HomeMy WebLinkAboutRES 12-39RESOLUTION NO. 12-39
A RESOLUTION OF THE MAYOR AND CITY COUNCIL OF THE
CITY OF APACHE JUNCTION,ARIZONA,AUTHORIZING THE
ADOPTION OF OWNER OCCUPIED HOUSING REHABILITATION
GUIDELINES DATED FEBRUARY 1,1994,AS AMENDED,IN
RELATION TO A HOUSING REHABILITATION ACTIVITY.
WHEREAS,the City of Apache Junction,Arizona,is
desirous of undertaking an owner -occupied housing
rehabilitation program; and
WHEREAS,this program is anticipated to be funded
with funds provided by the State of Arizona Department of
Housing ("ADOH"); and
WHEREAS,ADOH requires that every local government
requesting funds for housing rehabilitation adopt
specific guidelines for such a program; and
WHEREAS,the City of Apache Junction has developed
such owner -occupied Housing Rehabilitation Guidelines
("HRGs") dated February 1994, as amended, which have been
previously approved by ADOH.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY
COUNCIL OF THE CITY OF APACHE JUNCTION,ARIZONA,AS
FOLLOWS:
1)The City Council of the City of Apache Junction,
Arizona,hereby adopts such owner -occupied HRGs,
dated February 1994,as amended in Attachment A,
which shall be used to implement its housing
rehabilitation program; and
2)The City of Apache Junction,Arizona,shall utilize
such owner -occupied HRGs,without revisions,except
those authorized by the Mayor.Such revisions shall
be submitted to ADOH by the City 10 working days
before such amended guidelines are effectuated.
RESOLUTION NO. 12-39
PAGE 1 OF 2
PASSED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE
CITY OF APACHE JUNCTION, ARIZONA, THIS 15TH DAY OF
JANUARY ,2013.
SIGNED AND ATTESTED TO THIS 15TH DAY OF JANUARY
2013.
.,71 /
-.J10+lI S. INSALAC5
Mayor
ATTEST:
KATHLEEN CONNELLY
City Clerk
APPROVED AS TO FORM:
I .2 3 •i
RICHARD J. STERN
City Attorney
RESOLUTION NO. 12-39
PAGE 2 OF 2
CITY OF APACHE JUNCTION, ARIZONA
HOUSING REHABILITATION PROGRAM GUIDELINES
As Adopted by the City Council on February 1, 1994
Modified by the City Council on January 17, 1995
Addendum by the City Council on March 21, 1995
Modified by the City Council on June 20, 1995
Modified by the City Council on March 7, 2000
Modified by the City Council on May 15, 2001
Modified by the City Council on February 5, 2002
Modified by the City Council on January 16, 2007
Modified by the City Council on June 5, 2007
Modified by the City Council on November 18, 2008
Modified by the City Council on December 15, 2009
Modified by the City Council on December 6, 2011
Modified by the City Council on January 15, 2013
The City Council of the City of Apache Junction adopts the following Housing
Rehabilitation Guidelines to assist the City in administering the City's Housing
Rehabilitation Program.This program is intended to provide safe and decent
housing to City of Apache Junction residents by offering funding options to assist
homeowners with the rehabilitation or modification of their home.
PROGRAM PURPOSE (GOALS)
1.Eliminate health and safety hazards in homes;
2.Benefit very low-, low- and moderate -income residents; and
3.Improve neighborhoods and encourage stability.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 1 of 27
TABLE OF CONTENTS
Program Purpose and Goals 1
Program Design 3
Target Area 3
Eligibility Requirements 3
Property Standards 6
Allowable Work Items 6
Non -allowable Work Items 8
Rehabilitation Assistance Plans 8
Emergency Housing Repair 8
Housing Accessibility 8
Housing Rehabilitation 8
Replacement 9
Permit Fee Fund 9
Deferred Payment/Forgivable Loans 10
Exceptions to the Maximum Allowed 11
Recapture Period 11
Loan Servicing Policy/Subordination 11
Revolving Loan Fund/Program Income 12
Third Party Income Verification 12
Method for Determining After Rehab Value 13
Homeowner Information 13
Contractor Information 16
Housing Maintenance and Homeowner Education 21
Energy Efficiency Guidelines 22
Lead Based Paint Requirements 22
Conflict of Interest 23
Complaint and Grievance Procedures 23
Marketing 24
Staffing and Administrative Review 25
Non -Discrimination 25
Assistance to Applicants 25
Fair Labor Standards 25
Applicable Documents 26
Changes to Program Guidelines 26
Forms 26
City of Apache Junction Housing Rehabilitation Program Guidelines,page 2 of 27
PROGRAM DESIGN
The focus of the Housing Rehabilitation Program (hereinafter "HRP") is to increase
the life and improve the livability of homes owned by very low-, low- and moderate-
income families, by correcting code violations and addressing accumulated deferred
home maintenance projects.
Funds for the program are primarily provided through the:1)Community
Development Block Grant Program ("CDBG") and 2) State Housing Fund ("SHF")
including HOME and State Housing Trust Funds as administered by the Arizona
Department of Housing ("ADOH").
Owner -occupied housing rehabilitation ("OOHR") assistance to homeowners in the
SHF funded portion of the City's HRP may be in the form of deferred
payment/forgivable loans.
00HR assistance to homeowners in the CDBG funded portion of the City's HRP
may be in the form of grants or deferred payment/forgivable loans.
Unless specifically stated to the contrary, comments contained in these guidelines
are applicable to both the CDBG and SHF funded portions of the City's HRP.
TARGET AREA
The program will be open to all full-time permanent residents who live within the
incorporated boundaries of the City of Apache Junction, excluding those who live in
designated ineligible areas or structures as outlined in the eligibility requirements
below. CDBG funds may only be used in the Pinal County portion of the City.
ELIGIBILITY REQUIREMENTS
To be eligible, the applicant and/or the property to be rehabilitated must meet the
following criteria:
•Located within the incorporated boundaries of the City of Apache Junction.
•Feasible for rehabilitation under the time and monetary constraints of the
program.
•Owned and occupied by a full-time permanent resident.
•Applicants must have a verifiable income that falls below 80% of the area
median income as indicated by The US Department of Housing and Urban
Development and the State of Arizona —State Housing Fund Program
income limits for very low-,low-and moderate -income families.Income
guidelines are updated annually. Income verification is valid for a period of
City of Apache Junction Housing Rehabilitation Program Guidelines,page 3 of 27
six (6) months. Upon expiration of income verification information, applicants
must complete and submit new income verification documentation. Income
must be anticipated and verifiable for the next 12 months.Required
documentation of income can be found under Third Party Income Verification
within this document.
•For all programs, specifically the SHF Program, the property owner cannot
have assets that total more than $25,000 (e.g. cash, stocks, bonds, money
market accounts, IRA, etc.)This is exclusive of the home they live in, two
vehicles, and personal property necessary for daily living.
•Provide proof of homeowner's insurance.
•For the purposes of eligibility, self help or "sweat" equity are not allowable
forms of equity.
•The current owner must have occupied the structure for at least one (1) year
prior to program entry.
•Households applying for funding must meet one of the following criteria: 1)
be elderly (62 years of age or older); 2) have a disability (a legally recognized
physical/mental/emotional condition that limits the performance of daily living
skills);or 3)have minor child (ren) age 17 and under related to head of
household residing in the residence.
•A.R.S. 1-501 and 1-502 requires that all homeowners who receive services
under the program shall provide proof of lawful presence in the United States
including a sworn affidavit that the required documentation is true under
penalty of perjury.
•Owner is to complete any recent construction project underway prior to the
City's approval of rehabilitation assistance.
•Manufactured and mobile homes are deemed eligible contingent upon:1)
applicant (s) having owned and occupied both property and dwelling for one
(1) year prior to program entry; and 2) the home being permanently attached
to a foundation, either as a pre-existing condition or as a work element of the
Rehabilitation Program.
•Properties in non -conforming zoning, properties located within 1,000 feet of
an explosive/flammable operation, properties with open, unresolved building
or code compliance cases and homeowners unwilling to follow the City of
Apache Junction Program Guidelines,are not generally eligible for
rehabilitation under this program.
•Homes of historical value may only be eligible upon favorable review by the
City of Apache Junction Housing Rehabilitation Program Guidelines,page 4 of 27
State Historic Preservation Office.
•Manufactured homes that were built before June 1976 are not eligible to
receive housing rehabilitation funding,however they would be eligible for
emergency and housing accessibility assistance.
•The rehabilitation of dwellings that are located in the 100 -year floodplain are
not eligible for participation in the rehabilitation program.
•Properties that are classified "non -conforming" are not generally eligible for
rehabilitation.However, if the proposed rehabilitation is non-structural and
there are no properties waiting to be rehabilitated, nonconforming properties
that meet all other eligibility criteria may be considered.
•Properties with an open building or code case are generally not eligible for
rehabilitation.However if the case is relating to a correctable building
condition that HRP funds can correct under the requirements of the program,
then the unit will be deemed eligible.
•Properties rehabilitated through this program must be free of any
encumbrances such as liens or judgments.Properties may be encumbered
by a mortgage in first position so long as a financial institution or other such
mortgage company holds that mortgage; however, there must be sufficient
equity remaining to justify placing a lien for the rehabilitation deferred
payment loan in second position.Properties encumbered by
mortgages/loans held by individuals or partnerships are not eligible unless a
warranty deed is recorded and a lien may be placed on the
property. Mortgage payments and insurance premiums must all be current.
Is the home
located within
the city limits
of Apache
Junction?'
( 1 -Zintune)
OA Tag
..cfcgithca0
\ 7 .
Do you
own your
home
and land?
Is ther,e'
someone; who
is over the age
of 62, under the
age of 18, or
disabled living
1111=1112P
t s p t
tWacomLw
tionycuai0
ave yo
coargi
hccab
imtior&
t v
ear?
tv ale
nrf(3 rag
e)gg
afiggRe
Are you low
income and
willing to
provide
documentatio
n of income?
Click here to view
the income limits for
program eligibility.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 5 of 27
PROPERTY STANDARDS
The property standards that must be achieved as a result of assisted rehabilitation
are established by the City's Building Codes,the Federal Housing Quality
Standards, Arizona Department of Housing's Housing Rehabilitation Standards, the
Owner Occupied Housing Rehabilitation Weatherization Standards,and the City of
Apache Junction Housing Rehabilitation Program Construction Guidelines.
The City's Energy Efficiency requirements incorporate the following standards:
BPI/BA Standards, IECC 2009, ASHRAE 62.2-2010, Energy Star, and Standardized
Work Specification.
ALLOWABLE WORK ITEMS
HOME guidelines require that an entire dwelling be brought up to local code; such
improvements are eligible under this program. A preliminary property inspection is
completed to assist with ensuring homes meet Housing Quality Standards ("HQS")
and are safe, sanitary and decent.
Priorities have been established for determining the work that will be completed in
the eligible homes.The following must also be taken into consideration when
determining the priority of items for inclusion in the work -write up (Scope of Work):
a)The age and the physical condition of the building;
b)The goal of the program (building revitalization or direct benefit);
c)Funds available for rehabilitation of each unit; and
d)Value of unit after rehabilitation.
The following levels are utilized to determine priorities for the HRP:
•Level 1:Initial inspection reports must include those items that are included
in Level 1.
•Level 2: Items included on Level 2 are also considered critical but not as
critical as those items in Level 1.Other items are considered less critical
and should always be inspected but may not be rehabilitated.
•Level 3: The items on List 3 should be reviewed, and where feasible,
corrected.These items must also be included whenever substantial
rehabilitation is taking place.
•Items from all levels must be included in the preliminary inspection report for
all construction projects and those where the cost of rehabilitation exceeds
75% of the value of the property.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 6 of 27
Level 1 - Items that must be included in the inspection report and must be repaired
or replaced:
1.Lead Based Paint Assessment (only on properties built prior to 1978)
2.Hazardous Materials
3.Health and Safety Hazards
4.Stable and Weather Tight Roof
5.Electrical System — the unit must have a minimum 100 -amp electrical
service, with no unsafe conditions
6.Plumbing (including hot water) — Must be in good working order and be safe
and sanitary
7.Heating and Cooling Systems — must be adequate and safe with a
reasonable (three year) useful life
8.Egress in accordance with local health and safety codes
9.Trip Hazard (HQS Standard).
Level 2 - Items that must be included in the inspection report and should be
repaired or replaced:
1.Structural soundness and integrity (including rotted or deteriorating materials
and those impacted by termites and/or other wood -boring insects).
2.Siting of the structure and its relationship to water penetration that may
impact structural integrity.
3.Appropriate kitchen facilities including a sink and means of cooling and
heating food to healthful standards.
4.If the structure has an attached garage, appropriately -rated fire wall between
garage and living areas.
The above mentioned items are first priority items that shall be included in every
inspection report.These items shall also be included in the Work Write -Ups (funds
permitting)and shall receive priority in work to be completed as part of the
rehabilitation project. Repair or replacement may take place based on the amount of
available resources.
Level 3 - Items that must be included in the inspection report and may be repaired
or replaced:
1.Debris that may be a fire hazard
2.All existing exposed surfaces painted or sealed and not presenting a health
or safety hazard.
3.Cabinetry
4.Finished flooring
5.Repair and replacement of doors and windows not presenting a health or
safety hazard.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 7 of 27
The above mentioned items shall be included in every inspection report and may be
included in the Work Write -Up (funds permitting).These items generally result from
deferred maintenance and are considered general improvements.
The City wishes to encourage contractors to buy locally whenever possible.
NON ALLOWABLE WORK ITEMS
None of the program funds shall be used for temporary/long term relocation of
applicants during periods of home rehabilitation/repair.
REHABILITATION ASSISTANCE PLANS
1. EMERGENCY HOUSING REPAIR PLAN
A grant plan that assists homeowners in the elimination of an imminent threat to life,
safety or health; the necessary repairs may include,but shall not be limited to:
roofs, floor repairs, window/door replacements, and wall and ceiling repairs. The
minimum assistance is $1,000 and the maximum assistance is $15,000 per
recipient.The grant may address no more than two (2) emergency conditions,
unless approved by the Development Services Director, or his/her designee, due to
some extenuating circumstances.A structure may be eligible for an Emergency
Grant even though it may not meet structural integrity requirements.After a
recipient has received services through the Emergency Housing Repair program
they may not be eligible to receive additional services until five years after the
completion of the project unless the emergency services enable the homeowner to
remain in their home until the home can be rehabilitated under the City's Housing
Rehabilitation Plan or replaced under the City's Replacement Plan. Additionally, no
single owner of a home may receive more than two emergency assistance grants.
2. HOUSING ACCESSIBLITY PLAN
A grant or deferred payment/forgivable loan plan that assists homeowners to make
residences physically accessible. Assistance can be either structural changes or
purchase of durable medical equipment (if it becomes a permanent part of
structure) and may include ramps, grab bars, handrails, raised toilets, lowered light
switches,automatic door openers,visual alarms, transfer shower benches,and
hand held showers. Grants are limited to $ 2,500 per recipient. This program is
offered through the City's partnership with Community Action Human Resources
Agency (CAHRA) or may be a component of another rehabilitation plan.
3. HOUSING REHABILITATION PLAN
A grant or deferred payment/forgivable loan plan that assists homeowners to
address safe,sanitary,and decent housing rehabilitation issues.Rehabilitation
projects may either be major or minor.Grants and deferred payment/forgivable
City of Apache Junction Housing Rehabilitation Program Guidelines,page 8 of 27
loans are limited to a minimum of $1,000 and a maximum as required by the grant
from which the funds will be expended, this amount may change each funding year.
Mobile/manufactured homes and conventional,site -built homes have different
maximum investments. HOME funds can not be utilized in the form of a grant. In the
HOME Program, weatherization,emergency repairs,or accessibility projects
may be undertaken only if the property is brought up to the State's
rehabilitation standards upon completion. When a recipient receives a deferred
payment/forgivable loan, no further investment of CDBG or HOME funds can be
made on the home until after the recapture period has expired. However, should the
recipient receive any housing rehabilitation services in the form of a grant, they may
not be eligible to receive additional services until five years after the completion of
the project.
4. REPLACEMENT PLAN
A grant/deferred payment/forgivable loan plan that assists homeowners with the
replacement of unsafe, hazardous living conditions by providing a new
manufactured or site -built home. This plan provides a maximum investment as
stipulated within each grant from which the funds will be expended. This amount
may change each funding year and is intended for the construction of a new home
or for the replacement of a manufactured home. HOME funds can not be utilized in
the form of a grant. When a recipient receives assistance through HOME funds, no
further investment of CDBG or HOME funds can be made on the home until after
the recapture period has expired.
5. PERMIT FEE FUND
In 2003, the City of Apache Junction created a revenue fund (004-04420-422-225)
in order to track and collect permit fees that have been paid for by contractors that
are participating in the City's Housing Rehabilitation Program. The fees that were
collected were to be used to supplement and support the activities of the City's
Housing Rehabilitation Program. These fees are collected in accordance with the
City of Apache Junction City Code, Volume I, Chapter 7, Article 4-4 Sections A
through I.
All relevant fees shall be due payable by the contractor prior to the start of
construction on any City of Apache Junction housing rehabilitation project. These
fees will be tracked by the Housing Rehabilitation Program Coordinator ("HRPC")
and reported to the Finance Director for deposit into the appropriate revenue
account. This account will be tracked to ensure accurate balance and expenditures.
Eligible expenses to be withdrawn from this account shall be minor repair items that
are eligible under the City of Apache Junction's Housing Rehabilitation Program and
the adopted Housing Rehabilitation Guidelines. Recipients of these funds, however,
must be homeowners that are not eligible under the same guidelines or available
funding programs. These repairs must be determined an emergency by the
City of Apache Junction Housing Rehabilitation Program Guidelines,page 9 of 27
Program Coordinator. Further, the Coordinator must have found that there is no
other funding or community assistance can be located for the homeowner. Eligible
homeowners must be either elderly (over the age of 62), disabled, or have children
under the age of 18 occupying the home and the total household income must not
exceed 80% of the area median income.
When an expense is determined to be eligible to be charged to this account, the
Coordinator will submit a check request along with an invoice for payment to the
finance department. The maximum amount payable toward any project shall be
$1,000 unless otherwise approved by the Development Services Director.
Replacement
A Replacement may be provided to
homeowners when the cost to
rehabiltate their home exceeds the
maximum investment allowable.
Replacement homes will be site built
homes, where zoning allows for such
construction.
Manufactured homes may be used as a
replacement in areas where zoning does
not allow for site built homes.
A lien is placed on the home for the
extent of the recapture period which is
based upon the total investment
amount.
Emergency
Rehabilitation
Housing
Rehabilitation
Eligible Homes
1) Single family homes, manufactured ,
homes, condos, and townhomes;
2) Pre -1976 manufactured homes; t
3) Manufactured homes affixed to a
foundation;
4) Homes with encumbrances e.g.
reverse mortgage and liens excluding a
first mortgage.
Eligible items
1) Acessibility improvements;
2) Health and safety improvements; I
3) Limited to two improvements per
grant. ;
Assistance Provided
Grant not to exceed $15,000 \
Limit assistance to two times per home
DEFERRED PAYMENT/FORGIVABLE LOANS
Eligible Hornai
1) Single family;;
2) Post -1976 manufactured homes,
affixed to a foundation;
3) Condos and town homes;
4) Homes without embumbrances e.g.'
reverse mortgage and liens, excluding a
first mortgage.,
Eligible items1
1) Complete rehabilitation of home;]
2) Address all code, health and safety,
items;]
3) Incorporate energy efficiency,
improvements;I;
4) Accessibility items.]
Assistance Provided
Deferred Payment Forgivable Loan'
Single family home maximum
investment $60,000
Manufactured home maximuml
investment $20,000'
No additional assistance duringl
recapture period]
A lien is placed on the home for the
extent of the recapture period which
based upon the total investment
amount.1
_J
All deferred payment forgivable loans are secured by a lien and promissory note. A
percentage of the total assistance provided on forgivable loans will be forgiven on
the anniversary date of the execution of the recording of the loan instruments
throughout the recapture period, provided that the dwelling unit continues to be
occupied by the original occupant or an income qualified immediate family member.
The unforgiven balance of the loan shall become due and payable upon the sale of
City of Apache Junction Housing Rehabilitation Program Guidelines.page 10 of 27
the property. Properties encumbered by mortgages/loans held by individuals or
partnerships are not eligible unless a warranty deed is recorded and a lien may be
placed on the property. HOME funds cannot be used in the form of a grant.
The HRPC will be responsible for recording the required paperwork as determined
by the loan. The lien will be recorded at the Pinal County Assessor's Office and will
include applicable administrative costs and a contingency of 10%above the
Contractor's Bid. The Deed of Trust will be placed on a tracking system by the
HRPC who will track the loan calculating the amount of dollars that will be forgiven
as each year passes until the loan has been completely forgiven as outlined in the
HRGs.The City will send a letter to the homeowner annually advising the
homeowner of the status of their loan,identifying the amount forgiven and the
amount that remains on the loan. The City will be no lower than the first position on
the lien of the home or second if a financial institution held first position prior to the
City recording the loan documents.A letter to the homeowner shall provide a
reminder that the City cannot subordinate the loan.
EXCEPTIONS TO THE MAXIMUM ALLOWED
The Maximum investment for each project is stipulated under each grant program
from which the funding is expended. This maximum may change with each funding
year.However under no circumstance may the maximum per unit investment
exceed that which is determined by the geographic area 221 (d) 3 per unit limits
based on the number of bedrooms nor can the after rehabilitation value exceed
95% of the FHA 203 (b) Insuring limits for single family properties.
RECAPTURE PERIOD
When a recipient elects to receive assistance in
the form of a deferred or forgivable loan, a
recapture period applies.The recaptured
period is based on the amount of funds invested
in the assisted unit.Recipients may elect to have
a recapture period that is longer than the required
period. When a recipient receives a deferred
payment/forgivable loan, no further investment
of CDBG or HOME funds can be made on the home
until after the recapture period has expired.
LOAN SERVICING POLICY/SUBORDINATION
•Investment of $1,000-
[$15,000
\ / ''Investment of $15,001
upsygEog.-$40,000
•Investment of $40,001
- $75,000
\WI/'Investment of $75,001
golgia3 and over
After execution of the loan, subordination agreements with lending institutions will
not be honored since such practice is lending of City credit in violation of State
constitutional law. Properties rehabilitated through this program must be free of any
encumbrances such as liens or judgments.Properties may be encumbered by a
mortgage in first position so long as a financial institution or other such mortgage
City of Apache Junction Housing Rehabilitation Program Guidelines,page 11 of 27
company holds that mortgage; however, there must be sufficient equity remaining to
justify placing a lien for the rehabilitation deferred payment loan in second position.
Should a refinancing request be made by the homeowner after the rehabilitation
work has been completed and a lien has been placed on the structure and the
request has been made prior to the end of the recapture period, the lien shall
become due and payable upon refinancing to the City. Thus, should the refinance
be cash out, the City will require payment in full of the lien. The City will be no lower
than first position on the lien of the home.As noted above,the City cannot
subordinate the loan in any manner.
REVOLVING LOAN FUND/PROGRAM INCOME
The City of Apache Junction does not currently have a revolving loan fund.
Therefore the City will be tracking all loans.In the event that a house that has
received services is sold prior to the end of the recapture period,the City will
enforce the repayment of the loan in the amount that remains unforgiven. These
funds will then be immediately circulated into the Housing Rehabilitation Program
and will be utilized prior to the use of any new grant funds. However when utilizing
HOME funds,any recaptured or repaid funds will be returned to the Arizona
Department of Housing as retention of HOME funds is not allowed by the Arizona
Department of Housing.
THIRD PARTY INCOME VERIFICATION
Upon receipt of the application, the HRPC will verify eligibility based upon the
homeowners income. The definition of income is taken from 24 CFR Part 5. Gross
Income will be used to calculate income for all members of the household over the
age of 18. Income must be anticipated and verifiable for the next 12 months. Typical
required documents to verify income will include, but are not limited to:
1.Bank Statements including checking and savings accounts;
2.Paycheck stubs including tips, commission and bonuses, and overtime;
3.Earned Interest and Assets: This amount is calculated into the income if over
$5,000. Eligible assets include but are not limited to Value of Stock, Life
Insurance, 401K, interest, CD's, Real Estate, Personal property not including
home;
4.Social Security;
5.Welfare Assistance;
6.Alimony and Child Support;
7.Minors Income specifically disability payments;
8.If self employed, must include the past three (3) years income tax returns for
net income;
9.Excluded items include earned income from minors (under age 18), full-time
student income (ages 18-23), disabled persons' income, and food stamps
City of Apache Junction Housing Rehabilitation Program Guidelines,page 12 of 27
Median Income Guidelines
HUD updates the Median Income Guidelines on an annual basis. The most current
information can be found on the US Department of Housing and Urban
Development website.
Income Calculator
http://www.hud.gov/offices/cpd/affordablehousing/training/web/calculator/calculator.
cfm
METHOD FOR DETERMINING AFTER REHABILITATION VALUE
The FHA 203 (b) insuring limits is utilized when determining the after rehabilitation
value. This value cannot exceed 95% of the provided limit and is determined by
adding the full cash value and the cost of the rehabilitation.
HOMEOWNER INFORMATION
Applications are available by mail, in the Development Services office, or obtained
from the City's website at www.aicity.net/rehab by the applicant. Eligible applicants
will be prioritized on a first come, first served basis, unless the nature of the project
constitutes an eminent threat to health or safety, as determined by the Building
Inspector.
STEP 1: Waiting List
Once an application is approved and the homeowner is determined to be eligible to
participate in the City's HRP, they will be placed on a waiting list. Homeowner's will
be served based on two factors:
1.A First Come - First Serve Basis
2.Based upon the funding availability of the program with which they are
eligible. The City has several housing programs. Based on their eligibility
they may not qualify for all programs.
Applicants can remain on the waiting list for up to 18 months before receiving
assistance. The financial information provided with the application is valid for 6
months. Therefore homeowner's may be required to re -submit financial information
to re -certify that they are eligible to participate in the program.
A typical timeline for services may be:
Application is submitted
Review of application (eligibility determination)2 months
Placed on waiting list up to 1 year
Schedule initial meeting to discuss the program 2 months
City of Apache Junction Housing Rehabilitation Program Guidelines,page 13 of 27
Schedule home inspection 2 months
Determine work write up 2 months
Procure contractor 4 months
Signed documents/contracts 2 months
Construction 3 months
Final inspection 1 month
STEP 2: Interview
When the time has come to receive the benefits of the program an appointment will
be scheduled to make a home visit to discuss the details of the program an dsign
the Memorandum of Understanding. All homeowners must be present.
There are two basic programs in which homeowner's may be eligible. It will be
determined which program would best suit their needs once an inspection of the
home is completed and a cost estimate is determined. Following are the two
programs:
1.Emergency Rehabilitation: This program will address two emergency needs
within the home. This program is provided in the form of a grant. Once a
homeowner receives this service, they may not be eligible for additional
assistance for five years.
2.Housing Rehabilitation: This program will address all the necessary needs
within the home under the requirements of the program. Health and safety
issues and code compliance will be addressed. This program is provided in
the form of a deferred payment loan which will place a lien on the property. A
deferred payment loan means that over a given period of time, the loan will
be forgiven so long as the homeowner remains in the home as their only and
primary residence. Once they receive this service, they may not be eligible
for additional assistance until the loan has been forgiven. This recapture
period is dependent upon the amount of funds invested into the home.
STEP 3: Home Inspection
The City will complete an inspection on the home. This inspection will help to
determine what items will need to be completed on the home.Below is information
to help determine what items are eligible under the requirements of the program.
We would like to:
Eliminate unsafe and hazardous conditions
Improve living conditions and extend the life of the home
Make the home accessible for family members with special needs
Bring the home to minimum safe property standards and local codes
Improve property values in the neighborhood
City of Apache Junction Housing Rehabilitation Program Guidelines,page 14 0127
Areas we can provide help include:
Electrical Accessibility
Plumbing Insulation
Heating/Cooling Foundation
Roofing Bath facilities
Walls Kitchen facilities
Painting Hot water
Windows/Doors Smoke alarms
The program will NOT:
Change of colors or styles
Cover routine maintenance
Make the home look like new
STEP 4: Work Write-up and Bid Process
After the inspection is completed a work write-up and cost estimates are determined
to assist with the procurement of a contractor. The homeowner must approve the
project scope prior to procuring a contractor. The City Council has approved
guidelines for the HRP and has indicated that when completing the work write-up,
the following must be taken into consideration when determining the priority items
for inclusion in the work write-up:
a)The age and the physical condition of the building;
b)The goal of the program (building revitalization or direct benefit);
c)Funds available for rehabilitation of each unit; and
d)Value of unit after rehabilitation.
It is required that all projects competitively procure a licensed contractor to complete
the work on the home. The City will assist the homeowner in this process. The
following is the process that will take place when procuring a contractor.
A notice will be placed on the City's website and in the newspaper advertising a
mandatory "pre -bid" meeting to be held at the home. Contractors will arrive on that
day along with the Program Coordinator and will walk through the home and the
work write up will be discussed. Each contractor will be required to submit a bid to
the City of Apache Junction's Office of the City Clerk on the date and time specified
in the advertisement.
The contractor is not allowed to discuss any compensation with the homeowner. If
the contractor has any questions regarding the project and/or the bidding
procedures they must contact the HRPC.
Once the bids have been received, the City will review the information and
determine if the contractor is eligible to participate in the program. There are
requirements that each contractor must have in order to be eligible.
It is recommended that the lowest responsible bidder be the contractor that is
awarded the project. Therefore the homeowner will be notified as to which
contractor that is. However the homeowner will be signing the contract with the
contractor and as such may select the contractor to complete the work on their
City of Apache Junction Housing Rehabilitation Program Guidelines,page 15 of 27
home. It should be noted that if the selected contractor is not the lowest bidder, the
homeowner will be required to pay the difference of the bid amounts. Once a
contractor is selected all homeowners and the contractor will be asked to come to
City Hall and sign the required contract documents. A notice to proceed will be
issued after the documents have been executed. No work can begin until this has
taken place.
STEP 5: Construction
The contractor will be issued the notice to proceed and given a time frame to
complete the construction on the home. The homeowner is not authorized to make
changes to the project scope of work. All requests for changes must come through
the City's HRPC.
STEP 6: Final Inspection
The City will not release payment to the contractor until a final inspection has been
completed on the home and the homeowner and City have signed off on the work
completed. All concerns should be discussed during this final walk through with the
contractor. Although there is a warranty on their workmanship, it is important to
discuss any concerns as soon as possible.
CONTRACTOR INFORMATION
Energy Audit
Prior to creating the work write up, the City will request from a BPI certified
contractor to complete an Energy Audit on the home (See Energy Efficiency
Guidelines). The results of the audit will be incorporated into the work write up.
Work Write-up
After the application has been received, the information verified and funding is
available, the Program Coordinator will make an inspection of the property and
prepare a work write-up and cost estimate.The Program Coordinator and
homeowner will thoroughly discuss the work to be done.Once the project scope is
approved by the homeowner,the City will competitively procure a qualified
contractor that meets all of the procurement requirements of the City and the
Arizona Department of Housing.
Work write-ups will be completed by the Program Coordinator.Specific building
materials and building methods will be left up to the discretion of the Program
Coordinator but must meet ICC Standards. The City of Apache Junction Housing
Rehabilitation Construction Guidelines will provide guidance on preparing the
project scope. The Program Coordinator will provide a rehabilitation cost estimate
based on available information from recent projects completed.All new
City Of Apache Junction Housing Rehabilitation Program Guidelines,page 16 of 27
construction that requires substantial repair (more than 50%) of a system must meet
the City's current building codes upon completion.The rehabilitated home should at
a minimum meet Section 8 Housing Quality Standards and/or all City Building
Codes, whichever is more restrictive, shall govern.
The City wishes to encourage contractors to buy locally whenever possible.
Request for bids
An advertisement will be placed in the Arizona Republic a minimum of fourteen (14)
days prior to the bid opening and/or an email notification will be sent to contractor's
listed on the Housing Rehabilitation Program's Bid List.
The City will require bids from two or more licensed contractors to complete the
work. Contractors will be required to meet all City of Apache Junction and Arizona
Department of Housing requirements to be eligible to be awarded a contract.
Requirements include a current City Privilege Tax License;a valid contractor
license from the State of Arizona, listed on the Registrar of Contractors website and
hold valid insurance. Additionally, any contractor participating in the rehabilitation
program must be verified as being eligible to receive federal funds.
The City of Apache Junction encourages minority contractor participation in all
projects to include Disadvantaged Business Enterprises e.g.Small Business
Enterprises,Minority -owned Business Enterprises,and Women -owned Business
Enterprises.
Project walk-thru
A mandatory pre -bid meeting will be scheduled prior to the acceptance of the bids
to invite all potential contractors to the project site to review the project scope in
order to offer an accurate quote. The pre -bid meeting will also be utilized to answer
questions and offer information to the contractors and property owner.The
contractor may not contact the homeowner prior to this meeting.
Proposal submissions
Proposals must be submitted on the date provided in the request for bids.All
proposals must be submitted in a minimum 8 1/2"x 11" letter sized envelope with
the words "Sealed Bid Residential Rehab" along with the address, and the name of
the owner of the project being bid.This must be clearly printed on the face of the
envelope. In addition, the name of the firm submitting the bid must be listed on the
face of the envelope.Failure to comply with the requirements of this paragraph will
result in such a bid being considered invalid and returned unopened to the sender.
All bidders will be notified in writing of the bid awards.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 17 of 27
Addend urns
All addendums will be sent to interested bidders a minimum of 3 days prior to the
bid opening.
Any changes in the finalized work write-up or specifications must be agreed upon in
writing and signed by both the Homeowner and the Housing Rehabilitation Program
Coordinator before they become effective.
No change orders will be approved or paid if the work was completed prior to signed
approval by the Program Coordinator. Change orders shall not exceed 10% of the
total bid price unless the additional work was requested by the Program
Coordinator. No side agreements between Contractor and Homeowner will be
allowed.
Codes and Standard Specifications
The contractor is responsible for knowledge of the City's building codes. All work
must conform to Apache Junction Building Codes and/or meet approved Uniform
Building Codes unless otherwise specified in writing. The property standards that
must be achieved as a result of assisted rehabilitation are established by the City's
Building Codes, the Federal Housing Quality Standards and the Arizona
Department of Housing's Housing Rehabilitation Standards, the Owner Occupied
Housing Rehabilitation Weatherization Standards,and the City of Apache Junction
Housing Rehabilitation Program Construction Guidelines.
The City's Energy Efficiency requirements incorporate the following standards:
BPI/BA Standards, IECC 2009, ASHRAE 62.2-2010, Energy Star, and Standardized
Work Specification.
Privilege Tax License
The contractor and all subcontractors must have an Apache Junction City privilege
tax license prior to beginning work after being awarded a contract for services.
Subcontractors must be named on the Contractor Bid Proposal.
Bid Award
Bid awards are done by the homeowner; however the City of Apache Junction's
Housing Rehabilitation Program will recommend the lowest most responsible and
responsive bidder. The City of Apache Junction's Housing Rehabilitation Program
reserves the right to reject any and/or all bids for reasons included but not limited to
the following:
City of Apache Junction Housing Rehabilitation Program Guidelines,page 18 of 27
1.The contractor is not licensed or his license is suspended or has been barred
from federal procurement or no procurement programs.
2.The contractor is not able to proceed with the project in a timely manner, has
failed to complete past projects in a timely or workmanlike manner or has
failed to respond appropriately to requests for warranty service.
3.The bid submitted is more than 15% above or below the estimate and may
not be able to complete the project for this amount.
4.The Contractor has failed to provide lien waivers as required below or has
had mechanic's liens filed by suppliers or subcontractors on past projects.
5.Bidding forms are improperly filled out, incomplete or not using the correct
bidding forms provided.
Owner Bid Rejection
The owner may reject any or all bids without cause subject to the following
provisions:
1.The owner may choose to reject the lowest bid and select a contractor other
than the lowest bidder if the owner is willing to provide from his own funds an
amount equal to the difference between the low bid and the selected bid.
2.The owner may reject all bids at any time up to three working days after the
contract is closed.
The contract will be between the homeowner and the contractor.However the
contractor and homeowner may not discuss the award or non -award of the project
until the City has completed the required procurement process. The City will serve
only as an administrator/financier to the contract. The contractor must be a licensed
contractor in the State of Arizona, hold a City business license, be in good standing
with the Registrar of Contractors, and not appear on the excluded parties listing.
Delays in Awarding Contract
Generally the contract will be closed and the work will begin within thirty (30) days
of the date of bid submission. If thirty days has passed and no contract is signed,
the Contractor may honor the original bid or withdraw the bid. If the Contractor
chooses to withdraw the bid, the project will be offered to the next qualified low bid
or a new bid process will begin. The Housing Rehabilitation Program Coordinator
reserves the right to negotiate any bid.
Notice to Proceed
The Notice to Proceed will issued by the City of Apache Junction's Housing
Rehabilitation Program which will identify the start date. All construction must begin
within seven (7) days.
A pre -construction conference will be held between the homeowner, the contractor
City of Apache Junction Housing Rehabilitation Program Guidelines,page 19 of 27
and Program Coordinator to discuss work items,furniture moving,and other
questions in need of clarification. All contractors will be required to secure a building
permit from the City and post it at the site.
Quality of Work Provided
General Contractors, sub -contractors and their employees qualified to perform the
installations for which they are responsible shall perform all work in a quality
workmanlike manner.The job site is considered a federal location and must, at all
times, be free from an individual chemical use. All moved or effected equipment
shall be returned to a completely functional nature. The Contractor will make
provisions for the fact that Owners will, at all times, occupy this dwelling the course
of construction and need basic services at day's end.
Permits
The permit application for the project is prepared and submitted by the Contractor.
The Building Permit will be issued upon receipt of payment from the Contractor. The
permit must be picked up before beginning any work on the property. Follow the
Building Department's procedures for scheduling inspections. The Contractor is
responsible for all necessary inspections of the property.
Clean-uP
The job site should be thoroughly cleaned during and upon completion of the
project. All construction debris of every sort should be removed along with other
debris that may have been on the property or collected during the work. Compact,
grade and rake any area disturbed by construction for proper drainage.
Construction debris is to be hauled to the landfill and disposed of in accordance with
all local ordinances. Under no condition is debris to be left in the ally for City pick-
up.
Timely Manner
Work should proceed in diligent manner after start-up.Progress inspections will be
made almost daily.While material or subcontractor delays are sometimes
unavoidable, extended periods without progress or repeated unnecessary delays in
completing a project may constitute grounds for rejecting future bids.The
contractor is expected .to complete the job within 45 days from the notice to
proceed.There is a one-year warranty on workmanship and materials.
Owner Selections
The homeowner is allowed to select the following items:
1.One interior paint color
2.Exterior wall and trim color
City of Apache Junction Housing Rehabilitation Program Guidelines,page 20 of 27
3.Counter top
4.One carpet color
5.One floor tile (grout to be sealed)
The contractor must supply the homeowner with a minimum of three (3) color
samples.
Payment
No payments shall be made to the contractors without written approval from the
Program Coordinator and the homeowner,with the exception of disputed
discrepancies which may be resolved and paid with the signature of the Program
Coordinator.The Program Coordinator will monitor all rehabilitation work during
construction.If progress payments are called for in the contract, the homeowner
and the Program Coordinator will make an inspection of the work outlined in the
work write-up scheduled for completion before a progress payment will be made.
A contractor may request a 50% draw when one-half of the contracted work is
completed and a 40% draw when 90% if the work is completed.The City will hold
10% retention for up to thirty (30) calendar days at the end of the contract to cover
closeout contingencies.The contractor must submit all lien waivers,
warranties/guarantees prior to the release of the 10% retention.
Warranties and Owners Manuals
The contractor shall warrant all work for a period of two (2) years or more, exclusive
of the manufacturer's warranty, from the date on the approval of the final inspection,
which will be signed by the homeowner and the Program Coordinator.Major
systems or items necessary to make the property meet code should be analyzed on
the basis of a three year life expectancy. Major systems include: roofs, heating,
cooling, plumbing, water heaters, and electrical components. When included in a
project, warranties for all items such a new appliances/hot water heaters shall be
given to the Program Coordinator by the contractor(s). All warranties will be
provided to the homeowner.
Final Inspection
After the contractor has passed all permit inspections from the Building Department,
please inform the Program Coordinator so that a final inspection can be scheduled.
Approval of the work by the City Building Inspector does not constitute acceptance
of the workmanship by the Housing Rehabilitation Program or the Homeowner.
Upon the homeowner's acceptance of the work completed, final payment will be
issued after final invoice and lien waiver are presented to the Housing Program
Coordinator. Final payment can be expected within 30 days of work completion and
successful final inspection.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 21 of 27
In the event of any dispute between the owner and the contractor concerning the
completion of rehabilitation, the HRPC will work with both parties to negotiate a
satisfactory solution.If a solution cannot be arrived at, a grievance can be filed as
outlined below.
HOUSING MAINTENANCE AND HOMEOWNERSHIP EDUCATION
In addition to warranty brochures, information will be provided to the homeowner to
include but not limited to:
•Energy Checklist (Salt River Project);
•Energy Savers (Southwest Gas on behalf of the US Department of Energy);
•Energy Savings Guide (Salt River Project);
•Home Care (City of Apache Junction);
•Safety Checklist (Home Safety Council);
The HRPC and Contractor shall conduct training in the home to instruct the
homeowners on the new equipment, appliances and general housing maintenance
counseling on items that had' been installed in the home. The City will counsel each
homeowner in budgeting necessary to complete house payments, maintenance and
upkeep.
The City's Housing Program also provides a Housing Programs and Services
Newsletter on a quarterly basis for all housing rehabilitation program recipients.
Homeownership Counseling is currently provided by the Arizona Department of
Housing and/or their designee.
ENERGY EFFICIENCY GUIDELINES
The HRPC will write the bid specifications to include energy efficiency measures as
required by the Arizona Department of Housing Owner Occupied Housinc
Rehabilitation Weatherization Standards.Detailed information pertaining to the
Energy Efficiency requirements can be found in the City's Housing Rehabilitation
Program Construction Guidelines.
The City's requirements incorporate the following standards:BPI/BA Standards,
IECC 2009,ASHRAE 62.2-2010,Energy Star,and Standardized Work
Specification.
LEAD BASED PAINT REQUIREMENTS/ PRE -1978 HOUSING
On September 15,1999,HUD published a Final Rule at 24 CFR Part 35 to
implement new regulations with regard to lead -based paint in compliance with the
Residential Lead -Based Paint Hazard Reduction Act of 1992.This Rule was
effective on September 15, 2000.ADOH received permission from HUD to defer
implementation of this Rule until January 10, 2002.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 22 of 27
As of January 10, 2002, any CDBG or HOME awards made by the ADOH after
January 10, 2002, and used to fund housing rehabilitation projects are required to
comply with these lead -based paint requirements.However,CDBG or HOME
awards made by the ADOH before January 10, 2002, and used to fund housing
rehabilitation projects, whether or not the actual projects have been started, will not
be subject to these requirements.In order to comply and implement these lead-
based paint requirements,the HRP shall use as guidance the ADOH Housing
Bulletin #1 issued by the Office of Housing Development ("OHD") on December,
2001.The HRP shall specifically adhere to the evaluation,disclosure,work
requirements, and clearance procedures contained in this Bulletin.Any interim
control or abatement procedures of lead -based paint hazards as prescribed by HUD
requirements shall be included in the scope of work.The HRP shall also attempt to
obtain lead -based paint general liability insurance for lead -based paint hazards and
encourage contractors to secure lead -based paint hazard liability insurance.
The HRPC will provide the homeowner with the EPA/HUD Pamphlet "Protect Your
Family from Lead in Your Home".The HRPC shall also provide the homeowner
with the Lead Based Paint Notification for the homeowner's review and signature.
The HRPC shall specifically review the notification form with the homeowner and
make every effort to ensure the homeowner is aware of the hazards and ways to
avoid lead based paint poisoning.The executed notification is retained in the
homeowner/client's file and a copy is provided to the client.If lead based paint
hazards are identified and treated by a certified lead based paint risk Assessment
Company,the HRPC shall meet with the recipient and discuss the findings
contained in a Risk Assessment Report.The recipient shall also sign off on the
report to reflect that the findings contained in the Risk Assessment Report were
explained and discuss with the recipient.The Risk Assessment Report shall then
become a part of the recipient's file.
All brochures regarding lead -based paint hazards are available in alternate format
for non-English Spanish speaking persons upon request.
CONFLICTS OF INTEREST
1)Any person who is an employee,agent,consultant,officer,or elected or
appointed official of the City may not obtain a personal or financial interest or
benefit from this activity, nor may they have an interest whatsoever, however
remote, in a contract, subcontract or proceeds either for themselves, their
family or business ties during their tenure, or for one year thereafter.
2)No contract will be awarded to a contractor who is related,or whose
employee is related to the applicant by blood or marriage.
Upon written request to the HRP in care of the Apache Junction Development
Services Department, the Development Services Director, or his/her designee, will
City of Apache Junction Housing Rehabilitation Program Guidelines,page 23 of 27
determine if a conflict exists.
COMPLAINT AND GRIEVANCE PROCEDURE
Applicants,Program participants,or contractors may initiate a complaint by
submitting concerns in writing to the City of Apache Junction Development Services
Director, or his/her designee, at 300 East Superstition Boulevard, Apache Junction,
Arizona 85119.
The Development Services Director,or his/her designee,is responsible for
receiving, reviewing, and responding to all complaints including prequalification of
applicant or contractor qualification. The City must issue a written response to any
complaint within ten (10) working days of receipt.
If unsatisfactory to the complainant, a written appeal of the City's response shall be
filed within ten (10) working days of receipt of the City's response. Appeals shall be
made to the City Manager,by sending such appeal to 300 East Superstition
Boulevard, Apache Junction, Arizona, 85119 Attn: City Manager.The City Manager
shall be the final administrative decision maker. Further judicial appeals shall be in
accordance with A.R.S. Title 12, 12-901.
Assistance from the City in preparing a grievance is available at no charge if
needed due to either a disability or language limitation. Assistance will be provided
through the Development Services Department at (480) 474-5090 TDD (480) 983-
0095; FAX (480) 474-5102 or 300 East Superstition Boulevard, Apache Junction,
Arizona 85119.
MARKETING
The Housing Rehabilitation Program will be marketed using the following media:
Brochures,Flyers, City of Apache Junction Website, the Housing Programs and
Services Newsletter, The Citizen (Parks & Recreation Publication), City of Apache
Junction's Cable Channel,and local newspapers including AJ News and the
Independent.
Direct marketing to neighborhoods may also be conducted by mailing a postcard to
residents within a targeted area notifying them of the City's programs.
Distribution of marketing materials will be through a local network of human/social
services agencies and at general posting locations throughout the City which
include but are not limited to the outlets below:
Human/Social Service Agencies
TRIAD
Pinal County Housing
Neighborhood Watch Groups
Pinal County Volunteer Center
City of Apache Junction Housing Rehabilitation Program Guidelines,page 24 of 27
CAAFA
ABIL
Salvation Army
Apache Junction Food Bank
Project Help
Apache Junction Senior Center
CAAG RSVP Program
CAHRA
Area HOA's
Boy's and Girl's Club
HOPE Women's Center
Apache Junction School District
Apache Junction Community Development Corporation
Apache Junction Chamber of Commerce
Central Arizona Council on Development Disabilities
City of Apache Junction Victim Assistance (Police Department)
City of Apache Junction Victim Advocate (City Attorney's Office)
Superstition Mountain Mental Health Center
Posting Locations
City Hall Library
Parks and Recreation Multigenerational Center
The City will make every effort to accommodate persons with disabilities and non-
English speaking persons.See the section entitled Assistance to Applicants for
additional information.
STAFFING AND ADMINISTRATIVE REVIEW
All administrative and supervisory work will be done
by City Staff.Procedures to protect applicants, HRP
participants, and contractors are outlined in the
sections entitled Complaint and Grievance Procedure
and Non -Discrimination.
The City of Apache Junction's HRPC will be
responsible for the following: application intake;
income verification; case management; contractor
procurement; change order approvals; and final
inspection.
ICrty Manager
F r '77 7 -7
11
Revenue Dev ;
-Manager
tRgtaiigei
C1J7=7
Program
Coordinator
The HRPC can be reached at 300 East Superstition,
Apache Junction, Arizona 85119.The HRPC can also be contacted at (480) 474-
5090 or TDD (480) 983-0095.
NON DISCRIMINATION
The City of Apache Junction, or any of its sub recipients, do not discriminate in any
activity on the basis of race, color, religion, sex, disability, familial status, or national
origin.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 25 of 27
The City of Apache Junction is an Equal Opportunity Employer, Minority Contractors
participation is encouraged DBE/MBE/VVBE. A copy of the City's Equal Employment
Opportunity Policy is available on-line at http://www.ajcity.net/index.aspx?nid 556.
ASSISTANCE TO APPLICANTS
Should an individual need assistance in preparation of an application, assistance
will be provided, at no charge, through the Development Services Department. The
Department can be reached at 300 East Superstition, Apache Junction, Arizona
85119.Assistance can also be requested at (480) 474-5090 or TDD (480) 983-
0095.Applicants may request assistance because of a:1)
physical/mental/emotional disability or 2) limited ability to speak/read English.
FAIR LABOR STANDARDS
The provisions of the FLSA are not applicable to the rehabilitation of single family
homes under this program.
APPLICABLE DOCUMENTS
The City's HRP uses guidance from the following sources of information pertaining
to the administration of the HRP:
1)Arizona Department of Housing Owner Occupied Housing Rehabilitation
Standards
2)United States Department of Housing and Urban Development Housing
Quality Standards.
3)United States Environmental Protection Agency Information regarding
Lead Based Paint.
4)Arizona Department of Housing, State Housing Fund Program Summary
and Application Guidelines.
5)Arizona Department of Housing Community Development Block Grant
Handbooks.
6)Arizona Department of Housing Owner Occupied Housing Rehabilitation
Weatherization Standards.
7)City of Apache Junction City Ordinances and adopted Building Codes.
8)City of Apache Junction Housing Rehabilitation Program Construction
Guidelines.
CHANGES TO HOUSING REHABILITATION PROGRAM GUIDELINES
The Housing Rehabilitation Program Guidelines are generally adopted with
revisions annually,however should an emergency change within the Housing
Rehabilitation Guidelines as adopted by the City Council be required throughout the
program year, the Mayor shall submit a letter in writing to the Arizona Department of
Housing ten (10) days prior to the change coming into effect.
City of Apache Junction Housing Rehabilitation Program Guidelines,page 26 of 27
FORMS
A complete packet of forms utilized by the City's Housing Rehabilitation Program
are available upon request. Below is the listing of those forms.
Form Form
Application which includes:Owner Acceptance of Work Write Up
Authorization for Release of Info.Contractor Participation Statement
Verification of Employment Contract between Contractor and Owner
Affidavit of Non -Income Owner's Color Preference Verification
Declaration of Citizenship Change Orders
Income Verification Determination Sheet Final Acceptance of Work Completed
Memorandum of Understanding:Final Invoice and Waiver of Lien
Certification of Principal Residence Truth In Lending Form
Federal Assistance Notice Memorandum of Understanding
Complaint and Grievance Procedure Right of Rescission
Disclaimer Promissory Note
Development Services Due Diligence Deed of Trust
Work Write Up including cost estimates Release of Lien
City of Apache Junction Housing Rehabilitation Program Guidelines,page 27 of 27