � CONTROL 1 0 1 U 41 14 27 i-way stop 28 10 38 O 0 0 0 sB �� 0 0 0 a z rn Ln V a LOCATION#: 22-1400-007 0 TURNING MOVEMENT COUNT a o 0 0 Chevron Access&Resort Blvd a (Intersection Name) � o HFIF-17 N ~ U a W EDNESDAY 06J29J22 pDay Date y APPROACH LANES COUNT PERIODS U AM 700AM - 900AM NOON PM 40OPM 60OPM AM PEAK HOUR 800 AM NOON PEAK HOUR PM PEAK HOUR 415 PM Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX C EXISTING PEAK HOUR ANALYSIS ,C4'0'--E—E, C i v T e c h Existing AM 1:Goldfield Rd/EB Old West Hwy Existing PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HOM6thTN5C 22-1180 Alliance Broadstone Silveray HCM 6thTW5C .s#Zy}t}r<1t,}}>,4{ytt{�ts:xt?4{ytt{�tt f3, r{'t2 ,L,YiiII II II II II II II II II II II II II II II II II II II II II II II II }$rr7,t#t 7£{ ,'r,Y3i�I�Iffi rJ3�,< !s'�5,� iY�s}{it�'t{s�'t{s�'t{s�'t{sta;f s,r Y�{o1 SFr 11,7Fr 11,7Fr 11,7Fr 11,7Fr 11,7Fr 11,7Fr 11,7Fr 11,7Fr 11,7�{•}:�F.{2etlY lY lY lYf13�k}y`{t},}.. Y,�Sfi?� s<� ��,�2t'f�2}, s,�t}��� if,r,f{e�� I}� r�# ,C��� •�LL •�LL •�LL �t,���)t r' •� )�i, i, i, i, i, i, i, i, 4 }E{'�S ii� i ,�{��iL,�, Int Delay,srveh 3.8 Int Delay,siveh 2.9 Lz, �ftf}}z1J;`i;1})af til, ,� tu„ iil,r �h t Lane Con iguranos tt Lane Carfiguratiom tt Traffic Val,vah/h 54 i 0 0 0 0 112 TratficVd,cAWh 46 0 0 0 i 0 185 Future Vol,ve" 54 0 0 0 0 112 Future Vol,ve" 46 0 0 0. 0 185 ConfildirgPaxla,ftr 0 0 0 0 0 0 CaMicting Peds,#ft 0 0 0 0 0 0 i Sign Cottrrol Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RTCt nelmed - None - RTC ndized - Now Now - Nonei Storage Leah 0 195 Storage Length 0 195 VehinM enStaage,# 0 0 0 VetinIAkanStake,#! 0 0 0 Grade,% o_ , a o Grade,f 0 a _ o Pc k H Factor 63 63 25 25 91 91 PeakHourFadbor 46 46 25 25 79 79 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 "t How 86 0 0 0 0; 123 My t saw 100 0 0 0 0 234 .,, }. t..,:.,f.rw .t ... r,.._ a,r?? �•x ?? z"S„r -�� rr , e-1-�. ??31{s,t 7.J�jtn7F}?7>tiTt{t}SP1rt�ti 17}> 3Yl tl aj?.f{tstfY}:t, }.}intr(5, ttf S@t?„s?� tf3 F}k },t# I,)�kSS}{?. f>+t£t} jZcr' t },t.{c,t,}} XrFt ) ((rl f.eS,rs {:"{r, }?2155}• r�z.7sr 3,,i1}I,str s,$rr{3,,,Fi i{S„{L,C.. Connidirg RowAl 62 - 0 0 Conflicting Ra Al 117 - 0 0 Stage 1 0 Stage 1 0 Stage 2 62_ _ _ Stage 2 117 _ CkincalHJwy 6,84 4.14 Ckihc�Hdtiy 6.84 4A4 Qiticad Hdwy Stg 1 _ _ Critical Hdwy Stg 1 Critical Hdvny*2. 5,84 Q%paIHdvnyStg2 5S4 FdiaN-up Hdny 3.52 ? 2.22 - Fdlm-up HchW 3.52 - 2.22 Pat Cap-1%h-arver 937 0 Pot Cap-1 Nkmver 867 0 - Stage 1 - 0 Stage 1 - 0 Stage2 953 0 StagB2 895 0 Platoon hocked,% e Platoon hocked,% e, Mov r1 Maneuvv 937 - Mjv Cap-1Maraw 867 Mcv Cap-2 Mara rver 937 - - Nov Cap-2 Maneuver 867 - Stage 1 - stage 1 Stage 2 953 Stage 2 895 _ e ft rziz f�f �. r 6J Lzs-t'/I •�ttt tR• r t< .- ?' 1 L SS it r ttu { t s l } t i .t�, {J r .2 r, ,,ff J#3i{1 f l S Y t i r.} •t t E? Y' J J f?r ', s <l S}l 7, S 3 l i s i 4,C, 3 , Z"K }F tSl S J 1 t z S+t, t, t�rr�4u-�i:I<�}�',}•tf�.7 kl��'��{-�{'i t��2rJ,�}c�it� �tli�{`fi�7�.�t,f� ��ff �„��f#5 �}�,Ut44��t�r�`�f�r�'�,{s<t�3art<.7��trtstS�Szrtf3 �{tl+iLm°,S' #F1, }{4�fStf�'f�Y ,4{�,r��}� Y2c},�c�&< ti�' ���r„tt�l)�tt��t3n�Ts�}��},$,ts}t�t.�t fft'�fz}Ink„�${{S{,p�S ��{{#, tX1,�'fSrSt.2,a HCM G rd Delay,s 9:2 0 HC MC attrd Deday,s 9.7 0 It a..,: ,r,......Lrrz, ,.,; ,�..,t,y.,.. 7.ys.a,} .. .tt• :-} > c r,:f ra t s ,?>., ;sr'sr r'rm 3: r:t �is t t<.tr}}}}P Gfi, Y{ s# ea+ 5124t}tt.tr},1{sJJtt, ,Jr{7J#{ �}kt,t tSctzZ?s lff( (ff t,#�Jtt{1tt} k}{ti>„}�Jt IZf1. h }f l+ ft,#�1J� }Yt:t}�,t��ttittttl,r,d�}t, ir,�,{,1?t irtF�}fir}•tt�tf,trt,?tS}„frtrG „>tit?i {; t}2� )i� }I�f,�� f{S`Lst}..,3 rLr.tr�`,2k f�ii �}r}�1}Se��•c�31t,f���lf,#f{ �t,2��F,{{�}, ),� ��41r ,e,k£ f i ���,r ,If{S��t��tt��irt�r,{�,.2 t��i{�t,<��t t{'} �:� ��f,t�r} ,8'.fZfyJ Y{rr}}�t.2��� ���zf''. cq)a*(td-Vh) 937 Capaaty(vem) 867 HCM Lane V1C Ratio 0,091 HCM Lane V1C Ratio 0,115 - HWQxdrd Way(s) 9.2 0 t Ic Lay{s) R7 0 HCM Lane LOS A A FILM Lane LOS A A HCM h"ldYleC(veh) 03 9 195th°ldileG(veh) 0,4 07114/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report QVTech Inc.-CM Page 1 QVTech Inc.-CM Page 1 Existing AM 2:Goldfield Rd&WB Old West Hwy Existing PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6thTZC 22-1180 Alliance Broadstone Silveray HCM 6thTwsC t t .�rs� s� s� s� s� s� s� s� s� {s »J f YZ� ti �+}Jk• L s� s� s� s� s� s� s�Int Delay,stveh 35 Int Delay,siveh 3.8 Lane Configurabo s P ° Lane Ccefigurafiors TraificVd,vahth 0 16 0 " 0 54 9 0 178 28 0 0 0 TraffroVd,veh/h 0 19 0 0 ; 46 5 0 171 49 0 0 0 Future Val,vehJh 0 16 0 0 54 9 0 178 28 0 0 0 Future Vol,vel Jh 0 19 0 0 46 5 0 171 49 0 0 0 Confiding Pam,itfhr 0 0 0 0 0 0 0 0 0 0 0 0 toxttiding Pew,Vhr 0 0 0 0 0 0' 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free 9F ' twd Norte ' - Stop Yield INIcre RTChahnelimd Nora: Stop r Yield Nate Storage Length _ 0 0 Storage Length _ 0 0 Veh in Medan Storage,# - 0 0 0 Veh in Stake,# - 0 n 0` 0 Grade,% 0 0 0 _ 0 0 a 0 0 _ 0 Peak Hour Factor 91 91 91 ' 63 63 63 84 84 64` 25 25 25 Peak Hour Factor 79 79 79 46 46 46 89 89 W 25 25 25 Heavy Vehicles.% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles.% 2 2 2 2 2 2 2 2 2 2 2 2 NMAROW 0 '18 0 0 66 14 0; 212 83 0 0 0 MimtHow 0 24 i 0 0 100 11 0 192 55 0 0 0 .... Y. »t—sJ'. 5 z� .:;. }t i..,�f k k� eee'1,i 3` ....t... ») • 't...`\ !�, ...\».... } `,i»t £-I. »,.._+ Yr t}g,�....( tt.C(r Jr, 2»+, :._ C.rv...S SSS ti... 2 5 t C Y>t, zY} 5I!!;k Si tY r}t l olds 1\ 15 l}}t tl £ lrt7 tt Y rll F Z,r1 r ,S S.Y t. fl; 1 C.+�t r}Eitr r+tr Irl t},} J55,,t, s3 kt 4zM1 ttt,{ {; ZI IIIft}l-((�'3 1 rJ) 1,�,£. y} t>tj l.,/.,S13F }})Et Yr,sF{3,}} }l Z1Z}Al} }}+ JAl4} }Jrr�t<,}„�'t�PR) tL,1}}4}7 vC£�t3rlt,rt-2r is SYZt��S SSS r.� 2ZrrtZt l} li S2,s t£, .ts )»Il}1\}tt.�t�yr Y}5..rj,?JtS kr Z�tk 2{z+Y�f7 iL4kiri 2t4 Conflicting HowAII - 212 - - 212 106 - 0 0 Conflicting Flow Al - 192 - - 192 96 - 0 0 Stage 1 0 212 - Stage.1 0 192 Stage _ 212 _. _. .0 _ _ Stage - 192... _ 0 aiiti I kf" 6.54 6S4 6,94 _ C ribcd,)* 6.54 - i6.54 6.94 i Critical Hdwy Stg 1 - 5.54 - Qitical Hdwy Stg 1 - 5.54 Critical H*Slg 2 - 5,54 - Critical Hdwy Stg 2 - &54 Fdlaw-up HJW - 4.02 4.02 3.32 - Follow-up FkNV 4.02 - - 4.02 3.32 Rrtcfir-1 0 4 0 0 684 928 0 cap-1 hh� 0 702 0 0 702 942 0 Stage 0_. 0 0 726 0, _ Sty 1 0 0 0 740 0 _ Stage2 0 726 0 0 0' Ste2 0 740 ', 0 0 0 Platoon blocked,% A Platoon blocked, Move r-1 E 0reaver - 634 - - 684 928 Mw C 1 Maneuver - 702 - 702 942 Mav Cap-2 lvLaneuver 684 684 Mov Cap-2 Maneuver 702 - 702 - - Stage 1 726 Stage 1 740 Stage 2 726 v Stage 2 740 S;t)Sf 1 tiS fr, tC Jl 1 {�. ) ds„tJ rIt tr lt,y P'S r,4,ttt rU,f 1,£{ )5tS r,} S; 7 Et .$3I# f.. f 113# k:✓) r;tt£Sr St, rrrS S .�7Y 1 Fnl t 1l( ,{ }},S.,Nt f+53}f>l }SSfp z{}}#.r S.. ; '1aJl �,tji`}�}t»Sf�ibStt��L£,Iifll�sF�rrliif�#rf€tSj<�Fr:.ttt�,g;nilJ a„�r�it ��•s vr�+�4£�i„��.SS 't� 7��r� 1�k�1kj .��r {,) k&��lS r�`Yf;${a��ir(��rv�,£ztfl )tltb�t)j�>��?�i fL+jrr�rltf�t HCMContreIDeIay,s 10.4 10,7 0; HCviCotrd Delays 10.3 108 y 0 HC M M LOS B B HCM LC6 B B }r. .»Ly}YtII j}J t E Slk{;tEr�t,rtlyts�s��k,t�itt5tj,a5jj}�i2k1}�frv£(t r rttli l�,{})t Eke'#iz1,�3gaE}j 5 tr ,yet ,;str5}�,,{+t t5rf t, x77ill�;ttc�{{Lt��a1r;#strtlF L>lhis,rrt �sjt Et)„�#sk},<t�;Zlfl"i r air}�ftjll))3);artj#�sl;£rr:�,tJr. Cepacity(veh+h) 684 684!928 Capacity(velvh) 702 702 942" HCM Lane V/C Ratio 0,026 0,125 0.015 HCM Lane V1C Ratio 0,034 0,142 0.012 FCIVlCdntreI De*(s) 104 11 8.9 HOVICo trol Delays) 10.3 11 8,9 HCM Lane LC6 B B A HCM Lane LC6 - B B A HCM9ahl�leC( ) 0,1 0A 0 HCM951h°14fleQ,veh) 0.1 0.5 0 07114/2022 Synchro 11 Report 07l1412022 Synchro 11 Report QVTech Inc.-CM Page 2 QVTech Inc.-CM Page 2 Existing AM 3:Goldfield Rd&US-60t01d West Hwy Exit Existing PM 3:Goldfield Rd&US-60t01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM6thTWSC 22-1180 Alliance Broadstone Silveray HCM6thTWSC ; r} } } } } } v v{ i. .».;,•., S k} t f , { { { { i t.{i , { { {3 ,kr Y Int Delay,sfveh 4 Int Delay,stveh 2 a t,,,,,r�.�s,,.,,.»F,...:a'a:.....,.i.}..............................„.�.rr..........rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr, tt:�,..,,t„i,,...rrrrrrrr.�...,,,,......... ......„4............rr.........„4......„4......„4......„4......„4......„4......„4......„4......„4......„4......„4......„4......„4......„4......„4.......;.......;.......;.......;.......;......,.„.. T 1 T•* YY J ., >,=.t.=.t.=.t.=.t.=.t.=.t,=.t,=.t,=.t.=.t.=.t.=.t.=.t.=.t,=.t,=.t,=.t.=.t.=. l 4 §; { s =J 3k \$ z a. t». }i}�r��t„�#� �£ � i.} �1 � it����t � � � � � � � } ,„� ��{i�,4 ty ft331� �. 1 �t..+I, , „»� ,�3 ct}�ttlsrlsrrlsrlsrrlsrlsrrlsrlsrrlsrlsrrlsrlsrrlsrlsrrlsrlsrrlsrlsrrn�P� 1, LaneCcdguratiom r tt tt Lane CcrAgurations r tt tt TraflicVd,vWh 0 162 44 0 0 166 TraftVa, ih 0 110 110 0 0 231 Future Vol,vehJh 0 162 44 0 0 166 Future Vol,velyb 0 110 110 0 0 231 Conflicting Pe.,Or 0 0 0 0 0 0 Conflic#irgP,eds,#lhr ; 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free RTChannelized None we We RT zed - floe - - 6 Storage Length 0 Storage Length 0 VVehin Madan StoraW# 0 0 0 VehinMaS tStorage# 0 0 0 Grade, 0 e 0 0 ,% a _ o - 0 Peak Hour Facto 82 82 58 58 87 87 PeakHourFactor 84 84 86 86 68 68 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Iv1,ntt Flow 0 498 76 0 0 191 Mm Row 0 131 ,128 0 0 340 .. ,,, N;1v >y r r•_.,' .„}'.. £ 'aia C t, _r tt,� _:... 3 1c... lt^:5 �• t {v f£3 4, t iF£ £ ,„43 Sr 1.s ++ lfi Zz 5S fi c l\}} 13 zi§. ,T l k h 'T t�""+•ss1 �.F,F "' ,� i 111,tYx} z 7�cC S{' \,»"5 ! St7 TSS>Sr}?g c:s t;z+f 7{{ i.ttZ }�� 4 ,��;..t,{{{F z„ ij i��F#,ltrn2rJ11}'ili,}lJnf }1 T7\§#1 {{� }{ Z,l s£�i•.S15S,s�F�'{a tS�}•,S tl�r ;tf3r 7£Z41 �,f11}�... .,rl nl�lSSf'{4#fs£ y,s}/7}„t's r374i �til�b{i `s l$117I11r i,f{, 7I17t .'}G£� r;F}(SS .. Conflicting Flan AI - 38 0 - - - Conflicting HavAll - 64 0 - - - stage 1 stage 1 Stage 2 _ _ _ Stage 2 CrIbcaf Hdwy 6.94 Crtticag H ny 6.94 Criticad Hdwy Stg 1 - Critical Hdwy Stg 1 - Qi1ir Hd"Stg2 chi" Stg2 Folia*up FkfW _ 3.32 _ - FdloA up Hwy - 3.32 Pot Cap-1 Maneuver 0 1026 0 0 Pot Cap<1 0 7 0 0 Stage 1 0 0 0 _ Sty 1 0 _ 0 0 Stage2 0 0 0 Stge2 0 0 0 Platoon flocked,% Platoon blocked,% e Mav -1 Mar - 10 - MovC�r r l Manw - 87 May Cap-2 vlaneuve _ _ _ May Cap-2 Maneuve _ _ Rage 1 Stage 1 Stage 2 Stage 2 t t s < zi {3 3 f { z , }£ s } s r, r.:, ziLrc=rr i_.. >z:'Fr r}'u _ Lrr,�._, {I!r z.\_. i it�zpiSff tt}-ry,•, rr trt,�, z<t ,},4+'.. HCMCdr*d Way:s 9.3 0 ; Q HQ C3ntrot may,s 9.2 0 0 ,i { "J;1t}£Ft,is r i i 4.,F t P t'r t3ti}i}t L i » £� tsYJ Fi'�r3 ,t t T„�3 '" t. i t£ li 5r, SSs •:br =..,({ t» ,YF(# „I{21zrl,f£{3 rt[=[7 f.rf 7r�Zri,s.Z{^11:�{£�I 5„f�t`•.i4i{t;tR t§?r}1i11,,SjtUa}t} „;.)' s,fS t3 F) {4,Y:, 3 .},r{f „fCSC rr, 144,.}?t1 t,7i 41st.,#o4,�z"Z tjki,?,rtYF#°{?)3}Irt f'�tf llliU trl;7ft} £tf{r„ssitS{fF }34f}{#}..Z�. t �,» C h`(Veft) 1026 - Ovacity(va") - 987 HCM Lane V1C Ratio 0,193 HCM Lane VC Ratio 0,133 HCMC rolDelay(s) 9.3 FCMQ 'dD81W(a) R2 HOM Lane LC6 A HCM Lane LOS A HCM95th°/duet( ) 0.7 CXMMhl/4!IeQ(+ t) 0,6 07114/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report QVTech Inc.-CM Page 3 QVTech Inc.-CM Page 3 Existing AM 4:Goldfield Rd&US-60 WB Ramps Existing PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone SilveraX TinirKjs 22-1180 Alliance Broadstone SilveraX TinirKjs Lane Configurations tt ttt If Lane Configurations r I tt ttt r Traft Volurne(0) 7 0 5 34 87 121 80 Traffic Val we(vph) 19 0 2 27 108 180 59 Future Volume(vph) 7 0 5 34 87 121 80 Future Volume(vph) 19 0 2 27 108 180 59 Tun)Type Perm N4 Perm prn+0 NA, NA Perrin Tun Type Penn NA Perm prat NA N4 Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Pennnifted Rieses; a 3 1 1 Pernrided Phases 3 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Sa4ch Prime Switch Prime Mnin-urn Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Minirrurn Initial(s) 8.0 8.0 8.0 5.0 20.0 20.0 20.0 Mnin t-m--Iefit(s) 44.9 49 40 10.6 31.t'i 31,6 31.6 MnirrixnSpfit(s) 44.9 44,9 44-4 %6 31.6 31B 31.6 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 'row split(1/0) -5D,01/. 50,01% 5001% 1221% 3T8% 37,81% 37,81/6 'raw Soft(IN 5Y)01% 50,01% 5301% 122% 3701b 3781/o 3781 YellowTnre(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 YellowTirre(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Afl-Rqd Tiff e(s) 2.0 20 20 2.0 20 ZO 2.0 Afl-Rad Tare(s) ZO ZO 2.0 ZO 20 20 20 Lost Trre Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost TrneAdjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Loa Thie(s) 59 59 59 56 56 56 56 Tdat Lost Tire-(s) 59 59 59 56 56 56 56 Lead/Lag Lag Lead Lead Lead Le@dLag Lag Lead Lead Lead Lead-Lagopfirriza? yes yes yes yes Load-Lagoorntw? Yes Yes Yes Yes Recall Mode None None None Max C4jbx C-Mw( C-Mw( Recall N/locle Nbne None None Max CmMax C-Max C-Max Cycle Leigh:90 Cyde Length:90 Actcatecl Cycle Length,90 Ackeitecl Oyde LeVK 90 Offset:0(01%),Referenced to phase 1:NBS6,Start of Green,N/laster Intersection Offset:0(01%),Referenced to phase 1:NBSB,Start of Green,Nbster Intersection NAM O)de:90 NaW Cycle.90 Control Type:Actuated-Ccadnated Control Type:Actuated-Coorclinated Splits and Phases: 4:Go1c1fie1dRd&US-6DMRams Splits and Phases: 4:Goldfield Rd&LJS-6DMRamps �4 -'1 1#4 #5 #4 #5 #4 95 #4 #5 #4 #5 A,07/1412022 Synchro 11 Report 07/1412022 Synchro 11 Report QvTech Inc.-CM Page 1 QvTech Inc.-CM Page 1 Existing AM 4:Goldfield Rd&US-60 WB Ramps Existing PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone SilveraX HCM Signalized Intersection Capacity A-dos t /* Lane Configurabors tt ttt r Lane Configurations r tt ttt r Tr.ft Veturris(0) 0 0 0 7 0 5 34 87 0 0 121 80 ThaffloVialurna(vIch) 0 0 0 19 0 2 27 108 0 0 ISO 59 Future Volume(vph) 0 0 0 7 0 5 34 87 0 0 121 80 Future Vdun-e(vph) 0 0 0 19 0 2 27 108 0 0 180 59 Ided Row(vichpl) 19M 19M 1900 190D 1900 190D 19M 19M 1900 19M 1900 190D Ideal Row( l) 19M 1900 1900 19M 1900 19M 190D 19M 190D 19M 19M 19M Total Lost tirre(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost tirre(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Lam LAIL Factor 0.95 0.91 0.95 IOD 0g6 0.91 1100 Lane LJOI.Factor 0,95 0.91 OM I.OD 0195 M 1.00 Frt 1.00 0.94 0.85 1.00 1.00 1.00 0,85 Frt 1.00 1.00 0.85 1.00 1-00 1.00 0,85 At Protected 0.95 0,97 IOD 0,% 1.00 UO 'LOO Fit protected 0.95 r 0.95 UD 0.95 1,00 'LOO 'LOO Satd.Row(prot) 1681 1547 1504 1770 3539 5085 1583 Satc.Row(prot) 1681 1610 1504 1770 3539 5085 1583 At Parrafted OAS ON 1.00 OM 1.00 1.00 1,00 At Permitted OM 095 1.00 0.61 1,00 1,00 1,00 Satcl, 681 1547 1504 1235 3539 5085 1583 Said.Row erm) 1681 1610 1504 1140 3539 5085 1583 Pe*-hour Wor,PHF 025 0,25 025 035 0.75 0,75 089 0.89 0,89 OiW 0,90 00 Peak-hourfador,PHF 025 0,25 Us 458 (158 0,58 0,79 0,79 0.79 0,84 0.84 0.84 Adj.Row(vph) 0 0 0 9 0 7 38 98 0 0 134 89 Adj.Row(vph) 0 0 0 33 0 3 34 137 0 0 214 70 RT0RRqducbcn(vph) 0 0 0 0 5 5 0 0 0 l 0 0 29 RTCR f?Bdu Mon(vph) 0 0 0 0 i 0 3 0 0 0 0 f 0 23 Lane Group Row 0 38 98 0 0 134 60 Lane 17 0 34 137 0 0 214 47 Turn Type Farm M Perm Wo M N& Perm Turn Type Ram NA Penn WrIat NA, I'A Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permtted Phases 3 3 1 1 PaTritted Phases 3 3 1 1 Actuated GreaR G(s) 6.8 6.8 6.8 66.1 60.7 607 607 Actuated Green,G(s) 6.7 6.7 6.7 66.2 60,8 60,8 60,8 STed-Grisen,O) 6.8 6,8 68 66.1 60.7 60.7 60.7 Effect-Green,Q(g) 67 V 67 66.2 60.8 60A 6H Actuated c,YC Ratio 0.08 0.08 0.08 0.73 0.67 0.67 0.67 Actuated g(C:Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Clearance,The(s) 5.9 5,9 5,9 66 56 H U Clearance Trr is(a) 5.9 59 5,9 H 5,6 5.6 &6 Vehicle Extension(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Vahide Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 L-Orp Cap(Wh) 127 116 113 939 2386 3429 1067 L-GpCap(vph) 125 119 Ill 876 239D 3435 1(W- Ws Ratio Prot cO.00 0.03 0.03 v/s Ratio Prot cO.00 0.04 o0.04 V/S Ratio Perm cOOD qOD ODD 0.03 (D.04 V/S Ratio Perm 0,01 001 OOD 003 OM v/C Ratio 0.05 0,00 0.00 0.04 0,04 0,04 0,06 v1c Ratio 0,13 0.14 0,00 0,04 0,06 0,06 0,04 Unform Oft dl 38,6 38.5 385 33 4,9 A9 5.0 Uht1brinri Delay,dl 38.9 39.0 38.6 5.2 4,9 4:9 4.9 Progression Factor 1.00 1.00 1.00 0.46 0.61 1.00 1.00 Progression Factor 1,OD 100 1,00 0.56 0.65 1.00 1,00 Incrennental Way,d2 RI Go 0.0 0.1 go 0.0 0.1 Incrarnerilal Delay,d2 i 0.2 02 0.0 01 0.0 010 0.1 Way(s) 38.7 38.5 38.5 1.6 ao 4.9 5.1 Delay(s) 39.1 39.2 38.6 1.9 3.3 5.0 5.0 Levi of Service, D D D A A A A Level of Sermce D D D A A A A AMeach Delay(s) H 38.5 26 5.0 Approach Delay(s) H 391 3.0 5.0 Approach LOS j A D A A Approach Ltd A D A A M I HONAMbontrot Way 56 FICM2000 Level of SM" A HCM20WQrtrd Wary 6A FOA200OLevelafServitce A HCM 2000 Volurne to Capacity ratio 0.05 HCM 2000 Volurne to Capacity ratio 0.07 Actuated Coe Length(s) gao Surn,of lost tirre(s) 17.1 Actuated Cycle Lo-Oh(s) WD 17A Intersection Capacity 1-kilization 42.6% ICU Level of Samoa A Intersection Capacity I.Ailization 45-71% ICU Level of Service A Analysis Period(rrin) 15 A-dysisPanod(rdri) 15 c Critical Lane Group, c Critical Lane Group 07/1412022 Synchro 11 Report 07/1412022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 Existing AM 4:Goldfield Rd&US-60 WB Ramps Existing PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Cuajes 22-1180 Alliance Broadstone Silveray Quajes EE MIN Lane GroLp Raw(vph) 6 5 5 38 98 134 89 Lane Go Raw(vph) 16 17 3 34 137 214 70 Vic Ratio 004 0.02 U2 0.04 004 0,04 OA8 Vic RWO 0.10 0,11 0,01 0.(4 0,06 006 0.06 Control Delay 37,2 0,2 0,2 13 3.4 5.4 1,2 Control Delay 38,8 39,0 0,0 1,5 3,6 53 07 01"Way 0.0 OD ao 0,0 Ob ao OD coewway, OD ao OD OD 0,0 0,0 0.0 Total Delay 37.2 0.2 0.2 1.3 3.4 5.4 1.2 Total Delay 38.8 39.0 0.0 1.5 3.6 5.3 0.7 0"-e two sm(ft) 3 0 0 1 4 8 0 tea—Length Mh(ft) 9 9 0 1 6 13 0 Q—Length 95th(ft) 12 0 0 3 8 16 12 aaB LffKp 95th(ft) 18 19 0 3 10 21 5 Internal Unk Ost(ft) 63q 484 300 Internal UnklDst(ft) 639 484 300 Tian Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Be-Cal—ly(vph) 730 729 709 955 2432 3495 1120 B—Capacity(vph) 730 699 709 890 2436 3WO 1192 Starvation Cap ReMctn 0 0 0 0 0 0 0 Starvation Cap Rgftjctn 0 0 0 0 0 0 0 8011back Cap Reductn 0 0 0 0 0 0 0 Spillba*Cap ReUtn 0 0 0 0 0 0 0 Storage Cap Redidn 0 0 0 0 0 0 0 Stuage Cap Redudn 0 0 0 0 0 0 0 Rq&wd We Me U1 0,01 001 ON 0.04 ON UB RqUed vie Ratio 0,02 a0Z aOD 0.04 0,06 H6 0,06 07/1412022 Synchro 11 Report 07/1412022 Synchro 11 Report QvTech Inc.-CM Page 2 QvTech Inc.-CM Page 2 Existing AM 5:Goldfield Rd&US-60 EB Ramps Existing PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray # Timings 22-1180 Alliance Broadstone Silveray Trrirgs -� -+* 'i 1 r'` 1► � ''� -► `fit � l* �► r r rrr� },.t,r rs,.,.,.,. r i==" t.y< >z>. - :t;,a .� »-i ">�F.•<>al r 1 7} }} f t li t# (( � �t ,.,,.Y. t £�{ ,r�� , ,.}5}S„�1fSC�{tb r;{{t ii} III (I# 3k>rr i} 1 1} {}n.;rJu 3.tkt i25,r ik l`�}171 J,,•••, }}s).t '$t4f fs3} .�{{�{. t' dr),'(t=;{z{{,ze,t lt,S##�) I 4f f({ ((f#5izi ft£ Lane Configurations a$r 1 ttt tt Lane Configurations 1 44 r ttf r tt TrafC7cVdt (vp) 60 0 30 61 17 91 37 TratficVdur (uph) 85 0 43 44 40 147 55 Future Volume(vph) 60 0 30 61 17 91 37 Future Vdurre(vph) 85 0 43 44 40 147 55 Turn Type Pam PEA Pam NA Perm pro" M Ta T)" Perrin PEA Penn NA Farm pn+pt NA , Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Perrntledphases`, 3 3 1 1 Petlritted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Snitch Phase taMch Phaw Mnimamintial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Mnim rnInitial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 MN-Split 44.9 44.9i 44.9 31B al,6 10.6 31.6 Mni-Solt(s) 44.9 44.9 44.9 31.6 31.6 106 31.6 Total Spit(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 "row split(IN 9D.01% 51M. 50 % 3T8°}0 37.Wl. 12.2%. 378% TOW Spit(1/0) %01/6 50.01% 5D,01/. 37.81% NO% 1221% 370/ YellowTirre(s) 3.9 3.9 3.9 3.6 3.6 3.6 a6 YelloWTirre(S) 3.9 3.9 3.9 3.6 3.6 3.6 a6 Al-RedTirre(s) 2R 20: 20 2.0 20 20 20 A114WTirr (s) 2.0 2.0 20 2.0 2.0 20 2.0 Lost Tirre Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Tirre Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOW Lost Tirm(S) 59 5.9 5.9 5.6 5;6 5.6 SO Total Lost Tirre(s) 5.9 52 5.9 5.6 5B .6 5.6 Le dLag Lead Lead Lag Lead LeacULag Lead Lead Lag Lead Leackag 01 Yes Yes Yes Yes L Lag C phnni e? YES Yes Y68. Yes t Recall I ... N ne Pore Pore C-Max C-Max Max C-Max Recall Mxie Now Nore Pore C-Max C-Max Melt Gives...: .f,n S r,lL f.„ i l\,.*•l`y`c�<uC "rS,Yt F ,f, f t4, }„' :".h { St tttC "t {.I 1 ;f.Z: (S Y=i., �7tp,J�ils,,t .�sttt�ts Y2t#=t.r,.�t4}t�,t, >>JiV#ssrt� i15r7?).�vrf}t �,r)�f,3tf5,r�#sLrS)i�kt)�rt�h�{(c��c �t` firs>•,�)(} L�711),j li, �ai rr�� r}i,5,¢#� �.f�z�=�•,as ii}i,x{Lt� )fr �1tStj,J�tadj a#rt�`t,�tzJ�F: Cycle Length:90 Cycle Length:90 AdtuatedOydI matedOydeLength:90 Offset:0(01%),Referenced to phase 1:NBSB,Start of Green,I Intersection Offset:0(01%),Referenced to phase 1:NBSB,Start of Green,Nlaster Intersection Natural Cycle:9€7 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US6D EB Rarrps Splits and Phi: 5:Goldfield Rd&US-6D EB Rarrps 44 z5 414 41 1#4 #5 »4 a5 «4 r5 :4 #5 01 07/1412M Synch 11 Repot 07/14/2022 Synch 11 Report QvTedn Inc.-CM Page 4 QVTedn Inc.-CM Page 4 Existing AM 5:Goldfield Rd&US-60 EB Ramps Existing PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Sgrialized Intersection Capacity A-dysis 22-1180 Alliance Broadstone Silveray HCM Sgrialized Intersection Capacity Analysis Lane Configurations ttt r fit Lane Configurations +tt tt Tmfflcvdum(vph) 6D 0 30 0 0 0 0 61 17 91 37 0 Traft Vdurna(vph) 85 0 43 0 0 0 0 44 40 147 55 0 Future Volume(vph) 60 0 30 0 0 0 0 61 17 91 37 0 Future Volume(viph) 85 0 43 0 0 0 0 44 40 147 55 0 idea Raw(v") 190D 1900 19M 19M 19M 1900 19M 19M 1900 190D 19M M Ideal Rox(v") 19M 19M 1900 1900 19M 19DD 19M 19DD IU M 19M 19M Total Lost tirre(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 Total Lost tirne(s) 5.9 5.9 5.9 5.6 5.6 5.6 5.6 L"UK Factor 0,95 0.91 0.95 1191 1.00 i1,00 U5 Lane LJOI.Factor 0,95 0.91 a95 0,91 IDO 1.00 0,95 Frt 1,00 0,99 0,85 1.00 0.85 1-00 1,00 Frt 1.00 0,99 0,85 1.00 0.85 1-00 1,00 Fit protected Q95 0,96 1,00 1,00 1.00 095 1.00 Rt Protedled 0,95 0,96 1,00 I.OD 1.00 0,95 10 Satd.RoN(prot) 1681 1600 1504 5085 1583 1770 3539 Satd.Row(prot) 1681 1598 1504 5085 1583 1770 3539 HtPernifted 0.95 OM IM 1.00 1.00 03D 1.00 Htpurrritlied 095 0'% UO 1,00 WD 072 r 1,00 Satd. 5085 1583 1306 3539 Satd.Row(perm) 1681 1598 15D4 5085 1583 1341 3539 Pe*-hourWor,PHF 068 0,68 0,68 0,25 0,25 025 078 038 038 ON ON 0,92 Peak-hourfaclorPHl' ON 0.87 0,87 1125 0,25 0,25 ON 0.84 OS4 0,80 0180 50 Adj.Row(vph) 88 0 44 0 0 0 0 78 22 108 44 0 Adj.Row(vph) 98 0 49 0 0 0 0 52 48 184 69 0 RTCRReducUon(vph) 0 42 37 0 0 0 0 0 7 0 a 0 RTCR Reduction(vph) 0 47 41 0 0 0 0 0 16 0 0 0 Lane Group Row(vphi 47 3 3 0 0 0 0 78 15 108 44 0 Lane Gp-p 0 0 0 52 32 184 69 0 Turn Type P8011 t A Perm IN Perrn proo NA Turn Type Farm M Perm IN Perin pirtipt NA, Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Penritled Phases 3 3 1 1 Parrifted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 60.7 60.7 661 60.7 Actuated Green,G(s) 6.7 6.7 6.7 60,8 60,8 662 60,8 M-fi-Green,9 68 6,9 6.8 60.7 601 Tal 60,7 Effecft-Greeng(s) 61 67 6.7 60.8 60,8 662 60,8 Actuated c,YC Ratio 0.08 0.08 0.08 0.67 0.67 0.73 0.67 Actuated g(C Patio 0.07 0.07 0.07 0.68 0.68 0.74 0.68 aearano-a Tim,(a) 5.9 5.9 5.9 5.6 5,6 H 5,6 Oearance Tim(s) 5.9 5.9 69 5.6 5,6 a6 U Vehicle FAerision(s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 12 Lane Grp Cap(Wh) 127 12D 113 3429 1067 987 2386 L-GPCM(V1Jh) 125 118 111 3435 1069 1012 2390 v/s Ratio Prot 0.02 00.01 0.01 v/s Ratio Prot 0.01 c0.01 0.02 v/s Ratio Perm c0,03 ODD 0.00 0,01 c0,07 v1s Ratio Form c1,03 0,00 Q00 0.02 c012 V/c Ratio 0.37 0.03 0,03 0,02 0,01 0,11 0,02 v/c Patio 0.42 0,03 0.03 0.02 0.03 0,18 0,03 Urflatin Way,di 39A 385 38.5 4A 48 3,5 4,8 Uniform Way,dI 39,8 38S 336 48 4.8 3,6 4,8 Progression Factor 1,00 1,00 1,00 1,00 1,00 0.42 0.67 Progression Factor 1,00 1,00 1.00 1.00 1,00 0.53 0.55 Increrriental Way,d2 01 oO OD QO 0.0 0.2 igO traerriental Delay,Q CIA 00 (10 0,0 0,1 04 0,0 Delay(s) 40.2 38.6 38.6 4.9 4.8 1.7 3.2 Way(s) 40.6 38.7 38.7 4.8 4.9 23 27 Level d Service D D D A A A A Level ofSermce 0 D D A A A A Approach Way(s) 392 H 4.9 2.1 Approach Way(s) 394 H 4.8 24 Approach LC S D A A A Approacht-O$ 0 A A A 0, ROM=Control W-UqNY 166 HCM206�Vevelof&Moa a HCM2000Contrd Delay IaB HCM200DI-evelolSerwroe a HCIVI 20M Volum to Capacity ratio 0.13 HCIVI 2000 Volunie to Capacity ratio 0.20 Actuated Cycle Length(s) 90,0 Surnaflostfiffe(s) 171 AdualedCydelength(s) 90.0 amd lost urn e(s) 171 Intersection Capacity Uilization 426% ICLJ Level of Sermce A Intersection Capacity Lkilization 45.71% ICU Level of Sermoe A Arialysis Period(trin) 15 ArefysisPedod(rrin) 15 c atical Lane Group c 0i6cal Lane Group 07/1412022 Synchro 11 Report 07/1412022 Synchro 11 Report QvTech Inc.-CM Page 6 QvTech Inc.-CM Page 6 Existing AM 5:Goldfield Rd&US-60 EB Ramps Existing PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Q ajes 22-1180 Alliance Broadstone Silveray « } 1 7} j} S t ji .{f f{ -}jjt}Y �3f}E '{$i S} { ,., {,�i n<{,�i n<{,�},�{¢€�} j}7} II) (II tfkl}Y.{f£f( ? ii {}k�;xJu 1 ik{ i2`+;` ,k 1`Y}tft t,'••, }}s).i. '34}}{�{3? {r{{r{{ �,,F^r;�t,S{i II) ��izf£� �l,s� tt Lane Group Flaw(vph) 47 45 40 78 22 108 44 Lane Coup Raw(vph) 52 51 44 52 48 184 69 V/b Pofic, 0.30 0.19 0.17 0.02 0.02 0.11 0,02 v/cRatio 0.34 022 0.19 Q.01 0.04 0.18 0.03 Control Delay 43.1 1.7 1.6 5.5 0.1 1.3 a8 Control Delay 44.3 3.5 1.9 55 0.1 1.8 3.0 QueLeDelay 010 0.0 0.0 0.0 U 0.0 0.0 C,3.>eueDeelay, 0.0 0,0 0.0 0.0 0.0 0.0 0.0 Total Way 43.1 1.7 1.6 5.5 0.1 1.3 a8 Total Way 44.3 3.5 1.9 5.5 0.1 1.8 3.0 Q to*50ttt(ft) 27 0' 0 4 0 2 2 QBW Length so(ft) 29 0 0 3 0 0 2 CuaR Length 95th(ft) 45 0 0 9 0 4 4 Queue Length 95th(ft) 64 5 0 7 0 21 6 Internet Unk Dist(ft) 535; 222 484 Internet Link Dist(ff) 535 222 484 Tian Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 C ty(vph) 730 750' 709 3495 1123 1003 2432 B Caparaty(vph) 73D 750 709 35W 1122 IM 2436 Starvation Cap ReMctn 0 0 0 0 0 0 0 Starvation Cap Paftxtn 0 0 0 0 0 0 0 SlelfbackCapRaductn 0 0i 0 0 0 0 0 Spillback Cap t n 0 ' 0 0 0 0 0 0 Storage Cap Ern 0 0 0 _ 0 0 0 _ 0 Storage Cap Redudn 0 : 0 0 0 0 _ 0 0 Radumd ulcRake, 0.05 U6 0.06 0,02 0.02 0.11 002 Ra&ced vlcRatio 0.07 0.07 0.€S 0.01 ON 018 1103 ii E zii S F �S S F , l�. �{}ni`s( nntzJ�J1 t€ 07/14/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report QVTech Inc.-CM Page 5 QVTech Inc.-CM Page 5 Existing AM 6:Goldfield Rd&Chevron Access Existing PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray ROM 6th TV\SC 22-1180 Alliance Broadstone Silveray ROM 6th TV\SC 7 x7 x7,v x7 x7 x7 x7 x7 x7 x7 x7 t S t E}zYz's}a �1 , Z <ft,<f ,'<f ,'<`,`t,<f ,'<ft zti 7 k 2.t3s + f}ts3�,{tt}ts3�,{tt.d,rt � t3s t3s t3s t3s t3s t3s ,.#i i71} t+.t1t kt kt€.rfs T{`2a t{t{}; s s s {s ts+t{1,7FY1,7FY1,7FY1,7FY1,7F{1,7F{1,7F{1,7F{1,7F{l,t{.}.�„ � r,}tr�.,t } tax S .},+tt.. � rr 't� ,� i� t,�'.,t.Q)h„�',17'Lsi��k`rr rr rr rr rr rr rr� 711gjf71 71 71 71 71 71j�tir �J��xt{tt�r�r}##.. }�s{,{t„tx,c,�sttj�t�tj�t�tj�t�t�t,s��ltlst��r,r,� IJ,� IJ,� IJ,� IJ,� IJ,� IJ,� IJ,� Ill r�F,tt��t{�tt��m>•t��`�€��fi�1},jr}�1Y 1E.. Int Delay,s(veh 2.7 In[Delay,siveh 2.5 Lane Configurations ' '';'' r ) 0 Lane Configurations a'a I `fit r ThAcVd,vdVh % 3 2 0 2 1 21 01 71 8 19 87 3 Traffic Vol,VeNh 5 0 1 4 0 28 1 64 8 28 57 9 Future Vol,veh/h 3 2 0 2 1 21 0 71 8 19 37 3 Future Vol,vel Jh 5 0 1 4 0 28 1 64 8 28 57 9 QxActirg Pete,Vhr 0 0 0 ' 0 0 0 0+ 0 0 0 0 0 Conflicting Fads,Nhr 0 0 0 0 0 0 0 0' 0 0 0 6 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free IRTChannelmed None we - None Now RF mc4 None hone -!lone Now Storage Length _ 50 50 50 ;wage Length 50 50 50 Ve s in Medan Storage,# - 0 0 0 0 Veh in Madan Storage,#i - 0 0 0' 0 Grade,% 0 a 0 ? 0 _ 0 Grade,o_ 0_ 0 0 _ 0 r Peaki-eurFactor 63 63 63 75 75 75 99 91 9D 74 74 92 Peak Hour Fad r 50 50 50 80 80 8) 55 55 55 87 87 87 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 mot pow 5 3 0 3 1 28 0 79 9 26 50 3 WA SON' 10 0 2 5 0 35 2 116 15 32 66 10 „ t x � =E EE� .f �... .,,t c tt „•,.. ,y sJ n >f_ t„} ,,, ;., t zY t{ S4 EZ314t tY,n;l {{c(t tt}Ftj F: tol„Zki tT r, ( .1 fzStr+F. 3f 22{Y 3 }lti YsJ �} }"' „ll}{. 1 ! l\{ { { ,tsie}71l s'}ttt rr; Ceriicing Row At 144 192 27 158 184 40 53 0 0 88 0 0 ConfiidirgRowAl 197 270 38 217 260 58 76 0 0 131 0 0 Stage 104 104 79 79 - - Stagel 135 135 - 120 120 Sty 2 40 88 79 105 _i _ _ _ Stage 2 62 135...;. 97... 140 _ Critical!YMy 7.54 6.54 6.94 7.54 654 694 4,14 4A4 Cr ficd Fkwuy 7,54 6,54 6.94 T54 6,54 694 4.14 4,14 Qiticd Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 1 6.54 5.54 6.54 5.54 - - - Offical HdwyStg2 6.54 5,64 - 6,,54 5,54 Clifical HdvYySIg2 6.54 5.54 - 6,54 1544 - Fdiav Lp HIJ W 3.52 4.02 3.32 3.52 4.02 3.32 222 2.22 - Follow-up HdMW 3.52 4.02 3.32 3.52 4.02 3.32 2.22 2.22 - PotCa4r1 Mamw 811 702 1042 i 793 709 <1022 1551 15TO Pat C p4 ManeLw 770 65t7 058 745 659 9Wii 1542 1462 Stage 1 890 808 921 829 Stage 1 877 798 - 872 796 Stage2 970 W 921 807 Stage 942 784 I - 923 794 Platoon blocked,% _ A v Ratoon blocked,% 1 1 1 1 1 1 A ^ M3vCap-1Icon 777 690 1042 :7 4 697 1022 1551 1506 Mov Ga4r1PVIarr T 3 635 105E 730 644 996 1542 1452 Mov Cap-2 Mar>euver T77 690 780 697 - - Mov Cap-2 Maneuver 730 635 730 644 - Stage 890 794 921 829 Stags 876 78D 871 :795 Stage 2 942 821 - 901 793 - - - - Stage 2 908 783 901 776 St ,z tt F /l }Zi Z{ 2F/{ttt tF7 tr i, t,t .,f ZS St i ,Z t rrS t6S ( F f£ lP r, ti } }Zlit r» ,,} Yit rS t r, FSS, CSm 14Fs<Y zi"lZJ 4 ,\, HOMCortrd Delay,s 9.9 88 0 2.4 HCM0o 6d Dday,s 9,7 8.9 at 22 HCMLC6 A A _.. R MLC6_. A A _. .,t' ,.. t{tI R}' trJ...t Y .;y. y.,e,z t,,.,' ,,s"" rx,zt, f .t.,..r.. ., k..r Rif' .. ti}'• 1}. i f }.J II P r '"zr y caperity( ) !; 1551 Tao M 1506 cvaaty(vd*) 1542 770 953'1452 HCM Lane V1C Ratio - 0,011 0.033 0.017 ROM Lane V/C Ratio 0,001 0,016 0.042 0.022 FICIVIOontralD (s) 0 99; 8.8 T4" H IContral0day(s) 7.3 9.7 &9 T5 HCM Lane LC6 A - A A A - HCM Lane LOS A - A A A - HCM 95th°Idile0(veh) 0 0 ' 0.1 0.1' HCM95thI/WileG(veh)_, 0 0 0.1 0.1 07114/2022 Synchro 11 Report 07/14/2022 Synchro 11 Report QVTechInc.-CM Page 4 QVTechInc.-CM Page4 Existing AM 7:Goldfield Rd&Resort Blvd Existing PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCU 6th TV\SC 22-1180 Alliance Broadstone Silveray HCU 6th TVVSC Int Delay,s(veh U Int Delay,s/veh 2 Larle C"Agurabom Y 0 'fit I-aleCaIguralJorG Y 0 tt Traffic Vd,veh/h 2 27 52 3 17 22 Traffic Vd,vdYh 2 17 56 5 13 49 Future Vol,vel-Vh 2 27 52 3 17 22 Future Vol,veb/h 2 17 56 5 13 49 Oarfiding Reds,Or 0 0 0 i 0 0 0 Corffiding Peds,Vhr 0 0 0 0 0 0 Sign Ca*ol Stop Stop Free Free Free Free Sign Ca*oI Stop Stop Free Free Free Free Rro)wwmd - Nbre We - NDre RrChwWLwd - Norle None - Nwe a-age Leh 0 50 - a-age L"h 0 50 - Vets in Medan Storage,# 0 0 - 0 Veh in Mdan image,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Reek HoLr Factor 60 60 86 86 70 70 PeakHourRdor 53 53 61 61 74 74 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 K"t9ow 3 45 60 3 24 31 WmTt Flow 4 32 92 8 18 66 Connicting F1cNAI 126 32 0 0 63 0 Conflictirg RcNAI 165 50 0 0 100 0 Sty 1 62 - - - - - stage 1 96 Stage 2 64 - Stage 2 69 Critical FbW 6.84 6.91 4.14 Critical HJW 6,84 6X 4,14 Qibcd Hdwy SIg 1 5.64 - - Crftical FdW Stg 1 5.84 Critical Hdwy Sig 2 5.84 - Critical Hd*y*2 684 Fclio*Lp HAW 3.52 3.32 229 FolloALp HJvy 3.52 3.32 2.22 Pat Cap-1 MmW M 1035 1538 PbtCap�l Mmwver 833 1008 1490 Stage 1 953 - - Stage 1 917 - - Slage2 951 - - Stage 2 967 - - Platoon blocked, e e Plabon blocked,% I Wvt�l Ifteuver 842 1035 1538 WvCap*1 Maneuver 823 1008 1490 Nbv Cap-2 Maneuver 815 - - Mdv Cap-2 lvbreAer 801 - - ;stage 1 953 - Stage 1 917 Stage 2 936 Stage 2 955 FEMCIontrul Delay,s 8.7 0 32 HCM Control Delay,a &8 0 1,6 HCM LOS A HCM LOS A capacity(Vd*01) 1016 1538 Cq)adty(vd-Vh) W 1490 HCM Lane V/C Ratio 0,048 0,016 HCM Lane VC Ratio 0,037 0,012 HCMax*d Delays) 87 T4 Hm Calrd Oda/(8) 8.8 7A HCM Lane LOS A A HCM Lane LOS A A HCM95th-%bIeQ(veh) 0.1 0 HCMg&h-/,tiIeQ(veh) 0.1 0 07/1412022 Synchro 11 Report 07/1412022 Synchro 11 Report QvTech Inc.-CM Page 5 QvTech Inc.-CM Page 5 Existing AM 8:Resort Blvd&Chevron Access Existing PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6thTVVSC 22-1180 Alliance Broadstone Silveray HCM 6thTVVSC .�t�,r,.sh3f mf�sY�j#t�s{'�'ri 2�}�, ;{.zlJI{�y�, ��{�;ak}��f�y,�� r�� r�� r�� r�� r�� r�� r�� r�� ffjS�7��rr{#�}rSS?>�S S,������FFlrii{r<4 '�S�I t«�,�7 iY�i111111111111111111111111111111111111111111111111111111111111 igl�if,`�t}F��fr���}}�rsr''{'t»lYi?„t Y�il11111111111i1ii�I��f j='i Int Delay,sfveh 1.7 In[Delay,slyeh 0.8 LaneCorAgurabons z ° LaneCcdguratiom ' Traffic Vol,Vd Vh 6 14 28 1 3, 1 ThAcVbI,veWh 2 27 10 0 1 3 Future Vol,ve" 6 14 28 1 3 1 Future Val,vehJh 2 27 10 0 1 3 C unll cting Poft 4#hr 0 0 0 0 0 0 Cor f sting Pecs,#ihr 0 0 0 0 0 0 Sic„p'r Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop RTChannaload Now Nona - None PT ized Norre -' - None '' tone S1 Leh 0 Sty L,Vh 0 Veh in Madan Stoic# - 0 0 ; 0 ! Veh in Mean Stones,#" - 0 0 0 Grade,% 0 0 0_. G ade,% 0 0 0 _ Pwk Hour F 83 83 60 + 60 33 92 Fkaek Hour Factor 81 81 42 42 1W 100 Heavy Vehicles.% 2 2 2 2 2 2 Heavy Vehicles.% 2 2 2 2 2 2 N"F0W 7 17 47 2 9 1 MCI ROW 2 33 ;24 0 1 3 } „rkr ec- }S v 5_E Y•t )'s 'r'....�>rf,.... � '* ) _�..r r ......Tl1 �E�tts ='mil% } i -,..._ •• k) ,. )s r Connict ng Flow Al 49 0 - 0 79 48 Conhicting HavAl 24 0 - 0 61 24 Stage 1 48; stage 1 24 Stage 2 _ + _ _ 31 Stage 2 - 37 _ Offical Hdaky 4,12 642 &22 Critical HJ" 4,12 6A2 6,22 Critical Hdvvy Stg 1 - 5.42 - Qiticd Hdwy Stg 1 - 5.42 - CdcalHcKWStg 2 5,42 C - Citical y5'tg2 642 Follow-up Hdvy 2.218 - 3.518 3.318 Fallow-up Hd\W 2.218 - 3.518 3.318 Pot caps i 15% f 924 1021 Pot t 1 1591 945 1052 StageS 1 _ 974 Sty 1 - 999 Platoon blocked,% Platoon blocked,% _ + thnrCap-1 Maneuver 1558 919 1021 lybiCap-Mbneuver M 944 1052 Mov Cap-2 Maneuver - - - 919 Mix Cap-2 None uver - - 944 Stage 1 969 Stage 1 998 Stage 2 e _ 992 Stage 2 985 _ r..i JS {r .G... ,t!!! }r•'t rid.. J. s_u. 1r, 5=Nfr's E\InY.iT .1._, �� r 3 T sT, �s'S riv"a, , � {i!,}t 'r`s } .., �4 s'£?lr {I F }t t r 4 7r J 3 , 4 1 {J 4 F5 {} l S , } s t 1}" } }}7. fi Y £ nY Y z}J zf, t4. 2 r) i £Y ri t i { 7 .Y{r ?}{{ ll1{ti ,bolt St{t?Ytt rFt{ ;{J l fir t�,�,}» }, }t / .t{{{;},.flrr{,r{t. it Cs tt.t c(,.f },'rrr( €ti #;ii;'c..S{€"} z,ti ? tt l�hrtS,51 {1,(t1i.,1��,ts}{ccr�T'4�f�Li�,{,?trtrU,}��}�rri�i(s�ri1{ ,3 P;,rr �s��a 5� FS, T,{�S�i#,!< i, i .,i}s st}r HC IVIControl Delay,s 22 0 89 l KY ODNrol Delay,a 0.5 0 8.5 FILM LOS A HCM LOS A Capacity( Yh) 155B 929 Capacity(Vehfh) 1591 HCM Lane VC Ratio 0,005 0.011 HCM Lane VC Ratio 0,002 0.004 HCM Control Daiay(S T3 0 8.9 HCM Control Delay(s) 7.3 i 0 8.5 HCM Lane LOS A A - A HCM Lane LOS A A p HCIVI95fh°ldileQ(veh) 0 0 HCM95th°lattieQ(v€h) 0 0 r 07114/2022 Synchro 11 Report 07l1412022 Synchro 11 Report C1vTech Inc.-CM Page 6 C1vTech Inc.-CM Page 6 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX D CRASH ANALYSIS WORKSHEETS C i v T e C h CRASH STATISTICS 1-1-1—L Goldfield Rd & Old West Hwy NWB C 2019-2020 C N O 0 0 z z, 0 ,k Code ON. Code No. Additional Useful Information Incidents 3 5 Veh 7 0 First Harmful Event Month Fatal 0 0 PSI 0 0 Circumstances OVERTURN ROLLOVER 1 0 January 1 0 Vehicle Action Codes Injury 1 1 Ppl 0 0 Hit & Run? 0 FIRE_EXPLOSION 2 0 February 2 1 1 GOING_STRAIGHT_AHEAD PDO 2 4 Veh Intersection Related? 0 :MMERSION 3 0 March 3 0 2 SI.,OWING_IN_TRAFFICWAY Pods/Bikes Summary n Inluries JACKKNIFE 4 0 April 4 0 3 STOPPED_IN_TRAFFICWAY o CARGO-EQUIPMENT-LOSS SHIFT 5 0 May 5 0 4 MAKING LEFT TURN O - _ - _ ny ro p ro Code No. FELL_JUMPED_FROM VEHICLE 6 0 June 6 0 5 MAKING RIGHT TURN w w 2 w JunctionRalatlon THROWN_OR_FALLID7G_OBJECT 7 0 July 7 0 6 MAKING U TURN Pedestrian: 0 0 0 0 NOT_JUNCTION_RELATED 0 0 OTHER NON COLLISION 8 0 August 8 0 7 OVERTAKING_PASSING Bicyclo: 0 0 0 0 -NTERSECTION_NON_INTERCHANGE 1 0 FQUIPMENT FAII,URF 9 0 September 9 1 8 CHANGING LANES INTERSECTION_RELATED NON_INTERCHANGE 2 0 SEPARATION_OF_UNITS 10 0 October 10 1 9 NEGOTIATING A CURVE Code No. FNTRANCE_FXIT_RAMP_NON_INTERCHANGF, 3 2 RAN OFF ROAD RIGHT 11 0 November 11 0 10 BACKING LiahtCondition RAILWAY_GRADE_CROSSIDIG 4 0 RAN_OFF_ROAD_LEFT 12 0 December 12 0 t.l. Avdding_V2hid0 2Ct Pedestnan DAYLIGHT 1 2 CROSSOVER_RELATED 5 0 CROSS_MEDIAN 13 0 Total 3 12 ENTERING_PARKING POSITION DAWN 2 1 FRONTAGE ROAD NON INTERCHANGE 6 1 CROSS_CENTERLID7E 14 0 13 LEAVING_PARKING_POSITION DUSK 3 0 DRIVEWAY 7 0 DOWNHILL_RUNAWAY 15 0 (Unit) S—f--Condition 14 PROPERLY_PARKED DARK_LIGHTED 4 0 ALLEY_ACCESS_RELATED 8 0 MOTOR_VEHICLE_IN_TRANSPORT 16 2 DRY 1 44 15 IMPROPERLY_PARKED DARK_NOT_LIGHTED 5 0 UNKNOWN_NON INTERCHANGE 9 0 PEDESTRIAN 17 0 WET 2 1 16 DRIVERLESS_MOVING_VEHICLE DARK_UNKNOWN_LIGHTING 6 0 THRU_ROADWAY 10 0 PEDALCYCLE 18 0 SNOW 3 0 17 CROSSING ROAD UNKNOWN 99 0 INTERSECTION_INTERCHANGE 11 0 RAILWAY VEIIICLE TRAIN ENGINE 19 0 SLUSH 4 0 18 WALKING_WITH_TRAFFIC Check Total 3 INTERSECTION_RELATED INTERCHANGE 12 0 LIGHT_RAILWAY_RAILCAR_VEHICLE 20 0 ICEFTAST 5 0 19 WALKING_AGAINST_TRAFFIC ENTRANCE_EXIT RAMP INTERCHANGE 13 0 ANIMAL_WILD_NON_GAME 21 0 WATER_STANDING_MOVING 6 0 20 STANDING Weather FRONTAGE ROAD INTERCHANGE 14 0 ANIKAL_WILD_GAME 22 0 SAND 7 0 21 LYING CLEAR 1 1 OTHER_PART_OF_INTERCHANGE 15 0 ANIMAL_PET 23 0 MUD_DIRT_GRAVEL 8 0 22 GETTING ON OR OFF VEHICLE CLOUDY 2 2 <Lot defined, 16 0 ANIKAL_LIVESTOCK 24 0 OIL 9 0 23 WORKING_ON_0.2_PUSHING_VEHICLE SLEET_NAIL_FREEZING_RAIN_OR DRIZZLE 3 0 UNKNOWN_INTERCHANGE 17 0 PARKED_MOTOR_VEHICLE 25 0 OTHER 97 0 24 WORKING_ON_ROAD RAIN 4 0 UNKNOWN_JUNCTION 18 0 WORK_ZONE-MAINTENANCE-EQUIPMENT 26 0 UNKNOWN 99 0 97 OTHER SNOW 5 0 UNKNOWN 99 0 STRUCK_6Y_FALLING SHIFTINO_CARLO_OR_OBJECT 27 0 Total 5 99 UNKNOWN SEVERE CROSSWINDS 6 0 OTHER_NON_INTERCHANGE 109 0 OTHER NON_FIXED_OBJECT 28 0 BLOWING_SAND_SOIL_DIRT 7 0 Check Total 3 IMPACT_ATTENUATOR-CRASH_CUSHION 29 0 Body Styles FOG SMOG_SMOKE 8 0 BRIDGE_OVERHEAD STRUCTURE 30 0 -1 NOT_REPORTED BI.RWING SNOW 9 0 C.1 'sipnMaL-C, BRIDGF RAIL 31 0 1 \Pa4s(xx,7er VeMdes,including RVs OTHER 97 0 SINGLE_VEHICLE 1 1 CULVERT 32 0 53 / UNKNOWN 99 0 ANGLE (front to side)(other than left turn) 2 2 CURB 33 1 54 \TRUCKS Check Total 3 LEFT_TURN 3 0 DITCH 34 0 88 / REAR END 4 0 FMBANKMF,N7 35 0 89 \MOBIL&HOMF (NOT RVS) Traf_cWayTvne„ HEAD_ON 5 0 GUARDRAIL, FACE 36 0 92 / ONF_WAY_TRAFFICWAY 1 2 STDESWTPE_SAME_DIRF,CTION 6 0 GUARDRAILFND 37 0 93 \TRAILF,RS TWO WAY NOT DIVIDED 2 0 SIDESWIPF,_OPPOSSTF,_DIRECTION 7 0 CONCRETE_TRAFFIC_BARRIER 38 0 120/ -;D T CONE O T_T RN AN 3 0 REAR TO SIDE 8 0 CABLE_TRAFFIC_BARRIER 39 0 121 \MOTORCYCLES 'N ROT CT D3 ANT D 4 T M DIAE 4 1 REAR TO RFAR 9 0 OTHER TRAFFIC BARRIFR 40 0 12B/ D O T M D AN.BARR IR 5 0 OTHER 97 0 TREE BUSH STUMP STANDING 41 0 254 UNKNOWN UNKNOWN 99 0 UNKNOWN 99 0 TRAFFIC_SIGN_SUPPORT 42 0 255 NOT REPORTED Cheek Total. 3 Check Total 3 TRAFFIC_SIGNAL.,_SUPPORT 43 0 UTILIrY POLE,LIGHT SUPPORT 44 0 Weekday, T=a.velD11oltion, I NORTH N OTHER_POST_POIE_OR_SUPPORT 45 0 .Sunday 1. 0 2 SOUTH S FFNCF 46 0 Monday 2 0 3 FAST E MAILBOX 47 0 Tuesday 3 1. 4 WEST W BUI1'..,D:NG 48 0 Wednesday 4 0 5 NORTHWEST NW OTHER_FIXED_OBJFCT 49 0 Thursday 5 0 6 NORTHEAST NR UNKNOWN 99 0 Friday 6 0 7 SOUTHWEST SW Not Reported 255 0 Saturday 7 2 8 SOUTHEAST SE Check Total 3 Check Total 3 99 UNKNOWN 99 CRASH LISTING Goldfield Rd & Old West Hwy NWB <---------------------- LOCATION -----------------------> <-DATE & TIME-X------------------- UNITS --------------------> <---------- PERSON -----------><------- SEVERITY -------><----- GENERAL ----> OFF- D DIS- INTERSECT ODOR D TO- SRFCND ALGMT GRADE DFCTS BSTYLE TRIP, UACT TTL TTL TYP INJR VLTN PHSCND NON INCIDENTS INJURIESATALITIES H LT WE JCT CAR HE M INCIDNT ON STREET MP SET R TANCE STREET NCIC NCIC YYMMDD HH:MM W TAL Ul U2 1 2 1 2 U1 U2 U1 U2 1 2 U1 U2 MOT NON 1 2 1 2 D1 D2 D1 D2 LOC PDOINJFATTT]:.,MOTNON-TLMO'PNON R CN CN REL CWY CD C 3489075 1.1 OLD WEST P 0 Goldfield (0) Rd 1113 1113 190223 08:09 '7 1 2 2 1 99 44 W I 1 0 1 3 5 0 1 1 0 0 0 0 0 N 2 1 203 1 33 1 3566569 11. OLD WFST P 0 Goldfield (0) Rd 11.13 1113 190923 15:06 3 2 1 1 _ 2 1 0 0 0 44 32 S NW 97 1 2 0 1 1 1 1 20 1 0 0 255 1 0 0 N 1 2 206 4 16 2 3705064 11 OLD WEST P 0 Goldfield (0) Rd 1113 1113 201024 14:39 7 2 1 1 1 2 1 0 0 0 30 47 S W 1 1. 4 0 1 4 1 1 20 0 0 0 255 1 0 0 N 1 2 203 1 16 2 4 1 .. .. 0 :. 0 0 255 Appendix D _rinsed: 7/18/2022 Goldfield Rd & Old West Hwy NWB Page 1 Goldfield Rd & Old West Hwy NWB SUMMARY BY YEAR SEVERITY/INCIDENTS 2019 2020 Totals Checks _LFJ�rj j dj JI F-iDO =An= 1 1 11 TOTA:: :! 1 IF 3 ,--Ed 1r Ted B Ela Ted SEVERITY1 INVOLVIKENT L-["-Lll�_t E 11-I N 1 1 �DO TJL ! 4 11 di Llf ]Llm i ii-1 ri--d Fill or d&_-I I-jua ALL-7 HEJ B=Tr--=N =Er Ed COLLISION MANNER AN F1 L_11_j' T:_T1,_1RN 3 R=ARF-iF-i,ND 4 AD 1,ON -- i- F1-D1--=1 =­FAM7__-D_RECT­ON RiiAR_-TOi=D:-_ 8 R__AR TO:,_R:_AR OT R NO:-,: N TOTAm 11 1 3 Appendix D Printed: 7/18/2022 Summary by Year Page 2 CRASH STATISTICS 1-11AI-L Goldfield Rd & 01dWest Hwy Exit C 2018-2019 C N O 0 0 s z, 0 ,k Code No. Code No. Additional Useful Information Incidents 6 7 Veh 8 0 First Harmful Event Month Fatal 0 0 Pal 0 0 Circumstances OVERTURN_ROLLOVER 1 0 January 1 1 Vehicle Action Codes Injury 2 2 Pal 0 0 Hit & Run? 2 FIRE_EXPLOSION 2 0 February 2 0 1 GOING_STRAIGHT_AHEAD PDO 4 5 Veh Intersection Related? 1 :MMERSION 3 0 March 3 0 2 SI.,OWING_IN_TRAFFICWAY Pods/Bikes Summary w In uries JACKKNIFE 4 0 April 4 0 3 STOPPED_IN_TRAFFICWAY o CARGO-EQUIPMENT-LOSS- _ - SHIFT 5 0 May 5 1 4 MAKING LEFT TURN O _ ny ro p ro Code No. FELL_JUMPED_FROM VEHICLE 6 0 June 6 0 5 MAKING RIGHT TURN w w 2 w JunctionRalaticn THROWD7_OR_FALLID7G_OBJECT 7 0 July 7 0 6 MAKING U TURN Pedestrian: 0 0 0 0 NOT_JUNCTION_RELATED 0 3 OTHER NON COLLISION 8 0 August 8 1 7 OVERTAKING_PASSING Bicyclo: 0 0 0 0 INTERSECTION NODI INTERCHANGE 1 1 FQUIPMFNT FAII,URF 9 0 September 9 1 8 CHANGING LANES INTERSECTION_RELATED NON_INTERCHANGE 2 0 SEPARATION_OF_UNITS 10 0 October 10 0 9 NEGOTIATING_A_CURVE Code No. FNTRANCE_FXIT_RAMP_NON_INTERCHANGF, 3 1 RAN OFF ROAD RIGHT 11 0 November 11 0 10 BACKING LiahtCondition RAILWAY_GRADE_CROSSIDIG 4 0 RAN_OFF_ROAD_LEFT 12 0 December 12 2 t.l. Avdding_Vehid0 2Ct Pedestnan DAYLIGHT 1 3 CROSSOVER_RELATED 5 1 CROSS_MEDIAN 13 0 Total 6 12 ENTERING_PARKING POSITION DAWN 2 2 FRONTAGE_ROAD_NON_INTERCHANGE 6 0 CROSS_CENTERLID7E 14 0 13 LEAVING_PARKING_POSITION DUSK 3 0 DRIVEWAY 7 0 DOWNHILL_RUNAWAY 15 0 (Unit) SurfaceCondition 14 PROPERLY_PARKED DARK_LIGHTED 4 1 ALLEY_ACCESS_RELATED 8 0 MOTOR_VEHICLE IN TRANSPORT 16 1 DRY 1 7 15 IMPROPERLY_PARKED DARK_NOT_LIGETED 5 0 UNKNOWN_NON INTERCHANGE 9 0 PEDESTRIAN 17 0 WET 2 0 16 DRIVERLESS_MOVING_VEHICLE DARK_UNKNOWN_LIGHTING 6 0 THRU_ROADWAY 10 0 PEDALCYCLE 18 0 SNOW 3 0 17 CROSSING ROAD UNKNOWN 99 0 INTERSECTION_INTERCHANGE 11 0 RAILWAY VEHICLE TRAIN ENGINE 19 0 SLUSH 4 0 18 WALKING_WITH_TRAFFIC Check Total 6 INTERSECTION_RELATED INTERCHANGE 12 0 LIGHT_RAILWAY_RAILCAR_VEHICLE 20 0 ICE_TAST 5 0 19 WALKING_AGAINST_TRAFFIC ENTRANCE_EXIT RAMP INTERCHANGE 13 0 ANIMAL_WILD_NON_GAME 21 0 WATER_STANDING_MOVING 6 0 20 STANDING Weather FRONTAGE_ROAD_IDITERCHANGE 14 0 ANIKAL_WILD_GAME 22 0 SAND 7 0 21 LYING CLEAR 1 5 OTHER_PART_OF_INTERCHANGE 15 0 ANIMAL_PET 23 0 MUD_DIRT_GRAVEL 8 0 22 GETTING_ON_OR_OFF VEHICLE CLOUDY 2 1 <Lot defined, 16 0 ANIKAL_LIVESTOCK 24 0 OIL 9 0 23 WORKING_ON_0.2_PUSHING_VEHICLE SLEET_NAIL_FREEZING_RAIN_OR DRIZZLE 3 0 UNKNOWN_INTERCHANGE 17 0 PARKED_MOTOR_VEHICLE 25 0 OTHER 97 0 24 WORKING_ON_ROAD RAIN 4 0 UNKNOWN_JUNCTION 18 0 WORK_ZONE-MAINTENANCE-EQUIPMENT 26 0 UNKNOWN 99 0 97 OTHER SNOW 5 0 UNKNOWN 99 0 STRUCK_6Y_FALLING SHIFTINO_CARLO_OR_OBJECT 27 0 Total 7 99 UNKNOWN SEVERE CROSSWINDS 6 0 OTHER_NON_INTERCHANGE 109 0 OTHER NON_FIXED_OBJECT 28 0 HLOWING_SAND_SOIL_DIRT 7 0 Check Total 6 IMPACT_ATTENUATOR-CRASH_CUSHION 29 0 Body Styles FOG SMOG_SMOKE 8 n BRIDGE_OVERHEAD STRUCTURE 30 0 -1 NOT_REPORTED BI.RWING SNOW 9 0 Co,1, 'sipnMaL-C, BRIDGE RAIL 31 0 1 \Pa4s(xx,7er VeMdes,including RVs OTHER 97 0 SINGLE_VEHICLE 1 5 CULVERT 32 0 53 / UNKNOWN 99 0 ANGLE (front to side)(other than left turn) 2 0 CURB 33 4 54 \TRUCKS Check Total 6 LEFT_TURN 3 0 DITCH 34 0 88 / REAR END 4 0 FMBANKMF,N7 35 0 89 \MOBILFHOMF (NOT RVS) Traf_cWayTvne„ HEAD_ON 5 0 GUARDRAIL, FACE 36 0 92 / ONF_WAY_TRASFICWAY 1 3 STDESWIPE_SAME_DIRECTION 6 .. GUARDRAILFND 37 0 93 \TRAILF,RS TWO WAY NOT DIVIDED 2 0 SIDFSWIPF_OPPOSSTE_DIRECTION 7 0 CONCRETE_TRAFFIC_BARRIER 38 0 120/ D T CONE O T_T RN AN 3 0 REAR_TO_SIDE 8 0 CABI.,E_TRAFFIC_BARRIER 39 0 121 \MOTORCYCLES :N ROT CT D:::.ANT D 4 T M D:AE 4 1 REAR_TO_RFAR 9 0 OT'HF',R TRAFFIC BARRIER 40 0 128 / D O T M D AN.BARR IR 5 .. OTHER 97 0 TREE BUSH STUMP STANDING 41 0 254 UNKNOWN UNKNOWN 99 1 UNKNOWN 99 0 TRAFFIC_SIGN_SUPPORT 42 1 255 NOT REPORTED Cheek Total. 6 Check Total 6 TRAFFIC_SIGNAL.,_SUPPORT 43 0 UTILIrY POLE,LIGHT SUPPORT 44 0 Weekday, Trd e_D,,c ti.h I NORTH N OTHER_POST_POIE_OR_SUPPORT 45 0 .Sunday 1. 2 2 SOUTH S FENCF 46 0 Monday 2 .. 3 FAST E MAILBOX 47 0 Tuesday 3 0 4 WEST W BU.Ci'..,DlNG 48 0 Wednesday 4 0 5 NORTHWEST NW OTHER_FIXED_OBJFCT 39 0 Thursday 5 1 6 NORTHEAST NF UNKNOWN 99 0 Friday 6 0 7 SOUTHWEST SW Not Reported 255 0 Saturday 7 2 8 SOUTHEAST SE Check Total 6 Check Total 6 99 UNKNOWN 99 CRASH LISTING Goldfield Rd & 01dWest Hwy Exit <---------------------- LOCATION -----------------------> <-DATE & TIME-X------------------- UNITS --------------------> <---------- PERSON -----------><------- SEVERITY -------><----- GENERAL ----> OFF- D DIS- INTERSECT OFCR D TO- SRFCND ALGMT GRADE DFCTS BSTYLE TRIP, UACT TTL TTL TYP INJR VLTN PHSCND NON INCIDENTS INJURIESATALITIES H LT WE JCT CAR HE M INCIDNT ON STREET MP SET R TANCE STREET NCIC NCIC YYMMDD HH:MM W TAL Ul U2 1 2 1 2 U1 U2 U1 U2 1 2 U1 U2 MOT NON 1 2 1 2 D1 D2 D1 D2 LOC PDOINJFATTT]:.,MOTNON-TLMO'PNON R CN CN REL CWY CD C 3335071 1.1 GOI.,DcUE1..,D P 0 0?d West Hwy Non-Car,1113 1113 180128 0 1:4 9 1 1 1 3 1 99 50 N 1 1 0 1 2 3 0 1 1 0 0 0 0 O N 4 1 0 1 33 1 34076:-8 11. OLD WREST P 0 Goldfield Rd 1113 1113 1808a.9 05:54 1 1 1 1 1 99 44 W 1 1 0 1 3 3 0 1 _. 0 0 0 0 0 Y 2 1 5 1. 33 1. 3462439 11 OLD WEST P 0 Goldfield Rd 1113 1113 181222 08:12 '7 1 1 3 1 0 50 S 1 1 0 1 1 2 0 1 0 0 N 2 1 1 5 42 1 3474659 11. OLD WFST P 0 Goldfield Rd 11.13 11.13 181229 16:33 7 1. 1 1 1. 0 44 BE 1 1 0 1 1 2 0 1 0 0 N 1. 1 0 1 33 1 3528119 11. GOLDFIELD P 0 Old West Hwy 1113 1113 190520 06:37 2 1 1, 3 1 0 44 S 1 2 0 1 4 1 1 ## 0 0 0 255 1 0 0 N 1 2 3 99 33 1 3558273 11. GOLDFIELD M 200 Old West Hwy 1.1.13 11.13 1.90905 15:01 5 2 1 _. 2 2 3 0 0 0 31. 50 NW NW 1 1 2 0 1 1. 99 99 12 i. 0 0 255 1. 0 0 Y 1 1. 0 4 1.6 6 Appendix D _rinsed: 7/18/2022 Goldfield Rd & 01dWest Hwy Exit Page 1 Goldfield Rd & OldWest Hwy Exit SUMMARY BY YEAR SEVERITY/INCIDENTS 2018 2019 Totals Checks N:,-": _LFJ❑rj j Idl JI F-iDO =An= F1 4 TOTA:: :! 4 IF il ITALA-Irl" i:d 1r Ted B:0LJ Cl_! Ll:J&,'_,"_l B El-I= Fd SEVERITY1 INVOLVIKENT N mlr=, r_1 F-1 1DO I 3 11 di Ltr[ ]L7_m'i!mri__d Fill or d&_-I I-jua ALL-7 HEJ B=Tr--=N =Er Ed COLLISION MANNER 1 4 1 ❑ AN L_11_j' T:_T1,_lRN 3 R=ARF-iF-i,ND 4 A� Dl,ON , -- i- Fl-Dl--=l =­FAM7__-D-RECT­ON 1 1 RiiAR_-TOi=D:-_ 8 R__AR TO:,_RAR OT R NO:-,: N TOTAm 4 Appendix D Printed: 7/18/2022 Summary by Year Page 2 CRASH STATISTICS Involvement Goldfield Rd & US60 WB Off-ramp c 2018-2020 c o, G m o 0 0 tiM A, N r° Code No. Code No. Additional Useful Information 1'ncidelts 4 8 ven 11 0 L_i. Ha r=r�£ulEvent Month Fatal 0 0 Ppi 0 0 circumstances OVERTURN ROLLOVER 1 0 January 1 3 Vehicle Action Codes T nj ury 1 1 PP' 0 0 Hit & Run? 0 cIRE_FXPZOSION 2 0 February 2 1 1 GOING STRAIGHT AHEAD PDO 3 6 Van Intersection Related? 1 IMMERSION 3 0 March 3 0 2 SLOWING_IN_'PRAFFICWAY P.ds/S.ikes,_Summa_Gy m InjJC,ie S, JACKKNIFE 4 0 April 4 0 3 S7:'OPPFD_IN_'TRAFI'ICWAY K o CARGO-EQUIPMENT-LOSS- - SHIFT 5 0 May 5 0 4 MAKING LEFT TURN a �o N ° ° Code No. rF 11.., JUMPFID_r ROM VETHICLE 6 0 June 6 0 5 MAKING_RTGH'T_'CURN G w 2 w Junctiortelation THROWN_OR FALLING OBJECT 7 0 July 7 0 6 MAKING_U_TURN Pedestrian: 0 0 0 0 NOT JUNCTION RELATED 0 1 O-CHER_NON COLLISION 8 0 Amgnst 8 0 7 OVERT'AKING_PASSING Bicycle: 0 0 0 0 INTERSECTION_NON_INTERCHANGE 1 0 EQUIPMENT_FAILURE 9 0 September, 9 0 8 CHANGING LANES INTFRSEC PION_Rl,'LATED NON IN'CERCHANGE 2 1 SFPARATTON OF UNITS 10 0 October 10 0 9 NFGOTIATING A CURVE Code No. ENT'RANCE_FXIT RAMP NON_TNTI,:�RCHANGE 3 1 RAN OIF ROAD_RSGH7:` 11 0 November 11 0 10 HACKING Lj„gnl tCondJi tj,,,pn RAILW7AY_GRADF_CROSSING 4 0 RAN OFF ROAD LEFT 12 0 December 12 0 11 Adding_Vehide Ci7;ed Pcedestran DAYLIGHT 1 4 CROSSOVER RELATED 5 0 CROSS MEDIAN 13 0 Total 4 12 ENTERING PARKING POSITION DAWN 2 0 E'RON'TAGE_ROAD_NON_IN`PERCHANGE 6 1 CROSS_CFN`PEftLINF 14 0 13 1,FAVING_PARKING_POSTTI0N DUSK 3 0 DRIVEWAY 7 0 DOWNHILL_RUNAWAY 15 0 (Unit) ourfaceCondition 14 PROPERLY PARKED DARK IUGHT:TD 4 0 A7LFY_ACCFSS_RY`LATFD 8 0 MO'FOR__VEHICl,F_IN_'PRANSPORT 16 4 DRY T. 8 15 IMPROPERLY_PARKED DARK_NOT LIGHTED 5 0 UNKNOWN_NON_INTERCHANGE 9 0 PEDESTRIAN 17 0 WET 2 0 16 DRIVERLESS_MOVING_VEHICLE DA.RH_UNKNOWN_I.,IGH'CING 6 0 THRU ROADWAY 10 0 PEDALCYCLE 18 0 SNOW 3 0 17 CROSSING_ROAD UNKNOWN 99 0 INTERSECTION_INTERCHANGE 11 0 RAILWAY VEHICLE TRAIN ENGINE 19 0 SLUSH 4 0 18 WALKING_WITH_TRAFFIC Check 'Total. 4 INTFRSEC'CION_RFLA'PED_INCF�RCHANGF 12 0 LIGHT RAILWAY RAILCAR VEHICLE 20 0 ICE FROST 5 0 19 WALKING_AGAINST_1'RAI;'FIC ENTRANCE_EXIT RAMP INTERCHANGE 13 0 ANIMAL_WILD_NON_GAME 21 0 WATER_STANDING_MOVING 6 0 20 STANDING Weather PRONTAGE_ROAD_TN'TERCHANGE 14 0 ANIMAL WILD GAME 22 0 SAND "7 0 21 I.GING CLEAR 1 4 OTHER_PART_OF_INTERCHANGE 15 0 ANIMAL PET 23 0 MUD_DIRT_GRAVEL 8 0 22 GETTING_ON_OR_OFF_VEHICLE CLOUDY 2 0 not defined> 16 0 ANIMAL LIVESTOCK 24 0 OIL 9 0 23 WORK.TNG_ON_OR_PUSHING_VEHICLE SLEET HAIL FREEZING RAIN OR DRIZZLE 3 0 UNKNOWN_INTERCHANGE 17 0 PARKED MOTOR VEHICLE 25 0 OTHER 97 0 24 WORKING_ON_ROAD RAIN 4 0 UNKNOWN_J'UNCTION 18 0 WORK ZONE MAINTENANCE_EQUIPNIE.NT 26 0 UNKNOWN 99 0 97 OTHER SNOW 5 0 UNKNOWN 99 0 STRUCK_BY FALLING SHIETINC.CARGO OR OBJECT 27 0 Total 8 99 UNKNOWN SFVERE CROSSWINIDS 6 0 OTHER_NON_INIFRCHANGF 109 0 OTHER NON FIXED OBJ'EC7:` 28 0 BLOWING_SAND_SOIL_DIRT 7 0 Check Total 4 IMPACT A'ITENU IOIt CRASH CUSHION 29 0 Body Stvles BOG SMOG_SMOKE 8 0 BRIDGE OVERHEAD STRUCTURE 30 0 -1 NO'C_RFPOR'TED BLOWING_SNOW 9 0 Coll,isionManner BRIDGE RAIL 31 0 1 \Passenger Vehides,indudirg Ws OTHER 97 0 SINGIF_VEHTCLE 1 0 CULVERT 32 0 53 / UNKNOWN 99 0 ANGLE (front to side)(other than left turn) 2 0 CURB 33 0 54 \'T'RUCKS Check Total 4 LEFT TURN 3 1 DITCH 34 0 88 / REAR END 4 0 EMBANKMENT:' 35 0 89 \MOBILEHOME (NOT GAS) TrafficWaVTVPP F_EAD ON 5 0 GUARDRAIL_FACE 36 0 92 / ONE_WAY_TRAFFICWAY 1 C SIDESWIPE SAME DIRECTION 6 3 GUARDRAIL_END 37 0 93 \TRAILERS TWO WAY NO'T_DIVIDED 2 2 SIDESWIPE_OPPOSITF_DIRECTTON `/ 0 CONCRFTF_'TRAi•FIC_BARRIE',R 38 0 120 / D:.D T CONT.N O T::T RN AN: 3 2 REAR TO_SIDE 8 0 CABLE_TRAFFIC_BARRIER 39 0 121 \MOTORCYCLES 'I N ROT CT D: ANT D 4 t T M UAE 4 0 REAR TO REAR 9 0 OTHER_TRAFFIC BARRIER 40 0 128 / D':D 0 T M D AN.BARR '_.R 5 0 OTHER 97 0 TREE BUSH STUMP STANDING 41 0 254 UNKNOWN UNKNOWN 99 0 UNKNOWN 99 0 TRAFFIC SIGN SUPPORT 42 0 255 NOT REPORTED Chock Total 4 Check Total 4 TRAFFIC_SIGNAL_SUPPORT 43 0 UTILITY POLE LIGHT SUPPORT 44 0 W¢ kdav TravelDirection 1 NORTH N OTHER POST POLE�OR SUPPORT 45 0 Sunday 1 2 2 SOUTH S FENCE 46 0 Monday 2 0 3 EAST E MAILBOX 47 0 'Tuesday 3 0 4 WEST W BUILDING 48 0 Wednesday 4 0 5 NORTHWEST NW OTHER_FIXED_OBJECT 49 0 Thursday 5 2 6 NORTHEAST NE UNKNOWN 99 0 Friday 6 0 7 SOUTHWFS'T SW Not Reported 255 0 Saturday 7 0 8 SOUTHEAST SE Chock Total 4 Check Total.. 4 99 UNKNOWN 99 CRASH LISTING Goldfield Rd & US60 WB Off-ra= <---------------------- LOCATION -----------------------> <-DATE & TIME-X------------------- UNITS --------------------> <---------- PERSON -----------><------- SEVERITY -------><----- GENERAL ----> OFF- D DTS- INTERSECT OFCR D TO- SRFCND ALGMT GRADE DFCTS BSTYLE TRDR FACT TTL TTL TYP SNJR GLYN PHSCND NON INCIDENTS INJURIESFATALITIES H LT WE JCT TAR HE M INCIUNT ON STREET MP SET R TANCE STREET NCIC NCIC YYMMDD HH:MM W TAL Ul U2 1 2 1 2 Ul U2 Ul U2 1 2 Ul U2 MOT NON 1 2 1 2 Dl D2 Di D2 LOC PDOINJPAT"TTLMOTNON`TTLMO`TNON R AN AN REL CWY CD C 3327884 11 GOLDFIELD P 500 US-60 Exit 198 J-Ramr 1113 1113 180128 13:03 1 2 1 1 1 1 1 0 0 0 44 30 S S 8 1 3 0 1 1 1 1 12 1 0 0 255 1 0 0 N 1 1 0 2 16 6 4 1 0 0 3580689 11 GOLDFIELD P 500 US-60 Exit 198 J-Ramp 1113 1113 180128 13:03 1 2 1 1 1 1 1 0 99 99 44 15 E N 4 1 3 0 1 1 1 1 99 99 0 C 255 1 C 0 N 1 1 6 2 16 6 3631089 11 GOLDFIELD P 100 US-60 Exit 198 C-Ramp1113 1113 200123 12:52 5 2 1 1 1 1 2 0 0 0 50 44 S S 8 2 3 0 1 4 1 1 12 0 0 0 255 1 0 0 N 1 1 206 3 16 6 1 1 1 0 2 3637779 11 GOLDE"IELD P 0 US-60 Exit 198 J'-Ramp1.11.3 1.11.3 200227 14:41 5 2 1 1 1 1 1 0 0 0 44 15 NW S 4 1 2 0 1 1 3 1 20 1 0 0 255 1 1 0 0 0 0 0 N 1 1 3 3 16 3 Appendix A Printed: '7/18/2022 Goldfield Rd & US60 ED Off-ramp Page 1 Goldfield Rd & US60 WB Off-ramp SUMMARY BY YEAR SEVERITY/INCIDENTS 2018 2019 2020 Totals Checks N:,-": 7[]I_] _LFJ❑rj j dj JI F-iDO =An= F1 1 3 TOTA:: IF 4 ,--Ed Tr Ted B Ela= ❑ Fd SEVERITY1 INVOLVIKENT L-L"-Lll�_t E 11-I N 1 1 JDO T,J DU 4 U Lj'JO i L]Ld L Jir Llul!'"iIi-Irl--d F11 OT_d & B=T=N =Er Ed COLLISION MANNER _1!N I j, U: " 1: AN L-11 ',_,T:_T1,_1RN 3 1 1 R=ARFiF-i,ND 4 D1,� ON , --A i- F1-D1--=1 =­FAM7__-D_RECT­ON F1 1 3 Rii ARC Oi=D:-_ 8 R__AR TO:,_RAR OT R NO:-,: N TOTAm 11 11 4 Appendix D Printed: 7/18/2022 Summary by Year Page 2 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX E TRIP GENERATION CALCULATIONS ,C4'0'--E—E, C i v T e c h 22-1180 Alliance Broadstone Trip Generation Proposed June 2022 Methodology Overview This form facilitates trip generation estimation using data within the Institute of Transportation Engineer's(ITE)Trip Generation Manual,11th Edition and methodology described within ITE's Trip Generation Handbook,3rd Edition.These references will be referred to as Manual and Handbook,respectively.The Manual contains data collected by various transportation professionals for a wide range of different land uses,with each land use category represented by a land use code(LUC).Average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized LUC in various settings and time periods.The Handbook indicates an established methodology for how to use data contained within the Manual when to use the fitted curve instead of the average rate and when to adjustments to the volume of trips are appropriate and how to do so.The methodology steps are represented visually in boxes in Figure 3.1.This worksheet applies calculations for each box if applicable. Box f-Define Study Site Land Use Type&Site Characteristics, i Box 2-Define Site Context I Box 3-Define Analysis Objectives Trip Types&Time Period The analyst is to pick an appropriate LUC(s)based on the subject's zoning/land use(s)/future land use(s).The size of the land use(s)is described in reference to an independent variable(s)specific to(each)the land use(example:1,000 square feet of building area is relatively common).Context assessment is to"simply determine whether the study sites is in a multimodal setting"and"could have persons accessing the site by walking,bicycling,or riding transit."This assessment is used in Box 4.The Manual separates data into 4 setting categories-Rural,General Urban/Suburban, Dense Multi-Urban Use and Center City Core.This worksheet uses the following abbreviations,respectively:R,G,D,and C.The Manual does not have data for all settings of all land use codes. The"General Urban/Suburban"setting is used by default. This tool will focus on vehicular trips for a 24-hour period on a typical weekday as well as its AM peak hour and PM peak hour.Other time period(s)may be of interest. Land Use T es and Size LR-Apartments No Rail 275 Dwelling Units 220 Multifamily Housing(Low-Rise Not Close to Rail) Box 4-Is Study Site Multimodal? Per the Handbook,"if the objective is to establish a local trip generation rate for a particular land use or study site,the simplified approach(Box 9)may be acceptable but the Box 5 through 8 approach is required if the study site is located in an infill setting,contains a mix of uses on-site,or is near significant transit service." Box 5/13ox 9 Estimate Baseline Trips/Estimate Vehicular Trips(Determine Equation) Vehicle trips are estimated using rates/equations applicable to each LUC.When the appropriate graph has a fitted curve,the Handbook has a process(Figure 4.2)to determine when to use it versus using the weighted average rate or collecting local data.The methodology requires for engineering judgement in some circumstances and permits engineering judgement to override or make adjustments when appropriate to best project(example 1:study site is expected to operate differently than data in the applicable land use code-such as restaurant that is closed in the morning or in the evening;example 2:LUC data in a localized area fails to be represented by the typically selected fitted curve/weighted average rate-a small shop/LUC 820,AM peak hour is skewed by the high y-intercept). Equation T pe:Equation Used Equated Rate (T pe Abbreviations:Wei hted Avera a Rate("WA",Fitted Curve T pe:Equation Used[Equated Rate LR-Apartments No Rail C:T=X*7.41[7.41] C:T=X*0.45[0.45] FC:T=0.43*X+20.55[0.50] Box 5/13ox 9-Estimate Baseline Trips/Estimate Vehicular Trips(Apply Equations and in/out Distributions) Baseline Vehicular Trips • s LR-Apanments No Rail 50% 1,019 1,019 2,038 24% 30 94 124 63% 88 51 139 Appendix E Page 1 of 1 August 2022 22-1180 Alliance Broadstone Trip Generation August 2022 Methodology Overview This form facilitates trip generation estimation using data within the Institute of Transportation Engineer's(ITE)Trip Generation Manual,11th Edition and methodology described within ITE's Trip Generation Handbook,3rd Edition.These references will be referred to as Manual and Handbook,respectively.The Manual contains data collected by various transportation professionals for a wide range of different land uses,with each land use category represented by a land use code(LUC).Average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized LUC in various settings and time periods.The Handbook indicates an established methodology for how to use data contained within the Manual when to use the fitted curve instead of the average rate and when to adjustments to the volume of trips are appropriate and how to do so.The methodology steps are represented visually in boxes in Figure 3.1.This worksheet applies calculations for each box if applicable. Box 1-Define Study Site Land Use Type&Site Characteristics The analyst is to pick an appropriate LUC(s)based on the subject's zoning/land use(s)/future land use(s).The size of the land use(s)is described in reference to an independent variable(s)specific to (each)the land use(example:1,000 square feet of building area is relatively common). Land Use Types and Size 0.2 FAR 2.4 RAR 43560 SF Lot 1®High Turnover 10.803 1,000 square feet 931 High Turnover(Sit Down)Restaurant Sit Down Restaurant Lot 3:Hotel or Motel 178 Rooms 310 Hotel Lot 4:Medical,Dental or Health Office 8 276 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Lot 5:Medical,Dental or Health Office 8.102 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Lot 6:Medical,Dental or Health Office 7 928 1,000 square feet 720 Medical-Dental Office Building Buildings and Clinics Lot 7:High Turnover 6.447 1,000 square feet 931 High Turnover(Sit Down)Restaurant Sit Down Restaurant Lot 8:Medical,Dental or Health Office 100.014 1,000 square feet 720 Medical-Dental Office Building Buildin s and Clinics Box 2•Define Site Context Context assessment is to"simply determine whether the study sites is in a multimodal setting"and"could have persons accessing the site by walking,bicycling,or riding transit."This assessment is used in Box 4.The Manual separates data into 4 setting categories-Rural,General Urban/Suburban,Dense Multi-Urban Use and Center City Core.This worksheet uses the following abbreviations,respectively: R,G,D,and C.The Manual does not have data for all settings of all land use codes.See the table on the next page titled"Site Context and Time Periods"-if this table is not provided,the"General Urban/Suburban"setting is used by default. Box 3-Define Analysis Objectives Types of Trips&Time Period This tool will focus on vehicular trips for a 24-hour period on a typical weekday as well as its AM peak hour and PM peak hour.Other time period(s)may be of interest. Site Context and Time Periods-Actual Setting,Setting Data Available for LUC,Setting Used in Analyses Lot 1®High Turnover C- al Urban/Suburban G G G B G G e G G B Sit Down Restaurant Lot 3:Hotel or Motel General Urban/Suburban G G C G G D C G G C G Lot 4:Medical,Dental or Health Office General LItarYSutxarban G G G G G G G Buildings and Clinics Lot 5:Medical,Dental or Health Office General UrbaniSub urban G G G G G G G Buildings and Clinics Lot 6:Medical,Dental or Health Office General Urban/Suburban G G G G G G JG Buildings and Clinics Lot 7:High Turnover GeneraltkbaNsuburban G G G G G G Sit Down RestaurantLot 8:Medical,Dental or Health Office GeneraltkbaniSuburban G G G G G G Buildings and Clinics If the desired setting is not available within the Manual,adjustments may be made in Boxes 6 through 8. Per the Handbook,"if the objective is to establish a local trip generation rate for a particular land use or study site,the simplified approach(Box 9)may be acceptable but the Box 5 through 8 approach is Box 5113ox 9-Estimate Baseline Trips/Estimate Vehicular Trips(Determine Equation) Vehicle trips are estimated using rates/equations applicable to each LUC.When the appropriate graph has a fitted curve,the Handbook has a process(Figure 4.2)to determine when to use it versus using the weighted average rate or collecting local data.The methodology requires for engineering judgement in some circumstances and permits engineering judgement to override or make adjustments when appropriate to best project(example 1:study site is expected to operate differently than data in the applicable land use code-such as restaurant that is closed in the morning or in the evening;example 2: LUC data in a localized area fails to be represented by the typically selected fitted curve/weighted average rate-a small shop/LUC 820,AM peak hour is skewed by the high y-intercept). Equation Type:Equation Used[Equated Rate](Type Abbreviations:Weighted Average Rate "WA",Fitted Curve("FC"),or Custom("C" Lot 1•High Turnover WA:T=X*107.2[107.20] WA:T=X*9.57+[9.57] WA:T=X*9.05•[9.05] Sit Down Restaurant Lot 3:Hotel or Motel WA:T=X*7.99[7,99] FC:T=0.5*X-7.45[0.46] FC:T=0.74*X-27.89[0,58] Lot 4:Medical,Dental or Health Office FC:T=42.97*X-108.01[29,921 FC:LN(T)=0.9*LN(X)+1.34[3,09] FC:T=4.07*X-3.17[3,69] Buildings and Clinics Lot 5:Medical,Dental or Health Office FC:T=42.97*X-108.01[29.641 WA:T=X*3.1[3.10] WA:T=X*3.93[3.93] Buildings and Clinics Lot 6:Medical,Dental or Health Office FC:T=42.97*X-108.01[29,351 FC:LN(T)=0.9*LN(X)+1.34[3.10] WA:T=X*3.93[3,93] Buildings and Clinics Lot 7:High Turnover WA:T=X*107.2[107.201 WA:T=X*9.57[9.57] WA:T=X*9.05[9.05] Sit Down Restaurant Lot 8:Medical,Dental or Health Office WA:T=X*36[36,001 FC:LN(T)=0.9*LN(X)+1.34[2,41] WA:T=X*3.93[3,93] Buildings and Clinics Box 5/Box 9-Estimate Baseline Trips/Estimate Vehicular Trips(Apply Equations and in/out Distributions) Baseline Vehicular Trips Lot 1:High Turnover 50% 579 579 1,158 55% 57 46 103 61% 60 38 98 (Sit Down)Restaurant Lot 3:Hotel or Motel 50% 713 713 1,426 56% 46 36 82 51% 53 51 104 Lot 4:Medical,Dental or Health Office 50% 124 124 248 79% 21 5 26 30% 9 22 31 Buildings and Clinics Lot 5:Medical,Dental or Health Office 50% 120 120 240 79% 20 5 25 30% 10 22 32 Buildings and Clinics Lot 6:Medical,Dental or Health Office 50% 116 116 232 79% 20 5 25 30% 9 22 31 Buildings and Clinics Lot 7:High Turnover 50% 346 346 692 55% 34 28 62 61% 35 23 58 Sit Down Restaurant Lot 8:Medical,Dental or Health Office 50% 1,800 1,800 3,600 79% 190 51 241 30% 118 275 393 Buildings and Clinics Totals 3,798 3,798 7,596 388 176 564 294 453 747 CivTech Page 1 of 1 August 2022 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX F TRIP DISTRIBUTION CALCULATIONS C i v T e C h 2020 2030 v � Quadrant Population Percent Employment Percent Population Percent Employment Percent n North Northwest 4,283 5.3% 737 6.7% 5,550 5.4% 967 6.2% a C c North Northeast 3,691 4.6% 491 4.4% 5,420 5.3% 601 3.9% Q° C North 7,975 9.9% 1,228 11.1% 10,970 10.7% 1,567 10.1% East Northeast 9,170 11.4% 970 8.8% 13,369 13.1% 1,233 7.9% s to East Southeast 9,170 11.4% 970 8.8% 13,369 13.1% 1,233 7.9% East 18,340 22.8% 1,940 17.6% 26,738 26.2% 2,466 15.8% --1 3 South Southeast 11,069 13.8% 878 7.9% 13,883 13.6% 1,378 8.9% D a� South Southwest 9,520 11.9% 1,222 11.1% 11,095 10.9% 2,018 13.0% D N South 20,590 25.7% 2,099 19.0% 24,978 24.5% 3,396 21.9% West Southwest 16,675 20.8% 3,117 28.2% 20,847 20.4% 4,520 29.1% CD West Northwest 16,636 20.7% 2,672 24.2% 18,523 18.1% 3,563 23.0% C- West 33,311 41.5% 5,789 52.4% 39,370 38.5% 8,082 52.1% Totals 80,216 99.9% 11,056 100.1% 102,056 99.9% �rt 15,512 99.9/o C Radii northern limits Population radius: 10 miles - Employment radius: 10 miles NNW NNE m -. 2020 2030 2020 2030 Select Analysis Year(2020, 2030, 2040,2050) 5.3% 5.4% 4.6% 5.3% 2020 WNW 6.7% 6.2% 4.4% 3.9% ENE 4, 2020 2030 2020 2030 n 20.7% 18.1% 11.4% 13.1% CD N 24.2% 23.0% 8.8% 7.9% (D 0 ' 2020 2030 2020 2030 ' 20.8% 20.4% 11.4% 13.1% to 28.2% 29.1% 8.8% 7.9% , tQ WSW 2020 2030 2020 2030 ESEp 11.9% 10.9% 13.8% 13.6% -n 11.1% 13.0% T9% 8.9% > m Cr Pop% SSW SSE CD K Q Em % N o x southern limits c m .� Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX G BACKGROUND GROWTH CALCULATIONS C i v T e C h 22-1180 Alliance Broadstone Silveray Background Traffic Calculations Location of counts. US-60 Exit 198 A-Ramp just West of Goldfield Rd (Location ID: 6980) ADOT Traffic Counts available at https://adot.public. ms2soft.com/tcds/ts earch.asp?loc=Adot Source(s): &mod=TCDS Year Volume Start 2018 1,141 End 2019 1,163 AAGR 1.90% Exp Factor 1.019 Growth Rate Used 2.0% Per-Year Multiplier 1.020 2024 2027 Expansion Year Factor(s) 2022 1.000 Existing 2023 1.020 2024 1.040 Opening 2025 1.061 2026 1.082 2027 1.104 Horizon 2028 1.126 2029 1.149 2030 1.172 2031 1.195 2032 1.219 2033 1.243 2034 1.268 2035 1.294 2036 1.319 2037 1.346 2038 1.373 2039 1.400 2040 1.428 2041 1.457 2042 1.486 2043 1.516 2044 1.546 2045 1.577 2046 1.608 2047 1.641 2048 1.673 2049 1.707 2050 1.741 2051 1.776 2052 1.811 2053 1.848 2054 1.885 Appendix G Page 1 July 2021 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX H 2024 NO BUILD PEAK HOUR ANALYSIS C i v T e C h 2024 Background AM 1:Goldfield Rd/EB Old West Hwy 2024 Background PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.2 Int Delay,s/veh 2.3 Lane Configurations tt Lane Configurations tt Traffic Vol,v,-h/h 59 0 0 0 0 116 Traffic Vol,vehlb 59 0 0 0 r 0 192 Future Vol,veh/h 59 0 0 0 0 116 Future Vol,veh/h 59 0 0 0 0 192 Conflicting Peds,#1hr 0 0 0 0 0 0 Conflicting Peds,4/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channellmd - None None - None FIT Channelized - None None None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 0 0 Von In Median Storage,# D 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Ptak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 74 0 0 0 0 136 Mvmt Flow 74 0 0 0 0 226 Conflicting Flow All 68 - 0 0 Conflicting Flow All 113 - 0 0 Stage 1 0 stage 1 0 Stage 2 68 Stage 2 113 Critical Hdwy 6.04 4,14 Critical Hdwy 6,84 4,14 Critical Hdwy Stg 1 - - Critical Hdwy Stg I - - Critical Hdwy Stg 2 5,84 Critical Hdwy Stg 2 5.84 Follow-up Hdwy 3,52 2.22 Follow-up Hdwy 3,52 2.22 Pot Cap-1 Maneuver 929 0 - Pot Cap-1 Maneuver $72 0 - Stage I - 0 Stage 1 - 0 Stage 2 947 i 0 Stage;2 899 a Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 929 s - Mov Cap-1 Maneuver 872 Mov Cap-2 Maneuver 929 Mov Cap-2 Maneuver 872 Stage 1 Stage I Stage 2 947 Stage 2 899 HCM Control Delay,a 9,2 0 HCM Control Delay,a 9.5 0 HCM LOS A HCM LOS A Capacity(veb/h) 929 Capacity{veh/h) 872 HCM Lane V/C Ratio 0.079 HCM Lane V/C Ratio 0.085 HCM Controf Delay(s) 9.2 0 HCM Control Delay(s) 9.5 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tile 0(veh) 03 HCM 95th%ble 0(veh) 0.3 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CjvTech Inc.-CM Page 1 2024 Background AM 2:Goldfield Rd&WB Old West Hwy 2024 Background PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3 Int Delay,s/veh 2.9 Lane Configurations Lane Configurations +t Traffic Vol,veh/h 0 17 0 0 59 9 0 188 39 0 0 0 Traffic Vol,vehlin 0 20 0 0 59 5 0 180 58 0 0 0 Future Vol,veh/h 0 17 0 0 59 9 0 188 39 0 0 0 Future Vol,vehlh 0 20 0 0 59 5 0 180 58 0 0 0 Conflicting Pods,#1hr 0 0 0 0 0 0 0 0 0 0 0 0 Conflicting Pods,#/hr 0 0 a 0 0 a 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free PIT Channelized None Stop Yield None FIT Channelized None Stop Yield None Storage Length 0 0 Storage Length 0 0 Veh in Median Storage,# 0 0 i 0 0 Veh in Median Storage,# 0 0 - 0 0 Grade,% 0 0 0 - 0 Grade,% 0 0 - 0 0 - Peak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Ptak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 26 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 21 0 0 74 11 0 221 49 0 0 0 Mvmt Flow 0 25 0 0 74 6 0 212 73 0 0 0 Conflicting Flow All - 221 - - 221 111 - 0 0 Conflicting Flow All - 212 - - 212 106 - 0 0 Stage 1 0 221 stage 1 0 212 - Stage 2 221 0 Stage 2 212 0 - Crificall Hdwy 644 6.54 6,94 Critical Hdwy 6,54 6,54 6.94 Critical Hdwy Stg I - 5.54 - Critical Hdwy Stg 1 - 5.54 - Crifical Hdwy Stg 2 6.54 Critical Hdwy Stg 2 5.54 Follow-up Hdwy 4.02 4.02 3.32 Follow-up Hdwy 4.02 4.02 3.32 Pot Cap-1 Maneuver 0 676 0 0 676 921 0 Pot COP-1 Maneuver 0 684 0 0 684 928 0 Stage 1 0 - 0 0 719 0 Stage 1 0 - 0 0 726 - 0 Stage 2 0 719 0 0 - - 0 stage,2 0 726 0 0 - - 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver - 676 - - 676 921 Mov Cap-1 Maneuver 684 - 684 928 Mov Cap-2 Maneuver 676 676 - Mov Cap-2 Maneuver 684 684 - Stage 1 719 Stage 1 726 Stage 2 719 - Stage 2 726 - HCM Control Delay,a 10,5 101 0 HCM Control Delay,a 10,5 10,7 0 HCM LOS B B HCM LOS B B Capacity(veh1h) 676 676 921 capacity(veh/h) 684 684 928 HCM Lane V/C Ratio 0.031 0.109 0.012 HCM Lane V/C Ratio 0.037 0.108 0.007 HCM Controf Delay(s) 10.5 11 9 HCM Control Defay(s) 10,5 10,9 8,9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th%flte Q(vefi) 01 014 0 HCM 95th%tile O(veh) 01 0,4 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 2 CjvTech Inc.-CM Page 2 2024 Background AM 3:Goldfield Rd&US-60/01d West Hwy Exit 2024 Background PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.8 Int Delay,s/veh 2.2 Lane Configurations r tf tt Lane Configurations Traffic Vol,vehlb r 0 168 59 0 0 176 Traffic Vol,vehih 0 114 123 0 0 251 Future Vol,veh/h 0 168 59 0 0 176 Future Vol,veh/h 0 114 123 0 0 251 Conflicting Reds,#1hr 0 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Chandelized None None None FIT Channelized None None None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 - 0 0 Veh in Median Storage,# 0 0 0 Grade,% 0 - 0 0 Grade,% 0 0 0 Peak Hour Factor 80 85 80 So 80 85 Peak Hour Factor 80 85 65 80 i 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 198 74 0 0 207 MvmtFlow 0 134 145 0 0 295 Conflicting Flow All - 37 0 - - - Conflicting Flow All - 73 0 - - - Stage 1 Stagei I Stage 2 Stage 2 Crifical Hdwy 6,94 CriffeaJ Hdwy &94 Critical Hdwy Stg 1 - Critical Hdwy Stg I - Critical Hdwy Stg 2 Critical Hdwy Stg 2 Follow-up Hdwy 3,32 Follow-up Hdwy 3,32 Pot Cap-1 Maneuver 0 1027 0 0 Pot Cap-1 Maneuver 0 974 0 0 Stage 1 0 - 0 0 Stage 1 0 - 0 0 Stage 2 0 0 0 Stage''2 0 - 0 a Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1027 Mov Cap-1 Maneuver 974 - Mov Cap-2 Maneuver - Mov Cap-2 Maneuver - Stage I Stage I Stage 2 Stage 2 HCM Control Delay,a U 0 a HCM Control Delay,a 93 0 0 HCM LOS A HCM LOS A Capacity(veh/h) 1027 Capacity(vsh/h) 974 HCM Lane V/C Ratio 0.192 HCM Lane V/C Ratio 0.138 HCM Control Delay(s} a3 HCM Control Delay(s) 93 HCM Lane LOS A HCM Lane LOS A HCM 95th%fle Q(veh) 03 HCM 95th Mile Q(veh) 0.5 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CjvTech Inc.-CM Page 3 2024 Background AM 4:Goldfield Rd&US-60 WB Ramps 2024 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings t 4e Lane Configurations Lane Configurations r tt ttf Traffic Volume(vph) 7 0 17 35 105 162 128 Traffic Volume(vph) 20 0 42 28 162 211 91 Future Volume(vph) 7 0 17 35 105 162 128 Future Volume(vph) 20 0 42 28 162 211 91 Tom Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 i 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 H 8,0 H 20,0 20.0 20,0 Minimum Initial(s) 8.0 U 8,0 5.0 20,0 20,0 20,0 Minimum Split(a) 44,9 40 40 10,13 31,6 31-6 31.6 Minimum Split(a) 44.9 44,9 49 %6 34,15 31,6 31,6 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11.0 34.0 34.0 34.0 Total Split(1/0) 50,01/6 50.0% 50.0% 12.21% 37.8% 37,8% 37,81 Total Split(%) 50,0% 50L0% SON 12,2% 37,8% 37.81% 37.8% Yellow Time(s) 19 19 19 16 16 16 16 Yellow Time(s) 19 19 19 16 16 16 16 All-Red Time(s) 2.0 2.0 2,0 10 2.Or 2.0 2,0 All-Red Time(s) 2.0 10 2.0 ZO 10 2.0 10 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(a) 5,9 5.9 5.9 5,6 U 5,6 54 Total Lost Time{s) 5,9 5,9 6,9 516 5.6 5.6 U Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Lerigft 90 Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Nature[Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60WB Ramps Splits and Phases: 4:Goldfield Rd&US-60WB Ramps 4111(R) r1it'l, 1 02 403 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2024 Background AM 4:Goldfield Rd&US-60 VVB Ramps 2024 Background PM 4:Goldfield Rd&US-60 VVB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silve,ray HCM Signalized Intersection Capacity Analysis Lane Configurations r tt ttf r Lane Configurations 41 tt ttf r Traffic Volume(vph) 0 0 0 7 0 17 35 105 0 0 162 128 Traffic Volume(vph) 0 0 0 20 0 42 28 162 0 0 211 91 Future Volume(vph) 0 0 0 7 0 17 35 105 0 0 162 128 Future Volume(vph) 0 0 0 20 0 42 28 162 0 0 211 91 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1800 1900 1900 Total Lost time(s) 5,9 5,9 5.9 5,6 H 5,6 5.6 Total Lost time(s) 5,9 5,9 5.9 5.6 H 5,6 5.6 Lane Util,Factor 0L95 0 91 0.95 100 0.95 021 lko Lane U111.Factor 0,95 0,91 0.95 1.00 0.95 0.91 ILOG Fri 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Fri 1.00 0,87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0,95 1.00 1Z 4,95 140 1.00 1,00 Fit Protected 0,95 0,99 1 Z 0.95 lbo 1.00 1 Z Said,Flow(prof) 1681 1457 1504 1770 3539 5085 1583 Said.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0,95 1,00 1,00 0,63 1.00 1,00 1.00 Fit Permitted 0,95 0,99 1.00 0L59 1.00 1.00 1,00 Said.Flow(perm) 1681 1457 1504 1167 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1102 3539 5085 1583 Peak-hour factor,PHF 0.25 025 0.25 0.80 1180 030 0.80 0,85 OM HO 0,85 0,85 Peak-hour factor,PHF 0,25 0.25 0.25 0,80 0,80 HO 0.80 0,85 0,80 0,80 0,85 (L80 Adj.Flow(vph) 0 0 0 9 0 21 44 124 0 0 191 151 Adj.Flow(vph) 0 0 0 25 0 52 35 191 0 0 248 114 RTOR Reduction(vph) 0 0 0 0 10 10 0 0 0 0 a 49 RTOR Reduction(vph) 0 0 0 0 26 26 0 0 0 0 0 38 Lane Group Flow(vph) 0 0 0 8 1 1 44 124 0 0 191 102 Lane Group Flow(vph) 0 0 0 22 2 2 35 191 0 0 248 76 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G is) 6.6 6.6 6.6 66.3 60.9 60.9 60.9 Actuated Green,G is) 7.6 7.6 7.6 65.3 59.9 59.9 59.9 Effective Green,g is) 6,6 H 6,6 66.3 60,9 6U 9 60L9 Effective,Green,g(a) 7.6 7$ 7,6 653 %9 69,9 59.9 Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Actuated g/C Ratio 0.08 0.08 0.08 0.73 0.67 0.67 0.67 Clearance Time(a) 5.9 5,9 5,9 6A 5.6 5,6 5.6 Clearance Time(a) 5.9 5.9 5,9 5,6 516 516 5,6 Vehicle Extension is) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 123 106 110 895 2394 3440 1071i Lane'Grp Cap(vph) 144 123 127 839 2365 3384 1053 v/s Ratio Prot CHO 0.04 0.04 v/s Ratio Prot c(LOO c0.05 0.05 via Ratio Perm C0.00 0,00 0.00 0,03 c0.06 v/s Ratio Perm C0,01 WDO 0.00 0.03 r 0,05 v1c Ratio 0.07 0.01 0.01 0.05 0.05 0.06 0.10 v1c Ratio 0.16 0.02 0.02 0.04 0.08 0.07 0.07 Uniform Delay,dl 38 8 381 383 12 4,9 4,9 &0 Uniform Delay,ill 38,2 3T6 37,8 3.5 5,3 53 53 Progression Factor 1.00 1.00 1.00 0.46 0.62 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.70 0.65 1.00 1.00 Incremental Delay,Q 0.1 0.0 H OA 0.0 0.0 0.2 Incremental Delay,d2 0,2 (LO 010 01 O'l (LO OA Delay(s) 38.9 383 383 1.6 3.0 4,9 5,2 Delay(s) 38A 37,8 37,8 2.5 3.5 5,3 5.4 Level of Service D D 0 A A A A Level of Service D D D A A A A Approach Delay is) 0.0 38.7 2.7 5.0 Approach Delay is) 0.0 38.0 3.4 5.4 Approach LESS A D A A Approach LOS A D A A PSI' HCM 2000 Control Delay 6,2 HCM 2000 Level of Service A HCM 2000 Control Delay 8.5 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.09 HCM 2000 Volume to Capacity ratio 0.09 Actuated Cycle Length(a) WO Sum of lost fime(s) 17,1 Actuated Cycle Length(s) 90,0 Sum of lost time(s) 17,1 Intersection Capacity Utilization 44.8% ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) is Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2024 Background AM 4:Goldfield Rd&US-60 WB Ramps 2024 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Plow(vph) 8 11 11 44 124 191 151 Lane Group Plow(vph) 22 28 28 35 191 248 114 We Ratio 0,05 0,05+ 0.05 US US 0.05 0,13 ulc Ratio 0,13 0,12 012 0,04 0,08 ON 0,10 Control Delay 37.8 0.4 0.4 1.3 3.3 5.3 1.3 Control Delay 37.4 1.0 1.0 2.2 3.9 5.8 1.6 Queue Delay 0.0 0.0 0.0 0.0 U O.0 0.0 Queue Delay O.0 0.0 0.0 0.0 0.0 O.O 0.0 Total Delay 37.8 0.4 0.4 1,3 3.3 5.3 13 Total Delay 37.4 "0 1.0 2.2 3.9 5.8 1.6 Queue Length 50th(ft) 4 0 0 1 5; 12 0 Queue Length 50th(it) i 12 0 0 1 '' 8 16 0 Queue Length 95th(ft) 16 0 0 3 9 19 16 Queue Length 95th(ft) 30 0 0 3 16 27 14 Internal Link Dist(11) 1339; 484' 300 Internal Link Dist(ft) 639 484 300 Turn Bay Length(it) 190 190 145 Turn Bay Length(it) 190 190 145 Base Capacity(vph) 730 688: 709 911 2439 3505 1137 Base Capacity(vph) 730 690 709 854 s 2400 3448 1110 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spilltiack Cap Reductn 0 0 0 0 0 0 0 SplOback Gap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v1c Ratio 0,01 0,02 0.02 0,05 0,05•: 0.05 0.13 Reduced We Ratio 0.03 ON 0,04 0,04 0,08 0.07 0.10 ; 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2024 Background AM 5:Goldfield Rd&US-60 EB Ramps 2024 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings r'�„„,�; �,L.,.f.;f, .. irr .,Ya ...C-T4 r �, .T��. ""s?Y .f� „�,L.,,�„ z s„fit-. -•.��Y, ;�. s1 r=r"t: ��i�.. ,1................................ryY Lane Configurations W r I tt Lane Configurations Traffic Volume(uph) 77 0; 31 63 18 131 38 Traffic Volume(vph) 138 0 45 46 42 177 57 Future Volume(vph) 77 0 31 63 18 131 38 Future Volume(vph) 138 0 45 46 42 177 57 Turn Type Perm NA; Perm NA Perm; pm+pt NA Turn Type Perm ' NA Perm NA ;Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 &0 8.0 20.0 20.0 5.0 20.0 Minimum Split(a) E44.9 44,9 44.9 31.6 31.6i 10.6 31.6 Minimum spin(s) 44.9 44,9 40 316 31.6 1Q.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total';Split(%) 50N 50.0°Ioi 5H% 37.80k 37.8% 12.2%a 37.8% Total Split(%) 50.0°1u 50.0% %0°la 37A% 37.8% 12.2°!0 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(a) r 2A 2,0 2,0 2 0 2.0 2.0 2.0 AH-Red Time(a) 2.0 2.0 2,0 2.0 2.0 2.0 10 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(a)i 5.9 U 5.9 H 5.6' 5.6 5.6 Total Lost Time(a) 5,9 ! 519 &9 5.6 5.6 H 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length:90 Offset 0(0%),Referenced to phase 1.NBSB,Start of Green,Master Intersection Offset 0(0%),Referenced to phase 1:NBSB,Start of Green Master Intersection Natural Cycle:90 Natural Cycle;90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps F3; 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2024 Background AM 5:Goldfield Rd&US-60 EB Ramps 2024 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silve,ray HCM Signalized Intersection Capacity Analysis Lane Configurations 4a +tt r tt Lane Configurations 41 ttt r I tt Traffic Volume(vph) 77 0 31 0 0 0 0 63 18 131 38 0 Traffic Volume(vph) 138 0 45 0 f 0 0 0 46 42 177 57 0 Future Volume(vph) 77 0 31 0 0 0 0 63 18 131 38 0 Future Volume(vph) 138 0 45 0 0 0 0 46 42 177 57 0 Ideal iPlow(vphpl) 1900 1900 1900 1900 1900 1900 1900 lsoo 1900 1900 1900 1900 Ideal Flow(vphpi) 1900 1900 1900 1000 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5,9 5.9 5,9 H 5,6 5,6 5.6 Total Lost time(s) 5,9 5,9 5,9 H 5.6 5,6 5.6 Lane Util.Factor 0195 021 0,95 0191 1.00 I.00 095 Lane Uft Factor 0.95 021 0195 091 1 GO 1,00 0195 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fit 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0.96 1.00 1.00 1100 0.95 1.00 Fit Protected 0,95 0.96 1,00 1,00 1.00 0.95 1.00 Said.Flow(prof) 1681 1601 1504 5085 1583 1770 3539 Said.Flow(prof) 1681 1603 1504 5085 1583 1770 3539 Fft Permitted 0.95 096 1,00 1,00 1.00 0,70 1,00 Fit Permitted 0.95 0,96 1.00 1,00 1,00 0,72 i t00 Said.Flow(perm) 1681 1601 1504 5085 1583 1305 3539 Said.Flow(perm) 1681 1603 1504 5085 1583 1333 3539 -Peak-hour factor,PHF 0.8585 0.80 0.8080 025 0.25 0,25 0.80 0,80 0,80 0.85 0,80 0.8080 Peak-hour factor,PHF 0,85 0.80 0.8080 0.2525 0.25 0,25 0.80 0,80 0.80T8 O 0.85 0,80 0 Adj.Flow(vph) 91 0 39 0 0 0 0 79 22 154 48 0 Adj.Flow(vph) 162 0 56 0 0 0 0 58 52 208 71 0 RTOR Reduction(vph) 0 44 32 0 0 0 0 0 7 0 0 0 RTOR Reduction(vph) 0 77 46 0 0 0 0 a is 0 0 0 Lane Group Flow(vph) 47 4 3 0 0 0 0 79 16 154 48 0 Lane Group Flow(vph) 84 7 4 0 0 0 0 58 35 208 71 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.6 6.6 6.6 60.9 60.9 66.3 60.9 Actuated Green,G(s) 7.6 7.6 7.6 59.9 59.9 65.3 59.9 Effective Green,g(a) 6,6 6,6 6.6 60.9 60.9 66.3 60.9 Effective Green,g(.5) 7.6 7,6 7,6 %9 59,9 653 69,9 Actuated g/C Ratio 0.07 0.07 0.07 0.68 0.68 0.74 0.68 Actuated g/C Ratio 0.08 0.08 0.08 0.67 0.67 0.73 0.67 Clearance Time(a) 5.9 5s 5.9 5,6 5.6 H 5.6 Clearance Time(a) 5.9 &S &9 5,6 5,6 516 5.6 Vehicle Extension(s) 1.2 11 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 12 12 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 123 117 110 3440 1071 989 2304 Lane Grp Cap(vph) 141 136 127 3384 1053 993 i 2355 v/s Ratio Prot 0.02 C0.01 0.01 v/s Ratio Prot 0.01 C0.01 0.02 v/s Ratio Perm c0,03 0.00 0.00 0.01 80.11 v1s Ratio Perm c0.05 0.00 0.00 0 02 c0,14 v/c Ratio 0.38 0.03 0.02 0.02 0.01 0.16 0.02 v1c Ratio 0.60 0.05 0.03 0.02 0.03 0.21 0.03 Uniform Delay,dli 39.8 383 381 4,8 4,8 15 4,8 Uniform Delay,dl 393 37,9 37.8 5,1 51 4,0 5A Progression Factor 1.00 1.00 1.00 1.00 1.00 0.36 0.51 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.47 0.52 Incremental Delay,42 0.7 (LO 0.0 10 Out) 03 0.0 Incremental Delay,d2 4A 0A 0.0 0.0 OJ 0.5 (LO Delay(s) 40.5 38s 38.7 4.8 4s 1.6 2A Delay(s) 44.2 37,9 37.9 5.1 5,2 2.4 2,7 Level ol'Service D 0 D A A A A Leval of Service D 0 D A A A A Approach Delay(s) 39.4 0.0 4.8 1.8 Approach Delay(s) 40.3 0.0 5.2 2.4 Approach LOS D A A A Approach LOS D A A A HCM 2000 Control Delay 13,8 HCM 2000 Level of Service B HCM 2000 Control Delay 1615 HCM 2000 Level of Service 13 HCM 2000 Volume to Capacity ratio 0.18 HCM 2000 Volume to Capacity ratio 0.25 Actuated Cycle Length(a) WO Sum of lost time(a) 17,1 Actuated Cycle Length(a) 9010 Sum of lost Ifirre,(a) 17,1 Intersection Capacity Utilization 44.8% ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) 15 Analysis Period(min) Is c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2024 Background AM 5:Goldfield Rd&US-60 EB Ramps 2024 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Plow(vph) 47 48 35 79 23 154 48 Lane Group Plow(vph) 84 84 50 58 53 208 71 vlcRatio 0,31 020 0.15 0,02 0,02 015 OW ft Ratio 0,49 0.33 021 002 US 0,21 003 Control Delay 43.7 2.7 1.4 5.4 0.1 1.3 2.8 Control Delay 47.6 9.7 3.0 6.1 0.3 1.9 3.2 Queue belay 010 0.0 (L 010 O,Di 0.0 U Queue Delay 00 0.0 0.0 0.0 U 0 0 010 Total Delay 43.7 23 1.4 5A 0.1 1.3 2,8 Total Delay 47.6 93 10 6.1 0.3 1.9 3,2 Queue Length 50th(ft) 27 0 0 5 0 0 1 Queue Length 50th(ft) 49 0 0 3 0 1 2 Queue Length 95th(ft) 57 0 0 9 0 4 3 Queue Length 95th(ft) 87 25 0 8 0 15 6 Internal Link Dist(11) 535 222 484 Internal Link;Dist.(ft) 5M 222 484 Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base;Capacity(vph) 730 750 709 3505 1123 1006 2439 Base Capacity(vph) 730 752 709 3448 1106 1009 2400 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0: 0 0 Spilltrack Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced vtc Ratio; 0.06 0,06, 0,05 ,(LO2 U2! 0.15 0.02 Reduced We Ratio 0.12 0„11 OV 0.02 US 0.21 0,03 1 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2024 Background AM 6:Goldfield Rd&Chevron Access 2024 Background PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 2.4 Int Delay,s/veh 2.7 Lane Configurations 4x 4a 0 Lane Configurations +t r ) 0 Traffic Vol,v,-hth 3 2 0 2 1 22 0 74 8 20 38 3 Traffic Vol,veh/h 5 0 1 4 i 0 29 1 67 8 29 59 9 Future Vol,veh/h 3 2 0 2 1 22 0 74 8 20 38 3 Future Vol,veh/h 5 0 1 4 0 29 1 67 8 29 59 9 Conflicting Parts,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 i 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free FIT Channerized None None None I - None PIT Channelized Norte None None None Storage Length 50 - 50 50 - Storage Length 50 - 50 50 Veh in Median Storage,# 0 0 0 0 Van in Median Storage,# 0 0 0 - 0 Grade,% 0 0 0 - - 0 Grade,% 0 0 - - 0 - - 0 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Peak Hour Factor 80 80 80 go go 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mwat Flow 4 3 0 3 1 28 0 93 10 25 48 4 Mvmt Flow 6 0 1 5 0 36 1 84 10 36 74 11 Conflicting Flow All 147 203 26 169 195 47 52 0 0 103 0 0 Conflicting Flow All 196 248 43 195 243 42 85 0 0 94 0 0 Stage I too 100 93 93 - Stage 1 152 152 - 86 86 - Stage 2 47 103 76 102 - Stage 2 44 96 - 109 157 - Critical Hdwy 7.54 8.54 6,94 7,54 6,54 6,94 414 414 critical Hdwy 7.54 &54 6,94 7,54 6,54 694 4,14 4,14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - Criticall Hdwy Stg 2 6.54 &54 6.54 5,54 Critical Hdwy Stg 2 6.54 5.64 - 6.54 5.54 - - Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 132 2.22 2,22 Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 132 2.22 2,22 Pot Cap-1 Maneuver 807 692 1044 779 699 1012 1552 1487 Pot Cap-1 Maneuver 771 669 1050 772 674 1019 1531 1498 Stage 1 895 811 - 904 817 - - - Stage 1 857 784 - 912 823 - - stage 2 961 809 - 924 810 - Stageii2 965 816 909 780 - - Platoon blocked,% Platoon blocked,% 1 1 1 1 1 1 MovCap-1 Maneuver 774 680 1044 767 687 i1012 1552 1487 Mov,Cap-1 Maneuver 729 662 1050 756 667 1019 1531 1498 Mov Cap-2 Maneuver 774 680 - 767 687 - - - Mov Cap-2 Maneuver 729 652 - 756 657 - - - Stage 1 895 797 904 817 stage 1 856 765 911 822 Stage 2 933 809 906 796 Stage 2 930 814 886 761 HCM Control Delay,a 10 8,8 0 2.4 HCM Control Delay,a 9.7 8.8 0.1 2,2 HCM LOS B A HCM LOS A A Capacity jvahlh) 1552 733 969 1487 Capacity(veh/h) 1531 768 978 i 1498 HCM Lane V/C Ratio - 0.009 0.032 0.017 HCM Lane V/C Ratio 0.001 0.01 0.042 0.024 HCM Control Delay(a) 0 10 8,8 7,6 HCM Control Delay(s) 7.4 91 8,8 7.5 HCM Lane LOS A B A A HCM Lane LOS A A A A HCM 95th-Atile 0(veh) 0 0 0.1 0.1 HCM 95th%tile 0(veh) 0 0 0.1 i 0.1 07/15/2022 Synchic 11 Report 07/15/2022 Synchic 11 Report CivTech Inc.-CM Page 4 CjvTech Inc.-CM Page 4 2024 Background AM 7:Goldfield Rd&Resort Blvd 2024 Background PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 3.1 Int Delay,s/veh 1.9 Lane Configurations tt Lane Configurations Traft Vol,veWh 2 s 28 54 3 18 23 Traffic Vol,veh/h 2 18 58 5 i 14 51 Future Vol,veh/h 2 28 54 3 18 23 Future Vol,veh/h 2 18 58 5 14 51 Conflicting Peds,#1hr 0 0 0 0 0 0 Conflicting Pods,#/br 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Charinelized - None None - None FIT Chiannefized - None None - None Storage Length 0 50 - Storage Length 0 50 - Veft in Median Storage,# 0 0 - 0 Veh in Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvrnt Flow 3 35 68 4 23 29 Mvmt Flow 3 23 73 6 18 64 Conflicting Flow All 131 36 0 0 72 0 Conflicting Flow All 144 40 0 0 79 0 Stage 1 70 - - - stage 1 76 - - - - - Stage 2 61 - Stage 2 68 - Critical Hdwy 6.84 6,94 414 Critical Hdwy 6,84 6,94 4.14 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg,2 5,84 Critical Hdwy Stg 2 5.84 - - Follow-up Hdwy 3,52 3.32 2.22 Follow-up Hdwy 3,52 3.32 2.22 Pot Cap-1 Maneuver 850 102R 1526 Pot Cap-1 Maneuver B58 1022 1517 Stage 1 945 Stage 1 938 - - Stage 2 954 stage 2 968 Platoon blocked,% Platoon blocked,% 1 Mov CapA Maneuver 837 1029 1526 Mov Cap-1 Maneuver W 1022 1517 Mov Cap-2 Maneuver 812 - - Mov Cap-2 Maneuver 819 - - Stage 1 945 Stage I 938 Stage 2 940 Stage 2 956 HCMi Control Delay,a 8.7 0 3,2 HCM Control Delay,a 8.7 0 1.6 HCM LOS A HCM LOS A Ilk Capacity(veh1h) j 1011 1526 Capacity(veh/h) 997 1517 HCM Lane V/C Ratio 0.037 0.015 HCM Lane V/C Ratio 0.025 0.012 HCM Control Delay(s) 8.7 7A HCM Control Defay i(s) 81 7A HCM Lane LOS A A HCM Lane LOS A A HCM 95th Utle 0(veh) 01 0 HCM 95th 1/6111e, 0A 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 5 CjvTech Inc.-CM Page 5 2024 Background AM 8:Resort Blvd&Chevron Access 2024 Background PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 1.4 Int Delay,s/veh 1.1 bpi Lane Configurationsr Lane Configurations Traffic Vol,vehlh 6 15 29 1 3 1 Traffic Vol,vehlin 2 28 10 0 1 3 Future Vol,veh/h 6 15 29 1 3 1 Future Vol,veh/h 2 28 10 0 1 3 Conflicting Reds,#1hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Chairinefized Nom None - None FIT Channelized None Norte . None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Veh in Median Storage, 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 60 90 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 8 19 36 1 4 1 Mvmt Flow 3 35 13 0 1 4 Conflicting Flow All 37 0 - 0 72 37 Conflicting Flow All 13 0 - 0 54 13 Stage 1 37 - stage 1 13 - Stage 2 - 35 - Stage 2 - 41 - Critical Hdwy 4,12 6A2 622 Critical Hdwy 412 642 6.22 Critical Hdwy Sig I - 5.42 - Critical Hdwy Stg 1 - 5.42 - critical Hdwy Stg 2 . 6.42 Critical Hdwy Stg 2 5,42 1 Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1574 932 1035 Pot Cap-1 Maneuver 1606 954 1067 Stage I - 985 - Stage I - 1010 - Stage 2 987 stage;,2 - 981 - Platoon blocked,% Platoon blocked,% Mey Cap-1 Maneuver 1574 927 ^1035 Mov Cap-1 Maneuver 1606 952 1067 Mov Cap-2 Maneuver - 927 - Mov Cap-2 Maneuver - 952 - stage 1 980 Stage?1 1008 Stage 2 - 987 Stage 2 - 981 HCM Control Delay,a 21 0 8,8 HCM Control Delay,s 05 0 8.5 HCM LOS A HCM LOS A Capacity(veh/h) 1574 - 952 Capacity(veh1h) 1606 1036 HCM Lane V/C Ratio 0.005 - 0.005 HCM Lane V/C Ratio 0.002 0.005 HCM Control Delay(a) 73 0 &.8 HCM Controf Delay(a) 7.2 0 8,5 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile O(veh) 0 0 HCM 95th'/.file Q(veh) 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 6 CjvTech Inc.-CM Page 6 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX I 2027 NO BUILD PEAK HOUR ANALYSIS C i v T e C h 2027 Background AM 1:Goldfield Rd/EB Old West Hwy 2027 Background PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.3 Int Delay,s/veh 2.3 Lane Configurations tt Lane Configurations tt Traffic Vol,veh(h 63 0 0 0 0 8 124 Traffic Vol,vehin 62 0 0 0 0 204 Future Vol,veh/h 63 0 0 0 0 124 Future Vol,veh/h 62 0 0 0 0 204 Conflicting Pads,#1hr 0 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channelized None None - None RT Channelized None None - None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,It 0 0 - 0 Van In Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 79 0 0 0 0 146 Mvmt Flow 78 0 0 0 0 240 Conflicting Flow All 73 - 0 0 Conflicting Flow All 120 - 0 0 Stage 1 0 stage 1 0 Stage 2 73 Stage 2 120 Critical Hdwy 6,84 4,14 t critical Hdwy 6.84 04 Critical Hdwy Sig I - Critical Hdwy Sig 1 - - Critical Hcwy Sig 2 5,84 Critical Hdwy Sig 2 5.84 Follow-up Hdwy 3,52 - 2.22 Follow-up Hdwy 3,52 2.22 Pot Cap-1 Maneuver 922 0 - Pot Cap-1 Maneuver 863 0 Stage 1 - 0 Stage 1 - 0 Stage 2 941 0 Stage 2 892 0 Platoon blocked,% Platoon blocked,% MoVCaP-1 Maneuver 922 i Mov,Cap-1 Maneuver 863 Mov Cap-2 Maneuver 922 Mov Cap-2 Maneuver 863 Stage I Stage;1 Stage 2 941 Stage 2 892 HCM Control Delay,a 93 0 HCM Control Delay,a 9,6 0 HCM LOS A HCM LOS A Capacity(vohlh) 922 Capacity(veh/h) 863 HCM Lane V/C Ratio 0.085 HCM Lane V/C Ratio 0.09 HCM Control Delay(a) 9.3 0 HCM Control Delay(s) 9.6 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tifla 0(veh) 0.3 HCM 95th%tile 0(veh) 03 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 1 CjvTech Inc.-CM Page 1 2027 Background AM 2:Goldfield Rd&WB Old West Hwy 2027 Background PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.1 Int Delay,s/veh 2.9 Lane Configurations Lane Configurations t tt Traffic Vol,veh/h 0 18 0 0 63 10 0 200 41 0 0 0 Traffic Vol,veh/h 0 21 0 0 62 6 0 191 i61 0 0 0 Future Vol,veh/h 0 18 0 0 63 10 0 200 41 0 0 0 Future Vol,veh/h 0 21 0 0 62 6 0 191 61 0 0 0 Conflicting Peds,#Ihr 0 0 0 0 0 0 0 0 0 0 0 0 Conflicting Pods,#/hr 0 0 0 0 i 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Chainnelized None Stop Yield None FIT Charrittelized Norte Stop Yield None Storage Length - 0 0 Storage Length 0 0 Veft in Median Storage,# a 0 - 0 - 0 Veh in Median Storage,# • 0 0 - 0 0 Grade,% 0 0 - 0 - 0 - Grade,% 0 0 - 0 - 0 Peak Hour factor 80 80 80 80 80 80 80 85 60 25 25 25 Ptak Hour Factor 80 80 80 80 80 80 80 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 23 0 i 0 79 13 0 235 51 0 0 0 Mvmt Flow 0 26 0 0 78 8 0 225 76 0 0 0 Conflicting Flow All 235 235 118 0 0 Conflicting Flow All 225 225 113 0 0 Stage 1 0 235 Stage 1 0 225 Stage 2 235 0 - Stage 2 225 0 Critical Hdwy 6,54 6,54 6,94 Critical Hdwy Uzi 6.54 6,94 Critical Hdwy Stg I - 5.54 - Critical Hdwy Stg 1 - 5.54 - Critical Hdwy Stg 2 5.54 - - Critical Hdwy Sig 2 5,54 Follow-up Hdwy 4.02 4.02 3.32 Follow-up Hdwy 4.02 4.02 3.32 Pot Cap-1 Maneuver 0 664 0 0 664 912 0 Pot Cap-1 Maneuver 0 673 0 0 i 673 918 0 Stage 1 0 - 0 0 709 - 0 Stage 1 0 - 0 0 716 - 0 Stage 2 0 709 0 0 0 Stage 2 0 716 0 0 a Platoon blocked,% Platoon blocked,% Mov 6ap-1 Maneuver 664 664 j 912 Mov Gap-1 Maneuver 673 - 673 918 Mov Cap-2 Maneuver 664 664 - Mov Cap-2 Maneuver 673 673 Stage 1 709 Stage;I - 716 Stage 2 709 - Stage 2 716 - HCM Control Delay,a 10.6 10.9 0 HCM Control Delay,a 10.6 10,8 0 HCM LOS B B HCM LOS B B Capacity(vehlh) 664 664 912 Capacity(vsh1h) 673 673 918 HCM Lane V/C Ratio 0.034 0.119 0.014 HCM Lane V/C Ratio 0.039 0.115 0.008 HCM Control Delay(s) %6 11.2 9 HCM Control Delay(a) 10.6 11 S HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th Ue Q(veh) U 0.4 0 HCM 95th%tfle Cloven) 01 0.4 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 2 CjvTech Inc.-CM Page 2 2027 Background AM 3:Goldfield Rd&US-60/01d West Hwy Exit 2027 Background PM 3:Goldfield Rd&US-60/01d West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.9 Int Delay,s/veh 2.2 Lane Configurations r tf tt Lane Configurations r tt tt Traffic Vol,vWh 0 179 62 0 0 186 Traffic Vol,vehih 0 121 130 0 0 266 Future Vol,veh/h 0 179 62 0 0 186 Future Vol,veh/h 0 121 130 0 0 266 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Charinelized None None None FIT Channel zed None None None Storage Length 0 - Storage Length 0 - Veh in Median Storage,# 0 0 0 Veh in Metan Storage,# 0 - 0 0 Grade,% 0 0 0 Grade,% 0 - 0 0 Peak Hour Factor 80 85 80 80 80 85 Peak Hour Pactor 80 85 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 211 78 0 0 219 Mvmt Flow 0 142 153 0 0 313 Conflicting Flow All - 39 0 - - - Conflicting Flow All - 77 0 - - - Stage 1 stage I Stage 2 Stage 2 Critical Hdwy 894 Critical Hdwy 6,94 Critical Hdwy Sig 1 - Critical Hdwy Sig 1 critical Hdwy Stg 2 Critical Hdwy Stg 2 Follow-up Hdwy 3,32 Follow-up Hdwy - 3,32 Pot Cap-1 Maneuver 0 1024 0 0 Pot Cap-1 Maneuver 0 968 0 0 Stage 1 0 - 0 0 Stage 1 0 - 0 0 Stage 2 0 0 0 Stage 2 0 0 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1024 - - Mov Cal Maneuver 968 Mov Cap-2 Maneuver Mov Cap-2 Maneuver - Stage 1 Stage I Stage 2 Stage 2 HCM Godard Delay,a 94 0 0 HCM Control Delay,a 9,4 a a HCM LOS A HCM LOS A Capacity(veb1h) 1024 capacity(veh1h) 968 HCM Lane V/C Ratio 0.206 HCM Lane V/C Ratio 0.147 HCM Control Delay(a) 94 HCM Control Defay(s) 9.4 HCM Lane LOS A HCM Lane LOS A HCM 95th%tile Q(veh) 0,8 HCM 95th'kille Q(veh) 0,5 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 3 CjvTech Inc.-CM Page 3 2027 Background AM 4:Goldfield Rd&US-60 WB Ramps 2027 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings t Lane Configurations Lane Configurations r tt ttf Traffic Volume(vph) 8 0 18 38 Ill 170 133 Traffic Volume(vph) 21 0 42 30 169 223 95 Future Volume(vph) 8 0 18 38 ill 170 133 Future Volume(vph) 21 0 42 30 169 223 95 Tom Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pnn+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 H 8,0 H 20,0 20.0 20,0 Minimum Initial(s) 8.0 U 8,0 H 20.0 20,0 20,0 minimum split($) 444 44.9 44,9 10.6 31.6 31.6 31.6 Minimum Split(a) 40 49 44,9 10.6 31,6 31,6 31,6 Total Split(s) 45+0 45.0 45.0 11+0 34.0 34.0 34.0 Total Split(s) 45.0 45.0 45.0 11+0 34.0 34.0 34.0 Total Split(%) 500% 50,0% 5(L()% 12.2% 37.8% 37.80% 37,81% Total Split(%) 50,0% 50,,()% 50,01% 12.2% 37.8% 3731/6 37,81% Yellow Time(s) 19 19 19 16 16 16 16 Yellow Time(s) 19 19 19 16 16 16 16 All-RedTime(s) 10 2,0 2,0 2.0 10 2,0 2,0 All-Red Time(a) ZO 10 ZO 10 2,0 2,0 2,0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time is) 5.9 5,9 5.9 5,6 5,6 5,6 U Total Lost Time(a) 5.9 5.9 59 5,6 5,6 5,6 51 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Cycle Length:90 Cycle Length:90 Actuated Cycle Length.,90 Actuated Cycle Length,90 Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase I:NBSB,Start of Green,Master Intersection Natural Cycle'.90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60WB Ramps Splits and Phases: 4:Goldfield Rd&US-60WB Ramps 4 95 1#4 #5 4 #5 4 95 #4 #5 (R) 4\ "Nsoz 03 valmr, 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2027 Background AM 4:Goldfield Rd&US-60 VVB Ramps 2027 Background PM 4:Goldfield Rd&US-60 VVB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis Lane Configurations 1 4.11 r tt ttf r Lane Configurations 41 tt ttf r Traffic Volume(vph) 0 0 0 a 0 18 38 111 0 0 170 133 Traffic Volume(vph) 0 0 0 21 0 42 30 169 0 0 223 95 Future Volume(vph) 0 0 0 8 0 18 38 ill 0 0 170 133 Future Volume(vph) 0 0 0 21 0 42 30 169 0 0 223 95 Ideal Flow(vphpl) 1900 1900 1900 1900 1900i 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1800 1900 1900 Total Lost time(s) 5,9 5,9 5.9 5.6 5.6 5,6 5.6 Total Lost time(s) 5,9 5,9 5.9 5.6 5.6 5,6 5.6 Lane U11111,Factor 0,95 O'Rl 0195 1 DO 0.95 0191 'LOO Lane Ulfif.Factor 0.95 0.011 0.95 1100 0195 091 1.00 Fri 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Fri 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0.96 100i 140 0.95 f.00 1.00 1.00 Fit Protected (L95 0.99 lb() 0.95 1.00 1,00 140 Said,Flow(prof) 1681 1456 1504 1770 3539 5085 1583 Said.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 025 1,00 100 062 IS 1100 'LOO Fit Permitted 0,95 0.99 1100 058 1.00 1.00 1,00 Said.Flow(perm) 1681 1456 1504 1157 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1087 3539 5085 1583 Peak-hour factor,PHF 0,25 0.25 0.25 0,80 0,80 0.110 0,80 0,85 0.80 0,80 0,85 0,85 Peak-hour factor,PHI` 0.25 0.25 0,25 0,80 0.80 HO 0,80 0,85 180 0.80 0,85 0.85 Adj.Flow(vph) 0 0 0 10 0 22 48 131 0 0 200 156 Adj.Flow(vph) 0 0 0 26 0 52 38 199 0 0 262 112 RTOR Reduction(yph) 0 0 0 0 it 11 a 0 0 0 0 51 RTOR Reduction{vph) 0 0 0 0 26 26 0 0 0 0 0 38 Lane Group Flow(vph) 0 0 0 9 1 1 48 131 0 0 200 105 Lane Group Flow(vph) 0 0 0 23 2 2 38 199 0 0 262 74 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm i NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.7 6.7 6.7 66.2 60.8 60.8 60.8 Actuated Green,G(s) 7.8 7.8 7.8 65.1 59.7 59.7 59.7 Effective Green,g(a) 61 6,7 6.7 66.2 608 60,8 60.8 Effective Green,g(a) 7.8 73 7.8 65.1 50,7 591 501 Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Actuated g/C Ratio 0.09 0.09 0.09 0.72 0.66 0.66 0.66 Clearance Time(a) 5,9 5.9 5.9 5,6 5.6 5.6 5,6 Clearance Time(a) 519 5.9 5.9 5.6 5.6 5,6 5.6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 126 108 Ill 887 2390 3435 1069 Lane Grp Cap(vph) 145 126 130 827 2347 3373 1050 v/s Ratio Prot 00.00 0.04 0.04 v/s Ratio Prot cO.00 cO.06 0.05 via Ralto Perm c0,01 0,00 [LOO 0.04 CON via Ratio Perm C0.01 0,00 0.00 0103 0,05 v/c Ratio 0.07 0.01 0.01 0.05 0.05 0.06 0.10 vic Ratio 0.16 0.02 0.02 0.05 0.08 0.08 0.07 Uniform Delay,dl 38,8 38,6 38.6 33 4,9 L9 51 Uniform Delay,dl 381 37.6 37,6 3,6 5A 5A SA Progression Factor 1.00 1.00 1.00 0.46 0.61 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.72 0.65 1.00 1.00 Incremental Delay,d2 OA 0,0 (LO 01 0,0 0,0 02 Incremental Delay,d2 02 0.0 Ok 011 O'l 0,0 OA Delay(s) 38.8 38,6 38,6 1.6 3.0 5,0 5,3 Delay(s) 382 37,6 37,6 2.7 3.6 5.4 5.5 Level of Service D 0 D A A A A Level Of Service D 0 D A A A A Approach Delay(s) 0.0 38.7 2.7 5.1 Approach Delay(s) 0.0 37.8 3.4 5.4 Approach LEIS A 0 A A Approach LOS A 0 A A HCM 2000 Control Delay 63 HCM 2000 Level of Service A HCM 2000 Control Delay I 8,5 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.09 HCM 2000 Volume to Capacity ratio 0.09 Actuated Cycle Length(s) 90,0 Sum of lost fitne,(a) 17.1 Actuated Cycle Length(a) 90,0 Sum of lost rime(a) 171 Intersection Capacity Utilization 45.1% ICU Level of Service A Intersection Capacity Utilization 47.9% ICU Level of Service A Analysis Period(min) 16 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2027 Background AM 4:Goldfield Rd&US-60 WB Ramps 2027 Background PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Plow(vph) 9 12 12 48 131 200 156 Lane Group Plow(vph) 23 28 28 38 199 262 112 WcRatio 6.06 0.05'; O05 0,05 O05 0,06 0,14 v/cRatio 0.13 0.12 011 005 0.08 (LO8 0.10 Control Delay 38.0 0.5 0.4 1.3 3.3 5.3 1.3 Control Delay 37.3 1.0 1.0 2.3 4.0 5.9 1.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Delay 0.0 0.0 0.0 0.0 0<0 (LO 0<O Total Delay 38.0 0.5 0.4 1.3 3.3 5.3 1.3 Total Delay 37.3 "0 1.0 2.3 4.0 5.9 1.7 Queue Length 50th(ft) 5 01 0 1 5r 12 0 Queue Length 50th(11) , 12 0 0 2 9 17 0 Queue Length 95th(ft) 17 0 0 3 9 20 17 Queue Length 95th(ft) 31 0 0 3 22 29 16 Internal Link Dist(it) 639 484; 300 Internal Link Dist(it) 639 484 300 Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688', 709 903 2438 3504 1139 Base Capacity(vph) 730 690 709 840 s 2393 3439 1107 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Sptllback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced*Ratio l A.01 0,02: 0,02 0.05 0,05! 0,06 ON Reduced A Ratio 0.03 0.04 (L04 0.05 U8 0,08 0.10 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 2 CivTech Inc.-CM Page 2 2027 Background AM 5:Goldfield Rd&US-60 EB Ramps 2027 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings r'�„„,�; �;,L.,.1,.;L, .. i�d .,T'a ...$-T4 r �, .T��. ""s?Y .�� „�,L.,,�„ z "g"„fit-. -•.�1T, ;�. sm rir"1: ��i�.. ,1................................ryY Lane Configurations W r I tt Lane Configurations Traffic Volume(uph) 81 0; 33 = 67 19 136 41 Traffic Volume(vph) 144 0 47 49 44 186 61 , Future Volume(vph) 81 0 33 67 19 136 41 Future Volume(vph) 144 0 47 49 44 186 61 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases! 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 &0 8.0 20.0 20.0 5.0 20.0 Minimum Split(a) 44.9 40 44,9 31.6 31.6 10.6 31.6 Minimum Split(s) 44.9 44.9 49 31.6 31.6 10,6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split N %0% 50.0% 50.01% 37.8% 37.8% 122% 3T8% Total Split(%) 50.ffa SHIA *SON 37.8% i37.8% 1220A 37.81 j Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(a) 2.0 2.0 2.0 2.0 2.0 2.0 10 AI-Red Time(s) 2.0 , 10 2 0 10 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5.9 5.9 5,9 5.6 5.61 5.6 5,6 Total Lost Time(s) 5.9 5.9 5.9 5.6 5.6 56 &6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead''=Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max ..z .....::.... . ...r,},}.�JJ Y.?5,{`4s••.))�'. 11\1����,� "�'�T'f[{ti"��d4'i''} �',�s` `{4�..rr�q{$ ,., tfS ��'��''�....,d n'��Y b`-'i7S'��': ,e..,t.}'r ,Y{�}}"€t,<y7}�'"�£'. �G�{?y"-4`�43"Y'�'}`�s`,}yS$ t'f'"4��j'�d?°�. gd+'�y��' `s€3�r�,`}""$�i 1'T'.;';r.��'u}`7`"J�z„ti�3d rq Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length:90 Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural'Cyclew,90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps 1t 01 IBM i �. C52 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2027 Background AM 5:Goldfield Rd&US-60 EB Ramps 2027 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis Lane Configurations +tt r tt Lane Configurations 41 If ttt r I tt Traffic Volume(vph) 81 0 33 0 0 0 0 67 19 136 41 0 Traffic Volume(vph) 144 0 47 0 0 0 0 49 44 186 61 0 Future Volume(vph) 81 0 33 0 0 0 0 67 19 136 41 0 Future Volume(vph) 144 0 47 0 0 0 0 49 44 186 61 0 Ideal Plow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(vphpi) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5,9 5.9 5,9 H 5.6 5,6 5.6 Total Lost time(s) 5,9 5,9 5,9 H 5.6 5,6 5.6 Lane Lffif.Factor 0.95 0,91 0195 0191 1,00 1.00 0.95 Lane UW.Factor 0,95 0.91 0.95 tLin 1,00 'LOO 0.95 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Frt 1.00 0.99 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 (Lse 1.00 1,00 1.00 0,95 1.00 Fit Protected 0.95 O'l)(i 1100 1,00 1.00 0,95 I 1.00 Said.Flow(prof) 1681 1601 1504 5085 1583 1770 3539 Said.Flow(prof) 1681 1603 1504 5085 1583 1770 3539 Fit Permitted 0,95 096i 1.00 1 u00 1.00 0.70 1,00 Fit Permitted 0.95 0.96 1,00 100 1.00 0711 1.00 Said.Flow(perm) 1681 1601 1504 5085 1583 1299 3539 Said.Flow(perm) 1681 1603 1504 5085 1583 1329 3539 Peak-hour factor,PHIF 0.85 0.80 0.80 0,25 0,25 025 0,80 030 0,80 0.85 0,80 0,80 Peak-hour factor,PHF 0.85 i 0,80 180 0,25 ± 0,25 025 0,80 0,80 0,80 0.85 0,80 4t80 Adj.Flow(vph) 95 0 41 0 0 0 0 84 24 160 51 0 Adj.Flow(vph) 169 0 59 0 0 0 0 61 55 219 76 0 RTOR Reduction(vph) 0 46 34 0 0 0 0 a 8 0 0 0 RTOR Reduction(vph) 0 1 79 48 0 0 0 0 0 19 0 0 0 Lane Group Flow(vph) 49 4 3 0 0 0 0 84 16 160 51 0 Lane Group Flow(vph) 88 8 5 0 0 0 0 61 36 219 76 0 Turn Type Perm NAi Perm NA Perm pM+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.7 6.7 6.7 60.8 60+8 66.2 60.8 Actuated Green,G(s) 7.8 7.8 7.8 59.7 59+7 65+1 59.7 Effective Green,g(a) 63 6.7 6.7 60.8 60,8 66.2 60,8 Effective Green,g(s) 7.8 i 7.8 7 8 59.7 591 65A 591 Actuated g/C Ratio 0.07 0.07 0.07 0.68 0.68 0.74 0.68 Actuated g/C Ratio 0.09 0.09 0.09 0.66 0.66 0.72 0.66 Clearance Time(a) 5,9 5.9 5.9 51 5,6 5.6 H Clearance Time is) 5.9 5,9 5.9 5.6 5,6 5.6 5.6 Vehicle Extension(s) 1.2 1.2 12 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 125 119 111 3436 1069 983 2390 Lane Grp Cap(vph) 145 138 130 3373 1060 087 2347 v/s Ratio Prot 0.02 C0.01 0.01 v/s Ratio Prot 0.01 C0.01 0.02 via Ratio Perm cO.03 0,00 0.00 0,01 co'll v/s Ratio Perm 00.05 0.00 OZ 0.02 c0L15 v1c Ratio 0.39 0.03 0.02 0.02 0.02 0.16 0.02 vic Ratio 0.61 0.05 0.04 0.02 0.03 0.22 0.03 Uniform Delay,dl 39.7 38.6 38.6 4.8 4,8 3.6 4.8 Uniform Delay,dl 39,6 3T7 373 52 5,2 41 5,2 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.37 0.50 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.47 0.51 Incremental Delay,d2 0,7 00 0,0 0,0 (LO 04 Ob Incremental Delay,d2 4,8 01 0,0 0.0 O'l 0 0.0 Delay(s) 40.4 38.7 38.7 4.8 4,8 1.7 2A Delay(s) 44.5 37,8 37.7 5.2 53 2.5 2,7 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 39.3 0.0 4.8 1.9 Approach Delay(s) 40.3 0.0 5.2 2.5 Approach LOS D A A A Approach LOS D A A A HCM 2000 Control Delay 13,8 HCM 2000 Level of Service 13 HCM 2000 Control Delay 1(15 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.18 HCM 2000 Volume to Capacity ratio 0.26 Actuated Cycle Length(a) 90,0 Sum of lost time(S) 171 Actuated Cycle Length(s) WO Sum of lostffine(a) 171 Intersection Capacity Utilization 45+1% ICU Level of Service A Intersection Capacity Utilization 47.9% ICU Level of Service A Analysis Period(min) 15 Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2027 Background AM 5:Goldfield Rd&US-60 EB Ramps 2027 Background PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues r'�„„,�; �,�.,.�.;1, .. )r .,T'a ...��4 r �, .��t� ..s?Y .��r „�,�.,,�,,, z g„fit-. -•.���, ;�. s7 r�"t: ��i�.. ,1................................r3Y Lane Group Plow(vph) 49 50 37 84 24 160 51 Lane Group Plow(vph) 88 87 53 61 55 219 76 WcRatio 0,32 0,21 0,16 602 0.02 0,16 042 ftRatio Q.SQ ' 034 0,22 0,02 0,05 0,22 0,03 Control Delay 44.0 3.2 1.5 5.4 0.1 1.3 2.7 Control Delay 47.8 10.3 3.6 6.2 0.4 2.0 3.2 Queue Delay OA 0.0 0.0 O.O U 0.0 Q.0 Queue Delay 0.0 0.0 U 0.0 0.0 U 0.0 Total Delay 44.0 3.2 1,5 5.4 0.1 1.3 2.7 Total Delay 47.8 10.3 3.6 6.2 0.4 2.0 3.2 Queue Length 50ti(ft) 28 0 0 5 0' 0 1 Queue Length 50th(ft) 51 0 0 4 0 1 2 Queue Length 95th(ft) 61 0 0 9 0 4 3 Queue Length 95th(ft) 91 27 2 8 1 16 7 Internal Link Dist(ft) 535, 222 494 Internal Link;Dist.(it) 535 222 484 Turn Bay Length(it) 130 130 115 Turn Bay Length(it) 130 130 115 Base Capacity(vph) 730 751; 709 3504 1123, 1000 _2438 Base Capacity(vph) 730 752 709 3439 1104 1004 2393 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillttack Cap Reductn 0 0i O 0 0 0 0 Spilltrack Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v}c Ratio; 0.07 0,07 U5 0.02 0.02 (L16 0.02 Reduced ytcRatio 0,12 0.12 0,07 0,022 0,05 0,22 0,03 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2027 Background AM 6:Goldfield Rd&Chevron Access 2027 Background PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 2.4 Int Delay,s/veh 2.7 Lane Configurations 0 Lane Configurations +t r ) 0 Traffic Vol,v,-hth 3 2 0 2 1 23 0 78 9i 21 41 3 Traffic Vol,vehih 6 0 1 4 i 0 31 1 71 9 31 63 10 Future Vol,veh/h 3 2 0 2 1 23 0 78 9 21 41 3 Future Vol,veh/h 6 0 1 4 0 31 1 71 9 31 63 10 Conflicting Parts,#/hr 0 0 0 0 0 i 0 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free FIT Channerized None None - None - None PIT Channel zed None None None . - None Storage Length 50 50 50 - Storage Length 50 50 50 - Veh in Median Storage,# 0 0 0 0 Veh in Median Storage,# G 0 0 0 Grade,% 0 0 0 - - 0 Grade,% 0 0 0 0 Peak Hour Factor 80 80 80 j 80 80 80 80 85 80 $0 80 80 Peak Hour Factor so to 80 80 80 80 80 80 80 80i 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 3 0 3 1 29 0 92 11 26 51 4 Mvmt Flow 8 0 1 5 0 39 1 89 11 39 79 13 Conflicting Flow All 152 208 28 171 199 46 55 0 0 103 0 0 Conflicting Flow All 211 266 46 209 261 45 92 0 0 100 0 0 Stage 1 105 105 - 92 42 - - - Stage 1 164 W 91 91 - Stage 2 47 103 - 79 107 - - - Stage 2 47 102 118 170 - Critical Hdwy 7,54 654 624 7.54 6.54 6,94 4,14 4,14 Critical Hdwy T54 6.54 6.94 7,54 6,54 6,94 414 4,14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 2 6.54 5.54 6.54 5.54 Critical Hdwy Stg 2 6.54 5,54 - 6.54 6,64 - - Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 132 2.22 2,22 Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 3,32 2.22 2,22 Pot Cap-1 Maneuver 828 764 1074 l802 712 1014 1570 y 1487 Pot Cap-1 Maneuver 762 654 1045 754 658 1015 1521 1490 Stage 1 913 821 - 905 818 - - - Stage 1 843 775 - 906 819 - - - Stage 2 961 809 . 946 820 - stage 2 S61 810 . 898 770 Platoon blocked,% 1 1 1 1 1 1 Platoon blocked,% 1 1 1 1 1 1 Mov Cap-1 Maneuver 793 692 1074 790 700 i1014 1570 r 1487 Mov Cap-1 Maneuver 708 636 1045 737 640 1015 1521 1490 Mov Cap-2 Maneuver 793 692 - 790 700 - - - Mov Cap-2 Maneuver 708 636 - 737 640 - - - Stage 1 913 807 905 818 stage;1 842 755 905 816 Stage 2 932 809 927 806 Stage 2 924 809 873 750 HCM Control Delay,a U 81 0 2A HCM Control Delay,a 9,9 8,9 0"1 22 HCM LOS A A HCM LOS A A Capacity(vah/h) ± 1570 749 976 1487 capacity(veh/h) 1521 ± 742 973 1490 HCM Lane V/C Ratio - 0.008 0.033 0.018 HCM Lane V/C Ratio 0.001 0.012 0.045 0.026 HCM Control Delay(a) 0 9.8 8,8 7.5 HCM Control Delay(s) 74 9.9 0 7.5 HCM Lane LOS A A A A HCM Lane LOS A A A A HOM 95th I/We O(veh) 0 0 J)"! 0"I HCM 95th%file 0(veh) 0 0 01 011 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CjvTech Inc.-CM Page 4 2027 Background AM 7:Goldfield Rd&Resort Blvd 2027 Background PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 3.1 Int Delay,s/veh 1.8 Lane Configurations tt Lane Configurations Y til I tt Traft Vol,veWh 2 30 67 3 19 24 Trafflic Vol,vehlb 2 19 62 6 14 64 Future Vol,veh/h 2 30 57 3 19 24 Future Vol,veh/h 2 19 62 6 14 54 Conflicting Peds,#Ihr 0 0 0 0 0 0 Conflicting Reds,#/hr 0 0 0 0 D 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Charinelized . None None - None FIT Channelized . None None - None Storage Length 0 50 - Storage Length 0 50 - VA-h in Median Storage,# 0 0 0 Veh in Median Storage,# 0 a 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 38 71 4 24 30 Mvmt Flow 3 24 78 8 18 68 Conflicting Flow All 136 38 0 0 75 0 Conflicting Flow All 152 43 0 0 86 0 stage 1 73 - stage 1 82 Stage 2 63 - Stage 2 70 Critical Hdwy 6.84 6,94 414 Critical Hdwy 6.84 &94 414 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 1 5.84 - - Critical Hdwy Sig 2 5.84 Critical Hdwy Stg 2 6,84 Follow-up Hdwy 3,52 3.32 2.22 Follow-up Hdwy 3,52 3.32 2.22 Pot Cap-1 Maneuver 844 1026 1522 Pot Cap-1 Maneuver 848 1018 1508 Stage 1 941 - - Stage 1 932 - - Stage 2 952 Stage 2 965 - Platoon blocked,% Platoon blocked,% 1 Mov Cap-1 Maneuver 830 1026 1522 Mov Cap-1 Maneuver W 1018 1508 Mov Cap-2 Maneuver 807 - - Mov Cap-2 Maneuver 812 - - stage 1 941 Stage,1 932 Stage 2 937 Stage 2 953 HCM Control Delay,a 8.7 0 13 HCM Controf Delay,s 81 0 1Z HCM LOS A HCM LOS A Capacity(veh1h) 1009 1522 Capacity(v,,hlh) 994 1508 HCM Lane V/C Ratio 0.04 0.016 HCM Lane V/C Ratio 0.026 0.012 HOM Control Delay(a) 81 7,4 HCM Control Delay(a) 81 7.4 HCM Lane LOS A A HCM Lane LOS A A HCM 95th'We 0(veh) 01 0 HCM 95th Ule O(veh) 011 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 5 CjvTech Inc.-CM Page 5 2027 Background AM 8:Resort Blvd&Chevron Access 2027 Background PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 1.5 Int Delay,s/veh 1.1 bpi Lane Configurations Y Lane Configurations Y Traft Vol,veWh 7 15 31 1 3 1 Traffic Vol,veWh 2 30 11 0 1 3 Future Vol,veh/h 7 15 31 1 3 1 Future Vol,vehlh 2 30 11 0 1 3 Conflicting Peds,#1hr a 0 0 0 0 0 Conflicting Peds,#Ihr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Channefizod Node None . None FIT Channel zed None None . None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Veh In Median Storage,# 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Ptak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvrnt Flow 9 19 39 1 4 1 Mvmt Flow 3 38 14 0 1 4 Conflicting Flow All 40 0 - 0 77 40 Conflicting Flow All 14 0 - 0 58 14 Stage I - 40 - Stage;;.1 - - 14 - Stage 2 - 37 - Stage 2 - 44 - UtIcal Hdwy 4,12 642 622 Critical Hdwy 4J 2 6,42 6,22 Critical Hdwy Sig 1 - 5.42 - Critical Hdwy Stg 1 - 5.42 - Critical Hdwy ft 2 . 5.42 Criticat Hdwy Stg 2 5,42 - Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1570 926 1031 Pot Cap-1 Maneuver 1604 949 1066 Stage 1 - 982 - Stage I - 1009 - Stage 2 985 - Stage'2 - 978 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1570 920 11031 Mov Cap-1 Maneuver 1604 947 1066 Mov Cap-2 Maneuver 920 - Mov Cap-2 Maneuver - 947 - Stage 1 976 Staged 1007 Stage 2 985 Stage 2 - 978 HCM Control Delay,a 2.3 0 8.8 HCM Control Delay,a 9t15 0 8,5 HCM LOS A HCM LOS A Capacity(volh1h) 1570 945 Capacity(veh/h) 1604 1034 HCM Lane V/C Ratio 0.006 0.005 HCM Lane V/C Ratio 0.002 - 0.005 HCM Control Delay(s) 7.3 0 8.8 HCM corttroll Delay(t) 7.2 0 8.5 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%file O(veh) 0 0 HCM 95th 1/ofile 0(veh) 0 a 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CjvTech Inc.-CM Page 6 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX J 2024 BUILD PEAK HOUR ANALYSIS ,C4'0'--E—E, C i v T e c h 2024 Total AM 1:Goldfield Rd/EB Old West Hwy 2024 Total PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Int Delay,s/veh 3.2 Int Delay,s/veh 2.3 Lane Configurations tt Lane Configurations tt Traffic Vol,v,-h/h 60 0 0 0 0 123 Traffic Vol,vehlb 64 0 0 0 r 0 215 Future Vol,veh/h 60 0 0 0 0 123 Future Vol,veh/h 64 0 0 0 0 215 Conflicting Peds,#1hr 0 0 0 0 0 0 Conflicting Peds,41hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channelized - None, None - None FIT Channelized - None None - None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 a 0 Von In Median Storage,# 0 0 0 Grade,% 0 0 -- 0 Grade,% 0 0 -- 0 Peak Hour Factor c 80 60 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 76 0 0 0 0 145 Mvmt Flow 80 0 0 0 0 253 Conflicting Flow All 73 - 0 0 Conflicting Flow All 127 - 0 0 Stage 1 0 Stage'1 0 Stage 2 73 Stage 2 127 Critical Hdwy 6.84 4,14 Critical Hdwy 6.84 4J4 Critical Hdwy Stg 1 - Critical Hdwy Stg 1 - Critical Hdwy Stg 2 5.84 Critical Hdwy Sig 2 5.84 Follow-up Hdwy 3,52 - 2.22 Follow-up Hdwy 3,52 - 2.22 Pot Cap-1 Maneuver 922 0 Pot Cap4 Maneuver 854 0 - Stage 1 - 0 Stage 1 - 0 Stage 2 941 0 Stage!2 885 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 922 Mov Cap-1 Maneuver 854 - Mov Cap-2 Maneuver 922 Mov Cap-2 Maneuver 854 Stage I stage;1 Stage 2 941 Stage 2 885 HCM Control Delay,a 9.3 i 0 HCM Control Delay„a 9.7 0 HCM LOS A HCM LOS A Capacity(VIhlh) 922 capacity(veh/h) 854 HCM Lane V/C Ratio 0.081 HCM Lane V/C Ratio 0.094 HCM Control Delay(a) 93 0 HCM Control Delay(a) 9.7 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th-!mile 0(veh) 0.3 HCM 95th Utle O(veh) 03 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CjvTech Inc.-CM Page 1 2024 Total AM 2:Goldfield Rd&WB Old West Hwy 2024 Total PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 2.8 Int Delay,s/veh 2.9 Lane Configurations +t r Lane Configurations +t Traffic Vol,vehilh 0 17 0 0 60 9 0 212 44 0 0 0 Traffic Vol,veh/h 0 20 0 0 64 5 0 194 61 0 0 0 Future Vol,veh/h 0 17 0 0 60 9 0 212 44 0 0 0 Future Vol,veh/h 0 20 0 0 64 5 0 194 61 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Corifficting Pods,#/hr 0 0 a 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free FIT Chandolized Norio stop yield Norio FIT Chantrolized None stop yield None Storage Length 0 0 Storage Length 0 0 Van in Modred Storage,# 0 0 0 0 Veh in Median Storage,# 0 0 0 0 Grade,% 0 0 - 0 - - -0 Grade,% 0 0 - 0 - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80 26 25 25 Ptak Hour Factor 80 go 80 80 So 80 80 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 21 0 0 75 11 0 244 55 0 0 0 Mvmt Flow 0 25 0 0 80 6 0 228 76 0 0 0 Conflicting Flow All - 249 - - 249 125 - 0 0 Conflicting Flow All - 228 - - 228 114 - 0 0 stage 1 0 249 - Stage,1 0 228 - Stage 2 249 0 Stage 2 228 0 - Critical Hdwy U4 6.54 &N Critical Hdwy &54 6.64 6.94 Critical Hdwy Stg 1 - 5.54 Critical Hdwy Stg 1 - 5.54 - Critical Hdwy Sig 2 5.54 - Critical Hdwy Stg 2 5.54 - - Follow-up Hdwy 4.02 - - 4.02 3.32 Follow-up Hdwy 4.02 4.02 3.32 Pot Cap-1 Maneuver 0 653 0 0 653 902 0 Pot Cap-1 Maneuver 0 670 0 0 670 917 0 Stage 1 0 - 0 0 699 - 0 Stage 1 0 - 0 0 714 - 0 Stage 2 0 699 0 0 - 0 Stage 2 0 714 0 0 - 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver - 653 - - 653 902 Mov Cap-1 Maneuver 670 670 917 - Mov Cap-2 Maneuver 653 653 - Mov Cap-2 Maneuver 670 670 - Stage 1 699 Stage'1 714 Stage 2 699 - Stage 2 714 - HCM Control Delay,a 10,7 10,9 0 HCM Control Delay,s 10.6 10,9 0 HCM LOS B B HCM LOS B B Capacity(veh/h) 653 663 902 Capacity(vish1h) 670 670 917 HCM Lane V/C Ratio 0.033 0.115 0.012 HCM Lane V/C Ratio 0.037 0.119 0.007 HCM Control Delay(a) 10.7 112 9 HCM Controf Delay(s) 10.6 111 9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th%ifle O(veh) 01 0.4 0 HCM 95th stile O(veh) 01 04 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchic 11 Report CjvTech Inc.-CM Page 2 CjvTech Inc.-CM Page 2 2024 Total AM 3:Goldfield Rd&US-60/01cl West Hwy Exit 2024 Total PM 3:Goldfield Rd&US-60/01cl West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.6 Int Delay,s/veh 2 Lane Configurations ++ Lane Configurations Traffic Vol,veh/h 0 168 88 0 0 185 Traffic Vol,vehih 0 114 140 0 0 278 Future Vol,veh/h 0 168 88 0 0 185 Future Vol,veh/h 0 114 140 0 0 278 Confli Peds,#1hr 0 0 0 0 0 0 Conflicting Reds,#/hr 0 0 0 0 i 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channetized Nom None None FIT Channefized None None None Storage Length 0 - - - Storage Length 0 - Van in Median Storage,# 0 - 0 0 Veh,in Metiltan Storage,# 0 0 0 Grade,% 0 - 0 0 Grade,% 0 0 0 Peak Hour Factor 80 85 85 so 80 85 Peak Hour Factor 80 86 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 0 198 104 0 0 216 Mvmt Flow 0 134 165 0 0 327 Conflicting Flow All - 52 0 - - - Conflicting Flow All - 83 0 - - - Stage 1 Stage I Stage 2 Stage 2 Critical Hdwy &94 Critical Hdwy 6.94 Critical Hdwy Stg I - Critical Hdwy Stg I Critical Hdwy Stg 2 Critical Hdwy Stg 2 Follow-up Hdwy 3,32 Follow-up Hdwy - 3,32 Pot Cap-1 Maneuver a 1005 0 0 Pot Cap-1 Maneuver 0 960 0 a Stage 1 0 - 0 0 Stage 1 0 - 0 0 Stage 2 0 0 0 Stage 2 0 0 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1005 - - Mov Cap-1 Maneuver 960 - Mov Cap-2 Maneuver - Mov Cap-2 Maneuver - Stage I Stage I Stage 2 Stage 2 HCM Control Delay,a 9.5 0 a HCM Control Delay,a 9.4 0 0 HCM LOS A HCM LOS A Capacity(veh1h) 1005 9 Capacity(veh/h) 960 HCM Lane V/C Ratio 0.197 HCM Lane V/C Ratio 0.14 HCM:Control Delay(s) 9.5 HCM Control Delay(a) 9.4 HCM Lane LOS A HCM Lane LOS A HCM 95th lAtile Q(veh) U HCM 95th%lite 0(veh) 0.5 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 3 CjvTech Inc.-CM Page 3 2024 Total AM 4:Goldfield Rd&US-60 WB Ramps 2024 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings 4e t Lane Configurations Lane Configurations 4+ ++ Traffic Volume(vph) 8 0 17 97 134 171 128 Traffic Volume(vph) 25 0 42 64 179 238 91 Future Volume(vph) 8 0 17 97 134 171 128 Future Volume(vph) 25 0 42 64 179 238 91 Tom Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 H 8,0 H 20,0 20.0 20,0 Minimum Initial(s) 8.0 H 8,0 H 20,0 20.0 20,0 Minimunn Split(at 444 44,9i 44,9 10,6 31s 31.6 31 k Minimum Split(a) 44,9 40 44,9 10,6 31.6 31,6 31,6 Total Split(s) 45+0 45.0 45+0 11+0 34.0 34.0 34.0 Total Split(s) 45+0 45+0 45.0 11+0 34.0 34.0 34.0 Total Split(%) 500% 50.0% 50.0% 112% 3T8% 37.8% 37,81% Total Split(IN 50.0% 50,01k 50.q1/6 112% 3T8% 37,81% 37,81/o Yellow Time(s) 19 19 19 16 16 16 16 Yellow Time(s) 19 19 19 16 16 16 16 All-Red Time(a) 10 ZO 2,0 ZO 2,0 ZO ZO All-Red Time(a) 10 10 2.0 ZO 2.0 2,0 10 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(a) 5,9 &9 5,9 5,6 5.6 5.6 5,6 Total Lost Time(a) 5,9 5,9 5 9 5.6 5.6 5,6 516 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Lead-Lag Optmhze7 Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Cycle Length:90 Cycle Length:90 Actuated Cycle Lengft 90 Actuated Cycle Length:90 Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle:90 Natural Cycle,,90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60WB Ramps Splits and Phases: 4:Goldfield Rd&US-60WB Ramps 4 #5 1#4 #5 4 #5 4 *5 #4 #5 �N" "'03 g 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2024 Total AM 4:Goldfield Rd&US-60 WB Ramps 2024 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silve,ray HCM Signalized Intersection Capacity Analysis Lane Configurations 1 4.11 tt ttf r Lane Configurations 41x r tt ttf r Traffic Volume(vph) 0 Or 0 a 0 17 97 134 0 0 171 128 Traffic Volume(vph) 0 0 0 25 0 42 64 179 0 0 238 91 Future Volume(vph) 0 0 0 8 0 17 97 134 0 0 171 128 Future Volume(vph) 0 0 0 25 0 42 64 179 0 0 238 91 Ideal Flow(vphpi) 1900 1900 1900 1900 19001 1900 1909 1900 1900 1900 1900 1900 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 i1900 1900 Total Lost time(s) 5,9 5,9 5.9 5.6 H 5,6 5.6 Total Lost time(s) 5,9 5,9 5.9 5,6 H 5,6 5.6 Lane U111.Factor 0,96 OM 0,95 1,00 0,95 0,91 1,00 Lane U01,Factor 0195 0,91 (t95 1 DO 0195 0,91 1 Z Fri 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Fri 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0:95 1.00' 1,00 0,95 1.00 1.00 1,00 Fit Protected 0,95 0.99 1.00 0,95 1,00 1,00 1,00 Said.Flow(prof) 1681 1457 1504 1770 3539 5085 1583 Said.Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0,95 1,00 1.00 0.62 1,00 1,00 1.00 Fit Permitted 025 < 0,99 1.00 0.57 1.00 1.00 100 Said.Flow(perm) 1681 1457 1504 1155 3539 5085 1583 Said.Flow(Perm) 1681 1460 1504 1067 3539 5085 1583 Peak-hour factor,PHF 0.25 0.25 0,25 0,80 0,80 HO 0,85 0,85 0,80 0.80 0,85 0Z5 Peak-hour factor,PHF 0.25 0.25 025 OZO 0,80 030 0,80 0,85 0,80 0,80 0.85 015 Adj.Flow(vph) 0 0 0 10 0 21 114 158 0 0 201 151 Adj.Flow(vph) 0 0 0 31 0 52 80 211 0 0 280 107 RTOR Reduction(vpb) 0 0 0 0 10 10 0 0 0 0 0 49 RTOR Reduction(vph) 0 0 0 0 25 25 0 0 0 0 0 39 Lane Group Flow(vph) 0 0 0 9 1 1 114 158 0 0 201 102 Lane Group Flow(vph) 0 0 0 28 3 3 80 211 0 0 280 68 Turn Type Perm NA• Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 66.1 60.7 60.7 60.7 Actuated Green,G(s) 10.0 10.0 10.0 62.9 57.5 57.5 57.5 Effective Green,g(a) 6.8 6,8 6.8 661 603 601 601 Effective Green,g(8) 10,0 10b WO 62.9 57,5 5T5 57,5 Actuated g/C Ratio 0.08 0.08 0.08 0.73 0.67 0.67 0.67 Actuated g/C Ratio 0.11 0.11 0.11 0.70 0.64 0.64 0.64 Clearance Time(a) &9 5,9 5.9 5,6 5.6 5,6 5,6 Clearance Time(el 5.9 52 59 5.6 5,6 5.6 5,6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 L-Grp Cap(vph) 127 110 113 885 2386 3429 1067 Lane Grp Cap(vph) 186 162 167 787 2264 3246 1011 v/s Ratio Prot C0.01 0.04 0.04 v/s Ratio Prot C0.01 0.06 0.06 v/s Ratio Perm C6.01 0.00 0,00 C0,09 0.06 v/s Ratio Perm cO.02 0,00 0,00 00,06 0,04 v/c Ratio 0.07 0.01 0.01 0.13 0.07 0.06 0.10 v1c Ratio 0.15 0.02 0.02 0.10 0.09 0.09 0.07 Uniform Delay,dl 38.7 38,5 38.5 3.5 54 5,0 51 Uniform Delay,di 362 35,6 35,6 4A 62 6,2 6A Progression Factor 1.00 1.00 1.00 0.44 0.60 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.71 0.63 1.00 1.00 Incremental Delay,Q 01 0,0 0.10 03 0.1 0.0 01 Incremental Delay,d2 0.1 0.0 0.0 03 OA 0.1 O'l Delay(s) 38.8 38,5 38,5 1.8 3.0 5,0 5,3 Delay(s) 36.3 35,6 35,6 3.4 4.0 6,3 6,3 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 0.0 38.6 2.5 5.1 Approach Delay(s) 0.0 35.9 3.8 6.3 Approach L08 A D A A Approach LOS A D A A HCM 2000 Control Delay 5,6 HCM 2000 Level of Service A HCM 2000 Control Delay 8,6 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.12 HCM 2000 Volume to Capacity ratio 011 Actuated Cycle Length(s) 90,0 Sum of It time(s) 17.4 Actuated Cycle Length(s) 90,0 SUM Of lost time(a) 17.1 Intersection Capacity Utilization 44.8% ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(min) 15 Analysis Period(min) Is c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2024 Total AM 4:Goldfield Rd&US-60 WB Ramps 2024 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Flow(vph) 9 11 11 114 158 201 151 Lane Group Flow(vph) 28 28 28 80 211 280 107 Wc Ratio 0,06 0,05i 0,05 0,13 0L06 0,06 0,13 Wc Ratio 0,15 OM 011 0110 009 0,09 0110 Control Delay 37.6 0.4 0.4 1.5 3.3 5.4 1.4 Control Delay 36.6 0.9 0.9 2.7 4.3 6.6 1.9 Queue Delay 0.0 0.0 U 0.0 U U 0.0 Queue Delay 0.0 0.0 U 0,0 U 0'0 0,0 Total Delay 37.6 OA 0.4 1,5 13 5.4 1.4 Total Delay 36.6 0,9 0.9 2,7 4,3 6.6 1,9 Queue Length 50th(ft) 5 0 0 2 6 13 0 Queue Length 50th(ft) 15 0 0 3 9 19 0 Queue Length 95th(ft) 17 0 0 4 11 21 17 Queue Length 95th(ft) 34 0 0 20 36 32 17 Internal Link Dist(ft) 639 484 300 Internal Link Dist(ft) 639 484 300 Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688 709 900 2433 3496 1135 Base Capacity(vph) 730 690 709 787 2260 3247 1049 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductri 0 0 0 0 0 0 0 8pillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.01 0,02 0,02 0J3 0.06 0,06 0,13 Reduced We,Ratio 0.04 0,04 0,04 0.10 0,09 0.09 010 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 2 CjvTech Inc.-CM Page 2 2024 Total AM 5:Goldfield Rd&US-60 EB Ramps 2024 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Configurations W r I tt Lane Configurations 4a r ttf tf Traffic Volume(uph) 77 0; 50 154 23 131 48 Traffic Volume(vph) 138 ( 0 104 98 45 177 89 Future Volume(vph) 77 0 50 154 23 131 48 Future Volume(vph) 138 0 104 98 45 177 89 Turn Type Perm NA Perm NA Perm, pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3, 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 &0 8.0 20.0 20.0 5.0 20.0 Minimum Split(s) 44.9 44.9 44.9 31.6 31.6 10,6 31.6 Minimum Split(s) 44.9 44,9 44.9 31,6 31.6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total';Split(%) 50blk 50.0% 50b% 37.8% 37.8%' 12.2% 37A% Total Split({a) SON 0,0% 50.0% 37.8% 37.8% 12.21% 37,8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Ali-Red Time(s) 2,0 2.0, 20 2.0 2.0 20 2.0 Ail-Red Time(s) 2.0 ! 20 2.0 2.0 2.0 2.0 2-0 i Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Timets)' 5,9 5.9' 5,9 5.6 5,6 5$ 5.6 Total Lost Time(a) 5,9 5.9 5,9 5.6 5.6 5.6 5,6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length:90 Offset:0(0%),Referenced to phase 1.NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green Master Intersection Natural Cycle:90 Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2024 Total AM 5:Goldfield Rd&US-60 EB Ramps 2024 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silve,ray HCM Signalized Intersection Capacity Analysis Lane Configurations 41 Lane Configurations 40 Traffic Volume(vph) 77 Oi 50 0 0 0 0 154 23 131 48 0 Traffic Volume(vph) 138 0 104 0 0 0 0 98 45 177 89 0 Future Volume(vph) 77 0 50 0 0 0 0 154 23 131 48 0 Future Volume(vph) 138 0 104 0 0 0 0 98 45 177 89 0 Ideal iPlow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(Vhpl) 1900 i 1900 1900 1900 1900 1900 Igoo 1900 1900 1900 1900 1900 Total Lost time(s) 5,9 5.9 5,9 H 5.6 5,6 5.6 Total Lost time(s) 5,9 5,9 5,9 H 5.6 5,6 5.6 Lane Ulff.Factor (195 0.91 i 0195 OM 10 1100 0.95 Lane U91.Factor 0.95 021 0.95 0,91 1.00 'LOO 0,95 Frt 1.00 0.96 0.85 1.00 0.85 1.00 1.00 Fit 1.00 0.95 0.85 1.00 0.85 1.00 1.00 Fit Protected 0.95 0,96 1.00 1.00 1.00 0.95 1.00 Fit Protected 0.95 0:97 1.00 1.00 1Z 0,95 i1.00 Said.Flow(prof) 1681 1571 1504 5085 1583 1770 3539 Said.Flow(prof) 1681 1557 1504 5085 1583 1770 3539 Fft Permitted 005 0.96 '1,00 1,00 1,00 0,63 10 Fit Permitted 0.05 ON 1,00 1�00 1,00 0.68 1,00 Said.Flow(perm) 1681 1571 1504 5085 1583 1179 3539 Said.Flow(perm) 1681 1557 1504 5085 1583 1259 3539 Peak-hour factor,PHF 0.80 0,80 0,80 0,25 0.25 0,25 0.80 0,85 0,80 0,85 0,80 0,80 Peak-hour factor,PHF 0,85 0.80 OAS 0,26 0.25 025 0.80 0,85 HO 0,85 0,85 080 Adj.Flow(vph) 96 0 62 0 0 0 0 181 29 154 60 0 Adj.Flow(vph) 162 0 122 0 0 0 0 115 56 208 105 0 RTOR Reduction(vah) 0 50 46 0 0 a a 0 9 0 0 0 RTOR Reduction(vph) 0 85 79 0 0 0 0 0 20 0 0 0 Lane Group Flow(vph) 56 4 4 0 0 0 0 181 20 154 60 0 Lane Group Flow(vph) 99 11 10 0 0 0 0 115 36 208 105 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.8 6.8 6.8 60.7 60.7 66.1 60.7 Actuated Green,G(s) 10.0 10.0 10.0 57.5 57.5 62.9 57.5 Effective Green,g(s) H 6,8 6,8 601 60.7 66,1 601 Effective Green,g(a) I(LO r 10,0 10,0 67.5 57.5 62,9 57,5 Actuated g/C Ratio 0.08 0.08 0.08 0.67 0.67 0.73 0.67 Actuated g/C Ratio 0.11 0.11 0.11 0.64 0.64 0.70 0.64 Clearance Time(s) 5,9 519 519 5A 5,6 5.6 5.6 Clearance Time(a) 51 5,9 6.9 5.6 5,6 5.6 5.6 Vehicle Extension(s) 1.2 12 12 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 12 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 127 118 113 3429 1067 901 2386 Lane Grp Cap(vph) 186 173 167 3248 1011 910 2261 v/s Ratio Prot 0.04 C0.01 0.02 v/s Ratio Prot 0.02 C0.01 0.03 v/s Ratio Perm c0,03 0.00 (YOO 0,01 cO,12 We Ratio Perm C0,06 0.01 0.01 0.02 co.15 v/c Ratio 0.44 0.03 0.03 0.05 0.02 0.17 0.03 v1c Ratio 0.53 0.06 0.06 0.04 0.04 0.23 0.05 Uniform Delay,dl i 39.8 3&6 38,6 4,9 0 17 0 Uniform Delay,nit 37,8 35.8 W8 6.0 &0 0 &0 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.39 0.50 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.46 0.50 Incremental Delay,d2 0.9 0.0f (LO 0.0 0.0 OA Ob Incremental Delay,Q 1.5 0.1 Oi 0A 01 0L6 00 Delay(s) 40.7 38,6 38.6 5.0 4,9 1.8 2A Delay(s) 39.3 359 35.8 6.0 6,1 2.8 3A Level cf Service D D D A A A A Level of Service 0 D D A A A A Approach Delay(s) 39.3 0.0 5.0 2.0 Approach Delay(s) 37.0 0.0 6.0 2.9 Approach LOS D A A A Approach LEIS D A A A HCM 2000 Control Delay 132 HCM 2000 Level of Service 8 HCM 2000 Control Delay 16,2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.20 HCM 2000 Volume to Capacity ratio 0.27 Actuated Cycle Length(s) 90.0 Sum of lost time(8) 171 Actuated Cycle Length(a) 90,0 surn of lost time(s) Intersection Capacity Utilization 44.8% ICU Level of Service A Intersection Capacity Utilization 47.4% ICU Level of Service A Analysis Period(rein) is Analysis Period(min) 15 c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2024 Total AM 5:Goldfield Rd&US-60 EB Ramps 2024 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Plow(vph) 56 54 49 181 29 154 60 Lane Group Plow(vph) 99 96 89 115 56 208 105 v!c Ratio 0,36 0 23 0.21 0.05 0 03 017 0.02 ft Ratio 0,53 0.37 0.35 0 04 US 0.23 US 1 Control Delay 44.8 4.2 3.1 5.4 0.0 1.5 2.8 Control Delay 47.7 11.5 10.4 6.5 0.5 2.3 3.3 Queue belay 0.0 0.0• 0.0 0.0 0.0r 0.0 0.0 Queue Delay 0.0 0.0 Ok 0.0 (L0 0.0 0.0 Total Delay 44.8 4.2 3.1 5.4 0.0 1.5 2.8 Total Delay 47.7 11,5 10.4 6.5 0.5 4.3 3.3 Queue Length 50tt(ft) 32 0 0 11 0. 0 2 Queue Length 50th(ft) 57 0 0 7 0 9 4 Queue Length 95th(ft) 62 3 0 19 0 7 4 Queue Length 95th(ft) 97 32 31 15 1 17 10 Internal Link Dist(ft) 535' 222 484 Internal Link Dist(ft) 535 222 484 Turn Bay Length(ft) 130 130 115 Turn Bay Length(ft) 130 130 115 Base;Capacity(vph) 730 738' 709 3496 1120 916 2433 Base Capacity(vph) 730 731 709 3247 1048 910 2260 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spiilback Gap Reductn 0 0' 0 0 0',, 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 ; Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced vtc Ratio` 0.08 0.07# 0.07 tf 05 0,03, 0.17 0.02 Reduced vfc Ratio 0.14 013 0.13 ON 0.05 0.23 US 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2024 Total AM 6:Goldfield Rd&Chevron Access 2024 Total PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 1.8 Int Delay,s/veh 2 Lane Configurations tt r 1 0 Lane Configurations tt If ) 0 Traffic Vol,vehlb 3 2 9 2 1 29 0 163 8 22 65 3 Trafflo Vol,veNtl 5 U 1 4 0 33 1 118 8 36 143 9 Future Vol,veh/h 3 2 0 2 1 29 0 163 8 22 65 3 Future Vol,veh1h 5 0 1 4 0 33 1 118 8 36 143 9 Conflicting Peds,Whr 0 0 0 0 0 0 0 0 0 0 0 0 Conflicting Parts,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None . - Nonei None RT Channelized None, None . None - None Storage Length 50 - 50 50 - Storage Length 50 50 50 Veh In Median Storage,# a 0 - a - 0 Veh in Median Storage,# 0 0 ID - . - Grade,% 0 - 0 - - 0 - 0 Grade,% 0 0 0 - - 0 - Ptak Hour Factor 80 80 80 80 80 80 80 85 90 80 80 80 Ptak Hour Factor 80 80 80 80 80 80 80 85 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 3 0 s 3 1 36 0 192 10 28 81 4 Mvmt Flow 6 0 1 5 0 41 1 139 10 45 168 11 Conflicting Flow All 236 341 43 290 333 96 85 0 0 202 0 0 Conflicting Flow All 336 415 90 315 410 70 179 0 0 149 0 0 Stage 1 139 139 192 192 stage;1 264 264 - 141 i141 Stage 2 97 202 - 98 141 Stage 2 72 151 - 174 269 Critical Hdwy 7,54 5.54 04 754 6,54 &94 414 4,14 Critical Hdwy 7,54 6,54 6,94 754 6.54 6,94 4,14 4,14 Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - Critical Hdwy Stg 2 6,54 6.54 . 6.64 5.54 Critical Hdwy Stg 2 6.64 5.54 - fL54 5.54 Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 3.32 2.22 2,22 Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 3,32 2.22 2,22 Pot Cap-1 Maneuver 722 592 1050 r661 699 942 1531 1367 Pot Cap-1 Maneuver 686 583*1038 711 irr587 978 i1481 1430 Stage 1 873 795 - 791 740 - - - Stage 1 807 743 - 847 779 - - - Stage 2 899 3 - 922 793 Stage 2 929 771 915 739 Platoon blocked,% 1 1 1 1 1 t Platoon blocked,% 1 1 1 1 1 1 Mov Cap-1 Maneuver 683 581 1050 648 587 942 1531 1367 Mov Cap-1 Maneuver 641 564*1038 693 568 978 1481 1430 Mov Cap-2 Maneuver 683 581 - 648 587 - - - Mov Cap-2 Maneuver 641 564 - 693 568 - - - Stage 1 873 779 791 740 Stage,''1 806 720 846 778 Stage 2 863 733 901 777 Stage 2 889 770 885 716 HCM Control Delay,a 10,7 9.2 0 1.9 HCM Control Delay,a 10.3 9 01 1.5 HCM LOS B A HCM LOS B A Capacity(-hlh) 1531 638 899 1367 Capacity(vah1h) 1481 685 936 1430 HCM Lane VIC Ratio - 0.01 0.044 0.02 HCM Lane V/C Ratio 0.001 0.011 0.049 0.031 HCM Control Delay(a) 0 101 91 7,7 HCM Control Delay(a) 7.4 10.3 9 7.6 HCM Lane LOS A B A A HCM Lane LOS A B A A HCM 95th%ble Q veh) 0 0 01 011 HCM 95th'Ute O(veh) y 0 0 02 0.9 Volume exceeds capacity $.,Delay exceeds 300s +:Computation Not Defined All major volume In platoon 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 8 CjvTech Inc.-CM Page 8 2024 Total AM 7:Goldfield Rd&Resort Blvd 2024 Total PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 5.7 Int Delay,s/veh 4.8 Lane Configurations Y 0 tt Lane Configurations Y til I tt Traffic Vol,veh/h 2 117 54 3 45 23 Traffic Vol,vehih 2 69 i 58 5 98 61 Future Vol,veh/h 2 117 54 3 45 23 Future Vol,veh/h 2 69 58 5 98 51 Conflicting Reds,#/hr 0 0 0 0 0 0 Conflicting Pleds,#Jhr 0 0 i a 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channelized - None None - None FIT Channel zed - None None . None Storage Length 0 - 50 - Storage Length 0 50 - Veh in Median Storage,9 0 0 - 0 Van In Median Storage,ft 0 0 0 - Grade,% 0 0 - 0 Grade,% 0 0 - 0 Peaki Hour Factor 80 85 80 80 go 80 Peak Hour Factor 80 80 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 138 68 4 56 29 Mvrnt Flow 3 86 73 6 115 64 Conflicting Flow All 197 36 0 0 72 0 Conflicting Flow All 338 40 0 0 79 0 Stage 1 70 stage I 76 - - - - - Stage 2 127 Stage 2 262 - Critical Hdwy 6.84 6.94 414 Critical Hdwy 6,84 &94 4.14 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 1 5.84 - Critical Hdwy Sig 2 5.84 Critical Hdwy Stg 2 5,84 - Follow-up Hdwy 3,52 3.32 2.22 Follow-up Hdwy 3,52 3.32 2.22 Pot Cap-1 Maneuver 773 1029 1526 Pot Cap-1 Maneuver 649 1022 1517 Stage 1 945 - - Stage 1 938 - - Stage 2 885 - - Stage,2 774 - Platoon blocked,% Platoon blocked,% 1 Mov Cap-1 Maneuver 744 1029 4526 Mov Cap-1 Maneuver 600 1022 1517 Mov Cap-2 Maneuver 743 - - Mov Cap-2 Maneuver 626 - - Stage 1 945 Stage;/ 938 Stage 2 852 Stage 2 715 HCM Control Delay,a 9A 0 4,9 HCM Control Delay,a 8.9 0 4,9 HCM LOS A HCM LOS A Capacity(veh1h) 1022 1526 Capacity{vehlh) - 1004 1517 HCM Lane V/C Ratio 0.137 0.037 HCM Lane V/C Ratio 0.088 0.076 HCM Control Delay(s) 9.1 7A HCM Control Delay(s) 8.9 7�6 HCM Lane LOS A A HCM Lane LOS A A HCM 95th-kille O(veh) 0,5 01 HCM 95th%Wle 0(veh) 0.3 0,2 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 9 CjvTech Inc.-CM Page 9 2024 Total AM 8:Resort Blvd&Chevron Access 2024 Total PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Iyf, roll Int Delay,s/veh 0.5 Int Delay,s/veh 0.3 Lane Configurations Lane Configurations Traffic Vol,veh/h 6 42 118 1 3 1 Traffic Vol,veh/h 2 112 61 0 1 3 Future Vol,veh/h 6 42 118 1 3 1 Future Vol,vehlh 2 112 61 0 1 3 Conflicting Reds,4/hr 0 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Chaintiolizod Now Norio - None FIT Charinelized None None - Norio Storage Length - 0 Storage Length - 0 Veh in Median Storage, 0 0 0 Veh in Median Storage,If 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 85 80 80 80 Peak Hour Factor 80 85 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 8 53 139 1 4 1 Mvmt Flow 3 132 76 0 1 4 Conflicting Flow All 140 0 - 0 209 140 Conflicting Flow All 76 0 - 0 214 76 Stage I - 140 - stage I - 76 Stage 2 - 69 - Stage 2 - 138 - Critical Hdwy 412 6,42 622 Critical Hdwy 412 642 6,22 Critical Hdwy Sig 1 - 5.42 - Critical Hdwy Stg I - 5.42 - Critkal Hdwy Stg 2 . 5,42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1443 779 908 Pot Cap-1 Maneuver 1523 774 985 Stage 1 - 887 - Stage I - 947 - Stage 2 954 - Stage;2 - 889 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1443 774 <908 Mov Cap-1 Maneuver 1523 772 985 Mov Cap-2 Maneuver - 774 Mov Cap-2 Maneuver - 772 - Stage 1 882 Stage 1 945 Stage 2 - 954 Stage 2 889 HCM Control Delay,a 0.9 0 9.5 HCM Controf Delay,a 0A 0 8.9 HCM LOS A HCM LOS A Capacity(vshlh) 1443 804 Capacity(vah1h) 1523 921 HCM Lane V/C Ratio 0.005 0.006 HCM Lane V/C Ratio 0.002 0.005 ROM Control Delay(s) 7.5 0 9's HCM Control Delay(a) 7.4 0 8'9 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th Ule Q(veh) 0 0 HCM 95th I/Wile 0(veh) 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 10 CjvTech Inc.-CM Page 10 2024 Total AM 9:Chevron Access&Access A 2024 Total PM 9:Chevron Access&Access A 22-1180 Alliance Broadstone Silveray HCM(3th TNSC 22-1180 Alliance Broadstone Silveray HCM 6th TNSC roll Int Delay,s/veh 1.6 Int Delay,s/veh 1.7 ONW140111*10111)=11 Lane Configurations 4 TO Y Lane Configurations Y Traffic Vol,veh/h 2 30 7 0 0 7 Traffic Vol,veh/h 7 37 2 0 0 4 Future Vol,veh/h 2 30 7 0 0 7 Future Vol,veh/h 7 37 2 0 0 4 Conflicting Peds,#1hr 0 0 0 0 0 0 Conflicting Peds,#Ihr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop PIT Channelized None None - None PIT Channel zed None None - None Storage Length - 0 Storage Length - 0 Voh in Median Storage,# 0 0 0 Veh in Median Storage,# 0 a 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Ptak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 38 9 0 0 9 Mvmt Flow 9 46 3 0 0 6 Conflicting Flow All 9 0 - 0 53 9 Conflicting Flow All 3 0 - 0 67 3 Stage 1 - 9 - stage,1 3 Stage 2 - 44 - Stage 2 - 64 - Critical Hdwy 4.12 6.42 622 Critical Hdwy 4.12 6,42 622 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 1 - 5.42 - C 0cal Hdwy Stg 2 - 5,42 ' Critical Hdwy Sig 2 5.42 Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1611 955 1073 Pot Cap-1 Maneuver 1619 938 1081 Stage 1 - 1014 - Stage I - 1020 - Stage 2 978 Stage;'2 959 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1611 953 1073 Mov Cap-1 Maneuver 1619 932 1081 Mov Cap-2 Maneuver - 953 - Mov Cap-2 Maneuver - 932 - Stage 1 1012 Stager I 10f4 Stage 2 - 978 Stage 2 - 959 HCM Control Delay,s 0.5 0 8.4 HCM Control Delay,a 1.2 0 83 HCM LOS A HCM LOS A capacity(veh(h) 1611 1073 Capacity,(v,,h/h) 1619 1081 HCM Lane V/C Ratio 0.002 0.008 HCM Lane V/C Ratio 0.005 0.005 HCM Control Delay(a) 7,2 0 8.4 ROM Control Delay(a) 71 Q 83 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%Ifle Q(veh) 0 0 HCM 95th%tile Q(veh) 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 11 CjvTech Inc.-CM Page 11 2024 Total AM 10:Access B&Resort Blvd 2024 Total PM 10:Access B&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 4.7 Int Delay,s/veh 2.9 Lane Configurations *4 40 4# Lane Configurations *T# *T* 40 *14 Traffic VOL ven/b, 3 18 20 0 41 0 65 0 0 0 0 12 Traffic Vol,vohlh 11 39 62 0 17 0 W 0 0 0 0 7 Future Vol,veh/h 3 18 20 0 41 0 65 0 0 0 0 12 Future Vol,veh/h 11 39 62 0 17 0 37 0 0 0 0 7 Conflicting Pods,#1hr 0 0 0 0 0 0 0 0 0 0 0 0 Conflicting Peds,#1hr g 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop PIT Channolized None Norio None None FIT Chatrinelizod None None None None Storage Length Storage Length Von in Median Storage,# 0 0 0 0 Von In Median Storage,#1 0 0 0 i 0 Grade,% 0 0 0 - 0 Grade,% 0 - 0 0 - 0 - Ptak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 23 25 0 51 0 81 0 0 0 0 15 Mvmt Flow 14 49 78 0 21 0 46 0 0 0 0 9 Conflicting Flow All 51 0 0 48 0 0 103 95 36 95 107 51 Conflicting Flow All 21 0 0 127 0 0 142 137 88 137 176 21 Stage I - 44 44 - 51 51 - Staged 116 116 21 21 Stage 2 - 59 51 - 44 56 - Stage 2 26 21 116 155 - Critical Hdwy 4,12 02 T12 652 622 7,12 6,52 6,22 Critical Hdwy 412 412 7,12 652 6,22 7,12 6,52 6,22 Critical Hdwy Stg I - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2i 612 5.52 -I 6,12 5.52 . Critical Hdwy Stg 2 6.12 5,52 . 6A2 5.52 . Follow-up Hdwy 2,218 2,218 3,518 4.018 3,318 3,518 4,018 3,318 Follow-up Hdwy 2,218 2,218 3,518 4.018 3,318 3,518 4,018 3,318 Pot Capi-1 Maneuver 1565 1559 877 795 1037 888 783 1017 Pot Cap-1 Maneuver 1595 1459 828 754 970 834 717 1056 Stage 1 - - 970 858 - 962 852 Stage I - - 889 800 - 998 878 - Stage 2 - - 953 852 - 970 848 stage 2 - 992 878 - 889 769 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1655 1559 862 793 1037 886 781 1017 Mov Cap-1 Maneuver 1595 1459 i 815 746 970 827i 710 1056 Mov Cap-2 Maneuver - - 862 793 - 886 781 - Mov Cap-2 Maneuver - - 815 746 - 827 710 - Stage 1 967 855 959 862 stage 1 880 792 988 878 Stage 2 - 939 852 967 845 Stage 2 - 984 878 880 761 HCM Control Delary,s 0,5 a 9.6 8,6 HCM Control Delay,a U 0 91 8A HCM LOS A A HCM LOS A A Capacity(voh/h) 862 1555 1559 1017 Capacity(veh1h) 815 1595 - 1459 1056 HCM Lane V/C Ratio 0.094 0.002 - 0.015 HCM Lane V/C Ratio 0.057 0.009 - - 0.008 HCM Control Delay(s) 9,6 73 0 0 8,15 HCM Control Delay(a) 9.7 7.3 0 0 8,4 HCM Lane LOS A A A A A HCM Lane LOS A A A A A HCM 95th%tile 0(veh) 03 0 0 0 HCM 95th!Stile O(veh) 02 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 12 CjvTech Inc.-CM Page 12 2024 Total AM 11:Resort Blvd&Access C 2024 Total PM 11:Resort Blvd&Access C 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 0.8 Int Delay,s/veh 1.1 10" Lane Configurations Y Lane Configurations 4 T# Y Traffic Vol,vehilln 1 17 36 0 0 5 Traffic Vol,veh/h 5 34 14 0 0 3 Future Vol,veh/h 1 17 36 0 0 5 Future Vol,veh/h 5 34 14 0 0 3 Conflicting Peds,#Ihr 0 i 0 0 i 0 0 0 Conflicting Pods,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop PIT Channelized None None . None PIT Charinelized None None . None Storage Length 0 Storage Length - 0 Veh in Median Storage,# G 0 0 Veh in Median Storage,# 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Ptak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 so go 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 21 45 0 0 6 Mvmt Flow> 6 43 18 0 0 4 Conflicting Flow All 45 0 - 0 68 45 Conflicting Flow All 18 0 - 0 73 18 Stage I - 45 - stage I - - 18 - Stage 2 - 23 - Stage 2 - 55 - Critical Hdwy 4,12 6,42 6,22 Critical Hdwy 4.12 6,42 6,22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 6,42 Critical Hdwy Stg 2 6.42 Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1563 937 41025 Pot Cap-1 Maneuver 1599 931 1061 Stage 1 - 977 - Stage 1 - 1005 - Stage 2 - 1000 Stage 2 - 968 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1563 936 1025 Mov Cap-1 Maneuver 1599 927 1061 Mov Cap-2 Maneuver - 936 - Mov Cap-2 Maneuver - 927 - Stage 1 976 Stage 1 1001 Stage 2 - 1000 Stage 2 - 968 HCM Control Delay,a 04 0 8.5 HCM Control Delay,a 0,9 0 8A HCM LOS A HCM LOS A Capacity(veh1h) 1563 1025 Capacity(velvh) 1599 - 1061 HCM Lane V/C Ratio 0.001 - 0.006 HCM Lane V/C Ratio 0.004 - 0.004 HCM Control Delay(a) 73 0 8,5 HCM Control Delay(s) 1.3 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%tile,Q(veh) a 0 HCM 95th%tile O(veh) 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 13 CjvTech Inc.-CM Page 13 2024 Total AM 12:Resort Blvd&Access D 2024 Total PM 12:Resort Blvd&Access D 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 0.6 Int Delay,s/veh 0.8 Lane Configurationsr Lane Configurations Traffic Vol,vehih 1 16 32 0 0 3 Traffic Vol,vahth 3 31 f 12 0 0 2 Future Vol,veh/h 1 16 32 0 0 3 Future Vol,veh/h 3 31 12 0 0 2 Conflicting Reds,#/hr 0 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 a 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Chandelized Nom None . None RT Channel zed None None . None Storage Length 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Veh in Median Storage,If 0 0 0 Grade,% 0 0 - 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 so 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 20 40 0 0 4 Mvmt Flow 4 39 15 0 0 3 Conflicting Flow All 40 0 - 0 62 40 Conflicting Flow All 15 0 - 0 62 15 Stage 1 40 - Stage 1 15 Stage 2 - 22 - Stage 2 47 Critical Hdwy 4,12 6.42 6,22 Critical Hdwy 4.12 6,42 6,22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 2 . 5.42 Critical Hdwy Stg 2 &42 - Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1570 944 1031 Pot Cap-1 Maneuver 1603 944 1065 Stage I - 982 - Stage I - 1008 - Stage 2 - 1001 - Stage,2 - 975 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1570 943 i1031 Mov Cap-1 Maneuver 1603 941 1065 Mov Cap-2 Maneuver - 943 - Mov Cap-2 Maneuver - 941 - Stage 1 981 Stage 1 1005 Stage 2 - 1001 Stage 2 - 975 HCM'Control Delay,a 04 0 8,6 HCM Control Delay,a 0,6 0 &4 HCM LOS A HCM LOS A Capacity(v,,hlh) 1570 - 1031 Capacity(vah/h) 1603 - 1065 HCM Lane V/C Ratio 0.001 - 0.004 HCM Lane VIC Ratio 0.002 - 0.002 HCM Control Delay(s) 7.3 a 85 HCM Control Delay(s) ## 7,3 0 8A HCM Lane LOS A A A HCM Lane LOS A A A HCM 96th 9/611le Q(Yeh) 0 0 HCM 95th%tile O(veh) 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 14 CjvTech Inc.-CM Page 14 2024 Total AM 13:Resort Blvd&Access E 2024 Total PM 13:Resort Blvd&Access E 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 0.7 Int Delay,s/veh 0.9 13, Lane Configurations Y Lane Configurations 4 T4 Y Traffic Vol,veh1h 1 15 29 0 0 3 Traffic Vol,veh/h 3 28 10 0 0 2 Future Vol,veh/h 1 15 29 0 0 3 Future Vol,veh/h 3 28 10 0 0 2 Conflicting Reds,Whr 0 0 0 0 0 i 0 Conflicting Peds,Whr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Chantrelized Now None - None FIT Charinelized None None . None Storage Length - 0 Storage Length - 0 Veh in Median Storage,If 0 0 0 Veh in Median Storage,# 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 60 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 19 36 0 0 4 Mvmt Flow 4 35 13 0 0 3 Conflicting Flow All 36 0 - 0 57 36 Conflicting Flow All 13 0 - 0 56 13 stage 1 36 - Stage;1 - 13 Stage 2 21 - Stage 2 - 43 - Crifloat Hdwy 4,12 6.42 622 Critical Hdwy 4,12 6A2 622 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Sig I - 5.42 - Critical Hdwy Sig 2 - 5.42 ' Critical Hdwy Sig 2 - 5.42 - Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1575 950 1037 Pot Cap-1 Maneuver 1606 952 1067 Stage 1 - 986 Stage 1 - 1010 - Stage 2 1002 - Stage;2 979 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1575 949 1037 Mov Cap-1 Maneuver 1606 949 1067 Mov Cap-2 Maneuver - 949 - Mov Cap-2 Maneuver - 949 - Stage 1 985 stage 1 1007 Stage 2 - 1002 Stage 2 - 979 HCM Control Delay,a 0,5 a 8.5 HCM Control Delay,a 0.7 0 8.4 HCM LOS A HCM LOS A Capacity(vlh/h) 1575 1037 capacity("h/h) 1606 1067 HCM Lane V/C Ratio 0.001 0.004 HCM Lane V/C Ratio 0.002 - 0.002 HCM Control Delay(a) 7.3 0 8,5 HCM Control Delay(s) 7.2 0 8.4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th 9/611le O(veh) 0 0 HCM 95th%file 0(veh) 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 15 CjvTech Inc.-CM Page 15 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX K 2027 BUILD PEAK HOUR ANALYSIS ,C4'0'--E—E, C i v T e c h 2027 Total AM 1:Goldfield Rd/EB Old West Hwy 2027 Total PM 1:Goldfield Rd/EB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC Int Delay,s/veh 3.2 Int Delay,s/veh 2.3 Lane Configurations tt Lane Configurations tt Traffic Vol,v,-h/h 64 0 0 0 0 131 Traffic Vol,vehlb 67 0 0 0 r 0 227 Future Vol,veh/h 64 0 0 0 0 131 Future Vol,veh/h 67 0 0 0 0 227 Conflicting Peds,#/hr 0 0 0 0 0 0 Conflicting Peds,41hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channelized - None None - None FIT Channelized - Now None - None Storage Length 0 195 - Storage Length 0 195 - Veh in Median Storage,# 0 0 0 Von In Median Storage,# 0 0 - 0 Grade,% 0 0 - 0 Grade,% 0 0 - 0 Ptak Hour Factor 80 80 25 25 80 85 Peak Hour Factor 80 80 25 25 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 80 0 0 0 0 164 Mvmt Flow 84 0 0 0 0 267 Conflicting Flow All 77 - 0 0 Conflicting Flow All 134 - 0 0 Stage 1 0 stage;1 0 Stage 2 77 Stage 2 134 CritleaJ Hdwy 6.84 414 Critical Hdwy 644 4,14 Critical Hdwy Stg I - Critical Hdwy Stg I - Critical Hdwy Stg 2 5.84 Critical Hdwy Stg 2 6.84 Follow-up Hdwy 3,52 2.22 Follow-up Hdwy 3,52 - 2.22 Pot Cap-1 Maneuver 917 0 Pot Cap-1 Maneuver 846 0 Stage 1 - 0 Stage I - 0 Stage 2 937 0 Stage 2 878 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 917 - Mov Cap-1 Maneuver 946 Mov Cap-2 Maneuver 917 Mov Cap-2 Maneuver 846 Stage I Stage:1 -Stage 2 937 Stage 2 878 HCM Control Delay,s 9.3 0 HCM Control Dalays U G HCM LOS A HCM LOS A Capacity(v,-hlh) 917 Capachy(vetvh) 846 HCM Lane V/C Ratio 0.087 - HCM Lane V/C Ratio 0.099 HCM Control Delay(a) 9.3 0 HCM Control Delay(a) 9.7 0 HCM Lane LOS A A HCM Lane LOS A A HCM 95th lkfile Q(veh) 03 HCM 95th lkfile O(Yeh) 0.3 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CjvTech Inc.-CM Page 1 2027 Total AM 2:Goldfield Rd&WB Old West Hwy 2027 Total PM 2:Goldfield Rd&WB Old West Hwy 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 2.9 Int Delay,s/veh 2.9 Lane Configurations r tt f Lane Configurations +t Traffic Vol,WWII 0 18 f), 0 64 10 0 224 46 0 0 0 TraffloVol,veh/h 0 21 0 0 67 6 0 205 64 0 0 0 Future Vol,veh/h 0 18 0 0 64 10 0 224 46 0 0 0 Future Vol,veh/h 0 21 0 0 67 6 0 205 64 0 0 0 Conflicting Parts,#1hr 0 0 a 0 0 i 0 0 0 0 0 0 0 Conflicting Pods,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free PIT Cheirinelized None Stop Yield Norte FIT Channelized Norte Stop Yield None Storage Length 0 0 Storage Length 0 0 Veh in Median Storage,# a 0 1 a 0 Veh in Median Storage,# 0 0 0 0 Grade,% 0 - 0 - 0 0 Grade,% 0 0 - 0 - 0 Peak Hour Factor 80 80 80 80 80 80 80 85 80f 25 25 25 Ptak Hour Factor 80 80 80 80 80 80 So 85 80 25 25 25 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 23 0 0 80 13 0 264 58 0 0 0 Mvmt Flow 0 26 0 0 84 8 0 241 80 0 0 0 Conflicting Flow All - 264 - - 264 132 - 0 0 Conflicting Flow All - 241 - - 241 121 - 0 0 Stage 1 0 264 - Stage;1 0 241 Stage 2 264 0 - Stage 2 241 0 - Critical Hdwy 6.54 6,54 6.94 Critical Hdwy 6,54 6,54 6.94 Critical Hdwy Stg 1 - 5.54 - Critical Hdwy Stg 1 - 5.54 - Critical Hdwy Stg 2 5.54 - - Critical Hdwy Stg 2 5.64 -Follow-up Hdwy 4.02 4.02 3.32 Follow-up Hdwy 4.02 4.02 3.32 Pot Cap-1 Maneuver 0 640 0 0 640 893 0 Pot Cap-1 Maneuver 0 659 0 0 669 908 0 Stage 1 0 - 0 0 689 - 0 Stage 1 0 - 0 0 705 - 0 Stage 2 0 689 0 0 0 Stage!2 0 705 0 0 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver - 640 640 B93 - Mov Cap-1 Maneuver 659 - - 659 908 Mov Cap-2 Maneuver 640 640 Mov Cap-2 Maneuver 659 659 - Stage 1 689 Stage 1 706 Stage 2 689 - Stage 2 705 - HCM Control Delay,s 10,8 111 0 HCM Control Delay,a 10.7 11"t 0 HCM LOS B B HCM LOS B B Capacity(v,,h/h) 640 640 893 Capacity(vehlh) 659 659 908 HCM Lane V/C Ratio 0.035 0.125 0.014 HCM Lane V/C Ratio 0.04 0.127 0.008 HCM Controf Delay(s) 10.8 il,4 9A HCM Control Delay(s) 101 %3 9 HCM Lane LOS B B A HCM Lane LOS B B A HCM 95th I/otfle Q(veh) 01 0.4 0 HCM 95th I/offe O(veh) 0,11 GA 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 2 CjvTech Inc.-CM Page 2 2027 Total AM 3:Goldfield Rd&US-60/01cl West Hwy Exit 2027 Total PM 3:Goldfield Rd&US-60/01cl West Hwy Exit 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 3.7 Int Delay,s/veh 2 Lane Configurations Lane Configurations r tt tt Traffic Vol,veh1h 0 179 91 0 0 195 Traffic Vol,veWh 0 121 147 0 0 293 Future Vol,veh/h 0 179 91 0 0 195 Future Vol,veh/h 0 121 147 0 0 293 Conflicting Peds,#1hr 0 0 0 0 0 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free PIT Channelized None None None PIT Channel zed Non-, None None Storage Length 0 Storage Length - 0 - Van in Median Storage,# 0 a 0 Veh,in median Storage,#4 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 85 85 80 80 85 Peak Hour Factor 80 85 85 80 80 85 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Ftow 0 211 107 0 0 229 Mvmt Flow 0 142 I173 0 0 346 Conflicting Flow All - 54 0 - - - Conflicting Flow All - 87 0 - - - Stage i stage 1 Stage 2 Stage 2 Critical Hdwy 6,94 Critical Hdwy 6,94 Critical Hdwy Stg I - Critical Hdwy Stg 1 Critical Hdwy Stg 2 Critical Hdwy Sig 2 Follow-up Hdwy 3.32 Follow-up Hdwy - 3,32 Pot Cap-1 Maneuver 0 1002 0 0 Pot Cap-1 Maneuver 0 954 0 0 Stage 1 0 - 0 0 Stage 1 0 - 0 0 Stage 2 0 0 0 Stage!2 0 0 0 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1002 Mov Cap-1 Maneuver 554 - - Mov Cap-2 Maneuver - Mov Cap-2 Maneuver - Stage 1 Stage 1 Stage 2 Stage 2 HCM Control Delay,a 9Z 0 0 HCM Control Delay,a 9.4 0 0 HCM LOS A HCM LOS A Cape*(vah/h) 1002 Capacity(vehlh) 954 HCM Lane V/C Ratio 0.21 HCM Lane V/C Ratio 0.149 HCM Control Delay(a) 9,5 HCM Control Delay(s) 54 HCM Lane LOS A HCM Lane LOS A HCM 96th 1%fle O(veh) U HCM 95th%4ile Q(veh) 015 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 3 CjvTech Inc.-CM Page 3 2027 Total AM 4:Goldfield Rd&US-60 WB Ramps 2027 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Configurations Lane Configurations 4+ ++ Traffic Volume(vph) 9 0 18 100 140 179 133 Traffic Volume(vph) 26 0 42 66 186 250 95 Future Volume(vph) 9 0 18 100 140 179 133 Future Volume(vph) 26 0 42 66 186 250 95 Tom Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 2 1 1 1 Detector Phase 3 3 3 2 1 1 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 H 8,0 H 20,0 20.0 20,0 Minimum Initial(s) 8.0 U 8,0 H 20,0 20.0 20,0 Minimum Split(a) 40 44.9 44,9 10,6 31A 31,6 31.6 Minimum Split(a) 44,9 40 40 10.6 31,6 31,6 31,6 Total Split(s) 45+0 45.0 45+0 11+0 34.0 34.0 34.0 Total Split(s) 45+0 45.0 45.0 11+0 34+0 34.0 34.0 Total Split(%) KiM6 50.0% 50.0% 112% 373% 3T8% 37 8% Total Split(IN 50.0% 50,01k 50.0% 122% 37.8% US% 37,8% Yellow Time(s) 19 19 19 16 16 16 16 Yellow Time(s) 19 19 19 16 16 16 16 All-Red Time(a) 2,0 2,0 ZO 2.0 2,Of 2,0 2,0 All-Red Titne(s) 10 U 2.0 ZO 2,0 2,0 10 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(s) 5,9 5,9 5,9 5.6 5,6 5,6 5,6 Total Lost Time(a) 6,9 519 &9 5.6 5,6 5,6 5,6 Lead/Lag Lag Lead Lead Lead Lead/Lag Lag Lead Lead Lead Laad-Lag Optimize? Yes Yesi Yes yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None Max C-Max C-Max C-Max Recall Mode None None None Max C-Max C-Max C-Max Cycle Length:90 Cycle Length:90 Actuated Cycle Length.,90 Actuated Cycle Length:90 Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Offset:0(0%),Referenced to phase 1:NBSB,Start of Green,Master Intersection Natural Cycle-90 Natural cycle-90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 4:Goldfield Rd&US-60WB Ramps Splits and Phases: 4:Goldfield Rd&US-60WB Ramps 5 1#4 #5 4 #5 144 95 #4 #5 4,03 'A* NO 02 �4 3 An 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 1 CivTech Inc.-CM Page 1 2027 Total AM 4:Goldfield Rd&US-60 WB Ramps 2027 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis Lane Configurations 1 4.11 It tt ttf r Lane Configurations 41� r tt ttf r Traffic Volume(vph) 0 Or 0 9 0 18 100 140 0 0 179 133 Traffic Volume(vph) 0 0 0 26 0 42 136 186 0 0 250 95 Future Volume(vph) 0 0 0 9 0 18 100 140 0 0 179 133 Future Volume(vph) 0 0 0 26 0 42 66 186 0 0 250 95 Ideal Flow(vphpI) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 ideal Flow(vphpl) 1900 1900 1900 1900 1900 Iwo 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5,9 5,9 5.9 5,6 H 5,6 5.6 Total Lost time(s) 5,9 5,9 5.9 5.6 H 5,6 5.6 Lane Lffil.Factor 0195 0.91 0196 1100 0.95 021 1.00 Lem Uli Factor 0195 0.91 0195 1.00 0.95 i 0.91 1.00 Fri 1.00 0.86 0.85 1.00 1.00 1.00 0.85 Fri 1.00 0.87 0.85 1.00 1.00 1.00 0.85 Fit Protected 0,95 1,00 1,00 0195 1Z 1Z 1,00 Fit Protected 0.95 0199 1.00 0.95 1.00 1.00 Said.Flow(prof) 1681 1456 1504 1770 3539 5085 1583 Said,Flow(prof) 1681 1460 1504 1770 3539 5085 1583 Fit Permitted 0,95 1,00i 1.00 O.61 1.00 1Z 1,00 Fit Permitted 0,95 0,99 1,00 0,56 1,00 1.00 1100 Said.Flow(perm) 1681 1456 1504 1144 3539 5085 1583 Said.Flow(perm) 1681 1460 1504 1052 3539 5085 1583 Peak-hour factor,PHF 0.25 0,25 0,25 0,80 0.80 1180 0,65 0,85 0.80 030 0,85 0.85 Peak-hour factor,PHF 0,25 i 0.25 0.25 0,80 0,80 0,80 0.80 0,85 HO 0.80 tL85 0,85 Adj.Flow(vph) 0 0 0 11 0 22 118 165 0 0 211 156 Adj.Flow(vph) 0 0 0 32 0 52 82 219 0 0 294 112 RTOR Reduction(vph) 0 0 0 0 11 11 0 0 0 0 0 50 RTOR Reduction(vph) 0 0 0 0 25 25 0 0 0 0 0 41 Lane Group Flow(vph) 0 0 0 10 1 1 118 165 0 0 211 106 Lane Group Flow(vph) 0 0 0 30 3 3 83 219 0 0 294 71 Turn Type Perm NA Perm pm+pt NA NA Perm Turn Type Perm NA Perm pm+pt NA NA Perm Protected Phases 3 2 1 1 Protected Phases 3 2 1 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 6.6 6.6 6.6 66.3 60.9 60.9 60+9 Actuated Green,G(s) 10.1 10.1 10.1 62.8 57.4 57.4 57.4 Effective Green,g(s) 6,6 6,16 6.6 66,3 60.9 60A 60.9 Effective Green,g(s) 10A 101 10,1 62.8 67A 57A 57A Actuated g/C Ratio 0.07 0.07 0.07 0.74 0.68 0.68 0.68 Actuated g/C Ratio 0.11 0.11 0.11 0.70 0.64 0.64 0.64 Clearance Time(s) 5,9 5.9 5,9 5,6 &6 5.6 5.6 Clearance Time(a) 5,9 5.9 5.9 5.6 5.6 5.6 5,6 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Lane Grp Cap(vph) 123 106 110 880 2394 3440 1074 Lane Grp Cap(vph) 188 163 166 777 2257 3243 1009 v/s Ratio Prot C0.01 0.05 0.04 v/s Ratio Prot C0.01 0.06 0.06 via Ratio Perm 00,01 0.00 0L00 '0.09 0,07 via Ratio Perm c0.02 0.00 0,00 c0u07 0.05 v1c Ratio 0.08 0.01 0.01 0.13 0.07 0.06 0.10 v1c Ratio 0.16 0.02 0.02 0.11 0.10 0.09 0.07 Uniform Delay,di 38,9 38.7 381 15 0 4,9 &D Uniform Delay,di 36A 35,5 35.5 4,5 &3 6,3 62 Progression Factor 1.00 1.00 1.00 0.45 0.63 1.00 1.00 Progression Factor 1.00 1.00 1.00 0.72 0.63 1.00 1.00 Incremental Delay,d2 0.1 0.0 0,0 03 01 0.0 0,2 Incremental DeW,d2 (LI 0,0 0.0 03 O'l 0.1 0J Delay(s) 39.0 383 38,7 1.9 3.1 4.9 5,2 Delay(s) 36.3 35,6 35,6 15 41 6,3 6,3 Level of Service D D D A A A A Level of Service 0 D D A A A A Approach Delay(s) 0+0 38+8 2.6 5.1 Approach Delay(s) 0+0 35+8 3.9 6.3 Approach LOS A 0 A A Approach LOS A D A A HCM 2000 Control Delay 5,7 HCM 20W Level of Service A HCM 2000 Control Delay H HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.13 HCM 2000 Volume to Capacity ratio 0.11 Actuated Cycle Length(s) 90,0 Sum Of lost time(s) 17A Actuated Cycle Length ts) 90,0 Sum of lost time(s) ITI Intersection Capacity Utilization 45+1% ICU Level of Service A Intersection Capacity Utilization 47.9% ICU Level of Service A Analysis Period(min) is Analysis Period(min) is c Critical Lane Group c Critical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 3 CivTech Inc.-CM Page 3 2027 Total AM 4:Goldfield Rd&US-60 W13 Ramps 2027 Total PM 4:Goldfield Rd&US-60 WB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Flow(vph) 10 12 12 118 165 211 156 Lane Group Flow(vph) 30 28 28 83 219 294 112 Wc Ratio ON 0.05 0,05 0,13 0,071 0.06 0,14 Wc Ratio 0,16 0,11 011 0,11 0.10 0,09 011 Control Delay 38.1 0.5 0.4 1.5 3.4 5.3 1.3 Control Delay 36.8 0.9 0.9 2.8 4.4 6.7 1.8 Queue Delay 010 0.0 0.0 0.0 0.0 (LO 0,0 Queue Delay Ob U 0,0 0.0 (LO H 0.0 Total Delay 38.1 0,5 0.4 1,5 3.4 5.3 13 Total Delay 36,8 0,9 0.9 2,8 4.4 6.7 1,8 Queue Length 50th(A) 5 0 0 3 7 13 0 Queue Length,50th(ft) 16 0 0 3 10 20 0 Queue Length 95th(ft) 18 0 0 5 12 21 16 Queue Length 95th(ft) 36 0 0 21 38 34 17 Internal Link Dist(ft) M 484 300 Internal Link Dist(ft) 639 484 300 Turn Bay Length(ft) 190 190 145 Turn Bay Length(ft) 190 190 145 Base Capacity(vph) 730 688 709 894 2439 3505 1139 Base Capacity(vph) 730 690 709 776 2257 3242 1050 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Roductri 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 01 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced Wr Ratioi 0.01 0.02 0.02 013 0.07 0,06 0,14 Reduced v/c Ratio 0,04 0,04 0,04 0L11 0.10 0,09 0,11 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 2 CjvTech Inc.-CM Page 2 2027 Total AM 5:Goldfield Rd&US-60 EB Ramps 2027 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Timings 22-1180 Alliance Broadstone Silveray Timings Lane Configurations r W r I tt Lane Configurations 4a r ttf tf Traffic Volume(uph) 81 0; 52 158 24 136 51 Traffic Volume(vph) 144 ` 0 106 101 47 186 93 Future Volume(vph) 81 0 52 158 24 136 51 Future Volume(vph) 144 0 106 101 47 186 93 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1 2 1 Permitted Phases! 3 3 1; 1 Permitted Phases 3 3 1 1 Detector Phase 3 3 3 1 1 2 1 Detector Phase 3 3 3 1 1 2 1 Switch Phase Switch Phase Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Initial(s) 8.0 8.0 8.0 20.0 20.0 5.0 20.0 Minimum Split{a); 40 44.9 44.9 31.6 31,6' 10.6 31.6 Minimum Split(a) 442 r 49 44,9 31.6 31,6 10.6 31.6 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(s) 45.0 45.0 45.0 34.0 34.0 11.0 34.0 Total Split(%) 50.0% 50.0% 50.0% 37,81/4 37.81% 1120% 37,81% Total Split(%) 50.01% 50.01/4 50.0% 37,8% 37.8% 12,21% 37.8% Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 Yellow Time(s) 3.9 3.9 3.9 3.6 3.6 3.6 3.6 All-Red Time(s) { 2.0 2.0' 2.0 2,0 2.0 2.0 2.0 All-Red Time(a) 2A 10 2.0 2,0 2.0 2.0 2.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lost Time Adjust(s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time(a) 5.9 5.9' 5,9 5.6 5,6` 5.6 5,6 Total Lost Time(a) 5,9 5.9 5,9 5.6 5,6 5,6 5.6 Lead/Lag Lead Lead Lag Lead Lead/Lag Lead Lead Lag Lead Lead-Lag Optimize? Yes Yes' Yes Yes Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode None None None C-Max C-Max Max C-Max Recall Mode None None None C-Max C-Max Max C-Max . ..r v,} ~•a14� .,�r���§4 �2)a` � `i"� q' -'"1 '��_�=t �,��.,� �r �#if7 • �a it��u pt�'�t P S �'�;j � 1 � ( � a �' ,i �,4.. Cycle Length:90 Cycle Length:90 Actuated Cycle Length:90 Actuated Cycle Length:90 Offset 0(0%),Referenced to phase 1.NBSB,Start of Green,Master Intersection Offset 0(0%),Referenced to phase 1:NBSB,Start of Green Master Intersection Natural Cycle:90; Natural Cycle:90 Control Type:Actuated-Coordinated Control Type:Actuated-Coordinated Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps Splits and Phases: 5:Goldfield Rd&US-60 EB Ramps 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 4 CivTech Inc.-CM Page 4 2027 Total AM 5:Goldfield Rd&US-60 EB Ramps 2027 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis 22-1180 Alliance Broadstone Silveray HCM Signalized Intersection Capacity Analysis Lane Configurations 41 Lane Configurations 40 Traffic Volume(vph) 81 Oi 52 0 0 0 0 158 24 136 51 0 Traffic Volume(vph) 144 0 106 0 0 0 0 101 47 186 93 0 Future Volume(vph) 81 0 52 0 0 0 0 158 24 136 51 0 Future Volume(vph) 144 0 106 0 0 0 0 101 47 186 93 0 Ideal iPlow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Ideal Flow(Vhpl) 1900 j 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time(s) 5,9 5.9 5,9 H 5.6 5,6 5.6 Total Lost time(s) 5,9 5.9 5,9 H 5.6 5,6 5.6 Lane U10.Factor 9.95 0.911 0,95 0,91 1100 1100 0.95 Lane U91,Factor 0,95 0191 0,95 0L91 1:00 1.00 0.95 Frt 1.00 0.94 0.85 100 0.85 1.00 1.00 Frt 1.00 0.95 0.85 1.00 0.85 1.00 1.00 Fft Protected 0.95 0197 1.00 1,00 1,00 0.95 1.00 Fit Protected 0.95 0.97 1.00 1.00 1.00 0,95 1.00 Said.Flow(prof) 1681 1551 1504 5085 1583 1770 3539 Said.Flow(prof) 1681 1560 1504 5085 1583 1770 3539 Fit Permitted 0,95 0,97 1,00 1.00 1,00 0,63 1.00 Fit Permitted 0.95 0,97 1.00 1.00 1,00 0.67 1.00 Said.Flow(perm) 1681 1551 1504 5085 1583 1173 3539 Said.Flow(perm) 1681 1560 1504 5085 1583 1254 3539 Peak-hour factor,PHF 0.85 0,80 0.87 025 0.25 0,25 0,80 0,85 0,80 0.85 0,80 0,80 Peak-hour factor,PHF 0,85 0.80 085 0,25 025 0,25 0,80 0L85 0.80 0L85 O.85 (50 Growth Factor(vph) 80% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Adj.Flow(vph) 169 0 125 0 0 0 0 119 59 219 109 0 Adj.Flow(vph) 76 0 60 0 0 0 0 186 30 160 64 0 RTOR Reduction(vph) 0 88 82 0 0 0 0 0 21 0 0 0 RTOR Reduction(vph) 0 42 40 0 0 0 0 0 10 0 0 0 Lane Group Flow(vph) 101 13 10 0 0 0 0 119 38 219 109 0 Lane Group Flow(vph) 48 3 3 0 0 0 0 186 20 160 64 0 Turn Type Perm NA Perm NA Perm pm+pt NA Turn Type Perm NA Perm NA Perm pm+pt NA Protected Phases 3 1 2 1 Protected Phases 3 1i 2 1 Permitted Phases 3 3 1 1 Permitted Phases 3 3 1 1 Actuated Green,G(s) 10.1 10.1 10.1 57.4 57.4 62.8 57.4 Actuated Green,G(s) 6.6 6.6 H 60.9 60.9 66,3 60,9 Effective Green,g(s) 101 101 10A 574 57A 62.8 57.4 Effective Green,g(s) H 6.6 6.6 60.9 60.9 66.3 60.9 Actuated g/C Ratio 0.11 0.11 0.11 0.64 0.64 0.70 0.64 Actuated 9/C Raflo 0,07 ON 0,07 0,68 068 0J4 0.68 Clearance,Time(a) 5,9 5.9 519 5.6 5,6 5.6 5.6 Clearance Time(s) 5.9 5.9 5,9 5.6 5.6 5.6 5.6 Vehicle Extension(s) 1.2 12 1.2 1.2 1.2 1.2 1.2 Vehicle Extension(s) 11 1.2 12 1,2 1,2 1,2 1.2 Lane Grp Cap(vph) 188 175 168 3243 1009 905 2257 Lane Grp Cap(vph) 123 113 110 3440 1071 899 2394 v/s Ratio Prot 0.02 C0.01 0.03 v/s Ratio Prot 0,04 cO.01 0,02 v/s Ratio Perm cO,06 0.01 0M D,02 c(115 v/s Ratio Perm c0.03 0.00 0.00 0.01 c0.12 v/c Ratio 0.54 0.07 0.06 0.04 0.04 0.24 0.05 ft Ratio 0,39 OD3 0L03 0.05 0,02 018 0.0 Uniform Delay,di NY 35,8 351 6,0 6.O U 6.1 Uniform Delay,dl 39.8 38.7 38.7 4.9 4.8 3.6 4.8 Progression Factor 1.00 1.00 1.00 1.00 1.00 0.47 0.50 Progression Factor 1.00 1.00 1.00 1,00 1.00 0,40 0.50 Incremental Delay,d2 1.5 01 0"1 DO 01 0.6 DO Incremental Delay,Q 0.7 0.0 0.0 0.0 0.0 0A 0.0 Delay(s) 39.2 35,8 35.8 6.1 6,1 3.0 3.1 Delay(s) 40.5 38.8i 38,8 4,9 iLft 1,9 2.4 Level of Service D D D A A A A Level of Service D D D A A A A Approach Delay(s) 37.0 0.0 6.1 3.0 Approach Way(a) 39A 0,0 4,9 2,0 Approach LOS 0 A A A Approach LOS D A A A HCM 2000 Control Delay 16,2 HCM 2000 Level of Servilbe B HCM 2000 Control Delay 11.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.28 HCM 2000 Volume to Capacity ratio 0,20 Actuated Cycle Length(9) 9010 Sum of lost fime(s) ITA Actuated Cycle Length(s) 90.0 Sum of lost time(s) 17.1 Intersection Capacity Utilization 47.9% ICU Level of Service A Intersection Capacity Utilization 451% ICU Level of Service A Analysis Period(min) is Analysis Period(min) 15 c Critical Lane Group c Crifical Lane Group 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 6 CivTech Inc.-CM Page 6 2027 Total AM 5:Goldfield Rd&US-60 EB Ramps 2027 Total PM 5:Goldfield Rd&US-60 EB Ramps 22-1180 Alliance Broadstone Silveray Queues 22-1180 Alliance Broadstone Silveray Queues Lane Group Plow(vph) 48 45 43 186 30 160 64 Lane Group Plow(vph) 101 101 92 119 59 219 109 We Ratio 031 019 0.19 0,05 0,03 017 U.03 ft Ratio 0,54 0.39 0,36 U4 0,06 0,24 0,06 Control Delay 43.9 1.9 1.8 5.3 0.0 1.5 2.8 Control Delay 47.8 12.4 10.9 6.6 0.6 2.4 3.4 Queue Delay 0,0 0<O OZ 0.0 0,0 0,0 0.0 Queue Delay 0,0 0.0 0,0 010 0,0 0,0 0,0 Total Delay 43.9 1,9 1.8 5,3 OA 1.5 2,8 Total Delay 47.8 12.4 10,9 6,6 0,6 2A 3A Queue Length 50tt(ft) 27 0' 0 12 0f 0 2 Queue Length 50th(ft) 58 1 0 8 0 12 5 Queue Length 95th(ft) 58 0 0 19 0 4 4 Queue Length 95th(ft) 98 36 33 16 2 18 10 Internal Link Dist(it) 535 222 ;484 lutemal Link Dist(ft) 535 222 484 Turn Bay Length(it) 130 130 115 Turn Bay Length(it) 130 130 115 Base;Capacity(vph) 730 729, 709 3505 1123i 915 2439 Base Capacity(vph) 730 733 709 3242 1046 905 2257 Starvation Cap Reductn 0 0 0 0 0 0 0 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0', 0 0 Spillback Cap Reductri 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reducedv/eRatio 0,07 0,06 0.06 0.05 OM 0.17 0,03 Reduced*Ratio 0,14 0.14 0,13 ON 0,06 0,24 0,05 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 5 CivTech Inc.-CM Page 5 2027 Total AM 6:Goldfield Rd&Chevron Access 2027 Total PM 6:Goldfield Rd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC Int Delay,s/veh 1.8 Int Delay,s/veh 2.1 Lane Configurations tt r 1 0 Lane Configurations 4o 4* tf r ) 0 Traffic Vol,vehlb 3 2 9 2 1 30 0 167 9 23 68 3 Traffic Vol,veh/h 6 0 1 4 0 35 1 122 9 38 147 10 Future Vol,veh/h 3 2 0 2 1 30 0 167 9 23 68 3 Future Vol,veh/h 6 0 1 4 0 35 1 122 9 38 147 10 Conflicting Peds,Whr 0 0 0 0 0 0 0 0 0 0 0 0 Conflicting Pods,#1hr 0 0 0 0 0 0 0 0 0 0 0 a Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Chamiefized None None - None None RT Chonnelized None None . . None . . None Storage Length 50 50 50 Storage Length 50 - 50 50 - Van In Median Storage,# 0 0 a 0 Vah in Median Storage,# 0 0 0 0 Grade,% 0 0 0 0 Grade,% 0 0 0 0 Ptak Hour Factor 80 80 80 80 80 80 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 85 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvrm Flow 4 3 0 3 1 38 0 196 11 29 85 4 Mvmt Flow 8 0 1 5 0 44 1 144 11 48 173 13 Conflicting Flow All 244 352 45 298 343 98 89 0 0 207 0 0 Conflicting Flow All 350 433 93 329 428 72 186 0 0 155 0 0 Stage 1 145 145 196 196 - - - stage 1 276 276 146 146 Stage 2 99 207 - 102 147 - - Stage 2 74 157 183 282 Critical Hdwy T54 6,54 6,94 7,54 651 I6,94 4,14 4,14 Critical Hdwy T54 6,54 &94 7.54 8Z4 6,94 4,14 4,14 Critical Hdwy Sig 1 6.54 5.54 - 6.54 5.54 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - Critical Hdwy Stg 2 6,54 5,54 - 6,54 5$4 Critical Hdwy Sig 2 6,54 5,54 . 6,64 s5.54 - - Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 132 2.22 2,22 Follow-up Hdwy 3,52 4.02 3.32 3.52 4.02 132 2.22 2,22 Pot Cap-1 Maneuver 712 585 1047 652 591 939 1525 1361 Pot Cap-1 Maneuver 670 569*1038 694 573 975 1473 1423 Stage 1 866 790 - 787 737 - - - Stage 1 794 734 - 842 775 - - - Stage 2 896 729 . 917 788 Stage 2 927 767 . 903 730 - - - Platoon blocked,% 1 1 1 1 1 1 Platoon blocked,% 1 1 1 1 1 1 Mov Cap-I Maneuver 672 572 1047 639 579 939 1525 1361 Mov Cap-1 Maneuver 623 550*1038 675 553 975 1473 1423 Mov Cap-2 Maneuver 672 572 - 639 579 - - - Mov Cap-2 Maneuver 623 550 - 675 553 - - - Stage 1 866 773 787 737 stage 1 793 709 841 774 Stage 2 859 729 895 771 Stage 2 885 766 872 705 HCM Control Delay,a 10,8 92 0 1.9 HCM Control Delay,s 10,5 9.1 01 U HCM LOS B A HCM LOS B A Capacity(veh1h) i 1525 628 897 1361 Capacity(vsh1h) 1473 661 932 1423 HCM Lane VIC Ratio - 0.01 0.046 0.021 HCM Lane V/C Ratio 0.001 0.013 0.052 0.033 HOM Central Delay Is) 0 10,8 9,2 7.7 HCM Control Delay(s) 7.4 10S ILI 7'6 HCM Lane LOS A B A A HCM Lane LOS A B A A HCM 95th%tile,O(veh) 0 0 0A 011 HCM 95th"kille O(ven) 0 r 0 0.2 0.1 Volume exceeds capacity $:Delay exceeds 300a +:Computation Not Defined All major volume In platoon 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CivTech Inc.-CM Page 8 CivTech Inc.-CM Page 8 2027 Total AM 7:Goldfield Rd&Resort Blvd 2027 Total PM 7:Goldfield Rd&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 5.7 Int Delay,s/veh 4.7 Lane Configurations Y 0 tt Lane Configurations Y tT4 tt Traffic Vol,veh/h 2 119 57 3 46 24 Traffic Vol,vehlb 2 70 62 6 98 54 Future Vol,veh/h 2 119 57 3 46 24 Future Vol,veh/h 2 70 62 6 98 54 Conflicting Reds,#/hr 0 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Sign Control Stop Stop Free Free Free Free FIT Channelized - None None - None FIT Channelized - None None y - None Storage Length 0 50 - Storage Length 0 50 - Veh in Median Storage,# 0 0 0 Veh In Median Storage,# 10 0 - 0 Grade,% 0 0 0 Grade,% 0 0 - 0 Peaki Hour Factor 80 85 80 80 80 80 Peak Hour Factor 80 80 80 80 85 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 140 71 4 58 30 Mvmt Flow 3 88 78 8 115 68 Conflicting Flow All 204 38 0 0 75 0 Conflicting Flow All 346 43 0 0 86 0 Stage 1 73 Staged 82 Stage 2 131 Stage 2 264 Critical Hdwy 6.84 6.94 414 Critical Hdwy &84 6.94 414 Critical Hdwy Stg 1 5.84 - - Critical Hdwy Stg 1 5.84 Critical Hdwy Stg 2 5.84 Critical Hdwy Sig 2 5,84 Follow-up Hdwy 3,52 3.32 2.22 Follow-up Hdwy 3,52 3.32 2.22 Pot Cap-1 Maneuver 766 1026 1522 Pot Cap-1 Maneuver 641 1018 1508 Stage 1 941 - - Stage 1 932 - - Stage 2 881 Stage';2 772 Platoon blocked,% Platoon blocked,% 1 Mov Cap-1 Maneuver 737 1026 1522 Mov Cap-1 Maneuver 592 1018 1508 Mov Cap-2 Maneuver 738 - - Mov Cap-2 Maneuver 622 - - Stage 1 941 Stage;1 932 Stage 2 848 Stage 2 713 HCM Control Delay,a 9A 0 4.9 HCM Control Delay,a 9 0 4.8 HCM LOS A HCM LOS A Capacity(veh/h) 1019 1522 Capacity(voh/h) - 1000 1508 HCM Lane V/C Ratio 0.14 0.038 HCM Lane V/C Ratio 0.09 0.076 HCM Control Delay(s) 91 7,5 HCM Control Delay(a) 9 7.6 HCM Lane LOS A A HCM Lane LOS A A HCM 95th%tite 0(veh) 0.5 0A HCM 95th'kille,O(veh) 0.3 01 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 9 CjvTech Inc.-CM Page 9 2027 Total AM 8:Resort Blvd&Chevron Access 2027 Total PM 8:Resort Blvd&Chevron Access 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC 22-1180 Alliance Broadstone Silveray HCM 6th TVVSC roll Int Delay,s/veh 0.6 Int Delay,s/veh 0.3 Lane Configurationsr Lane Configurations *7 Traft Vol,vehlh 7 42 120 1 3 1 Traffic Vol,veh/h 2 114 62 0 1 3 Future Vol,veh/h 7 42 120 1 3 1 Future Vol,vehlh 2 114 62 0 1 3 Conflicting Reds,Whr 0 0 0 a 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Channefized None None . None RT Channel zed None None - Norio Storage Length - 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Veh in Median Storage,# 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 85 80 80 80 Peak Hour Factor 80 85 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 9 53 141 1 4 1 Mvmt Flow 3 134 78 0 1 4 Conflicting Flow All 142 0 - 0 213 142 Conflicting Flow All 78 0 - 0 218 78 Stage 1 - 142 stage 1 78 - Stage 2 - 71 Stage 2 140 - Criticail Hdwy 4,12 6,42 622 Critical Hdwy 4.12 6,42 622 Critical Hdwy Sig 1 - 5.42 - Critical Hdwy SIg 1 - 5.42 - Critical Hdwy Sig 2 5,42 - Critical Hdwy Stg 2 i5,42 . Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1441 775 906 Pot Cap-1 Maneuver 1520 770 983 Stage I - 885 - Stage 1 - 945 Stage 2 952 Stage,2 887 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1441 770 i 906 Mov Cap-1 Maneuver 1520 768 983 Mov Cap-2 Maneuver - 770 - Mov Cap-2 Maneuver - 768 - Stage 1 880 Stage 1 943 Stage 2 - 952 Stage 2 - 887 HCM Control Delay,a 11 a 9.5 HCM Control Delay,a 0.1 0 8,9 HCM LOS A HCM LOS A Capacity(voh1h) y 1441 800 Capacity(veh1h) 1520 919 HCM Lane V/C Ratio 0.006 - 0.006 HCM Lane VIC Ratio 0.002 0.005 HCM Control Delay(s) 7.5 0 a's ROM Control Delay(a) 7.4 0 U HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th-Wile O(veh) 0 0 HCM 95th%til 0(veh) 0 0 07/15/2022 Synchic 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 10 CjvTech Inc.-CM Page 10 2027 Total AM 9:Chevron Access&Access A 2027 Total PM 9:Chevron Access&Access A 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 11 roll Int Delay,s/veh 1.5 Int Delay,s/veh 1.6 N Lane Configurations Y Lane Configurations Y Traffic Vol,veh1h 2 32 $ 0 0 7 Traffic Vol,vehih 7 40 2 0 0 4 Future Vol,veh/h 2 32 8 0 0 7 Future Vol,veh/h 7 40 2 0 0 4 Conflicting Reds,#/hr 0 0 0 0 0 0 Conflicting Reds,#/hr 0 0 0 0 a 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Charrinelized I None None - None FIT Charinelized None None . None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Veh in Median Storage,# 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 3 40 10 0 0 9 Mvmt Flow 9 so 3 0 0 5 Conflicting Flow All 10 0 - 0 56 10 Conflicting Flow All 3 0 - 0 71 3 Stage I - 10 stage 1 3 - Stage 2 - 46 - Stage 2 - 68 - Critical Hdwy 4.12 6.42 622 Critical Hdwy 02 &42 6,22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg I - 5.42 - Crifical Hdwy Sig 2 . 5.42 - Critical Hdwy Stg 2 . 5.42 Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 PotCap-IManeuver 1610 952 1071 Pot Cap-1 Maneuver 1619 933 1081 Stage 1 - 1013 - Stage I - 1020 - Stage 2 976 - Stage 2 955 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1610 950 1071 Mov Cap-1 Maneuver 1619 927 1081 Mov Cap-2 Maneuver - 950 - Mov Cap-2 Maneuver - 927 - Stage 1 1011 Stage;1 1014 Stage 2 - 976 Stage 2 - 955 HCM Control Delay,a 04 0 8.4 HCM Control Delay,a 1.1 0 83 HCM LOS A HCM LOS A Capacity(veh/h) 1610 1071 Capacity(veb/h) 1619 1081 HCM Lane V/C Ratio 0.002 0.008 HCM Lane V/C Ratio 0.005 - 0.005 HCM Control Delay(s) 7.2 0 8.4 HCM Control Delay(a) 7.2 0 83 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th 1/61IJe O(veh) 0 0 HCM 95th/We O(veht 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 11 CjvTech Inc.-CM Page 11 2027 Total AM 10:Access B&Resort Blvd 2027 Total PM 10:Access B&Resort Blvd 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 4.6 Int Delay,s/veh 2.8 Lane Configurations Lane Configurations Treffic Vol,veh1h 3 IS 20 0 43 0 65 0 0 0 0 12 Traffic:Vol,veh/h 11 41 62 0 18 0 37 0 0 0 0 7 Future Vol,veh/h 3 18 20 0 43 0 65 0 0 0 0 12 Future Vol,veh/h 11 41 62 0 18 0 37 0 0 0 0 7 Conflicting Peds,#1hr 0 0 0 0 0 0 0 i 0 0 0 0 0 Conflicting Peds,#1hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop FIT Channolized None Norio None None FIT Channeltzed None None None None Storage Length Storage Length VehIn Median Storage,# 0 0 0 0 Veh in Median Storage,# 0 0 0 0 Grade,% 0 - 0 0 0 Grade,% 0 0 0 0 -Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 23 25 0 64 0 81 a 0 0 0 15 Mvmt Flow 14 51 78 U 23 0 46 0 0 0 0 9 Conflicting Flow All 54 0 0 48 0 0 106 98 36 98 110 54 Conflicting Flow All 23 0 0 129 0 0 146 141 90 141 180 23 Stage 1 44 44 - 54 54 Stage 1 119 118 - 23 23 Stage 2 62 54 - 44 56 - Stage 2 28 23 - 118 157 - Critical Hdwy 4,12 412 7.12 6,52 6.22t 712 s,52 612 Critical Hdwy 4,12 4,12 T12 652t 6.22 712 6,52 622 Critical Hdwy Stg 1 - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 1 - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 6.12 5.52 - 6,12 5.52 . Critical Hdwy Stg 2 6,12 5.52 - 6.12 5,52 1 Follow-up Hdwy 2,218 2,218 3,518 4.018 3,318 3,518 4,018 3,318 Follow-up Hdwy 2,218 2,218 3,518 4.018 3,318 3,518 4,018 3,318 Pot 0ap-1 Maneuver 1551 1559 873 792 1037 884 780 1013 Pot Cap-1 Maneuver 1592 1457 823 750 968 829 714 1054 Stage 1 - - 970 858 - 958 850 - Stage I - - 887 798 - 995 876 - Stage 2 949 850 - 970 848 stage 2 989 876 887 768 - Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1551 1559 858 790 1037 882 778 1013 Mov Gap-1 Maneuver 1592 1457 810 743 968 822 707 1054 Mov Cap-2 Maneuver - - 858 790 - 882 778 - Mov Cap-2 Maneuver - - 810 743 - 822 707 - stage 1 967 865 955 850 stage 1 878 790 986 876 Stage 2 - 935 850 967 845 Stage 2 - - 981 876 878 760 HCM Control Delay,s U 0 9.6 8,6 HCM Control Delay,a 01 0 91 8A HCM LOS A A HCM LOS A A Capacity(veh/h) 858 1551 1559 1013 Capacity(voh/h) 810 1592 - 1457 1054 HCM Lane V/C Ratio 0.095 0.002 - - 0.015 HCM Lane V/C Ratio 0.057 0.009 - - 0.008 HCM Control Delay(a) 9,6 7.3 0 a U HCM Control Delay(a) 91 7.3 0 j 0 8A HCM Lane LOS A A A A A HCM Lane LOS A A A A A HCM 95th%file Q(veh) 03 0 0 0 HCM 95th-Mle,Q(veh) 02 0 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 12 CjvTech Inc.-CM Page 12 2027 Total AM 11:Resort Blvd&Access C 2027 Total PM 11:Resort Blvd&Access C 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 0.8 Int Delay,s/veh 1.1 10" Lane Configurations Y Lane Configurations 4 T# Y Traffic Vol,vehilln 1 17 38 0 0 5 Traffic Vol,veh/h 5 36 15 0 0 3 Future Vol,veh/h 1 17 38 0 0 5 Future Vol,veh/h 5 36 15 0 0 3 Conflicting Peds,#Ihr 0 i 0 0 0 0 0 Conflicting Pods,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Channelized None None . None FIT Chatirrelized None None - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,If 0 0 0 Van in Median Storage,# 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Ptak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 21 48 0 0 6 MvmtFbw 6 45 19 0 0 4 Conflicting Flow All 48 0 - 0 71 48 Conflicting Flow All 19 0 - 0 76 19 Stage 1 48 - Stage;1 - 19 - Stage 2 - 23 - Stage 2 - 57 - Ciflical Hdwy 4.12 642 622 Critical Hdwy 4,12 6,42 6,22 Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Sig 2 5A2 - Critical Hdwy Stg 2 SA2 - Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1559 933 1021 PotCap-1 Maneuver 1597 927 1059 Stage I - 974 - Stage I - 1004 - Stage 2 1000 Stage;2 - 966 - Platoon blocked,% Platoon blocked,% Mov,Cap-1 Maneuver 1559 932 i1021 Mov Cap-1 Maneuver 1597 923 1059 Mov Cap-2 Maneuver - 932 - Mov Cap-2 Maneuver - 923 - Stage 1 973 Stage 1 1000 Stage 2 - 1000 Stage 2 966 IN HCM Control Delay,s 0,4 0 8.5 HCM Control Delay,a (L9 0 8A HCM LOS A HCM LOS A Capacity(vish1h) 1559 - 1021 Capacity(veh/h) 1597 - 1059 HCM Lane V/C Ratio 0.001 - 0.006 HCM Lane VIC Ratio 0.004 - 0.004 HCM Control Delay(a) 7.3 0 &S HCM Control Delay(a) 73 0 SA HCM Lane LOS A A A HCM Lane LOS A A A ROM 95th%tileD(veh) 0 0 HCM 95t1'Mie Q(veh) 0 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 13 CjvTech Inc.-CM Page 13 2027 Total AM 12:Resort Blvd&Access D 2027 Total PM 12:Resort Blvd&Access D 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 0.6 Int Delay,s/veh 0.8 Lane Configurationsr Lane Configurations Tramo Vol,vehill 1 16 34 0 0 3 Traffic Vol,vah/h 3 33 13 0 0 2 Future Vol,veh/h 1 16 34 0 0 3 Future Vol,veh/h 3 33 13 0 0 2 Conflicting Reds,#/hr 0 0 0 0 0 i 0 Conflicting Peds,#1hr D 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Chandelized i None None . stone RT Channel zed None None - None Storage Length 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Veh in Median Storage,# 0 a 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 20 43 0 0 4 Mvmt Flow 4 41 16 0 0 3 Conflicting Flow All 43 0 - 0 65 43 Conflicting Flow All 16 0 - 0 65 16 Stage 1 43 - stage I - 16 Stage 2 - 22 - Stage 2 - 49 - Critical Hdwy 4.12 6,42 6,22 Critical Hdwy 4,12 642 622 Critical Hdwy SIg 1 - 5.42 - Critical Hdwy Stg 1 - 5.42 - Critical Hdwy Sig 2 5,42 Critical Hdwy Sig 2 5.42 - Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1566 941 1027 Pot Cap-1 Maneuver 1602 941 1063 Stage I - 979 - Stage I - 1007 - Stage 2 1001 Stage 2 973 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 4566 940 I1027 Mov Cap-1 Maneuver 1602 936 1063 Mov Cap-2 Maneuver - 940 - Mov Cap-2 Maneuver - 938 - Stage 1 978 stage 1 1004 Stage 2 - 1001 Stage 2 - 973 HCM Control Delay,a 0.4 0 8,5 HCM Control Delay,a 0,6 0 8,4 HCM LOS A HCM LOS A Capacity(veh/h) 1566 1027 Capacity(vablh) 1602 1063 HCM Lane VIC Ratio 0.001 0.004 HCM Lane V/C Ratio 0.002 0.002 HCM Control Delay(s) T3 0 8,5 HCM Control Delay(s) 7.3 0 8,4 HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%ilie Q(veh) 0 0 HCM 95th%tile O(veh) 0 0 07/15/2022 Synchic 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 14 CjvTech Inc.-CM Page 14 2027 Total AM 13:Resort Blvd&Access E 2027 Total PM 13:Resort Blvd&Access E 22-1180 Alliance Broadstone Silveray HCM 6th TWSC 22-1180 Alliance Broadstone Silveray HCM 6th TWSC roll Int Delay,s/veh 0.7 Int Delay,s/veh 0.9 13, Lane Configurations Y Lane Configurations 4 T4 Y Traffic Vol,veh/h 1 15 31 0 0 3 Traffic Vol,veh/h 3 30 11 0 0 2 Future Vol,veh/h 1 15 31 0 0 3 Future Vol,veh/h 3 30 11 0 0 2 Conflicting Reds,Whr 0 0 0 i 0 0 0 Conflicting Peds,Whr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop Sign Control Free Free Free Free Stop Stop FIT Chaintrelized i None Norte - None FIT Channel zed None None t - None Storage Length - 0 Storage Length - 0 Veh in Median Storage,# 0 0 0 Van in Median Storage,If 0 0 0 Grade,% 0 0 0 Grade,% 0 0 0 Peak Hour Factor 80 80 80 80 80 80 Peak Hour Factor 80 80 80 80 80 80 Heavy Vehicles,% 2 2 2 2 2 2 Heavy Vehicles,% 2 2 2 2 2 2 Mvmt Flow 1 19 39 0 0 4 Mvmt Flow 4 38 14 0 0 3 Conflicting Flow All 39 0 - 0 60 39 Conflicting Flow All 14 0 - 0 60 14 Stage 1 39 - Stage 1 14 Stage 2 21 - Stage 2 46 - Crtfical Hdwy 4,12 6.42 622 Critical Hdwy 412 6.42 622 Critical Hdwy Stg I - 5.42 - Critical Hdwy Stg I - 5.42 - Critical Hdwy Stg 2 . 5.42 Critical Hdwy Sig 2 5,42 Follow-up Hdwy 2,218 3.518 3,318 Follow-up Hdwy 2,218 3.518 3,318 Pot Cap-1 Maneuver 1571 947 1033 Pot Cap-1 Maneuver 1604 947 1066 Stage 1 - 983 - Stage I - 1009 - Stage 2 1002 stage,2 - 976 Platoon blocked,% Platoon blocked,% Mov Cap-1 Maneuver 1571 946 1033 Mov Cap-1 Maneuver 1604 944 1066 Mov Cap-2 Maneuver - 946 - Mov Cap-2 Maneuver - 944 - Stage 1 982 stage 1 1006 Stage 2 1002 Stage 2 - 976 HCM Control Delay,a U 0 8.5 HCM Control Delay,a 07 0 8.4 HCM LOS A HCM LOS A Capacity(veh1h) 1571 1033 Capacity(veh/h) 1604 - 1066 HCM Lane V/C Ratio 0.001 - 0.004 HCM Lane V/C Ratio 0.002 - 0.002 HCM Control Delay(a) 7.3 0 &5 HCM Control Delay(a) 7.2 0 BA HCM Lane LOS A A A HCM Lane LOS A A A HCM 95th%file O(veh) 0 0 HCM 95th%tile 0(veh) 0 07/15/2022 Synchro 11 Report 07/15/2022 Synchro 11 Report CjvTech Inc.-CM Page 15 CjvTech Inc.-CM Page 15 Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX L QUEUE STORAGE ANALYSIS ,C4'0'--E—E, C i v T e c h 22-1180 Alliance Broadstone Silveray Queue Length Analysis 2027 Queue Storage :Average Vehicle Length(it): 26 s. 'Trucks>10%? N Veh.Type %Vehicles 25 Passenger 98%. R •. 1 Goldfield Rd&Old 1-Way Stop(WB) - _ _(_) SB Left 45 18 21 1 1 1 1 - - - - 25' 25' 25' 25'(25') 100' BREW 175' 175(175) West Hwy SEB WB Left 35 64 67 3 3 1 1 - - - - 25' 25' 25' 25'(25') 150' 150' 150'(150') 245' 60' 180' 180' 180' 180(180) 2 Goldfield Rd&Old: 2-Way,Stop _ -(-) WB Right No 35 10 6 1 1 1 1 - - - <25'(<25') 100': 100' 100'(S00') 245' 60': 110 110 110(110) West Hwy NWB Control(EB/WB) :<25' <25' <25' 110' Goldfield Rd&US- 3 60/Old West Highway 1-Way Stop(WB) - - -(-) WB Right No 45 179 121 6 4 1 1 - - - - 25'(25') 225' 175' 225'(175') 405' 90' 310' 400' 400(310) Exit 25' 25' 25' 400' NB Left 35 100 66 4 3 1 1 5 4 S 1 1 5' 25' :25' 5'(25') 200' 4 175' 200'(175') 245' 60' 215' 180 215' 215(180)4 90)d 90 ali 4 Signalized 90 90( Goldfield Road and US- Sign WB Left 45 9 26 1 1 1 1 1 2 : 1 1 20' 40' 40' 20'(40') 100' 125 100'(125') 405' 90': 175' 175 175 175(175) . 60 WB Ramps S 5B Right No 35 133 '95 5 4 1 1 7 5 1 1 +r25 20' :20' <25"(20') 250' I 200' :250'(200') 245' 60' 250' 215 250 250(215) WB Right No 45 18 i42 1 2 1 1 1 3 1 1 i<25' <25'i<25' <25'(<25') 100' 150' 100'(150') 405 90, i 175' 220 220 175(220) SB Left 35 136 186 5 7 1 1 7 10 1 1 5' 20' 20' 5'(20') 250' 325' 250'(325') 245' 60' 250' 320' 320' 250(320) 5 Goldfield Road and US- Signalized 90 90 90(90) EB Left 45 81 144 3 5 1 1 4 8 1 1 <25' 100' 100' <25'(100') 175' 275' 175'(275') 405' 90' 265' 355' 355' 265(355) 60 EB Ramps NB Right No 35 24 47 1 2 1 1 2 3 1 1 <25' 5' 5' <25'(5') 125' 150' 125'(150') 245' 60' 110' 145' 145' 110(145) EB Right No 45 52 106 2 4 1 1 3 6 1 1 <25' 35' 35' <25'(35) 150' 225' 150'(225') 405' 90' 220' 310' 310' 220(310) Goldfield Road and 2-Way Stop NB Left 35 0 1 0 1 0 1 - <25' <25' <25' <25'(<2T) 0' 100' 0'(100') 245' 60' : 90' 110 110 90(110) 6 -(-) SB Left 35 23 38 1 2 1 1 25' 25' 25' 25'(25') 100' 125' '.100'(125') 245 60' 110' 145 145 110(145)' Chevron Access Control(EB/WB} NB Right No 35 9 9 1 1 1 1 - - ;<25' <25 <25 <25'(<25') 100' i 100' 100'(S00') 245' 60' 110' 110 110 110(110) 7 Goldfield Road and 1-Way Stop(WB) - - -(-) SB Left 35 46 98 2 4 1 1 - - - - 25'(25') 125' 175' 125'(175') 245' 60' 215' 215' 145(215) Resort Boulevard 25' 25' 25' 145' IV`OCh 1 A- d - I Alliance Broadstone Silveray—Apache Junction, AZ Traffic Impact Analysis APPENDIX M SIGHT DISTANCE ANALYSIS ,C4'O'--E—E, C i v T e c h 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access A&Chevron Access Location:Access A&Chevron Access Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7.60 ft §3.2.6.1,p 3-15 Case Bt—Left Turn from the Minor Road §9.5.3.2.1,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(tg) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 9-44 Vehicle Height 4.25 ft §3.2.6.1,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/secz §3.2.2.2,in 3-4 Addl lanes to cross(1'is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbi 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V_j,) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(G,) % Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) % Approach Grade Adjustment Factor Left 1.0 Tbi 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/RO[/LI]only) Design Vehicle Gap+Adj for Approach Grade>3%+Adjs forAdd'I Lanes&Median Median Width(in"Lane Equivalents") [��](Use 0 for RI/RO[/LI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) L Combination Truck 10.8 sec LI LO/Th RO ISD to left&right along Major Road ISD=1.47V_j,,t9 (it) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 VZ Eq 3-2,p 3-5 ISO to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ Vz Eq 3-3,in 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 CIVTe h Appendix M CIVTech Appendix M Page 1 of 4 July 2022 Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access A&Chevron Access Location:Access A&Chevron Access Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case B2-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 Case B3-Crossin_q Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(tg) Passenger Car 5.5 sec Tel 9-16,p 9-57 Design Vehicle Time Gap(tg) Single-Unit Tuck 6.5 sec Tel 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tel 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1'`is assumed)-Case B-3 Only* Trucks 0.7 sec Tbl 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(adj'd for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,p 9-47 Case B-3 Only 0.2 sec Tbl 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj for Add'/Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1 A7V_r,,t9 (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) B2&B3 B3 Only Passenger Car calculated ISD= 220.5 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adjs for Add'I Lanes&Median for B3) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8 ft Combination Truck 9.8 9.1 design ISD= 260 ft SO to left(62/B3)&right(83)along Major Rd ISD=1.47V_j,t9 (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 ft ISD to Left ISO to right (B2&B3) (B3 Only) The differences between Case F and Cases B1,B2&B3 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344o 313.1 design ISD= 345 315 0 EBBEEMM Combination Truck calculated ISD= 432.2 401.3 Stopping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A *Number of major road lanes is irrelevant in Case B2. With effect of grade on right 200 N/A WA Intersection The differences between Case B1 and Cases B2&B3 are reduced To Right B1 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left B2/B3 265 345 435 On Major Road F 225 260 300 iStTeCh Appendix M CivTeCh Appendix M Page 3 of 4 July 2022 C7 Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access B&Resort Blvd Location:Access B&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7,60 ft §3.2.6A,p 3-15 Case 61—left Turn from the Minor Road §9.5.321,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(Ig) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 944 Vehicle Height 4,25 ft §3.2.6A,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14,50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/secz §3222,p 34 Add'I lanes to cross(V is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V,aia) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GJ / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) % Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROVLI]only) Design Vehicle Gap+Adj for Approach Grade>3%+Adis forAddl Lanes&Median Median Width(in"Lane Equivalents") (Use 0 for RI/ROVLI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) I Combination Truck 10.8 sec LI LO/Th RO ISO to left&right along Major Road ISD=147VmaiA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ VZ Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 6,1 iVT h Appendix M Appendix M Page 1 of 4 July 2022 Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access B&Resort Blvd Location:Access B&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 Case 133-Crossinq Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(t9) Passenger Car 5.5 sec TbI 9-16,p 9-57 Design Vehicle Time Gap(t9) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only* Trucks 0.7 sec Tbi 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(add d for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,In 9-47 Case B-3 Only 0.2 sec Tbi 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'1 Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1 A7V,,,aio,t9 (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) B2&63 B3 Only Passenger Car calculated ISD= 220.5 It Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdr/7 Lanes&Median for83) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8 It Combination Truck 9.8 9.1 design ISD= 260 It ISD to left(B2/63)&right(63)along Major Rd ISD=1.47Vm iA (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 It ISD to Left ISD to right (B2&83) (133 Only) The differences between Case F and Cases B1,B2&B3 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 design ISD= 345 315 Combination Truck calculated ISD= 432.2 401.3 Stopping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A *Number of major road lanes is irrelevant in Case 62. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&133 are reduced To Right 61 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 62/63 265 345 435 On Major Road F 225 260 300 IVTe h Appendix M CIVTeCh Appendix M Page 3 of 4 July 2022 Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access C&Resort Blvd Location:Access C&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7,60 ft §3.2.6A,p 3-15 Case 61—left Turn from the Minor Road §9.5.321,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(Ig) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 944 Vehicle Height 4,25 ft §3.2.6A,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14,50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/secz §3222,p 34 Add'I lanes to cross(V is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V,aia) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GJ / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) % Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROVLI]only) Design Vehicle Gap+Adj for Approach Grade>3%+Adis forAddl Lanes&Median Median Width(in"Lane Equivalents") (Use 0 for RI/ROVLI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) I Combination Truck 10.8 sec LI LO/Th RO ISO to left&right along Major Road ISD=147VmaiA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ VZ Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 6,1 iVT Ch Appendix M Appendix M Page 1 of 4 July 2022 Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access C&Resort Blvd Location:Access C&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 Case 133-Crossinq Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(t9) Passenger Car 5.5 sec TbI 9-16,p 9-57 Design Vehicle Time Gap(t9) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only* Trucks 0.7 sec Tbi 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(add d for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,In 9-47 Case B-3 Only 0.2 sec Tbi 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'1 Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1 A7V,,,alo,t9 (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) B2&63 B3 Only Passenger Car calculated ISD= 220.5 It Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdr/7 Lanes&Median for83) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8 It Combination Truck 9.8 9.1 design ISD= 260 It ISD to left(B2/63)&right(63)along Major Rd ISD=1.47VmaiA (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 It ISD to Left ISD to right (B2&83) (133 Only) The differences between Case F and Cases B1,B2&B3 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 design ISD= 345 315 Combination Truck calculated ISD= 432.2 401.3 Stopping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A *Number of major road lanes is irrelevant in Case 62. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&133 are reduced To Right 61 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 62/63 265 345 435 On Major Road F 225 260 300 IVTeCh Appendix M CIVTeCh Appendix M Page 3 of 4 July 2022 Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access D&Resort Blvd Location:Access D&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1,p 3-15 Truck 7,60 ft §3.2.6A,p 3-15 Case 61—left Turn from the Minor Road §9.5.321,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(Ig) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 944 Vehicle Height 4,25 ft §3.2.6A,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14,50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/secz §3222,p 34 Add'I lanes to cross(V is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V,aia) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GJ / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) % Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROVLI]only) Design Vehicle Gap+Adj for Approach Grade>3%+Adis forAddl Lanes&Median Median Width(in"Lane Equivalents") (Use 0 for RI/ROVLI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) I Combination Truck 10.8 sec LI LO/Th RO ISO to left&right along Major Road ISD=147VmaiA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ VZ Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 6,1 iVT h Appendix M Appendix M Page 1 of 4 July 2022 Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access D&Resort Blvd Location:Access D&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 Case 133-Crossinq Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(t9) Passenger Car 5.5 sec TbI 9-16,p 9-57 Design Vehicle Time Gap(t9) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only* Trucks 0.7 sec Tbi 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(add d for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,In 9-47 Case B-3 Only 0.2 sec Tbi 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'1 Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1 A7V,,,aio,t9 (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) B2&63 B3 Only Passenger Car calculated ISD= 220.5 It Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdr/7 Lanes&Median for83) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8 It Combination Truck 9.8 9.1 design ISD= 260 It ISD to left(B2/63)&right(63)along Major Rd ISD=1.47Vm iA (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 It ISD to Left ISD to right (B2&63) (63 Only) The differences between Case F and Cases B1,B2&B3 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 design ISD= 345 315 Combination Truck calculated ISD= 432.2 401.3 Stopping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A *Number of major road lanes is irrelevant in Case 62. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&63 are reduced To Right 61 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 62/63 265 345 435 On Major Road F 225 260 300 IVTe h Appendix M CIVTeCh Appendix M Page 3 of 4 July 2022 Page 4 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access E&Resort Blvd Location:Access E&Resort Blvd Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B—Intersections with Stop Control on the Minor Road §9.5.3.2,p 9-42 Passenger Vehicle 3.50 it §3.2.6.1,p 3-15 Truck 7,60 ft §3.2.6A,p 3-15 Case 61—Left Turn from the Minor Road §9.5.321,p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2,p 3-15 Design Vehicle Time Gap(Ig) Passing Sight Distance 3.50 ft §3.2.6.2,p 3-15 Passenger Car 7.5 sec Tbl 9-6,p 944 Vehicle Height 4,25 ft §3.2.6A,p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6,p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6,p 9-44 From Edge of Major Rd Traveled Way 14,50 ft §9.5.3.2.1,p 9-43 Deceleration Rate(a) Time gap adjustments Passenger Vehicle 11.20 ft/secz §3222,p 34 Add'I lanes to cross(V is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time(t) 2.50 sec §3.2.2.1,p 3-3 Trucks 0.7 sec below Minor Approach Upgrade(Per each 1%>3%) 0.2 sec Tbl 9-5,p 9-37 Site Specific Data(Bike&turn lanes are outside traveled wa and are not considered) Major Street Design Speed(V,aia) 30 MPH Site data Grades-Approaching Minor Street from:(—=approach downhill) Major Road Lanes on Left Approach 0.0 §9.5.3.2.1,p 9-44 Left(GJ / Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.1,p 9-44 Right(GR) % Approach Grade Adjustment Factor Left 1.0 Tbl 9-5,p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach (Use 1 for RI/ROVLI]only) Design Vehicle Gap+Adj for Approach Grade>3%+Adjs forAddl Lanes&Median Median Width(in"Lane Equivalents") (Use 0 for RI/ROVLI]only) Passenger Car 7.0 sec Minor Road Approach Upgrade,if>3% % Single-Unit Tuck 8.8 sec Minor Road Access(check restricted) I Combination Truck 10.8 sec LI LO/Th RO ISO to left&right along Major Road ISD=147VmaiA (ft) Eq 9-1,p 9-45 Stopping Sight Distance=Brake Reaction Distance+Braking Distance Neglecting Effect of Grade d=1.47Vt+1.075 Vz Eq 3-2,p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 308.7 ft Calculated d= 196.7 ft design ISD= 310 ft Design d= 200 ft Single-Unit Tuck calculated ISD= 388.1 ft With Effect of Grade d=1.47Vt+ VZ Eq 3-3,p 3-5 design ISD= 390 ft 30(( 32.2 )tG) Combination Truck calculated ISD= 476.3 ft design ISD= 480 ft Calculated d= 196.3 ft-left 200 ft-right Design d= 196.3 ft-left 200 ft-right SSD's do not consider design for truck operations,since better visibility is considered to offset longer braking distance. §3.2.2.5,p 3-6 6,1 iVT h Appendix M y T h Appendix M Page 1 of 4 July 2022 Page 2 of 4 July 2022 22-1180 Alliance Broadstone Silveray Sight Distance Analysis 22-1180 Alliance Broadstone Silveray Sight Distance Analysis Location:Access E&Resort Blvd Location:Access E&Resort Blvd Intersection Sight Distances(cont'd) Intersection Sight Distances(cont'd) AASHTO Ref AASHTO Ref Case 62-Right Turn from the Minor Road §9.5.3.2.2,p 9-47 Case FLeft Turns from the Major Road §9.5.3.6,p 9-56 Case 133-Crossinq Maneuver from the Minor Road §9.5.3.2.3,p 9-48 Design Vehicle Time Gap(t9) Passenger Car 5.5 sec Tbl 9-16,p 9-57 Design Vehicle Time Gap(t9) Single-Unit Tuck 6.5 sec Tbl 9-16,p 9-57 Passenger Car 6.5 sec Tbl 9-8,p 9-47 Combination Truck 7.5 sec Tbl 9-16,p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10,p 9-49 Time gap adjustments Add'I lanes to cross(1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'I lanes to cross(1"is assumed)-Case B-3 Only* Trucks 0.7 sec Tbi 9-16,p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade(Per each 1%>3%) Opposing Lanes(add d for x-wide median) -1.0 Case B-2 Only 0.1 sec Tbl 9-8,In 9-47 Case B-3 Only 0.2 sec Tbi 9-10,p 9-49 Time Gap based on site data Design Vehicle Gap+Adj forAdd'1 Opposing Lanes Site data Passenger Car 5.0 sec Major Road Lanes on Left Approach 0.0 §9.5.3.2.2,p 9-47 Single-Unit Tuck 5.8 sec Minor Road Approach Upgrade,if>3% 0% §9.5.3.2.2,p 9-47 Combination Truck 6.8 sec ISO to front along Major Road ISD=1 A7V,,,aio,t9 (ft) Eq 9-1,p 9-45 Time Gap based on site data(sec) B2&63 B3 Only Passenger Car calculated ISD= 220.5 It Design Vehicle Gap+Adj for Approach Grade>3%(+Adis forAdr/7 Lanes&Median for83) design ISD= 225 ft Passenger Car 6.0 5.5 Single-Unit Tuck 7.8 7.1 Single-Unit Tuck calculated ISD= 255.8 It Combination Truck 9.8 9.1 design ISD= 260 It ISD to left(B2/63)&right(63)along Major Rd ISD=1.47Vm iA (ft) Eq 9-1,p 9-45 Combination Truck calculated ISD= 299.9 ft design ISD= 300 It ISD to Left ISD to right (B2&63) (63 Only) The differences between Case F and Cases B1,B2&B3 are reduced Passenger Car calculated ISD= 264.6 242.6 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6,p 9-58 design ISD= 265 245 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD= 344.0 313.1 design ISD= 345 315 Combination Truck calculated ISD= 432.2 401.3 Stopping design ISD= 435 405 Without effect of grade 200 N/A N/A With effect of grade on left 200 N/A N/A *Number of major road lanes is irrelevant in Case 62. With effect of grade on right 200 N/A N/A Intersection The differences between Case 61 and Cases 62&63 are reduced To Right 61 310 390 480 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3,p 9-48 To Left 62/63 265 345 435 On Major Road F 225 260 300 IVTe h Appendix M CIVTeCh Appendix M Page 3 of 4 July 2022 Page 4 of 4 July 2022 feet)between delineators is the same as the speed limit(in miles per hour)for the roadway. (D) Conduits, sleeves or care ier pipes. Projects that have parkway landscaping with irrigation lines under public streets shall install conduit sleeves for the irrigation line(s)prior to the paving improvements. All parkway landscaping shall be as directed and approved by the Apache Junction Parks and Recreation Department. (E) Signage and striping. All signage and striping shall be per the latest MUTCD and approved by the Development Services Engineer. (Ord. 1282, § 3.3,passed 11-7-2006) § I0-3-4 DESIGN GUIDELINES. Street design will be in accordance with the following criteria,subject to the approval of the City Engineer. Geometric design standards not specifically included in this Standard will conform to the latest A Policy on Geometric Design of Highways and Streets, published by the American Association of State Highway and Transportation Officials(AASHTO). (A) Street right-of--way requirements. (1) The right-of-way requirements shall be as shown in Apache Junction Standard Details AJ-20.1 through AJ-20.8. (2) Right-of-way widths in excess of the standard widths may be required in special circumstances such as when: (a) Cut or fill slopes cannot be confined within the standard width; (b) Minimum sight distance lines on horizontal curves are not within standards; (c) Minimum sight distances at intersections are not within the standards;and (d) Auxiliary lanes are to be provided. (B) Intersections. Although all intersections share certain common elements,they are not subject to generalized treatment. (1) Minimize conflict. To minimize conflicts and provide for anticipated traffic movements,each intersection must be evaluated with regard to its individual characteristics,and designed based on the following factors: (a) Traffic factors such as capacities,turning movements,vehicle size and operating characteristics,vehicle speed, pedestrian movements,transit operations and accident history; (b) Physical factors such as topography,existing conditions,channelization requirements; and (c) Human factors such as driving habits,reaction to surprises,decision and reaction time, and natural paths of movement. (2) Angle of intersection. A right-angle intersection provides the shortest crossing distance for intersecting traffic streams. It also provides the most favorable condition for drivers to judge the relative position and speed of intersecting vehicles. Where special conditions exist,intersection angles may diverge from a right angle with approval of the City Engineer. (3) Alignment and profile. Intersections occurring on horizontal or crest vertical curves are undesirable. When there is latitude in the selection of intersection locations,vertical or horizontal curvature should be avoided. A line or grade change is frequently warranted when major intersections are involved. If a curve is unavoidable,it should be as flat as site conditions permit. Where the grade of the through roadway is steep,flattening through the intersections is desirable as a safety measure. (4) Intersection sight visibility. (a) Sight visibility triangles. Clear lines of sight will be maintained along all streets,alleys and driveways to assure the safety of motorists and pedestrians. (b) .Lines of sight. Lines of sight will not be obscured between 24 inches and 6 feet through a triangular area adjacent to a driveway,an alley or a street,where such access ways intersect with another street in a T-configuration. The sight visibility triangle,or sight triangle,consists of 3 sides that are formed by 2 intersecting access ways and a line connecting the 2 (see Apache Junction Standard Detail.AJ-27.1). (C) Sight distance. (1) Adequate sight distance shall be provided at all intersections,alleys and driveways(see Apache Junction.Standard Detail AJ-26.1). (2) The determination of whether an object constitutes a sight obstruction shall consider both the horizontal and vertical alignment of both intersecting roadways,as well as the height and position of the object. (3) The sight distance required varies according to traffic speeds on the through road. A designer shall provide the sight distance based on the latest AASHTO Policy on Geometric Design of Highways and Streets and submit it with the plans. (D) ,Street slopes. (1) Typical street cross-slope. Undivided streets should have a normal crown that is a 2-way cross-slope with the cross- section high point on the street centerline. Divided streets should have cross-slope on each pavement section. The high point of each slope on each pavement section shall occur on the edge of the pavement nearest to the median. Unusual conditions may cause cross-slope requirements to vary,but normally,the desirable cross-slope is 2%,with a maximum cross-slope of 3% and a minimum cross-slope of 1%. Any deviation from the desirable cross-slope shall be approved by the City Engineer. (2) Cross-slopes in street dip sections. While dip sections are discouraged,where storm drainage runoff flows must cross the street,dip sections are needed and must be approved by the City Engineer. The pavements through the dip section should have a 1-way slope(no crown),curbing and medians must not be raised,and cut-off walls shall be installed in accordance with MAG Standard Detail 552. Transitions back to normal street cross-slopes will be needed at both ends of the dip section. (3) Existing cross-slope. See Vol.II, § 10-3-6(D)for street widening guidelines. (4) Longitudinal slope. (a) The minimum street and gutter slope for public streets is 0.0032 feet/feet(0.32%). Special approval by the City Engineer is required for slopes less than the minimum. (b) Projects that have any area with less than the approved minimum gutter slope shall provide construction staking on the actual gutter alignment(not offset)at a spacing not to exceed 25 feet and have the grades checked by a city Engineering Inspector immediately preceding the concrete pour. (c) Grade breaks and grade changes shall be clearly noted and stationed on the grading and drainage plan and the profile views. (d) Projects with longitudinal slopes less than 0.32%shall have the gutter lines water-tested in the presence of and to the satisfaction of the city's Inspector. (5) Vertical curves. Roadways with a longitudinal grade break or grade change of greater than 1.5%shall be required to design and construct a vertical curve along that section of roadway. Vertical curves shall be designed,at a minimum,per the most current AASHTO guidelines. (6) Superelevation. Although the superelevation of roadways is discouraged,unusual circumstances may require the use of superelevation. The City Engineer must approve the use and design of superelevated roadways. Roadway drainage must be considered in superelevated conditions. (7) Undulating roadways. Roadways shall be designed to eliminate undulations. In the case where an existing paved roadway undulates,it shall be removed full width and reconstructed to a new grade acceptable to the City Engineer and the entire cost paid for by the developer. (8) Side slopes. Side slopes should be designed for functional effectiveness,ease of maintenance and pleasing appearance. (a) For areas more than 10 feet from back of curb,slopes of 4:1 or flatter shall be provided. (b) Steeper slopes may be approved in areas more than 30 feet from back of curb when soils are not highly susceptible to erosion,or when a cut is not more than 4 feet vertical. Cuts or fills greater than 4 feet vertically shall be approved by the City Engineer. (E) Pavement tapers.' (1) Projects are required to provide sufficient pavement tapers at all necessary locations(such as the'beginning or end of a project)to properly guide traffic. (2) The pavement section for tapers shall be per these Guidelines. See Table 10-3.1 under Vol.II, § 10-3-5 below. (3) Pavement tapers shall be constructed with a thickened edge per MAG Standard Detail 201,Type "B." (4) Taper length formulas: Taper length for merging traffic situations are calculated by the following formulas: (a) When the design speed is 40 mph or less: TL= WXS2 60 (b) When the design speed is 45 mph or greater: TL=WxS where: TL= Taper length in feet S = Design speed in miles per hour. The design speed is 5 mph over the posted speed limit. W = Width of the offset between the edge of the travel lane and the edge of the lane after the taper (5) Taper length for non-merging traffic situation(such as where pavement widens with traffic)is normally 50 feet minimum.However,there may be some instances when more than 50 feet of taper may be required. The requirement for a longer taper will be determined on a case-by-case basis by the city. (6) The Engineer shall investigate the existing conditions and if determined to be substandard,the project shall sawcut and remove any existing pavement tapers when extending or installing new pavement improvements. (Ord. 1282, § 3.4,passed 11-7-2006) § 10-3-5 STREET STRUCTURAL SECTION(AGGREGATE BASE,ASPHALT BASE COURSE AND ASPHALT SURFACE COURSE). (A) Flexible pavement. The flexible pavement street structural section for public streets shall be the minimum depths shown below. €r.-------------. .........,,"uRFm'E: TREATMENT .,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, i :4:r_ i � 4's w m i e "r r I"M t' i ......... ...... .:.............................................................................................................................................................................................................. ............................................................................................................................................................................... Table 10-3.1 -Street Structural Section(Minimum Depths) Street Classifications Asphalt Surface Asphalt Base ABC Fill Course(A) Course(B) (C) Parkway 2.5 in. -A-19** 3 in. -A-19 12 in.* Arterial 2.5 in.-A-19** 3 in.-A-19 12 in.* Collector 1.5 in. -A-12.5** 2.5 in. -A-19 8 in. Local Street-Residential 2.5 in. -A-12.5** 0 in. 6 in. Local Street-Commercial and Industrial 1.5 in. -A-]2.5** 2.5 in. -A-19 8 in. r I�: fi f w, t Silveray at Goldfield Market ViabilityStudy October 2023 Prepared for: Properties,Olsen Recker/Guadalupe LLC 4915 E. Baseline Rd. #105 Gilbert, AZ 85234 By: Rounds Consulting Group 4450 S. Rural Rd., Suite C-220,Tempe,AZ 85282 1 Phone: 480-508-4911 1 www.roundsgpn-sulfing.com Table of Contents Introduction............................................................................................................................1 ExecutiveSummary.................................................................................................................2 KeyFindings..............................................................................................................................................3 MarketAnalysis Summary......................................................................................................4 General Demographic Profile and Housing Supply ..................................................................................4 Household Retail Spending Potential.......................................................................................................8 Land Use Characteristics and Access to Site.............................................................................................8 Housing Market Characteristics and Trends...........................................................................................10 Benefitsof Rezoning.............................................................................................................13 Proposed Silveray at Goldfield Project...................................................................................................14 Conclusions& Recommendations..........................................................................................15 Appendix A:Study Area Statistics..........................................................................................17 r� Introduction Rounds Consulting Group, Inc. ("RCG") was contracted by Olsen Recker/Guadalupe Properties LLC to perform an independent study of the viability of the property for its underlying commercial zoning and identify the best use of the site. The subject site is an 18-acre parcel located on the east side of Goldfield Road, south of the US 60 in Apache Junction(Figure 1).The property is divided by Resort Boulevard into two parts,both of which have frontage on Goldfield Road.The site is currently zoned for general commercial use(B-1),with a PD overlay specifically designated for a hospital, office, hotel, and restaurant uses. RCG analyzed the general economic conditions throughout the Phoenix-Mesa-Scottsdale Metropolitan Statistical Area ("Phoenix MSA") and the City of Apache Junction. Due to varying factors discussed in the following sections, the subject site is unlikely to develop as a "retail destination site" such as a shopping center offering a range of retail and entertainment options. Therefore, a 5-minute and a 10-minute drive time radius from the site was identified as the areas where retail demand would originate from since the commercial site would be a place where consumers stop by at rather than drive to. Figure 2 displays the boundaries for the 5-minute(red area) and 10-minute (green area) drive time market areas. Figure 1:Subject Site o- s Source:(Plan Consulting;Google Maps 1 Figure -and - mute Drive Steady Area Boundaries f< 4 �41 rri t{' „i�j{fir �02 Source:Google Maps;Esri Executive Summary The purpose of this analysis is to determine the viability of commercial development at the subject site in the City of Apache Junction,Arizona ("Apache Junction" or"City"). The general and local demographic profile, economic trends, consumer spending, and housing/retail demand of the region and study areas indicate that a destination retail development (such as a mix of well-known retailers that includes dining and entertainment options) is not viable at the site. Viable alternative retail options include low-rise standalone retail stores such as vape/smoke shops,pawn shops, check cashing stores, etc. A multi-family development at the site will make for better use of the property, better serve the community by providing additional housing options for residents, drive retail development in existing retail corridors, and it will preserve view corridors, among others. RCG recommends that the current site be rezoned to address the fact that destination commercial development would not be viable because of the commercial demand in the area is low relative to averages, limited access to the site, low traffic counts,as well as the limited development of new housing in the area and connectivity growth for the coming decades.Alternatively,a multi-family residential rental property would help to address the community's needs by offering diversity in the type of housing available while supporting existing and future commercial activity, thus generating additional tax revenues in the City. 2 The following summarizes the key findings of the viability and market demand study. Key Findings C The site is not conducive to commercial or retail development due to a limited number of households surrounding the site, access is limited to Goldfield Road which ends just south of the property,the site is surrounded by undeveloped state-owned land which also restricts any future transportation routes to the site, and there are more viable alternatives to retail nearby (and others as discussed). C Additionally, because of the seasonal nature of the immediate customer base(i.e.,a large portion of the surrounding residents do not live in the area year-round), the seasonal downtime further adds to the lack of viability for commercial or retail development at this location. C The study area's spending potential was reviewed to determine the potential need for additional commercial development. The study areas' demand for various categories of retail was significantly lower than the average. Without additional housing development, the area is estimated to have limited growth in consumer retail demand. C The geometry of existing Resort Boulevard significantly limits retail viability by splitting up the site and preventing any retail from proper visibility and critical orientation to Goldfield Road. Because the freeway is elevated at this location and the site is separated from the freeway by the Goldfield on-ramp, there is no additional freeway visibility to compensate for this handicap to retail viability. C More viable commercial development is planned west of the site,further decreasing the viability of commercial activity at the site. E Arizona's housing cost has increased rapidly due to various factors, including population growth, housing shortages, rising interest rates, supply chain issues, and rising construction costs. For context,the median sales price of a home in Apache Junction was$403,456 in 2023. E As Arizona's population keeps increasing, places on the outskirts of the larger metropolitan area, like Apache Junction,should expect higher rates of growth than the metro area.This has not been the case for Apache Junction in recent years due to limited housing options. F There is a lack of multi-family housing options in the study areas and Apache Junction. Multi- family availability is important for housing diversity, housing affordability, and providing workforce housing to support economic development initiatives.Approximately 46.0%of housing units in Apache Junction are single-family, 43.9% are mobile homes, and 10.1% are multi-family homes. In comparison, 65.9%of housing units in Phoenix MSA are single-family homes, 28.4%are multi-family homes, and 5.5%are mobile homes. F Overall, the data presents that commercial zoning for the land is not feasible due to the area's low traffic counts, inaccessibility, and low spending potential or commercial zoning will lead to less desirable retail shops that would likely be in conflict with the adjacent residential uses. 3 Market Analysis Summary A review of the general demographic profile, real estate market trends,and land use characteristics of the region and study areas indicate that a destination commercial development (such as a shopping center) is not viable and that the current commercial designation will lead to low-rise standalone retail shops.The analysis also indicated that a multi-family development at the site will make the best use of the vacant land, providing workforce housing to support business development nearby and generate additional tax revenues for the City. General Demographic Profile i Phoenix MSA and the City of Apache Junction have experienced steady population growth over the last 10 years. The population of Phoenix MSA grew at an average annual rate of 1.6% from 2012 to 2022, adding approximately 774,000 new residents. Over the same period, Apache Junction's population grew at an average annual rate of 0.8%, adding approximately 3,040 new residents. As Arizona's population keeps increasing, places on the outskirts of the larger metropolitan area, like Apache Junction, should expect higher rates of growth than the metro area. This has not been the case for Apache Junction in recent years due to limited housing options. Figure 3 depicts the slowdown in population growth in Apache Junction compared to the Phoenix MSA. While new housing development at the Superstition Vistas is quickly ramping up in Apache Junction,the area surrounding the subject site is disconnected from the Superstition Vistas and is lacking diverse housing options. According to estimates from MAG, Apache Junction's population is expected to increase by 25.0%from 2022 to 2030. However, the current imbalance in Apache Junction's housing options could limit this growth, especially in the east US 60 area of Apache Junction that is very different and disconnected from the Superstition Vistas area of Apache Junction currently under development. 4 Figure 3:Annual Population Percent Change(2 2.00% 1.50% 1.00% 0.50% 0.00% -0.50% 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Phoenix MSA City of Apache Junction Note:Percent change represents year-over-year growth. Source:Arizona Office of Economic Opportunity MAG estimates employment growth from 2020-2040 in the Phoenix MSA, Apache Junction, and the 5- minute study area. MAG estimated that employment growth will remain strong with the addition of 967,300 jobs in the Phoenix MSA, over 11,100 jobs in Apache Junction, and 2,471 in the 5-minute study area by 2040. Phoenix MSA City of Apache Junction 5-Minute Study Area Year Employment Growth Employment Growth Employment Growth' Level Rate Level Rate Level Rate 2020 2,205,800 7,860 6,068 2040 3,173,100 43.85% 18,995 141.7% 8,539 40.7% Net Gain 967,300 11,135 - 2,471 Note:Employed in the selected area. Source:Maricopa Association of Governments;Rounds Consulting Group,Inc. Housing diversity is limited in Apache Junction and the surrounding areas.According to data from the U.S. Census Bureau, approximately 46.0% of housing units in Apache Junction are single-family units, 43.9% are mobile homes(or other similar types),and 10.1%are multi-family units,and the study areas displayed similar proportions to the City. For context, approximately 65.9% of the homes in the Phoenix MSA are single-family, 28.4%are multi-family, and 5.5%are mobile homes. 5 Figure 4: Percent Share of Housing Units by Structure 70 0 65.9% 60% 54.6% 50.9% 50 0 46.0%" 43.9% 40% 36.4% 34.5% 30% 28.4% 20% 12.6% 10.1% 9.9% 10 0� 5.5% 0% in Single-Family Multi-Family Mobile Homes and Other Apache Junchion 11 5-Minute Study Area 10-Minute Study Area 0 Phoenix MSA Source:U.S.Census Bureau;Esri Updated Demographics,2021;Rounds Consulting Group,Inc. According to the U.S. Census Bureau, as of 2021, 17.5% of those over the age of 25 living in Apache Junction obtained a bachelor's degree or higher, and 26.7% and 26.2% of those living in the 5- and 10- minute study area, respectively, have obtained a bachelor's degree or higher. This can be compared to 34.6%in the Phoenix MSA.This difference in educational attainment is a primary contributor to the large gap between the median household incomes. Apache Junction and the 5-minute study area report household incomes that are 29.3%and 12.0%less than the Phoenix MSA median income as of 2021, respectively. The data identified demand for rental housing options.The share of renter-occupied single-family homes was 26.9%within the 5-minute study area compared to 27.5%in Apache Junction.While renter-occupied apartments comprised 46.5% of the 5-minute study area's housing and 38.1% of Apache Junction's housing. The following table displays select key economic and demographic statistics of the Phoenix MSA,Apache Junction, and the 10-minute study area. The key statistics for the 5-minute study areas are displayed in the Appendix. 6 Phoenix M5A Apache Junction 10-Minute Study Area Est. Percent Est. Percent Est. Percent Total Population 4,946,145 38,311 - 90,362 - Age Median Age 39' - 53.5 - 49.5 - Under 5 years 282,742 5.7% 1,602 4.2% 4,337 4.8% 5 to 24 years 1,302,328 26.3% 8,262 21.6% 17,801 19.7% 25 to 64 years 2,530,101 51.2% 16,650 43.5% 40,753 45.1% 65 to 85+years 803,974 16.3% 12,769 33.3% 27,560 30.5% Educational Attainment Population 25 years and over 3,361,075 30,049 - 68,208 - Less than 9th Grade 160,529 4.8% 1,591 5.3% 5,661 8.3% High School Graduate(includes equivalency) 751,707 22.4% 10,342 34.4°% 20,735 30.4% Some College,No Degree 774,095 23.0% 7,662 25.5% 16,097 23.6% Bachelor's Degree 722,528 21.5% 3,499 11.6% 12,141 17.8% Graduate or Professional Degree 439,910 13.1% 1,767 5.9% 5,729 8.4% Household Income Total Households 1,777,705 - 17,334 - 38,586 - Family Households 1,176,350 66.2% 9,947 57.4% 25,143 65.2% Median Household Income(dollars) $69,216 - $48,917 - $64,870 - Less than$10,000 to$49,999 593,271 31.8% 8,840 51.0% 14,200 36.8% $50,000 to$200,000+ 1,271,943 68.3% 8,489 49.0% 24,386 63.2% Employment Occupation(of those living in the selected area) Civilian employed population 16 years and over 2,365,928 - 13,955 - 36,161+ - Management,business,professional occupations 996,907 42.1°% 3,960 28.4% 14,319 39.6% Service occupations 366,757 15.5% 2,548 18.3% 5,749 15.9% Sales and office occupations 542,631 22.9% 3,625 26.0°% 8,353 23.1% Construction and maintenance occupations 198,421 8.4% 2,038 14.6% 3,616 10.0% Production,transportation,moving occupations 261,212 11.0% 1,784 12.8% 3,977 11.0% Housing and Occupancy Total Housing Units 1,863,195 - 17,334 - 49,504 - Owner Occupied Housing Units 1,250,606 67.1% 13,468 77.7% 31,583 63.8% Renter Occupied Housing Units 612,589 32.9% ' 3,866 22.3% 6,980 14.1% Units in Structure Single-family 1,336,503 65.9% 7,974 46.0% 24,897 50.9°% Multi-family 576,679 28.4% 1,751 10.1% 6,194 12.6% Mobile Home and Other 110,658 5.5% 7,610 43.9% 17,803 36.4% Source:U.S.Census Bureau;Esri Updated Demographics,2021;Rounds Consulting Group,Inc. 7 Household Retail Spending Potential A spending potential index represents the amount spent by households in a given area for a product or service relative to the national average.The national average is represented as 100. The spending potential index for the multiple categories within the immediate study area (i.e., 5 minute drive) have a spending potential index that is significantly lower than the national average. This means that the spending potential within a 5-minute drive from the site is relatively low, thus commercial demand is lower than average.This is also generally true for the 10-minute study area. The future projections of consumer spending in the areas are estimated to have moderate growth over the next 5 years and beyond without increasing rooftops.This indicates that if the site remains zoned for commercial development,it will remain vacant or be developed as less desirable low-rise standalone retail due to low demand.The spending potential index for each given study area is shown in Appendix A. Land Use Characteristics and Access to Site Currently, Goldfield Road ends roughly half a mile south of the US 60, and the area consists of a majority of lower-density residential land uses.The nearby area has limited rooftops due to the state-owned land that will limit new rooftop growth and access to the site for decades. Additionally,the site does not have any plans for a transportation route to act as a connectivity path with other nearby areas,and plans for a future north-south freeway interchange will draw commercial activity away from the Goldfield area. These factors significantly lower traffic counts in the area, reducing the viability of commercial development for this site. Multi-family properties, however, can be developed without depending on nearby rooftops or sufficient traffic, and are more attractive when the site has highway access to nearby employment centers. Therefore, a multi-family residential project is clearly more viable due to its proximity to US 60 and compatibility with surrounding communities. Overall,the data presents that commercial zoning for the subject site is not feasible due to the area's low traffic counts, inaccessibility, high percentage of seasonal residents, and comparatively low spending potential. The following images illustrate that the location of the subject site and the varying factors hindering commercial development. 8 Retail Needs Rooftops Goldfield Has Very Limited b� Fe 3 mographk Trade Area: l o Density,Mountains, F a State Trust land st, No cann"Ovft path of p 5 comma 'u4 9 #4 r 1 � � „.•. fi�t�1Fl 0W roffib o ';,. R t� �➢` t�� 'i: � - S 'fib ket bz Rbt �x {Y•�{i4$4C13�8 r fA%1',tE'EIAiYffS fill y$'t..... ` firer$1$5t�9`ai y rr t.t, v Source:Ran Consulting t e e+w t FtE crteere FIorth South freeway I I e FeeW VAII Drmaw ordal AtVvIty Away 7 ram S+o4dfleld t 4 I 1 }r, Y d 3 t i } ��Id�S l�esl»ial�tm ely �are� # r�p�� �i i38rSEtM�Lcrt3t$$t�tk�t$1 kt3llty ,,"�y�;t��t �;,+ trlt tf�k�•C`aa�a��fPo!!LtiSta le�f3xGEt+b ir�t8+t�#��8s�t°t'SU#�} f,'1��K� � „ Source:Man Consulting 9 MarketHousing r The demand for residential housing in Arizona has outpaced supply, resulting in a rapid increase in home prices due to the recent influx of residents. The current surge in home prices can be traced back to the Great Recession of 2008 and was amplified by the COVID-19 pandemic. Following the housing crisis of 2008, developers significantly reduced the construction of new homes for an extended period. The Phoenix MSA economy thrived in 2019 and recovered from the pandemic induced recession more rapidly than other metros in 2020,attracting many people seeking job opportunities and affordable living. Due to the large migration of new residents, housing inventory shortages started driving home prices up quickly. Lower-income households were disproportionately affected by the rapid increase in housing costs. The majority of the job losses included occupations that earned a wage less than $60,000 a year. However, high-income workers did well through the pandemic. Additionally,the federal government overreacted by providing excessive stimulus programs and kept the interest rates historically low for a prolonged period.The combination of low interest rates and excessive stimulus spending put further pressure on housing prices as high-income individuals and potential homebuyers (who were waiting for the right market conditions) seized on the opportunity to buy starter homes,trade-up homes, investment properties, and/or second homes. According to Cromford Associates and Redfin data,the median sales price of a home in the Phoenix MSA was $556,1668, $403,456 in Apache Junction, and $470,250 in the 5-minute study area in 2023. The median sales price for all residential real estate grew at an annual rate of 1.4% in Phoenix MSA, 1.6% in Apache Junction, and 11.6%in the study area (Figure 5). Affordability in the Phoenix MSA worsened over the previous year due to rising home prices, increased investment capital in residential housing, and steady demand (Figure 6).The circumstance has raised the cost of housing to levels that many cannot afford. New housing products (i.e., starter homes, trade-up homes, multi-family, etc.) are necessary to mitigate housing shortages and affordability issues. 10 FigureAnnual Percent Change in Median Sales Prices for Phoenix MSA, Apache Junction,and the5-Minute Study Area 35% 30% 25% 20% 15% ,r 10% 5% 0 0% 2017 2018 2(A9 2020 2021 2022 2023 -5% Phoenix MSA City of Apache Junction -5-Minute Study Area Source:Cromford Associates LLC(data derived from residential deeds recorded by Maricopa County);Redfin Note:The available data for the study area include the years 2018 and onward.Pervious years data is unavailable. Figure 6; Housing Opportunity Index in the Phoenix MSA 90% 80% 70% 60% 50% 40% 30% 20% 10% O, O� Off' 0� O� O� O, Off' ti� titi titi ti15 ti� bh y�O y1 ti1b ti� ti� titi ti� LO 10 10 LO y0 10 LO ti0 10 LQ LO 10 10 Phoenix MSA Note:Share of homes sold affordable to families earning the median income. Source:NAHB/Wells Fargo Housing Opportunity Index The median household income in the Phoenix MSA increased at an average annual rate of 2.7%, 2.1% in Apache Junction,and 2.6%in the 5-minute study area from 2011 to 2021 (latest available data). Over the same period,home values in the Phoenix MSA increased at an average annual rate of 3.4%,4.7%in Apache Junction, and 4.6% in the 5-minute study area. 11 The data shows that household incomes are experiencing growth that is slower than the rate of growth that home values are having each year. Therefore, households are forced to spend a greater percentage of their incomes on housing. Overall,this will cause the households over time to become cost-burdened. Because only a small percentage of homes in the Phoenix MSA are affordable for individuals earning the median wage, many people have no choice but to seek out rental housing or other solutions. This has led to a surge in demand for rental properties, which has outpaced the supply growth. Consequently, rental rates have increased, mirroring the trend in home prices and further exacerbated the need for rental housing. It was estimated that single-family homes made up 65.9% of the Phoenix MSA housing stock, 45.4% of Apache Junction's, and 54.6% of the 5-minute study area in 2021, according to the U.S. Census Bureau. For context,the share of single family homes in East Valley cities,Apache Junction, and Maricopa County are displayed in Figure 7. Multi-family homes comprised 28.4%of all housing units in Phoenix MSA,while multi-family homes made up 10.7% Apache Junction's housing stock and 10.8% of the 5-minute study area's housing stock. For context,the share of multi-family homes in East Valley cities,Apache Junction, and Maricopa County are displayed in Figure 8. For additional context, in the Phoenix MSA, mobile homes and other housing options made up 5.5% of the housing stock, while mobile homes and others accounted for 43.9%Apache Junction's housing stock, and 34.5%of the housing stock within the 5-minute study area. Figure 7s Single Family Units as a Percentage of Total Housing Inventory 100% 94.2% 90% 84.9% 80% 70% 68.9% 64.4% 0 ° 54.8% 50% 45.4% 40% 30% 20% 10% 0% Maricopa County Apache Junction Chandler Gilbert Mesa Queen Creek Source:United States Census Bureau(latest available data). 12 Figure m IVIulti-Eqp1j1y_gnjLs as a Percentage of Total Housing Inventory 25% 21.4% 20% 19.5% 19.5% 15% 10.7% 9.9% 10% 5% 3.2% 0% o Maricopa County Apache Junction Chandler Gilbert Mesa Queen Creek Source:United States Census Bureau(latest available data). Benefits of Rezoning The following is a list of the key benefits of rezoning the site from commercial to multi-family residential. C The property is located adjacent to US 60, providing future households easy access to key employment areas as well as existing and future commercial areas within the City. Although, the property is adjacent to the US 60, it is not viable to develop as commercial due to its limited existing rooftops, the seasonal nature of the area residents, limited drive-by traffic, Goldfield road ending just south of the property, and future, better located commercial opportunities. 0111 The property is surrounded by residential housing on three sides, while the U.S. 60 covers the remaining side. Therefore, a residential property is more compatible the area. With the region already having an ample supply of single-family homes and mobile homes,a multi-family complex would be a benefit to this area. Past plans to develop a hospital center with office buildings, hotels, and restaurants has failed because of nearby hospital development(i.e.,the Banner Health Center that is less than five miles away) and because it would not be viable as the surrounding area lacks the necessary demographics,traffic counts, and access. 13 F- The property has a natural desert wash with views of Superstition mountains.The wash would be better preserved if the land is developed with a multi-family project with limited heights and appropriate setbacks from the wash. F_ Multi-family projects can be developed without depending solely on the surrounding demographics, nearby housing, or traffic counts. Therefore, a multi-family residential project is more viable and compatible with surrounding communities. F- The proposed multi-family project introduces a new product type to the community that expands the diversity of the City's housing stock, making it more appealing to employers as well as new families. C The activation of this property as a multi-family neighborhood will help build demand for commercial services in the area which will benefit the entire community. Proposed Silveray at Goldfield Project The Silveray at Goldfield project is planned as an approximately 18-acre rental home residential neighborhood consisting of about 270 units. The northern border of the property lines up the US 60's on-ramp. The portion of the property that is north of Resort Boulevard comprises seven different lots and has a Chevron convenience store on the west side. South of Resort Boulevard,the property is made up of one large lot. Neighboring the property is the Dolce Vita community,an adult multi-family development on the east and south sides. Goldfield Road borders the west side of the property,with the Golden Vista RV Resort on the other side. The proposed housing project will be a unique multi-family product that lives more similar to a single- family home.The project will feature clusters of one,two, and three homes with a maximum height of 30 feet. The units will offer an elevated level of luxury via high-end finishes, numerous floor plan options, and attractive architecture. Each unit will include a private rear yard space, which allows for secure and personal use for its residents,guests,and pets.About half of the units will also include an attached garage for the resident's use. The proposed housing units will have more similarities to a single-family home than traditional apartments. This will allow the Silveray project to benefit the community by being compatible with the surrounding residential areas and providing a different housing option for residents. The multi-family project aims to activate an undeveloped lot and introduce an innovative housing option to the area of Apache Junction. The City's current housing supply is comprised of primarily single-family homes or mobile homes.The shortage of housing options in the city creates a lack of diversity in income levels and lifestyles which results in a less vibrant and sustainable community. The Silveray at Goldfield project will help address that issue and fill a community need by introducing a new product. 14 Conclusions & Recommendations This subject site is distinctive because it is located near a major transportation corridor but has limited traffic since the connecting road ends just south of the highway. Furthermore, the area is surrounded by state-owned land that restricts access to the site and housing development. While state land is developing at a rapid pace along Ironwood in southern Apache Junction, development of state land in this area will not occur for many decades to come. Due to these factors, commercial development has not been feasible and the site has remained vacant. Furthermore, the approved commercial development is composed of high intensity uses that would not be compatible with the existing surrounding residential developments. The proposed project would offer a moderately dense multi-family product type that is compatible with the neighboring communities and includes a significant reduction in building height better preserving the views of the mountains. The property would bring working professionals who will be a short drive to the regional employment areas but desire a more single-family-like lifestyle combined with the luxuries of resort-like amenities and no maintenance responsibilities. The City as a whole would also benefit from the proposed property as increasing the number of households will support nearby commercial activity and generate new tax revenues. The Phoenix MSA's housing affordability has worsened over the years due to rising home prices, large migrations of new residents, and a housing shortage. The pandemic also had an effect on the housing market through the combination of historically low-interest rates for a prolonged period and excessive stimulus spending. Lower-income households have been disproportionately affected by the added pressure on housing prices. New housing products are imperative to mitigate the affordability issues and relieve the housing shortages. The proposed property would offer a unique housing type that would be a feasible option for households. Additionally the property site does not have a connectivity path to the nearby area as Goldfield Road ends just over a half of a mile to the south, limiting the number of cars going south of the US 60. Also, ADOT has plans for a north-south freeway interchange to the east of the property which will draw commercial interest away from the Goldfield interchange. The geometry of existing Resort Blvd significantly limits retail viability on the north of that road because it prevents retail from being oriented toward the arterial (Goldfield in this case) that is critical to retail viability. Because the freeway is elevated at Goldfield and the site is distanced from the freeway by the onramp,this lack of visibility is not sufficiently offset by proximity to the freeway. Any retail north of Resort Blvd will be hidden both from Goldfield and the freeway.The site south of Resort Blvd does have better visibility onto Goldfield. But, as explained, the lack of traffic counts and lack of residential rooftops in the area means destination retail is not a viable option, let alone on the larger parcel south of Resort Blvd. Furthermore, Resort Blvd splits the site up in a way that hinders commercial or retail development, adding to the general lack of retail viability in this location. 15 Retail that is too heavily disadvantaged by location,traffic,market depth,or demographic issues can easily degrade from desirable shops and restaurants to less desirable uses such as vape shops, cannabis, or check cashing.Retail development is market driven and cannot be forced to work where market conditions are not there to support it. Although nice retail shops and/or restaurants at this location would be desirable, because of the many market-driven disadvantages,those types of uses would not be viable at the site. Eventually any retail at this site would likely default to less desirable uses that are presumably not the desired outcome for either the City or the neighboring residents. RCG recommends that the current site be rezoned to address the fact that commercial development would not be viable because of the surrounding demographics,limited access to the site, the extremely low traffic counts,as well as the limited development of new rooftops and connectivity restrictions. The proposed multi family project, however, is viable, is compatible with the adjacent existing residential uses, and would help to address the community's needs by offering diversity in the type of housing available in the city. 16 Appendix A: Study Area Statistics Phenix MSA Apache Junction 5-Minute Study Area Est. Percent Est. Percent Est. Percent Total Population 4,946,145 38,311 - 13,979 Age; Median Age', 39 - 53.5 - 52.5 Under 5 years 282,742 5.7% 1,602 4.2% 657 4.7% 5 to 24 years 1,302,328 26.3% 8,262 21.6% 1,957 14.0% 25 to 64 years 2,530,101 51.2% 16,650 43.5% 5,885 42.1% 65 to 85+years 803,974 16.3°% 12,769 33.3% 4,808 34.4% Educational Attainment Population 25 years and over 3,361,075 - 30,049 - 10,683 - Less than 9th Grade 160,529 4.8% 1,591 5.3% 374 3.5% High School Graduate(includes equivalency) 751,707 22.4% 10,342 34.4% 2,820 ' 26.4% Some College,No Degree 774,095 23.0% 7,662 25.5% 2,628 24.6% Bachelor's Degree 722,528 21.5% 3,499 11.6% 1,944 18.2% Graduate or Professional Degree 439,910 13.1% 1,767 5.9% 908 8.5% Household Income Total Households 1,777,705 - 17,334 - 6,360 - Family Households 1,176,350 66.2°% 9,947 57.4% 3,988 62.7% Median Household Income(dollars) $69,216 - $48,917 - $60,876 - Less than$10,000 to$49,999 593,271 31.8% 8,840 51.0% 2,128 33.5% $50,000 to$200,000+ 1,271,943 68.3% 8,489 49.0% 4,223 66.5% Employment Occupation(of those living in the selected area) Civilian employed population 16 years and over 2,365,928 - 13,955 - 4,985 - Management,business,professional occupations 996,907 42.1°% 3,960 28.4% 1,308 26.2% Service occupations 366,757 15.5% 2,548 18.3% 696 14.0% Sales and office occupations 542,631 22.9% 3,625 26.0% 1,642 32.9% Construction and maintenance occupations 198,421 8.4% 2,038 14.6% 764 15.3% Production,transportation,moving occupations 261,212 11.0% 1,784 12.8% 1,339 26.9% Housing and Occupancy Total Housing Units 1,863,195 - 17,334 - 10,377 Owner Occupied Housing Units 1,250,606 67.1% 13,468 77.7% 8,123 78.3% Renter Occupied Housing Units 612,589 32.9% ' 3,866 22.3% 2,254 21.7% Units in Structure Single-family 1,336,503 65.9% 7,974 46.0% 5,671 54.6% Multi-family 576,679 28.4% 1,751 10.1% 1,031 9.9% Mobile Home and Other 110,658 5.5% ' 7,610 43.9% 3,585 34.5°% Source:U.S.Census Bureau;Esri Updated Demographics,2021;Rounds Consulting Group,Inc. 17 5-Minute 10-Minute 2023 2028 2023 2028 Population 13,979 13,953 90,362 92,790 Households 6360 6351 38,586 39,628 Families 3,988 3,993 25,143 25,955 Median Age 52.5 52.7 49.5 48.8 Median Household Income $60,876 $74,361 $64,870 $77,498 Source:Esri Spending Potential Index Average Amount Spent Total (SPI) Apparel and Services 72 $1,573.48 $10,007,328 Men's 77 $315,16 $2,004 412 Women's 74 $555.71 $3,534,304 Children's 67 $223,87 $1,423 798 Footwear 68 $340.46 $2,165,332 Watches&Jewelry ; 62 $105.43 $670513 Apparel Products and Services 74 $32.86 $208,969 Computer Computers and Hardware for Home Use 73 $186.23 $1,184,446 Portable Memory 72 $3.29 $20929 Computer Software 73 $10.52 $66,896 Computer Accessories 81 $20.20 $128474 Entertainment&Recreation 79 $2,978.30 $18,941,972 Fees and Admissions 71 $502.24 $3,194239 Membership Fees for Clubs 70 $195.01 $1,240,232 Fees for Participant Sports,excel.Trips 86 $102.64 $652775 Tickets to Theatre/Operas/Concerts 74 $40.23 $255,869 Tickets to Movies 74 $20.51 $130426 Tickets to Parks or Museums 72 $20.11 $127,884 Admission to sporting Events,excel.Trips 60 $35.28 $6,998230 Fees for Recreational Lessons 61 $87.86 $4,659,093 Dating Services 56 $0.60 $3 844 TV/Video/Audio 81 $1,100.35 $6,998,230 Cable and Satellite Television Services 85 $732.56 $4,659093 Televisions 78 $113.79 $723,707 Satellite Dishes 68 $1.17 $7454 VCRs,Video Cameras,and DVD Players 77 $3.69 $23,473 Miscellaneous Video Equipment 71 $8.97 $57036 Video Cassettes and DVDs 84 $5.47 $34,767 Video Game Hardware/Accessories 68 $27 43 $174423 Video Game Software 70 $13.60 $86,487 Rental/Streaming/Downloaded Video 74 $90.82 $577 596 Installation of Televisions 72 $1.16 $7,352 Audio 74 $99.46 $632570 Rental and Repair of TV/Radio/Sound Equipment 81 $2.24 $14,272 Pets 84 $770.70 $4,901649 Toys/Games/Crafts/Hobbies 75 $119.12 $757,616 Recreational Vehicles and Fees 75 $113.39 $721180 Sports/Recreation/Exercise Equipment 78 $220.32 $1,401,244 Photo Equipment and Supplies 70 $32.88 $209122 Reading 81 $102.72 $653,318 Catered Affairs 55 $16.57 $105374 Food 77 $8,098.41 $51,505,918 Food at Home 78 $5,321.18 $33,842709 Bakery and Cereal Products 77 $681.30 $4,333,061 Meats,Poultry,Fish,and Eggs 78 $1,146.75 $7,293349 Source:Esri 18 Spending Potential Index Average Amount Spent Total (SPI) dairy Products 79 $523.10 $3,326915 Fruits and Vegetables 78 $1,041.34 $1,041.34 Snacks and Other Food at Home 79 $1,928.68 $1,928.68 Food Away from Home 75 $2,777.23 $2,777.23 Alcoholic Beverages 77 $516.09 $516.09 Financial Value of Stocks/Bonds/Mutual Funds 71 $27,983.29 $27,983.29 Value of Retirement Plans 75 $105,847.08 $105,847.08 Value of Other Financial Assets 79 $6,790.30 $6,790.30 Vehicle Loan Amount Excluding Interest 79 $2,872.67 $2,872.67 Value of Credit Card Debt 75 $2,357.86 $2,357.86 Health Nonprescription Drugs 87 $14855 $944792 Prescription Drugs 89 $326.38 $2,075,751 Eyeglasses and Contact Lenses 78 $86.59 $550722 Home Mortgage Payment and Basics ' 76 $9,823.72 $62,478887 Maintenance and Remodeling Services 84 $3,194.65 $20,317,996 Maintenance and Remodeling Materials 88 $693 17 $4,408 571 Utilities,Fuel,and Public Services 80 $4,665.07 $29,669,835 Household Furnishings and Equipment Household Textiles 76 $93.61 $595,380 Furniture 78 $641.99 $4,083085 Rugs 76 $31.83 $202,465 Major Appliances 83 $439.00 $2,792024 Housewares 89 $85.20 $541,844 Small Appliances 76 $55.39 $352278 Luggage 76 $10.95 $69,659 Telephones and Accessories 75 $8031 $513 341 Household Operations Child Care 58 $298.37 $1,897640 Lawn and Garden 84 $560.65 $3,565,756 Moving/Storage/Freight Express 85 $76.42 $486031 Housekeeping Supplies 82 $768.53 $4,887,869 Insurance Owners and Renters Insurance 84 $657.90 $4,184,267 Vehicle Insurance 81 $1,755.74 $11,166492 Life/Other Insurance 77 $531.39 $3,379,641 Health Insurance 84 $4,150.44 $26,396 829 Personal Care Products 77 $426.60 $2,713,183 School Books and Supplies 75 $100.97 $642151 Smoking Products 82 $356.21 $2,265,511 Transportation Payments on Vehicles excluding Leases 78 $2,366.82 $15,052,983 Gasoline and Motor Oil 80 $2,033.38 $12,932313 Vehicle Maintenance and Repairs 82 $1,070.37 $6,807,577 Travel Airline Fares 74 $342.99 $2,181,430 Lodging on Trips 74 $533.82 $3,395 121 Auto/Truck Rental on Trips 74 $58.30 $370,761 Food and Drink on Trips 75 $418.95 $2,664544 Source:Esri 19 Wa ® aaa a a® a a ® s< Spending Potential Index Average Amount Spent Total (SPI) Apparel and Services 80 $1,759.18 $67,879,565 Men's 85 $349.59 $13,489343 Women's 82 $614.86 $23,725,017 Children's 78 $258.50 $9,974583 Footwear 76 $380.63 $14,686,825 Watches&Jewelry 71 $119.98 $4,629371 Apparel Products and Services 80 $35.62 $1,374,427 Computer Computers and Hardware for Home Use 82 $210.85 $8,135,880 Portable Memory 82 $3.73 $143807 Computer Software 82 $11.66 $449,887 Computer Accessories 89 $22.27 $859143 Entertainment&Recreation 87 $3,277.78 $126,476,348 Fees and Admissions 82 $585.61 $22,596166 Membership Fees for Clubs(2) 81 $224.72 $8,760,980 Fees for Participant Sports,excel.Trips 97 $115.64 $4,4462162 Tickets to Theatre/Operas/Concerts 83 $45.44 $1,753,386 Tickets to Movies 87 $24.02 $926975 Tickets to Parks or Museums 86 $24.04 $927,446 Admission to Sporting Events,excel.Trips 70 $40.74 $1,571812 Fees for Recreational Lessons 76 $110.32 $4,256,978 Dating Services 64 $0.69 $26444 TV/Video/Audio 88 $1,185.98 $45,762,292 Cable and Satellite Television Services 90 $772.50 $29,807 610 Televisions 86 $125.36 $4,837,095 Satellite Dishes 78 $1.34 $51822 VCRs,Video Cameras,and DVD Players 85 $4.10 $158,389 Miscellaneous Video Equipment 80 $10,09 $389 200 Video Cassettes and DVDs 94 $6.16 $237,619 Video Game Hardware/Accessories 77 $30.90 $1,192278 Video Game Software 79 $15.23 $587,499 Rental/Streaming/Downloaded Video 84 $104.00 $4,013,123 Installation of Televisions 81 $1.30 $50,234 Audio(3) 83 $112.78 $4,351846 Rental and Repair of TV/Radio/Sound Equipment 80 $2.22 $85,575 Pets 89 $816.22 $31,494675 Toys/Games/Crafts/Hobbies(4) 84 $133.82 $5,163,603 Recreational Vehicles and Fees(5) 81 $124.89 $4,818980 Sports/Recreation/Exercise Equipment(6) 83 $261.03 $10,071,944 Photo Equipment and Supplies 80 $37.86 $1,460 818 Reading(8) 89 $111.83 $4,314,885 Catered Affairs(9) 84 $20.55 $792,986 Food 83 $8,907.01 $343,685,723 Food at Home 93 $5,794.82 $223,598965 Bakery and Cereal Products 81 $740.98 $28,591,332 Meats,Poultry,Fish,and Eggs 88 $1,245.03 $48,040814 Dairy Products 86 $568.56 $21,938,302 Fruits and Vegetables 85 $1,136,18 $43,840 482 Snacks and Other Food at Home(10) 86 $2,104.08 $81,188,034 Food Away from Home 84 $3,112.18 $120,086758 Alcoholic Beverages 84 $567.27 $21,888,721 Financial Value of Stocks/Bonds/Mutual Funds 79 $31,115.37 $1,200,617,687 Value of Retirement Plans 84 $118,519.28 $4,573,184828 Value of Other Financial Assets 85 $7,285.25 $281,108,490 Vehicle Loan Amount Excluding;Interest i 89 $3,252.57 $125,503 496 Value of Credit Card Debt 82 $2,601.32 $100,374,620 Source:Esri 20 Spending Potential Index Average Amount Spent Total (SPI) Health Nonprescription Drugs 93 $159.12 $6,139632 Prescription Drugs 93 $341.70 $13,184,658 Eyeglasses and Contact Lenses 84 $93.96 $3,625596 Home Mortgage Payment and Basics ' 87 $11,198.19 $432,093181 Maintenance and Remodeling Services 94 $3,589.68 $138,511,373 Maintenance and Remodeling Materials 97 $761.73 $29,392 244 Utilities,Fuel,and Public Services 87 $5.052.50 $194,955,651 Household Furnishings and Equipment Household Textiles 85 $104.05 $4,014,873 Furniture 87 $715.70 $27,615923 Rugs 85 $35.19 $1,357,885 Major Appliances 92 $483.69 $18,663501 Housewares 88 $94.82 $3,658,861 Small Appliances 84 $61.20 $2,361401 Luggage 87 $12.42 $479,125 Telephones and Accessories 83 $89.27 $3,444670 Household Operations Child Care 71 $386.17 $14,206214 Lawn and Garden 90 $605.85 $23,377,216 Moving/Storage/Freight Express 93 $83.77 $3,232475 Housekeeping Supplies 89 $832.51 $32,123,397 Insurance Owners and Renters Insurance 92 $715.04 $27,590,635 Vehicle Insurance 89 $1,924.44 $74,256363 Life/Other Insurance 85 $588.80 $22,719,445 Health Insurance 90 $4,465.62 $172,310 366 Personal Care Products 85 $470.40 $18,150,923 School Books and Supplies 85 $114.08 $4,402033 Smoking Products 84 $364.15 $14,051,263 Transportation Payments on Vehicles excluding Leases 88 $2,645.68 $102,086,220 Gasoline and Motor Oil 87 $2,214.46 $85,447r005 Vehicle Maintenance and Repairs 89 $1,170.23 $45,154,587 Travel Airline Fares 85 $394.08 $15,205,781 Lodging on Trips 84 $605,30 $23,356 274 Auto/Truck Rental on Trips 84 $66.57 $2,568,839 Food and Drink on Trips 84 $472.18 $18,219562 Source:Esri 21 City ofApache Junction Development Services Department PLANNING AND ZONING COMMISSION PUBLIC HEARING STAFF REPORT DATE: April 23, 2024 CASE NUMBERS: P-23-63-Pz & P-23-64-GPA OWNERS: Jason Barney and John Hartman, Recker/Guadalupe Properties LLC. REPRESENTATIVE: Greg Davis, Iplan Consulting Corporation REQUEST: P-23-63-PZ: Proposed Rezoning of approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") P-23-64-GPA: Proposed Major General Plan Amendment to redesignate approximately 18 acres from Commercial to High Density Residential LOCATION: The property is generally located near the Southeast corner of US-60 and Goldfield Road GENERAL PLAN/ ZONING DESIGNATION: Commercial; currently zoned B-1/PD SURROUNDING USES: North: US-60; South: Manufactured Home Park ("MHP") (Dolce Vita) ; East: MHP (Dolce Vita) ; West: Recreational Vehicle Park by Planned Development ("RVP/PD") (Golden Vista RV Resort) . "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 1 BACKGROUND There are currently two (2) planned development Ordinances which govern the subject property. Ordinance No. 1144 (PZ-09-00) applies to the six (6) parcels north of Resort Blvd. (APNs : 103-01-0110, 103-01- 0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170) . This ordinance was approved in 2000 and permitted the development of a commercial project consisting of a gas station/convenience mart, hotel, restaurants, medical or office buildings and retail shops . Ordinance No. 1146 (Case PZ-13-00) governs the one (1) parcel south of Resort Blvd. (APN 103-01-0180) . This Ordinance was also approved in 2000 and permitted the development of the Apache Junction Medical Center, a 60-bed hospital campus including a single-level emergency unit and central lobby, a 3-story main hospital unit and medical office building on either side of the lobby, and a helipad on the northwest corner of the property. The only development that came to fruition was a gas station/convenience mart, located on APN 103-01-0120, which is not part of this rezoning/major general plan amendment request. All seven (7) parcels that are part of this request are currently undeveloped. PROPOSALS P-23-63-PZ Is a Planned Development (PD) Rezoning request by Greg Davis with Iplan Consulting, representing the property owner, Jason Barney with Olsen Recker/Guadalupe Properties LLC, to rezone approximately 17 . 96 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") near the SEC of the US-60 and Goldfield Road. The subject site is proposed to be developed with approximately 270 rental units to be known as Silveray on Goldfield. P-23-64-GPA Is a proposed Major General Plan Amendment of APNs 103-01- 0110, 103-01-0130f 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170 and 103-01-0180, located near the Southeast corner of Goldfield Rd. and US-60, from Commercial to High Density Residential (40 du/ac) . PLANNING STAFF ANALYSIS Relationship to General Plan: The subject site is designated by the city' s General Plan as "Commercial". The proposed use constitutes a Major General Plan Amendment from the land use type "Commercial" to "High Density Residential" . The change of use is considered a Major Amendment due to the subject size being over 10-acres in size. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 2 Zoning/Site Context: The approximate 18-acre property is surrounded by residential properties on the west (Golden Vista RV Subdivision) , east and south (Dolce Vita Manufactured Home Park) and US-60 on the north. Planned Development Zoning: The developer is requesting one (1) deviation from the Zoning Ordinance. They are requesting a 12-foot reduction in the rear setback from 20' to 8' to better organize the units on the northeastern corner of the project due to the existing wash corridor. Infrastructure Improvements: The surrounding infrastructure for the project is substantially developed, however, there are certain offsite improvements that are being requested by the City Engineer. The four curb returns along the intersection of Goldfield Road and Resort Boulevard and Chevron Gas Station shall be updated to current ADA standards . Also, concrete sidewalk shall be added from the north existing access drive heading north to tie into the existing sidewalk located within the Arizona Department of Transportation ("ADOT") right-of-way. Resort Boulevard is an existing roadway that was developed at the time of development of the Dolce Vita community. This roadway is substandard in size and, as such, will remain a private road and will not be dedicated as public right-of-way. Furthermore, all other necessary on-site and off-site improvements, such as community amenities, retention basins, accessible routes, and landscape buffers, will be built at the time of development. Please see project narrative to see a detailed list of all proposed infrastructure improvements . Availability of Water: The subject site is not being developed as a subdivision and, as such, is not required to obtain a 100-year certificate of assured water supply through the Arizona Department of Water Resources ("ADWR") , however, this project is under the jurisdiction of the Apache Junction Water District and has been reviewed by their Staff to ensure that there is enough water available to serve the project. For context, the District has what is known as a "Designation of Assured Water Supply" issued by ADWR. This means that the District has proved it has enough capacity/supplies to serve water up to a certain point. As development occurs, they track the water usage and report annually to ADWR. This is different from the Arizona Water Company "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 3 who does not have this designation. As such, The Arizona Water Company places the burden of proving there are enough water supplies on the developer to obtain a certificate of assured water supply from ADWR. Public input: Neighborhood meeting notification letters were sent from the applicant to all property owners within a 300-foot radius . The applicant hosted multiple neighborhood meetings regarding this project. The first formal Public Neighborhood Meeting was held on 10/24/23 at the Golden Vista RV Park. Approximately 90+ individuals were in attendance. Most of these individuals were residents of Golden Vista. Another meeting was held on 11/06/24 at Dolce Vita Community Meeting. This meeting was well attended by Dolce Vita Residents, as this meeting was held during their weekly meeting. Staff received multiple emails, as well as a protest petition from primarily residents located within Golden Vista, regarding the rezoning request. All emails and the petition have been attached to this report. Primary concerns that were discussed during the meetings and within the emails to Staff include the availability of water, traffic, road improvements, and concerns regarding the height of the development and its impact on view sheds. FINDINGS OF FACT As required by the Apache Junction Zoning Ordinance, a Planned Development request may be approved by the City Council after consideration has been given to three different criteria. The criteria is outlined in the text below: 1 . That a better design cannot be achieved by applying the strict provisions of the underlying zoning district. Applicant Response: The current zoning is specific to the development plans for a regional hospital and commercial uses which are no longer market viable at this location. Furthermore, maintaining the B-1 underlying zoning would allow the introduction of land uses that are incompatible with a residential neighborhood in terms of height, noise, light, odors, etc. 2 . That strict adherence to the provisions of the zoning ordinance is not required in order to ensure the health, safety and welfare of the inhabitants of the proposed development. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 4 Applicant Response: The proposed development plan is in strict adherence to the zoning ordinance (RM-2) with one exception which is a setback deviation for a small portion of the property that is adjacent to a 50-foot wide wash, thus the distance provided still meets the intent of the setback requirement and thus the zoning ordinance. 3 . That strict adherence to the ordinance is not required to ensure that property values of adjacent properties will not be reduced. Applicant Response: As aforementioned, the proposed development plan is in strict adherence to the zoning ordinance (RM-2) with one exception which is a setback for a small portion of the property that is adjacent to a 50-foot wide wash, thus the distance provided still meets the intent of the setback requirement and thus the zoning ordinance. Furthermore, the continuation of the PD overlay use will provide the area residents reliance that the approved plans cannot be amended without a public hearing process. This is especially important in terms of the proposed project density and the proposed building height, both of which are significantly reduced from the maximum allowed in the RM-2 zoning district. FINDINGS OF FACT FOR MAJOR GENERAL PLAN AMENDEMENT As required by the Apache Junction General Plan, a Major General Plan request may be approved by the City Council after consideration has been given to specific criteria. The criteria is outlined in the text below: 1 . Whether the amendment proposes a land use designation that the Land Use Plan Map does not adequately provide optional sites to accommodate. Applicant Response: Although the General Plan does provide alternative HDR sites, many are developed and /or in areas of the City already being served by higher density residential uses. 2 . Whether the amendment constitutes an overall improvement to the General Plan, will not solely benefit a particular landowner or owners at a particular point in time, and is consistent with the overall intent of the 2020-2050 General Plan. Applicant Response: The Commercial land use classification of the subject property was specific to a previous plan which proved to be non-viable and other than one parcel developing as a fuel station, the rest of the site has remained vacant. The proposed amendment to a residential use will activate this property, bringing in a housing product that will benefit the community and residents that will spur additional economic growth in the area. The proposed amendment is more consistent with the quieter character of the neighboring communities, thus more compatible from a general Plan perspective. Since Commercial "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 5 land is significantly more valuable, the amendment does not solely benefit the land owner and instead benefits the community which is consistent with the intent of the General Plan. 3 . Whether the proposed amendment is justified by an error in the 2020-2050 General Plan as originally adopted. Applicant Response: The proposed amendment is justified by a change in how commercial development occurs and is not tied to an error of the General Plan. The commercial market has adapted to the post-COVID world of fewer commercial centers and the clustering of uses in regional nodes versus on "every street corner". That change in market has made sites like this better suited for other land uses such as the HDR proposed. 4 . Whether the proposed change is generally consistent with goals, objectives, and other elements of the 2020-2050 General Plan. Applicant Response: As demonstrated later in this narrative, we strongly believe the proposed change is consistent with the goals and objectives of the General Plan. The proposal is also consistent with the adjacent properties which share the same HDR classification. 5 . Whether the proposed change is justified by a change in community conditions or neighborhood characteristics since adoption of the Plan. Applicant Response: Yes, as aforementioned, this property has proven to be non-viable for the current Commercial classification and in analyzing other land uses available, the HDR designation is the most appropriate given the surrounding land uses. 6. Whether the amendment will adversely impact a portion of, or the entire community by: a. Significantly altering acceptable existing land use patterns, especially in established neighborhoods . Applicant Response: The proposed HDR classification is more compatible with the established neighborhoods, many which also utilize the HDR land use designation. Furthermore, the Commercial designation and specifically the approved hospital use would certainly adversely impact this quiet residential area via the regular high levels of noise and light caused by ambulances & helicopters coming and going. b. Significantly reducing the housing to jobs balance in the Planning Area. Applicant Response: Although a Commercial classification is more associated with jobs, that only matters if the property can be developed under that land use designation. The commercial "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 6 classification (and commercial zoning) has been in place for almost 25 years and only produced one small fuel station. it is clear the property would continue to sit vacant producing no jobs for the foreseeable future. The HDR classification will allow the property to be developed immediately, create a handful of jobs, but more importantly, will provide a housing product for employees that not only will help the City attract employers, but also will spur economic growth in this otherwise under-developed part of town. c. Substantially decreasing existing and future water supplies. Applicant Response: The proposed HDR classification and resulting residential community will use significantly less water than the current Commercial classification and approved uses would. d. Replacing employment with residential uses. Applicant Response: As previously mentioned, this site, although currently designated for commercial use, is not viable and will remain vacant. Developing an HDR land use will help bring people here and will likely spur economic and job growth in the area by activating an otherwise vacant property. e. Requiring additional and more expensive improvements to infrastructure systems and/or proximity to municipal facilities and/or services than are needed to support the prevailing land uses and which, therefore, may impact the level of service for existing and proposed developments in other areas . Applicant Response: As an infill parcel, this site is already served by adequate infrastructure which means the City will bring in more revenue on systems already in place, increasing their efficiency. Furthermore, the proposed HDR land use will actually use LESS utilities than the Commercial approved land uses would producing lower stress levels on the City's infrastructure systems. f. Increasing traffic (without mitigation measures) on existing roadways beyond the planned level of service, and that negatively impact existing and planned land uses . Applicant Response: Although Goldfield Road sees very little traffic today, it is an arterial street that is designed to accommodate significantly more traffic. The traffic study prepared for the proposed HDR land projects an acceptable LOS (Level of Service) , meeting the City's guidelines. Furthermore, the proposed amendment actually reduces the traffic load on the area streets by over 70o from the projected traffic of the currently approved Commercial land uses. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 7 g. Affecting the existing character (i.e. , visual, physical and functional) of the immediate area. Applicant Response: The surrounding area is largely residential with a hybrid rental/ownership home community to our east and south (Dolce Vita) and an RV community to our west (Golden Vistas) , both of which have the same HDR land use classification that is proposed for the subject property. As such, our low intensity rental home community is consistent with the character of the area and may even enhance the built aesthetics. The current Commercial designation would significantly change the character of the area as hospitals, office buildings, and hotels are large blocky structures that would look foreign to the area and block view corridors. h. Increasing the exposure of residents to aviation generated noise, safety and/or flight operations. Applicant Response: This proposal does not have an aviation component, but also does not generate the noise, light, and potential safety issues that a commercial development might. The current Commercial classification included a hospital complex that likely would have a helicopter service which would expose residents to aviation noise, safety, and/or flight operations. i. Materially diminishing the environmental quality of the air, water, land, or cultural resources . Applicant Response: The proposed HDR classification will result in a development that is much more sensitive to the environmental quality of the area than the current Commercial classification would allow for as we are building a neighborhood for families to live in which -requires a longer-term vision in terms of the environment for our residents. j . Significantly altering recreational amenities such as open space, parks, and trails. Applicant Response: The current Commercial classification and approved plans make no mention of recreational amenities whereas the proposed HDR land use heavily focuses on recreational amenities for the residents which is detailed in the concur-rent PD Rezoning application package. PUBLIC HEARING ON MARCH 26,2024 On the meeting of the 26 1h, Staff made a presentation and introduced the preliminary recommended conditions of approval for the Planned Development Rezoning and Major General Plan Amendment. The applicant also made a presentation and answered questions asked by the Commission. ,Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 8 Eight (8) residents of Golden Vista Resort spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . Water pressure concerns 3 . Increased density 4 . Property value concerns 5 . Maintaining commercial land 6. Increased traffic PLANNING DIVISION PRELIMINARY RECOMMENDATION Staff is supportive of the proposed project due to the enhanced features such as the building elevations, community amenities and overall site design, however, it is Staff' s recommendation that a portion of the property remain commercial for a future use. Per the City Council and resident adopted General Plan, the subject site is currently designated commercial. As Staff reviews each proposed development within the City, we use the General Plan as a guide for our recommendations . Throughout the review of this project, and with the guidance of the General Plan, Staff noted a few primary factors that make this property a candidate for commercial use. 1 . US-60 Freeway Frontage: Commercial businesses look for highly visible and easily reachable locations to attract and serve potential customers. The northern six (6) parcels (+/- 6 acres) are located directly south of the US-60 . Not only are these properties visible from the freeway, but they have full access to the freeway allowing easy access to the site. 2 . Recent Rezoning Trends and Concerns : Staff is cognizant of both the Planning and Zoning Commission' s and City Council' s hesitation to rezone commercial property to residential. While providing a diverse housing stock is important to diversify the City' s population, the City relies heavily on sales tax since the City does not have a property tax. This is especially important to point out now that the City will no longer be able to collect rental tax as of 2025. This means that the City will only be able to collect a one-time development fee during construction from a residential rental product. While the City will benefit from the additional residents living within the City, there is no guarantee that these residents will spend money within Apache Junction. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 9 3 . North-South Corridor: The proposed North-South Corridor is expected to connect to the US-60 just east of the proposed Silveray development. This connection will travel south and connect to the SR-24 and continuing to Arizona Farms South. This new roadway will connect this area of Apache Junction with communities further south and provide additional traffic to the area, which is needed for successful commercial development. 4 . Location of Future Commercial: During an internal study of commercially zoned properties back in 2021, Staff discovered that, while we have a similar amount of commercial land in comparison to nearby municipalities, much of our commercial land is not located within an ideal location for development. There are three commonly referred to types of commercial developments: 1 . Neighborhood, which is typically spread throughout the community and provides services to the local population in the form of retail, office and other similar services. 2 . Community, which is typically located near major intersections and typically accommodates a larger size development. An example of this type of development would be the Fry' s Marketplace at the northeast corner of Idaho Road and Old West Highway. 3 . Regional commercial developments tend to be located near freeways or major arterials to have access to high traffic counts and visibility and are the largest commercial developments . An example of this type of development would be the Tempe Marketplace located near the southwest corner of the Loop 202 and Loop 101 in Tempe, AZ . Many of our existing commercial properties are considered neighborhood commercial and our availability of land to accommodate community commercial developments is becoming increasingly limited. Many of our existing, undeveloped commercial properties are not located at highly trafficked intersections and are not an adequate size to accommodate a community, or regional, development. Throughout the review process, Staff expressed the need to keep at least a portion of this area as commercial based on the location of the property along the US-60 . Staff is recommending that at least 5 acres of land be reserved for a commercial use, "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 10 but we have not designated a specific area to allow flexibility in the site design. A 5-acre property could reasonably accommodate a community commercial development. Respectfully, Staff recommends to the Commission that they include the following conditions of approval as part of a favorable recommendation to the City Council. As always, Commissioners may recommend changes or additional conditions which they feel will improve the development plan. RECOMMENDED MOTION FOR P-23-64-GPA (Major General Plam Amendment) I move that the Planning and Zoning Commission recommend to the Apache Junction City Council the (APPROVAL/DENIAL) of General Plan Amendment Case P-23-64-GPA, a request by Jason Barney and John Hartman with Recker/Guadalupe Properties LLC (developer) , represented by Greg Davis of Iplan Consulting Corporation (applicant) , to redesignate 18 acres, located near the Southwest corner of US-60 and Goldfield Road, from "commercial" to "high density residential . " RECOMMENDED MOTION FOR P-23-63-PZ (Planned Development Rezoning) I move that the Planning and Zoning Commission recommend to the Apache Junction City Council the (APPROVAL/DENIAL) of Planned Development Rezoning case P-23-63-PZ, a request by Jason Barney and John Hartman with Recker/Guadalupe Properties LLC (developer) , represented by Greg Davis of Iplan Consulting Corporation (applicant) , for an approximate 270 for-rent single- family residential community to be named Silveray, generally located near the Southwest corner of US-60 and Goldfield Road, from General Commercial by Planned Development ("B-1/PD") and B- 1/PD to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") , subject to the following conditions of approval : STANDARD CONDITIONS 1) All the provisions of the Zoning Ordinance are applicable to this case. 2) The development shall reflect substantial compliance and consistency with the Planned Development presented with case P-23-63-PZ, P-23-64-GPA and P-23-65-DR incorporated by reference herein, and as otherwise specified through these "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report conditions of approval, to include site layout, elevations, setbacks, public and private rights-of-ways, easements and tracts, amenities (including proposed pool and clubhouse) , perimeter and interior lot separation walls, model types, landscaping and other improvements. Landscape, screening and irrigation improvements, planted within a minimum 10-foot-deep strip inside the net property line (but outside of required walls) along the perimeters of the property, shall be provided in compliance with the city' s landscape and screening requirements contained in Apache Junction City Code, Volume II, Land Development Code, Chapter 1, Zoning Ordinance, Article 1-8, Landscape Regulations . All required trees shall be 24" box and all required shrubs shall be 5-gallon in size and a decorative 6-foot-tall wall shall be constructed on all roadway frontages. Street improvements include but not necessarily limited to, extension of pavement and the provision of sidewalk, curb, gutter, streetlights, underground utilities, fire hydrants, landscaping shall be required as part of this planned development project, and subject to review and approval by the City Engineer. All applicable permits shall be applied for and plans shall be designed to current city codes prior to any lot grading or construction on the lots. Inclusively, all applicable development fees, including public art fees, shall be paid at the time of permit issuance. Development fees shall be paid on a per unit basis. 6) All common areas, amenity areas, and tracts within and immediately adjacent to the proposed development, including perimeter walls and fences, and interior and exterior common area landscaping, shall be owned and maintained in good condition at all times by the owners or homeowners association of the proposed subdivision. 7) The developer' s engineer shall meet the civil engineering improvement plans and document requirements, as outlined in the previously provided pre-application and review comments and in accordance of the City' s approved engineering standards that are in effect at the time of plan submittal. 8) Minor PD modifications or alterations of the approved architecture designs, floor plans, open space, unit mix, unit count, clubhouse location or development plan, shall be administratively reviewed and approved by the Development Services Director or designee. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 12 9) Major deviations or proposed changes from the original plans associated with this case will require a Major PD Amendment. The Director or designee shall interpret the proposed modification to be significant/major if, in the Development Services Director or designee' s opinion, the modified project density (i.e. , units per acre) is proposed to be increased by more than 100, the quality of project design is diminished, the types of proposed land uses are significantly altered and/or the overall character of the project is contrary to the intent and spirit of the original City Council PD ordinance approval. PROJECT SPECIFIC CONDITIONS 1) The applicant shall reserve, at minimum, 5 acres of contiguous land for General Commercial ("B-l") development. 2) The permitted uses in the B-1 zoning district shall be those which are permitted by Zoning Ordinance, Article 1-5, Section 1-5-3 : Non-Residential Use Regulations, except that the following uses shall not be permitted herein: Motor vehicle dealer (new or used vehicles; and similar uses) ; Thrift store/used merchandise sales; Medical marijuana facilities and dual licensees; Swap meets; Tattoo and/or piercing services; Death care services/funeral homes; Commercial parking lots and garages; Check cashing stores; Psychiatric and substance abuse facilities; Nursing and residential care facilities; Homeless shelter; Community food and relief services; Commercial equestrian boarding, rentals, arenas and academies; Cemeteries/mausoleum.- Scenic and sightseeing terminal/parking; Assisted living facility; Group care home; Multi-family residential (including apartments, condominiums or townhouses) ; Similar uses designated by the Development Services Director not conducive to the City' s and community' s goals and objectives for successful community commercial development. 3) The proposed project must submit a Site Plan and Design Review Application for the revised residential and proposed commercial site for review and approval by Planning Department Staff. 4) The maximum height for the site shall be limited to 30-feet. "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 13 5) A reduced rear setback of 8' shall be permitted on the parcels north of Resort Boulevard. 6) The proposed development will not be age-restricted. 7) Resort Boulevard will remain a private road and will not be dedicated as public right-of-way. 8) The City will transfer ownership, maintenance, and payment of all existing streetlights along Resort Boulevard to the adjacent property owners/commercial homeowner' s association. 9) The four curb returns along the intersection of Goldfield Road and Resort Boulevard and Chevron Gas Station shall be updated to current ADA standards. 10) Concrete sidewalk shall be added from the north existing access drive heading north to tie into the existing sidewalk located within the Arizona Department of Transportation ("ADOT") right-of-way as outlined by the City Engineer. 11) Any other future improvements to existing public facilities in Goldfield Road will be per city standards and as requested by the City Engineer. Ke4i?�ySchaWnik Prepared by Kelsey Schattnik Senior Planner Attachments: Exhibit 1 - Project Narrative Exhibit 2 - Site Plan Exhibit 3 - Elevations and Floor Plans Exhibit 4 - Landscape Plan Exhibit 5 - Wall Plans Exhibit 6 - Final Participation Report Exhibit 7 - GPA External Agency Responses Exhibit 8 - Resident Emails to Staff Exhibit 9 - Updated Protest Petition (3.20.24) Exhibit 10 - Vicinity Map Exhibit 11 - Traffic Impact Analysis Exhibit 12 - Markey Study (applicant) "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA April 23, 2024 - Planning and Zoning Commission Staff Report 14 RESOLUTION NO. 24-09 A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, APPROVING GENERAL PLAN AMENDMENT CASE P-23-64-GPA, A REQUEST BY JASON BARNEY AND JOHN HARTMAN OF RECKER/GUADALUPE PROPERTIES LLCS, REPRESENTED BY GREG DAVIS OF IPLAN CONSULTING CORPORATION, FOR A MAJOR LAND USE PLAN MAP AMENDMENT TO REDESIGNATE APPROXIMATELY 18 ACRES AT THE SOUTHEAST CORNER OF US-60 AND GOLDFIELD ROAD, FROM "COMMERCIAL" TO "HIGH DENSITY RESIDENTIAL" . WHEREAS, the City of Apache Junction General Plan was adopted, pursuant to Arizona Revised Statutes ("ARS") § 9-461 . 06 Adoption and Amendment of General Plan; Expiration and Readoption; and WHEREAS, the City of Apache Junction General Plan, Chapter 13 : Amending the General Plan, also defines a major amendment to include : "Any proposed land use map change from a commercial, business park, or industrial land use designation to a residential land use designation of 10 or more contiguous acres"; and WHEREAS, the City of Apache Junction General Plan, Chapter 13 : Amending the General Plan, states that changes to the general plan are to be considered major amendments if the resulting change is a "substantial alteration of the municipality' s land use mixture or balance as established in the land use element"; and WHEREAS, proposed map amendment case P-23-64-GPA for the 18-acre property and the proposed companion rezoning case P-23- 63-PZ for the same 18-acre property, both fall within the definitions of requests requiring a major general plan amendment; and WHEREAS, the Apache Junction Planning and Zoning Commission on March 26, 2024 and on April 23, 2024, held public hearings regarding P-23-64-GPA, and on April 23, 2024, voted to recommend approval of case P-23-64-GPA by a vote of 4 : 3; and WHEREAS, the City Council has complied with the requirements for the preparation and adoption of a general plan amendment pursuant to ARS § 9-461 . 06; and RESOLUTION NO. 24-09 PAGE 1 OF 4 WHEREAS, the City Council finds that the action taken on this general plan amendment is necessary for sound and orderly community development, for the preservation of community values and for the promotion of the general health, safety, convenience and welfare of the citizens of Apache Junction; and WHEREAS, the City Council also finds the amendment: 1) Proposes a land use designation that adequately provides optional sites to accommodate . 2) Constitutes an overall improvement to the general plan, will not solely benefit a particular landowner or owners at a particular point in time, and is consistent with the overall intent of the 2020-2050 general plan. 3) Is justified by an error in the 2020-2050 general plan as originally adopted. 4) Is generally consistent with goals, objectives, and other elements of the 2020-2050 general plan. 5) Is justified by a change in community conditions or neighborhood characteristics since adoption of the general plan. 6) Will not adversely impact a portion of, or the entire community by: a. Significantly altering acceptable existing land use patterns, especially in established neighborhoods . b. Significantly reducing the housing to jobs balance in the planning area. c. Substantially decreasing existing and future water supplies . d. Replacing employment with residential uses . e . Requiring additional and more expensive improvements to infrastructure systems and/or proximity to municipal facilities and/ or services than are needed to support the prevailing land uses and which, therefore, may impact the level of service for existing and proposed developments in other areas . f. Increasing traffic (without mitigation measures) on existing roadways beyond the planned level of service, and that negatively impact existing and planned land uses . g. Negatively affecting the existing character (i .e . , visual, physical and functional) of the immediate area. RESOLUTION NO. 24-09 PAGE 2 OF 4 h. Increasing the exposure of residents to aviation generated noise, safety and/or flight operations . i . Materially diminishing the environmental quality of the air, water, land, or cultural resources . j . Significantly altering recreational amenities such as open space, parks, and trails . NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, THAT: Case P-23-64-GPA, a general plan land use plan map amendment request by Jason Barney and John Hartman of Recker/Guadalupe Properties LLC, represented by Greg Davis of Iplan Consulting Corporation, to redesignate approximately 18- acres at the southeast corner area of US-60 and Goldfield Road, from "commercial" to "high density residential, " be approved and adopted for the following generally described property: Parcel 1 (103-01-0110) : LOT 1 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 2 (103-01-0130) : LOT 3 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 3 (103-01-0140) : LOT 4 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 4 (103-01-0150) : LOT 5 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 5 (103-01-0160) : LOT 6 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 6 (103-01-0170) : LOT 7 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 7 (103-01-0180) : LOT 8 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E. PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, ON THIS DAY OF F 2024 . SIGNED AND ATTESTED TO THIS DAY OF 2024 . RESOLUTION NO. 24-09 PAGE 3 OF 4 WALTER "CHIP" WILSON Mayor ATTEST: JENNIFER PENA City Clerk APPROVED AS TO FORM: RICHARD J. STERN City Attorney RESOLUTION NO. 24-09 PAGE 4 OF 4 r Y Major General Plan Amendment Rezoning Project Narrative Submitted to: City of Apache Junction, Arizona Submitted on behalf of: Olsen Recker/Guadalupe Properties LLC 4915 E. Baseline Rd. #105 Gilbert, AZ 85234 Prepared by: Iplarn Consulting rt, 1,} 3317 S. Higley Road, Suite 114-622 Gilbert, AZ 85297 October 2023 Purpose of Request This narrative accompanies a request for formal application review of a Major General Plan Amendment (GPA) and a Planned Development (PD) rezoning for approximately 18 acres of vacant land located on the east side of Goldfield Road,immediately south of US60 within the City of Apache Junction. The property has an existing General Plan land use classification of Commercial and a zoning designation of B-1/PD which is proposed to be changed respectively to a classification of High Density Residential (HDR) and zoning designation of RM-2/PD (multi- unit residential) for the purpose of replacing the current PD development plan of a hospital complex along with offices, hotels, and restaurants, with a proposal for an approximately 15 DU/acre rental home residential neighborhood of 271 units (Site Plan currently shows 269 units but site can accommodate up to 271 units subject to an easement abandonment which is currently underway). Site Aerial r a i e � • s s � zt x m#s t 7z � �i tlxa �� � p��y};�1 ' � Location The subject property is bifurcated by Resort Boulevard into two parts which both front on to Goldfield Road. The northern part is located immediately south of the on ramp for US60 and contains seven separate parcels. The southern part is located south of Resort Boulevard and is comprised of one large lot. The entire northern boundary is comprised of ADOT right-of-way for US60. To the east and south is the Dolce Vita community which is an active adult multi-family development. Goldfield Road is our western boundary with the Golden Vista RV Resort beyond. Also to our west is the existing Chevron gas station and convenience store. Surrounding Property Information Direction General Plan Desi nation Zoning Existing Use On-Site High Density Residential RM-2/PD Vacant North - - US 60 R/W South High Density Residential MHP Dolce Vita Community East High Density Residential MHP Dolce Vita Community West High Density Residential RVP Golden Vista RV Resort We believe this property is ideally located for a multi-unit residential land use as it is in close proximity to US60 and the multiple services and employment nodes along it. In addition, this product type provides a great land use transition for the Dolce Vita and Golden Vista communities as it is a significantly less intense use that what the current zoning allows for, resulting in significantly less traffic and better preservation of view corridors. Description of Proposal The intent of this proposal is to both activate this otherwise overlooked and underdeveloped parcel and to bring a unique housing product to the City of Apache Junction that is needed. Currently, the City's housing stock is comprised of either single family homes or traditional apartments. The dearth of other housing types creates a lack of diversity in both lifestyle and income levels. The proposed Silveray product helps address that issue by introducing a new product type into the community that will fill an existing need for residents that want the lifestyle akin to that of a single- family home or townhome but not the long-term time/cost commitment or maintenance that comes with it. Residents also benefit from the resort level amenities and lock/leave ability that this product and project provides. This will be a market-rate, non-age-restricted project that can serve all members of the community. Access: Not only is the product unique,but so is the site as it is bifurcated into two parcels that span Resort Blvd. which will provide the main points of access to this project. Both sides of the project are proposed to be gated and will have multiple points of ingress/egress along Resort Blvd. The north parcels currently each show two points of ingress/egress and two second points of egress only, however all four access points permit emergency ingress. The southern parcel features the primary access from Resort Blvd. to the community clubhouse and leasing office which is outside of the gated area. The entry drive then continues on through a gated access that allows for both ingress and egress into the site. A secondary point of connection provides egress to Goldfield Road and also serves as an emergency vehicle access point. Circulation &Parking: Once through the gates, the 26-foot, or wider, driveways circulate through the property providing access to all of the residential units and parking areas. The current unit count and mix result in a parking requirement (established by the City of Apache Junction Zoning Code) of 496 spaces which we intend to exceed via a mix of private garages, shaded car ports, and open parking spaces. The parking ratios are based upon anticipated product mix for the site, which currently includes 95 one-bedroom units, 102 two-bedroom units, and 77 three-bedroom units. The parking ratios are 1.5 spaces/unit for the one-bedroom units, and 2 spaces/unit for the two and three-bedroom units for a blended ratio of 2.2 spaces/unit and a total space count, including garages, of 496 parking spaces. It is intended that 25%of the garages will provide enhanced electrical connection for residents with electric vehicles. Bicycle and pedestrian access is provided at all of the vehicular points of access but also in multiple other locations connecting residents directly to Resort Blvd. and Goldfield Road. The north parcels are compact and do not need additional points of access, however five additional access points are spread throughout the south parcel making it convenient for residents to exist the community safely. A total of fifty bicycle parking spaces are provided in the project via garage and designated bike racks around the site. Open Space &Amenities: As a high-quality residential community, the site will offer an elevated level of site amenities for the residents including the primary amenity area which features a clubhouse community building with fitness center, swimming pool with a large sun deck, spa, ramada, grilling areas, and more. Additional amenity areas feature a game lawn, two dog parks, and several walking paths with shade trees and multiple benches. The location of the primary amenity will be at the north end of the south parcel which affords centralized access from all residential units. The amenity area 411) a g c 1 p ian Co n s u itin ( location also enhances the streetscape along Resort Blvd. Additional passive parks will be provided and linked by walking paths the circulate throughout the project. In all, there is almost three acres of open space which equates to over 15% of the net site area. Product: The residential homes themselves offer an elevated level of luxury via high end interior finishes, numerous floor plan options, and attractive architecture. Although there is quite an eclectic mix of architecture in the area, the intent of this project is to blend into the more single family feel of the community which is why our homes use materials and roof structures similar to that seen in traditional single-family neighborhoods. We are using materials that stand up to the harsh environmental conditions in the desert including stucco, stone,metal, and concrete tile, and utilize colors that are complimentary to beautiful desert environs. Sloped rooflines and articulated massing complete the robust and complimentary architectural design for the project. Departing from traditional large monolithic multi-family buildings containing multiple units, this project features smaller cluster of one, two, and three units which have a maximum height of two- stories all under 30-feet tall. These smaller units look and live more like a traditional single- family home than traditional apartments thus are much more compatible to the adjacent HDR communities. Similar to a single-family home, every unit at Silveray includes a private rear yard space that allows for private and secure use by the residents, guests, and their pets. In addition, almost half of the units offer attached garages which is also something more akin to single family homes versus traditional multi-family apartments. Compatibility with adjacent uses This property is unique in several ways. First, although it is adjacent to US60, it is a difficult property to develop due to limited access and extremely low traffic volumes due to Goldfield being a dead-end street. The previous concept of a hospital complex, office buildings, hotels, and restaurants were a grand vision that is simply not viable at this location due to lack of surrounding demographics and traffic counts. A multi-family residential project is much more viable here as it can utilize the proximity to the highway but still be compatible with the existing residential communities surrounding it. Multi-family uses also do not rely on area demographics or traffic counts. Furthermore, being immediately adjacent to an important highway corridor leading to critical employment areas provides an important housing opportunity for the city. The site being 51Page 1i lan Consulting bifurcated by a private street serving another community affords some design challenges which we believe have been successfully mitigated by the more single-family nature of the product type. Additionally, this property is blessed with a beautiful natural desert wash and some of the most spectacular views of the Superstition mountains in the valley, both of which are better protected by developing a lower intensity multi-family project with limited heights and appropriate setbacks from the wash than the current zoning would allow for. The hospital, hotel, and restaurant uses that would come with the existing zoning would bring much higher vertical structures disrupting those views for some of the neighbors, especially to the west. In addition, those uses would bring much more intense traffic and congestion to Goldfield but most of all to Resort Boulevard, the primary access for the Dolce Vita residents. The proposed land use change would limit traffic to this area to people who live there as opposed to the existing land use which would draw a constant flow of people from elsewhere. This makes the proposed use much more compatible with the quiet residential character currently being enjoyed by neighboring communities. The site is bordered on three sides by existing residential uses, making this proposal compatible from a land use perspective. In addition, the building configuration (1-3 units per structure), building height (less than 30-feet), and design result in a single-family look and feel which is complimentary to the adjacent projects. Traffic: The site fronts onto Goldfield Road which is a fully improved arterial level road within the city and can easily accommodate the existing traffic volumes in addition to the traffic generated by this proposal. The proposed change in land use will actually reduce the potential traffic generated from the existing proposed uses as identified in the Traffic Impact Analysis for the site: 0 The proposed development is anticipated to generate 2,038 daily trips, 124 (30 in/94 out) trips during the AM peak hour, and 139 (89 in/51 out) trips during the PM peak hour. 0 The existing zoning of the site would be anticipated to generate 7,596 weekday daily trips, 564(388 in/ 176 out)trips during the AM peak hour, and 747 (294 in/453 out)trips during the PM peak hour. 0 The proposed land uses generate approximately 5,558 fewer daily trips, 439 (359 in/ 80 out) fewer AM peak hour volumes, and 602 (203 in/399 out) fewer PM peak hour trips than the existing zoning allows. 6 1 P a g e 1plan Consulting The reduced intensity of the proposal from the approved commercial land uses will also benefit the City in terms of a lessened demand on public infrastructure,facilities,and services,all of which are in place and have capacity to serve this project. Lastly, the Development Plan for the proposal currently exceeds the City parking requirements which ensures there is adequate off-street parking. Views: This property and area is blessed with wonderful views of the majestic Superstition Mountains and one of the many benefits of this project is the lowering of the allowable height for the property. The current zoning allows building heights to be up to 45-feet and while the proposed RM-2 zoning district reduces that maximum height to 40-feet, the proposed product is less than 30-feet which we will be voluntarily committing to via the PD overlay. The project will take advantage of the existing 8-foot wall of Dolce Vita by adding landscaping to effectively screen our project from the adjacent Dolce Vita project to the east. A new wall will be built along the perimeter where needed which will further screen the project. Goldfield Road acts as a buffer to the west and a 50'+wide wash provides a buffer to the east. Additional landscaping is proposed along the south boundary to act as a buffer beyond the existing 8-foot wall. Noise and Light: The proposed residential use does not contain any sources that will create atypical levels of odors, dust, gas, noise, lighting, vibration, smoke, heat, or glare. Lighting and noise obviously will emit from this project, but the levels of emission will be significantly less than would occur under the currently approved land uses, especially the noise and light attributed to a hospital use. Even so, we have prepared a photometric plan to demonstrate light level compliance with City regulations and all community amenities will close at I Opm minimizing impacts to adjacent properties. General Plan Amendment The current General Plan designation of Commercial has proven to be non-viable at this location for multiple reasons. The most damaging reason is the lack of ambient traffic in the area but specifically along Goldfield Road. Currently Goldfield Road dead ends one-half mile to the south, limiting the necessity of traffic to turn south of US 60. US 60 itself is a major transportation corridor but this specific interchange has nothing immediately nearby to attract motorists to exit which is of critical importance for the viability of the commercial uses the current zoning allows for. Large commercial centers exist to the east(Gold Canyon)and the west(at Signal Butte)which serve the regional needs for commercial services along US60, limiting the viability of any 7 1 P a g e IpIan Con sulti rig commercial services at this interchange. It is possible some commercial/employment uses that do not require high traffic volumes(e.g.mini-storage,warehousing,contractor yards,etc.)could work here, but those uses would still prefer to be in more active areas and we believe types of uses are not as compatible with the adjacent land uses as the residential use proposed. Another justification for the amendment is that the Commercial classification is not as compatible with surrounding land uses which use the same High Density Residential (HDR) land use classification of our proposal. This area has proven to be viable for residential uses such as the rental community of Dolce Vita to our east and south, and the Golden Vista RV park to our west. As such,we believe changing the land use classification to HDR is more appropriate and will allow the property to finally develop as a viable and long-term sustainable use. Findings of Fact: As required by the City of Apache Junction 2020 General Plan,below are the applicant's responses to the Findings of Fact which are the criteria the City evaluates the justification of the proposed Major General Plan Amendment from a land use classification of Commercial(C)to High Density Residential(HDR). 1. Whether the amendment proposes a land use designation that the land use plan map does not adequately provide optional sites to accommodate. Response: Although the General Plan does provide alternative HDR sites, many are developed and/or in areas of the City already being served by higher density residential uses. 2. Whether the amendment constitutes an overall improvement to the general plan,will not solely benefit a particular landowner or owners at a particular point in time, and is consistent with the overall intent of the 2020-2050 general plan. Response: The Commercial land use classification of the subject property was specific to a previous plan which proved to be non-viable and other than one parcel developing as a fuel station, the rest of the site has remained vacant. The proposed amendment to a residential use will activate this property, bringing in a housing product that will benefit the community and residents that will spur additional economic growth in the area. The proposed amendment is more consistent with the quieter character of the neighboring communities, thus more compatible from a general Plan perspective. Since Commercial land is significantly more valuable, the amendment does not solely benefit the land owner and instead benefits the community which is consistent with the intent of the General Plan. 3. Whether the proposed amendment is justified by an error in the 2020-2050 general plan as originally adopted. Response: The proposed amendment is justified by a change in how commercial development occurs and is not tied to an error of the General Plan. The commercial market has adapted to the post-COVID world of fewer commercial centers and the clustering of uses in regional nodes versus on "every street corner". That change in market has made sites like this better suited for other land uses such as the HDR proposed. 4. Whether the proposed change is generally consistent with goals, objectives, and other elements of the 2020-2050 general plan. Response: As demonstrated later in this narrative, we strongly believe the proposed change is consistent with the goals and objectives of the General Plan. The proposal is also consistent with the adjacent properties which share the same HDR classification. 5. Whether the proposed change is justified by a change in community conditions or neighborhood characteristics since adoption of the plan. Response: Yes, as aforementioned, this property has proven to be non-viable for the current Commercial classification and in analyzing other land uses available, the HDR designation is the most appropriate given the surrounding land uses. 6. Whether the amendment will adversely impact a portion of the community by: a. Significantly altering acceptable existing land use patterns, especially in established neighborhoods. Response: The proposed HDR classification is more compatible with the established neighborhoods, many which also utilize the HDR land use designation. Furthermore, the Commercial designation and specifically the approved hospital use would certainly adversely impact this quiet residential area via the regular high levels of noise and light caused by ambulances & helicopters coming and going. b. Significantly reducing the housing to jobs balance in the planning area. Response: Although a Commercial classification is more associated with jobs, that only matters if'the property can be developed under that land use designation. The commercial classification (and commercial zoning) has been in place for almost 25 years and only produced one small fuel station. It is clear the property would continue to sit vacant producing no jobs for the foreseeable future. The HDR classification will allow the property to be developed immediately, create a handful of jobs, but more importantly, will provide a housing product for employees that not only will help the City attract employers, but also will spur economic growth in this otherwise under- developed part of town. c. Substantially decreasing existing and future water supplies. Response: The proposed HDR classification and resulting residential community will use significantly less water than the current Commercial classification and approved uses would. d. Replacing employment with residential uses. Response: As previously mentioned, this site, although currently designated for commercial use, is not viable and will remain vacant. Developing an HDR land use will help bring people here and will likely spur economic and job growth in the area by activating an otherwise vacant property. e. Requiring additional and more expensive improvements to infrastructure systems and/or proximity to municipal facilities and/or services than are needed to support the prevailing land uses and which, therefore, may impact the level of service for existing and proposed developments in other areas. Response: As an infill parcel, this site is already served by adequate infrastructure which means the City will bring in more revenue on systems already in place, increasing their efficiency. Furthermore, the proposed HDR land use will actually use LESS utilities than the Commercial approved land uses would producing lower stress levels on the City's infrastructure systems. L Increasing traffic(without mitigation measures)on existing roadways beyond the planned level of service that negatively impact existing and planned land uses. Response: Although Goldfield Road sees very little traffic today, it is an arterial street that is designed to accommodate significantly more traffic. The traffic study prepared for the proposed HDR land projects an acceptable LOS (Level of Service), meeting the City's guidelines. Furthermore, the proposed amendment actually reduces the traffic load on the area streets by over 70%from the projected traffic of the currently approved Commercial land uses. g. Affecting the existing character (i.e., visual, physical and functional) of the immediate area. Response: The surrounding area is largely residential with a hybrid rental/ownership home community to our east and south (Dolce Vita) and an RV community to our west (Golden Vistas), both of`which have the same HDR land use classification that is proposed for the subject property. As such, our low intensity rental home community is consistent with the character of'the area and may even enhance the built aesthetics. The current Commercial designation would significantly change the character of the area as hospitals, office buildings, and hotels are large blocky structures that would look foreign to the area and block view corridors. It. Increasing the exposure of residents to aviation generated noise, safety and/or flight operations. Response: This proposal does not have an aviation component, but also does not generate the noise, light, and potential safety issues that a commercial development might. The current Commercial classification included a hospital complex that likely would have a helicopter service which would expose residents to aviation noise, safety, and/or flight operations. i. Materially diminishing the environmental quality of the air, water, land, or cultural resources. Response: The proposed HDR classification will result in a development that is much more sensitive to the environmental quality of the area than the current Commercial classification would allow for as we are building a neighborhood for families to live in which requires a longer-term vision in terms of the environment for our residents. j. Significantly altering recreational amenities such as open space,parks,and trails. Response: The current Commercial classification and approved plans make no mention of recreational amenities whereas the proposed HDR land use heavily focuses on recreational amenities for the residents which is detailed in the concurrent PD Rezoning application package. As evidenced above, we believe the proposed HDR land use classification not only meets the Findings of Fact but also will be more compatible with the existing neighborhoods, will spur economic growth in this area, and is a more appropriate land use for the property. Zoning Complimentary to the General Plan Amendment, we are proposing to rezone the property from PD B-1 to PD RM-2,replacing the previous plans for a hospital complex, hotels, restaurants, and offices with a residential project. We believe the RM-2 base zoning district is most applicable as it aligns with the density intent of the project at approximately 15 DU/acre. The PD overlay is proposed to highlight overall compliance with the development regulations of the RM-2 zoning district and request one deviation which is discussed in detail in the next paragraph. Below is the PD development standards proposed for Silveray on Goldfield. Development Standards Standard RM-2 Code PD RM-2 proposed Minimum Development Area 7,000 square feet 700,000 square feet Minimum Lot/Parcel Width 60-feet 60-feet Maximum Residential Density 22 DU/acre 15.1 DU/acre Minimum Area Per Unit 1,980 square feet 2,800 square feet Maximum Lot Coverage 50% 27% Minimum Front Setback(West) 20-feet 20-feet Minimum Side Setback(North) 10-feet 10-feet Minimum Side Setback(South) 10-feet 10-feet Minimum Street Side Setback(Resort Blvd.) 10-feet 20-feet 11 � 1' age tialan Consulting Minimum Rear Setback(East) 20-feet 8-feet' Maximum Height(feet) 40-feet 30-feet Minimum Building Separation 10-feet 10-feet2 1—Not including adjacent wash corridor. 2—0-feet when attached. We are currently identifying one deviation to the City's Zoning Code. The deviation is a 12-foot reduction in the rear setback that only affects the northeastern corner of the project. The northeastern parcel is severely constrained by wash corridors on both the east and west sides which significantly restricts the buildable area of that parcel. However, since there is over 90 feet of wash corridor buffering our property from the closet homes in the adjacent Dolce Vita community, we believe the intent of the setback is met and exceeded in this instance. Additional justification for the minor deviation includes our commitment to exceed compliance with many of the other development standards, including a lowered density and lowered building height which are more important standards to the adjacent residents. The project also exceeds the open space and amenity requirements which enhance the livability of the project and sufficiently compensates for any negative impact to the greater community this one deviation would have. General Plan Compliance As the guiding policy document for development with the City of Apache Junction, we have reviewed the 2020 General Plan and affirm the proposed amendment is consistent with the overall Goals identified therein. Following is an analysis of the project's compliance with the Goals of the General Plan. Goal 3.2 - Diversify housing stock and neighborhoods by incorporating a variety of housing types and associated values to allow for a diverse demographic of residents. Being one of the more outlying communities of the Phoenix Metropolitan area, Apache Junction has historically attracted only single-family home development and as noted within the General Plan, the existing housing stock percentages are heavily skewed that way. The proposed development of this site as a for-rent housing community will add to the City's multi-family inventory and help the overall diversity of both the City's housing stock and residents. Goal 3.3-Maintain and attract a quality housing stock in condition,design and construction standards. 121Page I an C o11sit. tin The ownership history has a history of developing and maintaining quality commercial, industrial and residential communities within the Phoenix metro area. The design, open space amenities, housing diversity and quality of life built into this community achieves the stated goal. Goal 5.1 -Attract all quality private investment that will add value and bring diversification to current and future residents of Apache Junction as a great place to live,work and play. Within the Economic Development Element of the General Plan, this goal is appropriately broad to recognize that economic development contains many different components. In this case, the private investment is expanding the housing diversity, thus employee pool, which is critical for not only existing employers to be able to maintain their workforce, but also important for prospective employers considering Apache Junction as their new home. This project meets this goal on a number of different levels. Goal 9.1 -Increase the city's financial sustainability. Financial sustainability is helped tremendously by increased residential density and diversity. Assuring sufficient disposable income through attainable housing choices, as well as increasing the number of people in the immediate trade area, the City is well served financially by the development of this project. Goal 9.3 -Encourage infill development. As a strategic piece of land located between an existing community and the US60, this property is an infill property. It can be difficult to identify the proper balance of uses in an infill location,but this site creates a density transition between existing commercial and residential, and takes advantage of the proximity to a major transportation corridor which might negatively impact other land uses. Goal 9.4- Support and foster sustainable growth. Sustainable growth is a term that relates to housing diversity, financial sustainability, economic development contribution, and the overall goals of creating a city favorable to a live, work and play environment. This goal is met on all accounts. Goal 11.2 -Provide a balance of uses throughout the community. From the General Plan: 131Pa g e 1plan C otisLiiting "Currently, the city has less multi family and single-family residential homes per capita than Queen Creek, Chandler, Gilbert or Mesa.A highly disproportionate percentage of current housing stock resides in manufactured/recreational vehicle homes which currently totals approximately 63 percent (63%) of the city's residences. As a result, only 27 percent (27%) of the city's housing stock is considered single family development. As young people grow out of their parent's home it is important to have a diversity of housing types in order to keep new generations within the city. Moreover, the lack of diversity in housing stock also has a direct effect on people being able to move into the city. The general plan addresses this concern through appropriate land use designations and housing policies. " As noted above, this product is critical to help achieve the overall balance of uses the community needs. Goal 11.4 -Encourage and promote sustainable land use development. As identified under the Sustainable Growth Goal, there are many components to sustainable land use development. Providing an appropriately dense housing project along a major transportation corridor reduces traffic in the community and creates a density transition away from the traffic and other commercial uses. This project, and multi-family projects in general, also result in higher efficiencies of utility infrastructure due to the focused intensity/density and bring a higher ratio of customers per capita resulting in a higher level of sustainability for the public utility providers. Conclusion: This property is unique as it is close to a major transportation corridor, but is somewhat isolated by the lack of transportation network to the south or east. For those reasons,the current entitlement failed to become viable. The property ownership has analyzed this site and larger context and believe this infill property's highest and best use is as a multi-family development. Even so, it is important to take the adjacent mobile home park and RV park communities into account and develop a project that is compatible both in land use and design. We are proposing a lower intensity product type that we believe it is compatible to the adjacent communities due to its lower height buildings and single family livability. Furthermore, this product is designed to attract working professionals that need to be a short drive into the regional employment areas,but desire a more single family like lifestyle combined with no maintenance responsibilities and resort like amenities which make this a complimentary development for both the adjacent neighbors and the City as a whole. Within the Phoenix metropolitan area, the shortage of housing quantity and variety is having a significant detrimental impact on communities' ability to grow in an economically viable fashion due to a variety of reasons, not the least of which is the inability of employers to find quality housing for new employees relocating to the Valley. If a community wants to develop in a smart and sustainable way, they need to have a range of housing to address affordability and lifestyle choices. This project will help achieve that goal for Apache Junction. 15 111 a g e 1plan ` onsafitiri DEVELOPMENT DATA GOLDFIELD ZONING: DENSITY: CURRENT: B-1 PD 1 BEDROOM 85 REQUIRED: PROVIDED: PROPOSED: RM-2 PD 2 BEDROOM 107 Northeast (PARCEL 3) CASE: P-23-63-PZ 3 BEDROOM 77 PARCEL 1 PARCEL 2 PARCEL 3 TOTAL --------------- BTR cc SECTION: 23 TOTAL 269 1 BEDROOM: 1.5(63)=95 1.5(22)-33 1.5(0)= 0 Garage 15 SEC OF S. GOLDFIELD RD AND o Resident-ADA Covered 1 Q TOWNSHIP: 01N 2 BEDROOM: 2(72)= 144 2(35)= 70 2(0)= 0 _ ___ __________ q m 13'-9" 12'-6" 19'9" 11'$" 12'-6" 19'9" 11'8" 12'-6" 19'9" 1 V-8" 12'-6" 19'9" 12'-8" 13'-9" °O 20'-6" o w ___ - -- _ --- - --- --- _ - --__-.-- _-- o w _-- _ RANGE: 08E DENSITY: 14.9 DUAC 3 BEDROOM: 2(52)= 104 2(10)= 20 2(15)= 30 Resident_Covered 3 RESORT BLVD - — .— � _ _ _ �j _ � _ _ _ �-� _ _ o — — _ — — APN. 103-01-0110 103-01-0130 103-01-0140 TOTAL. 343 123 30 496 Resident-Tandem 13 � _ —� - 103-01-0150 103-01-0160 103-01-0170 _. _ __ ___ APACHE JUNCTION ARIZONA 85219 - - - - - _ _ _ _ Visitor 21 TYPE 4 ; - o o 103-01-0180 Visitor-ADA 1 _. > (2-STORY)! t TYPE 7 TYPE 7 ' 54 TYPE 7 TYPE 7 TYPE 7 -_ a .,...TYPE 3 r � TYPE 3 ,� u J TYPE 8 TYPE 8, TYPE 8'' TYPE 8- TYPE 8: - TYPE 8, - TYPE 8 `TYPE 8' TYPE 8 ACREAGE. 17.96 ACRES 2 STORY 2 STORY ( ) 1016 (2-STORY) (2-STORY) 2 STORY _ _ + �L. I . _ PAR EL 2 I ( ) ( ). ( ). (2-STORY) 2 STORY C L Northwest(2-STORY) 2 STORY" ' 2 STORY' 2 STORY 2 STORY (2-STORY) 2 STORY. .2 STORY' 2 STORY ( ) ( ) o PEN SPACE: 2. ACRES 1 .0 S C 8 C S 56/0 �[1016] 80 ( h 7 '1 -- - r 2 SETBACK LOT COVERAGE. 4.8 ACRES(26.8/o) Garage 8 �* Resident-ADA Covered 1 V rn n rn ^' TYPE 6 Resident-Covered 43 7 -- 24 0 PERIMETER BUILDING SETBACKS: TYPE 1 TYPE 1 TYPE 1 TYPE 1 TYPE 1 --- (2-STORY) - < Resident-Tandem 8 (2 STORY) ,{ 2 STORY}% > (2 STORY) 1. (2 STORY) + 2 STORY} --- _ 1106 ------- 1001 1017 -- ---- -- _. rt � � FRONT. 20 0 t � ----- _ Visitor 62 -= ir co SIDES: 10-0 BICYCLE PARKING: visitor-ADA ____ _____ __ 1 1302 1120 1016 —N 1011 1017 _s ,Q �A REAR: 10'0° 143 1302 - il TrPE4 REQUIRED: 1 PER EVERY 10 VEHICLES ___ (PA - 1001 F3 (2-STORY) _ _ South (PARCEL 1) ( 496/10=49.6=50 C I TYPE3 PROVIDED: 10 SITE SPACES Garage 79 � ( ,, a - (2�sTORY) 91 Resident 8 EXIT 40 GARAGE / S d n . ONLY � � �Q oRvl � � � 11-5' „ �i <u 11 5 � —®® ___ �® 11302 � � Resident-ADA 2 — — — — - C �25� TYPEa TYPEa TYPEa 1114 9c� Resident-ADA Covered 1 (2-STORY (2-STORY (2-STORY 26'0" V 34'-0° _ ' " 1011 0 1114 � / Resident-Covered 102 � T �']� 1122 �� �� - - i -- K G _ .: 1126 1208 EXIT -— ----- L L �..J Resident-Tandem 50 EXIT ONLY -- -------- - _. Visitor 73 m0 2 ® .W.W 37- ONLY — -- e —_ - — — — Visitor-ADA 4 ----� _ _ _ _ World H ORBArch . com o �2s°�� - q ¢ o - 319 Q � RESORT BOULEVARD w 0 TOTAL PROVIDED 516 o- �/1Lu 1114 = = �� 1125 1106 (PRIVATE PAVED ROAD) � < . . RF�caRC��TF� 2 1124 ' ° � _ _ UNIT MIX. o \ �QeR�� / PARCEL 1 PARCEL 2 PARCEL 3 TOTAL 1 � — EXCEPTION \ r? �2s0' / 1 BEDROOM: 63 22 0 ( Ric Barbe 2 BEDROOM: 72 35 0 12 22 2 3 3 BEDROOM: 52 10 15 gfP V 1208 �. . . . . . ; / 269 qR� 5 P. TOTAL. 187 67 15 Expires 3/31/2026 1017 LEASING t RE r' r LEGEND KEYNOTES ��� / q \; a , 9'x 18'STALL 1001 TYPICAL PARKING STALL ►�� DENOTES PROPERTY LINE J0021201 1002 ACCESSIBLE PARKING STALL, MIN. 1 V x 18'STALL 1011 1011 BICYCLE PARKING S�2/ 0 1016 24'WIDE INTERIOR DRIVEWAY DENOTES ACCESSIBLE PARKING 1017 5'-0"WIDE SIDEWALK ADJACENT TO PARKING —0 __ --- '" �33 / 1018 4'-0"WIDE DETACHED MEANDERING SIDEWALK w 1017 - o ��eE 1001 c ° ° // 1019 TYPICAL TANDEM PARKING STALL, 9'x 18'STALL. STRIPING PROVIDED TO PREVENT - - _—_ o A s��R�� Q 1123 FIRE HYDRANT ENCROACHMENT INTO WALK AISLE. / 1106 PEDESTRIAN CROSSWALKL 1114 VEHICLE ACCESS GATE TYPE _ (2-STORY) / DENOTES ACCESSIBLE ROUTE 1120 DENOTES CARPORT STRUCTURE LOCATION _i- / 1121 PEDESTRIAN GATE AND ACCESS TO PUBLIC WAY 1 1122 MAIL KIOSK ������ o 'PE2QtRVI W ! ( TYPET C� tl S�0 W Q 11'-6 TYPE? 11'9" (2_sloRvl �2s�0R l2. 1106 / / 1 BEDROOM UNIT 1123 TOT LOT (2 STORY) � / / 1124 GAME LAWN _ - _ 1 BEDROOM 0 2 / DROOM UNIT OVER GARAGES 1125 RAMADA WITH BBQ 1 G� _V / Q DOG- J J TYPE 2, TYPE 2 TYPE 2 T{PET o ® CiQ oR l ®/ 12016 POOLPARK 0 m (2-STORY) TYPE? (2-STORY) ® ® ,(2-STORY) (2STORV) �2S (2-STORY) - - � TYPES / 2 BEDROOM UNIT 1208 DECORATIVE PAVERS OR EQUIVALENT - (z-STORY) 1301 DOUBLE REFUSE ENCLOSURE WITH DOUBLE FULL HEIGHT SET OF GATES I o, 1302 3 BEDROOM UNIT 1302 SINGLE REFUSE ENCLOSURE WITH FULL HEIGHT SET OF GATES TYPE 1405 EXISTING STREET LIGHT,TYPICAL PE 1 l2.STORY) / S'Fj�q 0', 4 -STORY)' 1120 < / �/r b 1302 1302 E 1017 Ell TYPE 5 ( TYPE 5 2-STORY ® . (2STORY / ®. 4"X8"X16"SOLID CAP I LOOP STEEL PIPE,PAINT TO MATCH DE6378"JET' 1777 35 $" 8"DECORATIVE CMU, TYPE 3 a TYPES - SEE DETAIL 2 THIS SHEET STEEL EMBED PLATE, ----- (2-STORY) (2STORY /� Sr, 9 �� '' `o WELD LOOP TO PLATE I " CONCRETE SLAB OR - I ° rYPE4 1016 1 4 Ell SIDEWALK PER PLAN %. ' (2-STORY) TYPE 2 I I TYPE 2 j 1 _._..... t .'(2-STORY),[ I :-Y , (2-STORY). 'f TYPE 5 '- " 18'-0" 1121 __ - DECOMPOSED GRANITE i (2-STORY) 1 6 4 0" 19'9" 9 9" �9'9"� 19 9 ---- SETBACK 1016 Lt STEEL DECKING,PAINT TYPE 1 TYPE 7 TYPE 7 _ TYPE 7_ TYPE 7 TYPE 1 - a TO MATCH DE6212 (2-STORY) ° (2-STORY) (2-STORY) (2-STORY) (2-STORY) (2-STORY) -' % 6"DIA.STEEL PIPE „ '', � rn CRISP MUSLIN 1124 BOLLARD FILLED W/ ___. - CONCRETE.PAINTED -- — - T11 YPE 5 rn rn -- --------- --------- --------- ---- --------- ------------------ 1405 �� I - ----- _—_' - -- - - � I _� � � � � � � � � � � � LU � � � � � � � � � � � � � � STEEL BEAM AND (2-STORY) a - TO MATCH WALL COLUMN,PAINT 50'-0"R.O.W. - DEET6 0"DOLPHINOTALES"H TYPE 2 1 TYPE z o LOOP STEEL PIPE,PAINT (2-STORY),1 (2-STORY)) TYPE 5 CONCRETE SLAB TO MATCH DE6378"JET" 16 6"THICK,4000 PSI, STEEL EMBED PLATE, Lu = rn (2 STORY) JL 3/4"AGGREGATE W/ WELD LOOP TO PLATE z o ®o� a3 to 6x6-10/10 WWM OR LANDSCAPE AREA z 0 1120 0. ); TYPE z 4 bo s TYPE z o Q EQUAL.SLOPE TO SIDEWALK PER PLAN PER PLANS w o (2-STORY) (z-STORY}y DRAIN 1l$"PER FOOT DECOMPOSED GRANITE i ® TYPE E -_- ��, '•'- �; 1019 % CURB& (2-STORY) 19'9" 9'9" . . 112'-0" SIDEWALK �_ I 1018 ,. TYPE 1 o TYPE 7 TYEll PE 7 '� � TYPE 7 TYPE 7 'rs TYPE 1 i n, a' ° .; �. � a ° I -- I ® L.. I -- a a 20 0 _ 2 STORY 2-STORY 2-STORY 2-STORY 2-STORY 2-STORY - _ c - 177 ( ) ( ) ( ) ( ) ( ) ( ) TYPE 5 - < . (2-STORY SETBACK _ -I '- --- a ,a - - - — - 18---0„ 6„ 5'-0, 1121 —� __ APPROXIMATE LOCATION CO - , �, , 4° �_ _ CONCRETE FOOTING PER CONCRETE HEADER I OF ADJACENT BUILDING ( _ MANUFACTURER SPECIFICATIONS „ �TYPE2.i ..I" TYPE2:.1 . 1 (z-STORY (2STORY) - - 1 t U 16 0"P.U. TYPESa ° (- r^ o (EASEMENT (2-STORY) � .° o� . .°. < m 1120 - 11 26'-0" 1'-0" -EASEMENT12"DIA.x 24"DEEP ,k 1017 . .-. �-. TYPE 3 ,� / �, TYPES _ TYPE 14'-0"� CONRETE FOOTING 2-STORY), (2-STORY) f (2-STORY ® ` 1011 EXIT 1017 0 1018 1001 ONLY 1106 - 1302 1016 N 1301 o _ 4,0„ ( o TRASH ENCLOSURE WALL GROUND MOUNTED BIKE RACKS CARPORT CANOPY MENC TYPE 1, TYPE 1 ❑1 = 8 -- ---- -- ---- 1121 ( �(2-STORY), `(2-STORY) r f -�- ��'- -- r ' Orr H 1126 SETBACK `� NOT TO SCALE 20'-0" - PRE-CASTLu SETBACK °F g = °p CONCRETE CAP q � ® / C TYPE 7 ' TYPE 7 ;' G - ° a (2 STORY) (2 STORY) 26 0„ --- TYPE 3 ih TYPE 2, TYPE 2 TYPE 2 TYPES (2-STORY)' o (2-STORY} 1g (2-STORY) o (2-STORY), �iS�M�NT Q " ACCESSIBLE RQUTE (2-STORY) > o n _' TYPE 7 TYPE 7 METAL GATE - _ > I i gym_ � w -�- 1 < (2-STORY) (2-STORY) _ : / BEYOND c� _ , _ �, ui SUPERSTITION FREEWAY > 77W_ --- ---- �__ _ T __ _� __=_1__ _ o m 8"x8"x16"DECORATIVE CMU Ui o N SIDE ELEVATION WALL,SEE NOTES 1 AND 2 I I " APPROXIMATE LOCATION � 9 FOR SPECIFICATIONS O O ----------- SITIr OF ADJACENT BUILDING S ----- MOTHER LODE DR 6"CONCRETE CURB --_ PRE-CAST 3"x23"VIEW SLOT IN GATE LANDSCAPE ISLAND CONCRETE CAP 10'0"AT SINGLE ENCLOSURE o N 19'-4"AT DOUBLE ENCLOSURE -----� BASELINE AVE PRELIMINARY SITE PLAN - l 1 30 60 120 -- - \� SCALE: 1"=60'-0" SOLID METAL - - ---- STEEL ENLCOSURE GATE n DECKING,COLOR TO o VICINITY MAP BE DUNN EDWARDS � i � DE6378"JET" 4"WIDE PAINTED PARKING STRIPES L]i PROVIDE SLOTS AT OPEN o RE-ZONING SUBMITTAL R3'0" &CLOSED GATE POSITION TO RELIEVE CANE BOLT ................... DATE: DECEMBER 22,2023 ORB #: 23-206 9,0„ FRONT ELEVATION FLOOR PLAN TYPICAL Al 01 1. SMOOTH FACE CMU BASIS OF DESIGN TO BE ECHELON STANDARD MASONRY SMOOTH FACE IN COLOR"ASPEN" 2. SPLIT FACE CMU TO BE ECHELON STANDARD MASONRY SPLIT FACE BLOCK IN COLOR"BLACK MOUNTAIN" PRELIMINARY SITE PLAN PARKING STALL WITH ISLAND REFUSE ENCLOSURE GOLDFIELD EXTERIOR FINISH SCHEDULE - ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- BTR Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND /0'2 3.04 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 ---------"COOL DECEMBER" ----------------------------------------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 96-3 DE6212 "CRISP MUSLIN" MEMO:] 00� 39'-11 564" D1 STUCCO FINISH DUNN EDWARDS ot Ri ry L -------- DE6376 "LOOKING GLASS-" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" > < El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" < E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" < < F VINYL WINDOW FRAME COLOR BLACK < ----—---------------------------------------------------------------------------------- -- G1 FLAT CONCRETE ROOF TILES."SIERRA MADRE" /T!ml ------------------------------------------------------- I"fi G2 FLAT CONCRETE ROOF TILES,AVONDALE BLEND ---------- A ----------------——---------- --------------------- --------------------------- A H < H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 DE6378 "JET" ► COMMUNITY FLEX SPACE < ti OFFICE FR I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .� a J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 T-" H "JET" < ----------- ---—---------------------------------------------------------------------------- < - World HQ@ORBArch . com < LEASING cD RED CY/ ------- \ CLUBHOUSE T.O. ROOF 9- K. . . . . . . < BREAK ROOM < 22'-10" K < < < 1 13 o K < < Ric Barbe a >�(0 < < 09 28 2 co MECHANICAL K STORAGE OFFICE < < > A3.04 > < < Y-A < ed. < � - < 3 zo A, > << 04 Cf Expires 3/31/2026 < < CLUBHOUSE T.O. PLATE < 7< Cp < < MAINTENANCE < CLUB ROOM < LEVE < 77777' < FITNESS BUSINESS 77777 CENTER > IL < III 1 4' 8' 16' > < > CLUB HOUSE FRONT ELEVATION > EMNE] > SCALE: 1/8" 1%0" 77< U? CLUBHOUSE T.O. RO OF10 CLUBHOUSE T.O. PLATE'' rt 1 V-6" 0,1 1 1 �4' 8' 16' tr CLUB HOUSE FLOOR PLAN 11�,VIVIVIVIVIVIV E] SCALE: 1/8" l'-O" LEVEL Ll ............... 0 011 OPEN 4" 12" 4" 12" 1 1 � 16' F - --1 CLUB HOUSE BACK ELEVATION 0,1 4' 8' SCALE: 1/8"=1'-0" L - - - - - - - - -j CLUBHOUSE T.O. ROOF 4" 12" 22'-10" ---------------- CLUBHOUSE T.O. PLATE_Au-� 1 V-6" 4" 12" LEVEL Ll ............. o,-o,, 4" 12" CLUB HOUSE RIGHT ELEVATION 0,1 �4' 8' 16' 3 F-1 El SCALE: 1/8"=1'-0" J CLUBHOUSE T.O. ROOF T - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - T - —�� 22'-10" (h 4" 12" 4" 12" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Is I it I L - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - CLUBHOUSE T.O. PLATE 1 V-6iti L - - - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - ........... fJ RE-ZONING UBMITTAL LEVEL Ll 01 DATE: SEPTEMBER 28,2023 ORB #: 23-206 CLUB HOUSE ROOF PLAN 0,1 1 1 �4 �8' 16' 6 MENU OPEN - SCALE: 1/8" 1%0" A 0,1 1 1 �4' 8' 16' CLUB HOUSE LEFT ELEVATION 4 SCALE: 1/8" 1'-0" CLUBHOUSE mmmmlu GOLDFIELD EXTERIOR FINISH SCHEDULE ------------------------------------------------------------------------------------------------------------------------ Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND — '-'COOL-DECEMBER" ——-—-----—--------------------------------------------------------------------------- RESORT BLVD 3.14 Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] Dl STUCCO FINISH DUNN EDWARDS Z 28'-0" -T_-7/ DE6376 LOOKING GLASS"------------_ ot Pd Ch ----------------------------------------------------------- ----------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK --------------------------------------------------------------------------------------------- Gl FLAT CONCRETE ROOF TILES "SIERRA MADRE" ——-—-- --------------------------------------------------- Ns Ll G2 FLAT CONCRETE ROOF TILES--"AVONDALE BLEND__ __ H GARAGE DOOR TO E3E PAINTED FINISH DUNN EDWARDS > S T, TORAGE: DE6378 _JET > I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" > J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 r4k-N = /3 11JET_ -—----------------------------------------------------------------------------------------- \A3.14 > --------------------—-------------------;.I —----- N3.14al W o r I d HQ@ORBArch . com > C? > < > > GARAGE GARAGE F7- GAUGE -�RED-ARC,�l \cD - /T I CAT Fc 1 13 Ric Barbe 09 28 2 S1 ned. Z 0-A, MAi 71 :2 Expires 3 31 2026 34'-3" - -------------------------------------------------------------------------------------------------------------------------------- Emmou FLOOR PLAN — LEVEL Ll o'l 1 1 �4' 81 16' 5 SCALE: 1/8" l'-O" 36-T /--------------------------------------------------------------------------------------------------34'--3liilliilliilliil IF EMEND. > > BEDROOM ROOF T.O. PLATE ROOF T.O. PLATE� 2 4tt 20,_4 0' " Xfr tr i. cl?) cli oq > < C4 zo > < > UNIT C LEVEL L�� LEVEL L2 , > < > 0_4 10'-4" > <> C�l > 6'SCREEN WALL > > < > > 1A LEVEL Ll LEVEL Ll ---------- ol---- —------- FLOOR PLAN LEVEL L2 o'l 1 1 �4' �8' 16' REAR COLOR ELEVATION 10,11114' 18' 116' FRONT COLOR ELEVATION o 4 �8' 16' 2 SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" SCALE: 1/8" l'-OCV - - - - - - - - - - - - - — — — — — — — — — — — — — — — — — — — — — — — — Lo F 1 5" 12" MY 5" 12" 5" 12" ROOF T.O. PLATE --ROOF T.O. PLATE .44. 20'-4" 20'-4" Lo t. St SF zo LEVEL LEVELL.2_&,� 1 0'4"__5� 10'-4" 6SCREEN WALL �5" 12"_ 5' 12" L — — — — — — — — — — — 71111 titz"21 Z4, LEVEL Ll LEVEL Ll o,-o,, 0'-0" ROOF PLAN o'l 1 1 �4' �8' 16' LEFT COLOR ELEVATION 10,11114' 18' 116' RIGHT COLOR ELEVATION 10,11114' 8' 16' 7 =ONE] mmc OEM[I 40 SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 . 1 4a BUILDING TYPE 1 COLOR SCHEME 1 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE ------------------------------------------------------------------------------------------------------------------------ Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "r. DOLPHIN TALES" BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND — '-'COOL-DECEMBER" ——-—-----—------------------ ---------------- ---------------- ------------------------ - RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" ot Pd ry 7- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK —--—--------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ——-—-- --------------------------------------------------- -G2--FLAT-CONCRETE-ROOF -,TIL-ES "AVONDALE-BLEND I------------------------------------------------------------ H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .0 I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .� a J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 11JET_'v -—----------------------------------------------------------------------------------------- World HQ@ORBArch . com cD_\g,EDCyz F1 C 1 13 Ric Barbe 09 28 2 ned.. Zo A, Expires V31/2026 INS IN ROOF T.O. PLAT ROOF T.O. PLATE 20,_4 tt ttd LEVEL L 10_4 LEVEL L2 10 4 6'SCREEN WALL LEVEL Ll_&� LEVEL Ll 01-01, REAR COLOR ELEVATION 10, -00 14' 18, 116' FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' 11 =SEC SCALE: 1/8 -01, SCALE: 1/8" 1'-0" ROOF T.O. PLATE ROOF T.O. PLATE__�� 20'-4" 20'-4" -LEVEL_L2-._& LEVEL L2_& 10'4" 10'-4" 6'SCREEN WALL LEVEL Ll LEVEL Ll ---0-0 -------- " ­—---------- 01-01, \__w RE-ZONING SUBMITTAL EMEME] 10, 14' 18' 116' ul 1 1 �4' 8' 16' DATE: SEPTEMBER 28,2023 ORB #: 23-206 LEFT COLOR ELEVATION RIGHT COLOR ELEVATION 30 SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' * 14 BUILDING TYPE 1 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR -------------- —------ ---------------------------------------------------------------------------- 00 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 2 -------------- DE6_2_12-"CRISP MUSLIN"_,_________ MEN(:] 3.24 D1 STUCCO FINISH DUNN EDWARDS • ry 7- DE6376 "LOOKING GLASS" 88'-8" D2 STUCCO FINISH DUNN EDWARDS ot P DE6215 "WOODEN PEG" ---------------I-—------------- ---------------------—------------------------------------------------------------------------------- - El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---- ------- -------------------------------- E2CORONA_D.0---STONE BRICK VENEER-COLOR-"BEAR-CREEK" ------------------------ 0 F VINYL WINDOW FRAME COLOR BLACK ------------ —------------------------------------------------------------------------------------------------------ G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" Ns Ll Ll __ Ll Ll- Ll H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS < > < < -------------- ---------------------------------------------------------------------------------------- JET > < < I �METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" > < ....... ------------------- > < J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 > I I o JET11 > r World HQ@ORBArch . com > < < < < < > < *4 \6, > I< RED ARC�,l C? > < �D > < cl) E�] C) D D 3 9�_ \A3.24aF < < < N3.24af < 1 13 < .....Ric arn 6 28 2 <UNIT TH2 UNIT TH2 UNIT TH2 UNIT TH2 UNIT TH1 < ned. < P. < 70 A, Expires V31/2026 UNIT LO j T.O.❑ ❑ ROOF PLATE 7777777fW/77777 r\/­A/-A 20'-4" ON xx 18'-2" 11,4, 18,4' 16'-6" le-—--------- -------- tv - 88'-8" cli LEVEL L2 10'-4" mop- 10, 14' 18, 116' LEVEL Ll FLOOR PLAN LEVEL L1 ........... C5D - \_w SCALE: 1/8" l'-O" FRONT COLOR ELEVATION 0,1 1 1 4' 8' 16' SCALE: 1/8" l'-O" 91' 1'4' . 4" - 88'-8" ---------------- 1­1 Ar > I A A A I I < BEDROOM BEDROOM BEDROOM BEDROOM I> > > /\j ❑ > /\j > 14 ----- ----- ---- -- - ----- ----- > < ROOF TO.__PLATE >co > - "20' 4.ntrr< fr c < < ❑ ( � .,, ( ;,�, .. ..,. r is tr -'. ,,,„,. ':. ifs t < UNIT TH2 UNIT TH2 L UNIT TH2 UNIT TH2 Ll UNIT TH1 < 1 7 < -- ----LEVELL2__ BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM < 101-4" < ------------ >> _ 6'SCREEN WALL .............. LE L ................ 01 FLOOR PLAN LEVEL L2 10, 14' 18, 116' REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' 601-1 1111111111111MOG] SCALE: 1/8"=l'-O" SCALE: 1/8"=l'-O" — — — — — — — — — -- — — — — — — — — — F — — — — — — — — — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5" 12" 5" 12" 5" 12" 5" 12 - - - - - - - - - - - - - - LO I LO 04 0 C'4 1 LO LO _j 5" 12" 5 112" ROOF T.O. PLAT' ROOF T.O. PLATE 2 0,_4 20'-4" zr qq =t cli cli LEVEL L —LEVEL L2 10 4� 10_4�_� 5" 12" 5" 12" 5" 12" 5" 12" 6'SCREEN WALL -- - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - L - - - — - - - - K. E 6'SCREEN WALL NO LEVEL Ll ------------ ------LEVEL Ll _5� 01-01, b-0 RE-ZONING SUBMITTAL -P DATE: SEPTEMBER 28,2023 ORB #: 23-206 0,1 1 1 �4' 8' 16' ROOF PLAN 10,11114' 18' 116' LEFT COLOR ELEVATION 0,1 1 1 �4' �8' 16' ❑ RIGHT COLOR ELEVATION El 70 40 11-01, �3) A . 24a SCALE: 1/8" l'-O" SCALE: 1/8" SCALE: 1/8" l'-O" BUILDING TYPE 2 COLOR SCHEME 1 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR -------------- ------- ---------------------------------------------------------------------------- CC A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 --------------_DE6_2_12-"CRISP MUSLIN"_,_________ MEN(:] D1 STUCCO FINISH DUNN EDWARDS ry 7- DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS ot p ---------------_DE6215 "WOODEN_ ---------------------—-------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---- ------- -------------------------------- E2CORONA_D.O---STONE BRICK VENEER-COLOR-"BEAR-CREEK" ------------------------ 0 F VINYL WINDOW FRAME COLOR BLACK —------------------------------------------------------------------------------------------------------ G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 -------------- DE6378-..JET —-——------------------------------------------------------------------------------------------- I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 11JET'f ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 JET WorldHQ@ ORBArch . com cD_\g,EDCyz FI C 1 13 F Ric Barbe 09 28 2 nedP. Z 0—A,U. Expires 3/31/2026 ...... IS W ROOF T.O. PLATE ...... xr, 20'-4" 17, fi is tt It .. .............. }fir I tI cli LEVEL L2 10'-4" ff 0,—o,, \_pF FRONT COLOR ELEVATION 0,1 1 1 4' �8' 16' mmmu SCALE: 1/8" l'-O" ................. ROOF T.O. PLATE ...... .. .......... .......... 29- ......... ............................ cli ......... ............. LEVELL2 10'-4" 6'SCREEN WALL i. L, --------------- LEVEL_01 0 REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' MENU 2 SCALE: 1/8"=l'-O" ROOF T.O. L�T ROOF T.O. PLATE 20_4� �04 -� tr it tt cli cli LEVEL L2 LEVEL L2 4 1 10 0,_4 USCREEN WALL 6'SCREEN WALL LEVEL Ll LEVEL Ll 01-o" -01, RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 0,1 14' 81 16' 0,1 1 1 �4' 8' 16' LEFT COLOR ELEVATION r,,� RIGHT COLOR ELEVATION =ONE] OEM[I SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" 024 � 4) BUILDING TYPE 2 COLOR SCHEME 2 mmmmic EXTERIOR FINISH SCHEDULE GOLDFIELD 2 134 Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND 87'4" A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" ot Pd Ch 1(DI 01 0 D2 STUCCO FINISH DUNN EDWARDS L-i DE6215 "WOODEN PEG" _.-___ E1 CORONADO STONE BRICK VENEER COLOR "WOLF GREY" '�/ ---—---------- — ----- ——---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" -- -------- --------- VINYL WINDOW FRAME COLOR BLACK > ------- < ------------------ —----------------------------------------------------------------------------------------------------- > < G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 0- > < > < G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" > > F > 7 < > < H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS > < I < > K < ---------------------------------------------------------------------- K > 000 < "NA3.34al I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" < (3`znqo�2� >1 Y. 3 DE6378 "JET" r4 0 C? > \A3. ZD > K > < -------- ------------------- co > K = > 0 < J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 ,< C�j C11j > < bo > Co < t GARAGE GARAGE > LLL GARAGE >> "JET" > World HQ@ORBArch . com 10'-T 10--T > 10'-7 > 1�0 III-' 0 0� /> > A < > > > UNIT TH3 < I > UNIT TH3 UNIT TH3 < > < > > < > > > D ARO > > CD < I CAT Fc r777771i X I Iii — b- 1 13 Ric Barbe 77 77 ---------- 2-� 0 28 ROOF T.O. PLATE _20'4" ned. S. /Zo A, 29'-2" 29'-0" 29'-2" Expires 3 31/2026 87'4' ------------------------------ ------- --------------------------------------------- LEVEL L2 n 10,_4 FLOOR PLAN LEVEL Ll 0,1 1 1 �4' 18' 16' LEVEL Ll F 0, SCALE: 11811 1 I-Of, FRONT COLOR ELEVATION III 1 �4 �8' 16' mmmmmw_l SCALE: 1/8"=1'-0" 901-01, —--------------- 1'4' Et 1'4 87 4 —----------------------- �O EEI > > > LE] 1 F 1 BEDROOM BEDROOM BEDROOM '71 > ROOF T.O. PLATE 20'-4" 1 7= BEDROOM BEDROOM BEDROOM C? 77 ZtD > cogrr > > A A A A > UNIT TH3UNIT TH3 UNIT TH3 > < > < > < > < > > < > < > < —LEVEL L2 BEDROOM < >> BEDROOM < > BEDROOM < 10'-4" 6A7=� ^7r^7A/\777^/,A 4,A A <----/A\^AAAAA 4.- 6'SCREEN WALL ---------- LEVEL Ll 01-01, FLOOR PLAN LEVEL L2 0,1 1 1 �4' �8' 16' REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' 06 -.-- mw�] 2 mmou SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5" 12" 5" 12" LO LO C14 Lr) NNI ; EM I L ROOFT.O. PLATE O.-PLATE 20'-4" 20'-4" 01 fr rt er rf t. LO LOit ............ L? I? - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL L2 LEVEL L2 I 10 4 10'-4iI 1 5" 12" 5" 12" 5" 12" 512 5" 12" C14 -0 0- ------ 6'SCREEN WALL LY LO LO L — — — — — — — — — — — — L — — — — — — — — — — — — — — — — -- L — — — — — — — — — — — — — — — — — - —T, LEVEL_�j LEVELL1 ......................................... ................­1 ­--­_­­---7..........7............ 0 0 . ...... "'711 , E-7 0 0�11 ROOF PLAN O'l 1 1 4' 8' 16' LEFT COLOR ELEVATION 0'1 I 114' 18, 116' /� RIGHT COLOR ELEVATION 0,1 1 1 4' �8' 16' � SCALE: 1/8"=1'0" SCALE: 1/8"=1'0" SCALE: 1/8" 1'4' RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 4a BUILDING TYPE 3 COLOR SCHEME 1 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" -------------- ------------------------------------------------------------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" ot Pd ry 7- ------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ............ ---——-- ---- ------------------------------------------------------------------------ G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND----------------------------------------------------------- H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .0 I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" a � J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 --------------1--l#J-E-T'#--.-----------------------------.------------—---------------------------------------------------------------------------------- World HQ@ORBArch . com bOG I i H i I _\g,ED —ARcl,, I CA T 1 13 Ric Barbe ROOF T.O. L�T� 28 2 20_4 ied. Expires 3/31/2026 LEVEL L2 10'-4" F. f. LEVEL Ll -I`7 7�`,' I TAGNORTEM 01-01, FRONT COLOR ELEVATION 0,1 1 1 �4 �8' �16' � - 1 - mmmmmW] SCALE: 1/8"=1'-0" J F ROOF T.O. PLATE 20'-4" km ............tI ......... rt, r. ............... �Z ..........�,44 77� ............... _7=7 ........... 77, ................... LEVEL L2 10'-4" 6'SCREEN WALL N LEVELL1 EW ............__7...... 01-01, REAR COLOR ELEVATION 0, 4' 8' 16' SCALE: 1/8" l'-O" ------------ ----- ------------------- ROOF T.O._PLATE_5� ROOFT.O.-PLATE ",""M N 20'-4" 20'-4" it rrr, rI .............................. ..... 17� ......... ........ .. .......... .. ........ .................. ........... I? cliir> .. ... C\j _ LEVEL L2 LEVEL L2 10'-4" 10'-4" 6'SCREEN WALL ......... 11111­11�1­1�.............i-, LEVEL Ll LEFT COLOR ELEVATION 10, 14' 18, 116' /� RIGHT COLOR ELEVATION 0,1 1 4' 8' 16' SCALE: 1/8"=1'4' SCALE: 1/8" 1'4 RE-ZONING SUBMITTAL' DATE: SEPTEMBER 28,2023 ORB #: 23-206 BUILDING TYPE 3 COLOR SCHEME 2 mmmmic r J-1 GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND ---------------- ----------------------------------------------------------------------------------- A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW 383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" —---—------------------------------ 3.44 E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW FRAMECOLOR BLACK---58-0 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" ---------------------------------------------------------------------- I _____I_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- n_ J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 Li (D Li 01 Li "JET" WorldHQ@ ORBArch . com > ED AROy CGS I C A T TFD 9- CAP 0 > < ?JO— > < < 1 13 < Ric Barbe > < LLL 09 28 2 > ned. < < /3--'\ F —LJ\ 1 'ql?IZO A,\�-'�' r4 0 < C:) > co > < N3.44al Expires 3/31/2026 < \A�3.44 GARAGE = GARAGE = < > K 0� C-� > > K > > > > > UNIT TH3 > UNIT TH3 < > > > ROOF T.O. PLATE > 20'-4" > > rf I? In cli LEVELL2, � 10'-4" 58'4" Wm LEVEL L------------------ ........................ R I—— 01 FLOOR PLAN LEVEL L1 10, 14' 18, 116' 5 SCALE: 1/8" l'-O" FRONT ---- COLOR ELEVATION 10, 14 18, 116' SCALE: 1/8"=l'-O" 61'-0" '4" 584' 1 4" -- ------------------------------------------------------------------------------------------------------------------------ ----------------------------------------------------------------------------------------- ------------------------------------------------------------------ 0�_ f—------- ----------------- 1 C G J 1 F 1 F ❑ > < > > < > BEDROOM BEDROOM < > > < > > > K > ROOF T.O. PLATE > > ft r._ > BEDROOM BEDROOM C? > > > K > K > < > N . < > LEVELL2 > 0__�� > '4� > < > < > UNIT TH3 UNIT TH3 < > > BEDROOM BEDROOM > > USCREEN WALL > ----LEVEL Ll 00tt > FLOOR PLAN LEVEL L2 10, 14' 18' 116' REAR COLOR ELEVATION 10,11114' 18' 116' C6j SCALE: 1/8" l'-O" NEWC SCALE: 1/8" l'-Ott - - - - - - - - - - - - - - - - - - - - - - - 1 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — N LO N N N LO I ROOFT.O. PLATE _ROOFT.O. PLATE 2 4" 4"0' 20' Ii rsr niS rr tt LOft ? L? 10 10 04 04 LEVEL_L2 —-- ----- —LEVEL L2 10'-4" 10'-4" - - - - - - - - - - - - - - - - - - - - - USCREEN WALL 5" 12" 5" 12" 5" 12" 5" 12" FSCREEN WALL Hli LEVEL L LEVEL Ll 00 SIN 01 -01, 1-0 L - - - - - - - - - - - - - - - - - IL - - - - - - - - - - - - - - - - - Li Lj ROOF PLAN 10,1 1 114' 18, 116' LEFT COLOR ELEVATION 10,11114' 18, 116' RIGHT COLOR ELEVATION 10,11114' 18, 116' RE-ZONING SUBMITTAL 4SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' __❑ _ DATE: SEPTEMBER 28,2023 ORB #: 23-206 A . 44a 7� BUILDING TYPE 4 COLOR SCHEME 1 mmmmmmu GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOI IS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" 2C, ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------­-------— ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW FRAMECOLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDSDE6378 JET .0 ---------------------------------------------------------------------- .1� I -][METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- n_ J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com cD-\g,ED­Cyz F1 C 1 13 Ric Barbe 09 28 2 ZO A,U. Expires V31/2026 ROOF T.O. PLATE 20'-4t . I? LEVELL2 10'-4" T TT NONNI[] LEVEL L 0 ==3 _01 FRONT ---- COLOR ELEVATION 10, 14 18, 116' SCALE: 1/8" l'-O" F ROOF1.0 PLATE 240 ........... tt tt .......... I? ....... LEVELL2 1 OQ-4� 6'SCREEN WALL LEVEL Ll 01-01, REAR COLOR ELEVATION 10, 14' 18' 116' SCALE: 1/8" l'-O" ROOFT.O. PLATE ROOFT T. O. PLATE 20'-4" 4"............ 20' il,S ............................... ................ ......... ......... ......�':........ ...... 77 ........ ............................ tt tz tir I? in ......... 04 04 ---------- ---- LEVEL L2 —LEVEL L2 10'-4" 10'-4" USCREEN WALL 6SCREEN WALL LEVEL Ll LEVEL Ll 0, 01 LEFT COLOR ELEVATION 10,1 1 114' 18, 116' RIGHT COLOR ELEVATION 10,11114' 18, 116' RE-ZONING SUBMITTAL 40 SCALE: 1/8" 1'4' 0� SCALE: 1/8"=1'4' DATE: SEPTEMBER 28,2023 ORB #: 23-206 A 044 BUILDING TYPE 4 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE 87'4" Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR NlIN "DOLPHIN TALES" ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- Lj I L-i ED 10 D1 STUCCO FINISH DUNN EDWARDS ot < --------Nl DE6376 "LOOKING GLASS" ------------ < > < < > < D2 STUCCO FINISH DUNN EDWARDS < DE6215 "WOODEN PEG" < > < < -------------_ _R N­AD_____T N_E­_BR_1K__`VE­N­_EE`_R __R ........W--------------------- -------------------------- ------------------------- ------------------ -- < El LF GREY" o < - ----- ------------------------ ---- -------- < of > E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK 0 > < --- -- -------------------------- > F VINYL WINDOW FRAME COLOR BLACK > F 7 F < ------------------ —-—-——------------------------------------------------------------------------------------------------ < > < G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" > > < > < 71 G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" > 1- 4 > 0 0 < r4 > K > K H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS co > K > o 1 11 K N3.54al \A3.54aF > > K N �01 K -1 DE6378 "JET" > K > ---------------------------------------------------------------------- GARAGE 30 GARAGE- > GARAGE < < K K 10, < I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" t/ 10W" 10 W" K -9.1 --------- -------- _ n - --------------------------------------- --------- -- --------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 > < > < "JET" UNIT TH3 UNIT TH3 UNIT TH3 < World HQ@ORBArch . com > _'g,ED ARC 1,11 I C A cFP 0 1 13 2 9-2" 2 - 2 -2 2 9-2" 7 Ric Ba be 09 28 2 87'-4" ied. 41?1 Z 0- A, Expires V31/2026 ROOF T.O. PLATE 2 4" 0' Ha FLOOR PLAN LEVEL Ll 0,1 1 1 �4' 8' 16' SCALE: 1/8" 1'4' —LEVEL L2 10'-4" mill ME LEVELL1 www .............. u-0 901-01, FRONT COLOR ELEVATION 0,1 1 1 �4' 8' 16' 87f4ff -4ff- moll SCALE: 1/8f'=1'4' ---JL > > K > < > El K E1 > BEDROOM BEDROOM BEDROOMo < > > ------------- ---------- < < > > < > < > L > < > < BEDROOM BEDROOM BEDROOM C? C? co ZtD < ED co < co < < ROOFT PLATE < < 2u- UNIT TH3 /,A/\A,,.)====, /�AAA UNIT TH3 UNIT TH3 ----------------N M< > < > ti BEDROOM < > BEDROOM BEDROOM < it t < ------rn LEVELL2 A A I 1 7 7777l777rr\7 10'-4" "i---------- ------- USCREEN WALL ----------------- LEVEL Ll .......................................... 60FLOOR PLAN LEVEL L2 10,1 1 1 �4' 8' 16' 1 — SCALE: 1/8" 1'-0" 0REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' � SCALE: 1/8" 1'4' - - - - - - - - - - - - r- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - 5" 12" 5" 12" �j) �Q�l 04 �Gj I E]j) Pjj 5" 12 1 1 F 5" 12" 5" 12 ROOF T.O. PLATE ROOF ROOF T.O.PLATE_4� 20_4� LID 5" 12" 5" 12" r. LO - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL L LEVELL 1 0,_ 10'-4 4 C\1 5" tr C\1 04 -0 LID USCREEN WALL sa LO 7 0 6'SCREEN WALL - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL Ll LEVEL Ll ——----------- 01 01 �............ RE-ZONING SUBMITTAL -206 -HT,. COL,OR.'ELEVATION 0,1 1 1 �4' 8' 16' DATE: SEPTEMBER 28,2023 ORB #: 23 ROOF PLAN 0,1 1 1 �4' �8' 16' LEFT COLOR ELEVAT 0,1 1 1 �4' �8' 16' RIG -1 moll MEW 4 . .. ....... 3 SCALE: 1/8" l'-O" SCALE: 1/8" 1'-0" SCALE: 1/8" 1'4' .............. 4a L -L---' F-1 L mill BUILDING TYPE 5 COLOR SCHEME 1 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" CG ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW 383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------ — ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW FRAMECOLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDSDE6378 JET .0 ---------------------------------------------------------------------- .1� I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" (3�znqv'2� .-------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com cD_\g,EDCyz F1 C 4;4 Ric Barbe 09 28 2 T ned. Zo A, Expires 3/31/2026 pW` ROOF T.O. PLATE 2 _4 —LEVEL L2 10'-4" LEVEL L1 wwww"M FRONT COLOR ELEVATION 0,1 1 1 4' �8' �16' MENG SCALE: 1/8" 1'4' F ROOF T.O. PLATE -——------- NONE= 20'-4" . .... .... ........ c. t 2, ........ ....... ............ 7................. .......... ....... ........ ................... LEVELL2 1 U-4- 6'SCREEN WALL LEVEL Ll 01 REAR COLOR ELEVATION 0,1 1 1 4' �8' 16' SCALE: 1/8" 1'4' 10 ; ROOF T.O. �20T Now= T.O.0 PLATE 4� 20_4� {Ilia .................................... ................... ........... ............... y. ......... LEVEL L2 LEVEL L2 10'-4" 10'-4" 6'SCREEN WALL 6'SCREEN WALL LEVEL Ll LEVEL Ll 01-01, 01-01, RE-ZONING SUBMITTAL 6-206 16' H T, 0,1 1 1 �4' 8' DATE: SEPTEMBER 28,2023 ORB #: 23 0,1 1 1 �4' �8' 16' RIG COLOR LEFT COLOR ELEVATION`,_ ' ' I ' ll , 1 -1 40 . ....... 3 SCALE: 1/8" l'-O" SCALE: 1/8" 14 • .............. BUILDING TYPE 5 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" cC ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD r2 C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 N3.64�F DE6212 "CRISP MUSLIN" MEMO:] ,*Vr ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch 1164" DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS --------------DE6215 "WOODEN PEG" —-—------------------------------------------------------------------------------------------------ El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS -----—------- ----------- ---------------------------- > DE6378 "JET" > ---------------------------------------------------------------------- ------ I ____]_METAL TO-BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" < J ME L FA CIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 < World HQ@ORBArch . com < F-7— < < < < �,7�71 < 43 000 000 r4 C? 0 0 0 0 0 0 3 < \A3.64,-r < > > < NA3.64a cD 0� > C�l C-� > < (j) bo bo > 80 80 > < > 10f-7ff 10'-T 101-T 10'-T Ric Barbe GARAGE - GARAGE- GARAGE - GARAGE - < 28 ?' 2 K < UNIT TH3 UNIT TH3 UNIT TH3 UNIT TH3 < I—01-1-11 7 —ROOF T.O. PLATE Expires 3/31/2026 20'-4" < 7=7�71 IIAIAA 1��Av,-- 29--0" 29'-0" 29--0" 29'-0" LEVEL L2_�� 116'-0" 10'-4" i i�i N iii RE imm; LEVEL L 01 FLOOR PLAN LEVEL L1 O'l 1 1 �4' �8' 16' SCALE: 1/8" l'-O'f FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' SCALE: 1/8" l'-O" 118'-8" 4 1'4' 116'-0" oe _;00 1 ;00 r --—----------- 71 < 1# OF 1 �c F 1 1 BEDROOM BEDROOM BEDROOM BEDROOM < < ------------------ < LL ROOF T.O. PLATE > 777 BEDROOM BEDROOM BEDROOM BEDROOM C? > < -4" > K > 20' co C:) W-1 co > > [Ell < > UNIT TH3 UNIT TH3 UNIT TH3 UNIT TH3 < > F__ > BEDROOM > BEDROOM BEDROOM BEDROOM < LEVEL L2 >1 > < 10'-4" 1 > < > > > < I > < USCREEN WALL > AAA/\A/\A/\A7771� VA/\A/�A4AAA iffl w LEVEL Ll w FLOOR PLAN LEVEL L2 0,1 1 1 �4' �8' 16' REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' NOME SCALE: 1/8" l'-O" SCALE: 1/8" 1'-0" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - = I J F 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5" 12" 5" 12" LO LO 5" 12" 5" 12" LO ROOFTO,PLATE_&� ROOFT.Q.-PLATE 20'-4" 20'-4" 5" 12" C\j 5" 12" 7: LO 5" 12" 5" 12" C14 cli - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --------------- LEVEL L2 —----- LEVEL_L2_A 10 10'4" 5" 12" 5" 12" 6'SCREEN WALL C\1 LO LO LO FSCREEN WALL L- - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L- - - - - - - - - - - - - - - - - --1 7, LEVEL Ll LEVEL L I ERR, 0, T= 0, 01 9 Al I RE-ZONING SUBMITTAL "P') ROOF PLAN 0,1 1 1 �4' 8' 16' LEFT COLOR ELEVATION 10,11114' 18, 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' 8' �16' DATE: SEPTEMBER 28,2023 ORB #: 23-206 No$ E_ MCI 70 40] 30 SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' 2, BUILDING TYPE 6 COLOR SCHEME I mmmmic r GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------ — ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS Q ---------------------------------------------------------------------- -1� I ____]_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" (3�znqv'2� . -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com _\g,ED ARC�IZ (j) 9- C 1 13 Ric Barbe 28 2 ned. - 41? ........... IZO A, ROOF T.O. PLATE_�� ------------— Expires 3/31/2026 20'-4" .......... _LEVELL2__�� 10'-4" LEVEL Ll 7777777-7--- .. ................ 7,­,�TX� 01-Oi FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' SCALE: 1/8" l'-O" —------------------------------ ................:L............................ ............... ............ ROOF T.O. PL 2�T 0 _4 ................... ......... ...... ................................... ............ ........... cli ......... ..................... .......... ......... ............... LEVE� L 10�4� 6'SCREEN WALL HE LEVEL Ll f TGRAMM; .... .......... 01-01, 0,1 1 1 �4' 8' 16' REAR COLOR ELEVATION SCALE: 1/8" 1'-0" i f 1 gii MEMO —ROOFT.O. PLATE ROO F-T.0,PLATE 20'-4" 20'-4" g, I........... .......... ............ 7 v 7� L, ............................................... .......... 04 04 LEVEL_L2__A-,\, —----- LEVELL2_�� 10'-4" 10'-4" 6'SCREEN WALL FSCREEN WALL E, T-111 ......... LEV%�L 01 LEVEL Ll 0-0 RE-ZONING SUBMITTAL 0 - LEFT COLOR ELEVATION 10,1 1 114' 18, 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' 8' �16' DATE: SEPTEMBER 28,2023 ORB #: 23-206 4jE_ SCALE: 1/8" l'-O" 30 SCALE: 1/8" 1'4' BUILDING TYPE 6 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" cc, ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------­------— ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- 2 F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- 3.74 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" 334' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 DE6378 ---------------------------------------------------------------------- I ______METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com [(:—Dl 10-1 Ns Li Ll Li ------------- > > 0 0 1 13 < Ric Barbe < 28 2 F < ned. < < 0 A, I> < Expires 3/31/2026 < r4 N%, �< C? 3 �0 �< \A3.74 < "kA3.74af >1 < > < > UNIT TH1 UNIT TH1 < > v > < > < C F F 1 > < > < > < > < A �,AAAA- -*��---------- ROOF T.O. PLATE NMI 20'-4" 16-5 1/2" 16-5 1/2" oe oe Nonni[] 32'-11" -/r----------------------------—------------------------------------------------------------- ZA_ -LEVELL2 10'-4 \A3.74al FLOOR PLAN LEVEL L1 10, 14' 18, 116' r........ —LEVEL�--� 0 01 SCALE: 1/8" l'-O" FRONT COLOR ELEVATION 0,1 1 1 �4' 8' 16' A mmmEl -0" 35-7 SCALE: 1/8" 1' 4 1'4` 32'-11" F 1 1 E110 Id Id ID 31/� ROOF T.O. PLATE < 20'-4" AIN < < co < cli co ZD UNIT TH1 UNIT TH1 LEVELL2 A I < 10'-4" > BEDROOM BEDROOM < > < > < < < < ........ 7 77777777= < 6'SCREEN WALL Lij LEVE L 01 FLOOR PLAN LEVEL L2 10, 14' 18' 116' REAR COLOR ELEVATION ul 1 1 �4' �8' 16' MENU SCALE: 1/8" l'-O" SCALE: 1/8" 1 1-01, r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - 5" 12" 5" 12" �b J) OF 1 1 5" 12" 5" 12" Lr) L0 NONNI5" 12" 5" 12" ROOF T.O. PLATE ROOF T.O._PL T 20'-4" _4� M C.0 CN LO LO LEVEL L2 LEVELL2 �1�0�4� 10'-4" 5" 12" 5" 12" 6'SCREEN WALL - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - - F"F`-7 T L T- .......... LEVEL Ll 77=777 ........... vmr RE-ZONING SUBMITTAL u DATE: SEPTEMBER 28,2023 ORB #: 23-206 A . 74a ROOF PLAN 10, 14' 18' 116' LEFT COLOR ELEVATION 10,11114' 18' 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' �8' 16' 30 SCALE: 1/8" l'-O" SCALE: 1/8" 1'-0" SCALE: 1 BUILDING TYPE 7 COLOR SCHEME I mmmmic 00 GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" CCII ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------ — ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS ---------------------------------------------------------------------- I ____]_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com cD_\g,�D__Cyz �1 C 1 13 Ric Barbe 28 2 ned.. Zo A, Expires V31/2026 ... ........ ......... .......... ROOFTO._PLATE_�� ..............----—-------- ........... 1 11 20-4 ........",= 1,11;'N' .......... mop_ ........ ..... ............... LEVEL L2' —LEVELL1 ............... .......... 01-01, FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' -0" SCALE: 1/8" 1' F —--------- ROOF T.O.-PLATE 20'-4" .... ............... LEVELUA 10'-4" FSCREEN WALL LEVEL Ll 01-0" REAR COLOR ELEVATION ul 1 1 �4' �8' 16' SCALE: 1/8" 1'4' F ROOF T.O. PLAT�_�� ROOF T.O. L�T� _R 20,_4 20_4 _77, 7 .......... . ...... C.0 ...... ................ LEVE L LEVEL L2 0'4� 10'-4" 6'SCREEN WALL E, LEVELL_1_�� LEVELL1_& RE-ZONING SUBMITTAL 01 DATE: SEPTEMBER 28,2023 ORB #: 23-206 (N A 074 LEFT COLOR ELEVATION 10, 14' 18' 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' �8' 16' � 4) 30 SCALE: 1/8" 1'-0" SCALE: 1/8" 1'-0" BUILDING TYPE 7 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE ------------ ---------------- ------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------- 1 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 1"DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" —-------------------------------------- C1 STUCCO FINISH DUNN EDWARDS ------------------------------ -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" ---------- ------—-—-------------------------------------—----------------------------------------------------------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 54'--4 G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND-------------------------------------------- H GARA­G__E_D_0OR­TO-BE PA—INT—ED­F1NIS_HDU­N­N ED—WARDS------------------------ .0 DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" 1 101 ------------------------------------------------------------------------- World HQ@ORBArch . com _\gED ARC1,11 -\UICAT 1 13 Ric Barbe T_ 28 2 ned. 7 __7 F > F—T— —T7 < Zo A, > < r4 4 < Expires 3/31/2026 > < > >1 00 1< 'NA3.84a/ 'A%.K C-) < < >1 �< > V 114r, \A3.84; 0 1 YA3 zC? J IL < < >1 _A�� < > < i F 1 1 > UNIT TH2 UNIT TH2 UNIT TH2 t A A ROOF T.O. PLATE 20'-4" 16-11/2" 181-01, 18'-11/2" ----------------- —------------------ ------------------- 54'-3" ------------------------------------ --------- —------------------------------ CN LEVEL L2_ 10'-4" FLOOR PLAN LEVEL L1 10, 14' 18, 116' _LEVELL1 F] El SCALE: 1/8" 1'-0" FRONT COLOR ELEVATION 10, 14' 18, 116' MEMMMME-1 SCALE: 1/8" l'-O" 56-11" 54'-3" 14' ...............---------------------------------------------------------------------------------------------------------------------------- -- ---------------------- F1 --------------- ---- ---------- n ­777- 1-77 > > F > BEDROOM > BEDROOM BEDROOM > IN ROOF T.O. PLATE 29-4 co 77 7\ UNIT TH2 UNIT TH2 UNIT TH2 lk -A Ed I== < LEVEL L2 BEDROOM 7 BEDROOM BEDROOM < �x > �x 6'SCREEN WALL v �x --------- LEVELLI__�� 01-01, 60 FLOOR PLAN LEVEL L2 10, 14' 18' 116' REAR COLOR ELEVATION 10,1 1 114'', 1'81' �1'6'1 ... SCALE: 1/8" 1'4' 2 SCALE: 1/8"=1'70"' ........ .... - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - 5" 12" 5" 12" 5" 12" 5" 12" LO ROOF T.O. PLATE ROOF T.O. L�T 20'-4" 20_4� Apr 5" 12" 5" 12" . . ....... . ....... C14 LO LEVEL L2 LEVEL L2 10'-4" 10f-4" 5" 12" 6'SCREEN WALL 5" 12" - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - b'SCREEN WALL L - - - - - - - - - - _ _ j -------------------- - - - - - - - - -LEVEL Ll LEVE,�L 0 RE-ZONING SUBMITTAL EMEME] DATE: SEPTEMBER 28,2023 ORB #: 23-206 CX BLDG TYPE 8 ROOF PLAN 10, 14' 18' 116' -1 LEFT COLOR_-ELEVATION 10,11114' 18' 116' RIGHT COLOR ELEVATION 10,11114' 18' 116' moo-] MM071 70 SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' 0� A UNIT TH2 BUILDING TYPE 8 COLOR SCHEME I mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE ------------ ---------------- ------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------- 1 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" cc, SEC OF S. GOLDFIELD RD AND A BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 __"COOL DECEMBER" —-------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS ------------------------------ -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" ---------- ------—-—-------------------------------------—----------------------------------------------------------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CON-CRETE ROOF-TIL-_ES "AVON-_DALE B-LEND------------------------------------------- H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 --'-'JET" ——-—--------------------------------------------------------------------- World HQ@ORBArch . com g,�D__Cyz _\�l C 1 13 Ric Barbe 28 2 ned.. - Zo A,\� Expires V31/2026 i F ............ ........... ROOF T.O. PLATE 20'-4" -----LEVEL L2 ..I........ LEVEL Ll 0'-0" FRONT COLOR ELEVATION 10, 14' 18, 116' SCALE: 1/8" l'-O" F 1 1 ME ......... ROOF T.O. PLATE C14 LEVEL L 10,_ 4 USCREEN WALL LEVEL Ll 01 10,1 1 1 14'� 1 8' 16' REAR COLOR ELEVATION SCALE: 1/8"=1'70" ........ .... i F ROOF T.O. PLATE ROOF T.O. PLAT 7 U_�� �L� 2 _4 ........ 20-4� "Y F_ C14 ............ Z, ................ LEVE L LEVE L 1 0� 4� 1 0� _4� 6'SCREEN WALL 6SCREEN WALL LEVEL Ll LEVEL Ll \------- ---- ------ 01 -0. RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 10, 14' 18' 116' 10,1 1 114' 18' 116' LEFT COLOR-ELEVATI-ON RIGHT COLOR ELEVATION 4) SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" BUILDING TYPE 8 COLOR SCHEME 2 GOLDFIELD EXTERIOR FINISH SCHEDULE - ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- BTR Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND /0'2 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 ---------"COOL DECEMBER" ----------------------------------------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 96-Y DE6212 "CRISP MUSLIN" MEMO:] 00� 39'-11 564" D1 STUCCO FINISH DUNN EDWARDS ot Ri ry L -------- DE6376 "LOOKING GLASS-" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" > < El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" < E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" < < F VINYL WINDOW FRAME COLOR BLACK < ----—------------------------------------------------------------------------------------ G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" /T!ml ------------------------------------------------------- I"fi A H ----------- AH < —----------------——---------------------------------------------------------- A H < H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 DE6378 "JET" COMMUNITY FLEX SPACE < OFFICE FR I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE T-" H "JET" < ----------- ----—---------------------------------------------------------------------------- < World HQ@ORBArch . com < LEASING CY/ ------- \cD 9- CLUBHOUSE T.O. ROOF K. . . . . . . < BREAK ROOM < 22'-10" K < < < 1 13 oK < < Ric Barbe a >�(0 < < >< K < 28 2 MECHANICAL K STORAGE OFFICE < < > < < > Y-A < ed. < �O4 zo- < A, > < < Cf Epims 3�il/2026 < 3 co < CLUBHOUSE T.O. PLATE < 7< Cp < < MAINTENANCE < CLUB ROOM < LEVE < 77777' < FITNESS BUSINESS 77777 CENTER > IL < O'l 1 1 4' 8' 16' > < > CLUB HOUSE FRONT ELEVATION > EMNE] > SCALE: 1/8" 1%0" 77< U? CLUBHOUSE T.O. R 22�9 UBHOUSE T.O. PLATE'' 1 V-6" 0,1 1 1 �4' 8' 16' CLUB HOUSE FLOOR PLAN 11�,VIVIVIVIVIVIV E] SCALE: 1/8" l'-O" LEVEL Ll ............... 0 011 OPEN 4" 12" 4" 12" 0,1 1 1 �4' 8' 16' F - --1 CLUB HOUSE BACK ELEVATION L - -1 SCALE: 1/8" 1'-0" L - - - - - - - - -j CLUBHOUSE T.O. ROOF 4" 12" 22'-10" ---------------- CLUBHOUSE T.O. PLATE_Au-� 1 V-6" 4" 12" LEVEL Ll ............. o,-o,, 4" 12" CLUB HOUSE RIGHT ELEVATION 0,1 �4' 8' 16' C3)F-1 El SCALE: 1/8"=1'-0" J CLUBHOUSE T.O. ROO T - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - T - —J�� 22'-10" (h 4" 12" 4" 12" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - CLUBHOUSE T.O. PLATE 1 V-6" L - - - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - ........... RE-Z NIN UBMITTAL LEVEL Ll 01 DATE: SEPTEMBER 28,2023 ORB #: 23-206 CLUB HOUSE ROOF PLAN 0,1 1 1 �4' �8' 16' 6 MENU OPEN - SCALE: 1/8" 1%0" A 0,1 1 1 �4' 8' 16' CLUB HOUSE LEFT ELEVATION C4) SCALE: 1/8" 1'-0" CLUBHOUSE mmmmlu GOLDFIELD EXTERIOR FINISH SCHEDULE ------------------------------------------------------------------------------------------------------------------------ Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND — '-'COOL-DECEMBER" ——-—-----—--------------------------------------------------------------------------- RESORT BLVD Cl STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] Dl STUCCO FINISH DUNN EDWARDS Z 28'-0" -T_-7/ DE6376 "LOOKI NG_GLASS"------------_ ot Pd Ch _//----------------------------------------------------------- ----------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK --------------------------------------------------------------------------------------------- Gl FLAT CONCRETE ROOF TILES "SIERRA MADRE" ——-—-- --------------------------------------------------- Ns Ll G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" > S T, TORAGE: E6378 "JET" > I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" > J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 r4k-N > /3 11JET'v < < -—----------------------------------------------------------------------------------------- \A3.14 > --------------------—-------------------;.I —----- N3.14al W o r I d HQ@ORBArch . com > C? > < > > GARAGEN' GARAGE F7- GAUGE -\�?,ED A C,�l \cD - //� I CAT 1 13 Ric Barbe 0 28 2 S1 ned. Z 0-A, MAi 71 :2 Expires 3 31 2026 34'-3" - -------------------------------------------------------------------------------------------------------------------------------- Emmou 50 FLOOR PLAN — LEVEL Ll o'l 1 1 �4' 81 16' SCALE: 1/8" l'-O" 36-T /--------------------------------------------------------------------------------------------------34'--3" IF EMEND. > > BEDROOM ROOF T.O. PLATE ROOF T.O. PLAT�� 20,_4 20'4" X cl?) cli oq > < zo > (D < C4 oli > < > UNIT C LEVEL L�� LEVEL L2 0, > < _4 > 10'-4" > < > C�l > 6'SCREEN WALL > > < > > 1A LEVEL Ll LEVEL Ll ---------- A/\AAA�� ol ---- —------- FLOOR PLAN LEVEL L2 o'l 1 1 �4' �8' 16' REAR COLOR ELEVATION 10,11114' 18' 116' FRONT COLOR ELEVATION o'l 1 1 �4' �8' 16' 2 SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" - - - - - - - - - - - - - — — — — — — — — — — — — — — — — — — — — — — — — Lo F 1 5" 12" MY 5" 12" 5" 12" ROOF T.O. PLATE --ROOF T.O. PLATE .4 20'-4" 20'-4" Lo zo LEVELL.2 LEVELL.2_&,� 1 0'4"__5� 10'-4" 6SCREEN WALL �5" 12"_ 5' 12" L — — — — — — — — — — — 71111 titz"21 Z4, LEVEL Ll LEVEL Ll o,-o,, 0'-0" ROOF PLAN o'l 1 1 �4' �8' 16' LEFT COLOR ELEVATION 10,11114' 18' 116' RIGHT COLOR ELEVATION 10,11114' 8' 16' C7 =ONE] mmc OEM[I 40 SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 . 1 4a BUILDING TYPE I COLOR SCHEME I mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE ------------------------------------------------------------------------------------------------------------------------ Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND — '-'COOL-DECEMBER" ——-—-----—--------------------------------------------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" ot Pd ry 7- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK —--—--------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ——-—-- --------------------------------------------------- -G2--FLAT-CONCR-ETE-ROOF-,TIL-ES "AVONDALE-BLEND I------------------------------------------------------------ H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .0 I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 11JET'v -—----------------------------------------------------------------------------------------- World HQ@ORBArch . com cD_\g,�D__Cyz �1 C 1 13 Ric Barbe 28 2 ned.. Zo A, Expires V31/2026 INS IN ROOF TO� PL�T ROOF T.O. PL�T 20,_4 LEVEL L LEVE�L� 10_4 10 4 6'SCREEN WALL LEVEL Ll_&� LEVEL Ll 01-01, REAR COLOR ELEVATION 10, 14' 18, 116' FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' 11 =SEC SCALE: 1/8 -01, SCALE: 1/8" 1'-0" ROOF T.O. PLATE' ROOF T.O. PLATE__�� 20'-4" 20'-4" -LEVEL_L2-._& LEVELL2_& 10'4" 10'-4" 6'SCREEN WALL LEVEL Ll LEVEL Ll ----------- �7""1 0, -0" ­----------- 01-01, \__w RE-ZONING SUBMITTAL EMEME] 10, 14' 18' 116' ul 1 1 �4' 8' 16' DATE: SEPTEMBER 28,2023 ORB #: 23-206 LEFT COLOR ELEVATION RIGHT COLOR ELEVATION 30 SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' * 14 BUILDING TYPE I COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR -------------- —------ ---------------------------------------------------------------------------- 00 A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 2 -------------- DE6_2_12-"CRISP M­_USLIN"_,_________ MEN(:] 3.24 D1 STUCCO FINISH DUNN EDWARDS ry 7- DE6376 "LOOKING GLASS" 88'-8" D2 STUCCO FINISH DUNN EDWARDS ot P DE6215 "WOODEN PEG" ---------------I-—------------- ---------------------—-------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---- ------- -------------------------------- .___E2__,_CORONA_D.0---STONE BRICK VENEER-COLOR-"BEAR-C-REEK-------------------------- 0 F VINYL WINDOW FRAME COLOR BLACK ------------ —------------------------------------------------------------------------------------------------------ G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" (D 1(_D1 (D] 1(D G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" Ns Ll Ll __ Ll Ll- Ll H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS �V\j !7= < > < < -------------- ---------------------------------------------------------------------------------------- > < < I �METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" > < ....... ------------------- > < J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 > 'vJ ET11 > r World HQ@ORBArch . com > < > k_j J_ < < < < > < *4 \6, > I< ,E ARC�,l C? > < �D > < cl) E�] C) D D 3 9�_ \A3.24aF < < < N3.24af < 1 13 < Kic arn 6 28 2 < UNIT TH2 UNIT TH2 UNIT TH2 UNIT TH2 UNIT TH1 < ned. < < 70 A, Expires V31/2026 LU NI LO j .0. PLATE 7777777fW/77777 r\/­A/-A 20'-4" ON xx 18'-2" 11,4, 18,4' 16'-6" le-—--------- --------- 88'-8" cli LEVEL L2 10'-4" mop- 10, 14' 18, 116' LEVEL Ll FLOOR PLAN LEVEL L1 ........... C5D - \_w SCALE: 1/8" l'-O" FRONT COLOR ELEVATION 0,1 1 1 �4' 8' 16' SCALE: 1/8" l'-O" 1'4' .91'4-" 88'-8" ---------------- 1­1 Ar > I A A A I I < BEDROOM BEDROOM BEDROOM BEDROOM I> > > /\j > /\j > 14 ----- ----- ---- -- - ----- ----- > < ROOF TO.__PLATE > < > 20'-4" < > c:) < co > < < < UNIT TH2 UNIT TH2 L UNIT TH2 UNIT TH2 Ll UNIT TH1 < 1 7 < -- ----LEVELL2__ BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM < 101-4" < ------------ >> AAA K AAAAAA_ 77 77 A 777= AAA 6'SCREEN WALL .............. LE�L ................ 01 FLOOR PLAN LEVEL L2 10, 14' 18, 116' REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' 601-1 1111111111111MOG] SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" — — — — — — — — — -- — — — — — — — — — F — — — — — — — — — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5" 12" 5" 12" 5" 12" 5" 12" - - - - - - - - - - - - - - LO I LO 04 0 C'4 1 LO LO _j 5" 12" 5" 12" ROOF T.O. PLAT' ROOF T.O. PLATE 2 0,_ 4 20'-4" =t cli cli L —LEVEL L2 10�4� 1_V4�_� 5" 12" 5" 12" 5" 12" 5" 12" 6'SCREEN WALL - --------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - L - - - — - - - - 6'SCREEN WALL E NO LEVEL Ll ------------ ------LEVEL Ll _5� 01-01, b-0 RE-ZONING SUBMITTAL -P DATE: SEPTEMBER 28,2023 ORB #: 23-206 0,1 1 1 �4' 8' 16' ROOF PLAN 10,11114' 18' 116' LEFT COLOR ELEVATION 0,1 1 1 �4' �8' 16' RIGHT COLOR ELEVATION El 70 40 11-01, �3) A . 24a SCALE: 1/8" l'-O" SCALE: 1/8" SCALE: 1/8" l'-O" BUILDING TYPE 2 COLOR SCHEME I mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR -------------- ------- ---------------------------------------------------------------------------- CC A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 --------------_DE6_2_12-"CRISP M__USLIN"_,_________ MEN(:] D1 STUCCO FINISH DUNN EDWARDS ry 7- DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS ot p ---------------_DE621__5___"WO_ODEN_ ---------------------—-------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---- ------- -------------------------------- .___E2__,_CORONA_D.O---STONE BRICK VENEER-COLOR-"BEAR-C-REEK-------------------------- 0 F VINYL WINDOW FRAME COLOR BLACK —------------------------------------------------------------------------------------------------------ G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 --------------_DE637_8 "JET" —-——------------------------------------------------------------------------------------------- I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 11JET'f ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 'vJ ET11 World HQ@ORBArch . com cD_\g,�D__Cyz �I C 1 13 F Ric Barbe 0 28 2 ned. Z 0—A, Epims 3�31/2026 ...... IS W ROOF T.O. PLATE ...... 20'-4" 17, .. .............. .......... cli LEVEL L2 10'-4" 0,-o,, \_pF FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' mmmu SCALE: 1/8" l'-O" ................. ROOF T.O. PLATE ...... .. .......... .......... 29- ......... ............................ cli ......... ............. —- ----- ...... LEVELL2 10'-4" 6'SCREEN WALL LEVEL,L__�� --------------- 0_01 lr._� REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' MENU 2 SCALE: 1/8" l'-O" ROOF T.O. L�T ROOF T.O. PLATE 20_4� �04"-� cli cli LEVEL L LEVEL L� 10 0,_4 4� 1 USCREEN WAL -7­­�: 6'SCREEN WALL LEVEL Ll LEVEL Ll 01-o" -01, RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 0,1 14' 81 16' 0,1 1 1 �4' 8' 16' LEFT COLOR ELEVATION r,,� RIGHT COLOR ELEVATION =ONE] OEM[I SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" 024 � 4) BUILDING TYPE 2 COLOR SCHEME 2 mmmmic EXTERIOR FINISH SCHEDULE GOLDFIELD 2 134 Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND 87'4" A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" ot Pd Ch 1(DI 01 0 D2 STUCCO FINISH DUNN EDWARDS L-i DE6215 "WOODEN PEG" ---—---------- — ----- ——---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" -- -------------------------- F VINYL WINDOW FRAME COLOR BLACK > ------- < ------------------ —----------------------------------------------------------------------------------------------------- > < G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" >P�� < 0- > < > < G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" > > < 'N > F > 7 < > < H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS > < I < > K < ---------------------------------------------------------------------- K > 000 < "NA3.34al I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" < (3�znqo�2� >1 Y. 3 DE6378 "JET" r4 0 C? > \A3. ZD > K > < -------- ------------------- co > K = > 0 < J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 ,< C�j C11j > < bo > Co < t GARAGE GARAGE > LLL GARAGE >> "JET" > World HQ@ORBArch . com 10'-T 10--T > 10'-T > 1�0 III-' �.L- 0 0� /> > A < > > > UNIT TH3 < I > UNIT TH3 UNIT TH3 < > < > > < > > > D > > CD < I C r777771i X I Iii - J�j b- 1 13 Ric Barbe 77 77 ---------- 2-� 0 28 ROOF T.O. PLATE _20'4" ned. /Zo A, 29'-2" 29'-0" 29'-2" /——-————-----------------------—— —------- ------- ..................................................... Expires V31/2026 87'4' ------------------------------ ------- --------------------------------------------- LEVEL L 10,_ 4 FLOOR PLAN LEVEL Ll 0,1 1 1 �4' 18' 16' LEVEL Ll F 0, SCALE: 11811 1 I-Of, FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' mmmmmw_l SCALE: 1/8" 1'-0" 901-01, —--------------- 1'4' 1'4 —----------------------- �O ml­-JF_-��-_----_-��-_-�� F---JL -11 ___11 EEI > > > LE] 1 F 1 BEDROOM BEDROOM BEDROOM '71 > ROOF T.O. PLATE 20'-4" 1 7= BEDROOM BEDROOM BEDROOM C? ZtD > co > > A A A A > UNIT TH UNIT TH3 UNIT TH3 > < > < > < > < > > < > < > < —LEVEL L2 BEDROOM < >> BEDROOM < > BEDROOM < 10'-4" 6A7=� ^7r^7A/\777^/,A 4,A A < ----/A\^AAAAA 4.- 6'SCREEN WALL ---------- LEVEL Ll 01-01, FLOOR PLAN LEVEL L2 0,1 1 1 �4' �8' 16' REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' 06 -.-- mw�] 2 mmou SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5" 12" 5" 12" LO LO C14 Lr) Lr) NNI ; EM I L ROOFT.O. PLATE O.-PLATE 20'-4" 20'-4" 01 LO LO ............ L? I? - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL L2 _LEVELL2 I 1 10'-4" 1 5" 12" 5" 12" 5" 12" 5" 12" 5" 12" C14 -0 0- ------ 6'SCREEN WALL LY LO LO L - - - - - - - - - - - - L - - - - - - - - - - - - - - - - -- L - - - - - - - - - - - - - - - - - - -T, LEVEL_�j LEVELL1 ......................................... ................­1 ­--­_­­---7..........7............ 0 0 . ...... "'711 , E-7 771"", 0 0�11 LEFT COLOR ELEVATION 10, 14' 18, 116' r.,� RIGHT COLOR ELEVATION 0,1 1 1 �4' �8' 16' O'l 1 1 �4' 8' 16' ROOF PLAN RE-ZONING SUBMITTAL SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' DATE: SEPTEMBER 28,2023 ORB #: 23-206 4a BUILDING TYPE 3 COLOR SCHEME I mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 SEC OF S. GOLDFIELD RD AND "COOL DECEMBER" -------------- ------------------------------------------------------------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS DE6376 "LOOKING GLASS" ot Pd ry 7- ------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" ............ ---——-- ---- ------------------------------------------------------------------------ G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND----------------------------------------------------------- H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" .0 I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 --------------1--l#J-E-T'#--.-----------------------------.------------—---------------------------------------------------------------------------------- World HQ@ORBArch . com bO I i H i I _\g,�D —ARcl,, I CA T 1 13 Ric Barbe ROOF T.O. L�T� 28 2 20_4 ied. Expires 3/31/2026 LEVEL L2 10'-4" LEVEL Ll -I `7 7�`,' I TAGNORTEM 01-01, FRONT COLOR ELEVATION 0,1 1 1 �4' �8' �16' --- mmmmmW] SCALE: 1/8" 1'-0" J F ROOF T.O. PLATE 20'-4" km ............ ......... ............... �Z ..........�,44 77� ............... _7=7 ........... 77, ................... LEVEL L2 10'-4" 6'SCREEN WALL LEVELL1 NEW ............__7...... 01-01, REAR COLOR ELEVATION 0,1 1 1 �4' �8' �16' SCALE: 1/8" l'-O" ------------ ----- ------------------- ROOF 7.0._PLATE_5� ROOFT.O.-PLATE ",""M N 20'-4" 20'-4" .............................. ..... 17� ......... ........ .. .......... .. ........ .................. ........... I? cli .. ... C\j _LEVELL2__�� _LEVELL2 10'-4" 10'-4" 6'SCREEN WALL "I........... 11111­11�1­1�.............i-, LEVEL Ll LEFT COLOR ELEVATION 10, 14' 18, 116' r.,� RIGHT COLOR ELEVATION 0,1 1 1 �4' �8' �16' RE-ZONING SUBMITTAL SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' DATE: SEPTEMBER 28,2023 ORB #: 23-206 BUILDING TYPE 3 COLOR SCHEME 2 mmmmic r J-1 GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND ---------------- ----------------------------------------------------------------------------------- A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- 58'-0" G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" ;�; H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" ---------------------------------------------------------------------- I _____I_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 Li (D Li 01 Li "JET" World HQ@ORBArch . com > �D I C A T 9- 0 > < ?JO— > < < 1 13 < Ric Barbe > < LLL 0 28 2 > ned. < < /3--'\ F —LJ\ 1 'ql?IZO A,\�-'�' r4 0 < C:) > co > < N3.44al Expires 3/31/2026 < \A�3.44 GARAGE = GARAGE = < > K 0� C-� > > K > > > > > UNIT TH3 > UNIT TH3 < > > > ROOF T.O. PLATE > 20'-4" > > I? In cli LEVELL2,_�� 10'-4" 58'4" Wm LEV L ------------------ ........................ R I——_1.1_.__1.,___­'­'­­ 01 FLOOR PLAN LEVEL L1 10, 14' 18, 116' 5 SCALE: 1/8" l'-O" ---- FRONT COLOR ELEVATION 10, 14' 18, 116' SCALE: 1/8" l'-O" 61'-0" '4" 58'4' 14" -- ------------------------------------------------------------------------------------------------------------------------ ----------------------------------------------------------------------------------------- ------------------------------------------------------------------ 0�_ f—-------t/�� ----------------- 1 1 F 1 F > < > > < > BEDROOM BEDROOM < > > < > > > K > ROOF T.O. PLATE > 20'-4" > r._ > BEDROOM BEDROOM C? > > > K > K > < > < > LEVELL2 > 0__�� > '4� > < > < > UNIT TH3 UNIT TH3 < > > BEDROOM BEDROOM > > USCREEN WALL > ----LEVEL Ll > > FLOOR PLAN LEVEL L2 10, 14' 18' 116' REAR COLOR ELEVATION 10,11114' 18' 116' C6j SCALE: 1/8" l'-O" NEWC SCALE: 1/8" l'-O" - - - - - - - - - - - - - - - - - - - - - - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — N LO N N N LO ROOFT.O. PLATE _ROOFT.O. PLATE 2 4" 4" 0' 20' L? L? 10 10 04 04 ___LEVEL_L2 —-- ----- —LEVEL L2 10'-4" 10'-4" - - - - - - - - - - - - - - - - - - - - - USCREEN WALL 5" 12" 5" 12" 5" 12" 5" 12" FSCREEN WALL Hli LEVEL L LEVEL Ll —11 SIN 01 -01, 01-0 L - - - - - - - - - - - - - - - - - IL - - - - - - - - - - - - - - - - - Li Lj ROOF PLAN 10,1 1 114' 18, 116' LEFT COLOR ELEVATION 10,11114' 18, 116' RIGHT COLOR ELEVATION 10,11114' 18, 116' RE-ZONING SUBMITTAL 40 SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' DATE: SEPTEMBER 28,2023 ORB #: 23-206 A . 44a 7� BUILDING TYPE 4 COLOR SCHEME I mmmmmmu GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOI IS PANEI C,01 OR DI INN EDWARDS DET600 BTR "DOLPHIN TALES" 2C, ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------­-------— ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 ---------------------------------------------------------------------- .1� I -][METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com cD-\g,�D­Cyz �1 C 1 13 Ric Barbe 28 2 ZO A, Expires V31/2026 ROOF T.O. PLATE 20'-4" I? LEVELL2 10'-4" NONNI[] LEVE L 0� ==3 _01 ---- FRONT COLOR ELEVATION 10, 14' 18, 116' SCALE: 1/8" l'-O" F ROOF1 PL�04 .0 2 ........... .......... I? ....... LEVELL2 �OQ-4� 6'SCREEN WALL LEVEL Ll 01-01, REAR COLOR ELEVATION 10, 14' 18' 116' SCALE: 1/8" l'-O" ROOFT.O. PLATE ROOFT-.-0. PLATE 20'-4" 4" ............ 20' il,S ............................... ................ ......... ......... ......�':........ ...... 77 ........ ............................ 7� ------ 7111111=7 ....... I? I? ......... 04 04 ---------- ----LEVELL2 —LEVEL L2 10'-4" 10'-4" USCREEN WALL 6SCREEN WALL LEVEL Ll LEVEL Ll 0, 01 LEFT COLOR ELEVATION 10,1 1 114' 18, 116' RIGHT COLOR ELEVATION 10,11114' 18, 116' RE-ZONING SUBMITTAL 40 SCALE: 1/8" 1'4' 0� SCALE: 1/8" 1'4' DATE: SEPTEMBER 28,2023 ORB #: 23-206 A 044 BUILDING TYPE 4 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE 87'4" Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR NlIN "DOLPHIN TALES" ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- Lj I L-i ED 10 L_j D1 STUCCO FINISH DUNN EDWARDS ot Pd t-V 7- < --------Nl DE6376 "LOOKING GLASS" ----—------- < > < < > < D2 STUCCO FINISH DUNN EDWARDS < DE6215 "WOODEN PEG" < > < < -------------_ _R N­AD_____T N_E­_BR_1K__`VE­N­_EE`_R __R ........W-------------------------------------------------------------------------------------------- < El LF REY" < — ----- ------------------------ ---- -------- < of > E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK 0 > < —-- -- -------------------------- > F VINYL WINDOW FRAME COLOR BLACK > F 7 F < ------------------ —-—-——------------------------------------------------------------------------------------------------ < > < G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" > > < > < 71 G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" > 1- 4 < 3 'N > 0 0 < r4 > K > K H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS co > K > o 1 11 K N3.54al \A3.54aF > > K N �01 K -1 DE6378 "JET" > K > ---------------------------------------------------------------------- GARAGE 30 GARAGE- > GARAGE �- < < < K K 10, < I ____]_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" t/ 10W" 1 OW" K -9.1 -------- ------------------- ------------ ----------------—---------------------- --------- -- --------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 > < > < "JET" UNIT TH3 UNIT TH3 UNIT TH3 < World HQ@ORBArch . com > _'g,ED ARC1,11 I C A 0 1 13 2 9-2" 29'-0" 2 9-2" 7 Ric Ba be 28 2 87'-4" ied. 41?1 Z 0- A, Expires V31/2026 ROOF T.O. PLATE 2 4" 0' FLOOR PLAN LEVEL Ll 0,1 1 1 �4' 8' 16' SCALE: 1/8" 1'4' —LEVEL L2 10'-4" mill ME LEVELL1 www .............. u-0 901-01, FRONT COLOR ELEVATION 0,1 1 1 �4' 8' 16' 87f4ff -4ff- moll SCALE: 1/8f'=1'4' ---JL ii;4"ii;4 > > K > < > El K E1 > BEDROOM BEDROOM BEDROOM < > > ------------- ---------- < < > > < > < > L > < > < BEDROOM BEDROOM BEDROOM C? C? co ZtD < ED co < co < < .............. > < < < 2u- UNIT TH3 /,A/\A,,.)====, /�AAA UNIT TH3 UNIT TH3 ----------------N M < > < > BEDROOM < > BEDROOM BEDROOM < < ------ LEVELL2 A A I 1 7 7777l777rr\7 10'-4" "i---------- ------- USCREEN WALL ----------------- LEVEL Ll .......................................... 60FLOOR PLAN LEVEL L2 10,1 1 1 �4' 8' 16' 1 — SCALE: 1/8" 1'-0" 0REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' � SCALE: 1/8" 1'4' - - - - - - - - - - - - r- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - 5" 12" 5" 12" �j) �Q�l 04 �Gj I E]j) Pjj 5" 12" 1 1 F 5" 12" 5" 12 Eiji ROOF T.O��20T ROOF T.O. L�T _4� 20_4� LID 5" 12" 5" 12" LO - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL L LEVELL 1 0,_ 10'-4 4 C\1 5" 5" 12" 5" 12" 7: C\1 04 -0 LID USCREEN WALL LO 7 0 6'SCREEN WALL - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - LEVEL Ll LEVEL Ll ——----------- 01 01 �............ RE-ZONING SUBMITTAL -206 -HT,. COL,OR.'ELEVATION 0,1 1 1 �4' 8' 16' DATE: SEPTEMBER 28,2023 ORB #: 23 ROOF PLAN 0,1 1 1 �4' �8' 16' LEFT COLOR ELEVAT 0,1 1 1 �4' �8' 16' RIG -1 moll MEW 4 . .. ....... 3 SCALE: 1/8" l'-O" SCALE: 1/8" 1'-0" SCALE: 1/8" 1'4' .............. 4a L -L---' F-1 L mill BUILDING TYPE 5 COLOR SCHEME I mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" CG ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------ — ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 ---------------------------------------------------------------------- .1� I ____]_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" (3�znqv'2� . -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com cD_\g,�D__Cyz �1 C 4;4 Ric Barbe 28 2 T ned. Zo A, Expires 3/31/2026 pW` ROOF T.O. PLA 2 _4 —LEVEL L2 10'-4" wwww"M FRONT COLOR ELEVATION 0,1 1 1 �4' �8' �16' MENG SCALE: 1/8" 1'4' F ROOF T.O. PLATE -——------- NONE= 20'-4" . .... .... ........ ........ ....... ............ 7................. .......... ....... ........ ....... ............ LEVELL2 1 U-4- 6'SCREEN WALL LEVEL Ll 01 REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' SCALE: 1/8" 1'4' 10 ; ROOF T.O��20T Now= —T.0 L�T 4� 20_4� .................................... ................... ........... ...............�7 ......... LEVEL L2 LEVEL L2 10'-4" 10'-4" 6'SCREEN WALL 6'SCREEN WALL LEVEL Ll LEVEL Ll 01-01, 01-01, RE-ZONING SUBMITTAL 6 -206 16' H T, 0,1 1 1 �4' 8' DATE: SEPTEMBER 28,2023 ORB #: 23 0,1 1 1 �4' �8' 16' RIG OL,OR 'ELEVATION LEFT COLOR ELEVATION`,_ ' ' I ' ll , 1 -1 40 . ....... 3 SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' .............. BUILDING TYPE 5 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" cC ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD r2 C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 N3.64�F DE6212 "CRISP MUSLIN" MEMO:] ,*Vr ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch 1164" DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS --------------DE6215 "WOODEN PEG" —-—------------------------------------------------------------------------------------------------ El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS -----—------- ----------- ---------------------------- > DE6378 "JET" > ---------------------------------------------------------------------- ------ I ____]_METAL TO-BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" < J ME L FA CIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 < World HQ@ORBArch . com < F-7— < < < < �,7�71 < 43 000 000 r4 C? 0 0 0 0 0 0 3 < \A3.64,-r < > > < NA3.64a cD 0� > C�l C-� > < (j) bo bo > 80 80 > < > 10f-7ff 10'-T 101-T 10'-T Ric Barbe GARAGE - GARAGE- GARAGE - GARAGE - < 28 ?' 2 K < UNIT TH3 UNIT TH3 UNIT TH3 UNIT TH3 < I—01-1-11 7 —ROOF T.O. PLATE Expires 3/31/2026 20'-4" < 7=7�71 IIAIAA 1��Av,-- 29--0" 29'-0" 29--0" 29'-0" LEVEL L2_�� 116'-0" 10'-4" i i�i N iii RE imm; LEVEL L 01 FLOOR PLAN LEVEL L1 O'l 1 1 �4' �8' 16' SCALE: 1/8" l'-O'f FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' SCALE: 1/8" l'-O" 118'-8" 4 1'4' 116'-0" oe _;00 1 ;00 r --—----------- 71 < 1# OF 1 �c F 1 1 BEDROOM BEDROOM BEDROOM BEDROOM < < ------------------ < LL ROOF T.O. PLATE > 777 BEDROOM BEDROOM BEDROOM BEDROOM C? > < -4" > K > 20' co C:) W-1 co > > [Ell < > UNIT TH3 UNIT TH3 UNIT TH3 UNIT TH3 < > F__ > BEDROOM > BEDROOM BEDROOM BEDROOM < LEVEL L2 >1 > < 10'-4" 1 > < > > > < I > < USCREEN WALL > AAA/\A/\A/\A7771� VA/\A/�A4AAA iffl w LEVEL Ll w FLOOR PLAN LEVEL L2 0,1 1 1 �4' �8' 16' REAR COLOR ELEVATION 0,1 1 1 �4' �8' 16' NOME SCALE: 1/8" l'-O" SCALE: 1/8" 1'-0" - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - = I J F 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5" 12" 5" 12" LO LO 5" 12" 5" 12" LO ROOFTO,PLATE_&� ROOFT.Q.-PLATE 20'-4" 20'-4" 5" 12" C\j 5" 12" 7: LO 5" 12" 5" 12" C14 cli - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --------------- LEVEL L2 —----- LEVEL_L2_A 10 10'4" 5" 12" 5" 12" 6'SCREEN WALL C\1 LO LO LO FSCREEN WALL L- - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L- - - - - - - - - - - - - - - - - --1 7, LEVEL Ll LEVEL L I ERR, 0, T= 0, 01 9 Al I RE-ZONING SUBMITTAL "P') ROOF PLAN 0,1 1 1 �4' 8' 16' LEFT COLOR ELEVATION 10,11114' 18, 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' 8' �16' DATE: SEPTEMBER 28,2023 ORB #: 23-206 No$ E_ MCI 70 40] 30 SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' 2, BUILDING TYPE 6 COLOR SCHEME I mmmmic r GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------ — ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS Q ---------------------------------------------------------------------- -1� I ____]_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" (3�znqv'2� . -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com _\g,ED ARC�IZ (j) 9- C 1 13 Ric Barbe 28 2 ned. - 41? ........... IZO A, ROOF T.O. PLATE_�� ------------— Expires 3/31/2026 20'-4" .......... _LEVELL2__�� 10'-4" LEVEL Ll 7777777-7--- .. ................ 7,­,�TX� 01-Oi FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' SCALE: 1/8" l'-O" —------------------------------ ................:L............................ ............... ............ ROOF T.O. PL 2�T 0 _4 ................... ......... ...... ................................... ............ ........... cli ......... ..................... .......... ......... ............... LEVE� L 10�4� 6'SCREEN WALL HE LEVEL Ll f TGRAMM; .... .......... 01-01, 0,1 1 1 �4' 8' 16' REAR COLOR ELEVATION SCALE: 1/8" 1'-0" i f 1 gii MEMO —ROOFT.O. PLATE ROO F-T.0,PLATE 20'-4" 20'-4" g, I........... .......... ............ 7 v 7� L, ............................................... .......... 04 04 LEVEL_L2__A-,\, —----- LEVELL2_�� 10'-4" 10'-4" 6'SCREEN WALL FSCREEN WALL E, T-111 ......... LEV%�L 01 LEVEL Ll 0-0 RE-ZONING SUBMITTAL 0 - LEFT COLOR ELEVATION 10,1 1 114' 18, 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' 8' �16' DATE: SEPTEMBER 28,2023 ORB #: 23-206 4jE_ SCALE: 1/8" l'-O" 30 SCALE: 1/8" 1'4' BUILDING TYPE 6 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" cc, ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------­------— ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- 2 F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- 3.74 G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" 334' H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS .0 DE6378 ---------------------------------------------------------------------- I ______METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com [(:—Dl 10-1 Ns Li Ll Li ------------- > > 0 0 1 13 < Ric Barbe < 28 2 F < ned. < < 0 A, I> < Expires 3/31/2026 < r4 N%, �< C? 3 �0 �< \A3.74 < "kA3.74af >1 < > < > UNIT TH1 UNIT TH1 < > v > < > < C F F 1 > < > < > < > < A �,AAAA- -*��---------- ROOF T.O. PLATE NMI 20'-4" 16-5 1/2" 16-5 1/2" oe oe Nonni[] 32'-11" -/r----------------------------—------------------------------------------------------------- ZA_ -LEVELL2 10'-4 \A3.74al FLOOR PLAN LEVEL L1 10, 14' 18, 116' r........ —LEVEL�--� 0 01 SCALE: 1/8" l'-O" FRONT COLOR ELEVATION 0,1 1 1 �4' 8' 16' A mmmEl -0" 35-7 SCALE: 1/8" 1' 4 1'4` 32'-11" F 1 1 E110 Id Id ID 31/� ROOF T.O. PLATE < 20'-4" AIN < < co < cli co ZD UNIT TH1 UNIT TH1 LEVELL2 A I < 10'-4" > BEDROOM BEDROOM < > < > < < < < ........ 7 77777777= < 6'SCREEN WALL Lij LEVE L 01 FLOOR PLAN LEVEL L2 10, 14' 18' 116' REAR COLOR ELEVATION ul 1 1 �4' �8' 16' MENU SCALE: 1/8" l'-O" SCALE: 1/8" 1 1-01, r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - 5" 12" 5" 12" �b J) OF 1 1 5" 12" 5" 12" Lr) L0 NONNI5" 12" 5" 12" ROOF T.O. PLATE ROOF T.O._PL T 20'-4" _4� M C.0 CN LO LO LEVEL L2 LEVELL2 �1�0�4� 10'-4" 5" 12" 5" 12" 6'SCREEN WALL - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - - F"F`-7 T L T- .......... LEVEL Ll 77=777 ........... vmr RE-ZONING SUBMITTAL u DATE: SEPTEMBER 28,2023 ORB #: 23-206 A . 74a ROOF PLAN 10, 14' 18' 116' LEFT COLOR ELEVATION 10,11114' 18' 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' �8' 16' 30 SCALE: 1/8" l'-O" SCALE: 1/8" 1'-0" SCALE: 1 BUILDING TYPE 7 COLOR SCHEME I mmmmic 00 GOLDFIELD EXTERIOR FINISH SCHEDULE Al CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 BTR "DOLPHIN TALES" CCII ---------------- ----------------------------------------------------------------------------------- SEC OF S. GOLDFIELD RD AND A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 "COOL DECEMBER" RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] ---------------- D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" ------------- —-—-------------------------------------------------------------------------------------------- El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" ---—------ — ----- —---—------------------------------ E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 —-- -- -------------------------- F-------VINYL WINDOW-FRAME COLOR BLACK--------------------------------------------------------------------------------------------------- G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND" H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS ---------------------------------------------------------------------- I ____]_METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" -------- ------------------- J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" World HQ@ORBArch . com cD_\g,�D__Cyz �1 C 1 13 Ric Barbe 28 2 ned.. Zo A, Expires V31/2026 ... ........ ......... .......... ROOFTO._PLATE_�� ..............----—-------- ........... 1 11 20-4 ........",= 1,11;'N' .......... mop_ ........ ..... ............... LEVEL L2' —LEVELL1 ............... .......... 01-01, FRONT COLOR ELEVATION 0,1 1 1 �4' �8' 16' -0" SCALE: 1/8" 1' F —--------- ROOF T.O.-PLATE 20'-4" .... ............... LEVELUA 10'-4" FSCREEN WALL LEVEL Ll 01-0" REAR COLOR ELEVATION ul 1 1 �4' �8' 16' SCALE: 1/8" 1'4' F ROOF T.O. PLAT�_�� ROOF T.O. L�T� _R 20,_4 20_4 _77, 7 .......... . ...... C.0 ...... ................ LEVE L LEVEL L2 0'4� 10'-4" 6'SCREEN WALL E, LEVELL_1_�� LEVELL1_& RE-ZONING SUBMITTAL 01 DATE: SEPTEMBER 28,2023 ORB #: 23-206 (N A 074 LEFT COLOR ELEVATION 10, 14' 18' 116' RIGHT COLOR ELEVATION 0,1 1 1 �4' �8' 16' � 4) 30 SCALE: 1/8" 1'-0" SCALE: 1/8" 1'-0" BUILDING TYPE 7 COLOR SCHEME 2 mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE ------------ ---------------- ------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------- 1 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 1"DOLPHIN TALES" SEC OF S. GOLDFIELD RD AND A BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 RESORT BLVD "COOL DECEMBER" —-------------------------------------- C1 STUCCO FINISH DUNN EDWARDS ------------------------------ -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" ---------- ------—-—-------------------------------------—----------------------------------------------------------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" 54'--4 G2 FLAT CONCRETE ROOF TILES "AVONDALE BLEND-------------------------------------------- H GARA­G__E_D_0OR­TO-BE PA—INT—ED­F1NIS_HDU­N­N ED—WARDS------------------------ .0 DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" 1 101 ------------------------------------------------------------------------- World HQ@ORBArch . com _\gED ARC1,11 -\UICAT 1 13 Ric Barbe T_ 28 2 ned. 7 __7 F > F—T— —T7 < Zo A, > < r4 4 < Expires 3/31/2026 > < > >1 00 1< 'NA3.84a/ 'A%.K C-) < < >1 �< > V 114r, \A3.84; 0 1 YA3 zC? J IL < < >1 _A�� < > < i F 1 1 > UNIT TH2 UNIT TH2 UNIT TH2 t A A ROOF T.O. PLATE 20'-4" 16-11/2" 181-01, 18'-11/2" ----------------- —------------------ ------------------- 54'-3" ------------------------------------ --------- —------------------------------ CN LEVEL L2_ 10'-4" FLOOR PLAN LEVEL L1 10, 14' 18, 116' _LEVELL1 F] El SCALE: 1/8" 1'-0" FRONT COLOR ELEVATION 10, 14' 18, 116' MEMMMME-1 SCALE: 1/8" l'-O" 56-11" 54'-3" 14' ...............---------------------------------------------------------------------------------------------------------------------------- -- ---------------------- F1 --------------- ---- ---------- n ­777- 1-77 > > F > BEDROOM > BEDROOM BEDROOM > IN ROOF T.O. PLATE 29-4 co 77 7\ UNIT TH2 UNIT TH2 UNIT TH2 lk -A Ed I== < LEVEL L2 BEDROOM 7 BEDROOM BEDROOM < �x > �x 6'SCREEN WALL v �x --------- LEVELLI__�� 01-01, 60 FLOOR PLAN LEVEL L2 10, 14' 18' 116' REAR COLOR ELEVATION 10,1 1 114'', 1'81' �1'6'1 ... SCALE: 1/8" 1'4' 2 SCALE: 1/8"=1'70"' ........ .... - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - 5" 12" 5" 12" 5" 12" 5" 12" LO ROOF T.O. PLATE ROOF T.O. L�T 20'-4" 20_4� Apr 5" 12" 5" 12" . . ....... . ....... C14 LO LEVEL L2 LEVEL L2 10'-4" 10f-4" 5" 12" 6'SCREEN WALL 5" 12" - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - b'SCREEN WALL L - - - - - - - - - - _ _ j -------------------- - - - - - - - - -LEVEL Ll LEVE,�L 0 RE-ZONING SUBMITTAL EMEME] DATE: SEPTEMBER 28,2023 ORB #: 23-206 CX BLDG TYPE 8 ROOF PLAN 10, 14' 18' 116' -1 LEFT COLOR_-ELEVATION 10,11114' 18' 116' RIGHT COLOR ELEVATION 10,11114' 18' 116' moo-] MM071 70 SCALE: 1/8" l'-O" SCALE: 1/8" 1'4' SCALE: 1/8" 1'4' 0� A UNIT TH2 BUILDING TYPE 8 COLOR SCHEME I mmmmic GOLDFIELD EXTERIOR FINISH SCHEDULE ------------ ---------------- ------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------- 1 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DET600 "DOLPHIN TALES" cc, SEC OF S. GOLDFIELD RD AND A BTR A2 CEMENTITIOUS PANEL COLOR DUNN EDWARDS DEW383 __"COOL DECEMBER" —-------------------------------------- RESORT BLVD C1 STUCCO FINISH DUNN EDWARDS ------------------------------ -APACHE JUNCTION, ARIZONA 85219 DE6212 "CRISP MUSLIN" MEMO:] D1 STUCCO FINISH DUNN EDWARDS ot Pd Ch DE6376 "LOOKING GLASS" ---------- ------—-—-------------------------------------—----------------------------------------------------------------- D2 STUCCO FINISH DUNN EDWARDS DE6215 "WOODEN PEG" El CORONADO STONE BRICK VENEER COLOR "WOLF GREY" E2 CORONADO STONE BRICK VENEER COLOR "BEAR CREEK" 0 F VINYL WINDOW FRAME COLOR BLACK G1 FLAT CONCRETE ROOF TILES "SIERRA MADRE" G2 FLAT CON-CRETE ROOF-TIL-_ES "AVON-_DALE B-LEND------------------------------------------- H GARAGE DOOR TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" I METAL TO BE PAINTED FINISH DUNN EDWARDS DE6378 "JET" J METAL FASCIA TO BE PAINTED FINISH DUNN EDWARDS DE6378 --'-'JET" ——-—--------------------------------------------------------------------- World HQ@ORBArch . com g,�D__Cyz _\�l C 1 13 Ric Barbe 28 2 ned.. - Zo A,\� Expires V31/2026 i F ............ ........... ROOF T.O. PLATE 20'-4" -----LEVEL L2 ..I........ LEVEL Ll 0'-0" FRONT COLOR ELEVATION 10, 14' 18, 116' SCALE: 1/8" l'-O" F 1 1 ME ......... ROOF T.O. PLATE C14 LEVEL L 10,_ 4 USCREEN WALL LEVEL Ll 01 10,1 1 1 14'� 1 8' 16' REAR COLOR ELEVATION SCALE: 1/8"=1'70" ........ .... i F ROOF T.O. PLATE ROOF T.O. PLAT 7 U_�� �L� 2 _4 ........ 20-4� "Y F_ C14 ............ Z, ................ LEVE L LEVE L 1 0� 4� 1 0� _4� 6'SCREEN WALL 6SCREEN WALL LEVEL Ll LEVEL Ll \------- ---- ------ 01 -0. RE-ZONING SUBMITTAL DATE: SEPTEMBER 28,2023 ORB #: 23-206 10, 14' 18' 116' 10,1 1 114' 18' 116' LEFT COLOR-ELEVATI-ON RIGHT COLOR ELEVATION 4) SCALE: 1/8" l'-O" SCALE: 1/8" l'-O" BUILDING TYPE 8 COLOR SCHEME 2 f* UJA L L L E C-:;E N FD rol vIEuJ FENCE (FREF. DET,41L 2, SHEET CL5-5) ro' f=,4FlTI,4L VIEW FENCE (FEF. F-)ET,41L ro, SHEET CL5=5) 9KDCFS G)_ITff_DMPNDFE33TB_\0 AFPCHEJJ�ClCN AR��EIE219 Immmommoommommommm ro' IDECOfR4TIVE THErlE UJ,4LL OREF. IDET,41L 3, SHEET CL5-5) E VEHICUL,4f;,' G,4TE OREF, DET,41L a, SHEET CL5-5) Li Li !Lj .......... _7m C6 Ism_ an, on, Imll SO 12'm 5' TU5ULAfR STEEL f=OOL B,4FfR1EF, OREF. DET,41L 5, 5HEET :1 0___W 0 0 ..... . ...... CL5 0 F_ -1 E h ------- v -- ---------- -- --- ------ -------------------- ---------- ID IT, 0 < .4' WELIDED WIRE E)OG f=,4fR< FENCE OREF. DET,41L 0, SHEET v _ 0 _[-------- --------- 7F Lil �F F\, :�-, -\T (D E) G mommmmummummmmummum ro' RE,4fR f=ATIO W,4LL OREF. E)ET,41L -1, 5HEET CL5-5) V v v A A A w w w m < EXISTING FIERI�IETEiR UJ,4LL R Ji I - -_ -1—EL L- �UA JAALJLLLLL A A A A A A A A A A 0 1 E_T NEW t'l0NUI"lENT 5Ir_:rN,4GE UNDEF, 5Ef=,4R,4TE FERtllIT OREF. DET,41L 1, SHEET CL5-5) L) ED _j \TEL ----- FIEI)ESTR14N G,4TE OREF. DET,41L 5, SHEET CLS-5) E-1 k g Tj- Tj- Tj- TF-45H ENCL05UfRE OREF. E)ET,41L c�, CL5-5 4ND V\b r I d HCXP OFUAr ch. co m F E F 4fRCHITECTUR,4L f=L,4N5) -- - - - - - - - - ---------- 2\, ----- ------ -------------- — ------- — ------- ........... MA A R -3 -- ------------- RN NA ------------------------------ ------------ - ------------ X--R OF :30� 11 ---------- ------ ----- ......... 0 011 ALLLIA 440 RESIDENTIAL COMPANY 001 PC COLLABORATIVE V - - --------- v DE516N 5TUDIO INC. % I p / / P 7116 EMT I ST AVENUE, L ---------------:::: OP 5UITE 103 'OTT5DALE, ARIZONA 5EE LEFT SEELEFT - — — — — — — — — — — 8525 f=14VED RD.) MEN No " 0 NEI OFFICE: 480-3 47-05 90 f=Rl ATE: V FAX: 480-656-601) LL (FRI P , VATE f=14vr=t::) RD�) All" 1111011 A 1A 8:4 ----------- ----- L J 0 0 7_� ------- --------- L 40", 0 0 - - - - -------- ------- ------------------------ Allf ----------O�i ------------ ........................... amoI F !�gr ------ ------- v ,=-, 57 111 EX15TING 5LCC< KD E_: x\ 4h, WALL, TTf=. E� "gor, omm", mm% L-------------- ----- ------- ........ ----------- ------ ------ ------ F-71 J r7 ID LEI -------------- L _j Li LJLJ Li Li !L _j 0 EE Li - ------ ------ Cj� E —- —------- KD _1 L 0 0 E:-:] E -------------------------- -------- (D tu 7z---- ----- --- V/ M mir-1 F-1171 r7 im E_ 'D � < ---------------------- E J. L L_j Li L_j; Li _jl V/ V KD /'D\ F < ID ID L---�j ------------------------------------ ----- —---—----- C7 ID mmmmmc L ID E L ------------ Eel ----------- /'D\ ID-A (D E 0 -1;E_l 10 . ...... I F 'D --------------- 1:0 0 L iL Li _j Li 'D ID E] El bw 1 E) 0 G -------------- L -7=7-- __T-1 Ifl --------------- v T_-vl7v__ VTv f7`11 Ll 19-7� jFU____ > A A A E�_ I /J .............. EX16TING ro' 5LOC< WALL, TTF. :D E M ad 3bliftel z� vatff 4 I 0:: 'Alk 0 0 -0 41.1t E :1 E zn� E —----- ONE No zn� 5EE Rlr:;HT -SEE fRIGHT _E aM5 L [A 19FU,m & kg�,,Igit'ggygg ,�ggj, gggggg g��yggggg' iiigigg "Jiggg' 'gg gii 'ggt,�g, iiiiiiiig" m ggpq%, ggggg ggggk, gg@ ggpg k?g f 7 grg. ..... .... . �gpggj jjgg�/', g!"If", f� ­_"g, �,ggggp "giiiig", ,%Tqgg� gg5q�p, "ggp), ggggg" Alooll", IK EX16TING (o' 5LOC,< fiqe6g, gggg MINE, E E E L f g WALL, T-T-F. SCALE: I" E�0'-O" 5CALE; I`=20'=011 LVENY (3 Gam ED r ---------- I I F" ll it 12 0 2 E7, �10 100 0 10' 20' 4ol NORTE] NORTID mmmmmc STEEL 5EAM CANOPY, PAINTED DE6315 "JET" STUCCO FINISH COLOR DE6212 "CR15P MUSLIN" 9EICFSG0ffFffD�DPNDRBJTEBE) A9%3EJJA:l(]Kj AR� 85219 PEDESTRIAN ENTRY Ell Milli G A T E MASONRY WALL W1 STUCCO FINISH PRE-CAST PRE-CAST COLOR DE6212 "CRISP MUSLIN" mmmmmG ONC-RETE CAP -CAST C PRE CONCRETE CAP R /' C6 COW, CONCRETE CAP PILASTER CORONADO STONE CORONADO STONE 5RICK VENEER COLOR "WOLF GREY" ON 5RICK VENEER COLOR EVERY 150'FT- VEHICULAR "WOLF GREY" ON ALONG MAJOR 24"X24" CMU -ONLY EMERGENCY FRONTAGE 24"X2411 cMU PILASTER GATE PILASTER ROADS. PRE-CAST V-0 CONCRETE CAP TUIBULAR STEEL PENCE, wrr PRE A5T CONCRETE POT METAL TO 5E PAINTED STUCCO FINISH DE&3"la "JET" COLOR DE6211 CORONADO STONE 5R C, RCO OR "WOLF GREY" ON PEDESTRIAN ENTRY 24"X24" CMU ENTf;,:>�� r-IONUr-IENT v I E UJ F Ez-N E GATE COLUMN, TYP. PILASTER V\b r I d HCKP, 0FUAr ch. corn /j� 5C-4LE: NTS 5CALE: NTS ............... "Z, CA EMERGENCY-ONLY VEHICULAR GATE +0 ------------------------------ --------------- ------------------------------ --- ......... ............. ......... ............... --------------------- 4, MA A R 4" NA '� DECORATIVE THEME WALL D. AkILLIANCE RESIDENTIAL COMPANY 1.777, 000000 000000 00 11 0 11 EEC VEHICULAR PAVERS AT COLLABORATIVE V ENTRY DE516N STUDIO INC. PRE-CAST 7116 EMT 15T AVENUE, CONCRETE CAP SUITE 103 5' SIDEWALK, TYF`. SC-OTTWALE, ARIZONA CORONADO STONE 85251 51RICK Vr 0 OFFICE: 480-347-0590 "WOLF GREY" ON FAX: 480-656-6012 ENEEIR COLOR Z'� CUR5, TYP. 24"X24" CMU PILASTER IDECOF7RATIVE T�4E�,IE WALL WIT�4 COLU�,IN 5C,,4LT=. 1/0" V-011 TUIBULAIR STEEL FENCE, METAL TO 5E PRE-CAST CONCRETE PAINTEI:) CAI= TUIBULAR DE&3'la "JET" CORONAL.)0 STONE STEEL PENCE 5RIC< VENEER COLOR "WOLF GREY" ON LOCKING PRE-CAST 24"X24" CMU MECHANISM CONCRETE CAP PILASTER mom 24"X2411 cMU METAL TO 5E PAINTED PILASTER la "JET" x A-77�/ CfRETE CAP PRE-CAST MASONRY CON MASONRY STUCCO FIN15H 5RICK VENEER COLOR 5C_,4LE: NT5 EXPOSED WALL W1 CORONADO STONE WALL W1 COLOR "WOLF GREY" ON SMOOTH DE6211 24"X24" CMU PAINTED "ANCIENT EARTHII PILASTER STUCCO FINISH COLOR DEro2l2 �X/�7 PRE-CAST CONCRETE MUSLIN CAP ACCESS15LE KEY F05 -011 21 SMOOTH PERFORATED FACE CMU SHEET METAL 10" KICKPLATE -lDf=-6Tf;;;Zl,4N G;ATE ANID FENCE AT OOL :)TIAL VIEW FENCE METAL GATE f=f= (o f=,4f;, 5EYOND 41-011 SC_4LIH: NTS 5C_,4Lr=: NTS SPLIT FACE f=ATIO WALL Gmu 10 a"Xa"XI(o" DECORATIVE CMU OMNI= WALL, SEE NOTES I AND 2 mmmmmc 511DE ELEVATION 5ELOW FOR SPECIFICATIONS -------------- PRE-CA5T CONCRETE CAP 3"X23" VIEW SLOT IN GATE 10'-0" AT 3" SQUA CONCRETE 6INGLE ENCLOSURE METAL FRAME CAP le'-4" AT DOU5LE ENCLOSURE _\1 4" O.C, TYP. PRE-CAST RE 1-1/4" PICKET, CORONADO STONE mm sm Emma Em sm 5RICK VENEER COLOR SOLID METAL DECKING, "WOLF GREY" ON COLOR TO 5E DUNN 24"X24" CMU STEEL ENCLOSURE GATE EDWARDS DE(o3la .00 PILASTER 11JET11 411 Jjy4M 2-d3bitcl PROVIDE SLOTS Al--------------------- —-—-----—-------—--------- SoeltEr 4 M ad SbAftcl ED GATE OPEN 4 CLOSE NO POSITION TO RECEIVE CANE 5OLT MENEM= FfRQNT ELEVATION FLOOR FLAN 14" METAL PLATE, PAINT TO MATCH NOTES, (17) F 1. METAL GATE COLOR - DUNN EDWARDS DE6316 "JET" INE M01W,M CF& aM5 0 H F,4 CF- "__��U E345�5 D [DF51GrN _50 5-1- F- 01 `_(__)N 2. PRE-CAST CONCRETE CAP�3AND COLOR - DAVIS, PEWTER aroO ' [,/-,c _N­ 3. STUCCO FINISH COLOR -DUNN EDWARDS DE6213 "FINE GRAIN" 74"---tE �N E�L LCI ON STANDAF�D t'!A,50Nf��-" C);:D: �1= P E31 0­< �N (-OLOF� 4_1 v z E3 L/"� < O'Ll N T A N:1 C IT] Fu L\f FAY (NGamED '44 Vr=�41C.-ULAFR ENTf;R"r r---;,4TE TfRAe�4 EN(,-LO5UfRE 6C-ALE: NT6 5C_,4LE: NT5 GPA & PAD Rezoning Citizen Participation Report P-23-63-PZ v!,,2,. r a, y n, ("'.5 Q "I fil'0Q, IW Submitted to: City of Apache Junction, Arizona Submitted on behalf of: Olsen Recker/Guadalupe Properties LLC 4915 E. Baseline Rd. #105 Gilbert, AZ 85234 Prepared by: Iplan COn5URing 3317 S. Higley Road, Suite 114-622 Gilbert, AZ 85297 November 2023 PURPOSE The purpose of this Citizen Participation Plan is to document and inform citizens,property owners,neighborhood associations, agencies, schools, and businesses in the vicinity of the site of the application and for the ongoing process and actions related to this request. Iplan Consulting, on behalf of the property ownership, has initiated a Major General Plan Amendment (GPA) and Planned Development (PD) rezoning request to amend the existing land use classification and zoning designation for an 18-acre property located on the east side of Goldfield Road just south of the US60 Highway in southeast Apache Junction. The intent of the proposed entitlements is to build a multi-family community on the subject property. Site Aerial CONTACT All questions and/or comments related to this proposal should be directed to: Iplan Consulting—Greg Davis 3317 S. Higley Rd. #114-622 Phone: (480) 227-9850 Email: Greg@iplanconsulting.com NOTIFICATION In order to provide effective citizen participation in regard to this application, the following actions will be taken to provide adequate opportunity to adjacent landowners or any other potentially affected individuals, agencies, or organizations to learn of and address any and all real or perceived impacts this proposed overlay may have on individuals,properties, or the community: A. A contact list was created and submitted to the City for all property owners within 300 feet of the site for the purpose of mailing Public Hearing notifications. B. A neighborhood meeting was held on 10/24/2023. The meeting was held at the Desert Vista RV Resort Community Room and was open to the public. A meeting notification letter was sent out to all property owners within 300 feet of the site notifying residents of the meeting time/date, a general description of the requests being made,as well as contact information should they not be able to attend. A summary of the meeting is included in this report. C. A second meeting was held with the residents of the Dolce Vita community on 11/06/2023. The Dolce Vita residents were notified of the meetiu by the Community Management since this is a rental neighborhood. About 100 residents attended and a summary of the meeting is included in this report. D. A Notice of Public Hearing sign(s)will be posted per City regulations on the property at least 15-days prior to the Planning and Zoning Commission hearing(s) and remain posted through the City Council hearing(s). E. A Notice of Public Hearing letter will be sent out by the City Sta to all property owners within 300 feet of the site notifying residents of the meeting per City regulations which is at least 15-days prior to the Planning and Zoning Commission hearing(s). SCHEDULE Formal Filing—07/21/2023 Citizen Participation Plan Initial Submittal—07/21/2023 Neighborhood Meeting Notification— 10/09/2023 Public Neighborhood Meeting— 10/24/2023 Dolce Vita Community Meeting— 11/06/2023 Citizen Participation Final Report— I 1/10/2023 Notice of Public Hearing Sign Posting &Mailing—TBD Planning and Zoning Commission Meeting—TBD City Council Hearing—TBD ATTACHMENTS Notification Map - 300-foot radius Notification List- 300-foot radius Neighborhood Meeting Invitation Letter Neighborhood Meeting Summary Dolce Vita Meeting Summary 5,1 i verag on C iolAcIJ — 300' F:)uffer Map a' Em lift SUTHERLAND BEVERLY & LEDI... WARD RONALD J & JACQUELIN... 14571 CROSS LAKE RD 921 S ALEXANDER ST PINE CITY, MN 55063 GREENVILLE, MI 48838 ELMSTRAND KATHLEEN M LIV ... MILLBRAND DEE & EUGENE JR MCCUBBIN RICHARD D TR 445 LAKE AVE 3710 S GOLDFIELD RD LOT 258 3323 COUNTY ROAD 338 WH ITE B EAR LAKE, M N 55110 APACHE JUNCTION, AZ 85119 NEW BLOOMFIELD, MO 65063 PETERSON DAVID A GIAUQUE PAULA J FAM LIV TRU... SHERETTE MICHAEL & JANET 3710 S GOLDFIELD RD LOT 467 4453 S MCKECHNIE LOOP 3710 S GOLDFIELD RD LOT 276 APACHE JUNCTION, AZ 85119 PALMER, AK 99645 APACHE JUNCTION, AZ 85119 HAGEN DAVID A & LINDA K TRS... HUPPERT PAUL A& BERNICE E... RABBITT SUSAN PO BOX 460 4255 S MCKECHNIE LOOP 3710 S GOLDFIELD RD LOT 277 CASCADE, ID 83611 PALMER, AK 99645 APACHE JUNCTION, AZ 85119 OSTBERG CHARLES J & JANIC... ARNT DAVID & CAROL KUNERT DAVE & LINDA 3710 S GOLDFIELD RD #468 5483 WOODBURY DR 30 N 1400TH AVE APACHE JUNCTION, AZ 85119 WOODBURY, MN 55129 ORION, IL 61273 HALVERSON STEVEN D & LAUR... DUEY WILLIAM P & JERRE ANN ... BORNE PAUL T & MARGARET F W5904 FRONTAGE RD 12910 E 54TH ST 3133 CHARTER OAK RD MENASHA, WI 54952 KANSAS CITY, MO 64133 EDGEWOOD, KY 41017 GARDNER BARRY& RONDA BURKE VICKI &VAN TASSEL AN 3445 E CLEVE BUTCHER RD 12653 HARRIET LAKE RD BLOOMINGTON, IN 47401 HIBBING, MN 55746 GUTZMAN RAMONA HUPPERT PAUL A& BERNICE E... OSWALD TIMOTHY J & DIANNA ... 1023 S EGAN AVE APT 2 4255 S MCKECHNIE LOOP 7201 MILKY WAY RD MADISON, SD 57042 PALMER, AK 99645 BISMARCK, ND 58503 FOLKERS MARK E 18612 SPRINGCREST DR MINNETONKA, MN 55345 ARNT CAROL J REV TRUST STOCKWELL JOHN VICTOR & ... 5483 WOODBURY DR 114 N WESTCHESTER DR SAINT PAUL, MN 55129 COLUMBIA CITY, IN 46725 BORNE PAUL T & MARGARET F LOVE MICHAEL W & CHERYL A 3133 CHARTER OAK RD 32581 HOMESTEAD DR EDGEWOOD, KY 41017 GRANGER, IA 50109 EMOND DENNIS D & MARIA SANGER MARK& CYNTHIA LANDON SAMUEL G & TAMMAR 3710 S GOLDFIELD RD LOT 477 111 W PINE RIDGE DR 17084 PHEASANT MEADOW LN APACHE JUNCTION, AZ 85119 POLK CITY, IA 50226 PRIOR LAKE, MN 55372 PETCOVIC DEBORAH OLSON KRISTI EGOLF NED & CATHY D 3710 S GOLDFIELD RD LOT 478 11081 108TH AVE N 5215 S 100 E-57 APACHE JUNCTION, AZ 85119 MAPLE GROVE, MN 55369 CHURUBUSCO, IN 46723 NELSON GLENN & JOSEPHINE DECORTE CAROL J CRITES BRIAN & SUSAN 111 4TH AVE SW 21601 MAYFIELD ST 33317 WATERBERRY CIR PIPESTONE, MN 56164 FARMINGTON HILLS, MI 48336 WAUKEE, IA 50263 BACHTOLD BERNARD W & SHA... DEBROUX DAVID & CANDACE SNYDER JERRY N &YVETTE V 3710 S GOLDFIELD RD 302 3517 ROAD 84 TRLR 109E 9414 N NORMANDIE LN APACHE JUNCTION, AZ 85119 PASCO, WA 99301 SPOKANE, WA 99218 MERRIGAN STEVEN D KING JAMES & CAROLYN JENSEN RANDOLPH R & ROSA... 3710 S GOLDFIELD RD UNIT 18... 100 PINNACLE LN APT A 12512 LEYTE ST NE APACHE JUNCTION, AZ 85119 EASLEY, SC 29642 MINNEAPOLIS, MN 55449 BLANKERS JERRY A LIVING TR... POOLEY RANDALL J & JOLENE ... FIREBAUGH R SCOTT & DONN... 727 141 ST ST 10012 W TWIN LAKES RD 11449 S NORTHWOOD CIR LAKE WILSON, MN 56151 RATHDRUM, ID 83858 OLATHE, KS 66061 OLSON DARLENE M BEDWELL DARYL WADE OLSON GERALD L & MARJORIE 682 WESTERGARD RD 349 S FORK DR 602 MARYSLAND AVE BOTTINEAU, ND 58318 GURNEE, IL 60031 DANVERS, MN 56231 ZIMMERMANN DONALD W & JA... OEPPING VERNON R TRS SCHMEIL PAUL F & MARYLIN L ... 9733 E LOMPOC AVE 4028 LITTLE VALLEY RD 17303 SPANAWAY LOOP RD S U MESA, AZ 85209 ESTES PARK, CO 80517 SPANAWAY, WA 98387 LITZINGER JOSEPH M & SUSA... STITH KENNETH & ELAINE TRU...25 GOOD ANN G TRS 108 SLEEPY HOLLOW ST GANDESA WAY PO BOX 654 GRAND FORKS, ND 58201 HOT SPRINGS VILLAGE, AR 71[E7:1 SHERIDAN, MT 59749 WEGNER MARION J REV TRUS... KASTE LON & SHELLEY WONG DEAN D & REBECCA A 11330 LAKEVIEW HEIGHTS RD 5838 COUNTY ROAD 12A 20525 UNIVERSITY AVENUE EX PINE CITY, MN 55063 PISEK, ND 58273 CEDAR, MN 55011 SCHMEIL PAUL F ETAL TRUSTE... LOPEZ DONALD & THERESA WYMA RICHARD LEE & GWEND 17303 SPANAWAY LOOP RD S U... 1723 COUNTY ROAD 29 3710 S GOLDFIELD RD 417 SPANAWAY, WA 98387 FORT LUPTON, CO 80621 APACHE JUNCTION, AZ 85119 STEWART ALAN W BASS MARCIA ANN & PATRICK ... BARBER MICHAEL & COLLEEN 521 KAISER RD NW 251 RAINBOW DR# 15148 706 WESTLAND LN OLYMPIA, WA 98502 LIVINGSTON, TX 77399 NEW LONDON, MN 56273 TAYLOR CHARLES H &AGNES ... DEROWITSCH JIM & ELLEN DAHLKE RICHARD P & SHERYL PO BOX 9615 PO BOX 345 19572 CLAREMONT CIR ALBUQUERQUE, NM 87119 GOLD BAR, WA 98251 FARMINGTON, MN 55024 WIGLEY CONNIE LARSEN BRETT D ODEGAARD DONNA 3710 S GOLDFIELD RD LOT 364 3710 S GOLDFIELD RD LOT 393 16110 55TH ST SE APACHE JUNCTION, AZ 85119 APACHE JUNCTION, AZ 85119 KINDRED, ND 58051 ZAUN MICHAEL &VICKI TRUST VANLEEUWE ROBERT C REV LI... DALEY CYNTHIA A 8829 E LOST GOLD CIR 705 NUESE LN 1398 SHERWOOD CT GOLD CANYON, AZ 85118 MARSHALL, MN 56258 GURNEE, IL 60031 BREITBACH STEPHEN T & DIAN... ROHDE BARBARA J MARTUCCI CAROLE T 811 FREEDOM CIR 23756 ARENA DR HART RANCH... 32 MEETINGHOUSE CT HAZEL GREEN, WI 53811 RAPID CITY, SD 57702 SHAMONG, NJ 08088 LANGE THOMAS F MCGOWAN TERRY DOUGHERTY INEZ E 3710 S GOLDFIELD RD LOT 489 31329 TOBIAH PL 162 LAKEVIEW DR APACHE JUNCTION, AZ 85119 CASTAIC, CA 91384 SEQUIM, WA 98382 BRAUN GARY &ANNETTE T HERTIG JAMES M & LORRAINE ... 100 ELLSWORTH ST SE 9485 SEBRING DR SLEEPY EYE, MN 56085 PORTAGE, MI 49002 CRAIGER MICHAEL C & SALLY ... STOUTENBURG FAMILY TRUST HERZOG GERALD A& FRANTZ 3710 S GOLDFIELD RD LOT 386 5211 WILLIAMSBURG LN LOT 1... 3710 S GOLDFIELD RD LOT 420 APACHE JUNCTION, AZ 85119 LEXINGTON, MI 48450 APACHE JUNCTION, AZ 85119 DEROWITSCH JIM & ELAINE RIZNER GARY LEE & JULIE KAY... CALLIES CAROL LEE TR PO BOX 345 1002 7TH ST 5656 BARONSWOOD CIR GOLD BAR, WA 98251 GRUNDY CENTER, IA 50638 TOLEDO, OH 43615 NOLTON DANIEL ARTHUR SCHMITT BETTY A SCHROEDERJODI &ANDERSO... 23412 BRIER RD 1101 S SCHEUBER RD UNIT 31 1811 8TH ST SE BRIER, WA 98036 CENTRALIA, WA 98531 EAST GRAND FORKS, MN 56721 ADAMS WILLIAM E & GEORGIA ... HOGG BRYAN A& DEBORAH J 228 LAKE FRONT CT 1016 LESLIE DR HAMILTON, OH 45013 INNI-iFIL , ON F-BFi CANADA BURKE LAURA M REV TRUST DUNSTAN-ADAMS TAMI & PETE... AKTRON LLC 3050 HIDDEN RD 2635 DARTMOUTH DR 3265 S GOLDFIELD RD APT A BAY CITY, MI 48706 PENTICTON, BC F,--A F-73 APACHE JUNCTION, AZ 85119 CANADA RODERICK LEWIS & SHEILA FAHRNOW JUDITH M TRUST 3270 S GOLDFIELD RD APT 814 3270 S GOLDFIELD RD APT 207 APACHE JUNCTION, AZ 85119 APACHE JUNCTION, AZ 85119 TKACHANKO WAYNE R&CARO... MADGEJAMESA SCHMIDT ROBERT E 205 52312 RANGE ROAD 223 5656 BARONSWOOD CIR 153 THAMESVIEW CRES SHERWOOD PARK, AB T8C 1 B3 TOLEDO, OH 43615 ST MARYS, ON N4X 1 C4 CANADA CANADA NOLTON DANIEL ARTHUR CURTIS KAY D & GAYLA A REV ... HELSETH AARON 23412 BRIER RD 13796 E LANGTRY LN PO BOX 2208 BRIER, WA 98036 TUCSON, AZ 85747 ELIZABETH, CO 80107 HOAR IRREVOCABLE GRANTO... HELLER BERNICE ANN 3734 CHERRY FLATS RD 3270 S GOLDFIELD RD APT 201 COVINGTON, PA 16917 APACHE JUNCTION, AZ 85119 KINNAN FAMILY LTD PSHIP BAM 109 LLC 112 PERRINE RD 3034 ARTHUR ST NE OWEGO, NY 13827 MINNEAPOLIS, MN 55418 STURDEFANT JOHN L FELTON ROSEMARY & BRUCE 3710 S GOLDFIELD RD LOT 451 3270 S GOLDFIELD RD APT 107 APACHE JUNCTION, AZ 85119 APACHE JUNCTION, AZ 85119 ANDERSEN IVAN C & FLORA LA... KRAMER RAYMOND J & SHARO... WRIGHT JAMES LEE & CHARLO 671 YUCCA RD 5126 KING AVE W 101 FLINTSTONE DR UNIT A ELK HORN, IA 51531 BILLINGS, MT 59106 WAVERLY, IA 50677 SORENSEN VERDON N & B LEE... WACKER ROBERT F & KATHLE... DAVIDSON GARY L & DIANE M 1 SIMPSON PL 17362 SUNRAY CIR SW 4880 WOODLAND DR NW SHENANDOAH, IA 51601 PRIOR LAKE, MN 55372 HACKENSACK, MN 56452 HISEK RONALD & BETTY 4121 JARMANN LN SHAKOPEE, MN 55379 FELTON BRUCE D KARTES CORINE 3270 S GOLDFIELD RD 107 6068 88TH AVE SE APACHE JUNCTION, AZ 85119 DICKEY, ND 58431 MCMAHON PAMELA K BARKLEY ANDREA & BLAKESL... 9902 E KIOWA AVE 1506 OAK DR SPC 108 MESA, AZ 85209 VISTA, CA 92084 GOETHALS ROBERT M WINNIKE ROBERT H 18784 E 40TH ST 605 5TH ST COAL VALLEY, IL 61240 WEST POINT, IA 52656 FASSLER JOHN A TRUST KELSEY STEPHEN L 86 PALMYRA RD UNIT 6863 HANNEGAN RD APT A STERLING, IL 61081 EVERSON, WA 98247 OLSEN RECKER/GUADALUPE P... KLOCKE DOUGLAS & PAULA SMITH HAROLD L & PEGGY J 5235 E SOUTHERN AVE APT Dl... 2965 HARRIS AVE 3710 S GOLDFIELD RD LOT 500 MESA, AZ 85206 ROCKWELL CITY, IA 50579 APACHE JUNCTION, AZ 85119 MHC DOLCE VITA LLC LENARDSON DAVID H &JUDIT... THEISEN WILLIAM 917 W WASHINGTON MS 316 3710 S GOLDFIELD RD LOT 501 647 N WISCONSIN ST CHICAGO, IL 60607 APACHE JUNCTION, AZ 85119 PORT WASHINGTON, WI 53074 SCHOTT GERALD J & CYNTHIA ... SCHMITT RICKY A& BETH A RE... NOTT BRENDA ELIZABETH & M... 513 N MUNDT AVE 1640 FAIRSIDE DR 411 100 SAGHALIE RD HARTFORD, SD 57033 SANDWICH, IL 60548 VICTORIA, VI LILA LA1 CANADA 1plan Consulting AA III Silveray on Goldfield Neighborhood Meeting Summary: Golden Vista RV Resort—October 24, 2023 Attendees: Applicant: Greg Davis—Iplan Consulting Jason Barney—Property Owner John Hartman—Property Owner City: Kelsey Schattnik—City Planner Neighbors: See sign-in sheets Meeting started at approximately 10:05 AM. Mr. Davis welcomed everyone, explained that the purpose of this meeting was to present the proposal of the landowners to modify the General Plan classification and the rezoning designation to allow for the development of a multi-family residential project. Mr. Davis explained what the current GP/zoning permitted in terms of uses (i.e. regional hospital, restaurants, hotels, offices, etc.) and then described the proposed multi-family project including access, circulation, open space/amenities, architecture, and then walked through several of the typical concerns brought up in similar projects. Mr. Davis then explained the approval processes and the expected timeframes associated with each phase of the process before asking if any of the attendees had any questions or comments. Below is a summary of questions and answers portion of the meeting. Please note that this list is meant to capture the most pertinent questions of the neighborhood, but similar questions, comments, and/or discussions have been combined or omitted and the responses have been summarized for brevity. Q: Question R: Response Q: What is the water source for the project? R: Mr. Davis replied that although water is a hot issue right now in the state, this site is already accounted for by the City which is the water provider. Furthen-nore, the proposed residential use will need much less water than the current approved uses. Q: What does the Traffic Analysis take into account? Does it include all the homes planned to the south? R: Mr. Davis replied that the traffic study looks at both existing and planned traffic generation and compares how the current use will compare to the proposed use and then makes recommendations based on the ability for the local roads to accommodate the projected traffic. Q: What road improvements will be made? R: Mr. Davis replied that the City will dictate what improvements need to be made and we expect some level of improvements for Goldfield Road. Q: Please clarify where the entries and exits are? We prefer them north of our entry. R: Mr. Davis went back to the appropriate slide and pointed them out. All of our access points are north of the existing access point for Golden Vista. Q: Will this property have an HOA? How will it be kept nice? R: Mr. Davis replied that the project will have a POA and the owners have the incentive and responsibility to maintain the property to a high degree. Q: Can you make the units along Goldfield single story? R: Mr. Davis replied that the product proposed is only two story. He also reiterated that the current zoning allows 45-feet (3 or 4 stories) and by proposing 2-stories was a fair compromise. Q: We would like to see this site be a City Park. Can the City buy it? R: Mr. Barney replied that a lot of work goes into locating City parks and this is not the right place for one. He also stated that the current plans were not for a park and thus the proposal never contemplated that use. Mr. Davis stated that City parks need to be more centralized to serve the most residents. Q: Can the project be built as a golf course? R: Mr. Barney stated that was not a viable use here on only 18 acres. Q: Can you have the project open space along Goldfield? R: Mr. Barney replied that the open space needs to serve the project residents, thus needs to be centralized. Q: How will this affect property values? R: Mr. Barney replied that although any/every project can have some impact on property values, this proposal would likely protect them more than the current commercial zoning. Mr. Davis stated that since our project was a rental product, no appraiser would use our project to establish land values for their homes. Q: Can you change the gray color with an earth tone or paint a mural of the mountain on the buildings along Goldfield? R: Mr. Davis replied that we can look at changing the building colors to be more earthen tones. Q: What is the distance between buildings? R: Mr. Davis replied that the front setback was 20-feet and distance between buildings was I 0-feet. Q: Can these be re-rented as AirB&Bs? R: Mr. Davis replied that no, these are end user rentals only and no tenant can sublet for that purpose. Q: What is the minimum rental length? R: Mr. Davis replied that these are intended to be long-term rentals which are typically one-year in length. Q: Are these rentals subsidized? R: Mr. Davis replied that no, these are market-rate rental homes. Q: Will the project contribute to the City for parks and road/sidewalk maintenance? R: Mr. Davis replied that yes, the project will pay impact fees to the City as well as pay taxes for on- going road maintenance. Q: Are pets allowed? R: Mr. Davis replied that yes,pets are allowed and the project includes amenities for them. Q: Can you bring in a nice restaurant? R: Mr. Barney replied that they don't believe a high end restaurant would choose this location over the US60/Signal Butte commercial center or the future one to the east at US60/North-South freeway. Q: Can you use your influence to get ADOT to widen US 60 to account for the future N/S freeway? R: Mr. Barney mentioned his involvement with the Pinal Partnership group and their efforts to work with ADOT to make that happen. He said getting that done will happen, but it is likely decades away. Q: Will there be a sound wall along US 60? R: Mr. Davis replied that as of now, no sound wall is planned,but that would look into that further. Q: The project is too dense. Can you build something else. R: Mr. Davis shared that the project, at—15 DU/acre was lower than many multi-family projects and the site is retaining 15% open space in addition to the parking and drive aisles, and with only 2- story buildings, we disagree. Furthermore, the Golden Vista RV resort is actually denser at almost 25 DU/acre. Q: Can you use bushes or cacti instead of trees along Goldfield(to preserve the view)? R: Mr. Davis replied that the ownership would be fine with that but it was the City's call. Q: Can you use build something temporary along Goldfield to demonstrate the proposed height? R: Mr. Davis replied that we probably can't build anything, but we could use color balloons to illustrate the heights discussed today. Q: If you sell to someone else, what happens to the proposal? R: Mr. Davis replied that, if approved, the zoning would remain in place for whomever bought the land and if they wanted to change it, they would have to go back through the entire rezoning process. Seeing no other questions or comments, Mr. Davis thanked everyone for attending the meeting, reminded them that his and the City Planner's contact information was available and then adjourned the meeting. Meeting adjourned at approximately 11:22 AM. Project: Silveray on Goldfield Meeting Date-, 10/24/2023 Location-, Golden Vista RV Park Time Started-, 10:00am Time Ended: : ATTENDANCE SIGN-IN NAME—(please Lrint) ADDRESS EMAIL (02tional) a(a 616M D4ia 1'4�n�015e kle6��,YMA I'/ eoOp7q 2, t all e� kefvx'�4 3 __�?�Oj �IV�4 e, _Z,MA/ 443S8 I nAL 3S(,V NAME— (please peint) ADDRESS ZIP e, 1 76 ' cs, 4 -7 Teo 4 W Iro-71 41L 2, 2, s co4f 7ff'41 0 L o+ 9 5 E,16 bq NAME—(please print) ADDRESS ZIP 'n KAw- r2 Fj-e 17 T)to�e rd A1411 e (VI�ICI� kill ion 7 2- AuWr=� /",Or-sscq �AL� JAL" cx�t' t ( q .6 m I Zralle:f 4-6 20 nyl Ou Myth js (7 A!NO/, Xt,ol ;I 1-40,71 7k ---------- NAME -(please print) ADDRESS EMAIL 4 P LIA , 4-4 VAJW c 6 3 !�;-2 V61 a) ;4�,a �,r Fojuf- 6cn o 4t, e,,,(,6 -xK7f-e rn a,I e_j 4 Y) V\ N ��ar-ov) k, A, ��LCO 41-1 t(-��-A ch 1114V d, a 2 �9 J a L71L G 7 L4�2 -71 C) 5 , 6- c f),/IF AMP F- 04-z7Z, Cof, r)eq.. A� )-to V1 yu,if, SAY J-P-r :tk-3 3 ol J-e-aA - nJ 'e-Pr t/e cog)cc,2 '2 1 ( ep 1plan Consulting AA 111 Silveray on Goldfield Neighborhood Meeting Summary: Dolce Vita—November 06, 2023 Attendees: Applicant: Greg Davis—1plan Consulting John Hartman—Property Owner City: Kelsey Schattnik—City Planner Neighbors: —100 (undocumented) Presentation Started at approximately 10:05AM Mr. Davis welcomed everyone, explained that the purpose of this meeting was to present the proposal of the landowners to modify the General Plan classification and the rezoning designation to allow for the development of a multi-family residential project. Mr. Davis explained what the current GP/zoning permitted in terms of uses (i.e. regional hospital, restaurants, hotels, offices, etc.) and then described the proposed multi-family project including access, circulation, open space/amenities, architecture, and then walked through several of the typical concerns brought up in similar projects. Mr. Davis then explained the approval processes and the expected timeframes associated with each phase of the process before asking if any of the attendees had any questions or comments. Below is a summary of questions and answers portion of the meeting. Please note that this list is meant to capture the most pertinent questions of the neighborhood and that similar questions, comments, and/or discussions have been combined or omitted and the responses have been summarized for brevity. Q: Question R: Response Q: Is this a rental project? R: Mr. Davis replied that yes, this is a for-rent residential project. Q: What will the rents be? R: Mr. Davis replied that the actual rents won't be known until the project is closer to opening and guessed that they would start at $1,000 or so. Mr. Hartman corrected Mr. Davis stating they would be quite a bit higher than that, likely above $1,800 a month. Q: Who owns Resort Blvd.? R: Mr. Hartman replied that our group owns Resort Blvd. and Dolce Vita gains access via easement. Q: What road improvements will be made? R: Mr. Davis replied that the City will dictate what improvements need to be made based on our Traffic Report and we expect some level of improvements for Goldfield Road and potentially Resort Blvd. Q: Can you move the access points to the west? R: Mr. Davis went back to the appropriate slide and pointed the access points out noting that most were already pretty far west which the exception of the northeast parcel which is cut-off from the rest of the project thus needs its own access points. Q: How can you ensure people will not park along Resort Blvd.? R: Mr. Davis replied that the project will have a POA that will prohibit parking along Resort Blvd. and the owners have the incentive to keep the entry road open and attractive. Q: Can you make the units along the perimeter single story? R: Mr. Davis replied that the product proposed is only two story noting that most have the garage on the lower level requiring a two-level design. He also reiterated that the current zoning allows 45- feet(3 or 4 stories) and by proposing 2-stories was a fair compromise. Q: Can you prohibit children from living here? R: Mr. Davis replied that he didn't believe it was legal to do that here and that the project was not designed to be attractive to families as there is very limited family services in the area. Q: Can you move the playground? R: Mr. Davis said they would look at that and could potentially move it to the west open space area. Q: Can you move the primary amenity area? That will be a party area. R: Mr. Davis replied that the primary amenity area needs to serve the project residents, thus needs to be centralized and that the pool facility will close at I Opm to minimize its use as a party location. Q: Will the construction traffic use Resort Blvd.? R: Mr. Davis replied that the construction traffic would mostly come from Goldfield Road as we are on the hook for maintenance of Resort Blvd. so will work to minimize use of that road for construction traffic. Seeing no other questions or comments, Mr. Davis thanked everyone for attending and then adjourned the meeting. Meeting adjourned at approximately 10:58 AM. Leo Lew County Manager PINAL COUNTY October 171h 2023 City of Apache Junction Development Services Department 300 E Superstition Blvd Apache Junction, AZ 85119 Re: Proposed Silveray at Goldfield Major General Plan Amendment Dear Kelsey: The Pinal County Development Services Department is aware of the proposed multi-family development proposed within the area of the Pinal County Comprehensive Plan. County staff has prepared comments regarding this proposal and would not offer our support of this recommendation. Staff finds the request to convert the 18-acre subject site may detract from prime commercial parcels South of US-60. The location of these parcels having access to an arterial roadway and a major highway offer potential for higher levels of traffic consistent with retail requirements and exceeding the trip generation typical of a multi-family development. The presence of such roadways may encourage the market area of potential commercial opportunities to support communities that are more distant and may attract revenue to Apache Junction. Proximity of existing residential uses to the site promotes a pedestrian scaled commercial development that may support existing residential development on both the West and East sides of the proposed development. Such commercial parcels would also support expansion of additional multi-family projects to the South, which are supported at present by the Pinal County Comprehensive Plan. Development of this multi-family project to the south of the General Commercial land-use designated parcels would be consistent with the High Density Residential land-use designation present within the Pinal County Comprehensive Plan. Staff would be amicable toward multi-family development south of the proposal area provided commercial designations remain that would support residential growth. Please feel free to contact me regarding staff comments and our position on this matter. Staff appreciates the opportunity to provide input regarding this case. Sincerely, Patrick Roberts Senior Planner Pinal County Development Services COMMUNrTY DEVELOPMENT PLAWNG MVISM 85 N Florence St,Florence,AZ 85132 1'520-866-6442 FREE 888-431-1311 F 520-866-6435 www,pinaIcountyaz,gov 12/14/23,10-09 AM [External]SPRSAZEA-Under Review City of Apache Junction General Plan Amendment-Silveray at Goldfield-Kelsey Schott_ [External] SPRSAZEA - Under Review: City of Apache Junction General Plan Amendment - Silveray at Goldfield Boyden, Holden <Holden.Boyden@funUen.com> Mon 9/11/2023 8,49 AM ToXelsey Schatmik <kschattnik@apachejunctio�iaz.gov> Cc:AZMetroRelo <AZMetrciReIo@Iumen,com> 0 1 attachments(2 MB) Utility Map I.pdf, Date:08/25/2023 Attn: Kelsey Schattnik Thank you for your project notification. LUMEN has reviewed your utility notice regarding P-479235 AZ I Sliveray at Goldfield-S Goldfield Rd&Dolce Vita at Superstition Falls,Apache Junction,AZ("Project"), In response to your inquiry please find the enclosed drawings indicating the approximate location of the project limits. X LUMEN has facilities within your proposed construction area.The plans submitted are under review by our LUMEN Field Engineer(s).Currently,the estimated completion date of review is 09/25/2021 LUMEN has facilities within your proposed construction area.Please find the enclosed drawings indicating the location of the LUMEN facilities.Once you have completed your review,please respond back if LUMEN facilities appear to be in conflict.A LUMEN engineer will be assigned when engineering plans are ready for review, LUMEN does not have facilities within your proposed construction area. LUMEN has facilities within your proposed construction zone,but it has been determined that no relocation will be necessary, However,due to the proximity of your project to our facilities,a LU MEN representative will be required on-site when construction begins. The information provided in your initial request is insufficient to determine if the location of your proposed construction will conflict with LUMEN facilities.Please provide additional detailed location maps,drawings(PDF preferred),and description for further conflict review. Please contact your�tate One Call prior to construction, Any changes or additions to the project plans or parameters should be submitted to LeLocations@ umen.com. L_ Note:the location(s)of facilities shown on drawings you receive from us, are only approximate. LUMEN hereby disclaims any responsibility for the accuracy of this information. Please contact LeLocations@ lumen.com regarding the above-mentioned project if you should have any questions. Please reference the file number P-479235 AZ with any future communications, Important Notice-For the States listed below,please add Lej_ocationsft�rightsp Sed.,corn to your distribution list for inquiries and updates regarding local facilities. (AL,AR,GA,It,IN,KS,LA, MI,MO,MS, NC, NJ,OH,OK,PA,SC,TN,TX,VA,WI) Thank you for your cooperation! Holden Boyden (Hezilim) Business Analyst Relocations Department about:blank 1/3 12/14/23,10-09 AM [External]SPRSAZEA-Under Review:City of Apache Junction General Plan Amendment-Silveray at Goldfield-Kelsey Schad- Holden.Boyjen@ lu men.c_om "We have combined!!To better serve everyone,there is now a single email inbox for LUMEN,One team is monitoring both national and local network relocations&road moves. Please add relocation c I@IyMgn,_QM to your contacts list for inquiries,updates, and use it for all future notifications.* From:Wagner, Kevin <kwagner@congruex.com> Sent:Friday,August 25, 2023 1:15 PM To:relocations<relocations@centurylink.com> Subject:,Fw:City of Apache Junction General Plan Amendment-Silveray at Goldfield CAUTIOR This email originated outside of Lumen Technologies.Do not click links or open attachments unless you recognize the sender and know the content is safe. From:owner-azreview@lxdnp 2k.corp tranet<owner-_azreView@lxdnp 2k.corp ntranet>on behalf of Kelsey In Schattnik<kschattntk@apachejlLnctionaz.gov> Sent:Thursday,August 24,2023 3:08 PM Subject:City of Apache Junction General Plan Amendment-Silveray at Goldfield CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless ou recognize the sender and know the content is safe. CAUTION:This email originated outside of Lumen Technologies.Do not click links or open attachments unless you recognize the sender and know the content is safe. Dear Neighbors and Interested Parties: Submitted for your review and comment is a general plan amendment request within the City Of Apache Junction (Case No. P-23-64-GPA). In accordance with state and city requirements,we are submitting this proposal to you as part of the 60-day review process. Please review the materials provided and convey your comments to Kelsey Schattnik,Senior Planner,via the contact information below,on or prior to October 23,2023.The City of Apache Junction values your comments and thanks you for your input.Thanks! All documents can be accessed through the below link: hAns,Udrive gg-ogLe—co—m-Ld—rl-v-elfo—ide—rsL'3d5lDb—h Fwcb!Lt���Mnih—aring Best, Kelsey Kelsey Schattruk,LEED Green Associate Senior Planner I Development Services Department City of Apache Junction,AZ (480)474-5085 abouttilank 213 12/14/23,%09 AM (External]SPRSAZEA-Under Review City of Apache Junction General Plan Amendment-Silveray at Goldfield-Kelsey Schatt_ kkschartnikcDap chejuncrionazg)v C_-a-- — �_ Hours:Monday—Thursday 7arn-tiptn;closed on Fridays. This communication is the property of Lumen Technologies and may contain confidential or privileged information. Unauthorized use of this communication is strictly prohibited and may be unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and destroy all copies of the communication and any attachments. about,,blank T3 LUMEN Relocate Utility Map E Z Ave E 30th VO" ....... Vig Doice Vita at Supersti Ig -----------------------------E-J a s p er-D r-------- ------- A D or]c0`1 V it or at, E fronstone Dr E Hawks Eye Dr DC;TJ�'V-Wa atSUperstition Falls P k 46 VA 'a CD titto 'a Dolce Vita 3t 1%41 17 f ;Z 0 0 x E Emerald Dr CL Z r ca A'e 0 0 E Diamond Dr C 0 Co N 1> 0 E Cinnebar Dr t t3 f E Beryl Dr % E Beryl Dr Z X E Aquamarine Dr Doice Vita at Superstition Falls E Mother Lode Dr E Nightdigger Dr 9/11/2023, 10:33:05 AM 1:4,514 Local Copper LIG Route ---- Underground,ln Construction ---- Underground,ln Construction 0 0.05 0.1 0.19 Mi ---- Underground,ln Service ---- Underground,ln Service Underground,in Service 0 0.07 0.15 0.3 km Fiber Cables Fiber Routes Earl Community Maps Contributors, @ OpenStreetMap, Microsoft, Aerial,ln Service Aerial,in Service Esri, HERE,Garmin,SafeGraph,GeoTechnologies, Inc,METI/NASA, USES, Bureau of Land Management, EPA, NPS, US Census Bureau,USDA @ map data Lumen @ 1992—2023 TomTom INTERNAL USE ONLY:This map data is for internal LUMEN use only and is NOT to be disseminated outside of LUMEN without authorization from RISK MANAGEMENT Dissemination ofthis data outside of LUMEN without authorization will be considered a violation of company policy. City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 13. File ID: 24-422 Sponsor: Kelsey Schaftnik Agenda Date:5/21/2024 Index: In Control: City Council Meeting Presentation, discussion, public hearing and consideration of Ordinance No. 1547 (case P-23-63-PZ), requested by Jason Barney and John Hartman with Olsen Recker/Guadalupe Properties LLC, and represented by Greg Davis with 1plan Consulting for a proposed planned development rezoning of 18 acres located at the southeast corner of US-60 and Goldfield Road from General Commercial by Planned Development("B-1/PD")and B-1/PD to High Density Multiple-Family Residential by Planned Development("RM-2/PD"). (This is the companion case to Major General Plan Amendment Case P-23-64-GPA). City of Apache Junction,Arizona Page 1 Printed on 511612024 City ofApache Junction 7 Development Services Department CITY COUNCIL PUBLIC HEARING STAFF MEMO Date: May 8, 2024 To: Honorable Mayor and City Council Members Through: Bryant Powell, City Manager Rudy Esquivias, Development Services Director Sidney Urias, Planning Manager From: Kelsey Schattnik, Senior Planner Case Numbers : P-23-63-PZ & P-23-64-GPA Subject: May 21, 2024, City Council Public Hearing: P-23-63-PZ: Proposed Rezoning of approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") P-23-64-GPA: Proposed Major General Plan Amendment to redesignate approximately 18 acres from Commercial to High Density Residential Summary P-23-63-PZ Is a Planned Development (PD) Rezoning request by Greg Davis with Iplan Consulting, representing the property owner, Jason Barney with Olsen Recker/Guadalupe Properties LLC, to rezone approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM- 2/PD") near the southeast corner of the US-60 and Goldfield Road. The subject site is proposed to be developed with approximately 271 rental units to be known as Silveray on Goldfield. P-23-64-GPA Is a proposed Major General Plan Amendment of APNs 103-01- 0110, 103-01-0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170 and 103-01-0180, located near the southeast corner of Goldfield Rd. and US-60, from Commercial to High Density Residential (40 du/ac) . "Silveray on Goldfield" Cases P-23-63-Pz & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo Planning & Zoning Commission Hearing and Recommendation Due to the requirements for a Major General Plan Amendment, the Planning and Zoning Commission held two (2) public hearings for these cases . The General Plan requires that these meetings be held in two (2) different locations . The Planning and Zoning Commission held the first public hearing for P-23-63-PZ & P-23-64-GPA on March 26, 2024 in the Superstition Fire and Medical District' s Board Room located at 565 N. Idaho Road. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. At this meeting, Staff made a presentation and introduced the preliminary recommended conditions of approval for the Planned Development Rezoning and Major General Plan Amendment. The applicant also made a presentation and answered questions asked by the Commission. Eight (8) residents of Golden Vista Resort spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . Water pressure concerns 3 . Increased density 4 . Property value concerns 5 . Maintaining commercial land 6. Increased traffic The Planning and Zoning Commission held a second public hearing for P- 23-63-PZ & P-23-64-GPA on April 23, 2024 . Both Staff and the applicant gave a presentation. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. Five (5) residents spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . The desire for commercial development at this site. 3 . Increased density. Ultimately, the Planning and Zoning Commission voted 4-3 to recommend approval of P-23-63-PZ & P-23-64-GPA, subject to the conditions of approval that were recommended in the Staff Report, dated April 23, 2024, with the elimination of Project Specific Condition Numbers 1 & 2 . Project Specific Condition No. 1 would have required the developer to reserve 5 acres on the north side of Resort Boulevard to remain commercial. Project Specific Condition No. 2 provided a list of General Commercial Uses that would not be permitted. "Silveray on Goldfield" Cases P-23-63-Pz & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo The commissioners who voted in favor of the proposed development discussed the following: 1 . The benefit of developing a historically vacant property. 2 . The benefit of adding additional rooftops . 3 . Whether this site is viable for commercial use and noted that the approved development plan has been in existence for 20+ years and has yet to be developed. 4 . Recent trends of commercial development. 5 . Not wanting to keep commercial property that may never develop. The commission members who voted against the proposal discussed: 1 . The desire of an ownership product at this site as opposed to a rental product. 2 . The lack of desire to continue changing the voter approved General Plan. 3 . The concern of changing commercial to residential. 4 . Concerns regarding the lack of affordability with market rate housing. Staff Recommendation Staff is recommending approval of cases P-23-63-PZ and P-23-64-GPA subject to the full list of conditions found within the Planning and Zoning Commission staff report, including project specific conditions 1 and 2, which are described below: 1) Lot Numbers 1, 3, 4 and 5 of the existing Superstition Falls Subdivision shall remain zoned General Commercial by Planned Development ("B-1/PD") . 2) The permitted uses in the B-1 zoning district shall be those which are permitted by Zoning Ordinance, Article 1-5, § 1-5-3: Non-Residential Use Regulations, except that the following uses shall not be permitted herein: Motor vehicle dealer (new or used vehicles; and similar uses) ; Thrift store/used merchandise sales; Medical marijuana facilities and dual licensees; Swap meets; Tattoo and/or piercing services; Death care services/funeral homes; Commercial parking lots and garages; Check cashing stores; Psychiatric and substance abuse facilities; Nursing and residential care facilities; Homeless shelter; Community food and relief services; Commercial equestrian boarding, rentals, arenas and academies; Cemeteries/mausoleum; "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo Scenic and sightseeing terminal/parking; Assisted living facility; Group care home; Multi-family residential (including apartments, condominiums or townhouses) ; Similar uses designated by the Development Services Director not conducive to the City' s and community' s goals and objectives for successful community commercial development. City Council Work Session - May 6, 2024 On May 6, 2024, the City Council reviewed cases P-23-63-PZ and P-23- 64-GPA at a work session. This item was for presentation and discussion only. The Council primarily had questions regarding the proposed size and location of commercial zoning being recommended by Staff, why Pinal County was opposed to the General Plan Amendment, and details as to why surrounding residents were opposed to the project. Major General Plan Amendment Please note that a major general plan amendment requires a 2/3 majority vote (5 out of 7) of the Council for approval . If the general plan amendment is not approved, the rezoning case cannot be approved. Three motions are required: • Major General Plan Amendment (Resolution No. 24-09) • Planned Development Rezoning (ordinance No. 1547 and Resolution No. 24-08) Attached: - Planning and Zoning Commission Staff Reports and attachments (March 23, 2024 & April 23, 2024) - Resolution No. 24-09 - Ordinance No. 1547 - Resolution No. 2408 -Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo ORDINANCE NO. 1547 AN ORDINANCE OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, AMENDING THE APACHE JUNCTION, ARIZONA, ZONING ORDINANCE, BY AMENDING THE ZONING DISTRICT MAP, CITY OF APACHE JUNCTION, ARIZONA, CHANGING THE ZONING DISTRICT CLASSIFICATION FOR A PROPOSED NEW RENTAL COMMUNITY TO BE NAMED "SILVERAY" LOCATED ON THE PROPERTY DESCRIBED IN REZONING CASE P- 23-63-PZ FROM GENERAL COMMERCIAL BY PLANNED DEVELOPMENT ("B-1/PD") AND B-1/PD TO HIGH DENSITY MULTIPLE-FAMILY RESIDENTIAL BY PLANNED DEVELOPMENT (NNRM-2/PD") ; ADOPTING BY REFERENCE THAT CERTAIN DOCUMENT TITLED "LEGAL DESCRIPTIONS AND ZONING CONDITIONS OF CASE NO. P-23-63-PZ; REPEALING ANY CONFLICTING PROVISIONS; AND PROVIDING FOR SEVERABILITY. WHEREAS, the Silveray subject site is comprised of seven (7) parcels : Pinal County Assessor Parcel Nos . 103-01-0110, 103-01- 0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170, 103- 01-0180; and WHEREAS, the subject site is currently located within the Superstition Falls Commercial Subdivision; and WHEREAS, the subject site is bifurcated by a privately owned roadway known as "Resort Boulevard" and is currently governed by two previously adopted ordinances in 2000, Ordinance No. 1144 and Ordinance No. 1146; and WHEREAS, Ordinance No . 1144, which governs the parcels north of Resort Boulevard, approved a development plan for a commercial center, which has yet to be fully developed; and WHEREAS, Ordinance No. 1146, which governs the parcel south of Resort Boulevard, approved a 60-bed hospital campus, which has also yet to come to pass; and WHEREAS, the applicant applied for a rezoning of all seven parcels to construct approximately 271 rental units; and WHEREAS, on April 23, 2024, the Apache Junction planning and zoning commission voted 4 : 3 to recommend approval of rezoning case P-23-63-PZ; and ORDINANCE NO. 1547 PAGE 1 OF 3 WHEREAS, pursuant to A.R. S . § 9-462 . 01 (1) , the city council, before adopting any zoning ordinance or text amendment of general applicability, shall consider the probable impact the proposed zoning ordinance or text amendment would have on the cost to construct housing for sale or rent; and WHEREAS, the city council has determined the adoption of this ordinance or text amendment will have no negative impact on the cost to construct housing for sale or rent as delineated under A.R. S . § 9-462 . 01 (1) ; and WHEREAS, A.R. S . § 9-802 permits municipalities to enact the provisions of a code or public record theretofore in existence without setting forth such provisions in full text as long as the adopting ordinance is published in full text and at least one paper copy of the code changes or public record are filed in the of f ice of the clerk of the municipality and an electronic copy is accessible on the city' s website and made available for public inspection. NOW THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF APACHE JUNCTION, ARIZONA, AS FOLLOWS : SECTION I IN GENERAL 1 . That the planned development rezoning, as recommended by the city council in case P-23-63-PZ, is approved with conditions adopting by reference pursuant to Section 2 below. 2 That certain document entitled "Legal Descriptions and zoning conditions of case no. P-23-63-PZ", one paper copy filed in the office of the city clerk and one electronic copy accessible on the city' s website, with such document declared a public record by Resolution No. 24-08 of the City of Apache Junction, is hereby referred to, adopted by reference and made a part hereof as if fully set out in this ordinance, pursuant to A.R. S . § 9-802 . SECTION II REPEALING ANY CONFLICTING PROVISIONS All ordinances and parts of ordinances in conflict with the provisions of this ordinance or any part of the codes adopted herein by reference are hereby repealed. ORDINANCE NO. 1547 PAGE 2 OF 3 SECTION III PROVIDING FOR SEVERABILITY If any section, subsection, sentence, phrase, clause or portion of this ordinance or any part of the codes or regulations adopted herein by reference is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions thereof. PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, THIS DAY OF 1 2024 . SIGNED AND ATTESTED TO THIS DAY OF 2024 . WALTER "CHIP" WILSON Mayor ATTEST: JENNIFER PENA City Clerk APPROVED AS TO FORM: RICHARD JOEL STERN City Attorney ORDINANCE NO. 1547 PAGE 3 OF 3 LEGAL DESCRIPTIONS AND ZONING CONDITIONS OF CASE NO . P-23- 63-PZ 1 A) The mayor and council passed Ordinance No . 1547 on May 21, 2024, which approved the planned development rezoning of the approximately 18-acre property, located at the southeast corner of US-60 and Goldfield Road, legally described as follows : Parcel 1 (103-01-0110) : LOT 1 SUPERSTION FALLCOMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 2 (103-01-0130) : LOT 3 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 3 (103-01-0140) : LOT 4 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 4 (103-01-0150) : LOT 5 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 5 (103-01-0160) : LOT 6 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 6 (103-01-0170) : LOT 7 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E Parcel 7 (103-01-0180) : LOT 8 SUPERSTION FALLS COMMERCIAL CAB G - SLD 066 SEC 35 1N-8E B) The approval is subject to the following zoning conditions : STANDARD CONDITIONS 1) All the provisions of the zoning ordinance are applicable to this case . 2) The development shall reflect substantial compliance and consistency with the planned development presented with case P-23-63-PZ, P-23-64-GPA and P-23-65-DR incorporated by reference herein, and as otherwise specified through these conditions of approval, to include site layout, elevations, setbacks, public and private rights-of-ways, easements and tracts, amenities (including proposed pool and clubhouse) , perimeter and interior lot separation walls, model types, landscaping and other improvements . 3) Landscape, screening and irrigation improvements, planted within a minimum 10-foot-deep strip inside the 2 net property line (but outside of required walls) along the perimeters of the property, shall be provided in compliance with the city' s landscape and screening requirements contained in Apache Junction City Code, Volume II, Land Development Code, Chapter 1 : Zoning Ordinance, Article 1-8 : Landscape Regulations . All required trees shall be 24" box and all required shrubs shall be 5-gallon in size and a decorative 6-foot-tall wall shall be constructed on all roadway frontages . 4) Street improvements include but not necessarily limited to, extension of pavement and the provision of sidewalk, curb, gutter, streetlights, underground utilities, fire hydrants, landscaping shall be required as part of this planned development project, and subject to review and approval by the city engineer. 5) All applicable permits shall be applied for and plans shall be designed to current city codes prior to any lot grading or construction on the lots . Inclusively, all applicable development fees, including, but not limited to, public art fees, shall be paid at the time of permit issuance . Development fees shall be paid on a per unit basis . 6) All common areas, amenity areas, and tracts within and immediately adjacent to the proposed development, including perimeter walls and fences, and interior and exterior common area landscaping, shall be owned and maintained in good condition at all times by the owners or homeowners association of the proposed subdivision. 7) The developer' s engineering shall meet the civil engineering improvement plans and document requirements, as outlined in the previously provided pre-application and review comments and in accordance of the City' s approved engineering standards that are in effect at the time of plan submittal . 8) Minor PD modifications or alterations of the approved architecture designs, floor plans, open space, unit mix, unit count, clubhouse location or development plan, shall be administratively reviewed and approved by the development services director or his or her designee. 3 9) Major deviations or proposed changes from the original plans associated with this case will require a Major PD Amendment. The director or his or her designee shall interpret the proposed modification to be significant/major, if, in his or her opinion, the modified project density (i .e . , units per acre) is proposed to be increased by more than 10%, the quality of project design is diminished, the types of proposed land uses are significantly altered and/or the overall character of the project is contrary to the intent and spirit of the original city council PD ordinance approval . PROJECT SPECIFIC CONDITIONS 1) The maximum height for the site shall be limited to 30- feet. 2) A reduced rear setback of 8' shall be permitted on the parcels north of Resort Boulevard. 3) The proposed development will not be age-restricted. 4) Resort Boulevard will remain a private road and will not be dedicated as public right-of-way. 5) The City will transfer ownership, maintenance, and payment of all existing streetlights along Resort Boulevard to the adjacent property owners/commercial homeowner' s association. 6) The four curb returns along the intersection of Goldfield Road and Resort Boulevard and Chevron Gas Station shall be updated to current American Disabilities Act standards . 7) Concrete sidewalk shall be added from the north existing access drive heading north to tie into the existing sidewalk located within the Arizona Department of Transportation right-of-way as required by the city engineer. 8) Any other future improvements to existing public facilities in Goldfield Road will be per city standards and as required by the city engineer. 4 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 14. File ID: 24-423 Sponsor: Kelsey Schattnik Agenda Date:5/21/2024 Index: In Control: City Council Meeting Presentation, discussion, public hearing and consideration of Resolution No. 24-08, declaring as a public record that certain document filed with the City Clerk and entitled "Legal Descriptions and Zoning Conditions of Case No. P-23-63-PZ;" repealing any conflicting provisions and providing for severability. City of Apache Junction,Arizona Page 1 Printed on 511612024 City ofApache Junction Development Services Department CITY COUNCIL PUBLIC HEARING STAFF MEMO Date: May 8, 2024 To: Honorable Mayor and City Council Members Through: Bryant Powell, City Manager Rudy Esquivias, Development Services Director Sidney Urias, Planning Manager From: Kelsey Schattnik, Senior Planner Case Numbers : P-23-63-PZ & P-23-64-GPA Subject: May 21, 2024, City Council Public Hearing: P-23-63-PZ: Proposed Rezoning of approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM-2/PD") P-23-64-GPA: Proposed Major General Plan Amendment to redesignate approximately 18 acres from Commercial to High Density Residential Summary P-23-63-PZ Is a Planned Development (PD) Rezoning request by Greg Davis with Iplan Consulting, representing the property owner, Jason Barney with Olsen Recker/Guadalupe Properties LLC, to rezone approximately 18 acres from General Commercial by Planned Development ("B-1/PD") (Ordinance No. 1144) and B-1/PD (Ordinance No. 1146) to High Density Multiple-Family Residential by Planned Development ("RM- 2/PD") near the southeast corner of the US-60 and Goldfield Road. The subject site is proposed to be developed with approximately 271 rental units to be known as Silveray on Goldfield. P-23-64-GPA Is a proposed Major General Plan Amendment of APNs 103-01- 0110, 103-01-0130, 103-01-0140, 103-01-0150, 103-01-0160, 103-01-0170 and 103-01-0180, located near the southeast corner of Goldfield Rd. and US-60, from Commercial to High Density Residential (40 du/ac) . "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo Planning & Zoning Commission Hearing and Recommendation Due to the requirements for a Major General Plan Amendment, the Planning and Zoning Commission held two (2) public hearings for these cases . The General Plan requires that these meetings be held in two (2) different locations . The Planning and Zoning Commission held the first public hearing for P-23-63-PZ & P-23-64-GPA on March 26, 2024 in the Superstition Fire and Medical District' s Board Room located at 565 N. Idaho Road. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. At this meeting, Staff made a presentation and introduced the preliminary recommended conditions of approval for the Planned Development Rezoning and Major General Plan Amendment. The applicant also made a presentation and answered questions asked by the Commission. Eight (8) residents of Golden Vista Resort spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . Water pressure concerns 3 . Increased density 4 . Property value concerns 5 . Maintaining commercial land 6. Increased traffic The Planning and Zoning Commission held a second public hearing for P- 23-63-PZ & P-23-64-GPA on April 23, 2024 . Both Staff and the applicant gave a presentation. Please see the attached staff report and exhibits presented to the Planning and Zoning Commission. Five (5) residents spoke during the meeting. Their primary concerns included: 1 . The two-story height of the development 2 . The desire for commercial development at this site. 3 . Increased density. Ultimately, the Planning and Zoning Commission voted 4-3 to recommend approval of P-23-63-PZ & P-23-64-GPA, subject to the conditions of approval that were recommended in the Staff Report, dated April 23, 2024, with the elimination of Project Specific Condition Numbers 1 & 2 . Project Specific Condition No. 1 would have required the developer to reserve 5 acres on the north side of Resort Boulevard to remain commercial. Project Specific Condition No. 2 provided a list of General Commercial Uses that would not be permitted. "Silveray on Goldfield" Cases P-23-63-Pz & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo The commissioners who voted in favor of the proposed development discussed the following: 1 . The benefit of developing a historically vacant property. 2 . The benefit of adding additional rooftops . 3 . Whether this site is viable for commercial use and noted that the approved development plan has been in existence for 20+ years and has yet to be developed. 4 . Recent trends of commercial development. 5 . Not wanting to keep commercial property that may never develop. The commission members who voted against the proposal discussed: 1 . The desire of an ownership product at this site as opposed to a rental product. 2 . The lack of desire to continue changing the voter approved General Plan. 3 . The concern of changing commercial to residential. 4 . Concerns regarding the lack of affordability with market rate housing. Staff Recommendation Staff is recommending approval of cases P-23-63-PZ and P-23-64-GPA subject to the full list of conditions found within the Planning and Zoning Commission staff report, including project specific conditions 1 and 2, which are described below: 1) Lot Numbers 1, 3, 4 and 5 of the existing Superstition Falls Subdivision shall remain zoned General Commercial by Planned Development ("B-1/PD") . 2) The permitted uses in the B-1 zoning district shall be those which are permitted by Zoning Ordinance, Article 1-5, § 1-5-3: Non-Residential Use Regulations, except that the following uses shall not be permitted herein: Motor vehicle dealer (new or used vehicles; and similar uses) ; Thrift store/used merchandise sales; Medical marijuana facilities and dual licensees; Swap meets; Tattoo and/or piercing services; Death care services/funeral homes; Commercial parking lots and garages; Check cashing stores; Psychiatric and substance abuse facilities; Nursing and residential care facilities; Homeless shelter; Community food and relief services; Commercial equestrian boarding, rentals, arenas and academies; Cemeteries/mausoleum; "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo Scenic and sightseeing terminal/parking; Assisted living facility; Group care home; Multi-family residential (including apartments, condominiums or townhouses) ; Similar uses designated by the Development Services Director not conducive to the City' s and community' s goals and objectives for successful community commercial development. City Council Work Session - May 6, 2024 On May 6, 2024, the City Council reviewed cases P-23-63-PZ and P-23- 64-GPA at a work session. This item was for presentation and discussion only. The Council primarily had questions regarding the proposed size and location of commercial zoning being recommended by Staff, why Pinal County was opposed to the General Plan Amendment, and details as to why surrounding residents were opposed to the project. Major General Plan Amendment Please note that a major general plan amendment requires a 2/3 majority vote (5 out of 7) of the Council for approval . If the general plan amendment is not approved, the rezoning case cannot be approved. Three motions are required: • Major General Plan Amendment (Resolution No. 24-09) • Planned Development Rezoning (Ordinance No. 1547 and Resolution No. 24-08) Attached: - Planning and Zoning Commission Staff Reports and attachments (March 23, 2024 & April 23, 2024) - Resolution No. 24-09 - Ordinance No. 1547 - Resolution No. 2408 "Silveray on Goldfield" Cases P-23-63-PZ & P-23-64-GPA May 21, 2024 - City Council Public Hearing Memo RESOLUTION NO. 24-08 A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, DECLARING AS A PUBLIC RECORD THAT CERTAIN DOCUMENT FILED WITH THE CITY CLERK AND TITLED "LEGAL DESCRIPTIONS AND ZONING CONDITIONS OF CASE NO. P-23-63-PZ"; REPEALING ANY CONFLICTING PROVISIONS; AND PROVIDING FOR SEVERABILITY. WHEREAS, Arizona Revised Statutes Annotated (hereinafter "A.R. S . ") § 9-802 permits municipalities to enact the provisions of a code or public record in existence without setting forth such provisions in full text as long as the adopting ordinance is published in full text, and one paper copy is filed with the city clerk and an electronic copy is accessible on the city' s website, with both made available for public use and inspection; and WHEREAS, pursuant to A.R. S . §§ 9-801 (1) and 9-802, such codes include zoning conditions approved in rezoning cases; and WHEREAS, city staff has identified such provisions herein, and it is the intent of the city to declare such documents and compilations as public records, on file in the office of the city clerk. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA AS FOLLOWS : SECTION I IN GENERAL 1 . That certain document titled the "Legal Descriptions and zoning conditions of case no. P-23-63-PZ", of which at least one paper copy is on file with the city clerk and one electronic copy is accessible on the city' s website (www.apachejunctionaz .gov) , is hereby declared to be a public record, and shall be made available for public use and inspection. SECTION II REPEALING ANY CONFLICTING PROVISIONS All resolutions and parts of resolutions in conflict with the provisions of this resolution or any part of the codes adopted herein, are hereby repealed. RESOLUTION NO. 24-08 PAGE 1 OF 2 SECTION III PROVIDING FOR SEVERABILITY If any section, subsection, sentence, phrase, clause or portion of this resolution or any part of the codes or regulations adopted herein is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions thereof. PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA, THIS DAY OF f 2024 . SIGNED AND ATTESTED TO THIS DAY OF 2024 . WALTER "CHIP" WILSON Mayor ATTEST: JENNIFER PENA City Clerk APPROVED AS TO FORM: RICHARD JOEL STERN City Attorney RESOLUTION NO. 24-08 PAGE 2 OF 2 City of Apache Junction, Arizona 300 E Superstition Boulevard Agenda Item Cover Sheet Apache Junction,AZ 85119 Agenda Item No. 15. File ID: 24-434 Sponsor: Liz Langenbach Agenda Date:5/21/2024 Index: In Control: City Council Meeting Presentation, discussion, and possible adoption of the Rodeo Grounds Event Center Master Plan. City of Apache Junction,Arizona Page 1 Printed on 511612024 City of Apache Junction ' Home of the Superstition Mountains DATE: May 8, 2024 TO: Mayor and City Council THROUGH: Bryant Powell, City Manager Matt Busby, Assistant City Manager FROM: Liz Langenbach, Parks & Recreation Director David Butler, Parks Superintendent SUBJECT: Rodeo Grounds Master Plan Update The original Rodeo Grounds Master Plan was adopted in 2006. Since that time, only the first phase was implemented: restrooms and covered grandstands. Since purchasing the rodeo grounds in June 2023, the Parks and Recreation Department has been working with J2 Engineering & Design ("J2") to solicit public feedback, conduct stakeholder meetings, and draft an update to the original plan. The draft was presented to the Parks and Recreation Commission and at a public Open House on February 7t", 2024 and the updated draft was presented to city council on April 15, 2024. The estimated probable cost is approximately $23,000,000 and can be broken into as many phases as desired/needed. The recommended phasing plan allows for construction to take place without interrupting other future phases. It also allows for incremental growth in events and activities as funds become available. Staff respectfully recommend adoption of the master plan concept by city council. Once the master plan has been approved, phasing can be finalized based on funding and immediate needs. PARKS & RECREATION April. 21, 2024 Y i�k rr ra" m u m :i r j n" v: k "z., s �u'� ll'�:' Nv� 7,w ur , fi u k„ L r. t u.r r r 4 nr lttr } h s§ u Y 2 " t t} I j f !" T � i+ t is ,t s P,{ t i i s t f �( RODEO EVENT CENTER MASTER PLAN UPDATE k"{,. , r r ti i" Y l t t ...... .. ..,.„ ,, "tti} :n;�txi .m •^'".� t:, t, x= 4 .+r",_„, ..... .,. r cr: . .IG Al t t r t # t r f, t t Y £ i r i } r'. r 4} 14 r If Y:I t Y x S a ) lr f 1 ry r r t t t �1 4ir£ tr ,r 4t tY z tr,i r }t h I r, t E4+k, c Igj.t, e° Y�x {3 *Yl ini } w( 1is ? s b RODEO EVENT CENTER BACK6 WINr£.............. > � 1986 - Ci too over t e B (Burv^au� tease � i oRecreation and Public Pulspose Act �iowed development and usefree ofprohibitedm� ri o c a a but co e c al use U 2006 - Original Adopted t { une - Purchaser r was finalize 20 ace o e l r s r . commercial use ��jllft�yl SY rt 7 . }}� � ct er 621023 - Ro eo Groun s Ce a ration - transfer of "ke s � y r�fr�':f�}tt�;tis rl � ��rt r3 ijti l J r S i f1 r mBIM to Ci or & Kicked-oiltiepublic-inputprocess ror the master � {{{ u date ................................... r{ 4 Y�x {3 *Yl ini } w( 1is ? s b RODEO EVENT CENTER BACKG EWWIN............... 'r£ > � November 14211t13 - Event Planners Stake-holder Meeting h artJ2 Engineering & Design 0 0 0 • Staff and City Counci sessions conducted to deu. elop and review ra of master plan t { { i r Presentednow d"aOpena r�ua 7,, 20-.24 - at and to e Parks & Recreation Commission sm� { rfl 15, 20-24- Presentedfinal d planCityto} cfl 8 YS { law ��p'!Iv, T T"', 110",, JQMKT— 1, 0hr I KA.p... 1"M of two 01 Ole? jummkik MOM wow, ---Vy xg,jm El IN, win Mpg 1:4 ��Rt goo"wo an WWI-M", omit V&SM sox ........... vwv-a 01 � , 1 vt n lop jr WAS 'am d RIO dh, JR. , 7� " " " 01 y TV F"ENO DAMPS ATIMI"A coup ."Am"0 AQ mom% 01 -00�.Uw- AS"WA, own 0 to Hh',"�,"'Vovh . by I I — - ,, m AWN A gum tu,'L�! V! NEW 0 MR, :soup 00 N WE r r r r r rt{„ r t,'C , �" t,. S k� 2 ! u tnr•wxrtJ r}l,., }ti�`4a• '�`','Y' er =2� Y',�}x t }�"' t #Y � �, r }' r t,r3 n ,k ! r.s }.}`:•. ;^i' $,,." }Y} qt} ? $7�}t S wi��l n!yr} t r`�i{}; F= t t?t+=,.� a tt�=rst s, }t�k"'`' 7 r, N'' $ t�' �• „ $r t,;� z a �Sf� et Y } r�{'�$fi t' y ii s � 5rta t£ 5 i 147 r3 �£ 4 ` $nz "; t•,��r r Y w $}t �:'=o �';;�; ,:Y,4 {£ s l t rJt.,,,.,t ft$ .lt�: ,»;:Ht ?�s t'�' �;its xt� r£w •,•D„� x} r' }r, , a ! t 4 n. .:..t; „aFR4i .,,. ?,.} 1;�z, ,.5 ,.,., ,,,, },. „r,;,: �# R •S. .e.,;fi: �}rbr} „ .,ki't p ,,,r. ., �. .,,,•,£}U.J.tf {ti£}...,.ry Q: r.,,:,1 ,:. .}F :, ..•.. ,} {S,�rk �$„ �; t r t t 7 t !'4 t t 1, EEn",,.n , t :,.,<t r,,: .t ., t{t .f ,v. ,<....,, �.., r ,,, o.. {„ ,. •, t. � .n,.. ".,. .,.. .4 J} n, ,. ., r t%7 1 4. ft ;.tt i v, tr' 't'. <.. ,... 3, , •.. ,...• ,n .t} t ,.. , rS ,., t ,. t 3„»;,. .•. , ., ,. 1. r ,:, r .,. ,,..». „t,trt,, ::,,,.. <.. i s:: ",r, r, »,t „r, r �,: ,:. rt. :, ,, r ...r",•:tF 4t tYt. ..,..} rtt,,:," :,t ,.. lk1.. >. ,. ,tr„>, ","!, .., rt:••.. :, �:- ,r=4.,, :.s }' r. .. }. 4 ,•rl,. "v" 3�YSS,3:,Y}.. ,7< zt r£ i'� �f; .• r „'. _;,. t.rt" to '¢ >} rr stk. ,r. r" .� •, ', ,... ,f , LOW t {, }rttrti2 r i i }Sr=r e :,{$:.� 1�7,}F}{ tR}IJ .}. ki. �'t, 1}F�� �.r..•tt ,..r$ }u wt �t t• s4 3 I ,j f+» 4-r JJ.,. 3 S }r i trd t t } Y' t Fr n `ri ;'n, { i. <£{ {' ,pg; .rf t•,r{"r, i j• i��.=. { t .{twr far, '$ zr' ,t t±� �\ sy{Yr =,g;;� rwi£r ,f 2{: �J`=" wr V S t t �tr Vy C 7 Y,.Y� t; f(r:; Y t" _ t�t€`•±1, r 4< ¢t!'{`; ,`��` lowtl,,"t t' t i, tx „�<'»rrz ,i;• < T {Y' �`"}'Yak• f$ia ty;n, t�Y ,<.' r, 4 i t # w ow t z L "i ` { r}„ ,}[ �.tnS $Ji,S,� 's•S :" t'R't`,"4�tr{ � .t '1 , rt k •,fit � 'a`9 �Y f" ss t tt . ;:,",:.,,.. ;„r t :, ?Y'°;,, .„ :� �,., "; ,, » _ ,,: ,,.,,,lS.�. w s' °"kf}2 t•: r r,„ 't r "xt y 1 !„•,t{? s,, t,.t (N 7 tss,. ,tr �!},,r ! �€ r St a r. t ,r r r. .,t" r t � r„}5 a»... ,:. , r., „r ". ,,.. rt =. ,t ., ..•. , �:., .., ,,. r. .. � >~• ., ,,, .,.: ..4 :. .4 ... .,, ir,...,. rr, ,. <r.., 5. t ,,,,., r. ,). f'. t s "„ r. f..t r• , F. � ,a ..,:... �. , , „ ,,,. r.. rr,a ... ,, ,:.rv, r ,t, n, 4 », ,.,1, „r,. „,t.,..,," su.;. , u'.,.s ..u,: ::,,,,: .,.. .} r,Y � ,.,5 + ,. u" r� , wY:.. ., t• a.,..•�..,; r.} c1r, r,rwr,=€r ,$„ , ., ,it}},.. �, .. r. r ,. ,,..: ri»u}'r;,j �{;rt�. n, rzrt5 r,��Q���{r}�2�5{r#it�`k�. rrre�� >• `� r rcav }r •. r � r r ,} ,::, ,.•. „r,r r., tl;. , , ..,, r„ ;. ,:; " ' jr,e� r } '.c<" ,{.,. r. "?;; ;i�,<: } ;r ., , ". r"..�n, ry r �r ,.r �,� ,. f,.. .£ :v f.r �x� r, fi. », x=„,r. '.a, r ,., r „ ., cr =;•,. x ? f i r, r 2.» ,5 r,_ •',: ",r, ,, ,, ry , , r., ,7 i.. , .n Yt+ , .... F Z ,... ..,, z.. 3t:.. ::=s. .. , , s, t „•, ,. ., r ,..E , 3 r .4 r } ,..., r<„ .r.. ..•.,. 9 ,.2 , ! :. � ..: r s�, }, ,•." rr" ;G ,:" ,. a <. F, ,. .,.,,r i= .,r x » ry f'.,rv» .. -,�, i, ,r ,. ., ,: „y`� 7 a. .# .t ', t .•.. '"r=: _ , s, ., w,.. ,4r, .,... .n „ ,.� ....,„ • } al •,i.. ,t.2, r L :•r. « .. ., ...r .,.. .,.,. ,'•:-=s ...: z , ,,,e. .: v.., t,SSi, ^s „ >t. tr, ,.,. t} t„t1 Srr..w.tP a r, r„r ,., ,. ,, .»,.>a ,: .., „ ,' ry ... ,'r„J,.,>. •L.rs,,; ., _' } r FI ,>.. „., � t. "m V;�15,TV ;,,,,'W 41� S �Ail ""Pu RYV� f VIQ X V ow "OF *�T 'i IWO j P g4w PI 4P�,!AAAU�,,,ollrooi R, A", ............. F "'W I=1 31 101 NEE= �',,`l",Pfdodt4d Sleac nnou,ne lift PWO 4$0 hdd6,`,Stk f6� ernpordq� �`N e" XRM" 'd E- t"s propo$ed q von pace , Weather lRostroo "MA pp"IrIM"', 0:,si 4 d6 it it la, HIR�illl':Ill'i -qln, 4L, 4M AWN a b ft ow MESA 01, Dosed ft, "g, 7- C d"Stalit""Ill", 0 0 (60)`,,`,,,q "'Al ��Xij qjnton tj 1f� t�l � ✓ } r t �. t F s , s u r rt' £ tr J tr s hk` p t $ {it F { , , i t" t .,,, r .�, }d k t~: Ys,. rs,...}. ,,„ -, „:r,s. .,•.,, ,, ,,,Lf7 1 n t ,,a,rtj,t t$,. 5��'- t 5 ;e;? t. n t ' Event SpaC@ Stag@ Shade Structure Shade!Structure Events e,'• tr� � S`td , 34 j x ' t= { r ttt a j#i� t ' {fy :5 ✓ � t: 1t7 l ttkk3 f�S ,,,,,,. Y r4 X� s 3 �tr " ,e f,{y yr, t { b Y✓( a rr .r P Event Sp Stage EVent Space/Stage Events { r } ��t r Events JI r; silt ?tt�t�'S3x}t „7 t xy�rrra {} r 5 y r r E�k � 2 * s r,,;it rt t S,✓r r...t lt. r < 4, } k S= ,t, f t s tt Mom , ✓ "a }S. - t r ,t�: t{rrs>?;'vjq,r, FT t, '..4r,3s „?`t,:,,' t rs ¢+ t3 £ tt#^ F � +� �. �rrdrrit�trrwf{trt '� � � t #fr}1; Gcvered le Cher �fi Announcer Booth Covered Stalls Covered Stalls t ,ate.,,„, tt/yyyCt� 3y it t�jT t�STAFF RECOMMENDATIO y rtyf}tri�t�it �`+�� 14 L1�� 4 {i ry#f } �s Staff respectfully ."ecom-m--end council adoption of the In Rodeo Master Plan concept. Event Upon adoption, staff Will workwzt city management and city rt7t r t council to determine phasing of all p based on funding. rrr{� i i t tt{tt r r t� �tz�ti�{sty t Ott;fi#rtt yl it t �� ���t�t1 tty j}} t t(r4l rjyyl �{��t��5�44y81fY14 ,y t 2 ` t t � 4 i ryr�i tr{}r: 4 i r� � r t �Ek 1r tv,ya �, �,,, y�: i i li � � r i I i r CITY COUNCIL MEETING ROLL CALL Date: /��a�` !!l ail a / ` �s�QTC y;7 S�fS Work Study ."-. ,Regular Special 5/ail S: � E:�",53 S:�I;00 E:9�yl S:' af��E:�%�D �°�`�. CITY COUNCIL: Present Ab/excu Present Ab/excu Present Ab/excu ;d fp MAYOR WILSON VICE MAYOR SCHROEDER ,I�/ COUNCILMEMBER CROSS t/ V / 1✓/ COUNCILMEMBER HECK COUNCILMEMBER JOHNSON 1Z COUNCILMEMBER NESSER v v COUNCILMEMBER SOLLER TOTAL 1fy 61 Ll CITY STAFF: Present Ab/excu Present Ab/excu Present Ab/excu, / City Manager Bryant Powell V/ i/ 7/ Assistant City Manager Matt Busby ✓ t/ City Clerk Jennifer Pena / City Attorney Joel Stern V V Information Technology Director Doug Wirthgen 4xu-b' e-- rA C Public Safety Director Michael Pooley V Dev Services Director Rudy Esquivias PW Director Ted Wolff Parks& Rec Director Liz Langenbach ED Director Patrick Ainsworth Library Director Pam Harrison Finance Director Angelie Hawley HR Director Anna McCray Water District Director Mike Loggins V Municipal Ju ge A. Doug LaSota f� OTHERS: Deputy City Clerk Evie McKinney .Planning anager Sidney Urias Building&Saf ty Mngr Adrian Alegria AM Senior Planner E�e Planner P ' C( { eWey � -Pla ner Nick Leftwich PW Project Engineer Raquel Schatz City Engineer Emile Schmid S1,tenlipky tc�;& Forms\Ball Call t c i ,� .doer i ,° F r '. �� ce v1 Vn i Ci f. �►�.c,P�-��t e�^� ►/ City Council VOTE - ROLL CALL I- - MEETING ITEM # OF MOTION BY: - SECONDED BY: NOTES: YES NO ABSTAINED CITY COUNCIL COUNCILMEMBER SOLLER VICE MAYOR SCHROEDER V COUNCILMEMBER NESSER COUNCILMEMBER CROSS v.1 COUNCILMEMBER HECK COUNCILMEMBER JOHNSON MAYOR WILSON TOTAL UNANIMOUS IN FAVOR OPPOSED ABSTAINED TOTAL Vote sheet 1 S:/5—Templates&Forms/Vote Call—City Council City Council VOTE - ROLL CALL ITEM # �r' 3� MEETING OF MOTION BY: SECONDED BY: l / NOTES: f1 D01 e-0 LZ �(nn N 1�/I otiS e+� Pf a&i uf& d --� YES NO ABSTAINED CITY COUNCIL: COUNCILMEMBER NESSER COUNCILMEMBER JOHNSON COUNCILMEMBER CROSS COUNCILMEMBER HECK COUNCILMEMBER SOLLER VICE MAYOR SCHROEDER MAYOR WILSON TOTAL UNANIMOUS IN FAVOR OPPOSED ABSTAINED TOTAL Vote sheet 2 S:/5—Templates&Forms/Vote Call—City Council City Council VOTE,- ROLL CALL ITEM # ' a��y 2.� MEETING OF a MOTION BY: SECONDED BY: `r NOTES: lut 4t91, YES NO ABSTAINED CITY COUNCIL: COUNCILMEMBER SOLLER COUNCILMEMBER NESSER COUNCILMEMBER CROSS COUNCILMEMBER JOHNSON V VICE MAYOR SCHROEDER V COUNCILMEMBER HECK V MAYOR WILSON r TOTAL rA 0-4 UNANIMOUS IN FAVOR OPPOSED ABSTAINED TOTAL Vote sheet 3 S:/5—Templates&Forms/Vote Call—City Council Date: '7 CITY OF APACHE JUNCTION REQUEST TO SPEAK FORM Please fill out completely and return to the City Clerk PRIOR to the conclusion of the City Manager's Report portion of the agenda. I would like to speak on Agenda Item #: I would like to speak on a Non-Agenda matter regarding: / Do you wish to speak before Council on this item? Yes-),;,Z No Only If Necessary I am in favor of the proposed Item. 1 am opposed to the proposed Item. First Name Last Name (PRINT) Address V City Zip Code e Telephone Email address This information will be used by staff for follow-up, if necessary. Speakers shall make comments directly to the Mayor and City Council when called up to speak at the podium. Note: Call to the Public comments have a three minute limit and Public Hearing comments have-a five minute limit. Consent for Minor to be Audio and/or Video Recorded: as the parent/guardian of (minor(s)), a minor(s), agree to allow said minor(s) to appear and/or participate in the City of Apache Junction City Council Meeting. I further understand that this activity may,be audio and/or video recorded and I hereby consent to the minor being audio and/or video recorded during his/her participation with the likelihood that their image will appear on cable TV and the internet video stream showing their participation. A.R.S. § 1-602 (A)(9)_ Signs ure of Paren Guardian Me 08/26/2019 Date:J CITY OF APACHE JUNCTION REQUEST TO SPEAK FORM Please fill out completely and return to the City Clerk PRIOR to-the conclusion of the City Manager's Report portion of the agenda. I would like to speak on Agenda Item #: I would like to speak on a Non-Agenda matter regarding: Do you wish to speak before Council on this item? Yes No Only If Necessary V I am in favor of the proposed Item. I am opposed to the proposed Item. - First Nam Last-Name (PRINT) N7�_� fVZ 3�oo K) -��()A aw KZF-- Address City Zip Code Li�P� � �� o 1 , coy, Telephone Email ad ess This information will be used by staff for follow-up, if necessary. Speakers shall make comments directly to the Mayor and City Council when called up to speak at the podium. Note: Call to the Public comments have a three minute limit and Public Hearing comments have a five minute limit. Consent for Minor to be Audio and/or Video Recorded: I, , as the parent/guardian of (minor(s)), a minor(s), agree to allow said minor(s) to appear and/or participate in the City of Apache Junction City Council Meeting. I further understand that this activity may be audio and/or video recorded and I hereby consent to the minor being audio and/or video recorded during his/her participation with the likelihood that their image will appear on cable TV and the'internet video stream showing their participation. A.R.S. § 1-602 (A)(9). Signature of Parent/Guardian Date 08/26/2019