HomeMy WebLinkAboutRES 97-45RESOLUTION NO.97-45
A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE
JUNCTION,ARIZONA,APPROVING A PRELIMINARY SUBDIVISION PLAT,CASE
SD -97-11,FOR BASELINE INDUSTRIAL PARK SUBDIVISION,BY MONTY AND
CLARA NICHOLS.
WHEREAS,the subdivider in case SD -97-11 proposes to subdivide +/-58 acres
in the Southwest quarter area of Section 33,Township 1 North,Range Eight East
of the Gila and Salt River Base and Meridian,Pinal County,Arizona,into +/-50
industrial lots pursuant to Article 6.2 of Chapter 4 of Title 9, Arizona Revised
Statutes,and pursuant to the Apache Junction Subdivision Regulations;and
WHEREAS,the Apache Junction Planning and Zoning Commission held a public
hearing regarding SD -97-11 on November 25,1997,and recommended denial of
SD -97-11 by a vote of 7 to 0;and
WHEREAS,this Council finds this proposed subdivision to be in compliance
with the Industrial and Open Space designations of the Apache Junction General
Plan;and
WHEREAS,this Council finds this proposed subdivision to be in compliance
with the Apache Junction Zoning Ordinance and the Apache Junction Subdivision
Regulations;and
WHEREAS,this Council finds that the stipulations required for this
subdivision are necessary for sound and orderly community development,for
preservation of community values and for the promotion of the general health,
safety,convenience and welfare of the citizens of Apache Junction.
NOW,THEREFORE,BE IT RESOLVED by the Mayor and City Council of the City
of Apache Junction,Arizona,that:
Said preliminary subdivision plat,SD -97-11,Baseline Industrial Park,be
conditionally approved subject to the following stipulations and conditions:
1)An extension of the water distribution system shall
be in place,including water lines adequate enough
to handle necessary fire flows,before occupancy permits
for businesses in the platted subdivision shall be issued.
2)Appropriate structures for drainage and all-weather
access purposes shall be constructed where necessary,
as determined by the City Engineer,the Public Works
Director and the Fire District.
RESOLUTION NO.97-45
PAGE 1 OF 2
3)The developer shall coordinate and construct all on -site
and off -site improvements (roads,curbing,sidewalks,
gutters,streetlights,retention basins,drainage easements,
etc.)to the City Engineer's standards.
4)On -site retention basins must meet City requirements for
10 -year 24 hour storm.All retention basins shall
incorporate curvilinear layouts and shall avoid straight
side slopes with only rounded corners.
5)Internal development street lighting must be initiated by
the property owner to create an improvement district.
6)Lots in the Baseline Industrial Park Subdivision may be
combined,but any further division of any platted lot shall
require a subdivision plat amendment process.
7)All open space tracts/landscape areas are to be maintained
by individual property owners.All open space tracts/landscape
areas are to comply with the provisions of Ordinance No.940
and shall be kept clean and well maintained at all times.
PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF APACHE JUNCTION,
ARIZONA,THIS 6TH DAY OF JANUARY ,1998.
SIGNED AND ATTESTED TO THIS 6TH DAY OF JANUARY
DOUGLAS
Mayor
ATTEST:
KATHLEEN CONNELLY
City Clerk
APPROVED AS TO FORM:
12-18-9
RICHARD JOEL STERN
City Attorney
RESOLUTION NO.97-45
PAGE 2 OF 2
,1998.
°LEMAN