Loading...
HomeMy WebLinkAboutRES 92-21RESOLUTION NO.92-21 A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION, ARIZONA,GRANTING AN EASEMENT TO SALT RIVER PROJECT FOR THEIR EXISTING TRANSFORMER PADS AND OVERHEAD LINES,AND DIRECTING THE CITY MANAGER TO SIGN AND RECORD APPROPRIATE DOCUMENTS ON BEHALF OF THE CITY. WHEREAS,Salt River Project provides necessary electrical service to City structures located on Baseline Road,and; WHEREAS,Salt River Project facilities are located on private property. NOW,THEREFORE,BE IT RESOLVED by the Mayor and City Council of the City of Apache Junction,Arizona,that the City Manager is hereby authorized to sign appropriate documents to establish utility easements as described in Attachment A. PASSED AND ADOPTED by the Mayor and City Council of the City of Apache Junction,Arizona,this 1st day of September ,1992. SIGNED AND ATTESTED TO THIS 2ND DAY OF SEPTEMBER ,1992. THOMAS DAM IANO Mayor ATTEST: KATHLEEN CONNELLY City Clerk APPROVED AS TO FORM: 1/1/1/14/1',M/1 GLOW J'." gIMB,Or " Ciky Attorne ATTACHMENT A UTILITY EASEMENT A portion of Section 4, Township 1 South,Range 8 East of the Gila and Salt River Base and Meridian,Pinal County, Arizona, more particularly described as follows: Beginning at the North quarter corner of Section 4,Township 1 South,Range 8 East of the Gila and Salt River Base and Meridian,Pinal County,Arizona,said point being the True Point of Beginning; Thence East (assumed)a distance of 115.52 feet; Thence South 44 degrees 02 minutes 18 seconds West a distance of 69.55 feet; Thence West 1363.38 feet; Thence North 27 degrees 47 minutes 33 seconds East a distance of 56.52 feet; Thence East 1269.85 feet to the North quarter corner of Section 4,the True Point of Beginning. UTILITY EASEMENT SALT RIVER PROJECT (TRANSFORMER) Beginning at the North quarter corner of Section 4,Township 1 South,Range 8 East of the Gila and Salt River Base and Meridian,Pinal County,Arizona. Thence South (assumed)50 feet; Thence West 448.46 feet to the True Point of Beginning; Thence South 7.31 feet; Thence West 4.3 feet; Thence North 7.31 feet; Thence East 4.3 feet back to the True Point of Beginning. UTILITY EASEMENT SALT RIVER PROJECT (TRANSFORMER) Beginning at the North quarter corner of Section 4,Township 1 South,Range 8 East of the Gila and Salt River Base and Meridian,Pinal County,Arizona. Thence South assumed 50 feet; Thence West 725.85 feet to the True Point of Beginning; Thence South 8.18 feet; Thence West 13.56 feet; Thence North 8.18 feet; Thence East 13.56 feet to the True Point of Beginning.