HomeMy WebLinkAboutRES 95-12RESOLUTION NO.95-12
A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION,
ARIZONA, APPROVING PRELIMINARY SUBDIVISION PLAT SD -95-01, ARROYO VERDE, BY LENNAR
HOMES.
WHEREAS,the subdivider in case SD -95-01 proposes to subdivide 62 acres in
the South half of the Northwest quarter of Section 29, T.1 N.,R. 8 E.,Gila and
Salt River Base and Meridian,Pinal County,Arizona,into 218 residential lots
pursuant to Article 6.2 of Chapter 4 of Title 9,Arizona Revised Statutes,and
pursuant to the Apache Junction Subdivision Regulations;and
WHEREAS,the Apache Junction Planning and Zoning Commission held a public
hearing regarding SD -95-01 on May 9,1995 and recommended approval of SD -95-01
by a vote of 5 to 0;and
WHEREAS, this Council finds this proposed subdivision to be consistent with
the Medium Density designation of the Apache Junction General Plan;and
WHEREAS,this Council finds this proposed subdivision to be in compliance
with the Apache Junction Zoning Ordinance and the Apache Junction Subdivision
Regulations;and
WHEREAS,this Council finds that the stipulations required for this
subdivision are necessary for sound and orderly community development,for
preservation of community values and for the promotion of the general health,
safety,convenience,and welfare of the citizens of Apache Junction.
NOW,THEREFORE,BE IT RESOLVED by the Mayor and City Council of the City
of Apache Junction,Arizona,that:
Said preliminary subdivision plat, SD -95-01, Arroyo Verde, be conditionally
approved subject to the following stipulations and conditions:
A.PLANS AND SPECIFICATIONS:
1.The subdivider shall submit plans and specifications for all public
improvements within public rights -of -way and public easements to the
City Engineer for approval.
2.Below -surface utilities shall be installed before the installation
of concrete curbs, gutters,and sidewalks,and the surfacing of the
streets.
3.Sight distance requirements at all public street intersections shall
conform to the intersectional sight distance criteria as provided by
the American Association of State Highway Officials or to the
satisfaction of the City Engineer.
RESOLUTION NO.95-12
PAGE ONE OF THREE
4.Unless otherwise provided for by the City Engineer,the Apache
Junction Development Guide standards shall apply in preparing
improvement plans irrespective of what is shown on the approved
preliminary plat.
5.Construct,or agree to construct,the public improvements shown on
the improvement plans as approved by the City Engineer.
B.GRADING PLANS:
6.Prior to any grading on the site and prior to issuance of any
required grading permit,the subdivider shall submit grading plans
and any grading permit/plan review fees to the City Engineer for
approval.
7.Subdivider shall commit to a strategy,approved by the City
Engineer,to suppress emissions of dust where there is clearing,
blading,or disturbing of land.
C.SANITATION:
8.Subdivider shall provide and obtain commitment for sewer service to
all lots from the Superstition Mountain Community Facilities
District prior to obtaining final plat approval by the City Council.
D.FINAL PLAT:
9.Dedicate all rights -of -way and easements shown on the final plat or
as required by the City Engineer.
10.Lot design and street alignments on the final plat shall be in
substantial conformance to that shown on the approved preliminary
plat.
11.Proposed street names shall comply with the City's street naming
policy.
12.Proposed retention basin shall be dedicated to the City.
E.OTHER CONDITIONS:
13.This subdivision shall be placed in a street light improvement
district to energize,maintain,and operate the street lighting
system installed by the subdivider.
14.The approval of this preliminary subdivision plat expires in 12
months on June 20,1996. The subdivider must comply with the adopted
stipulations and file a complete final plat application before this
date or request a time extension for an additional 12 months.
RESOLUTION NO.95-12
PAGE TWO OF THREE
15.Landscaping plans for the open space/drainage/retention area shall
be submitted to the Parks and Recreation Director and to the City
Engineer for approval;and the subdivider shall improve or agree to
improve the open space/drainage/retention area prior to its
dedication to the City by revegetating the wash and augmenting the
landscaping with native desert materials,by constructing an 8 -foot
stabilized granite walkway the entire distance of the east/west wash
and by providing bank stabilization where required by the hydrology
study and as approved by the City Engineer and Parks and Recreation
Director.
16.The subdivider shall be required to obtain approval of a Planned
Development overlay zone in order to obtain setback reductions if
such setback reductions are requested by the subdivider/developer.
17.The subdivider shall be required to comply with all other applicable
city codes,policies,and requirements.
PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION,
ARIZONA,THIS 20TH DAY OF JIM ,1995.
SIGNED AND ATTESTED TO THIS
ATTEST:
Kathleen Connelly
City Clerk
Gitibut
Cftty Attofney
RESOLUTION NO.95-12
PAGE THREE OF THREE
21ST DAY OF JUNE
bouglasitoleman
Mayor
,1995.